Vendor Name: R.L. Alia Company
Vendor Number:
JD Edwards Number
Contract Number: PW 16-1 6 —00
This is assigned by City Clerk's Office
Project Name: James Street Im rovements-Watermain & Landscaping
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
Other:
Contract Effective bate: 3 29 15 Termination Gate:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Toby Hallock/Paul Kuehne Department: PW Engineering
Contract Amount: $2.070,001.30
Approval Authority: (CIRCLE' ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #
As of: 08/27/1.4
T
KENT FEB 0 7 2017
W w S H 1 N O T O n
CHANGE ORDER NO. #2
NAME OF CONTRACTOR: R.L. Alia Company ("Contractor")
CONTRACT NAME & PROJECT NUMBER: James Street Improvements-Watermain and Landscaping
ORIGINAL CONTRACT DATE: March 29, 2016
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Create pay item for the installation of the drain strip due to planter
strip washouts because of the rainfall and street runoff.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $2,070,001.30
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $12,385.91
(incl. applicable WSST)
Current Contract Amount $2,082,387.21
(incl. Previous Change Orders)
Current Change Order $12,798.50
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $2,095,185.71
CHANGE ORDER - 1 OF 3
Original Time for Completion 60 working days
(insert date)
Revised Time for Completion under 61 working days
prior Change Orders
(insert date)
Days Required (±) for this Change 4 calcridar days
Order
Revised Time for Completion 65 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final' settlement of all claims of any kind or nature
arising from or connected with any work either covered oir affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits., This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written b�elow.
CONTRACTOR: CITY GFJKENT:
By:— By
(signature) (signature)
Print Name: 6,41zv I— Print Name:..Tim.ot,hy J. LaPorte
Its w Its Public Works Director
(title) (title)
DATE:_.. DATE: A D/
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[In this Weld,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
KENT FILE NO: 200.2
w.a....a T..
CHANGE ORDER WORKSHEET NO. 2
Construction Management Division - Public Works
Project: James Street Landscape Project No.: 15-3010
Project Engineer: Paul Kuehne Fed-Aid No.: N/A
Owners Rep: Phil McConnell Contractor: RL Alia
Date: Various
I. PROPOSED CHANGE
Create pay item for the installation of drain strip
II. REASON AND BACKGROUND FOR CHANGE
Mitigate planter strip washouts due to rain fall and street runoff
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of
Qty PE Item
i
7B Install mowing strip 2327 2327 LF $5 50 $12 798 50
Independent Estimate Attached CREATE PAY ITEM ONLY— Payment to be made PAY THIS PAY ESTIMATE
-REQUIRED at a later date upon completion of work _ i___i_____7_.___
-- --- _ - ----- ------ -------- -------------- -------
Material Submittals Required CC: Construction Coordinator New Sub Reqrd? No
DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch. No. B.I.No. Item Description Qty ! Unit Unit Price Cost of Item
---- ----------- --- _._......_,. ....._......_..._....... ... _ ----- ------ ----..._.. ------- -- ------- --- -
i
Independent Estimate Attached -REQUIRED
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch.No. 13.1. No. Item Description Qty Unit Unit Price Cost of Item
- --- __ -- --- -------------
----- --------
Independent Estimate Attached -REQUIRED
1 REV. DATE:4/01/10
KENT FILE NO: 200.2
w.awi..o*o.
TOTAL ESTIMATED COST OF CHANGE ORDER * $12 798.50
*Total of the Cost of Item Columns
THIS PAY ESTIMATE $12,798.50
IV. WORKING DAYS
Original Contract Q Due This Change Order* 1 4 Previous Total
— _
_*_______ - `---.--------
--------------- _.____--_.-__
DATE DATE:
------
Ex anation Justification Re uired: extends work -critical ath
TOTAL WORKING DAYS*
*This Change Order+ Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: Date: t 2-3—Z^vl
Construction Supervisor: Date: / .. 7
Paul Kue ne
Construction Manager: �/ Date: /
ricConnor
2 REV. DATE:4/01/10
McConnell Phillip
From: David Pankiewicz <dpank@rlalia.com>
Sent: Tuesday, October 25, 2016 12:39 PM
To: Kuehne, Paul; 'Gary Pankiewicz' �d
Cc: Connor, Eric; McConnell, Phillip; Shields, Brian; Hallock, Tobias
Subject: RE: Strip Edge Pricing - James St Landscaping
Hi Paul,
We got a quote from the manufacturer that you suggested. With their price and the unknowns of concrete spillout
underneath the sidewalk, Alia would NOT be able to install this for less thatn$5.50/1-F. This product ships from out of
state and could be up to a 7-10 day lead time. Please let us know if you want us to proceed with procurement of this
material.
Also, Leith took a rough measurement in the field and is coming up with 4100 LF.
Thanks,
David
-----Original Message-----
From: Kuehne, Paul [mailto:PKuehne@kentwa.Rov]
Sent: Friday,October 21, 2016 3:41 PM
To: David Pankiewicz (dpank@rlalia.com); Gary Pankiewicz (gipank@rlalia.com)
Cc: Connor, Eric; McConnell, Phillip; Shields, Brian; Hallock,Tobias
Subject: Strip Edge Pricing-James St Landscaping
httgs://www.olyola.com/landscape-edging/super-edg/
Hello David and Gary,
Would you be willing to provide and install the attached product for$4.00 per lineal foot? ...1000 LF minimum.
Please provide a timeframe to start and complete the work.
Paul Kuehne, Construction Management Supervisor Construction Management Public Works Department
220 Fourth Avenue South, Kent,WA 98032
Phone 253-856-5543 1 Cell 253-740-5015
PKuehne@KentWA.gov<http://www.choosekent.com/>
CITY OF KENT, WASHINGTON
-----Original Message-----
From: David Pankiewicz [mailto:dpank@rlalia.com]
Sent: Friday, October 21, 2016 10:28 AM
To: Kuehne, Paul; 'Gary Pankiewicz'
1
Cc: Connor, Eric; McConnell, Phillip;Shields, Brian; Hallock, Tobias
Subject: RE:Strip Edging Pricing-James St Landscaping
Hi Paul,
Would it work if we did the strip edging on a force account basis?
Let me know.
Thanks,
David
-----Original Message-----
From: Kuehne, Paul [mailto:PKuehne@kentwa.gov]
Sent: Thursday, October 20, 2016 10:15 AM
To: David Pankiewicz (dpank@rlalia.com); Gary Pankiewicz (gipank@rlalia.com)
Cc: Connor, Eric; McConnell, Phillip; Shields, Brian; Hallock, Tobias
Subject: Strip Edging Pricing-James St Landscaping
Hello Gary and David,
Please provide pricing to install vertical UV resistant plastic strip edging along the uphill end and sidewalk side for
planters with slopes over 6%. The strip to be placed one inch above sidewalk elevation with a minimum 4" bury.
Please call me to discuss.
Paul Kuehne,
Construction Management Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 48032
Phone 253-856-5543 1 Cell 253-740-5015
PKuehne@KentWA.Rov
CITY OF KENT,WASHINGTON
2