Loading...
HomeMy WebLinkAboutPW16-066 - Change Order - #4 - Scarsella Bros, Inc. - 72nd Ave S Extension - 06/17/2017 Rue-, cOxds Mall" 'mgemel' ] , / -,, ENT77 W.S C,T Om Document CONTRACT COVER SHEET This is to be completed by the Contract. Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office, Vendor Dame: Scarsella Brothers, Inc. Vendor Dumber: JD Edwards Number Contract Dumber: PWW 16-066 -006 This is assigned by City Clerk's. Office Project Name: 72nd AveS Extension Description: ❑ Interllocal Agreement ® Change Order Amendment F-1 Contract. ❑ Other: Contract Effective Date: 2/28/16 Termination Date: Contract Renewal Notice (Nays):. Number of days required notice for termination or renewal or amendment Contract Manager: Ken Langhol,z Department: PWW Engineering Contract Amount: ,2,692,'813.Cl1 Approval Authority: (CIRCLE ODE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order 4 As of: 08/27/14 • KENT W A S H I N Q T O% CHANGE ORDER NO. #4 NAME OF CONTRACTOR: Scarsella Brothers, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: 72"d Avenue South Extension ORIGINAL CONTRACT DATE: February 28, 2016 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Field modifications to new storm system due to unforeseen private improvement conflicts. The existing Western Processing site improvements within our roadway easement conflicted directly with storm improvement layout and planned grades. Extensive modifications were necessary to field fir a custom system in order to maintain existing improvements while providing necessary roadway drainage 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,692,813.01 (including applicable alternates and WSST) Net Change by Previous Change Orders $201,158.03 (incl. applicable WSST) Current Contract Amount $2,893,971.04 (incl. Previous Change Orders) Current Change Order $13,679.06 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $2,907,650.10 CHANGE ORDER - 1 OF 3 Original Time for Completion 220 working days (insert date) �Revised Time for Completion under 0 working days prior Change Orders (insert date) Days Required (±) for this Change 0 calendar days Order Revised Time for Completion 220 working (lays (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and W DOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order andl acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date., All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemied to have applied. The parties whose names appear below swear under penalty of perjury that they are aiuthorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in: section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By:_7 By: V z ignatun (sigifature) Print Name: 4! Print Name: Timothy J LaPorte, P.E. its Its Public Works Director (title) DATE: DATE: CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department CHANGE ORDER - 3 OF 3 • FILE NO: 200.2 KENT CHANGE ORDER WORKSHEET NO. 4 Construction Management Division — Public Works Project: 72"d Avenue South Extension Project No.: 08-3004C Project Engineer: Ken Langholz Fed-Aid No.: N/A Owners Rep: Jason Barry Contractor: Scarsella Bros., Inc. Date: 04/27/17 I. PROPOSED CHANGE Field modifications to new storms stem due to unforeseen private improvement conflicts. II. REASON AND BACKGROUND FOR CHANGE The existing Western Processing site improvements within our new roadway easement conflicted directly with storm improvement layout and planned grades. Extensive modifications were necessary to field fit a custom system in order to maintain existing improvements while providing necessary roadway drainage. Installation of the first 114 feet of 12" DI storm, CB #17 and an additional curb inlet structure were performed on Force Account in lieu of bid item payment due to substantial time and effort. Reference Force Account sheets 33 & 34 dated 3/1 and 3/2/17. III. METHOD OF PAYMENT NEW PAY ITEM(S) ❑ Not Applicable Change Order No. - j FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Qty this ! Unit Unit Price Total Estimated Cost of Est.Qty PE Item I i .____._._._._._._._....._......._ -.............._........_._.__-._._----------_._._._._._._._..._............._._._. ' --- .-......_._._._._..._._._._._.______._._.;______.__.__._._._._._._._.___------__r__---'_-_.__.__.____________-__ ._._.____ 4 Storm Conflicts with Western 1 1 FA ? $13,679.06 ' $13,679.06 Processing site improvements _-_-..._.____._____ ----------_ I ® ! Independent Estimate Attached I ❑ I CREATE PAY ITEM ONLY— Payment to be made ® ! PAY THIS PAY ESTIMATE -REQUIRED I at a later date upon completion of work 1. ❑ Material Submittals Required —CC: Construction Coordinator New Sub Regrd? No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description _`Qty ! Unit _ Unit Price _ j Cost of Item ❑ Independent Estimate Attached -REQUIRED ❑ 1 REV. DATE:4/01/10 " FILE NO: 200.2 K CE.N T INCREASE/DECREASE TO EXISTING PAY ITEM( ) Not Applicable Change Order No. - j FOR ACCOUNTING USE ONLY Sch. No B I No. Item Description Qty 1 Unit Unit Price Cast of Item s .._ . 1 independent Estimate Attached - REQUIRED j _ TOTAL ESTIMATED OUST OF CHANGE ORDER: * :$13,679.06 _ *Total of�the YCost of Item Columns THIS PAY ESTIMATE $I<3fa?! U6 IV. WORKING DAYS C)riginal Contract ' 22C1 Clue This Change .rde.r* qi Previous Total 1220 DATE: 4..27 2c17 DATA,.....0,3128116 .. * Ex lanation justification Re aired: TOTAL WORKING DAYS* 220 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Date: !I—Kuehne Barry ConstructionS'upervispr: _" �» � ,w..- date: Construction Manager: _ .. Gate: Eric Connor 2 REV. DATE: /01/10 FA Sheet No.: 33 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: 72nd Avenue Extension Project No: 08-3004 Item No.: Schedule IV- Storm Date: 3/112017 Description of Work: Investigate acceptab'de modifications to new 12" DI Storm at.CB 17 to CB 16. Adjust grades and repair unlocated 10°Western Process Storm line. Work by Subcontractor?: q Prime Contractor: Scarsella Bros.„ Inc. Sub-Contractor.- LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT Jay Drier Labor Foreman 5.5 $68.70 $92.32 $ 377.85 Robert Elzig Operator 5.5 $68.70 $92.32 $ 377.85 Felipe Abraham Operator 5.5 $65.28 $87.19 $ 359,04 Seth Lucas Operator 5.5 55.28 $87.19 $ 359.04 Ty Williams Pipelayer 5.5 $53.32 $73.131 $ 293.26 SUBTOTAL-LABOR: $ 1,767.04 LABOR OVERHEAD&PROFIT @a 29% $ 512A4 LABOR TOTAL $ 2,279.48 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equi`pment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 2-237 Foreman Truck 5.5 $20.55 $ 113.03 3-97 On-hwy flat bed truck 5.5 $25.50 $ 140.25 3-98 On-hwy flat bed truck 5.5 $24.81 $ 136,46 17-151 Komatsu PC160LC-7 1 5.5 $73.731 $ 405.52 15.92 CAT 938G Loader 5.5 $58.81 $ 323.46 Misc Small Tools 1 5,51 $5.001 $ 27.50 SUBTOTAL W EQUIPMENT $ 1,146.20 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 240.70 EQUIPMENT TOTAL $ 1,386.90 I411ATERIAL /SERVICES/RENTAL MATERIALS 1 SERVICES Quantity Units Unit Price DOLLAR AMOUNT 12"Fernco Couplings 2 EA $ 54.00 $ 108.00 12"PVC Storm Pie 5 LF $ 28,00 ' $ 140.00 Type I Catch Basin#17 1 EA $ 117.30 $ 117.30 Curb inlet Catch Basin#16 1 EA $ 117.30 $ 117.30 $ SUBTOTAL $ 482.60 OVERHEAD&PROFIT @ 21% $ 101.35 TOTAL $ 683.95 Verification of Fours Worked: TOTAL; $ 4,250.33 12%MARKUP (far prime when subcontract work) $ - Contractors Representative Date SHEET TOTAL: $ 4,250.33 Owner's Representative Date Pay Estimate Entered: " Date: By: JBarry FA Sheet No.: 34 DAILY REPORT OF FORCE ACCOUNT WORDED Project Name: 72nd Avenue Extension Project No: 08-3004 Item No.: Schedule IV- Storm Date: 3/212017 Description of Work: Lay pipe at CB 17 crossing; cut'Western Process litter fabric, lay pipe and cover with new fabric, set modified curb inlet at WP 6" pipe outfall Work by Subcontractor?: No Prime Contractor: Scarsella Bros., Inc. Sub-Contractor: a. LABO STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs THouriy Rate Hrs OT Rate AMOUNT Jay Krier Labor Foreman 7 $68.70 S92.32 $ 480.90 Robert Elzig Operator 7 $68.70 $92.32 $ 480,90 Feli e Abraham Operator 7 $65.28 $87.19 $ 456.96 Seth Lucas Operator 7 $65,281 S87,191 $ 456.96 Ty Williams Pipelayer 7 $53.321 $73.131 $ 373.24 SUBTOTAL-LABOR: $ 2,248,96 LABOR OVERHEAD&PROFIT @ 29% $ 652.20 LABOR TOTAL. $ 2,901.16 EQU1P tNT EQUflPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 2-237 Foreman Truck 7 $20.55 $ 143.85 3-97 On-hwy flat bed truck 7 $25.50 $ 178.50 3-98 On-hwy flat bed truck 7' $24.81 $ 173,67 17-151 Komatsu PC160LC-7 7' $73.731 1 $ 516.11 17-157 Komatsu PC35MR-2 3' $18.83 $ 56A9 15-92 OAT 938E Loader 7 $58.81 $ 411.67 Misc Small Tools 7 $5.00 S 35.00 SUBTOTAL-EQUIPMENT $ 1,515.29 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 318.21 EQUIPMENT TOTAL $ 1,833.50 MATERIALS/SERVICES/RENTALS MATERIALS!SERVICES Quantity Units Unit Price DOLLAR AMOUNT Mirafi Fabric 5ft x 100ff 500 SF $ 0.50 $ 250.00 12"Cl 50 DI Storm pie 114 LF $ 28.65 S 3"266.10 6"Fernco Coupflng 2 EA $ 25,00 S 50.00 Curb Inlet Catch Basin 1 EA $ 117.30 $ 117.30 Grout bags 8 EA $ 8.00 $ 64.00 4"Type I adjustment risers 3 EA $ 44.00 S 132,00 SUBTOTAL $ 3,879.40 OVERHEAD&PROFIT @ 21% $ 814.67 TOTAL $ 4,694.07 Verification of Hours Worked: TOTAL: $ 9,428,73 12%MARKUP (for prime when subcontract work) $ - Contractors Representative Date SHEET TOTAL: $ 9,428.73 Owners Representative Date Pay Estimate Entered:_ Date. a By: ,IB rry Barry, Jason From: Mike Wilson <mike.w@SCARSELLABROS.com> Sent: Tuesday, April 25, 2017 4:26 PM To: Barry,Jason Subject: RE: 72nd Extension PE #8 Attachments: 3790_001.pdf I don't see anything handy for grout bags so either use $8 or we'll throw them in for free. Not worth looking far and wide. The rest of the items should be on these quotes. Thanks, Mike From: Barry,Jason [mailto:JBarry@kentwa.gov] Sent:Thursday, April 20, 2017 2:46 PM To: Mike Wilson <mike.w@SCARSELIA BROS.com> Subject: 72nd Extension PE#8 Mike, Attached is what I have for PE#8 work through 3/31/17.They want me to create a separate CO for the WP monitoring wells so I'm still putting that together, but these are the totals I have for bid items. If you can get those material unit prices together for the pipe crews work on the south end of the project I can include those here as well. If you could review what I have here and let me know if I'm missing anything I'd appreciate it. Thanks, Jason Barry, Capita!Construction Projects Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 e Phone 253-856-5546 I Cell 253-797-8462 KENT jbarry@KentWA.gov www.KentWA.aov ® e PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 1 FERNCO Elastorneric Polyvinyl Chloride Flexible Coupling, For Pipe Si... Page 1 of 2 FE-2 Plumbing l Pipe,Tubing and Fillings d Pipe Fittings I Flexible Fittings tX- EMAIL C, PRINT k Flpzloflienc Polyvinyl Chlande Flexible Coupling,For Pipe Size 6"x 5",5-39164"Inside Dia View Prod=Farnily I`F.R N,C,0 Elasto:meric Polyvinyl Chloride Flexible Coupling, For Pipe Size 6" x 611, 6-39/64" Inside Dia, ltem#3HCZ8 Mfl Model#1056-66 Catalog,Page#2876 UNSPSC#40142315 Usl Price 0 Auto-Reariier Every[TM- Confirm ZIP Code to determine $24.93 1 each Deliver one lime only avaitabity. Get This Price 98030 $20.58 1 1 ADD TO CART +Add to ll Be the first to write a review Shipping Weight 2.3 lbs. Country of Origin USA I Country of Origin is subject to change. Note:Product availability is real-time updated and adjusted continuously.The product will be reserved for you when you complete low can we improve our Product Images? your order.More M Compare PRODUCT DETAILS Create an effective,leakproof connection with this FERNCO flexible coupling.Model is designed for use in drain,waste,vent(DVVV)and sewer applications.Coupling allows easy,quick installation and it can flex to fit for easy hookup;resists corrosion,rot,and degradation from sunlight and View More'/ TECHNICAL SPECS tern Flexible Coupling inside Din, 6-39)64" Pipe Fitting;Material Elastornerift;Polyvinyl Chloride Max Pressure 4.3 psi Pipe Size-Pipe Fitting 13-x 6- Barid Material 300 Stall Steel Standards ASTMS C1173 Resistant'ro Chemicals,Ultraviolet Rays,Fungus Growth and Normal Sewer Gases Filling Length 61- Max.Temp, 140 Degrees F https://www.grainger.com/product/3HCZ8&AL.!2966!3! 166 588805 27... 4/28/2017 FERNCO Elastorneric Polyvinyl Chloride Flexible Coupling, For Pipe Si... Pagie 1 of 3 [E-3 Plumbing I Pipe,Tubing and I'Mings tl Pipe Fittings B Flexible Fittings EMAIL 6 PRINT 1 Eiastarnenr Polyvinyl 0110fide Rcxible Coupling,For Pipe Size 12"x 12",12,33164"inskde Chitin, View Product Family FERNCO Elastomeric Polyvinyl Chloride Flexible Coupling, For Pipe Size 12 it x 12111 12- 33/64" Inside Dia. Items 3HDA6 kltr Model#1056.1212 Catalog Page,#2875 LYNSPSC#40142315 Usl Price 0 Awu-ReorderE,e,,y[T—M—jn­tn � 0 Confirm ZIP Code to determine $54.05/each 00 Dewer one time polyavailability, Get This Price W 99 1 ADD TO CART Add to List Se the first to wrilie a review Shipping Welght 6.65 lbs. rot Country al'OnginUSA I Country or Origin is subject to change Flow can we improve our product Images? Note Product availability is res-fi(re updated and adjusted continuously rhe prooldrt mfl be reserved for you when you carnpiele Your order More Compare PRODUCT DETAILS Create an effective,leakproof connection with this FERNCO flexible coupling.Model is designed for use in drain,waste,vent(DVVV)and sewer applications. Coupling allows easy,quick installation and it can flex to fit for easy hookup„resists corrosion,rot,and degradation from sunlight and View More-" TECHNICAL SPECS item Flexible Coupling inside Dia, 12-33d64" Pipe Fitling l0attral Elastomeric Polyvinyl Chloride Max.Pressure 4,3 psu Pipe Size-Pipe r-ilwig 12"x:12"' nand Material 300 Stainless Stool Slandaids ASTIVI C1 173 Resistant T'o Chemicals,Ultraviolet Rays,Fungus Growth and Normal Sewer Gases Fitting Length 6-3/8" Max Ternp 140 Degrees F https://www.grainger.com/product/3HDA6&AL!2966!3! 1665888052... 4/28/2017 Granito Pr c adng&Concrete 1 I C r . � LdkkWl° r 4116 E3akorvlaw Spur G 11Inghtarn,W 'A 98226 Phon ,:(380)671-2251 Fax:(360)671-0780 Qua.#., 9555 Tar°traa: NET 30 Ord or Dense: 1126/2016 i V Bill to: QUOTE i Daltwory to: 72NO AVES.EXTENSICDN,KENT,WA, ESTIMATOR Contact: ESTIMATOR Pra)amct Manager: Phone; Fax: Phone, Fax: Customor ID: QUOTE t PO: ShlpWla: GPC $alaas Rep., DMD City It rn Doacrlptlon Weight Unh, F1,H Unit Price TX Eutenston structure: C 1 CI.10 Storm(BID ITEM .4106)CS 21 Inlat Statl= 1 CBR-04 4"CB RISER 180 1 CBR-04 4"CB RISER 180 1 CB-21 CB211 TYPE 4 INLET 1.191 I gb.as Structure: SDCB-01 Storm(BID 1ITE?A 04006)40"CTanaral Storm P Unit Station: 1 048TSP 48"FLATTOPI SQUARE HOLE 1,540 1 048Y03RKQ 48"X 3'RISER K.O. 1,914 1 048X0 8HKC 48"°X 5'BASE,HIGH K.O. 5,12,8 1' L04P 4 STEM POLY MH LADDER 17 2 048RC 48"°GASKET 0 $863.40 Structure: [] S DCB-02 Storm(BID IITE i 44086)43"Gonarral Storrn P Unit Station: I 048TSP 48"'FLATTOPI SQUARE,HOLE 1,640 1 048DCOt1Swc 48"X 6'BASE VW"4 HOLE 6,U2 1 048RG 48"GASKET 0 1 L05P 5 STEP POLY h4H LADDER 20 $667,25 Structure: ( � SDCq-00 storm BID ITEM 04030)Type I Catch B lm Staatlow ij zo .3 1 CBR-04 4"CB RISER 160 'L(' ")1,2- -f-" o stirs 1 CSR-04 4"CS RISER 180 C t Y r °°° w,"'s r:rg l 1 CB-1 TYPE I CATCH BASIN 2,000 � rr � 'g c� = ,00 $205;'4C i Structure; (.) SDCB-04 Storm BID ITEM -4030)Typ a I Catch Basin,% Station: � 1 CBR-06 6"CS RISER 280 1 CB-1 TYPE I CATCH',BA&N 2,000 1 Fr210 SUVc1ure, ( l ,*SDCO-05 Storm BID ITEM 4080)Type I Catcla Basins Station: 1 C;BR-G4 4"CS RISER 180 I CI:I-1 TYPE I CATCH BAa N 2,000 5tnacturraa: Q._.] 3DCS.4`1 Stonn BID I"fEM#4080,)"Typos I Catch IISasIna station: I CB-1 TYPE I G A1CH BASIN 2,000 T .m D Y..IenY,tary 2da, �U'I¢:a Ok:STa Plui Page 1 of ���� nr��na ��Pu� , nra�e ��� �A Granite Preaastin0 Concrete � ^� r r 4116 Baker�rtraw Spur IVWmAA Mry vv"4vhWY;t1. rw r Bellingham,WA 98226 Phone: (360)671-2251 Pax:(060)671.0780 V Quota Xs 9555 Terrraa: NET 30 i7 Order Date: 112612015 s E City Item Dmaacriptlon U4 olght Unit FIH Unit Prlca Tr Extension $I 17.30 Struatu e: 0 SDCB-00 Storm 8I0 ITEM#,4080)Typo I Catch Baaina Station: 1 CBR-04 4"CB RISER 160 1 CB-1 TYPE I CATCH BASIN 2.000 $161.30 Structure: [-] 'SDCB-10 Storm BID ITEM 4080)Typo I Catch SaWne Station: 1 CBR•02 2"CB RISER 100 i CB-1 TYPE I CATCH BASIN 2,000 150.30 Structures; 0 SDCB-11 Storm BITS ITEM N4000)Typo I Catch Basins Stations: 1 CBR-02 2"CB RISER i00 1 CB-1 TYPE I CATCH BASIN 2,000 V 50.30 Structure: ❑ SDCB-i2 Stoner BID ITEM#4060)Typo I Catch Basins Station: 1 CBR-02 2°CS RISER 100 1 CB-1 TYPE I CATCH BASIN 2.000 $150.30 Structured: [] SDCB-13 __.. _ .$torn).010 ITEM a1080)Type I Catch.Baalnaa Statlon: i CB-1 ( TYPE I CATCH BASIN 2,000 $117,30 Structure: [] SDCB-15 Storm BID'ITEM 0400)Typo I Catch Baeina 'Station; 1 CBR-01 4"CB RISER 180 1 CB-1 TYPE I CATCH BASIN 2,C00 $161.30 Structure: E] 8DC8-i7 Storrs BID ITEM#4080)Type I Catch Basins Statlon: i CBR-O 4 CB RISER 180 1 CB-1 'TYPE I CATCH BASIN 2.000 $161,30 Tuesday,January 26,2016 01:56 PM Page 2 of 4 LOCATION:SEATTLEWW %$ FERGUSON WAREHOUSE:3156 2042 SOUTH 112TH ST 'Wa, tenvorks, TACOMA,WA 9&444-0000 Phone:253-538-8275 aMLSELEYcornpAny Fax:253-531-9909 Project: 72nd Ave S Extention Bid Date: 02/02/2016 Bid Time: 1 1:OOAM Estimator: Ted Grimes Job Notes: City of Kent 72nd Ave S Extention - South 196th St to South 200th St Addenda: We acknowledge reciept of addendum(s) no. I & 2 Revised Pricing Ferguson -Your' i Direct Source for Erosion Control Needs Visqueen Catch Bask"i inserts A -ties lat nigh " is Fence SM Fence Woven I Non Woven Fabrics Contact your local sales associate for more information 1129/2016 Page 1 of 5 FERGUS 72nd Ave S EXtention WASHINGTON WATERWORKS QUOTE Watt�nwrkk M JOB QUOTE c0LSWYc�tcn, WOODINVILLE,WA 98072 Schedule 1 - Street Bid Item 1211 Western Processing Vault U-1 Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SP-1-1575-23 575 Vault EA 1.00 $2,953.608 $2,953.61 SP-HTYPE248"CB Catch Basin Type 2 48" EA 1.00 $1,463.918 $1,463.92 Bid Item 1211 Western Processing Vault U-1 Average Price: $4,417.53 I LS Subtotal: $4,417.53 Bid Item 1212 Western Processing Vault U-2 Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SP-1-1575-3 575 Vault EA 1.00 $1,365.979 $1,365.98 Bid Item 1212 Western Processing Vault U-2 Average Price: $1,365.98/LS Subtotal: $1,365.98 Bid Item 1213 Western Processing Piezometers RP 28 & P 26 Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SP-1-113030 3030 Vault EA 1.00 $850.615 $850.51 Bottomless Vault B,j scem 1213 Western Processing Piezometers RP 28&P 26 Average Price: $850.61 1 LS Subtotal: $860.51 Bid Item 1214 Western Processing Well Pair 5M4A/B Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SP-JUNCBOX1 Junction Box Type 1 EA 1.00 $293.814 $293.81 SP-JUNCBOX2 Junction Box Type 2 w/Slip Resistant Lid EA 1.00 $412.371 $412.37 Bid Item 1214 Western Processing Well Pair 5M4A/B Average Price: $706.18/LS Subtotal: $706.18 Bid Item 1217 Relocate Western Processing Water Service Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price AFT52PP 4 CL52 Cement Lined Ductile Iron FASTITE Pipe FT 250.00 $20.547 $5,136.75 3" not available priced using 4" for estimating purposes. MJ2LAU 6 Mechanical Joint C153 22-1/2 Bend Less EA 2.00 $46.800 $93.60 Accessories MJ1 LAU 6 Mechanical Joint C153 11-1/4 Bend Less EA 1.00 $48.360 $48.36 Accessories IMJAPP 4 Mechanical Joint C153 Accessory Pack With EA 6.00 $13.329 $79.97 Gland RC5010481035000 4 X 3 Ductile Iron Reducer Coupling 4.81X3.50 EA 2.00 $101.211 $202.42 1129/2016 Page 2 of 5 " FERGUSON'5 72nd Ave S Extention WASHINGTON WATERWORKS QUOTE 0 Watertlrrb- JOB QUOTE aWMSELEYcwc°"7 WOODINVILLE, NA 98072 �id Item 1217 Relocate Western Processing Water Service Average Price: $5,561.10/LS Subtotal: $5,561.10 Bid Item 1250 New Monument Case and Cover Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SP-HMONCVR Monument Case and Cover EA 5.00 $82.474 $412.37 Bid Item 1250 New Monument Case and Cover Average Price: $82.471 EA Subtotal: $412.37 Schedule 1 - Street $13,313.67 Schedule 4- Bid Item 4015%%rA%Wr Pipe 12" CL 50 DI Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price AFT50P12 12 CL50 Cement Lined Ductile Iron Fastite Pipe FT 1,220.00 $28.653 $34,956.66 F- Bid Item 4015 Storm Sewer Pipe 12"CL 50 DI Average Price: $28.65/LS Subtotal: $34,956.66 Bid Item 4080 Catch Basin, Type 1 Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price '3-HTYPE1CB Catch Basin Type 1 EA 11.00 $268.041 $2,948.45 Bid Item 4080 Catch Basin,Type 1 Average Price: $268.04/EA Subtotal: $2,948.45 Bid Item 4085 Catch Basin,Type 2 48" Alt Description/ UM City Final Bid Extended Bid Comments Price Price SP-HTYPE248"CB Catch Basin Type 2 48" EA 2.00 $1,108.247 $2,216.49 Bid Item 4085 Catch Basin,Type 2 48"Average Price: $1,108.251 EA Subtotal: =,216-49 Bid Item 4105 Concrete Inlet Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SP-HCONCINL Concrete Inlet EA 2.00 $185.567 $371.13 Bid Item 4105 Concrete Inlet Average Price: $185.561 EA Subtotal: $371.13 Bid Item 4120 Vaned Catch Basin Frame and Grate Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SP-HVANEDGR Locking Vaned Frame and Grate EA 13.00 $257.732 $3,350.52 Bid item 4120 Vaned Catch Basin Frame and Grate Average Price: $257.731 EA Subtotal: E,3=50.52 v ■moo Bid Item 4125 Thru Curb Inlet Frame and Vaned Grate Alt Description/ UM Qtv Final Bid Extended Bid 1/29/2016 Page 3 of 5 r$$ FERGUSON' 72nd Ave S Extention WASHINGTON WATERWORKS QUOTE Y vafP ikirks JOB QUOTE aWDLSELEYcwrm-t WOODINVILLE, NA 98072 Comments Price Price SP-HTHRUCURB Thru Curb Frame and Grate EA 2.00 $257.732 $515.46 Bid Item 4125 Thru Curb Inlet Frame and Vaned Grate Average Price: $257.731 EA Subtotal: $515.46 Schedule 4- Storm $44,358.71 Schedule 7 -TESC Bid Item 7005 Filter Fabric Fence Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price MWSP60 6OX100 SILT FENCE With 36 WIRE BLAC EA 10.00 $73.212 $732.12 VL25 5 FT Post EA 170.00 $2.890 $491.30 Bid Item 7005 Filter Fabric Fence Average Price: $1.22/FT Subtotal: $1,223.42 Bid Item 7010 Wattle Alt Description/ UM City Final Bid Extended Bid Comments Price Price SLSW925P12 9 IN X 25 Feet RL Straw Wattle EA 56.00 $20.024 $1,121.34 SLSTAKE18 18 WOOD STAKE F/STRAW WATTLE EA 336.00 $0.235 $78.96 Bid Item 7010 Wattle Average Price: $0.86/FT Subtotal: $1,200.30 Bid Item 7015 Inlet Protection Alt Description/ UM city Final Bid Extended Bid Comments Price Price E1341 ADJ RECT C/BASIN INS SED Only EA 3.00 $25.478 $76.43 Bid Item 7015 Inlet Protection Average Price: $25.48/EA Subtotal: $76.43 Lump Sum Cut Alt Description/ UM city Final Bid Extended Bid Comments Price Price Lump Sum Cut Lump Sum Cut LS 1.00 -$2,000.000 -$2,000.00 Lump Sum Cut Average Price: -INF/ Subtotal: ($2,000.00) Schedule 7 -TESC $500.15 1/29/2016 Page 4 of 5 %%FERGUSON' 72nd Ave S Extention WASHINGTON WATERWORKS QUOTE Watnncwks JOB QUOTE eWUL51FYccffcar' WOODINVILLE, NA 98072 Grand Total: $58,172.53 Job Terms: General Notes & Exclusions The above represents the interpretation of the plans and specs provided at bid time. Not all information was provided on the plans to create a complete quote, some assumptions were made. Contractor to verify quantity of material needed prior to order. Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce, This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either following this document, or on the web at http://wolseleyna.com/terms_conditionsSale.htmi. Govt Buyers: All items quoted are open market unless noted otherwise. Ferguson Field Division - Hot Taps - EZ Valve Installation - Line Stops - ChlorinationlDeclori nation - Large Meter Testing - Hydrant Testing and Repair - Fusion Welding - Mechanical Taps Contact Barney Gibbs for more information:(206)310-5061 Barney.Gibbs@ferguson.com WA Contractor#FERGUE1976RW Ready to Setup the Job? Click HERE to Start! 1/29/2016 Page 5 of 5 Pf?cfk-Qc, t 1 Y Z F x l. /S - �� `j 7/, 10 1 Iv-,+ 3 zS. va i, 3 Z S 17 �� , 679 , 06 { _ Sam lNsTALI- ),�fO F-,,, 72 EK1 z J� F - —�GFpFa[3� �GEOPa� ^� LI/JF_A- L rr Sur�P4 cv�ni L CuRb {uoEr uE� 1Z� /�( o R c.Ctf.6/ Lao4Uh.._. NEB C U-I_ L I kj(L 2 L 0LWj jj i k I �"I oA, F' r;po�� B�erc c8 !6 ` �,�► - L-y_ Rr�D Q,D, p be.aP ,r�' � c� pr _ �L I � � �' �►o��r C-8�;-7 � sEc pf-rrrj- r `� $�/zr L i�Fc.F_GYicNJ N 1 j 7L'> R JO c 0 �KC sr�u 6 'JNFb2£SPk 1�� XX OJT'c r T!G_S W I Dub Bac_-iC \\ Snl7C� c L i