Loading...
HomeMy WebLinkAboutPW17-011 - Original - PumpTech, Inc. - East Hill Well I Pump Replacement - 01/03/2017 y I ? .. D®h.u4 tl ➢eIlpf CONTRACT COVER SHEET This is to be completed by the cCnntract managar prior to sMUb mussWon � to City cClerlus Office. Ali porVons are: t® be completed. If you have questions, please contact City Clerk's Office. Vendor Number, JD Edwards Number contract Huambera Pyy n -o C This is assigned by City Clerk's Office Descriptlona Tnterlocal Agreement ❑ Change Order ❑Amendment ❑ Contract Other: �? N Contract Effective Dated �� � $� _ u ennination bated Onfr,MU RGnOlff al l OUM (DaVS)a Number of days required notice for termination or renewal or amendment i Contract Manager. DePartmenta Contract Aar o unta . IU_ Approval Authority. ❑ Department Director []Mayor City Council U11 p Detail,, (Le. address, location, parcel number, tax id, rate.). 6 }- C 1 l Wtil . PUMLO P"O 'f3 adccW10877_8_14 TAB INDEX Tab 1 Bidder's Tab 2 Payment and Performance and Contract Tab Table me is Tab e Special Provisions Tab 5 Kent Technical Specifications WaterTab 6 Well Report Tab 7 PrevailingWage Rates j CITY OF KENT KING COUNTY, WASHINGTON ;I K NT SPECIAL PROVISIONS FOR East Hill Well I Pump Replacement �i Promect Number BIDS ACCEPTED UNTIL BID OPENINGj' December 6, 2016 December 6, 2016 10:45 A.M. 11:00 A.M. DELIVER TO CITY OF KENTf CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 t A. ac' TIMOTHY J. LAPORTIE, P.E. ���0 was PUBLIC WORKS DIRECTOR KENT �II WA5HIN GTON 1 i i v BIDDER'S NAME Z�17'W7-,5'42Z' --27^I C- CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR East Hill Well 1 Pump Replacement Project Number: W20039 BIDS ACCEPTED UNTIL BID OPENING December 6, 2016 December 6, 2016 10:45 A.M. 11:00 A.M. DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 TIMOTHY J. LAPORTE, P.E. PUBLIC WORKS DIRECTOR 4^4��:F� KENT WASHINGTON ORDER OF CONTENTS FOR BID PACKAGE Invitation to Bid Contractor Compliance Statement Declaration - City of Kent Equal Employment Opportunity Policy Administrative Policy 1.2 - Minority and Women Contractors City of Kent Equal Employment Opportunity Compliance Statement (to be completed AFTER COMPLETION) Proposal City of Kent Subcontractor List (over $100K) Subcontractor List (over $1 million) Contractor's Qualification Statement Proposal Signature Page Bid Bond Form Combined Declaration Form: Non-Collusion, Minimum Wage Change Order Bidder's Checklist ORDERFCONTENTS Invitation to Bid Contractor Compliance Statement Declaration — City of Kent Equal Employment Opportunity Policy Administrative Policy 1 .2 — Minority and Women Contractors City of Kent Equal Employment Opportunity Compliance Statement Proposal City of Kent Subcontractor List (over $100K) Subcontractor List (over $1 million) Contractor's Qualification Statement I Proposal Signature Page Bid Bond Form Combined Declaration Form Non-Collusion, Minimum Wage Change Order Bidder's Checklist Payment and Performance Bond Contract Table of Contents Kent Special Provisions Kent Technical Specifications Water Well Report Prevailing Wage Rates it INVITATION TO BID Notice is hereby given that the City of Kent, Washington, will receive sealed bids at the City Clerk's office through December 6, 2016 up to 10:45 a.m. as shown on the clock on the east wall of the City Clerk's Office on the first floor of City Hall, 220 4th Avenue South, Kent, Washington. All bids must be properly marked and sealed in accordance with this "Invitation to Bid." Bids must be delivered and received at the City Clerk's office by the above-stated time, regardless of delivery method, including U.S. Mail. All bids will be opened and read publicly aloud at 11:00 a.m. for the City of Kent project named as follows: East Hill Well 1 Pump Replacement Project Number: W20039 The project consists of providing and installing a 250 Horsepower-Byron Jackson submersible well pump motor, a Byron Jackson submersible 5 stage well pump, 210 feet of 10-inch diameter hot-dipped galvanized column pipe, a 10-inch diameter bleed-back check valve, power cable assemblies, 630 feet of 1-inch diameter flush-thread schedule 80 PVC tubing, and miscellanies components in accordance to with the Kent Special Provisions and Technical Specifications, The Engineer's estimated range for this project is approximately $180,000 - $220,000. Bid documents may be obtained by contacting City of Kent Public Works Operations, Andrew Dacuag at 253-856-5653. For technical questions, please call Bryan Bond at 253-856-5662. Bids must be clearly marked "Bid" with the name of the project on the outside of the envelope, addressed to the City Clerk, 220 4th Avenue South, Kent, WA 98032-5895. Only sealed bids will be accepted. No facsimiles or electronic submittals will be considered. Each bid shall be in accordance with the plans and specifications and other contract documents now on file in the office of the City Engineer, City of Kent, Washington. Paper copies of the plans and Kent Special Provisions may be purchased at a non-refundable cost of $50 for each set. Plans and specifications can also be downloaded at no charge at KentWA.gov/­doinci-business/­bidg-procurement. Copies of the WSDOT Standard Specifications are available for perusal only. A cashier's check, cash or surety bond in the amount of 5% of the bid must be included with the bid, The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previously performed work subject to the President's Executive Order No. 11246. No bidder may withdraw his/her bid for a period of sixty (60) days after the day of bid opening. Dated this 21" day of November, 2016. BY: Kimberley A. moto, City Clerk Published in Daily Journal of Commerce on November 22 & 29 2016 CONTRACTOR COMPLIANCE STATEMENT (President's Executive Order #11246) Date /� —/ /Z This statement relates to a proposed contract with the City of Kent named East Hill Well 1 Pump Replacement Project Number: W20039 I am the undersigned bidder or prospective contractor. I represent that - 1. I X have hvve�t, participated in a previous contract or subcontract subject to the President's Executive Order #11246 (regarding equal employment opportunity) or a preceding similar Executive Order. NAME OF BIDDER � _ y SIG NATO ADDRESS (Note to Bidders: The information required in this Compliance Statement is informational only) East Hill Well 1 Pump Replacement/Bond 1 November 21,2016 Project Number: W20039 i DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such, all contractors, subcontractors and suppliers who perform work with relation to this contract shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific contract to adhere to. An affirmative response is required on all of the following questions for this contract to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlined, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the contract; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this contract I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this contract the, prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the contract I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this contract, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. For: ,�L✓f�T 't7�c� -7 Title: l� Date: East Hill Well 1 Pump Replacement/Bond 2 November 21, 2016 Project Number: W20039 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding contracts with the City amounting to $10,000 or more within any given year, must take the fallowing affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the contract. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. East Hill Well 1 Pump Replacement/Bond 3 November 21, 2016 Project Number: W20039 i CITY OF (CENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the contract. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before- mentioned company was the prime contract for the contract known as East Hill Well 1 Pump Replacement/Project Number: W20039 that was entered into on the (Date) , between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned contract. By: -c'— For: Title: Date: /z East Hill Well 1 Pump Replacement/Bond 4 November 21, 2016 Project Number: W20039 PROPOSAL To the City Clerk City Hall Kent, Washington 98032 The undersigned hereby certifies that has examined the job site and construction details of the work as outlined on the plans and described in the specifications for the project named East Hill Well 1 Pump Replacement/Project Number: W20039 for the City of Kent, Washington, and has read and thoroughly understands the plans and specifications and contract governing the work embraced in this improvement and the method by which payment will be made for that work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with the bid and contract, and at the following schedule of rates and prices: NOTE TO BIDDERS: 1) All bid items are described in the Kent Special Provisions (KSP) or the Standard Specifications (WSDOT). Reference the Section No. listed in this proposal, where the bid item is described. 2) Proposal items are numbered in sequence but are non-continuous. 3) Unit prices for all items, all extensions, and total amount of bid must be shown. 4) Should bid items with identically worded bid item descriptions, marked with asterisk (*), appear in more than one schedule of the proposal, the bidder must bid the same unit price on corresponding items for each schedule. If the Contractor enters different unit prices on these items, the City will unilaterally revise the bid amounts to the lowest unit price on each corresponding item and recalculate the Contractor's total bid amount. The corrected total bid amount will be used by the City for award purposes and fix the amount of the contract bond. SCHEDULE I ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1 2-03.5 100 Roadway Excavation, $14.00 $1,400.00 WSDOT CU YDS Including Haul Per CY Any bids not filled out properly may be considered non-responsive. East Hill Well 1 Pump Replacement/Bond 5 November 21, 2016 Project Number: W20039 SCHEDULE I - WATER ITEM TECHNICAL APPROX. ITEM UNIT TOTAL NO. SECTION QUANTITY PRICE AMOUNT NO. 1000 B.4.06 1 EACH Byron Jackson Submersible $ iS6S �$ Pump Motor 250 HP, 460V, Per EA 30, Oil-filled 1010 B.3.11 1 EACH Submersible Pump Byron $ 38,C Jackson 15MQL-5 Stage Per EA 1020 B.5.03 210 10-inch Column Assembly $ 76o ZZ5, LN FT Per LF 1030 B.6.03 1 10-inch Bleed-back Check $ 1,2,5 / $ EACH Valve Per EA 1040 B.7.05 210 500 MCM Round Submersible $ ! 9C,as $ LN FT Power Cable Per LF 1050 B.8.03 630 Flush-thread PVC Sounding $ /Q 8 3 $ ZE 70 LN FT Tubes Per LF Sub Total $ / / 5, .. �10 9.5% WA State Sales Tax $ / �f 190 o Schedule I Total $ I East Hill Well i Pump Replacement/Bond 6 November 21, 2016 Project Number: W20039 CONTRACTOR'S QUALIFICATION STATEMENT (RCW 39.04.350) THE CITY WILL REVIEW THE CONTRACTOR'S RESPONSES TO THIS FORM TO DETERMINE WHETHER THE BIDDING CONTRACTOR IS RESPONSIBLE TO PERFORM THE CONTRACT WORK THIS FORM REQUIRES CRITERIA ESTABLISHED BY STATE LAW AS WELL AS SUPPLEMENTAL CRITERIA ESTABLISHED BY THE CITY THAT ARE APPLICABLE TO THIS PUBLIC WORKS PROJECT, THE BIDDER SHOULD READ AND RESPOND TO THIS FORM CAREFULLY, Indicia of contractor's responsibility inherently involve subjective determinations as to the contractor's ability to perform and complete the contract work responsibly and to the owner city's satisfaction. The city has an obligation and a duty to its citizens and its taxpayers to administer its budgets and complete its projects in a businesslike manner. Accordingly, it has a duty to exercise the type of inquiry and discretion a business would conduct when selecting a contractor who will be responsible to perform the contract work. The city's supplemental criteria are based, in large part, on the qualification statement form used by the American Institute of Architects. The city provides these criteria so as to provide the most objective framework possible within which the city will make its decision regarding the bidder's ability to be responsible to perform the contract work. These criteria, taken together, will form the basis for the city's decision that a bidder is or is not responsible to perform the contract work. Any bidder may make a formal written request to the city to modify the criteria set forth in this qualification statement, but that request may only be made within 48 hours of the date and time that the bidder first obtains the bid documents or three (3) business days prior to the scheduled bid opening date, whichever occurs first. If the city receives a modification request, it will consider any information submitted in the request and will respond before the bid submittal deadline. If the city's evaluation results in changed criteria, the city will issue an addendum establishing the new or modified criteria. If the city determines that, based on the criteria established in this statement, a bidder is not responsible to perform the contract work, the city will provide written notice of its determination that will include the city's reason for its decision. The bidder has 24 hours from the time the city delivers written notice to the bidder that the bidder is not responsible to perform the contract work to appeal the city's determination. No appeals will be received after the expiration of this 24 hour appeal period. The city may deliver this notice by hand delivery, email, facsimile, or regular mail. In the event the city uses regular mail, the delivery will be deemed complete three days after being placed in the U.S. Mail. The bidder's right to appeal is limited to the single remedy of providing the city with additional information to be considered before the city issues a final determination. Bidder acknowledges and understands that, as provided by RCW 39,04.350, no other appeal is allowed and no other remedy of any kind or nature is available to the bidding contractor if the City determines that the bidder is not responsible to perform the contract work. East Hill Well 1 Pump Replacement/Bond 8 November 21, 2016 Project Number: W20039 If the bidder fails to request a modification within the time allowed, or fails to appeal a determination that the bidder is not responsible within the time allowed, the city will make its determination of bidder responsibility based on the information submitted. COMPLETE AND SIGN THIS FORM AS PART OF YOUR BID. FAILURE TO PROPERLY COMPLETE THIS FORM MAYALSO RESULT IN A DETERMINATION THAT YOUR BID IS NON-RESPONSIVE AND THEREFORE VOID, THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED BY: / ( G� �Gt��` PASe �' ��•: �Tcch �rlc_ NAME: _�jc �G <✓ a�.�/t�e as�,< ADDRESS: fza e7,� SG' 32„,GV s Z PRINCIPAL OFFICE: ADDRESS: PHONE: FAX: 1. STATUTORY REQUIREMENTS 1.1 Provide a copy of your Department of Labor and Industries certificate of registration in compliance with chapter 18.27 RCW. 1.2 Provide your current state unified business identifier number. 1.3 Provide proof of applicable industrial insurance coverage for your employees working in Washington as required in Title 51 RCW, together with an employment security department number as required in Title 50 RCW, and a state excise tax registration number as required in Title 82 RCW. Providing a copy of a state of Washington "Master License Service Registration and Licenses" form is typically sufficient evidence of the requirements of this subsection. 1.4 Provide a statement, signed by a person with authority to act and speak for your company, that your company, including any subsidiary companies or affiliated companies under majority ownership or under control by the owners of the bidder's company, are not and have not been in the past three (3) years, disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3). East Hill Well 1 Pump Replacement/Bond 9 November 21,2016 Project Number: W20039 2. ORGANIZATION To be filled in by the Applicant submitting a proposal. Each Applicant submitting a proposal on work and materials included in these contract documents shall prepare and submit the data requested in the following schedule of information: The City will use information offered by the Applicant in this Statement as a significant factor in determining which Applicants to contact to engage in further negotiations. (Attach additional pages as necessary) This data sheet must be included in and made a part of these proposal Documents. 1. Name of Applicant: 2�71'v I wfR gar 2. Business Address: /ZG) ZO S� 3 2"`� 5 /S'e%Vu-�i � 3. How many years have you been engaged in the municipal pump installation business under the present firm name? 3 C) & 2s iH J" 4. Qo-�A FQ9,,,&'hand. Gross amount: $ �� SC�0 c)00 5 List of 5..Irettmt cgnl�acts completed by your company similar to this project, iricludirI9Ijp$rox"tl `te costs and name and phone number of Owner: 6. List your major equipment: ?S TDvj elzl?�v- 7YCc'cK� 2 'J ✓O C'2 A vim, T2 r�Co�{ 7�6 ry e' e f1 lu e %e2 vCC� 7. Business references: /.//':7 %2 S" - Z SG - 6/6-;q-/ /' .,,$E.—/"' T'Jfa LifU r•C. /`�`°'2. i?ZX71—ar.n L_ 44�/'f 2- -"4" _ East Hill Well 1 Pump Replacement/Bond 10 November 21, 2016 Project Number: W20039 3. SIGNATURE sr- 3.1 Dated at this day of .ZCC 45 vi 6 cat 2016. Name of Organization: '(srhl G»Cif /w c By r. /—�—^`<2% f/e`e— ��7acJc c fJ a✓f�sGe c J Title: ✓/i�5rcti� ?� 3.2 -'UG w, aAv,,Oso,,, being duly sworn, deposes and says that the information provided herein is true and sufficiently complete so as not to be misleading. Subscribed and sworn before me this I day of Q / i^ , 2016. Notary Public: o 'Ir`I0"d— My Commission Expires: �I Z- I Nor��y 'MT a Out zoo �Q3;+ East Hill Well 1 Pump Replacement/Bond 11 November 21, 2016 Project Number: W20039 C 31 at v F 5 ♦ �§_ x n: k e .: �1 vCt k2 y�,l s i J IS s c a . s t y ': s �.,R Sk �v a >y but J 1 cY'3 p t r 'r �t•,!S��°'.4"�rtlfy rr;t�y-lS�'anyk.�.'�`i'�s ,��y�w�` R k y 1"l:l tli i. st t R �ar P: t � yq J l h R,A[ikR`" 14 'n F ,k Hl tA1�i7 S `3l }FX'tl^"�jT � .3'+A �S ap'�7p�. � k 3-�+,�y' y y1 51 y •f '� . c,. R r ;t,+ lh x C�a.,� + r �d'8✓'+. '1-�rr�. �( ,y, � x Iff �.nhll�JzhE a"yr� S"Gv., x sa s Y P� ✓ Ss `E`k." Pir xsg`s�' ��F rFi� �� � � a }z .,.iy,, Pi ¢r h ,zl-, z a, Y �*���.� r�� b fV y}yy�.{ ��� ��A{ �s��� e'er' �3ar' � ..t. 6t 'r ItS 515'• t',Yt� J I )�y......i ✓�e lfr s^r,�tuZ�r k.;Fr ttj,.t5}�5.A) r Y�ft A� +vR� y {,,,r "��3r�Skt� � t � ���Y�Tt�FJ� �x�' �. ti N4.3 M�h'^,�ts a `v vx av f p 2.' ki >r t,-+'� r V -:✓t t �ra,. it{^3ty t✓`J����>� � ",#i'�t;.yre '{:'ti) +# �'w"'k o$.2, x '� Vv 1 fs+ 4.� f iaP 1.tN l i i 5 �4 h Rx3d� "4 .L�'JH Flu '�`Yjb �� s rt e a Z'I 5's f r it Office of the Secrr wry or SAW 3, _ h mu, C,wpaaticna DmSion ( . SATE OF NiA,SHtadG'i Gh! I n Unified Business SD #: 600 622 783 rl Business ID 0: 1 Expires: 06-30-2017 PUMPTECH, INC. ;y '. 12020 SE 32ND ST STE 2 ;. BELLEVUE WA 98005 4121 II' � Domestic Profit Corporation Renewed by Authority of Secretary of Stake I 11 cd i � i I � 3y douinlrnt itt recipeni eeitfljor, hn'heformation pry,, id d n d- in u l r p011 wns cr,n iplet [Mll, and a trrate .01he beW A IS,fa li..t and;het tha co�nnar i d i ;a4rl i in coc,pliur,.e �.dh all nh�,ir::blei sRrai.,huv„U Stn�aSeas!r, �I S' � - , , 1212f2016 PUMPTECH INC IChnrc 7 I,a "I c.,.e,n,t 15earchL&I .. .__ rA-":;lodes Figs ilv f.3.4 Su e,y 6 is ensinq i Washina,7lan Stale Depanment of Labor & Industries PUMPTECH INC Owner or tradesperson 12020 BE 32ND Street Suite 2 BELLEVUE.WA 98005 Principals 425-644-8501 DAVIDSON, DOUGLAS KING County WOODBURN, PRESIDENT OLSON, RAMONA EDRIDGE,SECRETARY LONG,TOMMY CLYDE,TREASURER I, Doing business as ', PUMPTECH INC WA UBI No. Business type 600 622 783 Corporation Governing persons DOUG DAVIDSON TOMMY LONG; License Verify the contractor's active registration I license I certification(depending on trade)and any past violations. Construction Contractor Active. ..._...._.....I......... Meets current requirements. License specialties GENERAL CC-EC Pump&Irrigation License no. PUMPTI*945QG '.. Effective—expiration 1110712006—0110112017 _Bond DEVELOPERS SURETY&INDEM GO $12,000.00 '.. Bond account no. 160549C Received by L&I Effective date 11/0612006 11/08/2006 Expiration date Until Canceled Insurance Travelers Property Gas Co of A $1,000,000.00 Policy no. 6303E37950A Received by L&I Effective date 04/19/2016 05/1512016 Expiration data 05/1512017 ri2[ : LIIhTI: _,_ httns-Usenure_Ini wn nmtvprifv/Detail.asox?UBi=600622783&LIC=PUMPTI*945QG&SAW= 112 1 2/212 0 1 6 PUMPTECH INC Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No l&l tax debts are recorded for this contractor license during the previous 6 year period,but some debts '. may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees?If so,verify the business is up-to-date on workers'comp premiums. L&I Account I Account is current 511,635-00 Doing business as PUMPTECH INC Estimated workers reported Quarter 3 of Year 2016"76 to 100 Workers" L&I account representative T41 TERRI MADISON(360)902.4654-Email:KIRT235(dlni.wa.gov Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 03/24/2016 No violations Inspection no. 317939866 Location 515 156th st E Tacoma,WA 96445 3 WaslSiatmu Glste DopL of[,xbor&Irdusldcs U.'e of this site is subjject to tho Wws or vie sfaie of Wash'ngton. hRns-llsecurP.In1 wa novNerifv/Detail.asox?U81=600622783&LIC=PUMPTI"945QG&SAW= 212 SERVING THE PACIFIC NORTHWEST In PUMP SALES& SERVICE December 2, 2016 To whom it may concern, As President, Doug W. Davidson has authority to act and speak for PumpTech Inc., including any subsidiary companies or affiliated companies under majority ownership or under control by the owners of PumpTech, Inc. In the 30 year history PumpTech, Inc. has not been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3). Best Regards, Doug Davidson President Municipal Industrial Packaged Systems ❑ PumpTech Inc. ❑ PumpTech Inc. ❑ PumpTech Inc. 12020 SE 32nd St, Suite 2 209 S Hamilton Rd 321 S. Sequoia Parkway Bellevue,WA 98005 Moses Lake,WA 08837 Canby,OR 97013 Ph:425-644-8501 Ph:509-766-6330 Ph:503.659-6230 Fax:425-562-9213 Fax:509-766-6331 Fax:503-659-8718 pumptech@pumptechnw.com moseslake@pumptechnw.com inquiries@pumptechnw.com WA CONTRACTORS#PUMPTI*945QG www.pumptechnw.com OR CONTRACTORS#154997 �di✓TX�c/s G"6�s���j��,0 II FIJ;rm Ac I P,A fi F4 CH � � REFERENCES & MAJOR PROJECTS 2016 PROJECT: City of Warden NAME OF OWNER: City of Warden CONTACT PERSON: Kristine Shuler PHONE: (509)349-2326 PRIMARY CONTRACTOR: POW Contracting CONTRACT AMOUNT: $500,000.00 APPROX.DATE COMPLETED: February 2016 COMMENTS: Flowserve BJ Submersible with VFD and pump rehab with new motor and VFD ENGINEER: Gray&Osborne Engineers PROJECT: Anacortes Water Treatment Plant River Intake Pump NAME OF OWNER: City ofAnacortes CONTACT PERSON: Jeff Mars PHONE: (360)428-1598 PRIMARY CONTRACTOR: Award Construction CONTRACT AMOUNT: $180,000.00 APPROX.DATE COMPLETED: August 2014 COMMENTS: Byron Jackson/Ruhrpumpen ENGINEER: HDR Engineering PROJECT: Boeing 777X40-57 NAME OF OWNER: Boeing CONTACT PERSON: Dean Gray PHONE: (206)300-8168 PRIMARY CONTRACTOR: Hoffman Construction CONTRACTAMOUNT: $1,506,914.00 APPROX. DATE COMPLETED: December 2014 COMMENTS: Paco Split Case Pumps ENGINEER: BRPH—James.Woodard/(321)751-3150 PROJECT: Pottery Avenue Lift Station NAME OF OWNER: City of Port Orchard CONTACT PERSON: Dan Castillo PHONE: (360)876-2722 PRIMARY CONTRACTOR: Rush Developement CONTRACTAMOUNT: $160,000.00 APPROX. DATE COMPLETED: September 2014 COMMENTS: Vaughan ENGINEER: RH2 Engineering PROJECT: Pasco WWTP Aeration System Upgrades NAME OF OWNER: City of Pasco CONTACT PERSON: Reuel Klempel PHONE: (509)544-3083 PRIMARY CONTRACTOR: City of Pasco CONTRACTAMOUNT: $250,000.00 APPROX. DATE COMPLETED: November2013 COMMENTS: ABS HST Blowers ENGINEER: HDR Engineering PROJECT: Chief Joseph Fish Hatchery Phase 2 NAME OF OWNER: Bonneville Power Administration CONTACT PERSON: Pat Phillips PHONE/EMAIL: (509)631-1970/patrick.phillips@colvilletribes.com PRIMARY CONTRACTOR: PCL Construction Services CONTRACT AMOUNT: $532,840.00 APPROX.DATE COMPLETED: January 2013 COMMENTS: Supply and install of several Peerelss Vertical Turbine well pumps along with the supply of ABS submersible pumps at the reclamation ponds. ENGINEER: Tetra Tech—Darrel Nice (509)744-9271/darrel.nice@tetratech.com PROJECT: KID Kiona Intake-Red Mountain South LID NAME OF OWNER: Kennewick Irrigation district CONTACT PERSON: Kyle Pettibone--Engineer PHONE: (425) 951-5360(work) kpettibone@rh2.com PRIMARY CONTRACTOR: Pacific Crest Construction CONTRACTAMOUNT: $610,000.00 APPROX.DATE COMPLETED: October 2014 COMMENTS: This project consisted of 5 Peerless Vertical turbine pumps installed into a river intake structure on the Yakima River ENGINEER: RH2 Engineers—Kyle Pettibone (425)951-5360(work)kpettibone@rh2.com PROJECT: City of Coeur d'Alene Phase 5C.1 W WTP Upgrades NAME OF OWNER: City of Coeur D'Alene, ID CONTACT PERSON: Casey Fisher PHONE: (208)769-2346/CFISHER@cdaid.org PRIMARY CONTRACTOR: Williams Brothers Construction CONTRACTAMOUNT: $134,965.90 APPROX.DATE COMPLETED: November 2014 COMMENTS: This project included ABS submersible pumps&blowers ENGINEER: HDR-Michael Zeltner (208)387.7089/Michael.Zeltner@hdrinc.com PROJECT: Cashmere Waste Water Treatment Facility Upgrades NAME OF OWNER: City of Cashmere,WA CONTACT PERSON: Bob Schmidt PHONE: (509)782-3513/bob@citofcashmere.org PRIMARY CONTRACTOR: Harbor Pacific Contractors CONTRACTAMOUNT: $144,623.64 APPROX. DATE COMPLETED: September 2013 COMMENTS: Project included several ABS submersible pumps and Boosterpaq ENGINEER: RH2 Engineering—Kyle Pettibone (425)951-5360(work)/kpettibone@rh2.com PROJECT: Clarkston Waste Water Treatment Facility Upgrades NAME OF OWNER: City of Clarkston,WA CONTACT PERSON: Weslson PHONE: (509)758-1674/wwtp@clarkston.com PRIMARY CONTRACTOR: Williams Brothers Construction CONTRACTAMOUNT: $150,000.00 APPROX.DATE COMPLETED: September 2014 COMMENTS: Included ABS pumps and mixers and Vaughan Chopper pumps ENGINEER: Keller Engineering—Jason King (208)288-1992/ jking@kellerassociates.com PROJECT: City of Newport Lakewood Hills Pump Station NAME OF OWNER: City of Newport CONTACT PERSON: Lanny Schulze PHONE: (541)574-5874 PRIMARY CONTRACTOR: Clackamas Construction CONTRACTAMOUNT: $365,445.00 APPROX.DATE COMPLETED: November 2014 COMMENTS: 14'x26'x8' pre-fab blazer building with Boosterpaq BQ10337-R3, two CR10-3,and two CR90-2-2,3ph 230v.with two CU352 controllers. ENGINEER: Civil West Engineering PROJECT: Lyons-Mehama Water District Booster Pump Station NAME OF OWNER: Lyons-Mehama Water District CONTACT PERSON: Bill Grimes PHONE: (503)859-2367 PRIMARY CONTRACTOR: Clackamas Construction CONTRACTAMOUNT: $249,897.00 APPROX.DATE COMPLETED: July 2014 COMMENTS: 14'x20'x8' pre-fab blazer building with two Grundfos CR5-4, 25 GPM AT 86'TDH, 1.5HP,3450 RPM,460/3/60 domestic pumps,and two Paco 5070-7 VL, 1000 GPM AT 147'TDH,50HP, 1800 RPM 460/3/60 fire flow pumps. ENGINEER: CH21M Hill Engineering I MEOW i hmfw 01AFCH SERVING THE PACIFIC NORTHWEST If7C PUMP SALES& SERVICE Credit References for: PUMPTECH INC. 12020 SE 32nd St., SUITE#2 BELLEVUE, WA 98006 4121 P: 425-644-8501 F: 425-562-9213 Dunn & Bradstreet #15-691-5688 Bank: Umpqua Bank 10885 NE 41h St. Bellevue, WA 98004 Contact: Andy Pletz, Vice President andvpletz(o)umpquabank.com P: 425-256-6583 F: 503-372-0282 UBI Number: 600 622 783 Bonding Cc: Indemnity Co. of CA WA Contractors#: PUMPTI*945QG Federal Tax ID#: 91-1337311 WA Reseller Permit#: A02 1947 17 Credit References: Peerless Pump Cc HD Fowler Cc PO Box 7026 PO Box 160 Indianapolis IN 46207-7026 Bellevue WA 98009 P: 317-925-9661 P: 425-746-8400 F: 317-920-6642 F: 425-641-8885 Nicole Franklin NFranklinCcilGrundfos.com Cornell Pump Rueck Co. PO Box 6334 6515 SW Fallbrook Place Portland OR 97228 Beaverton OR 97008 P: 503-794-9731 P: 503-644-8363 F: 503-653-0338 F: 503-641-5252 Kim Fandry kfand!yacornellpump.com Dorsey dorsey(a)rueckco.com Flowserve Pump Corp. Pentair Flow Technologies 942 Memorial Parkway 1101 Myers Parkway Phillipsburg NJ 08865 Ashland OH 44805 P: 908-859-7305 P: 419-281-9911 F: 908-859-7317 F: 877-471-7285 Suzanne Boucher Abigail Fine abictail.fine(a)pentair.com sboucherCa)_flowserve.com P:\Forms\Credit References for Pumptech on Letterhead.doex Municipal Industrial Packaged Systems ❑ PumpTech Inc. ❑ PumpTech Inc. ❑ PumpTech Inc. 12020 BE 32nd St,Suite 2 209 S Hamilton Rd 321 S.Sequoia Parkway Bellevue,WA 98005 Moses Lake,WA 98837 Canby,OR 97013 Ph:425-644-8501 Ph:509-766-6330 Ph:503-659-6230 Fax:425-562-9213 Fax:509-766-6331 Fax:503-659-8718 pumptech@pumptechnw.com moseslake@pumptechnw.com inquiries@pumptechnw.com WA CONTRACTORS#PUMPTI*945QG www.pumptechnw.com OR CONTRACTORS#154997 l PROPOSAL SIGNATURE PAGE I The undersigned bidder hereby proposes and agrees to start construction work on the Contract, if awarded to him/her, on or before ten (10) calendar days from the date of the Notice to Proceed, and agrees to complete the Contract within six (6) calendar month following issuance of the City's Notice to Proceed. The undersigned bidder hereby agrees to submit all insurance documents, performance bonds and signed contracts within ten (10) calendar days after City awards the Contract. The City anticipates issuance of the Notice to Proceed on the day of the preconstruction meeting. No bidder may withdraw his/her bid for a period of sixty (60) calendar days after the day of bid opening. The required bid security consisting of a bid bond, cashier's check or cash in an amount equal to 5% of the total amount is hereto attached. Notice of acceptance of this bid or request for additional information shall be addressed to the undersigned at the address stated below. Receipt of Addendum No.'s to the plans and/or specifications is hereby acknowledged. Failure to acknowledge receipt of the addenda may be considered an irregularity in this proposal. By signing this Proposal Signature Page, the undersigned bidder agrees to accept all contract forms and documents included within the bid packet and to be bound by all terms, requirements and representations listed in the bid documents whether set forth by the City or by the Bidder. DATE: 7CG 0/G Z� 4%/-TZ %-6,- .-ANC N E-QF IDDER Stgrratur- f thorized Representative (Print Name and Title) /ZQzC) SE �;2 Address East Hill Well 1 Pump Replacement/Bond 12 November 21, 2016 Project Number: W20039 BID BOND FORM KNOW ALL MEN BY THESE PRESENTS: That we, as Principal, and as Surety, are held and firmly bound unto the CITY OF KENT, as Obligee, in the penal sum of Dollars, for the payment of which the Principal and the Surety bond themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal for East Hill Well 1 Pump Replacement/Project Number: W 20039 According to the terms of the proposal or bid made by the Principal thereof, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the invitation to bid, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the amount of this bond. SIGNED, SEALED AND DATED THIS DAY OF 2016. PRINCIPAL SURETY 20 Received return of deposit in the sum of $ East Hill Well 1 Pump Replacement/Bond 13 November 21, 2016 Project Number: W20039 BID BOND FORM KNOW ALL MEN BY THESE PRESENTS: That we, Pum tp ech Inc as Principal, and nevelopers Gnra y and Indemnity Company as Surety, are held and firmly bound unto the CITY OF KENT, as Obligee, in the penal sum of so/ et thetntai hid RtcyLI Dollars, for the payment of which the Principal and the Surety bond themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal for East Hill Well 1 Pump Replacement/Project Number: W20039 According to the terms of the proposal or bid made by the Principal thereof, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the invitation to bid, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the amount of this bond. SIGNED, SEALED AND DATED THIS gth DAY OF nepamhar 2016. Pumptech, PRINC A ;-- Deve[opre,l t Indemnity Company `SU y L. Faure',Attorney in fact 20_. Received return of deposit in the sum of $ East Hill Well 1 Pump Replacement/Bond 13 November 21, 2016 Project Number: W20039 POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Box 19725,IRVINE,CA 92623 (949)263-3300 KNOW ALL BY THESE PRESENTS that except as expressly limited,DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA,do each hereby make,constitute and appoint: ***Mary L, Faure, Deborah Cook,jointly or severally*** as their true and lawful Attorney(s)-in-Fact,to make,execute,deliver and acknowledge,for and on behalf of said Corporations,as sureties,bonds,undertakings and contracts of suretyship giving and granting unto said Allorney(s)-in-Fact full power and authority to do and to perform every act necessary,requisite or proper to be done in connection therewith as each of said corporations could do,but reserving to each of said corporations full power of substitution and revocation,and all of the acts of said Altomey(s}in-Fact,pursuant to these presents,are hereby ratified and confirmed. This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA,effective as of January 1st,2008. RESOLVED,that a combination of any two of the Chairman of the Board,the President,Executive Vice-President,Senior Vice-President or any Vice President of the corporations be,and that each of them hereby is,authorized to execute this Power of Attorney,qualifying the attomey(s)named in the Power of Attorney to execute,on behalf of the corporations,bonds,undertakings and contracts of suretyship;and that the Secretary or any Assistant Secretary of either of the corporations be,and each of them hereby is,authorized to attest the execution of any such Power of Attorney; RESOLVED,FURTHER,that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate hearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any bond,undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF,DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respecti ve officers and attested by their respective Secretary or Assistant Secretary this 181h day of April,2016. BY: OCT DanieVice-Presidant—l� /,53co4.Poxar�ogiy �� ooPPORgpm By: �7�IOVlP p�d�� 62%egC1fOPN\P-0 Mark Lansdon,Vice-President A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. State of California County of Orange On- April 18 2016 before me, _. Lucille Raymond Notary Public Data Here Insert Name and Tneof He eflrcer personally appeared _ Daniel Young and Mark Lansdon .— Namefs)of5nnerie who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s)!Glare subscribed to the within instrument and acknowledged to me that helshelthey executed the same In his7hed heir authorized capacify(fes),and that by hishredtheir signature(s)on the instrument the person(s),or the entity upon behalf of y]w+���+�+ LUCILLERAYMOND which the person(s)acted,executed the instrument. 7 Commission#20819/6 Notary Public California i I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is z Orange County true and correct. My Comm.6 Ires Oct 13 2018 WITNESS my hand and official seal. Place Notary Seal Above Signature. Lucki ond,Notary Puhiic CERTIFICATE '.. The undersigned,as Secretary orAsslstant Secretary of DEVELOPERS SURETYAND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA,does hereby III certify that the foregoing Power of Attorney remains in full force and has not been revoked and,furthermore,that the provisions of the resolutions of the respective Boards of lDhectors of said Corporations set forth in the Power ofAttomey are in force as of the date of this Carhfirate. This Certificate is executed in the Cityof Irvine,California,this 6th da of December 2016 yJ�4Y AN NF�� po�Ppgo c y pRP01t9� G rF 9` By: -�'���"'� OJ IB3A 1� O 19a7 = Cassle J. msford,Assistant Se tary `vY�.�Owa/ D 2 cgtrr•oF��P� ID-1380(Rev.04116) CITY OF KENT COMBINED DECLARATION FORM: NON-COLLUSION, MINIMUM WAGE NON-COLLUSION DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. AND MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having duly sworn, deposed, say and certify that in connection with the performance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work not less i than the prevailing rate of wage or not less than the minimum rate of wage as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. East Hill Well 1 Pump Replacement Project Number: W20039 NAME OF PROJECT NAME OF BIDDER'S FIRM SIGNATURE O-F-AUTHORIZED REPRESENTATIVE OF BIDDER East Hill Well 1 Pump Replacement/Bond 14 November 21, 2016 Project Number: W20039 This change order form is for example purposes only. By submitting a bid, the bidder agrees to be bound by the terms of this change order form for any change orders. CHANGE ORDER NO. [Enter # 11 2, 3, etc.] NAME OF CONTRACTOR: [Insert Comnanv Namel ("Contractor") CONTRACT NAME & PROJECT NUMBERJInsert Name of Original Contract & Project # if applicabiel ORIGINAL CONTRACT DATE: rInsert Date Original Contract was Sianedl This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: [Insert detailed description of additional materials, services, etc., that are needed which necessitate this change order - Be as detailed as possible. You may also refer to an attached exhibit, but clearly identify the exhibit by title and date] 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $ (including applicable alternates and WSST) Net Change by Previous Change Orders $ (incl. applicable WSST) Current Contract Amount $ (incl. Previous Change Orders) Current Change Order $ Applicable WSST Tax on this Change $ Order Revised Contract Sum $ East Hill Well 1 Pump Replacement/Bond 15 November 21, 2016 Project Number: W20039 Original Time for Completion (insert date) Revised Time for Completion under prior Change Orders (insert date) Days Required (f) for this Change working days Order Revised Time for Completion (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent Special Provisions and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: (signature) (signature) Print Name: Print Name: Timothy J. LaPorte P.E. Its Its Public Works Director (title) (title) DATE: DATE: APPROVED AS TO FORM: (applicable if Mayor's signature required) I Kent L wa Department East Hill Well 1 Pump Replacement/Bond 16 November 21, 2016 Project Number: W20039 BIDDER'S CHECKLIST The following checklist is a guideline to help the Contractor make sure all forms are complete. The bidder's attention is especially called to the following forms. Failure to execute these forms as required may result in rejection of any bid. Bidder's Package should include the following: Bid Document Cover Sheet filled out with Bidder's Name ....................Ek� Orderof Contents.................................................................................IY' Invitationto Bid...................................................................................o-, ContractorCompliance Statement........................................................0" Date............................................................................................EY� Have/have not participated acknowledgment.............................Er� Signature and address................................................................6--*� Declaration - City of Kent Equal Employment Opportunity Policy ........1711� Dateand signature .....................................................................EY� AdministrativePolicy ...........................................................................❑'� Proposal...............................................................................................EY� First line of proposal - filled in ...................................................GV Unitprices are correct ................................................................EJ'gA Subcontractor List (contracts over $100K) ..........................................E1" Subcontractors listed properly....................................................E, Signature ....................................................................................12"� Subcontractor List (contracts over $1 million).....................................❑µ', Subcontractors listed properly....................................................❑f� Dateand signature .....................................................................❑ Contractor's Qualification Statement ...................................................Evl� Completeand notarized ..............................................................L-' ProposalSignature Page......................................................................EV AllAddenda acknowledged .........................................................cl� Date, signature and address .......................................................E9,`� BidBond Form .....................................................................................0-, Signature, sealed and dated .......................................................0-� Powerof Attorney.......................................................................❑ (Amount of bid bond shall equal 5% of the total bid amount) CombinedDeclaration Form .................................................................Q,` Signature ....................................................................................0"� ChangeOrder Form..............................................................................0/� Bidder's Checklist ................................................................................C4' The following forms are to be executed after the Contract is awarded: A) CONTRACT This agreement is to be executed by the successful bidder. B) PAYMENT AND PERFORMANCE BOND To be executed by the successful bidder and its surety company. The following form is to be executed after the Contract is completed: A) CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT To be executed by the successful bidder AFTER COMPLETION of this contract. East Hill Well 1 Pump Replacement/Band 17 November 21, 2016 Project Number: W20039 i PAYMENT AND PERFORMANCE BON® TO CITY OF KENT w,.,uixo.u„ Bond No. 382537P KNOW ALL MEN BY THESE PRESENTS: I i That we, the undersigned, PumPtech Inc. as Principal, and Developers Surety and Indemnity Company a Corporation organized and existing under the laws of the State of Washington, as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $214,397.61--- , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. j Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of East Hill Well 1 Pump Replacement/Project Number: W20039 (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: i NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and Supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority of its governing body. i East HIII Weil 1 Pump Replacement/Bond 18 November 21, 2016 Project Number: W20039 i TWO WITNESSES: Pumptech Inc. PRINCIPAL (enter principal's name above) PAII(i �� BY: Q Mug- . avidson, TITLE: President DATE: alab labl(O DATE: CORPORATE SEAL: i PR'RY NAME Call �pr DATE: �2�� S� —�� Developers Surety and Indewity Company SURETY CORPORATE SEAL: BY: ure DATE: December 15, 2016 TITLE: Attorney-in-Fact ADDRESS: 17771 Cowan Suite 100 Irvine, CA 92614 CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within Bond; that POO w 0/2� (.O 6 Who signed the said bond on behalf of the Principal of the said Corporation; that I know his signature thereto is genuine, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. SECRET RY OR)ASSISTANT SECRETARY i I i I East Hill Well 1 Pump Replacement/Bond 19 November 21, 2016 Project Number: W20039 POWER OF ATTORNEY FOR li DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Box 19725,IRVINE,CA 92623 (949)263.3300 KNOW ALL BY THESE PRESENTS that except as expressly limited,DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA,do each hereby make,constitute and appoint: ***Mary L.Faure, Deborah Cook,jointly or severally*** as their true and lawful Attorney(s)-in-Fact,to make,execute,deliver and acknowledge,for and on behalf of said corporations,as sureties,bonds,undertakings and contracts of suretyship giving and granting unto said Attorney(s)-in-Fact full power and authority to do and to perform every act necessary,requisite or proper to be done in connection therewith as each of said corporations could do,but reserving to each of said corporations full power of substitution and revocation,and all of the acts of said Attorney(s)-in-Fact,pursuant to these presents,are hereby ratified and confirmed. This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA;effective as of January 1st,2008. RESOLVED,that a combination of any two of the Chairman of the Board,the President,Executive Vice-President,Senior Vice-President or any Vice President of the corporations be,and that each of them hereby is,authorized to execute this Power of Attorney,qualifying the aHomey(s)named in the Power of Attorney to execute,on behalf of the corporations,bonds,undertakings and contracts of suretyship;and that the Secretary or any Assistant Secretary of either of the corporations be,and each of them hereby is,authorized to attest the execution of any such Power of Attorney; RESOLVED,FURTHER,that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or cedificate bearing such facsimile signatures shalt be valid and binding upon the corporations when so affixed and in the future with respect to any bond,undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF,DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respective officers and attested by their respective Secretary or Assistant Secretary this 18th day of April,2016, D By: I //!//Y / _ j�GG rRu AND lyO �ptiPANYO� ',.. Daniel Young,Senior Vice-President fyJ foiwogyrly2 , �G OpPoggT v 1w'2 acT 19 FO`;t` y2ei Far -_ j`l 1936 l�- P 1967 y By Mark Lansdon,Vice-President A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. Slate of California County of Orange On _ _.. ..April 18 2016 before me, Lucille Raymond Notary Public Data Here Insert Name and rifle 0Me M., personally appeared Daniel Young and Mark Lansdon Name(sl of 9grcr(s) who proved to me on the basis of satisfactory evidence to be the persons)whose camels)islare subscribed to the within instrument and acknowledged to me that he/shelthey executed the same in hislherltheir authorized capacity(ies),and that by hislhedtheir signatures)on the instrument the person(s),or the entity upon behalf of I ILLE RAYMOND which the person(s)acted,executed the instrument. Commission#2081045 m. Ex Tr 0MyC= Notary Public-California z I Carty underPENALTY OF PERJURYunderthe laws ofthe State ofCalifomia that the foregoing paragraph is Orange County true and correct es OCt 13 2016 WITNESS my hand and official seal. � � r , Place Notary Seal Above Signature _ lJ _ Lucillk g2ay ond,Notary Public CERTIFICATE v The undersigned,as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA,does hereby certify that the foregoing Power of Attorney remains in full force and has not been revoked and,furthermore,that the provisions of the resolutions of the respective Boards of Directors of said corporal set forth in the Power of Attorney are in force as of the dale of this Certificate. This Certificate is executed in the City of Irvine,California.this 151h day of December 2016 t'"SV! o/nip"- OV,PANYOF �yJ�4 kpe`liq`T�F,�� h4GpRP 0ggr 9 "t�i <}'�, uvi. = OCT. 6y. Casso J. rrisford,Assistant Se Lary r��ae ID-1380(Rev.04l16) i CONTRACT THIS AGREEMENT, is entered into between the CITY OF KENT, a Washington municipal corporation ("City"), and rF 1 #Fi Fdl r t1/ organized under the laws of the tat�e of �4�f, �' n ` located and doing business at € FE,f� "Contractor") WITNESS: WITNESS: In consideration of the terms and conditions contained in this Agreement and in the project documents, plans, and specifications all of which are a part of this Agreement, the parties agree as follows: 1 . The Contractor shall do all work and furnish all tools, materials, and equipment for: East Hill Well 1 Pump Replacement/Project Number: W20039 in accordance with and as described in the Contract and shall perform any alterations in or additions to the work provided under the Contract and every part thereof. The Contract shall include all project specifications, provisions, and plans; the City's general and special conditions; the 2016 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations, if applicable ("Standard Specifications"); the City's bid documents; and the Contractor's response to the City's bid. The Contractor is responsible to obtain copies of the 2016 WSDOT Standard Specifications including the latest amendments issued by WSDOT as of the date of bid opening. Unless otherwise directed by the City, work shall start within ten (10) days after the City issues its Notice to Proceed and be completed within six (6) calendar months. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing all the work provided for in the Contract, except where the specifications allocate that responsibility to the City. 2. The City hereby promises and agrees with the Contractor to employ, and does employ, the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract and the terms and conditions herein contained and hereby contracts to pay for the same according to the Contract and the schedule of unit or itemized prices provided by Contractor in its response to the City's bid, at the time and in the manner and upon the conditions provided for in the Contract. 3. The Contractor for itself, and for its heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all covenants herein contained upon the part of the Contractor. 4. It is further provided that no liability shall attach to the City by reason of entering into this contract, except as expressly provided herein. East Hill Well 1 Pump Replacement/Bond 20 November 21, 2016 Project Number: W20039 i 5. Contractor shall defend, indemnify, and hold the City, its officers, officials, employees, agents, volunteers and assigns harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this contract, except for injuries and damages caused by the sole negligence of the City. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this contract. 6. Contractor agrees, upon the City's written demand, to make all books and records available to the City for inspection, review, photocopying, and audit in the event of a contract related dispute, claim, modification, or other contract related action at reasonable times (not to exceed three (3) business days) and at places designated by the City. 7. The Contractor shall procure and maintain, during the term of construction and throughout the specified term of maintenance, insurance of the types and in the amounts described in Exhibit A attached and incorporated by this reference. 8. Contractor is responsible for locating any underground utilities affected by the work and is deemed to be an excavator for purposes of RCW Ch. 19.122, as amended. Contractor shall be responsible for compliance with RCW Ch. 19.122, including utilization of the "one call" locator service before commencing any excavation activities. East Hill Well 1 Pump Replacement/Bond 21 November 21, 2016 Project Number: W20039 CITY OF KENT J f. �y`Y BY: SUZETTE OOKE, MAYOR DATE: ATTEST: ( ((n r KIMBERLEY A. K MOTO, CITY CLERK APPROVED AS TO FOR KEN LAW DEPARTMENT CONTRACTOR BY�_ .�� � � _ PRINT NAME TITLE: �� =`ra• �- . DATE: East Hill Well 1 Pump Replacement/Bond 22 November 21, 2016 Project Number: W20039 EXHI IT_A_ --- T INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum :scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 or its equivalent, with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an Additional Insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. All endorsements adding Additional Insureds shall be issued on form CG 20 10 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 8K Mlnirnurr. Amaaunits nf Insuran�.;,c Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. East Hill Well 1 Pump Replacement/Bond 23 November 21, 2016 Project Number: W20039 i EXHIBIT A (Continued) 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Co Othor Insurance ProOIE>ovs The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D, Contractor's Xnsgarance for Other losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. B. Waiver of Stubrogation The Contractor and the Citywaive all rights against each other an of their 9 9 Y Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. East Hill Well 1 Pump Replacement/Bond 24 November 21, 2016 Project Number: W20039 '.. r EXHIBIT A (Continued) Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. 9-1, S;Ubf'c)nt:wn,a Uor''s; i Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. I East Hill Well 1 Pump Replacement/Bond 25 November 21, 2016 Project Number: W20039 ® DATE)M5/2016 CERTIFICATE OF LIABILITY INSURANCE 12/15/2016 THIS:.:CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS — CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endomement(s). PRODUCER CONTACT Amber Harr NAME: _....____— Leavitt Group Northwest PHON o xtk (425)258-2300 _ _. qlc No: (4zslz -9363 PO Box 9068 ADMDRESS:fiber-harris@leavitt.com INSURERS)AFFORDING COVERAGE_ NAICR Tacoma WA 98490 INSURER A:Travelers Indemnity Com an 25666 INSURED INSURER B:Phoenix insurance Company 25623 Pumptech, Inc. INSURER c:Travelera Property Casualt Com an 25674 12020 BE 32nd St Suite 2 INSURERDAlaska National ____ INSURER E: Bellevue WA 98005 INSURER F: COVERAGES CERTIFICATE NUMBER:Cert of Liability REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, IN SR TypE OFINSURANCE AODL SNUBOR POLICY NUMBER MMI�DYIYEYYY POLICY EXP LIMITS LTR MOLT C YYYY X7COMMERCIAL GENERAL LIABILITY _EACH OCCURRENCE $ 11000,000 AIM -MADE 51OCCUR DAMAGES E.oc D 100,000 '.. PREMISES Esoccut11 Is X Y 6303E37950A 5/15/2016 5/15/2017 MED EX_P(my one person) $ 5,000 X I Jobeite Pollution �: PERSONAL&ADV INJURY $_ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: I GENERAL AGGREGATE $ 2,000,000 '. POLICY JECTPRO- LOC j PRODUCTS-COMPIOPAGG $ 2,000,000 OTHER: j Employee Benefits $ 1,000,000 AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 X ANY AUTO j BODILY INJURY(Par person) $ B ALL OWNED SCHEDULED 6103E37950A 5/15/2016 ! 5/15/2017 BODILY INJURY(Peraccident) $ AUTOS AUTOS NON-OWNED 1 PROTY DAMAGE PER $ X HIRED AUTOS x AUTOS Per accitlent ___ X comp$1,000 X Coll$1PD0 $ X UMBRELLA LIAR X OCCUR EACH OCCURRENCE -$_, 7,000,000 L, EXCESS LIAB CLAIMS-MADE AGGREGATE _ $ 7,000,000 DEO XRETENTION$ 0 X Y I CUP3E37950A 5/15/2016 5/15/2017 $ WORKERS COMPENSATION STR UTE X OTRH- I AND EMPLOYERS'LIABILITY YIN ANY PROPRIETORIPARTNER/EXECUTIVE NIA E.L.EACHACCIDENT $ 1,000,000 WDE07 OFFICERIMEMBER EXC A (Mandatory in NH) 6303E37950A 5/15/2016 5/15/2017 E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe undo, WA STOP GAP E.L.DISEASE-POLICY LIMIT 3 11000,000 DESCRIPTION OF OPERATIONS below A leased/Rented/Hired Equip 6303E37950A 5/15/2016 5/15/2017 Limit: 100,000 D USL&H 14EWU09705 5/8/2016 5/8/2017 Limit. 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be allached If more space is required) Project: East Hill Well 1 Pump Replacement Project Number: W20039 PumpTech SO#13011 City of Kent is named as additional insured per attached form CGD246 0805. Coverage is primary and non contributory per attached form CGDO37 0405. Waiver of subrogation applies per attached form CGD458 0713. Completed operation applies per attached form CGD144 0196. 30 days notice of cancellation applies. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Kent THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 220 4th Avenue S. ACCORDANCE WITH THE POLICY PROVISIONS. Kent, WA 98032 AUTHORIZED REPRESENTATIVE Dan Olson/AMFARR ©1988.2014 ACORD CORPORATION. All rights reserved. '.. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD NS025 onlanl l -- Policy Number:6303E37950A COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. OTHER INSURANCE - ADDITIONAL INSUREDS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PROVISIONS b. The"personal injury"or"advertising injury"for COMMERCIAL GENERAL LIABILITY CONDITIONS which coverage is sought arises out of an of- (Section IV), Paragraph 4. (Other Insurance), is fense committed amended as follows: subsequent to the signing and execution of that 1. The following is added to Paragraph a. Primary contract or agreement by you. Insurance: 2: The first Subparagraph (2) of Paragraph b. Ex- However, if you specifically agree in a written con- cess Insurance regarding any other primary in- tract or written agreement that the insurance pro- surance available to you is deleted. vided to an additional insured under this 3. The following is added to Paragraph b. Excess Coverage Part must apply on a primary basis, or Insurance, as an additional subparagraph under a primary and non-contributory basis, this insur- Subparagraph (1): ance is primary to other insurance that is avail- That is available to the insured when the insured able to such additional insured which covers such is added as an additional insured under any other additional insured as a named insured, and we policy, including any umbrella or excess policy. will not share with that other insurance, provided that: a. The "bodily injury" or "property damage" for which coverage Is sought occurs; and CG DO 37 04 05 Copyright 2005 The St. Paul Travelers Companies, Inc.All rights reserved. Page 1 of 1 i Policy Number:6303E7950A COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. OTHER ADDITIONAL INSUREDS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PROVISIONS 3. This insurance is excess over any valid and col- 1. WHO IS AN INSURED (SECTION II) is amended lectible insurance unless you have agreed in a to include as an insured any person or organiza- written contract for this insurance to apply on a tion (called hereafter "additional insured") with primary or contributory basis. whom you have agreed in a written contract, 4. This insurance does not apply on any basis: executed prior to loss, to name as an additional a. To any person or organization for whom you insured, but: have purchased an Owners and Contractors a. Only with respect to liability because of Protective policy. "bodily injury" or "property damage" arising b. To any person or organization who dis- out of"your work"for that additional insured tributes or sells"your products"in the regular performed by you or for you; and course of its business. b. Subject to any limitations in the written con- c. To any person or organization from whom tract regarding the scope of the additional you have acquired any products, or any In- insured status, gredient, part or container, entering into, ac- This insurance does not apply to "bodily injury" companying or containing such products. or "property damage" arising out of "your work" d. To any manager or lessor of premises with included In the "products-completed operations respect to liability arising out of the owner- hazard" unless you are required to provide such ship, maintenance, or use of that part of any coverage by written contract and then only for premises leased to you. the period of time required by the contract, but in no event beyond the expiration data of the e• To any lessor of leased equipment. policy. f. To any architect, engineer or surveyor for 2. The Limits of Insurance provided to such addi- Injury or damage arising out of: tional insured shall be: (1) The preparing, approving or failing to a. The limits which you have agreed to provide; prepare or approve maps, drawings, opinions, reports, surveys, change or- or ders, designs or specifications; and b. The limits shown on the Declarations (2) Supervisory, inspection or engineering whichever is less. services. CG D1 44 01 96 Copyright, The Travelers Indemnity Company, 1996. Page 1 of 1 Policy Number:6303E37950A COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. XTEND ENDORSEMENT FOR COMMERCIAL INDUSTRIES This endorsement modifies Insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART GENERAL DESCRIPTION OF COVERAGE—This endorsement broadens coverage. However,coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to this Coverage Part,and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights,duties, and what is and is not covered. A. Broadened Named Insured J. Bodily Injury To Co-Employees And Co-Volunteer B. Blanket Additional Insured—Broad Form Vendors Workers C. Damage To Premises Rented To You K. Aircraft Chartered With Crew 0 Perils of fire, explosion, lightning, smoke, L. Non-Owned Watercraft—Increased From 25 Feet water To 50 Feet Limit increased to$300,000 M. Increased Supplementary Payments D. Blanket Waiver Of Subrogation • Cost of bail bonds increased to$2,500 E. Blanket Additional Insured - Owners, Managers . Loss of earnings increased to $500 per day Or Lessors Of Premises N. Medical Payments- Increased Limit F. Blanket Additional Insured — Lessors Of Leased Equipment O. Knowledge And Notice Of Occurrence Or Offense G. Incidental Medical Malpractice P. Unintentional Omission H. Personal Injury—Assumed By Contract O. Reasonable Force - Bodily Injury Or Property I. Amended Bodily Injury Definition Damage PROVISIONS B. BLANKET ADDITIONAL INSURED - BROAD A. BROADENED NAMED INSURED FORM VENDORS 1. The following is added to SECTION II—WHO The following is added to SECTION II•-WHO IS IS AN INSURED: AN INSURED: Any organization, other than a partnership or Any person or organization that is a vendor and joint venture, over which you maintain owner- that you have agreed in a written contract or ship or majority interest on the effective date agreement to include as an additional insured on of the policy qualifies as a Named Insured. this Coverage Part is an insured, but only with re- However, coverage for any such organization spect to liability for "bodily Injury" or "property will cease as of the date during the policy pe- damage"that: riod that you no longer maintain ownership of, a. Is caused by an "occurrence"that takes place or majority interest in,such organization. after you have signed and executed that con- 2. The following replaces Paragraph 4.a. of tract or agreement; and SECTION II—WHO IS AN INSURED: b. Arises out of "your products' which are dis- a. Coverage under this provision is afforded tributed or sold in the regular course of such only until the 180th day after you acquire vendor's business. or form the organization or the end of the policy period, whichever is earlier, unless The insurance provided to such vendor is subject reported In writing to us within 180 days. to the following provisions: CG D4 58 07 13 ©2013 The Travelers Indemnity Company.All rights reserved. Page 1 of 7 Includes copyrighted material of Insurance Services Office,Inc.with its permission. L Policy Number:630BE3790A COMMERCIAL GENERAL LIABILITY a. The limits of insurance provided to such ven- JURY AND PROPERTY DAMAGE LIABIL- dor will be the limits which you agreed to pro- vide in the written contract or agreement, or Exclusions c.through n. do not apply to dam- the limits shown in the Declarations of this age to premises while rented to you, or tem- Coverage Part,whichever are less. porarily occupied by you with permission of b. The insurance provided to such vendor does the owner,caused by: not apply to: a. Fire; (1) "Bodily injury" or "property damage" for b. Explosion; which the vendor is obligated to pay c. Lightning; damages by reason of the assumption of liability in a contract or agreement. This d. Smoke resulting from such fire, explosion, exclusion does not apply to liability for or lightning; or damages that the vendor would have in e. Water. the absence of the contract or agreement; A separate limit of insurance applies to such (2) Any express warranty unauthorized by damage to premises as described in Para- you; graph 6.of Section III—Limits Of Insurance. (3) Any physical or chemical change in "your This insurance does not apply to damage to products" made intentionally by such premises while rented to you, or temporarily vendor; occupied by you with permission of the (4) Repackaging, unless unpacked solely for owner, caused by: the purpose of inspection, demonstration, a. Rupture, bursting, or operation of pres- testing, or the substitution of parts under sure relief devices; instructions from the manufacturer, and b. Rupture or bursting due to expansion or then repackaged in the original container; swelling of the contents of any building or (5) Any failure-to make such inspections, ad- structure, caused by or resulting from wa- justments, tests or servicing as vendors ter; agree to perform or normally undertake to c. Explosion of steam boilers, steam pipes, perform in the regular course of business, steam engines, or steam turbines. in connection with the distribution or sale TION III—LIMITS OF INSURANCE:2. The following replaces Paragraph : of SEC- of"your products'; (6) Demonstration, installation, servicing or repair operations, except such operations Subject to 5. above, the Damage To Prem- performed at such vendor's premises in ises Rented To You Limit is the most we will connection with the sale of "your prod- pay under Coverage A for damages because ts";uc or of "property damage" to any one premises (7) "Your products"which, after distribution or while rented to you, or temporarily occupied sale by you, have been labeled or role- by you with permission of the owner, caused beled or used as a container, part or In- by fire; explosion; lightning smoke resulting gredient of any other thing or substance from such fire, explosion, or lightning; or wa- by or for such vendor. ter. The Damage To Premises Rented To You Limit will apply to all damage proximately Coverage under this provision does not apply to: caused by the same "occurrence', whether a. Any person or organization from whom you such damage results from fire; explosion; have acquired "your products", or any ingre- lightning; smoke resulting from such fire, ex- dient, part or container entering into, accom- plosion, or lightning; water; or any combine- panying or containing such products;or tion of any of these. b. Any vendor for which coverage as an addi- The Damage To Premises Rented To You tional insured specifically is scheduled by en- Limit will be the higher of: dorsement. C. DAMAGE TO PREMISES RENTED TO YOU a. $300,000;or b. The amount shown on the Declarations of 1. The following replaces the last paragraph this Coverage Part for Damage To Prem- Paragraph Exclusions, of SECTION I COVERAGEE —S — COVERAGE A BODILY IN- ises Rented To You Limit. Page 2 of 7 ©2013 The Travelers Indemnity company.All rights reserved. CG D4 58 07 13 Includes copyrighted material of insurance services Office,Inc,with its permission. i L Policy Number:6303E37950A COMMERCIAL GENERAL LIABILITY 3. The following replaces Paragraph a. of the a. Is"bodily injury" or"property damage" caused definition of "insured contract" in the DEFINI- by an "occurrence" that takes place, or "per- sonal injury" or"advertising injury" caused by TIONSSection: a an offense that is committed, after you have . A contract for a lease of premises. How- signed and executed that contract or agree- ever, that portion of the contract for a ment; and lease of premises that indemnifies any b. Arises out of the ownership, maintenance or person or organization for damage to use of that part of any premises leased to premises while rented to you, or tempo- rarily occupied by you with permission of the owner,caused by: The insurance provided to such premises owner, manager or lessor is subject to the following pro- (1) Fire; visions: (2) Explosion; a. The limits of insurance provided to such (3) Lightning; premises owner, manager or lessor will be (4) Smoke resulting from such fire, ex- the limits which you agreed to provide in the plosion, or lightning;or written contract or agreement, or the limits shown on the Declarations of this Coverage (5) Water. Part,whichever are less. is not an"insured contract"; b. The insurance provided to such premises 4. The following replaces Paragraph 4.b.(1)(b) owner, manager or lessor does not apply to: of SECTION IV— COMMERCIAL GENERAL (1) "Bodily injury" or "property damage" LIABILITY CONDITIONS: caused by an "occurrence" that takes place, or "personal Injury" or "advertising (b) That is insurance for premises rented injury" caused by an offense that is com- mitted,or temporarily occupied by you with after you cease to be a tenant in the permission of the owner; that premises; or D. BLANKET WAIVER OF SUBROGATION (2) Structural alterations, new construction or The following Is added to Paragraph S., Transfer demolition operations performed by or on Of Rights Of Recovery Against Others To Us, behalf of such premises owner, manager of SECTION IV —COMMERCIAL GENERAL LI. or lessor. ABILITY CONDITIONS: c. The insurance provided to such premises We waive any right of recovery we may have owner, manager or lessor is excess over any against any person or organization because of valid and collectible other Insurance available payments we make for injury or damage arising to such premises owner, manager or lessor, out of premises owned or occupied by or rented unless you have agreed in a written contract or loaned to you; ongoing operations performed for this insurance to apply on a primary or by you or on your behalf, done under a contract contributory basis. with that person or organization; "your work"; or F. BLANKET ADDITIONAL INSURED —LESSORS ,.your products". We waive this right where you OF LEASED EQUIPMENT have agreed to do so as part of a written contract, The fallowing is added to SECTION II--WHO Is executed by you prior to loss. AN INSURED: E. BLANKET ADDITIONAL INSURED-OWNERS, Any person or organization that is an equipment MANAGERS OR LESSORS OF PREMISES lessor and that you have agreed in a written con- The following is added to SECTION 11 —WHO IS tract or agreement to include as an additional in- sured on this Coverage Part is an insured, but only with respect to liability for "bodily Injury", Any person or organization that is a premises property damage", "personal injury" or "advertis- owner, manager or lessor and that you have ing injury"that: agreed in a written contract or agreement to a. Is"bodily injury" or"property damage"caused name as an additional Insured on this Coverage by an "occurrence" that takes place, or "per- Part is an insured, but only with respect to liability sonal injury" or"advertising injury" caused by for "bodily Injury", "property damage", "personal an offense that Is committed, after you have injury"or"advertising injury'that: I CG D4 58 0713 ©2013 The Travelers indemnity company.All rights reserved. Page 3 of 7 Includes copyrighted material of Insurance Services Office,Inc.with its permission. Policy Number:6303E37950A COMMERCIAL GENERAL LIABILITY signed and executed that contract or agree- 3. SECTION following iI g is added IS AN INSURED:graph2.a.(1)of ment; and b. Is caused, in whole or in part, by your acts or Unless you are in the business or occupation omissions In the maintenance, operation or of providing professional health care services, use by you of equipment leased to you by Paragraphs (1)(a), (b), (c) and (d) above do such equipment lessor. not apply to any "bodily injury" arising out of any providing or failing to provide "incidental The insurance provided to such equipment lessor medical services"by any of your"employees", is subject to the following provisions: other than an employed doctor. Any such a. The limits of Insurance provided to such "employees' providing or failing to provide equipment lessor will be the limits which you "incidental medical services"during their work agreed hours for you will be deemed to be acting n provide in the written contract or within the scope of their employment by you agreement, or the limits shown the re or performing duties related to the conduct of rations of this Coverage Part, whichever are your business. ass. 4 b. The insurance provided to such equipment . The following exclusion is added to -COV graph 2., Exclusions, of SECTION I —COV- lessor does not apply to any"bodily injury" or ERAGES—COVERAGE A BODILY INJURY "property damage"caused by an"occurrence" AND PROPERTY DAMAGE LIABILITY: that takes place, or "personal injury" or "ad- vertising Injury" caused by an offense that is committed, after the equipment lease expires. "Bodily injury" or "property damage" arising out of the willful violation of a penal statute or c. The Insurance provided to such equipment ordinance relating to the sale of pharmaceuti- lessor is excess over any valid and collectible cals committed by, or with the knowledge or other insurance available to such equipment consent of,the insured. lessor, unless you have agreed in a written The following is added to Paragraph S. of contract for this insurance to apply on a pri- 5. SECTION III—LIMITS INSURANCE: mary or contributory basis. G. INCIDENTAL MEDICAL MALPRACTICE For the purposes of determining the applica- ble Each Occurrence Limit, all related acts or 1. The following is added to the definition of"oc- omissions committed in the providing or fail- currence" in the DEFINITIONS Section: ing to provide "incidental medical services"to Unless you are in the business or occupation any one person will be considered one "oc- of providing professional health care services, currence". "occurrence" also means an act or omission 6. The following is added to Paragraph 4.b., Ex- committed in providing or failing to provide cess Insurance, of SECTION IV — COM- "incidental medical services"to a person. MERCIAL GENERAL LIABILITY CONDI- 2. The following is added to the DEFINITIONS TIONS: Section: This insurance is excess over any valid and "Incidental medical services" means: collectible other insurance, whether primary, excess, contingent or on any other basis,that a. Medical, surgical, dental, laboratory,x-ray is available to any of your "employees" for or nursing service or treatment, advice or "bodily injury" that arises out of providing or instruction, or the related furnishing of faailiing to p any rovide to thedental extent medical serviit s food or beverages; Paragraph 2.a.(1) of SECTION II — WHO IS b. The furnishing or dispensing of drugs or AN INSURED. medical, dental, or surgical supplies or appliances; H. PERSONAL INJURY - ASSUMED BY CON- TRACT c. First aid; or d. "Good Samaritan services". 1. The following replaces Exclusion S C tual Liability, in Paragraph 2. of SECTIONTION I "Good Samaritan services" means any emer- — COVERAGES - COVERAGE B PER- gency medical services for which no compen- SONAL AND ADVERTISING INJURY LI- sation is demanded or received. ABILITY: Page 4 of 7 ©2013 The Travelers Indemnity company.All rights reserved. CG D4 58 07 13 Includes copyrighted malarial of Insurance services Office,Inc.with its permission. i Policy Number 6303E37950A COMMERCIAL GENERAL LIABILITY e. Contractual Liability the insured and the interests of the in- "Personal injury" or"advertising injury"for demnitee; which the insured is obligated to pay 4. The following replaces the first subparagraph damages by reason of the assumption of of Paragraph f. of the definition of "insured liability in a contract or agreement. This contract" in the DEFINITIONS Section: exclusion does not apply to: f. That part of any other contract or agree- (1) Liability for damages that the insured ment pertaining to your business (includ- would have in the absence of the ing an indemnification of a municipality in contract or agreement; or connection with work performed for a 2 Liability for damages because of municipality)under which you assume the O b tort liability of another parry to pay for "personal injury" assumed in a con- "bodily injury," "property damage"or"per- tract or agreement that is an "insured sonal injury" to a third person or organiza- contract", provided that the "personal tion. Tort liability means a liability that injury" is caused by an offense com- would be imposed by law In the absence mitted subsequent to the execution of of any contract or agreement. the contract or agreement. Solely for I. AMENDED BODILY INJURY DEFINITION the purposes of liability assumed in an "insured contract", reasonable at- The following replaces the definition of"bodily in- torneys fees and necessary litigation jury"in the DEFINITIONS Section: expenses Incurred by or for a party "Bodily injury" means bodily injury, mental an- other than an insured will be deemed gulsh, mental injury, shock, fright, disability, hu- to be damages because of "personal mlllation, sickness or disease sustained by a per- injury", provided that: son,including death resulting from any of these at (a) Liability to such party for, or for any time. the cost of, that party's defense J. BODILY INJURY TO CO-EMPLOYEES AND has also been assumed in the CO-VOLUNTEER WORKERS same"insured contract"; and The following is added to Paragraph 2.a.(1) of (b) Such attorney fees and litigation SECTION II--WHO IS AN INSURED: expenses are for defense of that Paragraph (1)(a) above does not apply to "bodily party against a civil or alternative injury"to a co-"employee" in the course of the co- dispute resolution proceeding in "employee's" employment by you or performing which damages to which this in- duties related to the conduct of your business, or surance applies are alleged. to "bodily injury"to your other"Volunteer workers' 2. The following replaces the third sentence of while performing duties related to the conduct of your business. Paragraph 2. of SUPPLEMENTARY PAY- MENTS m COVERAGES AAND B: K. AIRCRAFT CHARTERED WITH CREW The following is added to Exclusion g., Aircraft, Notwithstanding the provisions of Paragraph b.(2) of Section I—Coverage of Bodily ph Auto Or Watercraft, in Paragraph 2.of SECTION I —COVERAGES — COVERAGE A BODILY IN- jury And Property Damage Liability or Para- JURYAND PROPERTY DAMAGE LIABILITY: graph 2.e. of Section I — Coverage B — Per- This exclusion does not apply to an aircraft that sonal and Advertising Injury Liability, such is: payments will not be deemed to be damages because of"bodily injury", "property damage" (a) Chartered with crew to any insured; or "personal injury", and will not reduce the (b) Not owned by any insured; and limits of insurance. (c) Not being used to carry any person or prop- 3. The following replaces Paragraph 2.d. of ery for a charge. SUPPLEMENTARY PAYMENTS — COVER- L. NON-OWNED WATERCRAFT AGES A AND B: 1. The following replaces Paragraph (2) of Ex- d. The allegations in the "suit" and the in- clusion g., Aircraft, Auto Or Watercraft, in formation we know about the "occur- Paragraph 2. of SECTION 1 r COVERAGES rence"or offense are such that no conflict — COVERAGE A BODILY INJURY AND appears to exist between the interests of PROPERTY DAMAGE LIABILITY: CG D4 58 07 13 ©2013 The Travelers Indemnity company.All rights reserved. Page 6 of 7 Includes copyrighted material of insurance services office,Inc.with Its permission. Policy Number:6303E37950A COMMERCIAL GENERAL LIABILITY i (2) A watercraft you do not own that is: e. The following provisions apply to Paragraph (a) Fifty feet long or less; and a. above, but only for the purposes of the in- surance provided under this Coverage Part to (b) Not being used to carry any person or you or any Insured listed in Paragraph 1.or 2. property for a charge. of Section II—Who Is An Insured: 2. The following is added to Paragraph 2. of (1) Notice to us of such "occurrence' or of- SECTION II-WHO IS AN INSURED: fense must be given as soon as practica- Any person or organization that, with your ex- ble only after the "occurrence" or offense press or implied consent, either uses or is re- is known to you (if you are an individual), sponsible for the use of a watercraft that you any of your partners or members who is do not own that is: an individual (if you are a partnership or (1) Fifty feet long or less; and joint venture), any of your managers who (2) Not being used to carry any person or Is an individual(if you are a limited liability property for a charge. company), any of your trustees who Is an individual (if you are a trust), any of your M. INCREASED SUPPLEMENTARY PAYMENTS "executive officers" or directors(if you are 1, The following replaces Paragraph 1.b. of an organization other than a partnership, SUPPLEMENTARY PAYMENTS — COVER- joint venture, limited liability company or AGES A AND B of SECTION I - COVER- trust) or any "employee" authorized by AGES: you to give notice of an "occurrence" or b. Up to $2,500 for cost of bail bonds re- offense. quired because of accidents or traffic law (2) If you are a partnership,joint venture, lim- violations arising out of the use of any ited liability company or trust, and none of vehicle to which the Bodily Injury Liability your partners, joint venture members, Coverage applies. We do not have to fur- nish these bonds. managers trustees are individuals, n tice to us off such"occurrence" or offense 2. The following replaces Paragraph 1.d. of must be given as soon as practicable only SUPPLEMENTARY PAYMENTS — COVER- after the"occurrence"or offense is known AGES A AND B of SECTION I - COVER- by; AGES: (a) Any individual who is: d. All reasonable expenses Incurred by the (1) A partner or member of any part- insured at our request to assist us in the nership or joint venture; investigation or defense of the claim or "suit", including actual loss of earnings up (ii) A manager of any limited liability to $500 a day because of time off from company; work. (111)A trustee of any trust;or N. MEDICAL PAYMENTS—INCREASED LIMIT (iv)An executive officer or director of The following replaces Paragraph 7. of SECTION any other organization; III—LIMITS OF INSURANCE: that is your partner, joint venture 7. Subject to 5. above, the Medical Expense member, manager or trustee;or Limit is the most we will pay under Coverage O b An "employee" authorized b such C.for all medical expenses because of"bod- ilyjoint venture, limited li- injury" sustained by any one person, and partnership, will be the higher of: ability company, trust or other organi- zation to give notice of an "occur- (a) $10,000;or rence"or offense. (b) The amount shown on the Declarations of (3) Notice to us of such "occurrence" or of- this Coverage Part for Medical Expense fense will be deemed to be given as soon Limit. as practicable if it is given In good faith as 0. KNOWLEDGE AND NOTICE OF OCCUR- soon as practicable to your workers' RENCE OR OFFENSE compensation insurer. This applies only if The following is added to Paragraph 2., Duties In you subsequently give notice to us of the The Event of Occurrence, Offense, Claim or "occurrence" or offense as soon as prac- Suit, of SECTION IV — COMMERCIAL GEN- ticable after any of the persons described ERAL LIABILITY CONDITIONS: in Paragraphs e.(1) or (2) above dlscov- Page 6 of 7 ©2013 The Travelers Indemnity Company.All rights reserved. CG D4 58 07 13 Includes copyrighted material of Insurance Services Office,Inc.with its permission. Policy Number:6303E37950A l COMMERCIAL GENERAL LIABILITY ers that the 'occurrence" or offense may your rights under this insurance. However, this result in sums to which the insurance provision does not affect our right to collect add!- provided under this Coverage Part may tional premium or to exercise our rights of cancel- apply. lation or nonrenewal in accordance with applica- However, if this policy includes an endorse- ble insurance laws or regulations. ment that provides limited coverage for "bod- Q. REASONABLE FORCE — BODILY INJURY OR ily injury" or "property damage' or pollution PROPERTY DAMAGE costs arising out of a discharge, release or escape of "pollutants" which contains a re- The following replaces Exclusion a., Expected Or quirement that the discharge, release or es- Intended Injury, in Paragraph 2. of SECTION I — cape of "pollutants" must be reported to us COVERAGES — COVERAGE A BODILY IN. within a specific number of days after its JURY AND PROPERTY DAMAGE LIABILITY: abrupt commencement, this Paragraph e. does not affect that requirement. a. Expected or Intended Injury or Damage P. UNINTENTIONAL OMISSION "Bodily injury" or"property damage" expected The following is added to Paragraph 6., Repre. or intended from the standpoint of the in- sentations, of SECTION IV - COMMERCIAL sured, This exclusion does not apply to"bod- GENERAL LIABILITY CONDITIONS: ily injury" or"property damage" resulting from the use of reasonable force to protect any The unintentional omission of, or unintentional er- person or property. ror in, any information provided by you which we relied upon in issuing this policy will not prejudice I CG D4 58 07 13 ©2013 The Travelers Indemnity Company.All rights reserved. Page 7 of 7 Includes copyrighted material of Insurance services office,Inc.with its permission. POLICY NUMBER:Y-630-3E37950A-TIL-14 b THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. EARLIER NOTICE OF CANCELLATIONINONRENEWAL PROVIDED BY US This endorsement modifies Insurance provided under the following: ALL COVERAGE PARTS INCLUDED IN THIS POLICY SCHEDULE CANCELLATION: Number of Days Notice: 30 WHEN WE DO NOT RENEW(Nonrenewal): Number of days Notice: PROVISIONS: IS. For any statutorily permitted reason other than A. For any statutorily permitted reason other than nonpayment of premium, the number of days re- nonpayment of premium, the number of days re- re- quired for notice of When, We Do Not Renew nutted for notice of cancellation, as provided in (Nonrehewal), as provided In the CONDITIONS Sec the CONDITIONS Section of this Insurance, or as Section of this Insurance, or as amended R any amended by any applicable state cancellation applicable state When We Do Not Renew endorsement applicable to this insurance, is in- (NonreneWal) endorsement applicable to this in- creased to the number of days shown in the surance, is increased to the number of days SCHEDULE above. shown In the SCHEDULE above. o= o= m v r� o� o� IL T3 20 09 97 Copyright,The Travelers Indemnity Company, 1997 (Sage 1 of 1 acaexo Policy Number:6303E37950A Cf]MWRCIAL G59FRAL LIAGIUTY r THIS MoRSEAIENT CHANGES THE POLICY. PLEASE READ QT CAREFULLY BLANKET ADDIT (CONTRACTORS) This endorserient rmidifies insurance praVlaed ut der tt d futf ivhng- C4]mmr.,kdt�L GJ hrf2l4L LJdfditITY C4 u-RAGE PART 1, WHOA,AN IWS ii*b (See 6q 11)Is amranded cf The Inwrranpe pro tra the addr6anA In-. to fnciude,"dcay parson,or otgan(zaafon thade surad.'ds not "V to "hoduy IrrJvay' or agree m a Frr tikrt,aar,uaq raquuing Ensurarie{s" PropeltY Slam ege` ceu€e bJr3ur V±tirk` to tndlg+do we.an addi4f+0r 01 icrsOod'0 Chia C'Mr, ands Iriduded In tale prodpcls rampseR i crp- a 1-ait,ttu7 . gtetldna hazard" ,intone iho "written contract a) 0619wrlhrespeaEdahsbrldytdC,'hadlfyirriurV'; tagpro�idda�d eroveragen for ltfia actdr�aited�ao "praoaq dama!gs:as pmrsar,281nJury ;and Irrsurs ' and then, d+e rnsWarlort progldr#i�,to fs} If, and,anly tprtila extent that, the injury tf' the O'Wil ional inslu9rt aWidt oaty b:',sych dpmaygip Is aarassd, scls se vmisslpn® aSt "bodily hVovi °r w" F dalTre w.yc yO.0 of your sul3rnitradtar 111110.perfarmand� cum b6fore the end of the pentad of tirnto for of `your warty."' 16 which the adrs cartiact Which ;Iha wnitea aontract req*Ing Inns .r- *uKrrg Insurart,W" app0@5. Ttta Pef59.Orance regmms ytlil fa provido Such cat*@ qr eni aUan dais„,trot qualify as an addltlorral or the and of the poGey perlrpd, w'*116 ert id lrtsufed,vnth respg§t to N Iridependaril ems, asriley, ar amisslans of such parson qr argarntatiork 3 The i� OS P'twid6d to the additional tngttrad 2, Thu,Insvraance provided to the additional Imufed fry 4trJg eridatserararat is excess over any vafIrt aril By thjs erduasar>7ent 1s 1h toed as follows, calladbie "difler innrance , whether, prirr*+ a) In,the event,That the Lrinits qF 1rt9urar,aa of excess, .confinge- as an any other basis, that is th Gntrt3r qd fart show in lftitt Deb larnSlon; avaitatsl@ Yo the�ddtlpo ieY ir15i3 d fbr a lass v exceed,tEia IimiEs of 1Jataiity required by the. cover under Ihfs ertder;emer,t. 14 ' ef, tf the �tritteri aonhac4 req�ruhi®lnauranca^, atre im= "wrlttan cotttraat regtre ing hisuran€� 50 if!cauy surarae prnvlded to ttte aJditional (nsuiet r§quirrrs tlsal this Insurance apply on a pritriary slialY lie [I,Wtsd 16 the IfmiCs at uataltlty fps tresis ar a. pri,lary and non onhfbUtory, lusts, rtuired try thet 'Writtar4 can",tit req�(rif,9 U3, 11 In1.surance fs primary tea 'otJ r in6urafia "' ovOlable, to the addh6nal Insured %tilcl4 c,i ere st,ranca This endorsement shalt not frr- tt�t person or a6,ita�.. as a'It I IrI -6M ne the hrrNL3 of Ii W anca dwc:rib6d Iry Sec's till he LtrnitsOf Insurarrca for such loss, end iw wilt na# sh titvth. _Ib_At ocher Jr�ti aflae°. But.the Irtsuranaa provided to rr�wd 6) The .Insuror100 ped to the additional in- !hu adddiop�t I isuiod,by this endprsemerrY stilt Is noted, rigs not apply to tsodlly3nlury , "pray excess ver any Valid and colid, fie alfreylIn edY.tlari,3ga"ae'parsarat lnyilryr' arising mat starande'",vA4eutt"f PtltPar!" exn,ess of the r+3ndennp,a#,ar trrilare`ta terxim4 Any oft arty'bth, t3a815,,that la aualieble to the,add-: profassionaM arcttrtecb rt3J,g neering 1w buy- teanat,enured wtsan "at5 psrsoj or organIza4fon is uoylgg sarvJcas,YrCludtttg; err addnianaJ mowe '.under vt" "atl7dr I"10% ^ f 47iu preisring, approving or tauing toArty . prepotor 'or apprava, maps, sloop draw- 4. As a, raitipn air casarayta pnoufdedl tothn in9y. apiniar ; ra(soH3, sur+rays. field Of- addivenalinisured bj th]�endorsers c, tiers or change riders, or Uaa preparing, of The additional irrWrW mrnst'gW8 us WMah approving, a far4lrig to prepars or ap• notfoa as seen sa prat�tcabte trf an "gcaur:. prase, dra4v riga and shoo liaaal ,ns;and (66c " or art .b1f�so which may result in a it, Supervisory," Inspection, arolterdural or claim: Ta, thA sktont pdas(bJe, surf; 'not1e Untilnagdrlg'ba1�§M shlwld Include, 4:1'i IY2A$48 4 a 2005 The SI.Few,Tratrelera C,orvtpanleeg,Inc: page.,of 2 L. Policy Number:6303E37950A i G[7Pa WRICIAf. GEN.FkAL LIAIMLITy' I: How, %fieh and Where the `occurrence` any provider of Fothef insurance'whith wpvld of ONOKn 1pckpia6k cover the addi€lansd In d (or 9.kiss vie 11. The names and addrom6 of any injured ��gr ortde+ ibis endoreamaitt, Hsr+tevor,this j sou anr�lNiirlgsSes;'ana conditlan does not aff*wkrepier tE 4 Irrsur. and provldett, Co, the add tlu6ah Insured by IBI,. Tins naturearKl (ocalorl at any injury or IF�as er dorsamant +e pnrr Quy k� �kher IT, . damegaaiis4i otdofIh'd9eonurrerice"or ane ". ytaCtakalm is the addltionah Insured; tadGenss. vhtiph;zovars t9, perrxm,or 4ts]Ofmai as h) It a daf m is made or'sult®is Kughl agatnsf, nerried insured as desen4'ad in patagiaph 3,. th6 sd&elienal Irtsttiad, thrp aditiana1 insured ahoY9, mini; S, The folloWng derinitlon Is added to SECTION,V, I h?imsdlataly remnl thasfseelgps t� the ft EtNITIGN* e all'. OUsuit"-and}lta ate received;:and "4Yniten 45drt"gt r<quirin$ rnsurertee"mann�.s hh Npllfy us ass,gort as plr$etInbla, that"part of'..atrty tvitftelt conha (or a troe.?ktietSt The Addilivnal igsvMd mush sea to,II(hpd y� +t+tdar wltfd5 you ate raqu rail to Includm a r ive 5vr hail ndi%le 4f the`claJr i or"suit°as OerrW. or arganlzal am as ail aGldlhon rl iri- cured on Ibis Coverage Fart ptpuid ittat coat as prarkubbis, hhe"ti8d(I In and , damn a o k o} The add-rHortah lrt,:ured ntust immadlately curs ar(d the pe flt3t mlury"i4 aatr d b an sent!us copiesi frf ali legal papers raceivad tri aflensc�cotnmrttedt comies lion WI6 the olalm or"alit",cooperate a, After 1ha.sign ig atlsl;ettarcuSion of Iha with us in the lnvestigatkn of setilomanl of rxanlract'oragreemenibyyou; tftrn claim or dofdrnsa ddaiist'ttta Oiuk, end athv sa coruipFy w th,aft policy cortd t;on ha: 1+yhila Q?@! Part.bf tf a �nlradt oP d) The, sddiGonmt Insarad must tonder ihi ..:de agreermeraf Is In t ffext;card tense and indemnity of nary Claim cf "soil"to sv t afore the end of tha policy wrfad_ flne 2 of 2 0 2605 Tha St,Paul Twmkrs Campanles,Inc, CG 614 08 05 KE T SPECIAL PROVISI ONS TABLE OF CONTENTS PAGE DIVISION 1 GENERAL REQUIREMENTS ..................................... 1-1 1-01 Definitions and Terms...................................................... 1-1 1-02 Bid Procedures and Conditions.......................................... 1-2 1-03 Award and Execution of Contract....................................... 1 -5 1 -04 Scope of the Work .......................................................... 1 -6 1-05 Control of Work .............................................................. 1 -7 1-06 Control of Material .......................................................... 1-10 1-07 Legal Relations and Responsibilities to the Public................. 1-12 1-08 Prosecution and Progress ................................................. 1-16 1-09 Measurement and Payment .............................................. 1-18 KENT TECHNICAL SPEC IFI CAT I®NS................................................ A-1 WATER WELL REPORT..................................................................... A-2 PREVAILING WAGE RATES.............................................................. A-3 i East Hill Well 1 Pump Replacement/Bond 1 November 21, 2016 Project Number: W20039 KENT SPECIAL PROVISIONS The Kent Special Provisions ("Kent Special Provisions" or "KSP") modify and supersede any conflicting provisions of the 2016 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations ("WSDOT Standard Specifications")- Otherwise all provisions of the WSDOT Standard Specifications shall apply. All references in the WSDOT Standard Specifications to the State of Washington, its various departments or directors, or to the contracting agency, shall be revised to include the City and/or City Engineer, except for references to State statutes or regulations. Finally, all of these documents are a part of this contract. DIVISION 1 ® GENERAL. REQUIREMENTS 1-01 DEFINITIONS AND TERMS SECTION 1-01.1 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-01.1 General When these Kent Special Provisions make reference to a "Section," for example, "in accordance with Section 1 -01," the reference is to the WSDOT Standard Specifications as modified by these Kent Special Provisions. SECTION 1-01.2(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-01.2(2) Items of Work and Units of Measurement EA Each Eq. Adj. Equitable Adjustment FA Force Account HR Hour M GAL Thousand gallons NIC Not In Contract SF Square Feet SECTION 1-01.3, "CONTRACT"DEFINITION, IS DELETED AND REPLACED WITH THE FOLLOWING: 1-01.3 Definitions Contract The written agreement between the Contracting Agency and the Contractor. It describes, among other things: 1 . What work will be done, and by when; 2. Who provides labor and materials; and East Hill Well 1 Pump Replacement/Bond 1 - 1 November 21, 2016 Project Number: W20039 3. How Contractors will be paid. The Contract includes the Contract (agreement) Form, Bidder's completed Proposal Form, Kent Special Provisions, Contract Provisions, Contract Plans, WSDOT Standard Specifications (also including amendments to the Standard Specifications issued by WSDOT as of the later date of bid advertisement or any subsequent addenda), Kent Standard Plans, Addenda, various certifications and affidavits, supplemental agreements, change orders, and subsurface boring logs (if any). Also incorporated in the Contract by reference are: 1 . Standard Plans (M21 -01) for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and the American Public Works Association, current edition; 2. Manual on Uniform Traffic Control Devices for Streets and Highways, current edition, and; 3. American Water Works Association Standards, current edition; 4. The current edition of the "National Electrical Code." Responsibility for obtaining these publications rests with the Contractor. SECTION 1-01.3, "DEFINITIONS" IS SUPPLEMENTED BYADDING THE FOLLOWING DEFINITION: Incidental Work The terms "incidental to the project," "incidental to the involved bid J item(s)," etc., as used in the Contract shall mean that the Contractor is required to complete the specified work and the cost of such work shall be included in the unit contract prices of other bid items as specified in Section 1-04.1 (Intent of the Contract). No additional payment will be made. 1-02 BID PROCEDURES AND CONDITIONS SECTION 1-02.1 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.1 Qualification of Bidders Bidders shall be qualified by ability, experience, financing, equipment, and organization to do the work called for in the Contract. The City reserves the right to take any action it deems necessary to ascertain the ability of the Bidder to perform the work satisfactorily. This action includes the City's review of the qualification information in the bid documents. The City will use this qualification data in its decision to determine whether the lowest responsive bidder is also responsible and able to perform the contract work. If the City determines that the lowest bidder is not the lowest responsive and responsible bidder, the City reserves its unqualified right to reject that bid and award the contract to the next lowest bidder that the City, in its sole judgment, East Hill Well 1 Pump Replacement/Bond 1 - 2 November 21, 2016 Project Number: W20039 i determines is also responsible and able to perform the contract work (the "lowest responsive and responsible bidder"). Contractor shall be an authorized representative of Flowserve (Byron Jackson Products) and have support staff and equipment within 30 miles of the City of (tent. SECTION 1-02.2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.2 Plans and Specifications Upon awarding the Contract, the City shall supply to the Contractor, for its own use, up to ten (10) copies of the plans and specifications. If the Contractor requests more than ten (10) copies, the City may require the Contractor to purchase the additional sets. SECTION 1-02.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.5 Proposal Forms Prospective bidders may obtain Bid Documents including a "Bid Proposal" for the advertised project from the City upon furnishing a non-refundable payment as specified in the "Invitation to Bid" or by j downloading at no charge at KentWA.gov/doing-business/bids- procurement; however, a prospective bidder remains responsible to obtain Bid Documents, even if unable to download all or any part of the documents, whether or not inability to access is caused by the bidder's or the City's technology. Bid Documents may be requested by mail, or picked up at the Public Works Engineering Department, 400 West Gowe Street, Second Floor, Kent, Washington 98032, SECTION 1-02.6 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-02.6 Preparation of Proposal It is the Bidder's sole responsibility to obtain and incorporate all issued addenda into the bid. In the space provided on the Proposal Signature Page, the Bidder shall confirm that all Addenda have been received. All blanks in the proposal forms must be appropriately filled in. SECTION 1-02.6 IS SUPPLEMENTED BY ADDING THE FOLLOWING TO THE LAST PARAGRAPH: Proposals must contain original signature pages. FACSIMILES OR OTHER FORMS OF ELECTRONIC DELIVERY ARE NOT ACCEPTABLE AND ARE CONSIDERED NON-RESPONSIVE SUBMITTALS. East Hill Well 1 Pump Replacement/Bond 1 - 3 November 21, 2016 Project Number: W20039 SECTION 1-02.7 IS DELETED FIND REPLACED WITH THE FOLLOWING: 1-02.7 Bid Deposit A deposit of at least 5 percent of the total Bid shall accompany each Bid. This deposit may be cash, cashier's check, or a proposal bond (Surety bond). Any proposal bond shall be on the City's bond form and shall be signed by the Bidder and the Surety. A proposal bond shall not be conditioned in any way to modify the minimum 5-percent required. The Surety shall: (1) be registered with the Washington State Insurance Commissioner, and (2) appear on the current Authorized Insurance List in the State of Washington published by the Office of the Insurance Commissioner. The failure to furnish a Bid deposit of a minimum of 5 percent with the Bid shall make the Bid nonresponsive and shall cause the Bid to be rejected by the Contracting Agency. SECTION 1-02.9 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.9 Delivery of Proposal All bids must be sealed and delivered in accordance with the "Invitation to Bid." Bids must be received at the City Clerk's office by the stated time, regardless of delivery method, including U.S. Mail. SECTION 1-02.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.10 Withdrawing, Revising, or Supplementing Proposal After submitting a Bid Proposal to the Contracting Agency, the Bidder may withdraw or revise it if: 1 . The Bidder submits a written request signed by an authorized person, and 2. The Contracting Agency receives the request before the time for opening Bids. The original Bid Proposal may be revised and resubmitted as the official Bids Proposal if the Contracting Agency receives it before the time for opening Bids. SECTION 1-02.11 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.11 Combination and Multiple Proposals No person, firm or corporation shall be allowed to make, file, or be interested in more than one bid for the same work unless alternate bids are specifically called for; however, a person, firm, or corporation that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder is not disqualified from submitting a subproposal or quoting prices to other bidders or from making a prime proposal. East Hill Well 1 Pump Replacement/Bond 1 - 4 November 21, 2016 Project Number: W20039 SECTION 1-02.13 IS REVISED BY DELETING ITEM 1(a) AND REPLACING ITEM 7(a) WITH THE FOLLOWING: i 1-02.13 Irregular Proposals a. The bidder is not prequalified when so required. SECTION 1-02. 14 IS REVISED BY DELETING ITEM 3 AND REPLACING WITH THE FOLLOWING: 1-02.141 Disqualification of Bidders 3. The bidder is not qualified for the work or to the full extent of the bid. 1-03 AWARD AND EXECUTION OF CONTRACT SECTION 1-03. 1 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SECOND PARAGRAPH IN THAT SECTION: 1-03.1 Consideration of Bids The City also reserves the right to include or omit any or all schedules or alternates of the Proposal and will award the Contract to the lowest responsive, responsible bidder based on the total bid amount, including schedules or alternates selected by the City. SECTION 1-03.2 IS REVISED BYREPLACING "45 CALENDAR DAYS" WITH 1160 CALENDAR DAYS"RELATING TO CONTRACT AWARD OR BID REJECTION. 1-03.2 Award of Contract SECTION 1-03.3 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.3 Execution of Contract No claim for delay shall be granted to the Contractor due to its failure to submit the required documents to the City in accordance with the schedule provided in these Kent Special Provisions. SECTION 1-03.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.7 Judicial Review Any decision made by the City regarding the award and execution of the contract or bid rejection shall be conclusive subject to the scope of judicial review permitted under Washington State Law. Such review, if any, shall be timely filed in the King County Superior Court, located in Kent, Washington, East Hill Well 1 Pump Replacement/Bond 1 - 5 November 21, 2016 Project Number: W20039 1-04 SCOPE OF THE WORK .SECTION 1-04.1(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.1 (2) Bid Items Not Included in the Proposal The Contractor shall include all costs of doing the work within the bid item prices. If the contract plans, contract provisions, addenda, or any other part of the contract require work that has no bid item price in the proposal form, the entire cost of labor and materials required to perform that work shall be incidental and included with the bid item prices in the contract. SECTION 1-04.2 IS SUPPLEMENTED BY ADDING THE WORDS, - CENT SPECIAL PROVISIONS, /PENT STANDARD PLANS"FOLLOWING THE WORDS, "CONTRACT PROVISIONS" IN THE FIRST SENTENCE OF THE FIRST PARAGRAPH, SECTION 1-04.2 IS REVISED BY DELETING ITEMS 1 THROUGH 7 IN THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING S ITEMS: 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1 . Approved Change Orders 2. The Contract Agreement 3. Kent Special Provisions 4. Contract Plans 5. Amendments to WSDOT Standard Specifications 6. WSDOT Standard Specifications 7. Kent Standard Plans 8. WSDOT Standard Plans SECTION 1-04.4 IS REVISED BY DELETING THE THIRD PARAGRAPH (INCLUDING SUBPARAGRAPHS A AND B). SECTION 1-04.4 IS REVISED BY DELETING THE FIFTH PARAGRAPH AND REPLACING IT WITH THE FOLLOWING: 1-04.4 Changes For Item 2, increases or decreases in quantity for any bid item shall be paid at the appropriate bid item contract price, including any bid item increase or decrease by more than 25 percent from the original planned quantity. SECTION 1-04,4 IS REVISED BY DELETING THE EIGHTH PARAGRAPH (NEXT TO THE LAST PARAGRAPH) AND REPLACING WITH THE FOLLOWING: Within 14 calendar days of delivery of the change order the Contractor shall endorse and return the change order, request an extension of time for endorsement or respond in accordance with Section 1-04.5. The East Hill Well 1 Pump Replacement/Bond 1 - 6 November 21, 2016 Project Number: W20039 Contracting Agency may unilaterally process the change order if the Contractor fails to comply with these requirements. Changes normally noted on field stakes or variations from estimated quantities, will not require a written change order. These changes shall be made at the unit prices that apply. The Contractor shall respond immediately to changes shown on field stakes without waiting for further notice. SECTION 1-04.6 IS DELETED AND REPLACED WITH THE FOLLOWING. 1-04.6 Variation in Estimated Quantities Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. SECTION 1-04.9 IS DELETED AND REPLACED WITH THE FOLLOWING: SECTION 1-04. 11 ITEM 2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.11 Final Cleanup 2. Remove from the project all unapproved and/or unneeded material left from grading, surfacing, paving, or temporary erosion control measures. 1-05 CONTROL OF WORK SECTION 1-05.4 IS REVISED BY DELETING THE LAST FOUR PARAGRAPHS. SECTION 1-05.4 IS REVISED BY ADDING A PARAGRAPH AFTER PARAGRAPH 7 i 1-05.4 Conformity With and Deviations From Plans and Stakes To the extent a conflict exists between the requirements of WSDOT Section 1-05.4 and Kent Special Provision Section 1-05.5, the requirements of KSP Section 1-05.5 will prevail. 1-05.8 City's Right to Correct Defective and Unauthorized Work If the Contractor fails to remedy defective or unauthorized work within the time specified by the Engineer, or fails to perform any part of the work required by the contract, the Engineer may provide the Contractor written notice establishing a date after which the City will correct and remedy that work by any means that the Engineer may deem necessary, including the use of City forces or other contractors. If the Engineer determines that the Contractor's failure to promptly correct any defective or any unauthorized work creates a situation that could be potentially unsafe or might cause serious risk of loss or damage to the public, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work East Hill Well 1 Pump Replacement/Bond 1 - 7 November 21, 2016 Project Number: W20039 removed and replaced, or have the work the Contractor refuses to perform completed by using City or other forces. Direct and indirect costs incurred by the City attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment may be deducted by the Engineer from monies due, or to become due, the Contractor. Direct and indirect costs shall include, without limitation, compensation for additional professional services required, compensation and engineering and inspection services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. No increase in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the City's rights provided by this section nor shall the exercise of this right diminish the City's right to pursue any other remedy available under law with respect to the Contractor's failure to perform the work as required. SECTION 3-05.9 IS SUPPLEMENTED WITH THE FOLLOWING NEW SUBSECTION: 1-05.9 Equipment 1-05.9(1) Operational Testing It is the intent of the City to have at the Physical Completion Date a complete and operable system. Therefore when the work involves the installation of machinery or other mechanical equipment, street lighting, electrical distribution of signal systems, building or other similar work, it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the Physical Completion Date. Whenever items of work are listed in the contract provisions for operational testing they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. In the event the contract does not specify testing time periods, the default testing time period shall be twenty-one (21) calendar days. During and following the test period, the Contractor shall correct any items of workmanship, materials, or equipment that prove faulty or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. East Hill Well 1 Pump Replacement/Bond 1 - 8 November 21, 2016 Project Number: W20039 The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing shall be included in the various contract bid item prices unless specifically set forth otherwise in the contract. Operational and test periods, when required by the Engineer, shall not affect a manufacturer's guaranties or warranties furnished under the terms of the Contract. SECTION 1-05. 10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-05.10 Guarantees In addition to any other warranty or guarantee provided for at law or in the parties' contract, the Contractor shall furnish to the Contracting Agency any guarantee or warranty furnished as a customary trade practice in connection with the purchase of any equipment, materials, or items incorporated into the project. Upon receipt of written notice of any required corrective work, the Contractor shall pursue vigorously, diligently, and without disrupting city facilities, the work necessary to correct the items listed in the notice. Approximately sixty (60) calendar days prior to the one year anniversary of final acceptance, the Contractor shall be available to tour the project, with the Engineer, in support of the Engineer's effort to establish a list of corrective work then known and discovered. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE FIRST PARAGRAPH: 1-05.13 Superintendents, Labor, and Equipment of Contractor Within ten (10) days of contract award, the Contractor shall designate the Contractor's project manager and superintendent for the contract work. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE THIRD PARAGRAPH (AS PRINTED IN THE 2016 WSDOT STANDARD SPECIFICATIONS): If at any time during the contract work, the Contractor elects to replace the contract manager or superintendent, the Contractor shall only do so after obtaining the Engineer's prior written approval. THE LAST PARAGRAPH OF 1-05. 13 IS DELETED AND REPLACED WITH THE FOLLOWING: Whenever the City evaluates the Contractor's qualifications or prequalifications pursuant to Section 1-02.1 or RCW 47.28.070, the City may take these or other Contractor performance reports into account. East Hill Well 1 Pump Replacement/Band 1 - 9 November 21, 2016 Project Number: W20039 SECTION 9-05. 14 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.14 Cooperation With Other Contractors Details of known projects are as follows: N/A SECTION 1-05 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-05.16 Water and Power The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the Contract includes power or water as bid items, or unless otherwise provided for in other bid items. 1-05.17 Oral Agreements No oral agreement or conversation with any officer, agent, or employee of the City, either before or after execution of the contract, shall affect or modify the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered unofficial information and in no way binding upon the City, unless subsequently recorded and/or put in writing and signed by an authorized agent of the City. 1-06 CONTROL OF MATERIAL SECTION 1-06.2(2) 1S DELETED IN ITS ENTIRETY. 1-06.2(2) Statistical Evaluation of Materials for Acceptance SECTION 1-06 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-06.7 Submittals 1-06.7(1) Submittal Procedures Contractor shall include all submittals with his bid unless otherwise specified. All information submitted by the Contractor shall be clear, sharp, high contrast copies. Contractor shall accompany submittals with a letter of transmittal containing the following information: 1 . Contractor's name and the name of Subcontractor or supplier who prepared the submittal. 2. The project name and identifying number. 3. Each new submittal shall be sequentially numbered (1 , 2, 3, etc.). Each resubmittal shall include the original number with a sequential alpha letter added (1 A, 113, 1C, etc.). 4. Description of the submittal and reference to the Contract requirement or technical specification section and paragraph number being addressed. East Hill Well 1 Pump Replacement/Bond 1 - 10 November 21, 2016 Project Number: W20039 5. Bid item(s) where product will be used. 1-06.7(2) Shop Drawings, Product Data, and Samples The Contractor shall submit the following for the Engineer's review: 1 . Shop Drawings: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 2. Product Data: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 3. Samples: Submit three labeled samples or three sets of samples of manufacturer's full range of colors and finishes unless otherwise directed. One approved sample will be returned to the Contractor. Content of submittals: 1 . Each submittal shall include all of the items required for a complete assembly or system. 2. Submittals shall contain all of the physical, technical and performance data required to demonstrate conclusively that the items comply with the requirements of the Contract. 3. Each submittal shall verify that the physical characteristics of items submitted, including size, configurations, clearances, mounting points, utility connection points and service access points, are suitable for the space provided and are compatible with other interrelated items. 4. The Contractor shall label each Product Data submittal, Shop Drawing or Sample with the bid item number and, if a lump sum bid item, provide a reference to the applicable KSP paragraph. The Contractor shall highlight or mark every page of every copy of all Product Data submittals to show the specific items being submitted and all options included or choices offered. The City encourages a creative approach to complete a timely, economical, and quality project. Submittals that contain deviations from the requirements of the Contract shall be accompanied by a separate letter explaining the deviations. The Contractor's letter shall: 1 . Cite the specific Contract requirement including the Specification Section bid item number and paragraph number for which approval of a deviation is sought. 2. Describe the proposed alternate material, item or construction, explain its advantages, and explain how the proposed alternate meets or exceeds the Contract requirements, 3. State the reduction in Contract Price, if any, which is offered to the City. East Hill Well 1 Pump Replacement/Bond 1 - 11 November 21, 2016 Project Number: W20039 The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed deviation with or without cause. The Engineer will stamp and mark each submittal prior to returning it to the Contractor. The stamps will indicate one of the following: 1 . "APPROVED AS SUBMITTED" — Accepted subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. 2. "APPROVED AS NOTED" — Accepted subject to minor corrections that shall be made by the Contractor and subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. No resubmission is required. 3. "AMEND AND RESUBMIT" — Rejected because of major inconsistencies, errors or insufficient information that shall be resolved or corrected by the Contractor prior to subsequent re- submittal. An amended resubmission is required. Re-submittals that contain changes that were not requested by the Engineer on the previous submittal shall note all changes and be accompanied by a letter explaining the changes. 1-06.7(3) Proposed Equivalents The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed equivalent with or without cause. 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.2 State Taxes 1-07.2(1) State Sales Tax: WAC 458-20-171—Use Tax SECTION 9-07.2(1) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to use tax under Section 1 -07.2(1) in the proposal bid items. 1-07.2(2) State Sales Tax: WAC 458-20-170—Retail Sales Tax SECTION 1-07.2(2) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to retail sales tax under Section 1 -07.2(2) in the proposal bid items. East Hill Well 1 Pump Replacement/Bond 1 - 12 November 21, 2016 Project Number: W20039 SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH. 1-07.6 Permits and Licenses The City has obtained the following permits: None SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPHS AFTER THE LAST PARAGRAPH. A copy of each permit and/or license obtained by the Contractor shall be furnished to the City. Approved permits shall be furnished to the City upon completion of the project and prior to final acceptance. The Contractor shall promptly notify the City in writing of any variance in the contract work arising from the issuance of any permit. 1-07.9 Wages SECTION 1-07.9(1) IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SIXTH PARAGRAPH. 1-07.9(1) General To the extent allowed by law, the wage rates that will be in effect during the entire contract work period are those in effect on the day of bid opening, unless the City does not award the Contract within six months of the bid opening. 1-07.13 Contractor's Responsibility for Work SECTION 1-07.13(4) IS REVISED BY DELETING THE SECOND SENTENCE OF THE FIRST PARAGRAPH AND DELETING THE LAST PARAGRAPH. 1-07.13(4) Repair of Damage SECTION 1-07.14 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE BEGINNING OF THAT SECTION. 1-07.14 Responsibility for Damage To the extent a conflict exists between the terms of this Section 1- 07.14 and Section 5 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07. 15(1) IS REVISED BY ADDING THE FOLLOWING PARAGRAPH AFTER THE LAST PARAGRAPH. 1-07.15 Temporary Water Pollution Prevention 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan East Hill Well 1 Pump Replacement/Bond 1 - 13 November 21, 2016 Project Number: W20039 When the proposal form includes multiple bid schedules and the "SPCC Plan" bid item is present in only one bid schedule, the lump sum payment item for the "SPCC Plan" in that one schedule will apply to all bid schedules for all costs associated with creating and updating the accepted SPCC Plan, and all costs associated with the setup of prevention measures and for implementing the current SPCC Plan as required by this Specifications. SECTION 1-07. 17 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE END OF THE SECOND PARAGRAPH: 1-07.17 Utilities and Similar Facilities If a utility is known to have or suspected of having underground facilities within the area of the proposed excavation and that utility is not a subscriber to the utilities underground location center, the Contractor shall give individual notice to that utility within the same time frame prescribed in RCW 19.122.030 for subscriber utilities. SECTION 1-07.17 /S SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS 1-07.17(3) Utility Markings Once underground utilities are marked by the utility owner or its agent, and/or once new underground facilities have been installed by the Contractor, the Contractor/excavator is responsible to determine the precise location of underground facilities that may conflict with other underground construction. The Contractor shall maintain the marks or a record of the location of buried facilities for the duration of time needed to avoid future damage until installation of all planned improvements at that location is complete. 1-07.17(4) Payment All costs to comply with subsection 1-07.17(3) and for the protection and repair of all identified or suspected underground utilities specified in RCW 19.122 are incidental to the contract and are the responsibility of the Contractor/excavator. The Contractor shall include all related costs in the unit bid prices of the contract. No additional time or monetary compensation shall be made for delays caused by utility re- marking or repair of damaged utilities due to the Contractor's failure to maintain marks or to locate utilities in accordance with this section. 1-07.17(5) Notification of Excavation Within ten business days but not less than two business days prior to the commencement of excavation, the Contractor shall provide written notice (or other form of notice acceptable to the Engineer) to all owners of underground facilities, whether public or private, that excavation will occur, and when excavation will occur. East Hill Well l Pump Replacement/Bond 1 - 14 November 21, 2016 Project Number: W20039 f 1-07.17(6) Site Inspection Contractor warrants and represents that it has personally, or through its employees, agents and/or subcontractors, examined all property j affected by this project and that it is knowledgeable of specific locations for water, gas, telephone, electric power and combined sewerage utilities within those areas. The following list of contacts is provided only as a convenience to the Contractor. It may not be accurate and may not constitute a complete list of all affected utilities. Centur Ly ink Comcast Jason Tesdal Bill Walker 206-345-3488 253-288-7538 206-683-4242 (cell) 206-255-6975 (cell) Puget Sound Energy Gas Puget Sound Energy Power Chang Pak Brian Swart 253-395-6988 253-395-6839 425-449-6735 (cell) 206-604-3687 (cell) I Verizon Brad Landis 425-201-0901 425-766-1740 (cell) SECTION 1-07.18 IS REVISED BY ADDING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.18 Public Liability and Property Damage Insurance To the extent a conflict exists between the terms of this Section 1- 07.18 and the insurance requirements in Section 7 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.24 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.24 Rights of Way Street right of way lines, limits of easements and limits of construction are indicated or defined on the plans. The Contractor's construction activities shall be confined within these limits, unless arrangements for use of private property are made. It is anticipated that the City will have obtained all right of way, easements or right of entry agreements prior to the start of construction. Locations where these rights have not been obtained will be brought to the Contractor's attention prior to start of construction. East Hill Well 1 Pump Replacement/Bond 1 - 15 November 21, 2016 Project Number, W20039 The Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. SECTION 1-07.26 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.26 Personal Liability of Public Officers Neither the City, the Engineer, nor any other official, officer or employee of the City shall be personally liable for any acts or failure to act in connection with the contract, it being understood that, in these matters, they are acting solely as agents of the City. 1-08 PROSECUTION AND PROGRESS SECTION 1-08.4 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-08.4 Notice to Proceed, Prosecution and Hours of Work Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of required insurance have been approved by and filed with the City. Unless otherwise approved in writing by the Engineer, the Contractor shall not commence the work until the Notice to Proceed has been given by the Engineer. The Contractor shall commence construction activities on the Project Site within ten working days of the Notice to Proceed Date. The Work thereafter shall be prosecuted diligently, vigorously, and without unauthorized interruption until physical completion of the work. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the Contract. Except in the case of emergency or unless otherwise approved by the Engineer, the normal straight time working hours for the Contractor shall be any consecutive 8 hour period between 7:00 a.m. and 6:00 p.m. Monday through Friday, unless otherwise specified in the Kent Special Provisions, with a 5-day work week, plus allowing a maximum one-hour lunch break in each working day. The normal straight time 8-hour working period for the contract shall be established at the preconstruction conference or prior to the Contractor commencing work. If a Contractor desires to perform work on holidays, Saturdays, Sundays, or before 7:00 a.m. or after 6:00 p.m. on any day, the Contractor shall apply in writing to the Engineer for permission to work those times. The Contractor shall notify the Engineer at least 48 hours in advance (72 hours in advance for weekend work) so that the Inspector's time may be scheduled. Permission to work longer than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. For East Hill Well 1 Pump Replacement/Bond 1 - 16 November 21, 2016 Project Number: W20039 I any work outside of normal straight time working hours that requires city surveyors, all reasonable efforts shall be made by the Contractor to allow time for surveying to be completed during normal straight time hours. If city surveyors are required to work other than normal straight time hours at the convenience of the Contractor, all such work shall be reimbursed by the Contractor. I Permission to work between the hours of 10:00 p.m. and 7:00 a.m. during weekdays and between the hours of 10:00 p.m. and 9:00 a.m. on weekends or holidays may also be subject to noise control requirements. Approval to continue work during these hours may be revoked at any time the Contractor exceeds the City's noise control regulations or the city receives complaints from the public or adjoining property owners regarding noise from the Contractor's operations. The Contractor shall have no claim for damages or delays should this permission be revoked for these reasons. The Engineer may grant permission to work Saturdays, Sundays, holidays or other than the agreed upon normal straight time working hours, but may be subject to other conditions established by the City or Engineer. These conditions may include, but are not limited to the following: hours worked by City employees; impacts to the construction schedule; or accommodations to adjoining properties affected by the contract work. SECTION 1-08.5 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-08.5 Time for Completion Contract time shall begin on the day of the Notice to Proceed. The Contract Provisions may specify another starting date for Contract time, in which case, time will begin on the starting date specified. SECTION 1-08.6 IS REVISED BY DELETING THE FIFTH, SIXTH, AND SEVENTH PARAGRAPHS AND REPLACING WITH THE FOLLOWING: 1-08.6 Suspension of Work If the performance of all or any part of the Work is suspended for an unreasonable period of time by an act of the Contracting Agency in the administration of the Contract, or by failure to act within the time specified in the Contract (or if no time is specified, within a reasonable time), the Engineer will make an adjustment for any increase in the cost or time for the performance of the Contract (excluding profit) necessarily caused by the suspension. However, no adjustment will be made for any suspension if (1) the performance would have been suspended by any other cause, including the fault or negligence of the Contractor, or (2) an equitable adjustment is provided for or excluded under any other provision of the Contract. East Hill Well 1 Pump Replacement/Bond 1 - 17 November 21, 2016 Project Number: W20039 If the Contactor believes that the performance of the Work is suspended for an unreasonable period of time and such suspension is the responsibility of the Contracting Agency, the Contractor shall immediately submit a written notice of protest to the Engineer as provided in Section 1 -04.5. No adjustment shall be allowed for any costs incurred more than 10 calendar days before the date the Engineer receives the Contractor's written notice to protest. In any event, no protest will be allowed later than the date of the Contractor's signature on the Final Pay Estimate. The Contractor shall keep full and complete records of the costs and additional time of such suspension, and shall permit the Engineer to have access to those records and any other records as may be deemed necessary by the Engineer to assist in evaluating the protest. The Engineer will determine if an equitable adjustment in cost or time is due as provided in this Section. The equitable adjustment for increase in costs, if due, shall be subject to the limitations provide in Section 1- 09.4, provided that no profit of any kind will be allowed on any increase in cost necessarily caused by the suspension. SECTION 9-08.7 MAINTENANCE DURING SUSPENSION IS REVISED BY DELETING THE FOURTH AND SIXTH PARAGRAPHS. 1-09 MEASUREMENT AND PAYMENT SECTION 1-09.9 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION. 1-09.9(2) City's Right to Withhold certain Amounts In addition to the amount that the City may otherwise retain under the Contract, the City may withhold a sufficient amount of any payments otherwise due to the Contractor, including nullifying the whole or part of any previous payment, because of subsequently discovered evidence or subsequent inspections that, in the City's judgment, may be necessary to cover the following: 1 . The cost of defective work not remedied. 2. Fees incurred for material inspection, and overtime engineering and inspection for which the Contractor is obligated under this Contract. 3. Fees and charges of public authorities or municipalities. 4. Liquidated damages. 5. Engineering and inspection fees beyond Completion Date. 6. Cost of City personnel to re-establish locate marks for City-owned facilities that were not maintained by the Contractor in accordance with RCW 19.122.030 (3). 7. Additional inspection, testing and lab fees for re-doing failed, water, other utility tests. East Hill Well 1 Pump Replacement/Bond 1 - 18 November 21, 2016 Project Number: W20039 j SECTION 1-09. 11(3) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09,11(3) Time Limitations and Jurisdiction This contract shall be construed and interpreted in accordance with the laws of the State of Washington. The venue of any claims or causes of action arising from this contract shall be exclusively in the Superior Court of King County, located in Kent, Washington. For convenience of the parties to this contract, it is mutually agreed that any claims or causes of action which the Contractor has against the City arising from this contract shall be brought within 180 days from the date of Final Acceptance of the contract by the City. The parties understand and agree that the Contractor's failure to bring suit within the time period provided shall be a complete bar to any such claims or causes of action. It is further mutually agreed by the parties that when any claims or causes of action that a Contractor asserts against the City arising from this contract are filed with the City or initiated in court, the Contractor shall permit the City to have timely access to any records deemed necessary by the City to assist in evaluating the claims or actions. SECTION 1-09.13 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.13 Final Decision and Appeal All disputes arising under this contract shall proceed pursuant to Section 1-04.5 and 1-09.11 of the WSDOT Standard Specifications and any Kent Special Provisions provided for in the contract for claims and resolution of disputes. The provisions of these sections and the Kent Special Provisions must be complied with as a condition precedent to the Contractor's right to seek an appeal of the City's decision. The City's decision under Section 1-09.11 will be final and conclusive. Thereafter, the exclusive means of Contractor's right to appeal shall only be by filing suit exclusively under the venue, rules and jurisdiction of the Superior Court of King County, located in Kent, Washington, unless the parties agree in writing to an alternative dispute resolution process. East Hill Well 1 Pump Replacement/Bond 1 - 19 November 21, 2016 Project Number: W20039 i i i I East Hill Well 1 Pump Replacement/Bond A - 1 November 21, 2016 Project Number, W20039 A) GENERAL 1 .01 The City of Kent (also referenced as 'Owner' in these technical specifications) is soliciting bids for one submersible well motor and pump assembly as detailed herein. The new assemblies shall be identical in all dimensional and performance respects to Owners existing Byron Jackson equipment as described in these technical specifications. 1.02 One manufacturer shall build both the pump and the submersible motor assemblies. The pump and motor manufacturer must be ISO 9001.2000 certified. The submersible pump and motor unit shall be manufactured by Flowserve (Byron Jackson Products), no equals. For the safety and protection of Owner's water supply, only such types of equipment shall be installed that has been in successful operation for a period of not less than 5 years. Each bidder shall submit a list of 5 similar installations of units 250 horsepower or larger, that have been in continuous operation for a period of not less than 5 years at time of bid. Information shall be included as part of Contractors Compliance Statement. 1 .03 Potable Water Service Pump, motor, and power-cable assemblies shall have current ANSI/NSF 61 certification for potable water service. The interior of the well casing and all equipment shall be disinfected by Contractor with an ANSI/NSF 61 approved disinfectant during installation to eliminate bacteriological contamination. Contractor shall provide Owner their disinfection plan prior to installation for approval. Owner shall take bacteriological samples for laboratory analysis to verify adequate disinfection. 3.01 Guarantee All equipment furnished under this contract shall be new and guaranteed against defective workmanship and material for a period of one (1) year after the date of acceptance or 18 months from shipment from the point of manufacture, whichever comes first. In the event any equipment is found defective, corrections shall be made to the satisfaction of the Owner per the conditions of this contract. B) WELL PUMP 1.0 GENERAL CONDITIONS 1 .01 Scope of Work The successful bidder shall furnish all labor, tools, equipment, and materials necessary to provide, deliver, and install submersible pumping units, including any unspecified accessories, to provide a complete assembly ready for operation. Owner may request a manufacturer representative be present during the installation of equipment to certify said equipment is installed to manufacturers installation requirements. East Hill Well 1 Pump Replacement/Bond 1 November 21, 2016 Project Number: W20039 1 .02 Inspection and Factory Tests A certified factory test of the pump will be required which will provide the following data: ® Head capacity curve (gallons per minute versus total head (feet)) ® Shaft brake horsepower curve ® Efficiency (wire to water efficiency or pump efficiency) The test shall be conducted after the impellers have been trimmed to meet the duty head requirements. A calibrated test motor or the actual job motor may be used as the pump test driver. Field conditions are to be simulated as close as possible and corrections for column pipe and other losses are to be calculated and included for comparison of results with the contract curves and field test curves. All testing shall be carried out in conformity with the applicable sections of the standards of Hydraulic Institute Standard Level 1U. A minimum of seven (7) test points including shutoff and design points shall be included in the test. Three copies of the certified test results shall be submitted to Owner within three days after completion of all specified tests. The factory test will verify the guaranteed hydraulic performance. Should the pump not meet contract conditions, or not perform satisfactorily in the judgement of the Owner, the pump supplier/contractor shall proceed to correct the deficiencies at their expense. 1 .03 Field Test The pump and motor will be installed in accordance with the manufacturer's recommendations and the best-known practice and a post installation field test will be run to assure mechanical performance. The pump supplier/contractor may be represented at the field test to monitor test methods and results. The pump supplier/contractor shall bear the expense of this representative at the field test. The pump/contractor representative shall have free access to all plans and field information pertaining to the pump installation, test procedures, instrument calibrations and test data. 1 .04 Hanging Diagram Upon completion of the installation of the submersible pump, the contractor shall provide a true and accurate hanging diagram of the well, the pump, column, and sounding tubes installed. The City has included the Water Well Report (Appendix A) and will provide a diagram of the well's construction to the successful bidder prior to pump installation. 2.0 GUARANTEED DUTY REQUIREMENTS 2.01 Guaranteed Conditions Pump Duty Flow Rate in gallons per minute 1950 Pump Total Dynamic Head in feet 392 Design Point Efficiency 82% East Hill Well 1 Pump Replacement/Bond 2 November 21, 2016 Project Number: W20039 i Secondary Design Point: 1500 gpm at 475' at 77% efficiency Third Design Point: 2250 gpm at 300' at . 75% efficiency Proposed pump curves shall be submitted with the bid and shall include TDH, pump efficiency (%) and brake horsepower (BHP) versus flow (GPM). The curves shall extend from 0 flow, (closed valve) to 120% of the duty flow rate. 3.0 PUMP Byron Jackson model 95MQL-5 stage, 1950 gpm at 392' 3.01 Design General Each piece of equipment furnished shall be of the most recent proven design as approved by the purchaser. The pump shall be a submersible turbine type multi-stage in series design, with closed impellers. MODEL 15MQL —ETML 5 stage. It is desired to use this bowl so that the existing column length can be re-used in the installation without modification and to match existing wellhead dimensions. 3.02 Materials The pump bowl assembly shall be furnished in materials as specified. All materials used and not specified herein shall be the best available for the purpose intended as dictated by the best engineering practice and shall be within this limitation conform to the latest Standard of the American Society for Testing Materials, so far as practical. All materials proposed shall be described in the bidders submittals including references to ASTM numbers. 3.03 Pump Shaft The pump shaft shall be pickled, annealed, turned, ground, and polished corrosion resistant 416 Stainless Steel or better. The shaft, as a minimum, shall be based on a diameter as listed in the standards of ANSI/AWWA E101-88 and the requirements of ASTM-A582. 3.04 Impellers Impellers shall be of the closed type, made of Aluminum Nickel Bronze ASTM B30 material. The impellers shall be mounted to the pump shaft and held rigidly in place with either tapered collets or split rings and keys. Impellers shall be accurately machined and dynamically balanced to a minimum of ISO 1940 grade G6.3. The outer tips of the impeller blades shall not be feathered and shall be of sufficient thickness to withstand considerable wear before affecting performance of the pump. 3.05 Pump Bowl Assembly The pump cases (bowls) shall be made of Cast Iron with minimum physical properties as follows: Tensile Strength 30,000 PSI with a Brinnell Hardness of 210. The castings shall be smooth, sound, fine grained, high density, and free of sand pockets, blowholes, and all other detrimental flaws and defects. The East Hill Well 1 Pump Replacement/Bond 3 November 21, 2016 'i Project Number: W20039 pump cases shall be machined to a close fit and shall be designed so they can easily be disassembled and reassembled. The overall diameter of the pump bowl shall not exceed 15 inches. The pump bowls shall be enamel lined and epoxy coated with a coating thickness of not less than 8 mils. 3.06 Pump Bearings Each pump bowl shall include its own shaft sleeve bearing. Two extra-long pump strainer body bearings and an extra-long top series case bearing shall be included. Bearing material shall be bronze ASTM B584mgr 932. 3.07 Pump to Motor and Pump to Column Adaptation The pump strainer body, adapter bracket, and top case shall be new and unused and of the same material as specified for the pump series cases. The pump to motor adaptation shall include a 2-piece system (adapter bracket and strainer-body) to insure easy pump to motor adaptation. The shaft coupling shall consist of a 2-piece jaw type rigid coupling and be capable of transferring. the pump thrust to the motor up and down thrust bearings and allow up to 0.060" misalignment. Straight bar stock couplings utilizing keys and set screws will not be allowed or considered as equal. The suction screen shall be diamond shape with open surface area to be 4 times that of the area of the eye of the first stage impeller. 3.08 Inlet Screen and Wire Guard A stainless steel inlet strainer to cover the impeller inlet shall be provided and installed with the pump and bowl. A stainless steel guard to protect the flat cable assembly from damage during installation shall also be provided and installed. 3.09 Fasteners All fasteners shall be stainless steel. 3.10 Measurement Measurement for well pump shall be per each. 3.11 Payment Payment will be made for each of the following Bid items that are included in the proposal: "Submersible Pump Byron Jackson 15MQL-5 Stage", per each. The unit contract price of the above items shall include supplying the specified product, shipping, delivery to the job site, installation, testing, and all necessary tools and miscellaneous supplies for proper installation of the product. East Hill Well 1 Pump Replacement/Bond 4 November 21, 2016 Project Number: W20039 4.0 SUBMERSIBLE MOTOR — Byron Jackson 25Ohp 975Orpm 460V 3 please Oil filled with Double Mechanical Seal 4.01 Type The motor shall be new and unused, epoxy-coated with a minimum coating thickness of 8 mils, of the submersible type and be of the proper rating to drive the specified pump continuously over the complete operating range of head, capacity (shut-off to run-out) without the pump load exceeding the motor nameplate rating. The 250 HP submersible motor shall be a high reactance design that will provide an inrush current that is low enough to allow across- the-line full voltage starting. The motor shall be a completely enclosed type, designed for continuous underwater operation on 460 volts, 60 hertz, 3 phase, and alternating current. The motor shall be equipped with a double mechanical seal located in the top of the motor where its shaft extends through the motor housing. The motor design shall automatically balance the internal pressure in the motor with the well pressure (submergence pressure) outside the motor, without the use of diaphragms or springs. The motor shall be filled with a high dielectric strength FDA approved food grade mineral oil. The oil shall be continuously circulated and filtered throughout the interior of the motor for cooling the rotor, stator and bearings. The motor design shall include the capability to carry continuously the total sum of the weight of the rotating components of the pump and motor, and the hydraulic thrust that the pump may apply in both the up and down direction. The motor thrust bearing is to be designed to carry not less than 16,700 Ibs down thrust, and 10,800 Ibs up thrust. The motor windings shall be a minimum of Class F insulation utilizing a VPI process and be of the form wound design on all voltages 4000 volt and above. The motor rotor will be squirrel cage with high resistance copper bars for better starting characteristics and maximum efficiency, and be dynamically balanced to ISO grade G2.5. 4.02 Size The submersible motor furnished to this specification shall be not more than 13.563" in diameter and 121 .5" in length (including the shaft extension at the top end). 4.03 Performance The submersible motor offered to this specification should have efficiency characteristics not less than the following at rated voltages, current and frequency: Half ('/2) load PF of 73% and efficiency of 84%. Three-quarters (3/4) load PF of 81% and efficiency of 88%. Full load PF of 84% and efficiency of 90%. 4.04 Starting Characteristics The submersible motor offered shall be suitable for across the line starting with a full load current of 310 amps and a maximum inrush current of 488% of full load current. This shall be accomplished by the use of a high reactance motor East Hill Well 1 Pump Replacement/Bond 5 November 21, 2016 Project Number: W20039 ', design with special rotor bars. WATER FILLED MOTORS WILL NOT BE ACCEPTABLE OR APPROVED. 4.05 Measurement Measurement for well pump motor shall be per each. 4.06 Payment Payment will be made for each of the following Bid items that are included in the proposal: "Byron Jackson Submersible Pump Motor 250 Hp, 460V, 30, Oil-filled", per each. The unit contract price per each of the above items shall include supplying the specified product, shipping, delivery to the job site, installation, testing, and all necessary tools and miscellaneous supplies for proper installation of the product. 5.0 COLUMN ASSEMBLY- 10"Diameter, Thread-coupled Steel Pipe 5.01 Description Supplier shall provide 210' of Schedule 40 Hot-Dip Galvanized, threaded and coupled drop column pipe as described in the following table: Quantity Length 10 20 feet 1 9 feet 1 1 foot Lengths shall be as specified to allow for the re-use of the existing wellhead top plate and fittings. Pipe shall have a minimum wall thickness of 0.365". Each section of pipe shall be threaded American Standard Taper Pipe Thread with 8 threads per inch on a 3/4" taper per foot on both ends. One end of the pipe shall be protected using a plastic pipe protector end and the other shall be furnished with a 10" water well reamed and drifted coupling with a minimum outside diameter of 11 .75" and taper tapped 8 threads per inch, 3/4" taper per foot on the inside diameter, and be manufactured in accordance with ASTM specification A589. One extra coupling shall be supplied with the pipe. Pipe shall be shipped in a manner that protects it from debris or contamination during transit. 5.02 Measurement Measurement for payment of column pipe will be by the linear foot of pipe installed. East Hill Well 1 Pump Replacement/Bond 6 November 21, 2016 Project Number: W20039 5.03 Payment Payment will be made for each of the following Bid items that are included in the proposal: "10-inch Column Assembly", per linear foot. The payment per linear foot of the above items shall include supplying the specified product, shipping, delivery to the job site, installation, testing, and all necessary tools and miscellaneous supplies for proper installation of the product. 6.0 Check Valve 6.01 Description The check valve shall be new and unused, 10-inch diameter, taper-threaded to mate with the column pipe. The valve shall be of a bleed-back style to allow the column to drain slowly and constructed of steel. The valve shall be placed above the pump discharge. 6.02 Measurement Measurement for check valve shall be per each. 6.03 Payment Payment will be made for each of the following Bid items that are included in the proposal: "10-inch Bleed-Back Check Valve", per each. The unit contract price per each of the above items shall include supplying the specified product, shipping, delivery to the job site, installation, testing, and all necessary tools and miscellaneous supplies for proper installation of the product. 7.0 Power-cable Assembly 7.01 Description The pump/motor manufacturer shall supply, in addition to the pump and motor unit, a power-cable assembly of appropriate size and construction to meet the service intended and be NSF rated. The power-cable assembly shall be UL listed and furnished in the proper length to extend from the motor terminals to the junction box mounted at the.surface plate. The power-cable assembly design shall include a sealing terminal plug arrangement with metal guards for protection against rubbing the well casing interior during installation. The flat cable section is to be factory spliced to the round cable by the pump/motor supplier. The cable splice is to be Hi-Pot tested under water at the factory by the pump/motor supplier. East Hill Well 1 Pump Replacement/Bond 7 November 21, 2016 Project Number; W20039 7.02 Cable Plug Assembly — (Flat Cable Assembly) The cable power assembly shall include a UL listed factory hot-injection molded Plug at the motor terminal end. The plug design shall incorporate a sealing plug-in design, which can be removed without disassembling any part of the motor. The flat cable assembly shall be a minimum of 1/0 for 250 HP motors. The cable plug design shall be capable of withstanding full submergence pressure without failure. Motors that have factory spliced pigtails to the motor windings will not be accepted or considered. 7.03 Round Cable Assembly — (Submersible Power Cable) The round cable assembly shall be based on three (3) UL listed conductors of stranded copper. Each conductor shall have cross-linked polyethylene insulation (XLP). Round cable shall also include an integral ground lead of appropriate size as determined by the National Electric Code (NEC). The round cable size shall not be less than 500 MCM for 250 HP motor. The power-cable assembly complete including the flat cable splice and plug shall be Hi-Pot tested to twice rated voltage plus 1,000 volts. In addition, the flat to round cable splice shall be electrically submerged under water at the test voltage. The power cable will be supported on the column pipe by 3/4" wide, 0.030-inch thick stainless steel bands at intervals not exceeding 10 feet when installed. 7.04 Measurement Measurement for the round cable assembly shall be per linear foot. 7.05 Payment Payment will be made for each of the following Bid items that are included in the proposal: "500 MCM Round Submersible Power Cable", per linear foot. The payment per linear foot of the above items shall include supplying the specified product, shipping, delivery to the job site, installation, testing, and all necessary tools and miscellaneous supplies for proper installation of the product. 8.0 Sounding Tubes 8.01 Description Supplier shall furnish not less than 630' of 1" schedule 80 PVC flush thread sounding lines with an outside diameter not less than 1 .315" in 10' lengths that shall run from the top of the pump bowl to above the surface plate. Each 10' length shall have one end with a square male thread and the other end a square female thread such that the pipe can be screwed together without the need of a coupling and that the coupling area will be no larger than the outside diameter of actual PVC pipe. The bottom of the sounding lines shall be capped to prevent the sounding East Hill Well 1 Pump Replacement/Bond 8 November 21, 2016 Project Number: W20039 l device from exiting the bottom of the sounding tube. The bottom 10' of each sounding tube shall be drilled with not less than 10 3/8"-diameter holes equally spaced along its length to allow for water to enter and exit. The sounding tubes will be supported on the column pipe by 3/4" wide, 0.030- inch thick stainless steel bands at intervals not exceeding 10 feet when installed. 8.02 Measurement i Measurement for the sounding tubes shall be per linear foot. 8.03 Payment Payment will be made for each of the following Bid items that are included in the proposal: "Flush-thread PVC Sounding tubes", per linear foot. The payment per linear foot of the above items shall include supplying the specified product, shipping, delivery to the job site, installation, testing, and all necessary tools and miscellaneous supplies for proper installation of the product. East Hill Well 1 Pump Replacement/Bond 9 November 21, 2016 Project Number: W20039 I I I WATER WELL REPORT i East Hill Well 1 Pump Replacement/Bond A - 2 November 21, 2016 Project Number: W20039 Yrfle Original and e'[rst Cops with ApplivAlon N 4 u'GI- '3 ;ty^- On artment nr F'Ci,lnay WATER WELL REPORT Second Copy-Owner's Copy �^) gp�p [� Third Copy--Drilicrt Copy 9'ifAT OF WA'S1�`NOTON Permit No t..'1.4"�.-.J+�.815P (1) OWNER, Nama:..... Address_.. (2) LOCATION OF WELL. county.. ;"Ant ................ ..... ............................ .. t` . .. ....ti .JRttt✓?e sen,20..... TjZ..N_ R...9,. W.M. l� Hearing and distanea from section or subdivision corne �D (3) PROPOSED USEI Damastic ❑ Industrial ❑ Municipal❑ (10) WELL LOG, _._._.____ Irrigation ❑ Test Well O Other ❑ rormatlon;Datrribe bF color,character sire of material and.structure,and ahoto tKickns»of otltt 9Veil and the kin and Nature of the material to each -_- -_-_-- stratum penetrated. WA at feast one entry for each change of formation. (4) TYPE OF WORK' 0-1wr'z number or well .. (If more than one).._ . . ......... .. MATERIAL, 4'- PROM TO -� New well ;?4j Method: DUg ❑ Hared ❑ ""` ' Deepened ❑ Cable M Drlven ❑ -. Tull .207, t . Reconditioned Q Rotary O Jetted ❑ (5) DIMENSIONS: Diameter aI wasl ?R... sncn m. ' V—),�1- iLd'_. tt. Depth a! aomplated well 9 .3.'........_„.ft. .? R nl y.t i •• i ,• n rl,. (}tf q (6 ONSTRUCTION RETAILS„ ). � ri. 1i�rr3rnn _ I.nF. ?2lt r Casinginstalled:._.?n .. 9 - . . Dlam. Iran . . _!). ft, w 5.1... n. c.3 n d x�� Threaded Tl .......... Diem, from _.. It. to ft* a t Diann, from . tt to a POPS:OratIPA3t Yea i3 NO['{ Typeof perforator Wed.............._...._..._......__.......__. ._.....:........_.,... SIZE of perforations ..._......... ......._.. in. by ...._._...._. fn. t _............... ._. pertaxatleW.from ... .. ............ ft to ..._......,....... ., .......yettormlom from ... . . . ft. to .... ._ ., pertoratkons from ... ...... ... ft to _.._.... __ scroeTA81 Yes €rf No❑ - _• Maitutacttirer's Natite......s7: �:�..»f.2 ............._......._._...._......�_....... ✓� ___ ,n Type_.. p I - 1..t.1.�C'c-'r .^nlsladel No .. Dram. .)..�It Sknt sire 1 50 . from L22 tf ta4.. et. Diann. Slot size .., from ft, to .. ._... .. ft. Gravel packed: Yes ❑ No size of gravel Grpvel placed from .....ft. to ... . .........._...It. l�tirLeRe seal Yea . No❑ .to what depths Material ❑sad In seat (rEC1L,A'�........... ...._. ... ._ .. ... — -- -- Did jny strata contain unusable waters Ytc 13 No❑ Type of water?........ . ...... Depth Of strata. .. . ... .... ..... _._.�..__ method df e6allne strata nit...... ... ._ (7) PUMP. minuractumit's Name. ..... . Type: ... ..... .... . HT... A (8) WATER LEVELS: Land-surtece elavatkou above mean AM I"A .. -. St. Static level f.$_7. _ .......R. below top of well llhabat#4724M .�. Artseian prt", Iba.per square inch Date---:.- Artesian water is controlled by .. . ..... . . ........... _ ICap. valve, Our.) Drawdown is amount water level is •— - -- —'�---. -- __._ __.._ -._ (9) WELL TESTS: lowered beloW static lnvai x . . �.. Work started EG-'.�.�1.�.� Was a pump test made4 Yes❑ Sia 0 If Yes,by whom? ..... t r YIUdr gat lmin with it drawdoW4 after hre. WELL 1)fiILLER 4 STATEMENT.- This well'was drilled raider-MY jurisdiction a s report is .. true to the best of MY knowledge atL���l(Ilef,,� Recovery data (time taken as zero when pump turned off) (water level b measured from well t op to water level) I�FAMF...�'+4 . r '(E3�.�. rX' J.,F1�a" Z.Ri,'n!l t, r .. ...... Time Water Le id Time Water Leper Toms Water Legal (Parson arm or verporauon) (Type or print) R 198 75 ( 8 7 $.4.e.TV- man 1$4 , Ray nRn ,l,t)n�� `... OP 13..?nzn ..2.8h, 70 204 � $4.,ZS _ tStic + 181 3Aditeas.......�zte .. 3.7.E .0- . . .89 ..6. .1 Zfi2 $4 before ......$. .... , o , . e. . ) Data M test . . . )l r.11. 1.8 . 26.,_. 19$Q - £Signed] :: .. : .........+. ........... . . Heller tact. Cal./Min, with . ._.....ft. drawdown #Mir-_. ..,,.......hrs. Iwell DrlUerl gstesiatt Aow ..... .......... .__ ...g.P.m. Date..... . . .......................... L Temperature at water.. Was a chemt¢al analysis nude'[ YAK C] NO 0 License W. �3(l�.F� .. .. Date. n.`..- "-' ......... ..:.. (USE ADDrPit?NAZ SHEETS 17 NECESSARY y rcy 050-1.:0 i East Hill Well 1 Pump Replacement/Bond A - 3 November 21, 2016 Project Number: W20039 Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 12/06/2016 Countv Trade Job Classification Wa a Holida Overtime Noted King Asbestos Abatement Workers Journey Level $45.25 5D 1 H King Boilermakers Journey Level $64.29 5N 1C King Brick Mason Journey Level $54.32 5A 1M King Brick Mason Pointer-Caulker-Cleaner $54.32 5A 1M King Building Service Employees Janitor $22.84 5S 2F King Building Service Employees Traveling Waxer/Shampooer $23.291 55 2F King Building Service Employees Window Cleaner (Non- $23.99 5S 2F Scaffold) 'King Building Service Employees Window Cleaner (Scaffold) $26.78 5S 2F King Cabinet Makers (in Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $55.51 5D 4C King Carpenters Bridge, Dock And Wharf $55.51 5D 4C Carpenters King Carpenters Carpenter $55.51 5D 4C - - i King Carpenters Carpenters on Stationary Tools $55.64 5D 4C King Carpenters Creosoted Material $55.61 5D 4C King Carpenters Roor Finisher $55.51 5D 4C King Carpenters Roor Layer $55.51 5D 4C King Carpenters Scaffold Erector $55.51 5D 4C King Cement Masons Journey Level $55.56 7A 1M King Divers & Tenders Diver $108.77 5D 4C 8A King Divers 8 Tenders Diver On Standby $66.05 5D 4C King Divers 8 Tenders Diver Tender $59.88 5D 4C King Divers Et Tenders Surface Rcv Et Rov Operator $59.88 5D 4C King Divers 8 Tenders Surface Rcv 8: Rov Operator $55.76 5A 4C Tender King Dredge Workers Assistant Engineer $56.44 5D 3F King Dredge Workers Assistant Mate (Deckhand) $56.00 5D 3F King Dredge Workers Boatmen $56.44 5D 3F King Dredge Workers Engineer Welder 1 $57.51 5D I3F hffnc' //fnrfrccc Wn nnv/Inl/\A/nnc Inn LII in/nrxAAlnnn1nn I/i in ncnv Page 2 of 17 i Nng Dredge Workers Leverman, Hydraulic $58.67 5D L King DredveWorkeis Mates $56.44 5D 3F "King Drodge Workers Oiler $56.00 5D 3F King pEyw it�Ai)cator Journey Level $55.51 5D 1 H .,King PLmall. Tapers Journey Level $55.66 5P 1 E King Electrical Fixture Maintenance Journey Level $27.24 5L 1 E Workers King Electricians - Inside Cable Splicer $69.77 7C 4E King Electricians - Inside Cable Splicer (tunnel) $74.95 7C 4E King Electricians - Inside Certified Welder $67.41 7C 4E King Electricians - Inside Certified Welder (tunnel) $72.37 7C 4E King Electricians - Inside Construction Stock Person $37.94 7C 4E King Electricians - Inside Journey Level $65.05 7C 4E King Electricians - Inside Journey Level (tunnel) $69.77 7C 4E King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 KinR Electricians - Powertine Cable Splicer $71.85 5A 4D Construction King Electricians - Powerline Certified Line Welder $65.71 5A 4D Construction King Electricians - Powerline Groundperson $44.12 5A 4D Construction King Electricians - Powerline Heavy Line Equipment $65.71 5A 4D Construction Operator King Electricians - Powerline Journey Level Lineperson $65.71 5A 4D Construction King Electricians - Powertine Line Equipment Operator $55.34 5A 4D Construction King Electricians - Powerline Pole Sprayer $65.71 5A 4D Construction King Electricians - Powerline Powderperson $49.16 5A 4D Construction King Electronic Technicians Journey Level $31.00, 1 King Elevator Constructors Mechanic $85.45 7D 4A King Elevator Constructors Mechanic In Charge $92.35 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $16.55 5B LIR Products Work Only King Fence Erectors Fence Erector $15.18 King FlaRjers Journey Level $38.36 7A 31 King Glaziers Journey Level $58.31 7L IY King Heat Et Frost Insulators And Journeyman $65.43 5_1 LS Asbestos Workers King Heating Equipment Mechanics Journey Level $75.46 7F 1E King Hod Carriers Et Mason Tenders Journey Level $46.66 7A 31 King Industrial Power Vacuum Journey Level $9.47 1 Cleaner King Inland Boatmen Boat Operator $56.78 5B 1K King Inland Boatmen Cook $53.30 5B 1K https://fortress.wa.gov/lni/waqelookup/prvWaqelookup.aspx 11/21/2016 Page 3of17 King Inland Boatmen Deckhand $53.301 5BI 1K King Inland Boatmen Deckhand Engineer $54.32 5B 1K King Inland Boatmen Launch Operator $55.57 5B 1K King Inland Boatmen Mate $55.57 5B 1K King Inspection/Cleaning/Sealing Cleaner Operator, Foamer $31.49 1 Of Sewer & Water Systems By Operator Remote Control King Inspection/Cleaning/Seating Grout Truck Operator $11.48 1 Of Sewer Et Water Svstems By Remote Control King Inspection/Cleaning/Sealing Head Operator $24.91 1 Of Sewer & Water Systems By Remote Control King Inspection/Cteaning/Seating Technician $19.33 1 Of Sewer Ft Water Systems By Remote Control King Inspection/CteaninQ/Seating Tv Truck Operator $20.45 1 Of Sewer Et Water Svstems By Remote Control King insulation Applicators Journey Level $55.51 5D 4C King Ironworkers Journeyman $65.53 7N 10 King Laborers Air, Gas Or Electric Vibrating $45.25 7A 31 Screed King Laborers Airtrac Drill Operator $46.66 7A 31 King Laborers Ballast Regular Machine $45.25 7A 31 King Laborers Batch Weighman $38.361 7A 31 King Laborers Brick Pavers $45.25 7A 31 King Laborers Brush Cutter $45.25 7A 31 King Laborers Brush Hog Feeder $45.25 7A 31 King Laborers Burner $45.25 7A 31 King Laborers Caisson Worker $46.66 7A 31 King Laborers Carpenter Tender $45.25 7A 31 King Laborers Caulker $45.25 7A 31 King Laborers Cement Dumper-paving $46.09 7A 31 King Laborers Cement Finisher Tender $45.25 7A 31 King Laborers Change House Or Dry Shack $45.25 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $45.25 7A 31 King Laborers Chipping Gun(30 Lbs. And $46.09 7A 31 Over) !King Laborers Choker Setter $45.25 7A 31 King Laborers Chuck Tender $45.25 7A 31 King Laborers Clary Power Spreader $46.09 7A 31 King Laborers Clean-up Laborer $45.25 7A 31 King Laborers Concrete Dumper/chute $46.09 7A 31 Operator 'King Laborers Concrete Form Stripper $45.251 7A 31 King Laborers Concrete Placement Crew $46.091 7A 31 King Laborers $46.09 7A 1 31 hi-fnc-//fnrtrpcc mra nnv/Ini/IAranpinnl<iin/nrvl tAnpinnLlTn acnv 11 /?1 /7Mti Page 4 of 17 Concrete Saw Operator/core Driller 1 °King Laborers Crusher Feeder $38.361 7A 31 !:King Laborers Curing Laborer $45.251 7A 31 King Laborers Demolition: Wrecking 8: $45.251 7A 31 Moving (incl. Charred Material) King Laborers Ditch Digger $45.251 7A 31 King Laborers Diver $46.661 7A 31 King Laborers Drill Operator $46.09 7A 311 (hydraulic,diamond) King Laborers Dry Stack Walls $45.251 7A 31 King Laborers Dump Person $45.251 7A 31 King Laborers Epoxy Technician $45.25 7A 31 King Laborers Erosion Control Worker $45.25 7A 31 King Laborers Faller & Bucker Chain Saw $46.09 7A 31 King Laborers Fine Graders $45.25 7A 31 King Laborers Firewatch $38.36 7A 31 King Laborers Form Setter $45.25 7A 31 >;King Laborers Gabian Basket Builders $45.25 7A 31 King Laborers General Laborer I $45.25 7A 31 King Laborers Grade Checker & Transit $46.66 7A 31 Person King Laborers Grinders $45.25 7A 31 King Laborers Grout Machine Tender $45.25 7A 31 King Laborers Groutmen (pressure)including $46.09 7A 31 Post Tension Beams King Laborers Guardrail Erector $45.25 7A 31 King Laborers Hazardous Waste Worker $46.66 7A 31 (level A) King Laborers Hazardous Waste Worker $46.09 7A 31 (level B) King Laborers Hazardous Waste Worker $45.25 7A 31 (level C) King Laborers High Scaler $46.66 7A 31 King Laborers Jackhammer $46.09 7A 31 King Laborers Laserbeam Operator $46.09 7A 31 King Laborers Maintenance Person $45.25 7A 31 King Laborers Manhole Builder-mudman $46.09 7A 31 King Laborers Material Yard Person $45.25 7A 31 King Laborers Motorman-dinky Locomotive $46.091 7A 31 King Laborers Nozzleman (concrete Pump, $46.09 7A 31 Green Cutter When Using Combination Of High Pressure Air Ft Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $46.09 7A 31 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 11/21/2016 Page 5of17 King Laborers Pilot Car $38.36 7A 31 King Laborers Pipe Layer Lead $46.66 7A 31 King Laborers Pipe Layer/tailor $46.09 7A 31 King Laborers Pipe Pot Tender $46.09 7A 31 King Laborers Pipe Reliner $46.09 7A 31 King Laborers Pipe Wrapper $46.09 7A 31 King Laborers Pot Tender $45.25 7A 31 Kin Laborers Powderman _ _g $46.66 7A 31 King Laborers Powderman's Helper $45.25 7A 31 King Laborers Power Jacks $46.09 7A 31 "King Laborers Railroad Spike Puller - Power $46.09 7A 31 King Laborers Raker - Asphalt $46.66 7A 31 King Laborers Re-timberman $46.66 7A 31 King Laborers Remote Equipment Operator $46.09 7A 31 ,King Laborers Rigger/signal Person $46.09 7A 31 King Laborers Rip Rap Person $45.25 7A 31 King Laborers Rivet Buster $46.09 7A 31 King Laborers Rodder $46.09 7A 31 King Laborers Scaffold Erector $45.25 7A 31 'King Laborers Scale Person $45.25 7A 31 King Laborers Sloper (over 20") $46.09 7A 31 King Laborers Sloper Sprayer $45.25 7A 3l King Laborers Spreader (concrete) $46.09 7A 31 - t King Laborers Stake Hopper $45.25 7A 31 King Laborers Stock Piler $45.25 7A 31 King Laborers Tamper Et Similar Electric, Air $46.09 7A 31 Et Gas Operated Tools King Laborers Tamper (multiple Et Self- $46.09 7A 31 propelled) King Laborers Timber Person - Sewer $46.09 7A 31 (lagger, Shorer & Cribber) King Laborers Toolroom Person (at Jobsite) $45.25 7A 31 King Laborers Topper $45.25 7A 31 King Laborers Track Laborer $45.25 7A 31 King Laborers Track Liner (power) $46.09 7A 31 King Laborers Traffic Control Laborer $41.02 7A 31 8R 'King Laborers Traffic Control Supervisor $41.02 7A 31 8R King Laborers Truck Spotter $45.25 7A 31 King Laborers Tugger Operator $46.09 7A 31 King Laborers Tunnel Work-Compressed Air $83.12 7A 31 84 Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $88.15 7A 31 Worker 30.01-44.00 psi !.King Laborers Tunnel Work-Compressed Air $91.83 7A 31 Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $97.53 7A 31 S Worker 54.01-60.00 psi hHtnc-//fnrtrpcc wa nnv/Ini/lAianpinnki in/nrv%A/;;npinnln in acnv 1 1 /71 / nl A Page 6 of 17 King Laborers Tunnel Work-Compressed Air $99.65 7A 31 .....____ Worker 60.01-64.00 psi 'King Laborers Tunnel Work-Compressed Air $104.75 7A 31 Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $106.65 7A 31 Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $108.65 7A 31 Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $110.65 7A 31 Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $46.76 7A 31 ad Tender King Laborers Tunnel Work-Miner $46,76 7A 31 King Laborers Vibrator $46.09 7A 31 King Laborers Vinyl Seamer $45.25 7A 31 'King Laborers Watchman $34.86 7A 31 King Laborers Welder $46.09 7A 31 King Laborers Well Point Laborer $46.09 7A 31 King Laborers Window Washer/cleaner $34.86 7A 31 Xing Laborers - Under round Sewer General Laborer 8 Topman $45.25 7A 31 Et Water _ King Laborers - Underground Sewer Pipe Layer $46.09 7A I 31 Ft Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers,_____ King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers "King Lathers Journey Level $55.51 5D 1H King Marble Setters Journey Level $54.32 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (in Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 _ King Metal Fabrication (In Shop) Welder $15.48 1 King Millwri ht Journey Level $57.01 5D 4C 'King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11,56 1 King Modular Buildings Plumber $11.56 1 I King Modular Buildings Production Worker $9.47 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $40.60 6Z 2B King Pile Driver Journey Level $55.76 5D 4C King Plasterers Journey Level $53.20 M 1R https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 11/21/2016 Page 7 of 17 King Playground Ft Park Equipment Journey Level $9.47 1 Installers — —'—^-- -- _ King Plumbers @ Pipefitters Journey Level $75.06 6Z 1G King Power Equipment Operators Asphalt Plant Operators $58.69 7A 3C 8P King Power Equipment Operators Assistant Engineer $55.21 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $58.17 7A 3C 8P 'I King Power Equipment Operators Batch Plant Operator, $58.17 7A 3C 8P Concrete King Power Equipment Operators Bobcat $55,21 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $55.21 7A 3C 8P Equipment 'King Power Equipment Operators Brooms $55.21 7A 3C 8P King Power Equipment Operators Bump Cutter $58.17 7A 3C 8P King Power Equipment Operators Cableways $58.69 7A 3C 8P King Power Equipment Operators Chipper $58.17 7A 3C 8P King Power Equipment Operators Compressor $55.21 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $58.69 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $55.21 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $57.72 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $58.17 7A 3C 8P With Boom Attachment Up To 42 m King Power Equipment Operators Conveyors $57.72 7A 3C 8P i King Power Equipment Operators Cranes Friction: 200 tons and $60.47 7A 3C 8P over King Power Equipment Operators Cranes: 20 Tons Through 44 $58.17 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $59.28 7A 3C 8P 'r Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 tons- 299 tons, or $59.88 7A 3C 8P 250' of boom including jib with attachments ,King Power Equipment Operators Cranes: 300 tons and over or $60.47 7A 3C 8P 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 Tons Through 99 $58.69 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $55.21 7A 3C 8P Under King Power Equipment Operators Cranes: Friction cranes $59.88 7A 3C 8P through 199 tons King Power Equipment Operators $57.72 7A 3C 8P 1 hftnr-//fnrfracc tea nrni/Ini/mranalnnhrrn/nrvlAfanalnnhrrn acnv 11 /')7 /?nlr, Page 8 of 17 Cranes: Through 19 Tons With Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $58.17 7A 3C 8P King Pow�enfi Operators Deck Engineer/deck Winches $58.17 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $58.69 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $57.72 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $57.72 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $59.28 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $55.21 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell $58.17 7A 3C 8P And Gamaco & Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $57.72 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. $55.21 7A 3C 8P With Attachments King Power EaUlpment Operators Grade Engineer: Using Blue $58.17 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $55.21 7A 3C 8P King Power Equipment Operators Guardrail Punch $58.17 7A 3C 8P - King Power Equipment Operators Hard Tail End Dump $58.69 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $58.17 7A 3C 8P Articulating Off-road Equipment Under 45 Yards 9King Power Equipment Operators Horizontal/directional Drill $57.72 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $58.17 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $57.72 7A 3C 8P I' 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $55.21 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Ex $59.28 7A 3C 8P •` Over °King Power Equipment Operators Loader, Overhead, 6 Yards. $58.69 7A 3C 8P But Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $58.17 7A 3C 8P Yards I "rrKing Power Equipment Operators Loaders, Plant Feed $58.17 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $57.72 7A 3C 8P "King Power Equipment Operators Locomotives, All $58.17 7A 3C 8P King Power Equipment Operators Material Transfer Device $58.17 7A 3C 8P King Power Equipment Operators $59.28 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 11/21/2016 Page 9 of 17 Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) PKing Power Equipment Operators Motor Patrol Graders $58.69 7A 3C 8P '! King Power Equipment Operators Mucking Machine, Mote, $58.69 7A 3C 813 Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $55.21 7A 3C 8P Distribution Et Mulch Seeding Operator 'King Power Equipment Operators Outside Hoists (elevators And $57.72 7A 3C 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $58.17 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $59.28 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $58.69 7A 3C 8P '• Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $55.21 7A 3C 8P '- King Power Equipment Operators Pile Driver (other Than Crane $58.17 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $57.72 7A 3C BP I' King Power Equipment Operators Posthole Digger, Mechanical $55.211 7A 3C 8P King Power Equipment Operators Power Plant $55.21 7A 3C 8P ' King Power Equipment Operators Pumps - Water $55.21 7A 3C 8P King Quad 9, Hd 41, D10 And Over $58.69 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $55.21 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $58.69 7A 3C 813 Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $55.21 7A 3C 8P King Power Equipment Operators Rigger/Signal Person, Bellman $57.72 7A 3C 8P (Certified) King Power Equipment Operators Rottagon $58.69 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $55.21 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Mutti-lift $57.72 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $58.17 7A 3C 8P ;King Power Equipment Operators Saws - Concrete $57.72 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $58.17 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry $57.72 7A 3C 8P All King Power Equipment Operators Scrapers, Self-propelled: 45 $58.69 7A 3C 8P Yards And Over lKing Power Equipment Operators Service Engineers - Equipment $57.72 7A 3C 8P King Power Equipment Operators Shotcrete/gunite Equipment $55.21 7A 3C 8P King Power Equipment Operators $57.72 7A 3C 8P hf-nc- //fnri-raee WA 11 /71 /?nl A Page 10 of 17 Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $58.69 7A 3C 8P '! Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $58.17 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equ oment Operators Shovel, Excavator, Backhoes: $59.28 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Powers Operators Shovel, Excavator, Backhoes: $59.88 7A 3C 8P Over 90 Metric Tons King Power Egu�ment Operators Slipform Pavers $58.69 7A 3C 8P nt King Power Equipme Operators Spreader, Topsider & $58.69 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $58.17 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $57.72 7A 3C 8P King Power Equipment Operators Tower Crane Up To 175' In $59.28 7A 3C 8P Height Base To Boom King Power Equipment Operators Tower Crane: over 175' $59.88 7A 3C 8P through 250' in height, base to boom King Power Equipment Operators iTower Cranes: over 250' in $60.47 7A 3C 8P height from base to boom King Power Equipment Operators Transporters, All Track Or $58.69 7A 3C 8P Truck Type King !Power Equipment Operators Trenching Machines $57.72 7A 3C 8P King iPower E uioment 0 eratars Truck Crane Oiler/driver - 100 $58.17 7A 3C 8P Tons And Over King Power Equ pment Operators Truck Crane Oiler/driver $57.72 7A 3C 8P ! Under 100 Tons King ',Power Equipment Operators Truck Mount Portable $58.17 7A 3C 8P Conveyor King ;Power Equipment Operators Welder $58.69 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $55.21 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $58.17 7A 3C 8P King power Equipment Operators- Asphalt Plant Operators $58.69 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Assistant Engineer $55.21 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Barrier Machine (zipper) $58.17 7A 3C 8P Underground Sewer&Water King Power Equipment Operators- Batch Plant Operator, $58.17 7A 3C 8P Underground Sewer Et Water Concrete CKing Power Equipment Operators- Bobcat $55.21 7A 3C 8P Underground Sewer & Water i King Power Equipment Operators- Brokk - Remote Demolition $55.21 7A 3C 8P Underground Sewer & Water Equipment King Power Equipment Operators- Brooms $55.21 7A 3C 8P Underground Sewer & Water https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 11/21/2016 Page 11 of 17 iKing Power Equipment Operators- Bump Cutter $58.17 7A 3C 8P Underground Sewer & yVater King Power Equipment Operators- Cableways $58.69 7A 3C 8P _ Underground Sewer a Water 'King Power Equipment Operators- Chipper $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $55.21 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Concrete Pump: Truck Mount $58.69 7A 3C aP Underground Sewer a Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $55.21 7A 3C 8P Underground Sewer a Water Screed "King Power Equipment Operators- Concrete Pump - Mounted Or $57.72 7A 3C 8P Underground Sewer a Water Trailer High Pressure Line Pump, Pump High Pressure. ',King Power Equipment Operators- Concrete Pump: Truck Mount $58.17 7A 3C 8P Underground Sewer a Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $57.72 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Cranes Friction: 200 tons and $60.47 7A 3C 8P Underground Sewer a Water over King Power Equipment Operators- Cranes: 20 Tons Through 44 $58.17 7A 3C 8P Underground Sewer Ft Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $59.28 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $59.88 7A 3C 8P Underground Sewer Et Water 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $60.47 7A 3C 8P i Underground Sewer a Water 300' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 Tons Through 99 $58.69 7A 3C 8P Underground Sewer a Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $55.21 7A 3C 8P Underground Sewer a Water Under King Power Equipment Operators- Cranes: Friction cranes $59.88 7A 3C 8P Underground Sewer a Water through 199 tons King Power Equipment Operators- Cranes: Through 19 Tons With $57.72 7A 3C 8P Underground Sewer a Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $58.17 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Deck Engineer/deck Winches $58.17 7A 3C 8P Underground Sewer a Water (power) King Power Equipment Operators- Derricks, On Building Work $58.69 7A 3C 8P Underground Sewer a Water hffnc- //fnrfracc MIA nnv/Ini/�nranalnnlsiin/nrvUlancinn Lien acne 11 /71 /7M F. Page 12 of 17 King IDow�Euipmpnjoperatqrs-, Dozers D-9 Et Under $57.72 7A 3C §P jUnderground Sewer Ft Water King Drill Oilers: Auger Type, Truck $57.72 7A 3C 8P I Underground Sewer Et Water Or Crane Mount King Power Equipment Drilling Machine $59.28 7A 3C 8P Underground Sewer & Water King Elevator And Man-Lift: $55.21 7A 3C 8P Underground Sewer a Water Permanent And Shaft Type _King Power Equipment Operators Finishing Machine, Bidwell $58.17 7A k 3C 8P Underground Sewer a Water And Gamaco EL Similar Equipment King Forklift: 3000 Lbs And Over $57.72 7A 3C 8P Underground Sewer Et Water With Attachments King Forklifts: Under 3000 Lbs. $55.21 7A 3C 8P Underground Sewer 8: Water With Attachments King Power Equipment Operators- Grade Engineer: Using Blue $58.17 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $55.21 7A 3C 8P Underground Sewer & Water King Power EquiRment QperaYor`s Guardrail Punch $58.17 7A 3C 8P U jideroround Sewer a Water King Eq E ui m�A _tgt Operators- Hard Tail End Dump $58.69 7A 3C 8P Underground Sewer ft Water Articulating Off- Road Equipment 45 Yards. Et Over King Hard Tait End Dump $58.17 7A 3C 8P .Underground Sewer ft Water Articulating Off-road Equipment Under 45 Yards King HgLqer Equ7�ment Operators- Horizontal/directional Drill $57.72 7A 3C 8P Underground Sewer R Water Locator King Power E uj ment Operators- Horizontal/directional Drill $58.17 7A 3C 8P Underground Sewer ft Water Operator King Power Equipment Operators- Hydratifts/boom Trucks Over $57.72 7A 3C 8P Underground Sewer 8: Water 10 Tons King Hydratifts/boom Trucks, 10 $55.21 7A 3C 8P Underground Sewer a Water Tons And Under (King a2LNer Eau�RmenY Operators Loader, Overhead 8 Yards. Et $59.28 7A 3C 8P Underground Sewer a Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. $58.69 7A 3C 8P Underground Sewer & Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $58.17 7A 3C 8P I Underground Sewer ft Water Yards King Power Equipment Operators- Loaders, Plant Feed $58.17 7A 3C 2 Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $57.72 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Locomotives, All $58.17 7A 3C 8P Underground Sewer a Water King Power Equipment Operators-, Material Transfer Device $58.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $59.28 7A 3C 8P Underground Sewer & Water $0.50 Per Hour Over Mechanic) https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 11/21/2016 Page 13 of 17 King Power Eguipment Operators- Motor Patrol Graders $58.69 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, $58.69 7A 3C 8P Underground Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield ,King Power Equipment Operators- Oil Distributors, Blower $55.21 7A 3C 8P Underground Sewer a Water Distribution a Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $57.72 7A 3C 8P Underground Sewer St Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $58.17 7A 3C 8P Underground Sewer Ft Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $59.28 7A 3C 8P Underground Sewer a Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $58.69 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons '.King Power Equipment Operators- Pavement Breaker $55.21 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Pile Driver (other Than Crane $58.17 7A 3C 8P Underground Sewer Ft Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $57.72 7A 3C 8P Underground Sewer Et Water :King Power Equipment Operators- Posthole Digger, Mechanical $55.21 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Power Plant $55.21 7A 3C 8P Underground Sewer a Water _ King Power Equipment Operators- Pumps - Water $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $58.69 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Quick Tower - No Cab, Under $55.21 7A 3C 8P Underground Sewer a Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $58.69 7A 3C 8P Underground Sewer a Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Beltman $55.21 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, Beltman $57.72 7A 3C 8P '. Underground Sewer a Water (Certified) King Power Equipment Operators- Rollagon $58.69 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $55.21 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $57.72 7A 3C 8P Underground Sewer a Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $58.17 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Saws - Concrete $57.72 7A 3C 8P Underground Sewer Et Water King $58.17 7A 3C 8P hlfinc-//fnrfracc IAra nrni/Ini/mianelnn Ln n/nrvUlanolnn Lien acne 11 /71 /7h1ti Page 14 of 17 E2wer Equ�ament Operators- Scraper, Self Propelled Under Underground Sewer a: Water 45 Yards �King Power Equipment Operators- Scrapers - Concrete 8: Carry $57.72 7A 3C 8P Underground Sewer ft Water All King Power lEguipment Operators- Scrapers, Self-propelled: 45 $58.69 7A 3C 8P Underground Sewer & Water Yards And Over King E2Lier Equipment Operators- Service Engineers - Equipment $57.72 7A 3C 8P Underground Sewer Et Water King Egjter Equipment Operators �Shotcrete/gunite Equipment $55.21 7A 3C 8P Underground Sewer F± Water King Power Equipment Operators- jShovel , Excavator, Backhoe, $57.72 7A 3C 8P Underground Sewer Ft Water Tractors Under 15 Metric Tons. King EgAtr Equipment Operators- Shovel, Excavator, Backhoe: $58.69 7A 3C 8P Underground Sewer a Water Over 30 Metric Tons To 50 Metric Tons King Rgjver Equipment Operators- Shove[, Excavator, Backhoes, $58.17 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons lKing Power Equipment Operators- Shovel, Excavator, Backhoes: $59.28 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $59.88 7A 3C 8P Underground Sewer a Water Over 90 Metric Tons King Power Equipment Operators- Islipform Pavers $58.69 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- ISpreader, Topsider Et $58.69­7T 3C 8P Underground Sewer Et Water Screedman King Subgrader Trimmer $58.17 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators Tower Bucket Elevators $57.72 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In $59.28 7A 3C 8P Underground Sewer Et Water Height Base To Boom lKing Power Equipment Operators- Tower Crane: over 175' $59.88 7A 3C 8P Underground Sewer & Water through 250' in height, base to boom King Power Equipment Operators- Tower Cranes: over 250' in $60.47 7A 3C 8P Underground Sewer Et Water height from base to boom King Transporters, All Track Or $58.69 7A 3C 8P Underground Sewer Et Water Truck Type F King Power Equipment Operators- Trenching Machines $57.72 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $58.17 7A 3C 8P Underground Sewer Ft Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver $57.72 7A 3C 8P Underground Sewer Et Water Under 100 Tons �King Power Equipment Operators- Truck Mount Portable $58.17 7A 3C 8P Underground Sewe r & Water Conveyor King Power Equipment 02e mtors- 7A 3C Welder $58.69 8P .—Underground Sewer SL Water King Power Equipment Operators- Wheel Tractors, FarmaLL Type $55.21 7A 3C 8P Underground Sewer Et Water https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 11/21/2016 Page 15 of 17 King Power Equipment Operators- Yo Yo Pay Dozer $58.17 7A 3C 8P Underground Sewer & Water King Power Line Clearance Tree Journey Level In Charge $47.08 5A 4A Trimmers King Power Line Clearance Tree Spray Person $44.64 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $47.08 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $42.01 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $31.65 5A 4A Trimmers King Refrigeration & Air Journey Level $74.66 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $54.32 5A iM King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Journey Level $41.69 SD 4C Applicators King Residential Drywall Tapers Journey Level M� $55.66 5P 1 E King Residential Electricians Journey Level $30.44 1 ,King Residential Glaziers Journey Level $38.40 7L 1H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level _ $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers & Journey Level $34.69 1 Pipefitters King Residential Refrigeration & Air Journey Level $74.66 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $45.99 7F 1R Workers King Residential Soft Floor Lavers Journey Level $45.861 SA 3D King Residential Sprinkler Fitters Journey Level $42.73 5C 2R (Fire Protection) King Residential Stone Masons Journey Level $54.32 5A 1M King Residential Terrazzo Workers Journey Level $48.86 5A iM King Residential Terrazzo/Tice Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.171 1 King Roofers Journey Level $46.46 5A 3H King Roofers Using Irritable Bituminous $49.46 5A 3H Materials ;King Sheet Metal Workers Journey Level (Field or Shop) $75.46 7F 1E King Shipbuilding, & Ship Repair Boilermaker $41.72 7M 1H King Shipbuilding & Ship Repair Carpenter $41.06 7T 2B King Shipbuilding & Ship Repair Electrician $41.09 7T 4B hffnc• //fnrfrecc inia 11 /171 /7r11r. Page 16 of 17 King Shipbuilding & Ship Repair Heat & Frost Insulator $65.43 5J 15 King Shipbuilding Ee Ship Repair Laborer $41.08 7T 4B King _ Shipbuilding & ShiR Repair Machinist $41.32 7T 4B King Shipbuilding & Shin Repair Operator $41.03 7T 4B King Shipbuilding & Ship Repair Painter _ $41.05 7T 4B King Shipbuilding & Shi Repair Pipefitter $41.05 7T 4B "King Shipbuilding & Ship Repair_ Rigger $41.12 7T 4B King Shipbuilding & Ship Repair Sheet Metal $41.04 7T 4B King Shipbuilding & Ship Repair Shipfitter $41.12 7T 4B King Shipbuilding t Ship Repair Trucker $41.01 7T 4B King Shipbuilding Ft Ship Repair Warehouse $41.02 7T 4B King 5hibuitdin & Ship Repair Welder/Burner $41.12 7T 4B King Sign Makers & Installers Sign Installer $22.92 1 tElectrical King Sion Makers & Installers Sign Maker $21.36 1 {ELectrical} King Sign Makers & Installers (Non- Sign Installer $27.28 1 Electrical King Sign Makers & Installers (Non- Sign Maker $33.25 1 Electrical King Soft Floor Lavers Journey Level $45.86 5A 3D King Solar Controts For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $72.49 5C 1x Protection) King Stage Riggiizg MechanicsfNan Journey Level $13.23 1 5tructurall King Stone Masons Journey Level $54.321 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Su veyors Assistant Construction Site $57.72 7A 3C 8P Surveyor King Surveyors Chainman $57.17 7A 3C 8P King Surveyors Construction Site Surveyor $58.69 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $37.60 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20.79 SA 26 Outside King Telephone Line Construction - Installer (Repairer) $36.02 5A 213 Outside King Telephone Line Construction_- Special Aparatus Installer 1 $37.60 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer11 $36.82 5A 2B Outside King Telephone Line Construction - Telephone Equipment $37.60 5A 2B Outside Operator (Heavy) King Telephone Line Construction - Telephone Equipment $34.94 5A 2B Outside Operator (Light) https://fortress.wa.gov/Ini/wageIookup/prvWagelookup.aspx 11/21/2016 Page 17 of 17 King Telephone Line Construction - Telephone Lineperson $34.93 5A 2B Outside King Telephone Line Construction - Television Groundperson $19.73 5A 2B _ Outside King Telephone Line Construction - Television $26.31 5A 2B Outside Li neperson/Installer King Telephone Line Construction - Television System Technician $31.50 5A 2B Outside King Telephone Line Construction - Television Technician $28.23 5A 2B Outside King Telephone Line Construction - Tree Trimmer $34.93 5A 2B Outside King Terrazzo Workers Journey Level $48.86 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble & Terrazzo Finisher $39.69 5A 1B Finishers King Traffic Control Stripers Journey Level $44.35 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $51.25 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $50.41 5D 3A 8L .' WA-Joint Council 28) King Truck Drivers Dump Truck Ft Trailer $51.251 5D I 3A 8L PKing Truck Drivers Dump Truck (W. WA-Joint $50.41 5D I 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $51.25 5D 3A 8L Council 28) "`•`•King Truck Drivers Transit Mixer $43.23 1 King Well Drillers 8 Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers Et Irrigation Pump Oiler $12.97 1 Installers King Well Drillers £t Irrigation Pump Well Driller $18.00 1 Installers II h+}nc• //fn ri-roce n,� nnv/Ini Annnolnn Lien MrvlAlonalnn Lein ncnv 11 /7111)n 11; Benefit Code I(ey— Effective 8/31/2016 thru 3/2/2017 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF FIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES TIIE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two (2)hours after eight (8) regular horns Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a Four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all howl worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The fast two (2) hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at. three times the hourly rate of wage. (r. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours; worked in excess of ten (10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. I. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key—Effective 8/31/2016 thru 3/2/2017 Overtime Codes Continued 1. 0. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and alter twelve (12)hours, Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant) and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three tines the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12)hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday,,Friday, and the day after Sunday,Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day) shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 it Benefit Code Key—Effective 8/31/2016 thru 3/2/2017 Overtime Codes Continued 2. ALL HOURS WORKED IIQ EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PF.R WEEK SHALL BE PAID AT ONTE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two (2)hours after eight(8) regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thin Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The first eight(8) hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE.-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work performed alter 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1,00)per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. C. Work performed in excess of eight(8)hours of straight time per day, or ten(10)hogs of straight time per day when four ten (t0) hour shifts are established, or forty (40) hours of straight time per week. Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage. After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 Benefit Code Key— Effective 8/31/2016 thru 3/2/2017 Overtime Codes Continued 3. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday, shall be paid at a premium rate of 15% over the hourly rate of wage. All other hours worked after 6:00 am on Saturdays, shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. K All hours worked Sundays and holidays shall be paid at.double the hourly rate of wage. Each week, once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two (2) times the regular rate of pay. work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,) or a four day-ten hour work week (Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED 1N EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID A'r ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday, the first four(4)hours of overtime after eight(8) hours of straight time work shall be �� paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4) day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday,the first two (2)hours of overtime after ten (10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday, the first twelve (12)hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay, except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two (2)tines the straight time rate of pay. 4 Benefit Code Key—Effective 8/31/2016 thru 3/2/2017 Overtime Codes Continued 4. D. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturday, Sundays and holidays shall be paid at double the hourly rate of pay. Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines, switching stations,regulating, capacitor stations, generating plants, industrial plants, associated installations and substations, except those substations whose primary function is to feed a distribution system,will be paid overtime under the following rates: The first two (2) hours after eight(8)regular hours Monday through Friday of overtime on a regular workday, shall be paid at one and one-half times the hourly rate of wage. All hours in excess of ten (10) hours will be at two (2) times the hourly rate of wage. The first eight (8)hours worked on Saturday will be paid at one and one-half(1-1/2) times the hourly rate of wage. All hours worked in excess of eight (8) hours on Saturday, and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the hourly rate of wage. E. The first two (2) hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thnr Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The Monday or Friday not utilized in the nornal four-day,ten hour work week, and Saturday shall be paid at one and one half times the regular shift rate for the first eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Stmdays and holidays shall be paid at double the hourly rate of wage. F. All hours worked between the hours of 6:00 pm and 6:00 am,_Monday through Saturday, shall be paid at a premium rate of 20% over the hourly rate of wage. All hours worked on Sundays shall be paid at one and ono-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. G. All homy worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. Holidav Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). H. Holidays: New Year's Day,Memorial Day, Independence Day, Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). 5 Benefit Code Key— Effective 8/31/2016 thru 3/2/2017 Holiday Codes Continued 5. 1. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6) J. IIolidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). I K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Iabor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Christmas, And Christmas Day(9). L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday after Thanksgiving Day,And Christmas Day(8). j N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A IIoliday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, One-Half Day Before Christmas Day, And Christmas Day. (7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9)• Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the I!, Friday after Thanksgiving Day, And Christmas Day(8). 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and a Half-Day On Christmas Eve Day. (9 1/2). G. Paid IIolidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day, '.. Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Christmas Eve Day(11). H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). 1. Paid Holidays:New Year's Day,Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). 6 Benefit Code I<ey—Effective 8/31/2016 thru 3/2/2017 Holidav Codes Continued 6. T. Paid Ifolidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9). Z. Holidays:New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, 'Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday C. Iolidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Tbanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a.Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7), Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday- I. Holidays: New Year's Day, Memorial Day Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last wonting day before Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 1. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a. Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a_holiday on the preceding Friday. 7 Benefit Code Key—Effective 8/31/2016 thru 3/2/2017 Holiday Codes Continued 7. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day, Christmas Day,And the Day after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Cmstmas falls on a Saturday, the preceding Friday shall be observed as a holiday. P. IIolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. i Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid IIolidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day, Christmas Day, and the day after or before Christmas Day (10). if any of the listed holidays fall on Saturday, the precedmg Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. I S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,Christmas Day,the Day after Christmas, and A Floating Holiday(9).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. T. Paid IIolidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Tbanksgiving Day,the Friday after Thanksgiving Day,Christmas Day, and The Day after or before Christmas Day. (10). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Note Codes S. A. In addition to the hourly wage and fringe benefits, the following depth premiums apply to depths of fifty feet or more: Over 50' To 100'-$2.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$3.00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet 8 Benefit Code Key— Effective 8/31/2016 thru 3/2/2017 Note Codes Continued 8. C. In addition to the hourly wage and fringe benefits, the following depth premiums apply to depths of fifty feet or more: Over 50' To 100'-S1.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1.50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May Name'l heir Own Price D. Workers working with supplied air on hazmat projects receive an additional 51.00 per hour. I,. Workers on bazaar projects receive additional hourly premiums as follows -Level A: $0.75, Level B: 50.50, And Level C: 50.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: 51.00, Levels C &D: $050. N_ Workers on hazmat projects receive additional hourly premiums as follows-Level A: $1.00,Level B: $0.75,Level C: $0 50,And Level D: 50.25. P. Workers on hazmat projects receive additional hourly premiums as follows -Class A Suit: S2.00, Class B Suit: $1.50,Class C Suit: $1.00,And Class D Suit 50.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shrift shall be used in determining the scale paid. R. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana,or Idaho. These classifications are only effective on or after August 31, 2012. S. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho.This classification is only effective on or after August 31, 2012. T. Effective August 31, 2012 — A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31,2012. U. Workers on hazmat projects receive additional hourly premiums as follows — Class A Suit: 52.00, Class B Suit: $1.50. And Class C Suit: $1.00. Workers performing underground work receive an additional$0.40 per hour for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive an additional $0.50 per hour. The premium for work suspended shall be paid for the entire shift worked. Workers who do "pioneer" work (break open a curt, build road, etc.) more than one hundred fifty (150) feet above grade elevation receive an additional 50.50 per hour. 9 REQUEST FOR MAYOR'S SIGNATURE Print On Cherry-Colored Paper ICEIVI° , Routing Infnrmakion: (ALL REQUESTS MUST FIRST RE ROUTED THROUGH THE LAW DEPARTMENT) Approved bj D 7CtNw' , ct Originator: Bryan Bond Phone (originator): 5662 Date Sent: f 1/ Date Required: ice ;"; Return Signed Document`t' Andrew Dacuag Contract Termination Date:6 months from NTP VENDOR NAME: Date finance Notified:Pum Tech Inc. (Only required on contracts 1 1/ /1 6 p . .2d 000 and over or on.any Grant) t DATE OF COUNCIL APPROVAL GG Date Risk Manager Notified:N/A 1 2/13/1 U (Required on Non-City Standard Contracts/Agreements) Has this Document been Specificall Account Number: �p39 Authorized in the Budget? e YESC)NO Brief Explanation of Document: The attached agreement is for PumpTech Inc. to install a submersible well pump motor at the East Hill Well 1. l!Contracts Must Be Routed Through The Law Department h Ube completed by the Law Department) { Received: 1 � ; f 9 Approval of Law Dept,: , # 1, 3 ( Law Dept, Comments: Date ForwagqSd to Mayor: g r p �' 7`x S � to � ® B �Com feted By Administration Staff Received: Recommendations and Comments: Disposition: b jt3 � e1 Date Returned: PAMilPvemxl0oo neilY oressgwequego eyo gna 's � by '^t i