Loading...
HomeMy WebLinkAboutPW17-168 - Original - Davey Tree Surgery Co - Contract - 04/17/17 N", AMA-MM, 0", �}/yam{■ OF / age m E-:%: c r s M a"n, KENO" Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Davey Tree Surgery Co. Vendor Number: JD Edwards Number Contract Number: ' l _ 1 This is assigned by City Clerk's Office Project Name: Maple Removal 22204 105`" Ave Description: © Interlocal Agreement ❑ Change Order E@ Amendment N Contract ❑ Other; Contract Effective Date: 4/17/17 Termination Date: 5/17/17 Contract Renewal Notice (Days), Number of days required notice for termination or renewal or amendment Contract Manager: Ryan Carroll Department, Public Works Contract Amount: $3,327.00 --- Approval Authority: (CIRiCi-E CAN ) Department Dir Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Contractor will remove maple tree at 22204 105th Ave. As of: 08/27/14 f � KENT PUBLIC WORKS AGREEMENT between City of Kent and Davey Tree Surgery Co. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Davey Tree Surgery Co. organized under the laws of the State of California, located and doing business at 14515 NE 87t" St., Redmond, WA 98052, Phone (425) 462-8829, Contact: Jeff McCormick (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall remove a maple tree at 22204 105`h Ave. For a description, see Contractor's proposal which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 30 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Three Thousand, Three Hundred Twenty Seven Dollars ($3,327.00) , including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is $35,000 or less, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final fifty percent (50%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. PUBLIC WORKS AGREEMENT- 1 ($20K or Less and No Performance Bond) � T B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. PUBLIC WORKS AGREEMENT- 2 ($20K or Less and No Performance Bond) B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. PUBLIC WORKS AGREEMENT- 3 ($20K or Less and No Performance Bond) At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and S. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. PUBLIC WORKS AGREEMENT- 4 ($20K or Less and No Performance Bond) XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's duty to defend, indemnify, and hold the City harmless, and Contractor's liability accruing from that obligation shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this PUBLIC WORKS AGREEMENT- 5 ($20K or Less and No Performance Bond) Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law, This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; grovided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified In writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Contractor acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Contractor in its performance of this Agreement may be subject to public review and disclosure, even if those records are not produced to or possessed by the City of Kent. As such, the Contractor agrees to cooperate fully with the City in satisfying the City's duties and obligations under the Public Records Act. J. City Business License Reauired. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. K. Counternarts and Signatures by Fax or Email. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute PUBLIC WORKS AGREEMENT- 6 ($20K or Less and No Performance Bond) this one Agreement, Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearing the original signature was received in person. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and' affirmed, and the terms of the Agreement shall be deemed to have applied. CONTRAC O CITY OF DENT: By: By: 11L (511171,1tIM) —(signature) Print Name:- Richard L. Edson Print Name: David A. Brock, P.E. Its, Secretary/ Business Manager Its: Deputy Director Operations Manager (title) DATE:, April 7, 2017 DATE: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Jeff McCormick Timothy 3. LaPorte, P.E. Davey Tree Surgery Co. City of Kent 14515 NE 87 1h St, 220 Fourth Avenue South Redmond, WA 98052 Kent, WA 98032 (425) 462-8829 (telephone) (253) 85�6-5600 (telephone) (425) 462-8874 (facsimile) (253) 856-6500 (facsimile) PUBLIC WORKS AGREEMENT- 7 ($20K or Less and No Performance Bond) DECLARATION CITY OF (CENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contraictors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination, regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1 I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability, 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer, 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the, Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing 61,@ w, I agree to ful i I t e five requirements referenced above. By: Richard L. Edson signing 7X For: Davey Tree Surgery Company Title: Secretary/ Business Manager Date: April 7, 2017 EEO COMPLIANCE DOCUMENTS - I CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 a PUBLIC WORKS OPERATIONS EXHIBIT Dave Brock, P.E, Operations Manager 220 4th,Avenue South ., Kent, WA 98032 WASHINGTONFax: 253-856-6600 PHONE: 253-856-5600 City of lent Vegetation Management Tree Removal Scope of Work Site locations and description of work: 22204 105 th have Se. Removal of mapie tree located in city right of way, Chip and haul brush, leave firewood on site. * * Contractor must pay prevailing wage. Contractor is responsible for appropriate traffic control when needed. Proof of insurance and bonding will be required. ' *** E- c h site r_ntMlsi:_.I:e bit1 ra t e I � If you have any questions about the job please contact Ryan Carroll at 253-275-7715. Or Scott Schroeder at 253-856- 67,5. Please send each of the bids to Ryan Carroll at i t of i City of Kent Public Works Department Timothy J. LaPorte, P.E., Public wort<, Dtreaor, DAVE " TREE SURGERY COMPANY ��` POST WK2 BOX M 5, r ,CALI December 5,20 16 Ryan Carroll City of Kent PVtFD 5821 S. 24011 St, Dent, WA 98032 e: Proposal for'free Removals Dear Mr. Cull, Thank you for inviting Davey Tree Surgery Co. to submit a proposal for your current tree tl removal requirements in the City of Kent. Below are the work specifications and bids for each site. SITE I- 1424 E. Chicago St. Remove 2 cedars, Chip and haul all debris except firewood. That will be left approximately 3 feet long on site. Our bid for this project is$2, 4 .00. T 2- 22204 10511 Ave. Remove 1 maple. Chip and haul all debris except firewood. That will be left approximately 3 feet long on site. Our bid for this project is$3,327.00. We are prepared to conunence work following acceptance of our proposal and completion of all required documentation. Again, thank you for the opportunity to be of service to the City of Kent. please feel free to contact me if you have any questions. My cell phone number is 425-229-1146,or I may be reached via e-mail at:jeff.mccormick@davey.com Sincerely, Jeff McCormick Account Manager Davey`free Surgery Co. EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Workers' Compensation ,coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,006 each occurrence, $1,000,000 general aggregate and a $1,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability Insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3, The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 3/20/2017 Count Trade Job Classification Wage Holiday Overtime Note King Asbestos Abatement Workers Journey Level $45.25 5D 1H King Boitermakers Journey Level $64.54 5N 1C King Brick Mason Journey Level $54.32 5A 1M King Brick Mason Pointer-Caulker-Cleaner $54.321 5A 1M King Building Service Employees Janitor $22.841 5S 2F King Building Service Employees Traveling Waxer/Shampooer $23.29 5S 2F King Building Service Employees Window Cleaner (Non- $24.54 5S 2F Scaffold) King Building Service Emplovees Window Cleaner (Scaffold) $27.33 5S 2F King Cabinet Makers {In Shoo) Journey Level $22.74 1 King Carpenters Acoustical Worker $55.51 5D 4C King Carpenters Bridge, Dock And Wharf $55.51 5D 4C Carpenters King Carpenters Carpenter $55.511 5D 4C King Carpenters Carpenters on Stationary Tools $55.641 5D 4C King Carpenters Creosoted Material $55.611 5D 4C King Carpenters Floor Finisher $55.51 5D 4C King Carpenters Floor Layer $55.51 5D 4C King Carpenters Scaffold Erector $55.51 5D 4C King Cement Masons Journey Level $55.56 7A 1M King Divers Et Tenders Diver $108.77 5D 4C 8A King Divers Et Tenders Diver On Standby $66.05 5D 4C King Divers Et Tenders Diver Tender $59.88 5D 4C King Divers Et Tenders Surface Rcv £t Rov Operator $59.88 5D 4C King Divers Et Tenders Surface Rcv ft Rov Operator $55.76 5A 4C Tender King Dredge Workers Assistant Engineer $56.44 5D 3F King Dredge Workers Assistant Mate (Deckhand) $56.00 5D 3F King Dredge Workers Boatmen $56.44 5D 3F King Dredge Workers Engineer Welder $57.51 5D 3F https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/20/2017 LTOZ/OZ/£ xdse•dn>jooj96eMn.ld/dn>loolabenn/iuI/no6-em-ssa.l4.loj//:sdllq HL 9S 8L'95S joo:) uawaeog puelul ButN HL 9S 98'69$ joleaado leo9 uawaeog puelul SULN _ Jaueal:) L 00'L LS lanai Aawnor wnnOeA JGmOd letJ]snpul butN I£ dL 99'9V$ lanai Aawnor sJapual uOSPW � SJauJe3 poH ButN 3L 17 91''SL$ lanai Aawnor sO,uetaOaW ;uawOir, 3 bull2aH bunt SJG�JoM SOasagsd Hip f5 89'99S uewAauino£ pu\f SJC.elnsul 1SOJ3 r �eaH butN AL lL L£'6SS lanaq Aauinor sJaizelo bunt IE dL 9£'8£$ lanal Aawnor SJa e13 bunt T 8L'SL$ jo:paJ3 aoua3 UOIDGJ3 aOua3 SULN Aluo)poM SIDnpwd 21L Ts OULLS �oloe3-ul - suoi3eat�tsse1311V GIGJO.JO0 aseOaJd pa;eDlJge3 butN OL S£'Z6$ abjeq:) ul :)tuegDaW sJo�OnJasuo3 JoIena13 bu1N bF, aL St'S8$ otuegoaW sJC;OnJasuCl :c;enal3 ButN L 00'L£$ la^al Aawnor sue!Otuu,Oay OiuOJjOal3 bull u0t;OnJISuo' at, dS 9L'OS uosiadJapnnod auilJamO6 Sue101JjOa13 ButN uol:OnJasuo3 a� VS LL'99$ jaAeidS alod au;.lJaMod sueuuaOal3 bunt uo:1OnJ;suo� 0j7 d5 b£'SSS aolejado luawdtnb3 aurl aUi'IJ3NCd SUetOU{Oa13 ButN UOI'OnjjsuO' a� VS LL'S9S uosiadaut3 lanaq Aauinor a il:aN,Cd - SueiOu.Oal3 bu1N jolejado uoij5nJ5suo3 di' d5 LL'S9$ luawdtnb3 aut3 AAeaH autlJ@mOd - sueplJ;Oa13 butN uo1jOnJjsuo3 ab dS ZL'tt$ uosiadpunoaE) autlJGmOd - SUPPIJIDeI3 Su1N uoi-OnJjsuo] TJF VS LL'99S JaplaM autl patdtlaa:) aUtIJoMCd - SUetOIJ,Oa13 butN ,-CrOnJaSU0D o1' dS S8'LLS iaalldS alge3 auilJanaOd - suelOu�Oa13 ButN T 69 KS lanai Aawnol dOqS JOJOW - suetOtJ1Oa13 butN uewsljej:) dOQS JOJOW - suetOuaOa13 Bugl 3b 5L OZ'£L$ (lauunl) lanai Aauinor ap!Sul - sueoPIDG13 ButN 3ti TZ 0£'89S lanai Aauinor aptsul - sue OuaOa13 But 3� 77L 69'8£$ uosJad PolS uoilotuasuo:) aptsul - sueiDiJ:Oa13 butN 3f �L 68'SL$ (lauunl) JaplaM pat)WaD ap!Sul - suelOujOa13 SULN 3� TL SL'OL$ japlaM patjtl-ta:) aptsul - SUl?1D jDa13 butyl 317 �L 65'8L$ (lauunl) aaotlds alge:) aptsul - sue1OuIO013 Bunt 3F 5L OZ'£L$ Ja:)tld5 alge:) aptsul - SuetOtJ1Oa13 butm sJa�Jom 3L 3S 66-LZS lanag Aawno£ aOueuaauiew aJr,{xt3 leOu»a13 Bu1N 3 L dS 99'SSS lana-1 Aawnor sJa el ll2M Jp ButN HL OS LS'SSS lanai Aawnol- Lo4eD - ad 11eM Q butN T£ OS 00'9S$ Jalto SJaypom a paJa ButN 3S 4S wgSS saleW SJayJom a paJa ButN 3£ aS ILTOGS I otlneipAH 'uewanaj sJaxJOM a paJa ButN LT 40 Z a6ed Page 3of17 King ntand Boatmen Deckhand $56.181 5B 1K King !nland Boatmen Deckhand Engineer $57.26 56 1K King Inland Boatmen Launch Operator $58.59 5B 1K King Inland Boatmen Mate $58.59 5B 1K King Inspection/Cteaning/Seating Cleaner Operator, Foamer $31.49 1 Of Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Grout Truck Operator $11.48 1 Of Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Head Operator $24.91 1 Of Sewer Et Water Systems By Remote Control King Inspection/CteaninQ/Sealing Technician $19.33 1 Of Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Tv Truck Operator $20.45 1 Of Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $55.51 5D 4C King Ironworkers Journeyman $65.48 7N 10 King Laborers Air, Gas Or Electric Vibrating $45.25 7A 31 Screed King Laborers Airtrac Drill Operator $46.66 7A 31 King Laborers Ballast Regular Machine $45.25 7A 31 King Laborers Batch Weighman $38.36 7A 31 King Laborers Brick Pavers $45.25 7A 31 King Laborers Brush Cutter $45.25 7A 31 King Laborers Brush Hog Feeder $45.251 7A 31 King Laborers Burner $45.25 7A 31 King Laborers Caisson Worker $46.66 7A 31 King Laborers Carpenter Tender $45.25 7A 31 King Laborers Caulker $45.25 7A 31 King Laborers Cement Dumper-paving $46.09 7A 31 King Laborers Cement Finisher Tender $45.25 7A 31 King Laborers Change House Or Dry Shack $45.25 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $45.25 7A 31 King Laborers Chipping Gun(30 Lbs. And $46.09 7A 31 Over) King Laborers Choker Setter $45.25 7A 31 King Laborers Chuck Tender $45.25 7A 31 King Laborers Clary Power Spreader $46.09 7A 31 King Laborers Clean-up Laborer $45.25 7A 31 King Laborers Concrete Dumper/chute $46.09 7A 31 Operator King Laborers Concrete Form Stripper $45.25 7A 31 King Laborers Concrete Placement Crew $46.09 7A 31 King Laborers $46.09 7A 31 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 Page 4 of 17 Concrete Saw Operator/core Driller King Laborers Crusher Feeder $38.36 7A 31 King Laborers Curing Laborer $45.25 7A 31 King Laborers Demolition: Wrecking E: $45.25 7A 31 Moving (incl. Charred Material) King Laborers Ditch Digger $45.25 7A 31 King Laborers Diver $46.66 7A 31 King Laborers Drill Operator $46.09 7A 31 (hydraulic,diamond) King Laborers Dry Stack Walls $45.25 7A 31 King Laborers Dump Person $45.25 7A 31 King Laborers Epoxy Technician $45.25 7A 31 King Laborers Erosion Control Worker $45.25 7A 31 King Laborers Faller E: Bucker Chain Saw $46.09 7A 31 King Laborers Fine Graders $45.25 7A 31 King Laborers Firewatch $38.36 7A 31 King Laborers Form Setter $45.25 7A 31 King Laborers Gabian Basket Builders $45.25 7A 31 King Laborers General Laborer $45.25 7A 31 King Laborers Grade Checker Et Transit $46.66 7A 31 Person King Laborers Grinders $45.251 7A 31 King Laborers Grout Machine Tender $45.25 7A 31 King Laborers Groutmen (pressure)including $46.09 7A 31 Post Tension Beams King Laborers Guardrail Erector $45.25 7A 31 King Laborers Hazardous Waste Worker $46.66 7A 31 (level A) King Laborers Hazardous Waste Worker $46.09 7A 31 (level B) King Laborers Hazardous Waste Worker $45.25 7A 31 (level C) King Laborers High Scaler $46.661 7A 31 King Laborers Jackhammer $46.09 7A 31 King Laborers Laserbeam Operator $46.09 7A 31 King Laborers Maintenance Person $45.25 7A 31 King Laborers Manhole Builder-mudman $46.09 7A 31 King Laborers Material Yard Person $45.25 7A 31 King Laborers Motorman-dinky Locomotive $46.09 7A 31 King Laborers Nozzteman (concrete Pump, $46.09 7A 31 Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete E: Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $46.09 7A 31 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/20/2017 Page 5of17 King Laborers Pilot Car $38.36 7A 31 King Laborers Pipe Layer Lead $46.66 7A 31 King Laborers Pipe Layer/tailor $46.09 7A 31 King Laborers Pipe Pot Tender $46.09 7A 31 King Laborers Pipe Reliner $46.091 7A 31 King Laborers Pipe Wrapper $46.09 7A 31 King Laborers Pot Tender $45.25 7A 31 King Laborers Powderman $46.66 7A 31 King Laborers Powderman's Helper $45.25 7A 31 King Laborers Power Jacks $46.09 7A 31 King Laborers Railroad Spike Puller - Power $46.09 7A 31 King Laborers Raker - Asphalt $46.66 7A 31 King Laborers Re-timberman $46.66 7A 31 King Laborers Remote Equipment Operator $46.09 7A 31 King Laborers Rigger/signal Person $46.09 7A 31 King Laborers Rip Rap Person $45.25 7A 31 King Laborers Rivet Buster $46.09 7A 31 King Laborers Rodder $46.09 7A 31 King Laborers Scaffold Erector $45.25 7A 31 King Laborers Scale Person $45.25 7A 31 King Laborers Sloper(over 20") $46.09 7A 31 King Laborers Sloper Sprayer $45.251 7A 31 King Laborers Spreader (concrete) $46.09 7A 31 King Laborers Stake Hopper $45.25 7A 31 King Laborers Stock Piler $45.25 7A 31 King Laborers Tamper It Similar Electric, Air $46.09 7A 31 Et Gas Operated Tools King Laborers Tamper (multiple Ft Self- $46.09 7A 31 propelled) King Laborers Timber Person - Sewer $46.09 7A 31 (lagger, Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $45.25 7A 31 King Laborers Topper $45.25 7A 31 King Laborers Track Laborer $45.25 7A 31 King Laborers Track Liner (power) $46.09 7A 31 King Laborers Traffic Control Laborer $41.021 7A 31 8R King Laborers Traffic Control Supervisor $41.02 7A 31 8R King Laborers Truck Spotter $45.25 7A 31 King Laborers Tugger Operator $46.09 7A 31 King Laborers Tunnel Work-Compressed Air $83.12 7A 31 Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $88.15 7A 31 8�( Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $91.83 7A 31 8�( Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $97.53 7A 31 88 Worker 54.01-60.00 psi https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/20/2017 Page 6 of 17 King Laborers Tunnel Work-Compressed Air $99.65 7A 31 8Dt Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $104.75 7A 31 84 Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $106.65 7A 31 8D Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $108.65 7A 31 8D Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $110.65 7A 31 8D Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $46.76 7A 31 8g Tender King Laborers Tunnel Work-Miner $46.76 7A 31 8S King Laborers Vibrator $46.09 7A 31 King Laborers Vinyl Seamer $45.25 7A 31 King Laborers Watchman $34.86 7A 31 King Laborers Welder $46.09 7A 31 King Laborers Well Point Laborer $46.09 7A 31 King Laborers Window Washer/cleaner $34.86 7A 31 King Laborers - Underground Sewer General Laborer Et Topman $45.25 7A 31 Et Water King Laborers - Underground Sewer Pipe Layer $46.09 7A 31 Et Water King Landscape Construction: Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $55.51 5D 1 H King Marble Setters Journey Level $54.32 5A 1M King Metal Fabrication tIn Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $11.00 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (in Shop) Welder $15.48 1 King Millwright Journey Level $57.01 5D 4C King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $11.00 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $40.60 6Z 2B King Pile Driver Journey Level $55.76 5D 4C King Plasterers Journey Level $53.20 7D 1 R https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 Page 7of17 King ?layground a Park Eauipment Journey Level $11.00 1 [nsta[.ers King Pi.:moers tt Pipefitters Journey Level $76.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $58.69 7A 3C 8P King Power Equipment Operators Assistant Engineer $55.211 7A 3C 8P King Power Equipment Operators Barrier Machine(zipper) $58.17 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $58.17 7A 3C 8P Concrete King Power Equipment Operators Bobcat $55.21 7A 3C 8P King Power Equipment Operators Brokk- Remote Demolition $55.21 7A 3C 8P Equipment King Power Equipment Operators Brooms $55.211 7A 3C 8P King Power Equipment Operators Bump Cutter $58.17 7A 3C 8P King Power Equipment Operators Cableways $58.69 7A 3C 8P King Power Equipment Operators Chipper $58.17 7A 3C 8P King Power Equipment Operators Compressor $55.21 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $58.69 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $55.21 7A 3C 8P Screed King Power Equipment Operators Concrete Pump -Mounted Or $57.72 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $58.17 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $57.72 7A 3C 8P King Power Equipment Operators Cranes Friction: 200 tons and $60.47 7A 3C 8P over King Power Equipment Operators Cranes: 20 Tons Through 44 $58.17 7A 3C 8P Tons With Attachments King Power Equip', Cranes: 100 Tons Through 199 $59.28 7A 3C 8P Tons, Or 150'Of Boom (Including Jib With Attachments) King _Power Eauioment Operators Cranes: 200 tons- 299 tons, or $59.88 7A 3C 8P 250' of boom including jib with attachments King Power Equipment Operators Cranes: 300 tons and over or $60.47 7A 3C 8P 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 Tons Through 99 $58.69 7A 3C 8P Tons, Under 150'Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame- 10 Tons And $55.21 7A 3C 8P Under King Power Equipment Operators Cranes: Friction cranes $59.88 7A 3C 8P through 199 tons King Power Equipment Operators $57.721 7A 3C I 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 Page 8 of 17 Cranes: Through 19 Tons With Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $58.171 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $58.17 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $58.69 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $57.72 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $57.72 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $59.281 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $55.21 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell $58.17 7A 3C 81) And Gamaco Ft Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $57.72 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. $55.21 7A 3C 8P With Attachments King Power Equipment Operators Grade Engineer: Using Blue $58.17 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $55.21 7A 3C 8P King Power Equipment Operators Guardrail Punch $58.17 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $58.69 7A 3C 8P Articulating Off- Road Equipment 45 Yards. it Over King Power Equipment Operators Hard Tail End Dump $58.17 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $57.72 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $58.17 7A 3C 8P Operator King Power Equiornenr Operators Hydralifts/boom Trucks Over $57.72 7A 3C 8P 10 Tons King Po,r�er Equipment Operators Hydralifts/boom Trucks, 10 $55.21 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Ft $59.28 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. $58.69 7A 3C 8P But Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $58.17 7A 3C 8P Yards King Power Equipment Operators Loaders, Plant Feed $58.17 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $57.72 7A 3C 8P King Power Equipment Operators Locomotives, All $58.17 7A 3C 8P King Power Equipment Operators Material Transfer Device $58.17 7A 3C 8P King Power Equipment Operators $59.28 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/20/2017 Page 9of17 Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Graders $58.691 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, $58.69 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $55.21 7A 3C 8P Distribution Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $57.72 7A 3C 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $58.17 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $59.28 7A 3C 8P Tons And Over King _Power Equipment Operators Overhead, Bridge Type: 45 $58.69 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $55.211 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $58.17 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $57.72 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $55.21 7A 3C 8P King Power Equipment Operators Power Plant $55.21 7A 3C 8P King Power Equipment Operators Pumps - Water $55.21 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $58.69 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $55.21 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $58.69 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $55.21 7A 3C 8P King Power Equipment Operators Rigger/Signal Person, Bellman $57.72 7A 3C 8P (Certified) King Power Equipment Operators Rollagon $58.69 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $55.21 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $57.72 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $58.17 7A 3C 8P King Power Equipment Operators Saws - Concrete $57.72 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $58.17 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry $57.72 7A 3C 8P All King Power Equipment Operators Scrapers, Self-propelled: 45 $58.69 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $57.72 7A 3C 8P King I Power Equipment Operators Shotcrete/gunite Equipment $55.21 7A 3C 8P King Power Equipment Operators $57.72 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 Page 10 of 17 , Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $58.69 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $58.17 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $59.28 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $59.88 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $58.69 7A 3C 8P King Power Equipment Operators Spreader, Topsider It $58.69 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $58.17 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $57.72 7A 3C 8P King Power Equipment Operators Tower Crane Up To 175' In $59.28 7A 3C 8P Height Base To Boom King Power Equipment Operators Tower Crane: over 175' $59.88 7A 3C 8P through 250' in height, base to boom King Power Equipment Operators Tower Cranes: over 250' in $60.47 7A 3C 8P height from base to boom King Power Equipment Operators Transporters, All Track Or $58.69 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $57.721 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $58.17 7A 3C 8P Tons And Over King _Power Equipment Operators Truck Crane Oiler/driver $57.72 7A 3C 8P Under 100 Tons King Power Equipment Operators Truck Mount Portable $58.17 7A 3C 8P Conveyor King Power Equipment Operators Welder $58.69 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $55.21 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $58.171 7A 3C 8P King Power Eguipmen[ Operators- Asphalt Plant Operators $58.69 7A 3C 815 Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $58.17 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk- Remote Demolition $55.21 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms ---[$55.21 7A 3C 8P Underground Sewer $ Water https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 Page 11 of 17 King Power Equipment Operators- Bump Cutter $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $58.69 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $58.69 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $55.21 7A 3C 813 Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump- Mounted Or $57.72 7A 3C 8P Underground Sewer a Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $58.17 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes Friction: 200 tons and $60.47 7A 3C 8P Underground Sewer Et Water over King Power Equipment Operators- Cranes: 20 Tons Through 44 $58.17 7A 3C 8P Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $59.28 7A 3C 8P Underground Sewer Et Water Tons, Or 150'Of Boom (Including Jib With Attachments) King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $59.88 7A 3C 8P Underground Sewer Et Water 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $60.47 7A 3C 8P Underground Sewer- Et Water 300' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 Tons Through 99 $58.69 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $55.21 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction cranes $59.88 7A 3C 8P Underground Sewer Et Water through 199 tons King Power Equipment Operators- Cranes: Through 19 Tons With $57.72 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $58.17 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $58.69 7A 3C 8P Underground Sewer Et Water https://fortress.wa.gov/ini/wagelookup/prvWagelookup.aspx 3/20/2017 Page 12 of 17 King Power Eguipmen; Operators- Dozers D-9 Et Under $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Drill Oilers: Auger Type, Truck $57.72 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $59.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $55.21 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell $58.17 7A 3C 8P Underground Sewer Et Water And Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $57.72 7A 3C 8P Underground Sewer a Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. $55.21 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Grade Engineer: Using Blue $58.17 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $58.69 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tait End Dump $58.17 7A 3C 8P U_ nderground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $57.72 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $58.17 7A 3C 8P Underground Sewer Et Water Operator King Power Equiament Operators- Hydralifts/boom Trucks Over $57.72 7A 3C 8P Underground Sewer Et Water 10 Tons King Povier Equipment Operators- Hydralifts/boom Trucks, 10 $55.21 7A 3C 8P Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. ft $59.28 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. $58.69 7A 3C 8P Underground Sewer Et Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $58.17 7A 3C 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $58.17 7A 3C 8P Underground Sevier Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $59.28 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/20/2017 Page 13 of 17 King Power Equipment Operators- Motor Patrol Graders $58.69 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, $58.69 7A 3C 8P Underground Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $55.21 7A 3C 8P Underground Sewer Et Water Distribution E3 Mulch Seeding Operator King Power Equipment Operators- outside Hoists (elevators And $57.72 7A 3C 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $58.17 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $59.28 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $58.69 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $55.21 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $58.17 7A 3C 8P Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler- Asphalt, Crusher $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $58.69 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower- No Cab, Under $55.21 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $58.69 7A 3C 8P Underground Sewer Ei Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, Bellman $57.72 7A 3C 813 Underground Sewer Et Water (Certified) King Power Equipment Operators- Rollagon $58.69 7A 3C 8P Underground Sewer Et Water _ King Power Equipment Operators- Roller, Other Than Plant Mix $55.21 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $57.72 7A 3C 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $57.72 7A 3C 8P Underground Sewer & Water King $58.17 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 Page 14 of 17 Power Equipment Operators- Scraper, Self Propelled Under Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete & Carry $57.72 7A 3C 8P Underground Sewer Et Water All King Power Equipment Operators- Scrapers, Self-propelled: 45 $58.69 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $57.72 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $58.69 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $58.17 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $59.28 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $59.88 7A 3C 8P Underground Sewer a Water Over 90 Metric Tons King Power Equipment Operators- Stipform Pavers $58.69 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $58.69 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In $59.28 7A 3C 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Tower Crane: over 175' $59.88 7A 3C 8P Underground Sewer Et Water through 250' in height, base to boom King Power Equipment Operators- Tower Cranes: over 250' in $60.47 7A 3C 8P Underground Sewer Et Water height from base to boom King Power Equipment Operators- Transporters, All Track Or $58.69 7A 3C 8P Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver- 100 $58.17 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver $57.72 7A 3C 8P Underground Sewer ai Water Under 100 Tons King Power Equipment Operators- Truck Mount Portable $58.17 7A 3C 8P Underground Sewer Et Water Conveyor King Power Equipment Operators- Welder $58.69 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farman Type $55.21 7A 3C 8P Underground Sewer a Water https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/20/2017 Page 15 of 17 King Power Equipment Operators- Yo Yo Pay Dozer $58.17 7A 3C 8P Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $47.08 5A 4A Trimmers King Power Line Clearance Tree Spray Person $44.64 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $47.08 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $42.01 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $31.65 5A 4A Trimmers King Refrigeration Et Air Journey Level $75.36 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $54.32 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Journey Level $41.69 5D 4C Applicators King Residential Drywall Tapers Journey Level $55.661 5P 1E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $39.40 7L 1H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters King Residential Refrigeration Er Air Journey Level $75.36 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $45.99 7F 1R Workers King Residential Soft Floor Lavers Journey Level $45.86 5A 3D King Residential Sprinkler Fitters Journey Level $44.98 5C 2R (Fire Protection) King Residential Stone Masons Journey Level $54.32 5A 1M King Residential Terrazzo Workers Journey Level $50.26 5A 1M King Residential. Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $47.51 5A 3H King Roofers Using Irritable Bituminous $50.51 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $75.46 7F 1E King Shipbuilding E Ship Repair Boilermaker $41.72 7M 1H King Shipbuilding Et Ship Repair Carpenter $41.06 7T 2B King Shipbuilding & Ship Repair Electrician $41.09 7T 413 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/20/2017 Page 16 of 17 King Shipbuilding Et Shio Repair Heat Ft Frost Insulator $65.68 5J 4H King Shipbuilding Et Ship Reoair Laborer $41.08 7T 4B King Shipbuilding Et Ship Repair Machinist $41.32 7T 4B King Shipbuilding Et Ship Repair Operator $41.03 7T 4B King Shipbuilding Et Ship Repair Painter $41.05 7T 4B King Shipbuitdinp, Et Ship Repair Pipefitter $41.05 7T 4B King Shipbuilding Et Ship Repair Rigger $41.12 7T 4B King Shipbuilding $ Ship Repair Sheet Metal $41.04 TT 4B King Shipbuilding Et Ship Repair Shipfitter $41.12 7T 4B King Shipbuitding Et Ship Repair Trucker $41.261 7T 4B King Shipbuilding Et Ship Repair Warehouse $41.02 7T 4B King Shipbuitding Et Ship Repair Welder/Burner $41.12 7T 4B King Sign Makers Et Instatters Sign Installer $22.92 1 (Electrical) King Sign Makers Et installers Sign Maker $21.36 1 (Electrical? King Sign Makers a Installers (Non- Sign Installer $27.28 1 Electrical King Sign Makers & Instalters (Non- Sign Maker $33.25 1 Electrical) King Soft Floor Lavers Journey Level $45.86 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $72.89 5C 1x Protection) King Stage Rigging Mechanics (Nor Journey Level $13.23 1 Structural) King Stone Masons Journey Level $54.321 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $57.72 7A 3C 8P Surveyor King Surveyors Chainman $57.17 7A 3C 8P King Surveyors Construction Site Surveyor $58.69 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction Cable Splicer $38.84 5A 2B Outside King Telephone Line Construction Hole Digger/Ground Person $21.45 5A 2B Outside King Tetephone Line Corstruction - Installer(Repairer) $37.21 5A 2B Outside King Teiephone Lire Corstruction - Special Aparatus Installer 1 $38.84 5A 2B Outside King Telephone Line Constructior. - Special Apparatus Installer II $38.03 5A 2B Outside King Tetephone Line Construction - Telephone Equipment $38.84 5A 2B Outside Operator(Heavy) King Telephone Line Construction - Telephone Equipment $36.09 5A 2B Outside Operator (Light) https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 Page 17 of 17 M King i-etephone Line Construction - Telephone Lineperson $36.09 5A 2B Outside King Telephone Line Construction - Television Groundperson $20.33 5A 2B Outside King Telephone Line Construction - Television $27.21 5A 2B Outside Lineperson/Installer King Tetephone Line Construction - Television System Technician $32.55 5A 2B Outside King Telephone Line Construction - Television Technician $29.18 5A 2B Outside King Telephone Line Construction - Tree Trimmer $36.09 5A 2B Outside King Terrazzo Workers Journey Level $50.26 5A 1M King Tite Setters Journey Level $21.65 1 King Tile, Marble Et Terrazzo Finisher $41.09 5A I Finishers King Traffic Control Stripers Journey Level $44.85 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. $52.70 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $51.86 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck £t Trailer $52.70 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $51.86 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $52.70 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Welt Drillers Et Irrigation Pump Oiler $12.97 1 Installers King Well Drillers & Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/20/2017 s � ® DATE(MMI Drryw) A CERTIFICATE OF LIABILITY INSURANCE aaln12017 rzal7 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT MARSH USA INC. NA FAx PHONE 200 PUBLIC SQUARE,SUITE 1000 c, arc No: CLEVELAND,OH 44114-1824 E-MAIL Attn:Cleveland.Cer[Request@marsh.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC it 272402 SURGE Coyle INSURER A:Old Republic Insurance Company 24147 INSURED INSURER B: THE DAVEY TREE SURGERY COMPANY 2617 SOUTH VASCO ROAD INSURER C: P.O.BOX 5015 ENSURER D: LIVERMORE,CA 94651.5015 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: CLE-005322934-01 REVISION NUMBER:? THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCEMSD WVD POLICY NUMBER MMIDDIYYYY MMIDDIYYYY A X COMMERCIAL GENERAL LIABILITY MWZY 308148 09/0112016 09/01/2017 EACH OCCURRENCE $ 2.000,000 DAMAGE RENTED CLAIMS-MADE M OCCUR PREMISES Ea occurrence S 2,000,000 MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY S 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY1:1 PRO jECjLOC PRODUCTS-COMPIOPAGG S 2,000,000 PRO S OTHER: A AUTOMOBILE LIABILITY MWT8 308147 09/0112016 0910 /2017 COMBINED SINGLE LIMIT $ 2,000,000 Ea accident X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE S X HIREOAUTOS X AUTOS Peraccident S UMBRELLA LIAB OCCUR EACH OCCURRENCE S EXCESS LIAB CLAIMS-MADE AGGREGATE $ DEC) I I RETENTIONS S A WORKERS COMPENSATION MWC 30815100 09101/2016 09/01/2017 X STATUTE ERH AND EMPLOYERS'LIABILITY ANY PROPRIETORIPARTN£RIEXECUTIVE Ya N!A E.L.EACH ACCIDENT $ 5.000.000 OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE.EA EMPLOYEN S 5,000,000 If yes,describe under 5,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT S A EXCESS WORKERS COMPENSATION MWXS 308149(WA) 09/01/2016 0910112017 WORKERS COMPENSATION STATUTORY EXCESS OF$5,000,000 SIR EMPLOYERS LIABILITY $1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) RE:MAPLE REMOVAL AT 22204105TH AVE,KENT CITY OF KENT IS(ARE)INCLUDED AS ADDITIONAL INSURED(S)AS RESPECTS GENERAL LIABILITY AND AUTOMOBILE LIABILITY WHERE REQUIRED BY WRITTEN CONTRACT ORAGREEMENT AND ONLY AS RESPECTS OPERATIONS PERFORMED ON THEIR BEHALF BY THE NAMED INSURED. COVERAGE SHALL BE PRIMARY TO THE ADDITIONAL INSURED AND NOT CONTRIBUTING WITH OTHER INSURANCE AS RESPECTS ABOVE REFERENCED GENERAL LIABILITY POLICY. CERTIFICATE HOLDER CANCELLATION City of Kent SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 220 Fourth Avenue South THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Kent,WA 98032 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Luann M.GlavaC Or&.wt-, 07 v @ 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD IL 10 (12/06) OLD REPUBLIC INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CERTIFICATES OF INSURANCE This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM SCHEDULE Entity: The cancellation wording on all Certificates of Insurance is amended to read:'Cancellation Clause replaced in its entirety by the following: In the event of 1)Cancellation for other than nonpayment of premium,or 2)Material change that restricts or reduces the insurance afforded by any policy described above,the insurer affording coverage will mail notice 30 days before the date of cancellation or material change to the party named below." Policy Number MWTB 3OB147 The cancellation wording on all Certificates of Insurance is amended to read: The Cancellation Clause is replaced in its entirety by the following: In the event of: 1) Cancellation for other than nonpayment of premium;or 2) Material change that restricts or reduces the insurance afforded by any policy described above. the insurer affording coverage will mail notice 30 days before the date of cancellation or material change to the party named below. CA 385 005 0915 Page 1 or 1 Indudes copyrighted material of Insurance Services office,Inc.,with its permission. AIW76 305147 The Davey Tree Expert Company 09/0112016-OW1120l7 � N IL 10 (12/06) OLD REPUBLIC INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO CERTIFICATE HOLDERS This endorsement modifies the notice of cancellation of insurance provided hereunder by adding the following: A. In the event this policy is cancelled for any permissible reason, other than for nonpayment of premium, we shall endeavor to provide advance written notice of cancellation to oertificate holders set out In the schedule on rile with the Company,after notifying the first Named Insured of such cancellation. Notice of cancellation to certificate holders may be made by any commercially reasonable means,including mail,electronic mail,facsimile transmission or courier service, B. This advance written notificadon of a cancellation of coverage is intended as a courtesy only.Our failure to provide such advance written notification will not extend the policy cancellation date,nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. PIL 029 10 10 MWZY 309148 The Qarey Tree Expert Company o9mil2018.04 12017 1L 10 (12106) 4UQ REPUBUC INSURANCE COMPANY CERTIFICATES -- AMENDATORY ENDORSEMENT THE CANCELLATION WORDING ON ALL CERTIFICATES OF INSURANCE IS AMENDED TO READ: "CANCELLATION CLAUSE IS REPLACED IN ITS ENTIRETY BY THE FOLLOWING IN THE EVENT OF 1) CANCELLATION FOR OTHER THAN NONPAYMENT OF PREMIUM; OR 2) MATERIAL CHANGE THAT RESTRICTS OR REDUCES THE INSURANCE AFFORDED BY THIS POLXCY, THE INSURER AFFORDING COVERAGE WILL MAIL NOTICE 30 DAYS BEFORE THE DATE OF CANCELLATION OR MATERIAL CHANGE TO THE PARTY NAMED ON THE CERTIFICATE." FORMS J KWC308146 00 The Davey Tree Expert Company Policy Period: 9/1/16 to 9/1/17 Page 1 r st,En co=v