Loading...
HomeMy WebLinkAboutPK17-160 - Original - Christensen Inc. General Contractor - Contract - 04/13/17 r 1l ���/i/r�i r/✓ilr rr- Records KENT r,. Wnsgiporcn Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Christensen Inc. General Contractor Vendor Number: 1455780 JD Edwards Number Contract Number: N-11 - lud This is assigned by City Clerk's Office Project Name Housing & Human Services TI Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment X❑ Contract ❑ Other: Contract Effective Date: 04/13/17 Termination Date: 07/11/17 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Nancv Clary Department: Parks. Facilities Contract Amount: $15,625.13 Approval Authority: (CIRCLE ONE) IDepartment Directooi Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): As of: 08/27/14 KENT PUBLIC WORKS AGREEMENT between City of Kent and Christensen Inc. General Contractor THIS AGREEMENT Is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Christensen Inc. General Contractor, organized under the laws of the, State of Washington, located and doing business at 2840 Crites Street S'W, #100, Turnwater, WA 98512, Kevin Christensen, 360 709-0330 (hereinafter the "Contractor"), &PREEMEN The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Christensen Inc, General Contractor shall provide all labor and materials to construct a new office space In the City of Kent, Housing and Human Services division located at City of Kent City Hall, 220 Fourth Avenue South, Kent 98032, in accordance with the Proposal, dated 03/28/2017, which is attached as Exhibit A. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed, II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above Immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 90 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed $15,625.13, Including any applicable Washington State Sales Tax, for the work and services contemplated In this Agreement, The City shall pay the Contractor the following mounts according to the following schedule: a n Vendor shall invoice upon Letter of Acceptance by City, Net: 30 days A. NQ2Ayj3Xnt end N9-9,1t4ioAge, Because this contract Is $2 0,ODO or less, the City has elected to waive both the Performance/payment bond requirement of Chapter 39-08 RCW and the retamage requirement of Chapter 60.28 RCW, PUBLIC WORKS AGREEMENT - 1 ($20,000 or Less - OPTIONAL PROCESS) B. S I �f ..0.4MQrt?ed W r . The City reserves its right to withhold payment from Contractor for any defective or unauthorized work, Defective or unauthorized work includes, without limitation: work and materlals that do not conform to the requirements of this Agreement; and extra work and materials furnished without the Clty's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City, "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment; W iv Q j ms. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED ATTHE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for Its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and Is a service other than that furnished by the City,. or the Contractor Is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall Include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. PUBLIC WORKS AGREEMENT - 2 ($20,000 or Less - OPTIONAL PROCESS) C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D, The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES, Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work, Contractor shaft pay prevailing wages In effect on the date the bid Is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as It deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided In this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. PUBLIC WORKS AGREEMENT - 3 ($20,000 or Less - OPTIONAL PROCESS) national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's Inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising Out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's duty to defend, indemnify, and hold the City harmless, and Contractor's liability accruing from that obligation shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER 1N12USTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and If that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, Including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. (',ggyslable Makerals, Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of reach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. PUBLIC WORKS AGREEMENT - 5 ($20,000 or Less - OPTIONAL PROCESS) C. oJuLlon of DI$pukcN. ,gCLljtlg. r. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process, In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified In writing. E. Asslonment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. MpjJjg •I . No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Pre Agr ep monk. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Q!]lpince with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Contractor acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Contractor in its performance of this Agreement may be subject to public review and disclosure, even If those records are not produced to or possessed by the City of Kent. As such, the Contractor agrees to cooperate fully with the City in satisfying the City's duties and obligations under the Public Records Act. J. iy Buslnessll Eeauired. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. K. Cot�nCt�parts and Slona ur b "'ax or Email. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same farce and effect as if the Agreement bearing the original signature was received in person. PUBLIC WORKS AGREEMENT - 6 ($20,000 or Less - OPTIONAL PROCESS) IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and affirmed, and the terms of the Agreement shall be deemed to have applied. .............. -..-.. .--.-.-_�......... ._._m.__. �. .._._.... - CONTRACTOR: CITY OF KENT: By: -" BY . na ('signature Print ame y _ �� a J PriTif Name: Julie Parascondola, Director, Parks 1ts. ��L Its: Recreation and Community Services DATE: (title) C. 11 --- DATE: � "r' . — .... .- ... - --------- -'__ _. NOTICES TO BE SENT TO: NOTICES-_._ TO BE SENT TO: CONTRACTOR: CITY OF KENT: Kevin Christensen Nancy Clary Christensen In.c General Contractor City of Kent 2840 Crites Street SW, #100 220 Fourth Avenue South Tumwater, WA 98512 Kent, WA 98032 360 709-0330 (telephone) (253) 856-5084 (telephone) 360 709-0220 (facsimile) (253) 856-6080 (facsimile) PUBLIC WORKS AGREEMENT - 7 ($20,000 or Less - OPTIONAL PROCESS) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding, If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. 551 For. L; r ....,6 .. Title: 7. �CJ ----- _...._.._ Date:m..... T_ ._'! _.._....... EEO COMPLIANCE DOCUMENTS - I CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT I This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 rage i or 2u State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. _......_ -._..._..___.____.__._.._dm.._............... .m.m Journey Level Prevailing Wage Rates for the Effective Date: 03/28/2017 County Trade Jab WaQeHolidayOvertimeNote Classification --- m King Asbestos Abatement Journey Level $45.25 5D 1H Workers King Boilermakers Journey Level $64.54 5N 1c King Brick Mason Journey Level $54.32 5A 1M King. Brick Mason Pointer-Caulker-Cleaner $54.32 5A 1M King Bui(rliirt Seivrce Fn >l°i �t;s Janitor $22.84 5S 2F King Building 5orvire I Traveling $23.29 5S 2F Waxer/Shampooer King t3uilc ig Sery LLII to ees Window Cleaner (Non- $24.54 5S 2F Scaffold) King BA ding E�yees Window Cleaner $27.33 5S 2F (Scaffold) King ....[L Shaiai Journey Level $22.74 1_ King Carpenters Acoustical Worker $55.51'' 5D 4C King Carpr",1tte^r°a Bridge, Dock And Wharf $55.51 5D 4C Carpenters King Ca,i°pcntc-,r°s Carpenter $55.51 5D 4C King CarpcanIp s Carpenters on $55.64 5D 4C Stationary Tools King Carpf.nter's Creosoted Material $55.61 5D 4C King Carp raters, Floor Finisher $55.51 5D 4C King Ca i )enters Floor Layer $55.51 5D 4C King cssr cir >tc*rs Scaffold Erector $55.51 5D 4C King Cement Masons Journey Level $55.56 7A 1M King Divers & Tenders Diver $108.77 5D 4C 8A King Dryers Tenders Diver On Standby $66.0', 5D 4C King Divei_s.fxTenders Diver Tender $59.88 5D 4C https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 rage or w King Divers a Teeders Surface Rcv 8 Rov $59,88 5D 4C Operator King Divers a Tenders Surface Rev Et Rov $55.761 5A 4C r Operator Tender i King Drc'09 VJorkcrs Assistant Engineer $56.44 5D 3F King DrdiVPr°ksr_s Assistant Mate $56.00 5D 3F (Deckhand) King Dioci�t;e Workers Boatmen $56.44 5D 3F King Rpnk e wcOme s Engineer Welder $57.51 5D 3F King Dmluw Workels Leverman, Hydraulic $58.67 5D 3F King Dr.Ldge WQ0ELS. Mates $56.44 5D 3F King 17rcc1ge Worl<crs Oiler $56.00 5D 3F King 2umy ll Api Lnla or Journey Level $55.51 SD 1 H Kin IJ�-y g _4r a rs Journey Level $55.66 5P 1 E will C< King Electrical Fixture_ Journey Level $27.99 5L 1E Maintenance Workers King, Electricians Inside Cable Splicer $73.20 7C 4E King Electricians - Inside Cable Splicer (tunnel) $78.59 7C 4E King Electricians Inside Certified Welder $70.75 7C 4E King Electricians - Inside Certified Welder $75.89 7C - 4E . (tunnel) King Electricians-Inside Construction Stock $38.69 7C 4E Person King Electrici,ans_- Inside Journey Level $68.30 7C 4E . _, King Electricians - Inside I Journey Level (tunnel) $73.20 7C 4E King Flectdcians _Moto-' ,Np Craftsman $15.37 1 King Uoctdrian5 - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $71.85 5A 4D Consti uction_.._m__ King Electricians Powerline Certified Line Welder $65.71 5A 4D Construction King Electricians - Powerline Groundperson $44.12 5A 4D Construction King Electricians -_Powerline Heavy Line Equipment $65.71 5A 4D Construction Operator King Electricians - Powerline Journey Level $65.71 5A 4D Construction Lineperson King ElectriciansLL-Powerline Line Equipment $55.34 5A 4D Construction Operator King Electricians - Powerline Pole Sprayer $65.71 5A 4D Construction-�~ King Electricians -_Powerline Powderperson $49.16 5A 4D Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $85.45 7D 4A King Elevator Constructors Mechanic In Charge $92.35 7D 4A King Fabricated Precast All Classifications - In- $17.20 5B 1 R Concrete Products Factory Work Only King Fence Erectors Fence Erector $15.18 1 King Flasq_eers Journey Level $38.361 7A 31 https://fortress.wa.gov/lni/wagelookup/prvWageIookup.aspx 3/31/2017 rage of zu King Glacir:.rs Journey Level $59.31 7L 1Y King Heat Ft Frost Insulators And Journeyman $65.68 5J 4H Asbestos Workers King Heating;EtLdril,,mitt Journey Level $75.46 7F 1 E Mechanics King Hod Carriers &.Mason Journey Level $46.66 7A 31 Tenders _ King industrial Power Vacuum Journey Level $11.00 1 Cleaner King Inland Boatmen Boat Operator $59.86 5B 1K King Inland Boatmen Cook $56.18 5B 1K King Inland_Boatmen Deckhand $56.18 5B 1K King Inland Boatmen Deckhand Engineer $57.26 5B 1K King Inland Boatmen Launch Operator $58.59 5B 1K King Inland Boatmen Mate $58.59 5B 1K King asr7eLcaaibf6leDntinvl5call P Cleaner Operator, $31.49 1 Of Scwepr 8. Wator SySt(yns Foamer Operator y t rnnte Control King Insj c,.ctronf(lc�?rrwiag/5t:akins; Grout Truck Operator $11.48 1 Of Sr>wen L�VJaL:cr Syst:erns By Remote Control King Inspectionl0eining/SeaUntt Head Operator $24.91 1 Of Sewer Et Water Systems By Remote Control _ rmrrb/Sr,ullr3il Technician $19.33 1 King..... lnsp coon/Cls?a,.� OfSoworr Ei Water Systorns Bmmy ReraaaCc_(;nntrol King !:L Lpection/Cleaning/sealing,Tv Truck Operator $20.45 1 of Sewer fa Water Systems ,¢y�.6terncrtc Cr�n.Yrc�l King lnst�ilafi_on Apnlicr`atois, Journey Level $55.51 5D 4C King Ironworkers Journeyman $65.48 7N 10 King Laborers Air, Gas Or Electric $45.25 7A 31 Vibrating Screed King Laborers Airtrac Drill Operator $46.66 7A 31 King Laborers Ballast Regular Machine $45.25 7A 31 Kin, Laborers Batch Weighman $38.36 7A 31 King Laborers Brick Pavers $45.25 7A 31 King Laborers Brush Cutter $45.25 7A 31 King Laborers Brush Hog Feeder $45.25 7A 31 King Laborers Burner $45.25 7A 31 King Laborers Caisson Worker $46.66 7A 31 King Laborers Carpenter Tender $45.25 7A 31 King Laborers Caulker $45.25 7A 31 King Laborers Cement Dumper-paving $46.09 7A 31 King Laborers Cement Finisher Tender $45.25 7A 31 King Laborers Change House Or Dry $45.25 7A 31 Shack King Laborers Chipping Gun (under 30 $45.25 7A 31 Lbs.) fittps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 Page 4 of 2U King Laborer's Chipping Gun(30 Lbs. $46.09 7A 31 And Over) King Laborers Choker Setter $45.25 7A 31 King Laborers Chuck Tender $45.25 7A 31 King Laborers Clary Power Spreader $46.09 7A 31 King Laborers Clean-up Laborer $45.25 7A 31 King Laborers Concrete Dumper/chute $46.09 7A 31 Operator King Laborers Concrete Form Stripper $45.25 7A 31 King Laborers Concrete Placement $46.09 7A 31 Crew King Laborers Concrete Saw $46.09 7A 31 Operator/core Driller King Laborers Crusher Feeder $38.36 7A 31 King Laborers Curing Laborer $45.25 7A 31 Kin Demolition: Wrecking $45. m g Laborers�- g Et 25 7A 31 Moving (incl. Charred Material) King Laborers Ditch Digger $45.25 7A 31 King Laborers Diver $46.66 7A 31 King Laborers Drill Operator $46.09 7A 31 (hydraulic,diamond) King Laborers Dry Stack Walls $45.25 7A 31 King Laborers Dump Person $45.25 7A 31 King Laborers Epoxy Technician $45.25 7A 31 King Laborers Erosion Control Worker $45.25 7A 31 King Laborers Faller It Bucker Chain $46.09 7A 31 Saw King Laborers Fine Graders $45.25 7A 31 King Laborers Firewatch $38.36 7A 31 King Laborers Form Setter $45.25 7A 31 King Laborers Gabian Basket Builders $45.25 7A 31 King, Laborers General Laborer $45.25 7A 31 King Laborers Grade Checker Et $46.66 7A 31 Transit Person King Laborers Grinders $45,25 7A 31 King Laborers Grout Machine Tender $45.25 7A 31 King Laborers Groutmen (pressure) $46.09 7A 31 including Post Tension Beams King Laborers Guardrail Erector $45.25 7A 31 King Laborers Hazardous Waste $46.66 7A 31 Worker (level A) King Laborers Hazardous Waste $46.09 7A 31 Worker (level B) King Laborers Hazardous Waste $45.25 7A 31 Worker (level C) King Laborers High Scaler $46.66 7A 31 King Laborers Jackhammer $46.09 7A 31 King l aborei.s Laserbeam Operator $46.09 7A 31 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 Yage 5 of LU King daboreis Maintenance Person $45.25 7A 31 King Laborers Manhole Builder- $46.09 7A 31 mudman King Laborers Material Yard Person $45.25 7A 31 King Laborers Motorman-dinky $46.09 7A 31 Locomotive King Laborers Nozzleman (concrete $46.09 7A 31, Pump, Green Cutter When Using Combination Of High Pressure Air 3 Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $46.09 7A 31 King Laborers Pilot Car $38.36 7A 31 King Lahorers Pipe Layer Lead $46.66 7A 31 King Labor ors Pipe Layer/tailor $46.09 7A 31 King Laborers Pipe Pot Tender $46.09' 7A 31 King Laborers Pipe Reliner $46.09 7A 31 King Laborers Pipe Wrapper $46.09 7A 31 King Laborers Pot Tender $45.25 7A 31 King Laborers Powderman $46.66 7A 31 King Laborers Powderman's Helper $45.25 7A 31 King Laborers Power Jacks $46.09 7A 31 King Laborers Railroad Spike Puller - $46.09 7A 31 Power King Laborers Raker - Asphalt $46.66 7A 31 King Laborers Re-timberman $46.66 7A 31 King Laborers Remote Equipment $46.09 7A 31 Operator King Laborers Rigger/signal Person $46.09 7A 31 King; Laborers Rip Rap Person $45.25 7A 31 King Laborers Rivet Buster $46.09 7A 31 King Laborers Rodder $46.09 7A 31 King Laborers Scaffold Erector $45.25 7A 31 King Laborers Scale Person $45.25 7A 31 King Laborers Sloper (over 20") $46.09 7A 31 King Laborers Sloper Sprayer $45.25 7A 31 King Laborers Spreader (concrete) $46.09 7A 31 King Laborers Stake Hopper $45.25 7A 31 King Laborers Stock Piler $45.25 7A 31 King Laborers Tamper It Similar $46.09 7A 31 Electric, Air Et Gas Operated Tools King Laborers Tamper (multiple Ft $46.09i 7A 31 Self-propelled) King Laborers Timber Person - Sewer $46.09' 7A 311 (lagger, Shorer Ex Cribber) https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 rage o of lu King t-aborer, Toolrcom Person (at $45.25 7A 31 _ Jobsite) King Laborers Topper $45.25 7A 31 King Laborers Track Laborer $45.25 7A 31 King Laborers Track Liner (power) $46.09 7A 31 King Laborers Traffic Control Laborer $41.02 7A 31 8R King Laborers Traffic Control I $41.02 7A 31 8R Supervisor King Laborers Truck Spotter $45.25 7A 31 King Laborers Tugger Operator $46.09 7A 31 King Laborers Tunnel Work- $83.12 7A 31 8�C Compressed Air Worker 0-30 psi King Laborers Tunnel Work- $88.15 7A 31 8� Compressed Air Worker 30.01-44.00 psi King Laborers Tunnel Work- $91.83 7A 31 Compressed Air Worker 44.01-54.00 psi King Laborers Tunnel Work- $97.53 7A 31 Compressed Air Worker 54.01-60.00 psi King Laborers Tunnel Work- $99.65 7A 31 8� Compressed Air Worker 60.01-64.00 psi King Laborers Tunnel Work- $104.75 7A 31 Compressed Air Worker 64.01-68.00 psi King Laborers Tunnel Work- $106.65 7A, 31 82 Compressed Air Worker 68.01-70.00 psi King Laborers Tunnel Work- $108.65 7A 31 Compressed Air Worker 70.01-72.00 psi King Laborers Tunnel Work- $110.65 7A 31 8Q Compressed Air Worker 72.01-74.00 psi King Laborers Tunnel Work Guage and $46.76 7A 31 83� Lock Tender King Laborers Tunnel Work-Miner $46.76 7A I King Laborers Vibrator $46.09 7A 31 King Laborers Vinyl Seamer $45.25 7A 31 King Laborers Watchman $34.86 7A 31 King Laborers Welder $46.09 7A 31 Kin4 Laborers Well Point Laborer $46.09 7A 31 King Laborers Window Washer/cleaner $34.86 7A 31 King Laborers Unclei _0und General Laborer & $45.25 7A 31 Sewer tC Water Topman King Laborers -_LJndc r8r2unct Pipe Layer $46.09 7A 31 Sewer £c Water King Landse 3yaCc i sir};ict n Irrigation Or Lawn $13.56 1 Sprinkler Installers htt s://fortress.wa. ov/lni/wa elooku / rvWa eloolcu .as x 3/31/2017 P g g PP g A P rage of zu King ands air Cggst.ruc,ti(�n, Landscape Equipment $28.17 1 Operators Or Truck Drivers King Lanclsc-1tc Cvl?structfora Landscaping or Planting $17.87 1 -ction Laborers King Lathers Journey Level $55.511 5D 1H King Marble Setters Journey Level $54.32 5A 1M King Metalfzabruationfln $ho Fitter $15.86 1 King Meta( t abricadoan (Irt Sirtapj Laborer $11.00 1 King Metal Fabrication 17 Sho� ). Machine Operator $13.04 1 King Metal Fabrication (l i S(jojjjp Painter $11.10 1 King Metal Fabrication (in Shop) Welder $15.48 1 King Millwrigg lat Journey Level $57.01 5D 4C King MOdu_l_ar Buildings Cabinet Assembly $11.56 1 King Pia O-L" -Bu -Idim Electrician $11.56 1 King Macular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King itiMMaclufar I}uild mn Production Worker $11.00 1 King Mcclular Buildings Tool Maintenance $11.56 1 King Modu,la Buildings Utility Person $11.56 1 King Modrrlaso'BuitclinRs Welder $11.56 1 King Painters Journey Level $40.60 6Z 2B King Pil,eDriver Journey Level $55.76 5D 4C King Plasterers Journey Level $53.20 1R King P s�rouncf0 Park Journey Level $11.00 1 Equi_pspLont Ilr"t_rllcrr.s King flUI ab(ris Et Pl lihefotters Journey Level $76.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $58.69 7A 3C 8P King Powt,r Ec)rriiarnrrt Operators_ Assistant Engineer $55.21 7A 3C 8P King !Power uipmentOperaLoK'sBarrierMachine (zipper) $58.17 7A 3C 8P King F7owcr Ee3uipmgn QLe hors Batch Plant Operator, $58.17 7A 3C 8P Concrete King, Power Equipment Operators Bobcat $55.21 7A 3C 8P King Pnw l mEc)trols ?c3l?t Opc rptor_s Brokk - Remote $55.21 7A 3C 8P Demolition Equipment King Power Equipment Operators Brooms $55.21r7A 3C 8P King Power Equipment Operators Bump Cutter $58.17 3CBP King Ptawe^r B:ggipmpiq Operators Cableways $58.69 3C 8P King Power Equipment Operators Chipper $58.17 3C 8P King Power EoUIDment Operators Compressor $55.71 3C 8P King Power Equioment Operators Concrete Pump: Truck $58.69 3C 8P Mount With Boom Attachment Over 42 M King Paw<r Ec(r77ulaQaiLt t)J»rztars Concrete Finish Machine'' $55.21 7A 3C 8P laser Screed King Power t(n%aniel t CSpic*i'ptor' Concrete Pump - $57.72 7A 3C 8P Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 rage zs of zu King Pc vnr:..E:q ii i:nt; 0in itjws Concrete Pump: Truck $58.17 7A 3C 8P Mount With Boom Attachment Up To 42m King ow_er EgtrrpnrrrC operators Conveyors $57.72 7A 3C 8P King Pawcar EtiunrwrrenCm(7crators'Cranes Friction: 200 $60.47 7A 3C 8P tons and over King Zoay�!j V nt ment�OLacrzrtgrs Cranes: 20Tons $58.17 7A 3C 8P Through 44 Tons With Attachments King Pc@wer Err kmtrrrt_Oe�rtators Cranes: 100 Tons $59.28� 7A 3C 8P Through 199 Tons, Or 150' Of Boom (Including Jib With Attachments) King Power EaLiii ii errrt,0plrxtors Cranes: 200 tons- 299 $59.88 7A 3C 8P tons, or 250' of boom including jib with attachments King Powr*e' I cruipment Ope ralLo�:s Cranes: 300 tons and $60.47 7A 3C 8P _. over or 300' of boom including jib with attachments King ]"rawer' E urpn ion Operatam's Cranes: 45 Tons $58.69 7A 3C 8P Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) King I' wei'4(�GirrT�nt f pa a4ors Cranes: A-frame - 10 $55.21 7A 3C, 8P Tons And Under King Power t,y ri Tt nt: 0lierr?tors'Cranes: Friction cranes $59.88 7A 3C 8P through 199 tons King Power EquiPmentOC2er_ht(Lrs, Cranes: Through 19 $57.72 7A 3C 8P Tons With Attachments A-frame Over 10 Tons King V gAgL�g ament Operators Crusher $58.17 7A 3C 8P King Power,_ umx $58.17 7A C 8Pa 0 Winches (power) King Bawer Eye ,ltrfi;ic>n4_O7c4matcrs Derricks, On Building $58.69 7A 3C 8P Work King owev tram rn?en1 Dozers D-9 a Under $57.72 7A 3C 8P King Power Equrjgjrcrit OLorators Drill Oilers: Auger Type, $57.72 7A 3C 8P Truck Or Crane Mount King Power EauipmentOperators Drilling Machine $59.28 7A 3C 8P King Power Equipment oo_eiat_ors Elevator And Man-lift: $55.21 7A 3C 8P y Permanent And Shaft Type King Powrrr Ec grrrq(3t O�rcrraYor, Finishing Machine, $58.17 7A 3C 8P Bidwell And Gamaco Et Similar Equipment King Lowe ,t%L)r�ienL Opera rs Forklift: 3000 Lbs And $57.72 7A 3C 8P Over With Attachments King Powet'Equi 7g nerd OUSortztors Forklifts: Under 3000 $55.21 7A 3C 8P Lbs. With Attachments King Power _r a rnent Oor°rators Grade Engineer: Using $58.17 7A 3C 8P Blue Prints, Cut Sheets, Etc https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 rage V of )U King rjq_wcrf j �Ljjqjj q,,r.,iLoLtGradechecker/stakeman $55.21 7A I LC 8P King Rower-Eguiprngnt Operators Guardrail Punch $58.17 7A 3C SP King Power Er t —JL)rnem cm $58.69 7A 3C 8P _QLqlpr,s, Hard Tait End Dump Articulating Off- Road Equipment 45 Yards. Et Over King P(L,yff 1 eLtapme_ntOj7ern_lrars Hard Tait End Dump $58.17 7A 3C SP Articulating Off-road Equipment Under 45 Yards King Power Lqut nr a t Olacie t rs Horizontal/directional $57.72 7A 3C 8P Drill Locator King a powerr rnent Ol;xmt joLi Horizontal/directional $58.17 7A 3C SP Drill Operator King Ei,awoLf jmjMme mit Ope�ators Hydralifts/boom Trucks $57.72 7A 3C 8P _ _ Over 10 Tons King Lowe�r &�ui T10-ntOpp at2iLs Hydralifts/boom Trucks, $55.21 7A 3C 8P -Pa E_ _ 10 Tons And Under King Po%ycar rq ipgient )cralors Loader, Overhead 8 $59.28 7A 3C 8P Yards. ft Over King Power Equipment Operators Loader, Overhead, 6 $58.69 7A 3C 8P Yards. But Not Including 8 Yards King Power_f4ju.ip LatcLt:s Loaders, Overhead $58.17 7A 3C 8P Under 6 Yards King Power EnUipment Operators Loaders, Plant Feed $58.17 7A 3C 8P King EowtLr_Egj.ji )me,ra 0 xy,,LoLs Loaders: Elevating Type $57.72 7A 3C 8P Belt King Ppiyr L�Tjj<�yipi Locomotives, All $58.17 7A X 8P King Power E_quipmenLQpp rqtr?rs. Material Transfer Device $58.17 7A 3C 8P King Powei, Equipment _01)crators Mechanics, All (leadmen $59.28 7A 3C 8P - $0.50 Per Hour Over Mechanic) King 011orzatorss Motor Patrol Graders $58.69 7A 3C SP King t73rrrtators Mucking Machine, Mote, $58.69 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield King Power.E Lq�i2!L(tnt OL ijito(5. Oil Distributors, Blower $55.21 7A 3C 8P S �cr —- Distribution EL Mulch Seeding Operator King P o w o r E qt j i pftjgp_t 0 lLojja to r s Outside Hoists $57.72 7A 3C SP (elevators And Mantifts), Air Tuggers,strato King Power Overhead, Bridge Type $58.17 7A 3C 8P Crane: 20 Tons Through 44 Tons King Power Equij'anje it Ooaeaators Overhead, Bridge Type: $59.29� ZA 3C 8P 100 Tons And Over King EoAgr LcLuipmelaf 2pfLa oja Overhead, Bridge Type: $58.69 7A 3C 8P 45 Tons Through 99 Tons https://fortress.wa.gov/lni/wacyZ-1elookup/PrvWagelookup.aspx 3/31/2017 rage f u or Gu King I'ovwgr Equig)m,eit Olj�,Lg:ors Pavement Breaker $55.21 7A 3C 8P King Powr**o_E%ip-,nt Operators Pile Driver (other Than $58.17 7A 3C 8P Crane Mount) King Power 'cuipmentOperatgl's'Plant Oiler Asphalt, $57.72 7A 3C 8P Crusher King Power Equipment Operators Posthole Digger, $55.21 7A 3C 8P Mechanical King Power Equipment Operators Power Plant $55.21 7A 3C 8P King Power Fcluiperrent Operators Pumps - Water $55.21 7A 3C 8P King Power Ecr(Jprnernt OO u rtl)rs Quad 9, Hd 41, D10 And $58.69 7A 3C 8P Over King Pow t°p"EclurpnjLe 1l;l lQELoi c tL_ls Quick Tower - No Cab, $55.21 7A 3C 8P Under 100 Feet In Height Based To Boom King Power CgWiipmrorlOp2cL�Lors Remote Control $58.69 7A 3C SP Operator On Rubber Tired Earth Moving Equipment King Powrrr EGu pn t 0 avatars Rigger And Bellman $55.21 7A 3C 8P King Porno^r 4 g ripn)rcnak Ot craters Rigger/Signal Person, $57.72 7A 3C 8P Bellman (Certified) King Powv-f-Equiprrw(�rrt-O-rt�rators Rollagon $58.69 7A 3C 8P King o r,,iWEcicrr.Ewrn nt�)er'ajors Roller, Other Than Plant $55.21 7A 3C 8P Mix King Power- Eg.ai(amcrnt Oper'alnrs Roller, Plant Mix Or $57.72 7A 3C 8P Multi-lift Materials King Power Equipment Operators Roto-mill, Roto-grinder $58.17 7A 3C 8P King hro Etgt y maar?t Ohcoatrns Saws - Concrete $57.72 7A 3C 8P King PnwPr Fnum_mPnt Operators Scraper, Self Propelled $58.17 7A 3C 8P Under 45 Yards King Power E u! ment 2L)Lrators Scrapers - Concrete Et $57.72 7A 3C 8P Carry All King PoWver E OOM011twOa) Gral ps Scrapers, Self- $58.69 7A 3C 8P propelled: 45 Yards And Over King Power Ec1uiorn n O. Ziators Service Engineers - $57.72 7A 3C 8P Equipment King Powcrflcruipb_wgyrwQperatorSShotcrete/gunite $55.21 7A 3C SP Equipment King Power Emmrargenit OpL�C ors Shovel , Excavator, $57.72' 7A 3C 8P Backhoe, Tractors Under 15 Metric Tons, King Power Cquj enT-,Q) aturs Shovel, Excavator, $58,69 7A 3C SP Backhoe: Over 30 Metric Tons To 50 Metric Tons King Pcnvr<_LFggJ2 ePt Q alaais Shovel, Excavator, $58.17 7A 3C 8P Backhoes, Tractors: 15 To 30 Metric Tons King Power„- q rilan7e^rtit O)tars Shovel, Excavator, $59.28 7A 3C 8P Backhoes: Over 50 Metric Tons To 90 Metric Tons King f' awrr Ecluila aem!.-Olxeratrlr,1 1 $59.88 7A I 3C 8P https://fortress.wa.gov/lni/wagelook-up/prvWagelookup.aspx 3/31/2017 Page 11 of 210 Shovel, Excavator, Backhoes: Over 90 Metric Tons King fLLppn 1Zj to Ls Stipform Pavers $58.69 7A 3C 8P King Spreader, Topsider Et $58.69 7A 3C 8P Screedman King L)qwrLgtyiL $58.17 7A 3C 8P t�qqtratqr� Subgrader Trimmer King Powcr Ecjt1ij2!,LiCpj.PptZ��i rs Tower Bucket Elevators $57.72 7A 3C SP _ tp_ King Power (natois Tower Crane Up To 175' $59.28 7A 3C 8P LL In Height Base To Boom King Power E L—LdL�a'(m I t-on erators Tower Crane: over 175' $59.88 7A 3C 8P — through 250' in height, base to boom King uwrr,[.cl rjt zIA21is Tower Cranes: over 250' $60.47 7A 3C 8P in height from base to boom King Transporters, All Track $58.69 7A 3C 813 Or Truck Type King Power EcUlDrnent Operators Trenching Machines $57.72 7A 3C 8p King Pnweo=LrLtritrineniO3crators Truck Crane $58.17 7A 3C 8P Oiler/driver - 100 Tons And Over King RovLc:r -.q_L ji 1) �,ntO)era�rors Truck Crane $57.72 7A 3C SP Oiler/driver Under100 Tons King pQwrrj(LkjjL)jnent Ojx rotors Truck Mount u Portable $58.17 7A 3C 8P _ Conveyor_ I King E�Lwyc c, me nators Welder $58.69 7A 3C 8P 'LEI LApnt_Op2 King EgLw L_[c&jplent Op_orators Wheel Tractors, Farmatt $55.21 7A 3C 8P Type King Power Eq!,ip Liicnt Oporators Yo Yo Pay Dozer $58.17 7A 3C 8P _ _ — King LQ—WeLLmV—n Ica Asphalt Plant Operators $58.69 7A 3C 8P Sewer Ft Water King Power Eclulpigcq Assistant Engineer $55.21 7A 3C 8P Operators- Underarcund Sewer Ft Water King L?qw(Ll rrLLJILI!Ient Barrier Machine (zipper) $58.17 7A 3C 8P (12maPLn-.LJnlm,.round Sewer Et Water King Power Equipment Batch Plant Operator, $58.17 7A 3C SP Q2L�gtoi s- LhocLprgrw vid Concrete Sewer a Water King PowerfcLLjd jrgonj Bobcat 1 $55.21 7A 3C 8P PiLe-aLg"—Sulldgn'round Sewer Et Water King Brokk - Remote $55.21 7A 3C 8P Pj2c,,L,)L dvtj�round Demolition Equipment ki_ Severn' Et Water King 'Power Equipment Brooms $55.21 7A 3C 8P Or.)erators, Und grg!"OU d Sewer a Water gn King Bump Cutter $58.17 7A 3C 8P https://fortress.wa.gov/lni/wagelooktip/prvWagelookup.aspx 3/31/2017 rage 12 of zu I''cawer Ecar.rdyy-rci+mrot Operators- Underground Sewer a Water King Power elui)MOnt Cableways $58.69 7A 3C SP Oa)rtrators- Uncle_Pnuncl Sewer It Water King Paw�r FOui went, Chipper $58,17 7A 3C 8P c7ty r<ators- llnth_.r,rnUnd Sewer a Water King t awer Erlurlrbmc izt, Compressor $55.21 7A 3C 8P rator___Urxtfpam%q — — Sewer Ft Water King E_gmrr Ecluiipr erlt. Concrete Pump: Truck $58.69 7A 3C 8P Czar+r8f:ois-_UncrrrrPauirsf Mount With Boom Sewer a Water Attachment Over 42 M King Powerr Farm rent Concrete Finish Machine $55.21 7A 3C 8P Lergti;ors- lk_r7clerdtl incl -laser Screed Sewer E WaWater King 'owe+i° EtEiipertent Concrete Pump - $57.72 7A 3C 8P C c motors_n_(I_ryround Mounted Or Trailer High Sewer Et Water Pressure Line Pump, Pump High Pressure. King Dower Ecltai 3n� rent Concrete Pump: Truck $58.17 7A 3C 8P zators. UrIcLeMround Mount With Boom Sewer a Water Attachment Up To 42m King I?owar Fuiran'aent Conveyors $57.72 7A 3C 8P O Ler ators LL1-d2i:ano 11cl Sewer a Water King T'owcr Eckud>m(nt, Cranes Friction: 200 $60.47 7A 3C 8P 0)c.,r tears- U11c1Prr"(Writ! tons and over Sewer Es Water King Power Ecquipmont Cranes: 20 Tons $58.17 7A 3C 8P G7k)rsrator�- lJncierghr2tLna i Through 44 Tons With Sewer It Water' Attachments King Power Ec�tl)unent Cranes: 100 Tons $59.28 7A 3C 8P O er's ors._larlcicirgrr ury Through 199 Tons, Or 5eweo° Fc Watt r 150' Of Boom (Including --_,.._._ Jib With Attachments) King wme_a' Ec 21Pmigrrt. Cranes: 200 tons- 299 $59.88 7A 3C 8P t?peratars- undergroundf tons, or 250' of boom Sewer a Water including jib with attachments King Powc>+°fclurp!_nc�rlt Cranes: 300 tons and $60.47 7A 3C 8P 0,t?cC�[.crrs- gr1dergrourd over or 300' of boom Sewer Ft Water_ including jib with attachments King Power E rtriacr7t Cranes: 45 Tons $58.69 7A 3C 8P 7f2eratcrrs Unticrg_acrrd Through 99Tons, Under Sewer Ft Water 150' Of Boom (including Jib With Attachments) King Power EcImprnent Cranes: A-frame - 10 $55.21 7A 3C 8P Olvrators Undcrgrouud Tons And Under Sewer Et Water King Cranes: Friction cranes $59.88 7A 3C 8P through 199 tons https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 Fage I J of 2u l Power-f.an@»r2rnC r�_llai t_ramnjf_o S(jvver ft Wate� King P we r Lill ien L Cranes: Through 19 $57.72 7A 3C 8P raLnd Tons With Attachments Sewer 6 Water A-frame Over 10 Tons King LI0_tnCLLCj.LIjf)n(_IIQI Crusher $58.17 7A 3C 8P Sewer' Et Water King LL)WeL'ICI}J)I-nent Deck Engineer/deck $58.17 7A 3C SP 0 1a(-Fatcrs. jjqdo;+ f��mdl Winches (power) Sewer & Water King jLotg -�ui)nient Derricks, On Building $58.69 7A 3C 8P Onerators- Unde.igrqjjnLl Work Sewer Ei Water King E — _q�wLgrLcLwLrj*nt Dozers D-9 EL Under $57.72 7A 3C 8P PIRIELS—UnKTI ground Sewer ft Water King E2W(.1ir_EhU_I2nC_II 11 Mill Oilers: Auger Type, $57.72 7A 3C 8P pjLer,2toLs id Truck Or Crane Mount Sewer a Water King LO-W Drilling Machine $59.28 7A 3C 8P 01uje ators- gj iLeLp,rouid Sewet. Et Water King I erwcas,. fcta_ip 'nt Elevator And Man-lift: $55.21 7A 3C 8P pw 01 Irratqrs. jnd f Ld Permanent And Shaft y� Sewer & Water Type King Finishing Machine, $58.17 7A 3C SP ULLi!LLP , ��od Bidwell And Gamaco Et ,Lq _ Sewer A.V_ItLQ_r Similar Equipment King EoLCIL—Effi—Innient Forklift: 3000 Lbs And $57.72 7A 3C 8P On(mitors- LLrIcig qrotqnA Over With Attachments Sewer Et Water King L�qweLr�L 1�g�qt Forklifts: Under 3000 $55.21 7A 3C SP �L QIILr, Li;jo ry r r4I Uit Lbs. With Attachments Sewer Ft Water King Eqw<ae EcEu cut Grade Engineer: Using $58.17 7A 3C 8P Offer ...j..al m — nj(-L�Prourydl Blue Prints, Cut Sheets, . _ 14_ _ � _ Sewer & Water Etc King 2_ww e CgL�ilnnmt Gradechecker/stakeman $55.21 7A 3C SP OPL�alto_fsunkranowtncl Sewer Ft Water King Power Egul[LrUejit Guardrail Pinch $58,17 7A 3C 8P 0aeralors t.rou.LiLl Sewer Et Water King _FLqqipment Hard Tail End Dump $58.69 7A 3C 8P gjgr<itors- Wide 4ound Articulating Off- Road rf, Sewer.ft Water Equipment 45 Yards. Et Over King Lqw iL r F quaa inent Hard Tail End Dump $58.17 7A 3C 8P Opera 21s'jindeigound Articulating Off-road Sewer & Water Equipment Under 45 Yards King Horizontal/directionat $5732 7A 3C 8P Drill Locator https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 L UP -f,C Sewer Water King Paw r Fcrurl n w I It Horizontal/directional $58.17 7A 3C 8P Drill Operator Sewer Water King Iq i ( Hydralifts/boom Trucks $57.72 7A 3C 8P —Undo m ml ow"d Over 10 Tons Sewer El Water King Power swap rne,11 t Hydratifts/boom Trucks,1 $55.21 7A 3C 8P gLc rqtqjL��lUl-L�f(ypmmid 10 Tons And Under Sewer EL_Water -- --------- King 2(—m—Cr9 Sulp—IR—on! Loader, Overhead 8 $59.28 7A 3C 8P P12Lc,Liltqf ,�UndewroumLl Yards. & Over Sewer & Water King r'owero EwurlLjjjeujt Loader, Overhead, 6 $58.69 7A 3C 8P CiperatcF% 5dpjg iq Yards. But Not Including _gjrp,u_ Sewer Et Water 8 Yards King E2Ae�L-Lcl LJI�niont Loaders, Overhead $58.17 7A 3E 8P Operators- L Ei d Under 6 Yards Sewer ft Water King Power EquipmeM Loaders, Plant Feed 1 $58.17 7A 3C 8P 0j2emto!s .U ndgqr(&md _ Sewer a Water King Loaders: Elevating Type $57.72 7A 3C 8P Belt Sewer 8- Water King PmNet EQLJi"pment Locomotives, All $58.17 7A 3C 8P -()i07.r a t o r s- Sewer & Water King Pov—"C' EquiiLme)L Material Transfer Device $58.17 7A 3C 8P 012ci Ators-Uinlei v i ound Sewer_& Water King PoworEqufljLijic_n t Mechanics, All (leadmen $59.28 7A 3C 8P $0.50 Per Hour Over Sewer ft Water Mechanic) King Pomlr_IZ�Ulprnent Motor Patrol Graders $58.69 7A 3C 8P Sewer_a Water King Power r.cluilLrignt Mucking Machine, Mote, $58.69 7A 3C 8P Q)crators- Underground Tunnel Drill, Boring, Sewer a Water Road Header And/or Shield King E—owmi—r-cim,mrm)nt Oil Distributors, Blower $55.21 7A 3C 8P Distribution Ft Mulch Sewer Ei Water Seeding Operator King Powers Equipment Outside Hoists $57.72 7A 3C8P 2L�( — — — — Operatoirs Und r-qn ound (elevators And Sewer a Water Manlifts), Air Tug,R, ers,strato King a2w(l E(]Ldp ent Overhead, Bridge Type $58.17 7A 3C 8P p[jera torLsA ridergrou rid Crane: 20 Tons Through Sewer & Water 44 Tons I King Overhead, Bridge Type: $59,21 7A 3C 1P 100 Tons And Over https://fortress.wa.gov/lni/wacrelookup/prvWagelookup.aspx 3/31/2017 rage i:) of zu Ectu�i l)nwn Opet,;i! cot Undt*oground Power Edup er Sewer a Wat _ meat Overhead, Bridge Type: $58.69 7A 3C 8P King aprratr>ra U rdrer&rg_rmd 45 Tons Through 99 Sewer EL Water Tons King Power I g !iprrient Pavement Breaker $55.21 7A 3C 8P Ote-�ratois Und rnie]caatJ Sewer a Water King G°riwer Eriu hrr ct70. Pile Driver (other Than $58.17 7A 3C 8P Ot t r°atr]9 5 ttratler rr 4arrcl Crane Mount) Sewer Et Water King Powc>r�uai rrac,nt Plant Oiler - Asphalt, $57.72 7A 3C 8P (7yfE=i.crras-mlJotciusrm r'ta4incY Crusher Sewer Es Water- King PowrIr L!lipment Posthole Digger, $55.21 7A 3C 8P >crakois Unclrp_rnrrrerd Mechanical Sewer Et Water King I'owew�i�nE 7el'Yl, Power Plant $55.21 7A 3C 8P l ec tors- Underground Sewer Et Water .... King t'owerrLclrnlarnnrbl; Pumps - Water $55.21 7A 3C 8P C)Taerat rs= Urrdewrowrid Sewer a Water King Power EALAg ngLit Quad 9, Hd 41, D10 And $58.69 7A 3C 8P Operators- Undc�°g. gtund, Over Sewer a Water King Power Equipment Quick Tower - No Cab, $55.21 7A 3C 8P i��r2atc!r�r�- jno-round Under 100 Feet In Sewer a Water Height Based To Boom King k ow r Lmmtl< eEtt Remote Control $58.69 7A 3C 8P (3n ratans Undo_ round Operator On Rubber Sewer Es Water Tired Earth Moving ------------ _..— ...__.. Equipment King Power [=clu anent Rigger And Bellman $55.21 7A 3C 8P OOpe_ntois l uld ig ognd Sewer It Water King Powtlt_,I quiiLgjent Rigger/Signal Person, $57.72 7A 3C 8P OJPrrato s Undergrgund Bellman (Certified) Sewer & Water King Puwr-.'r_1ciLlroP-t1pent Rollagon $58.69 7A 3C 8P Qpt ratcirs- Un_err;r.rund Sewer a Water King Power Equipment Roller, Other Than Plant $55.21 7A 3C 8P Oa-0LloaS. Ur1clergro-jl'dd Mix Sewer EL Water King Power_EgUlpnlent Roller, Plant Mix Or $57.72 7A 3C 8P r perators- Undervtound Multi-lift Materials Sewer a Water King Power Ecla_iipment Roto-mill, Roto-grinder $58.17 7A 3C 8P OLayrtlt<> - Undetrtlound Sewer EL Water- King Powcar L ttia Twirnt Saws - Concrete $57.72 7A 3C 8P Qm1-rttocs- Understraumd Sewer a Water https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 ru;c I Ui /-v King Powertqur3Lg7ient. Scraper, Self Propelled $58.17 7A 3C 8P isewel ta W�tr de n tacl Under 45 Yards ._. King Poov4.Me fe!Aiplpe?it Scrapers - Concrete a $57.72 7A 3C 8P CJ�r_r }ars lL eerrnmu?el Carry All Sewer a Water King PQwerL 1ic—LJ'P7yent Scrapers, Self- $58.69 7A 3C 8P o ator - lk,Lc rarrouncl propelled: 45 Yards And Sewer &Water Over King Power-Equrp t7pe 1. nont Service Engineers - $57.72 7A 3C 8P r Ccris Jy7 errr�n (! Equipment Sewer Er. Water King Po+rver f"IL61)ment Shotcrete/gunite $55.21 7A 3C 8P Operatoo , INnrlcrr ceang9 Equipment Sewer a Water King powr;r l:gtrtilrirnerbt Shovel , Excavator, $57.72 7A 3C 8P gc;,rato�'s- tJrret_eurtKi Backhoe, Tractors Sewer a Water Under 15 Metric Tons. King Power Equipment Shovel, Excavator, $58.69 7A 3C 8P Q122_iaLL)r :Ur L&�iIjEoLqiq Backhoe: Over 30 Metric Sewer Ft Water Tons To 50 Metric Tons --------------------- King Pow¢hr Equi nio— ot Shovel, Excavator, $58.17 7A 3C 8P O)era,ears_Jne9rer—v1,o 1 n c I Backhoes, Tractors: 15 Sewer a Water To 30 Metric Tons King Porn g F IU-i�mmr,l. Shovel, Excavator, $59.28 7A 3C 8P Q)L)er'atorS- Undervrcurid Backhoes: Over 50 Sewer_ a Water Metric Tons To 90 Metric Tons King ho_wor Equ41nent Shovel, Excavator, $59.88 7A 3C 8P t7m, Backhoes: Over 90 Sewer a Water Metric Tons King EQwerr B ROPL12-nt Slipform Pavers $58.69 7A 3C 8P OJ:}e1_a.tor_s_Underground Sewer a Water King Powerr [clOp—ent Spreader, Topsider a $58.69 7A 3C 8P 6jer t rs Undeii,rougy t� Screedman Sewer fi Water King Power Equipment Subgrader Trimmer $58.17 7A 3C 8P Ope_rq,tors: Unde_ig until Sewer & Water King PoyvSr FruAincn7t Tower Bucket Elevators $57.72 7A 3C 8P Op_crextnr_ -_alnrrleft;1"ounil Sewer It Water King Powe ulill ent Tower Crane Up To 175' $59.28 7A 3C 8P _q, r'rrtor - Uridr r.anc6 In Height Base To Boom Sewer a Water King Pgnr�Cr3ku mnt, Tower Crane: over 175' $59.88 7A 3C 813 Oncrators- Udeerarouncl through 250' in height, Sewer a Water base to boom King PcwLi.Erj giprrrzti.nt, Tower Cranes: over 250' $60.47 7A 3C 8P xcratats- Woc6erround in height from base to Sewer Ei Water boom King Pc?wrtrr [i: i .@)mt.nt Transporters, All Track $58.69 7A 3C 8P Operators- Underground Or Truck Type Sewer a Water https://fortress.wa.gov/lni/wageloolcup/prvWagelookup.aspx 3/31/2017 Page I of )U King nwerlrlrurpnirrrt Trenching Machines $57.72 7A 3C 8P Jewer Fi Water 8— 7A 3 C 8P King L�Qt5' yj t Truck Crane 17 Pround Oiler/driver - 100 Tons Sewer Et Water And Over King Truck Crane $57.72 7A 3C 8P 21.�P[j L.ors- Und(-,,ri�i:c)uwj Oiler/driver Under 100 S F1Watewer er Tons King Powor EclwL)gimit Truck Mount Portable F$58.17 7A 3C 8 QpqjAUm, grOLI undqrnd Conveyor Sewer ft Water L $ King Welder 58.69 7A 3C 8P OneraLors..Undorgrot Ind Sewer ft Water ........... King Pa ver Equji)rnont Wheel Tractors, Farmall $55.21 7A 3C SID uiji Type Sewer El Water King Power f_gujij.)rnont Yo Yo Pay Dozer $58.17 7A 3C 8P ovs--Uule-lvvonrLct Sewer Et Water King Power Line Clearance Ti ee Journey Level In Charge $47.08 5A 4A Trimmers King Power Line Clearance Tree Spray Person $44.64 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment $47.08 5A 4A Trimmers Operator King Power Line Clearance Tree Tree Trimmer $42.01 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $31.65 5A 4A Trimmers Groundperson King An Journey Level $75.36 6Z IG Con L,t Lia! 1,kinic", King Residential Brick Mason Journey Level $54.32 LA IM King RLsidential Caf'L)trjqLs Journey Level. $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King RL1sjdcjjUal Nywah Journey Level $41.69 5D 4C Applicators King jLt�j iat I;�j �q, dent Journey Level $55,66 5P 1E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $39.40 7L 1H King Residential Insulation Journey Level $26.28 1 !J�2p-LaLOr5 King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 —- ---------------- — King Residential Plumbers Et Journey Level $34.69 1 King Residential rerriQrzraloun I. . Journey Level $75.36 6Z 1G Air Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or $45.99 7F IR Workers Shop) littps://foi-tress.wa.gov/lni/wagetookup/prvWagelookup.aspx 3/31/2017 rage 1 Z5 of zu King Residttr7bal Soft Floor Journey Level $45.86 5A 3D I a�c_rs King Residential Sprinkler Fittteis Journey Level $44.98 E5C 2R King Residential Stone Masons Journey Level $54.32 1M King Residential Terrazzo Journey Level $50.26 1M Workers King Residentiat Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile SettersJourney Level $25.17 1 King Roofers Journey Level $47.51 5A 3H King Roofers Using Irritable $50.51 5A 3H Bituminous Materials King Sheet Metat Workers Journey Level (Field or $75.46 7F 1E Shop) King 51r%alrt ualc9iu a!$data R-e air Boilermaker $41.72 7M 1 H King Sh_ipbuilcinr Ft Ship Repair Carpenter $41.06 7T 2B King Shi,pbuildinq & Ship Repair Electrician $41.09 7T 4B King 5 ahutdcltnc & SMp Rejjzjir Heat Ft Frost Insulator $65.68 5J 4H King SIrtJ3lJrlttthnr_ S_htiRc,aair Laborer $41.08 7T 4B King Shipbuilding @. Ship Repair Machinist $41.32 7T 4B King Shi12baJrl<.Itnn E Shio Itstp�ir Operator $41.03 7T 4B King ShipbuJJ drtq&_kr§,hh Rcpaii Painter $41.05 7T 4B King Siii'u btrulcfuurot� 6 5dpru Re p4ir Pipefitter $41.05 7T 4B King Shigalau ldtit Et Shtl' it 'Rigger $41.12 7T 4B King Shtpbinlchna 4,,L))J3 Repair 'Sheet Metal $41.04 7T 4B King ShIp1)ur[di 11P',S1111 Rg?arr Shipfitter $41.12 7T 4B King Shjj±gilchn & Sh o> r cdn, r Trucker $41.26 7T 4B King Shualnurtdfnn E 5itop 6teraair Warehouse $41.02 7T 4B King ShiplauttdietJ1„F¢_Shji Re;E,tir Welder/Burner $41.12 7T 4B King Sign Makers a installers Sign Installer $22.92 1 King 5rwua h A"I k.ms ft Rr7_;talLT�l-r Sign Maker $21.36 1 j¢lert_i_Actial] -- King Sion makers E €nstatlprs Sign Installer $27.28 1 jq(-n-Electu_iczl) King Stgn,PAra9cers £s, Installers. Sign Maker $33.25 1 jA n T! raricali King Soft Flc qLr.pyers Journey Level $45.86 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkles I itfirrs_.(C'iLe Journey Level $72.89 5C 1_X Protcx!i2ni King SC ¢,{rti ids roe Me r hanir s Journey Level $13,23 (Non Structrtrali, King Stone Masons Journey Level $54.32'' SA 1M King Street And Parkine Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction $57.72 7A 3C 8P Site Surveyor King Surycyo s Chainman $57.17 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/31/2017 Page 19 of 20 King SurvUnis Construction Site $58.69 7A 3C SP Surveyor King TeiecomMUnlCatlOn Journey Level $22.76 1 Technicians King TetophotM� Uric Cable Splicer $38.84 5A 2B Construction - Outside King Tcleg>honc Vutr Hole Digger/Ground $21.45 5A 2B Construction - Outside Person King Telephone-Line Installer (Repairer) $37.21 5A 2B Construction - Outside King 1ele)honeLine Special Aparatus $38.84 5A 2B Construction - Outside Installer I King TAUT!ann€7 Limy Special Apparatus $38.03 5A 2B Construction - Outside Installer II King Tel2I7h2nc Lin,2 Telephone Equipment $38.84 5A 2B Construction__Outside Operator (Heavy) King Telephone Line Telephone Equipment $36.09 5A 2B Construction - Outside Operator (Light) King Tele)—IaTrne Line Telephone Lineperson $36.09 5A 2B Construction - Outside King 1'-eleirhone Linn Television $20.33 5A 2B Construction - Outside Groundperson King Telerhonc loop Television $27.21 5A 2B Construction - Outside Lineperson/Installer King b"iile)hone t.inq Television System $32.55 5A 2B Construction Outside Technician King TrAcphone Line, Television Technician $29.18 5A 2B Construction - Outside King Y"elephone Line Tree Trimmer $36.09 5A 2B Construction - Outside King Terrazzo Workers Journey Level $50.26 5A 1M King Tile Setters Journey Level $21.65 1 King T deMaiblq & Terrazzo Finisher $41.09 5A 1B Finishers King Traffic Control udZ rs Journey Level $44.85 7A 1K King Truck Drivers Asphalt Mix Over 16 $52.70 5D 3A 8L Yards (W. WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards $51.86 SD 3A 8L (W. WA-Joint Council 28) Kin Tr Lick Drivers 8 g ��. -_-_ Dump Truck Trailer $52.70 5D 3A 8L King Truck Drivers Dump Truck (W. WA- $51.86 5D 3A 8L Joint Council 28) King Truck Drivers Other Trucks (W. WA- $52.70 5D 3A SL Joint Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers £t Irrigat_ioin Irrigation Pump Installer $17.71 1 Pump Installers King Well Drillers R Irrigation Oiler $12.97 1 Pump Installers King Well Driller $18.00 1 https://fortress.wa.gov/liii/wagelookup/prvWagelookup.aspx 3/31/2017 rage zu of lu �W PI C7r, Lle,s R It'n m—Ll u! Puorn�?:...InmtaY6�a'S I https://fortress.wa.gov/lni/wagelookyip/prvWagelookup.aspx 3/31/2017 EXHIBIT A Christensen Inc C; EN L R A L CCJNTRACTOR 28,10 Crites Street SW Ste 100 'I'uniwaler 1NA 98512 360 709-0330 FAX 360 709-0220 BID PROPOSAL KL Proposal Submitted To: Phone: Email: Nate Harper-City of Kent 253-856-5082 har er@k% a.uov Street: ProjectName: ate: 220 Forth Ave S Office Space Enclosure 3/28/2017 City, State&Zip Code: Project Location: Kent, WA 98032 City Hall, 3rd floor Human Services SCOPE OF WORK: Enclose Office Space Per Sketch e F ed fear orevalllnc vvaa WE PROPOSE hereby to furnish materiel and labor-complete In accordance with the above spedlIcations,for the,.sum of: Ea11mals excludes permits and fees,temporary power,utility hookups,special Inspections,and anything not listed above, Subtotal $14,269.53 Sales Tax @ 9.5% $1,355.60 $15,625.13 All mrtcclal is guaranteed to be..m specified.. All work Is guaranteed for one year after dote at Substantial Completion. All work to be Completed In aworkmanlike manner according to sumdant practices. Any ahcrationa or deviation from above specifications Involving extra cost allf be executed only upon written orders,and who become an extra charge over and above the esilmale. All armaments contingent Upon strikes,accidents or delays beyond our control. Owner to carry fire and'..other necessary Insurance, out worken are fully covered by workmen's compensation Mnsurance,hatrtat charged or 1.5x per month nn past doe accounts If cnlleetuan pprornadlnr,,s regeuVred,.Astorney fees and other costs will be paid by the Customer, Christensen Inc...,General Contractor It rcgislorod with tltt State of WA„registration.no. C'HRISIGO66LB at a general contractor and has posted with the state a bond of$6000 Nor She purpose of satisfying claims against the contractor for negligent or Improper work or breach of contract In the conduce or the contractor's business. The expiration data of this. contractor's registration is 06.11.2018. This bond may no't be sufficient to cover claim which might arise from the work done under your contract. If any supplier of material used In your construction project or any employee of the contractor or subcontractor Is not paid by the contractor or subcontractor on your job,your properly maybe Ilened to force payment. If you wish additional protection,you may request the contractor to provide you with original"`Ilan rtlaase"documents from each supplier or subcontractor an your pralem The contractor is required to provide you with further information about fen release documents if you request It,General Information if also available rrom the. Department of Labor and Industries. Christensen Inc., General Contractor Acceptance of Proposal Authorized Signature: The above prices,speclncallons and conditions are satisfactory and are hereby accepted. -Upon acceptance a contract will be Issued, V rs%1'F Thl p 56sal may be withdra, I�accepted In 3'0 days, Signalure Data 77 312BI20172:12 PM p'jw" Vito, JOA 'iIIIIA wffi"W' t"� )��'(M" Im Ol 'N�10 n1g)U60 te uj u E j G� i dip 'a E M 2 m 0 0 o Lr� Yx hh IL If 177 71 Ru ruMN 77SO4 m s,. Mn . Vu �M11� N e N C O 4w 1; V ry zv „: .0.: n nJ iS Fsw V�f Li.. O`n Y �L^ J c g as 2 'w Y w z EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automoblle iht insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Carr rcial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising Injury, and liability assumed under an insured contract. The Commercial Generall Llability Insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional Insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Comraensatlon coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Llabllitv insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. mmercial Gen_gLd Liability insurance shall be written with limits no less than $2,000,0100 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mall, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of range The City reserves the right to receive a certified copy of all required Insurance policies. The Contractor's Commerciia,l' General Liability insurance shall also contain a clause stating that coverage shall apply separately to each Insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, Including but not necessarily limited to the additional Insured endorsement, evidencing the Insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. CHRISM OP ID: BIT II ACORO CERTIFICATE OF LIABILITY INSURANCE DATE 1O0 12115111b12016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER, IMPORTANT': If the certificate holder Is an ADDITIONAL INSURED,the pollcy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the temis and conditions of the policy,certaln policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endoreement(s). TA I PRODUCER NANB IOIIIIe Trip .............. . Nicholson S Associates PAX PHONE 360.362 8444 c n 360-943 9712 1802 Black Lake Blvd.SW , . ILP aM➢........__..®. - tA+ N-L Olymppia,WA 98512 nDDRCS3 mollonlchlnsure.com Beet M.Houk _. IAFFO -.. -'--__ ... ................ .. ........ INSURERISI AFFORDING COVERAGE NgICtl INSURER A;Associated Industries Insuranc o... ..._. ... ..s ..................... y -.s .. , -- weuREo Christensen,Inc. ---- INSURERS'Ohio Security Insurance 24082 General Contractor ""' ' '.""" -- " " - '- 2840 Crites St SW,Sulte 100 INSURER C;Sta rStone Specialty Insurance Tumwater,WA 98612 INSURER0 INSURER E INSU0.E0.F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS ^ CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INgN ..._...�.. .-._ ....-. TxsL'.UaR_.,.,_. — ....,. 601rd(�` F �. .72fi IOy . . LIMITS LTR TYPE OF INSURANCE .an U FnLIr'YNHMRFR D A_ A X COMMERCIAL GENERAL LIABILITY EACHOCCURRENCE 5 1,000,00 - _ T1AhrA0E'"TONCmKD ""' ._ _.... _... ")CLAIMS-MADE �OCCUR X X AES1039630 06H612016 08116I2017 3 100,00 EBP.MGfi.8.1L.F.dt5Lkt4A^a21. _. __ ........_ MEDEXP(Anyone Perron) 3 5,00 .... ................._... ........ ... _......�. PERSONAL.....SADV INJURY 5 1,000,000 �.. ......._........�............. .......... . .. GENLAGGREGATE.LIM@ITAPPLIES PER GENERAL AGGREGATE 3 2. 00,00 POLICY JPII LOG PRODUCTS-COMPIOP AGG 3 2.000,00 OTHER' AUTOMOBILE LIABILITY COMBINED GNOLe LIM " S 1.000,000 A X ANY AUTO X X BAS672326ZO 0611612016 06/1612017 BODILY INJURY(Per Person) 3 AALL UTOOS�ED AUTCSULED .BODILY INJURY(Pa ecGOonB 3 NON-OWNED 15RER'Y"Y'OAMAD@ "" 3 X HIRED AU OS X AUTOS fggggEWanXI-____...................... 3 X UMBRELLA LIAR IX OCCUR EACH OCCURRENCE 3 4.000,00 C EXCESS LIAR CLAIMS-MADE X X 69D39R160ALI D6/16/2016 06116/2017 AGGREGATE s 4,000,00 nFn X RETENTIONS 10,000 s 'WORKERS COMPENSATION �® X TATIITF FR C AND EMPLOYERS'LIANUTY 1bT'-' — A ANY PRDPRETOR/PARTNERIE%ECUTIVE YIN X 4ES1D39630 D611612016 0WIS12017 EL EACHAOCIDENT 3 1,000,00 OFFICER."EMBER EXCLUDED? yY1A WA STOP GAP EL DISEASE-EA EMPLOYE R 1000,00 QMendatery In Nnd Ill yyea,dcwvfbe under 1.000 - DPSCRmTd N OF OPERATIONS below EL DISEASE-POLICY LIMIT 3 1,000,00 B Installation IBM057232670 0611812016 0611612017 (Limit: 580100 Floater DESCMPnONOFOPEMnONSILOCAnONSIVEHICLES IACORD 101,Additional Remrtka Schadula,may W shaehed If mom apse lemqulrodl RE:Centennial Conter Parking Gara10o Project City of Kent Is Included as additlanal insured per the attached andoraement. Coversgggg(e afforded shall be primary&nonconfilbputory&Include on 'oinpp& Compiler ap elllation or mai riallcchange iver In Coverage Goffltictitel° the.,cantinuiedd�p011cy CERTIFICATE HOLDER CANCELLATION CITYK-1 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Kent 220 4th Ave S Kent,WA 98032 AUTHORIZED REPRESENTATIVE C 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD NOTEPAD: HOLDER CODE CITYK-1 CHRIS01 � Pass2 Plauaso1 NAME Chrlstensen,Inc. OP ID:BT ow 1 2/1 612 01 6 holder shall be provided 30 days notification, except for nonpayment of premium in which case tees days notice shall ba provided. Policy Number:AES1039530 00 COMMERCIAL GENERAL LIABILITY CG 20 33 07 04 THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU This endorsement modifies Insurance provided under the following; COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to B. Willi respect to the insurance afforded to these include as an additional insured any person or or- additional insureds, the following additional exclu- ganization for whom you are performing operations sions apply: when you and such person or organization have This insurance does not apply to: agreed in wrltmg in a contract or agreement that'. such parson or organization be added as an addi- 1• "Bodily injury', "property damage" or "personal tional insured on your policy. Such person or or- and advertising injury" arising out of the render- ganization is an additional Insured only with re- ing of, or the failure to render, any professional spect to Ilabillty for "bodily injury", "property architectural, engineering or surveying servic- damage" or "personal and advertising injury" es, including: caused, in whole or in part,by: a. The preparing, approving, or failing to pre- 1. Your acts or omissions; or pare or approve, maps, shop drawings, opi- 2. The acts or omissions of those actin our opi- nions, reports. surveys, field orders, change g on Y orders or drawings and specifications;or behalf; in the performance of our ongoing operations for b. Supervisory, inspection, architectural or P Y 9 9 P engineering activities. the additional insured. A person's or organization's status as an additional 2. after: injury" or "property damage" occurring Insured under this endorsement ends when your operations for that additional Insured are com- a. All work, including materials, parts or pleted. equipment furnished in connection with such work, on the project (other than ser- vice, maintenance or repairs) to be per- formed by or on behalf of the additional in- suredjs) at the location of the covered operations has been completed;or b. That portion of 'your work" out of which the Injury or damage arises has, been put to Its Intended use by any person or organization other than another contractor or subcontrac- tor engaged in performing operations for a principal as a part of the same project. CG 20 33 07 04 © ISO Properties, Inc., 2004 Page 1 of 1 0 POLICY NUMBER: AES1039530 00 COMMERCIAL GENERAL LIABILITY NX GL 009 08 09 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NON-CONTRIBUTING INSURANCE (THIRD-PARTY) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Third Party: All persons or organizations where required by written contract with the Named Insured (Absence of a specifically named Third Party above means that the provisions of this endorsement apply as required by written contractual agreement with any Third Party for whom you are performing work) Paragraph 4.of SECTION IV: COMMERCIAL GENERAL LIABILITY CONDITIONS is replaced by the following: 4. Otherinsurance; With respect to the Third Party shown above, this insurance Is primary and non-contributing. Any and all other valid and collectable insurance available to such Third Party in respect of work performed by you under written contractual agreements with said Third Party for loss covered by this policy, shall in no instance be considered as primary, co-insurance, or contributing insurance. Rather, any such other insurance shall be considered excess over and above the insurance provided by this policy. NX GL 009 08 09 Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission POLICY NUMBER: AES1039530 00 COMMERCIAL GENERAL LIABILITY CG 24 04 05 09 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies Insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: All persons or organizations where required by written contract with the Named Insured Information re wired to com lete this Schedule, if not shown above,will be shown In the Declarations. The following is added to Paragraph 8.Transfer Of Rights Of Recovery Against Others To Us of Section IV—Conditions: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work"done under a contract with that person or organization and Included In the "products- completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. CG 24 04 05 09 m Insurance Services Office, Inc., 2008 Page 1 of 1 13 POLICY NUMBER: AES1039530 00 COMMERCIAL GENERAL LIABILITY CG 20 37 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Or anization s : Location And Description Of Completed Operations All persons or organizations where written contract with the Named Insured requires additional insured completed operations coverage. This form does not apply to your work on"residential property". Information required to complete this Schedule. if not shown above.will be shown in the Declarations. Section II — Who Is An Insured Is amended to include as an additional insured the persons) or organizations) shown in the Schedule, but only with respect to liability for 'bodily injury" or "property dam- age" caused, in whole or in part, by "your work" at the location designated and described in the sche- dule of this endorsement performed for that addi- tional insured and included in the "products- completed operations hazard". CG 20 37 07 04 ©ISO Properties, Inc., 2004 Page 1 of 1 13 City of Kent Business License KENT Wnaeixoros CHRISTENSEN INC GENERAL CONTRACTOR 2840 CRITES ST SW STE 100 TUMWATER,WA 98512 Please tear at perforation BUSINESS LICENSE Per xewss,a local sales b and use tax must be coded LICENSE MUST BE PAID ANNUALLY BY No. 1715 I'or nil c llfied • JANUARY 1st TO AVOID PENALTY soles within the city of KENT Issuance of License Does Not Imply Lleensce's Kent, we e n u o.o. Compliance with State and Locnl Lnws THIS LICENSE MUST BE POSTED IN A CONSPICUOUS Year : 2017 PLACE.NOT TRANSFERABLE OR ASSIGNABLE NAME AND ADDRESS OF BUSINESS G BLOC-2170046 CHRISTENSEN INC GENERAL CONTRACTOR MA YOR 2840 CRITES ST SW STE 100 The City of Kent TUMWATER, WA 98512 At 220 4Ta AVA so In?NT,WASWNGTON 98032 3/31/2017 aboutblank State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Payment Receipt Your payment has been processed and your form has been submitted. Transaction 3/31 /2017 Date Transaction Id 105683103 Project Name New Office Space Form Filed Intent Form Id 824012 Payment Type MC *rt****"*****2452 Amount Billed $40.00 about blank 1/1