Vendor Name: SCI Infrastructure, LLC.
Vendor Number:
JD Edwards Number
Contract Number: PW 15-256 — OOLp
This is assigned by City Clerk's Office
Project Name: SR 516 to S 231't Way Levee Impr.-Russell Rd. Upper Levee-S.Reach
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 7/24/2015 Termination Date:
Contract Renewal Notice )
Da s :
( Y
Number of days required notice for termination or renewal or amendment
Contract Manager: Toby Hallock Department: PW Engineering
Contract Amount: $1,994,502.86
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #5
As of: 08/27/14
T
wns Hirarox
CHANGE ORDER NO. # 5
NAME OF CONTRACTOR: SCI Infrastructure, LLC. ("Contractor")
CONTRACT NAME & PROJECT NUMBER:SR 516 to S 2315C Way Levee Impr.-Russell Rd Levee South R<
ORIGINAL CONTRACT DATE: July 24, 2015
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Neely Home Final Restoration - investigate, improve, and restore
existing irrigation system and lawn.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $1,994,502.86
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $20,412.99
(incl. applicable WSST)
Current Contract Amount $2,014,915.85
(incl. Previous Change Orders)
Current Change Order $32,412.80
Applicable WSST Tax on this Change $3,079.22
Order
Revised Contract Sum $2,050,407.87
CHANGE ORDER - 1 OF 3
Original Time for Completion 80 working days
(insert date)
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (t) for this Change 0 calendar days
Order
Revised Time for Completion 80 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order', are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CIT OF KENT:
By:
(slgnat re)
Print Name: Print Name: Timothy J. LaPorte, P,E.
Its Its Public Works Director
DATE: DATE:
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[In this TWd,you may enter the electronic flle0a[b where the mntr.d has been saved]
CHANGE ORDER - 3 OF 3
• r FILE NO: 200.2
�EN
CHANGE
ORDER WORKSHEET NO.
Construction Management Division — Public Works
Project: 5R 516 to S. 231st Way Levee Project No.: 09-3006.2
Improvements - James/Russell
Project Engineer: Toby Hallock Fed-Aid No.:
Owners Rep: Jason Barry Contractor: SCI Infrastructure, LLC
Date: 08/25/16 _
I. PROPOSED CHANGE
Neely Home Final Restoration
ii. REASON AND BACKGROUND FOR CHANGE
Investigate, improve and restore existing irrigation system and lawn.
III. METHOD OF PAYMENT
NEW PAY ITEM'I(S) [:] Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch. No. I Item Description Total 1 City this i Unit Unit Price Total Estimated Cos
! Est.Qty PE Item 0/p
__ _ __ '� 17......... ................................_..-._ .. ......._....... ....... ..:. _._-........... .......-.__ ....._...-_..- ..- .-...-
6 1 Neely Home Final Site 1 1 LS $32,412.80 $3+412.80
1 Restoration
.......... ....... . .. .... .. ...... _.....-... - - ----..-----..._
I -----------------
Independent ........... . . . .............. ............. i ....-.......__ ......._..... ....__.....
i
® Estimate Attached ❑ CREATE PAY ITEM ONLY Payment to be made ® PAY THIS PAY ESTIMATE
RE UIRED .... at a later date upon completion of work
__-- _ .. Q......
---- ----.._.. ................ ........ ...........
❑ Material Submittals Reouired — CC: Construction Coordinator i New Sub Reqrd? No
DELETE EXISTING PAY ITEM(S) per 1.09.5 ® Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch No B I No Item Description Qty Unit Unit Price Cost of Item
..... ..... ... -------- ......
I i 'i
❑ Independent Estimate Attached -REQUIRED ❑ I
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch No. B I No. ., Item Description { city Unit Unit Price I .Cost of Item
.............. .............. .. -. ...............� .................. . ... ......-................_,
..-.._............. ... .-..,..... .-.-...-.. . .....,..... . . ._-......... ._ .............. .-...............1. ..
.._... .......... . .....: ........ . .
1
® I Independent Estimate Attached - REQUIRED i ❑
1 REV. DATE: 4/01/10
/ T FILE NO: 200.2
KENT
TOTAL ESTIMATED COST OF CHANGE ORDER * $32,412.80
*Total of the cost of Item columns
THIS PAY ESTIMATE $32,412.80
IV. WORKING DAYS
Original Contract 80 : .Due This Change Order* 0 Previous Total j 80
...... ..__. . . — - �--- ........ ........ ........
__DATE . 08/24/15 __, „ , , ;_DATE - 08/24/15___
* Explanation/justification i uired:
TOTAL WORKING DAYS* F 80
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
G��-
Prepared By: Date: ? )/j'a& Bar y 0 1 k�
Construction Supervisor: Date: / _ _
Paul KuehFie
Construction Manager: -.a. ,:�- e � •,, Date 1,'s�;
Eric Connor
2 REV. DATE: 4/01/10
1
Connor, Eric
From: Connor, Eric
Sent: Tuesday,August 02, 2016 10:45 AM
To: Bieren, Chad
Subject: FW:Additional Work Items South Reach Levee
Chad,
We are getting moving on the irrigation system and landscape work at Neely. I am not sure where we are at with the
handrail.
We are in good shape with our budget on this job...I will come see you.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
Construction Management I Public Works Department
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT,WASHINGTON L..
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From Barry, Jason
Sent: Tuesday, August 02, 2016 9:06 AM
To: 'Tyson Lashbrook'
Cc: Connor, Eric; Kuehne, Paul
Subject: RE: Additional Work Items South Reach Levee
Tyson,
Please give Terra Dynamics authorization to proceed on the Neely irrigation and landscape work. Can you ask them if it
is possible to complete by Friday,August 19th7
Thanks,
Jason Barry, Capital Construction Projects
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
, Phone 253-856-5546 1 Cell 253-797-8462
ibarry@KentWA.00IGT
w.a, .osox �z
www.KentWA.aov 91
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From: Tyson Lashbrook [mailto•tyson_psciinfrastructure.com]
Sent: Tuesday, July 26, 2016 4:12 PM
L
i
i
Invoice
Terra Dynamics Inc.
PO Box 2479
Auburn,WA 98071-2479
SCI Infrastructure, LLC
2825 S 154th St 2825 S 154th St
Seattle, WA 98188 Seattle, WA 98188
I,InLJ�„JIG;61,Jallr,
76325 506-9124`.. ' 686 08/30/16 09/30116
1 1 6 Due OnRecei t
08116 28 1 SR516 to S 231st Levee South 35 532 1 0.000 0.00
08M 28 2 Work through 8.30-16 35-632 2 0.000 28,093.47'
0811628 3 Force Account on6-15&8-16 35.532 3 0.000 1,281.95
i
Notes: Total 29,375.42
See attached sheets for recap and force account workups Sales lax
Less Refaina e i 1488.77
. . 27:906.65
Page 1 of 1
0 0 0 0 0 0 0 0 0 0 o r oo 0 0 7 m k
0 0 0 0 o m o 0 0 0 o m o 0 0 0
m am. am. 0 0 0 o cv o 0 0 0 o ui 0 0 o G pj �j N
u n c c m w » ww cl a, ww w .n N o o m
m -J yy aV Q tm0_
0 o y m
m
U d L
F
O N N S S S Chi to N m V S O S O
oo' door ui o 4 ro 0 0
m 06
Ci v o m m a m o m
A .m 6 K . N r In
f 'o = m» w � w m m C' W
N E m N
a a ra w
0
0 o
c1 •i
da =�
0 0 0 0 0 o0
o m 0 0 0 m m m m g m o 0 0 0
�p o pry{ o 0 0 0 vi o OVJ3 0 m vi o
N m O m
O ccOO cm�1 O m (V
M � dFW wwmw w w
O VW m O y Oml O S S p p P
C J
a a
r r o 0 0 0 0 0 4u o 0 o m 0 m m m a o o a
LLJ a o �ci �d o 0 0 I o 1 �-i of i[i o 0 0 .i
o m m o ppin m v m o m v o 0 0 v
p' p C m W O m N
� O
a
d
W
eu 3 0 r ❑
E
m
y a
10
c c c a m c a a
N E asS d a p ryry n a as �• .9
:n a 8 a0 a z o E o fn u o T
E G N
NN mv a y (O U m m a m
m fj J Cp C w
g
N F p t 2 X W C m 2 C$ O Z 2 U K Z
N N N N N O O
iv r m 0 r '1
N N
N\
m (�N
O_ N Y ci
Oo O0U O O[� Oo coi c>N O O O O
l0[I N m tiOj r o V
/y N N m ci
m tj
❑ m�cd ap ' YGC mm oom
m2E O OO
O Oy
O
i eyi`.d4i
iyOn mmYl mmOo ymy mOm mypo oN
p oyyy.l
vl N b
I
Tern,Dynamics,Ina FoMle Account Worksheet
PROJECT:TO 532 -_-__ - -- -- - ---
SR 518 to S 2315t Way Levee Improvements
_. C#09-3000.2
- ' TOTAL $1,281.95
DATES COVERED 8115/16&8/16/16
BID ITEM/WORK PERFORMED Nsely Home Landscape CO
Neely Homestead -.. _.
- - - Irrigation repays and improvements CO
-
LABOR HOU-_" RS RATE EXTENDED
Andy Ward-Project Foreman _ 8 R $40.59 $324.72 -
_.._. OT; $57.20 i $0.00
--
R � $3454 $0.00
Landscape Equipment Operator - - -
Salvador Reyes-Landscape Labor ---- - 11 R $25 82 $284.02
_ Or $35.62 $0.00
Reyes Morales-Landscape Labor 11 R $25.82 $284.02
-- - - OT, $35.62 $0.00
SUBTOTAL - _ - $892.76 _
MARKUP - 29% $258.90
LABOR TOTAL $1,151.88
. _ _ -... HOURS _}7gT� EXTENDED
EOUIPMEN7 - - - -
BH272007 Takeuchi TB145 Crawler Mntd Compact Excavator W/tWMWD Hr. $32.47 $0.00 -.
111991 Mooroka MST800E Alltrack LGP 5cy Dump Carrier/� Hr $63.97
li
TC $0.00
LD14 2008 Takeuchi TL150 Compact Skid Steer Loader/Diesel Hr. $4104 $0.00 _
16 2003 Yanmar V4-5A Loader/Diesel Hr' $22.25 $0.00
LD
P33 2613 F150 1/2Ton P/U/EM Cab/Gas 8 Nr'. $13.46 $107.68 -
__._ Hr; $24.44 $0.00-.-- - -. ..
F1082000 F350 Flatbed/Diesel _ -- -- -
SUBTOTAL - - $107.68
MARKUP 21% $22.61
EQUIPMENTTOTALMAT $130.29
_.. E IAL ._ AMOUNT CAST EXTEND !._._
- -_ $0.00 _
none _. _.
WSST @ 9.5%on Inv# - $0.00 $0.00
. .. $0.00 '..
SUBTOTAL - --$0.00 -
MARKUP 21% _. !.. $0.00
MATERIAL TOTAL - $0.00
TOTAL AMOUNT DUE THIS SHEET
_. $1,28L95
i
Pegs 1 (
To:Tyson Lashbrook(ty on�o7scfl_rlfrastructure,com)
Subject: Additional Work Items South Reach Levee
Tyson,
I've been requested to seek pricing for additional items of work on the Levee project.See plan sheet 15
of 24 for location.
1. Provide and install 200 LF—Galvanized hand railing-$245_/LF
Materials and style to match that installed on stairs,see plan sheet 16 of 24;
a Post spacing 8 feet instead of 4,12" post embed at each 18"deep x 12" diameter post !,
concrete base
® 3 foot tall at top rail,3 equal spaced rails;
To be placed on land side edge of 5 foot ramp shown on sheet 15 of 24, Lakes development
side of levee.
2. HMA Class%' -10 Ton @ $_155____/Ton
Pave a 30 foot long by full width of levee(20 foot) asphalt pad at the top of newly installed
stairs.Before you ask... I have no idea?
he Neely irrigation plan for pricing is attached as well. I'm still waiting on specific seed type to be
required, but I don't see why pricing cannot be started.
Items of work look to be as follows:
Existing Irrigation investigation: potholing for connections, repairs and the like: $2,500 F.A.
New irrigation installation and testing,complete: 1 L.S. $_26,000_L.S.
Topsoil Type A,to be placed per notes on plan: 40 CY.or less $_41.00_C.Y.
Hydroseed placement,first mowing:Approx.1/3 Acre $_1,300_L.S.
Iso, I informally asked Rebekah with Terra Dynamics to remove and replace several planted 6"
ttonwood logs from the last phase with a potted variety,size doesn't matter,just replaced. If you
could follow up on that I'd appreciate it.
Thanks,
]aeon Barry, Capital Construction Projects
----- -- Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 1 Cell 253-797-8462
EJjV1barry@._KentWA,9gv !!
www.KentWA.gov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
3
i
Todd Wood
From: Todd Wood
Sent: Tuesday,August 02,201610:53 AM
To: 'Tyson Lashbrook'; Rebekah Washington
Cc: Andy Ward
Subject: RE:Additional Work Items South Reach Levee
Tyson
Rebekah is out of town but I believe she and Andy were thinking it was right around two weeks of work so it
should be pretty close.
Likely depends on the restoration of existing and the extent of damage etc.sometimes end up chasing the
rabbit down the hole....
I think crew liming wise Andy should be able to move back to the levee sometime early next week mid latest.
She'll back Thursday so we'll put it in motion and keep you posted at the end of this week.
Thanks for the green light and we'll trudge on.
Todd M. Wood
Estimator rroject Manager
®DYNAMICS .
W: 253-880-3100
F: 253-880-3109
C: 206-919-6643
From:Tyson Lashbrook[mailto:tyson@sciinfrastructure.com]
Sent: Tuesday,August 02, 2016 10:20 AM
To: Rebekah Washington;Todd Wood
Subject: Fwd: Additional Work Items South Reach Levee
See below regarding Jason's email
Tyson Lashbrook, Project Manager
SCI Infrastructure, LLC
2825 South 150 Street
5eatac Wa 98188
206-730-1227 Cell
206-242-0633 Office
206-242-0792 Fax
Contractor License SCIINL*993JA
i
i
Begin forwarded message:
From: "Barry,Jason"46arrv�kentwa. ov>
Date: August 2,2016 at 9:05:49 AM PDT
To: 'Tyson Lashbrook'<yson@scilnfrastructure.com>
Cc: "Connor, Eric"<EConnor@kentwa.aov>, %uehne, Paul"<PKuehne kentwa.gov>
Subject:RE:Additional Work Items South Reach Levee
Tyson,
Please give Terra Dynamics authorization to proceed on the Neely irrigation and landscape work. Can
you ask them if it is possible to complete by Friday,August 19th7
Thanks,
Jason Harry, Capital Construction Projects
---- -------- Construction Management I Public Works Department
220 Fourth Avenue South, Kent,WA 96032
Phone 253-856-5546 I Cell 253-797-8462
rz barry.Ca)ICeiLlAgov
www.KentWA.gov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From:Tyson Lashbrook[mailto: son sciirifrastructure.c0d
Sent: Tuesday, July 26, 2016 4:12 PM
To: Barry, Jason
Subject: RE: Additional Work Items South Reach Levee
See below
From: Barry,Jason jmailto:JBarry@kentwa.soy]
Sent:Tuesday,July 19,2016 2:46 PM
To:Tyson Lashbrook<tyson@sciigostructure.corn>
Subject:RE:Additional Work Items South Reach Levee
Any word on these added items Tyson?
Jason Barry, capital Construction Projects
I: I - -- ---- Construction Management I Public Works Department
J 220 Fourth Avenue South, Kent,WA 98032
Phone 253-856-5546 I Cell 253-797-8462
X1 Jbarr.Y@KentWA,9ov
www.KentWA.aov '..
PLEASE CONSIDER THEE NVIRONMENT OEFORE PRINTING THIO E-
MAIL
From: Barry,Jason
Sent: Wednesday, July 06, 2016 4:56 PM
2
i
Barry, Jason
From: Barry,Jason
Sent: Tuesday, August 02, 2016 9:06 AM
To: 'Tyson Lashbrook'
Cc: Connor, Eric; Kuehne, Paul
Subject: RE:Additional Work Items South Reach Levee
Tyson,
Please give Terra Dynamics authorization to proceed on the Neely irrigation and landscape work. Can you ask them if it
is possible to complete by Friday,August 19th?
Thanks,
Jason Barry, Capital Construction Projects
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
4 Phone 253-856-5546 1 Cell 253-797-8462
KENT ! bar vC&KentWA gov
www.KentWA.gov #;
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Tyson Lashbrook (mailto:tvson@sciinfrastructure.com]
Sent: Tuesday, July 26, 2016 4:12 PM
To: Barry, Jason
Subject: RE: Additional Work Items South Reach Levee
See below
From: Barry,Jason [mailto:JBarry@kentwa.gov]
Sent:Tuesday,July 19, 2016 2:46 PM
To:Tyson Lashbrook<tyson sciinfrastructure.com>
Subject: RE:Additional Work Items South Reach Levee
Any word on these added items Tyson?
Jason Barry, Capital Construction Projects
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
a Phone 253-856-5546 1 Cell 253-797-8462 '
KEN F ibarry- Kentw gov_
m
www.KentWA.gov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Barry, Jason
Sent: Wednesday,July 06, 2016 4:56 PM
To: Tyson Lashbrook(tyson(dsciinfrastructure.com)
Subject: Additional Work Items South Reach Levee
1
Tyson,
I've been requested to seek pricing for additional items of work on the Levee project. See plan sheet 15 of 24 for
location.
1. Provide and install 200 LF—Galvanized hand railing- $245_/LF
• Materials and style to match that installed on stairs, see plan sheet 16 of 24;
• Post spacing 8 feet instead of 4, 12" post embed at each 18"deep x 12" diameter post concrete base
Y 3 foot tall at top rail, 3 equal spaced rails;
• To be placed on land side edge of 5 foot ramp shown on sheet 15 of 24, Lakes development side of levee.
2. HMA Class%"- 10 Ton @ $_155__/Ton
• Pave a 30 foot long by full width of levee (20 foot) asphalt pad at the top of newly installed stairs. Before
you ask... I have no idea?
The Neely irrigation plan for pricing is attached as well. I'm still waiting on specific seed type to be required, but I don't
see why pricing cannot be started.
Items of work lool<to be as follows:
Existing irrigation investigation: potholing for connections, repairs and the like: $2,500 F.A.
New irrigation installation and testing, complete: 1 L.S. $_26,(J00_L.S.Topsoil Type A, to be placed per notes on plan: 40 C.Y. or less $_41.00_C.Y.
Hydroseed placement, first mowing: Approx. 1/3 Acre $_2,300__L.S.
Also, I informally asked Rebekah with Terra Dynamics to remove and replace several planted 6" cottonwood logs from
.the last phase with a potted variety, size doesn't matter,just replaced. If you could follow up on that I'd appreciate it.
Thanks, "
Jason Barry, Capita(Construction Projects -
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 1 Cell 253-797-8462
KEH� ' jbarryCa�KentWA.aov
.arrn9.9x '.
www.KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
I '
I
Barry, Jason
From: Hallock,Tobias
Sent: Thursday, July 28,2016 11:23 AM
To: Barry,Jason
Cc: ONeill, Rick; Connor, Eric
Subject: RE:James Street Trail Access
Yes, let's go ahead with the work at Neely. Is there time to complete it before August 20th?
I think the James Street access will need to be a higher level discussion.
Toby
-----Original Message-----
From: Barry,Jason
Sent: Thursday,July 28, 2016 11:05 AM
To: Hallock,Tobias
Cc: ONeill, Rick; Connor, Eric
Subject: Re:James Street Trail Access
Is it possible to incorporate that idea with the design of the future bike connection lane planned to the east on James
that Melvin, our regional bike patrol enforcer keeps telling me about?
Prices will improve, the current layout works just fine and SCl is very ready to finalize their contract. I believe a line
should now be drawn regarding this idea being outside the responsibility of this contract.
Any word on giving authorization for Neely?
Jason
Sent from my Whone
>On Jul 28, 2016, at 9:34 AM, Hallock,Tobias< >wrote:
>As la€Trove mentioned in person,wea€'"d like to look at the possibility of providing pedestrian access to the trail
behind (north) of the guardrail at James Street. This meeting is to determine the feasibility and what it would take to
accomplish this connection.
><m eeti ng.i cs>
i
TERRA DYNAMICS
FORCE ACCOUNT SWEET
Date
Page of
OWNER: GENERAL:
CONTRACT# IJOB# IJOB NAME:
LOCATION:
FORCE ACCOUNT ITEM# NAME:
DESCRIPTION & SPECIFIC AREA OF WORK
LABOR REG. OT
PERSONNEL TITLE/JOB CATEGORY HOURS HOURS
EQUIPMENT CREW/ 4X4?
TDI# YEAR MAKE/TYPE MODEL EXT CAB? DUMP? G/D? IHOURS
MATERIALS AND/OR RENTALS QTY UNIT EXT INVOICE COPY
MATERIAL VENDOR INVOICE# PRICE PRICE TO OWNER?
CONTRACTOR REP: OWNER:
PRINTED NAME: PRINTED NAME:
CC: I GENERAL CONTRACTOR
OWNER
i
9l07/01/L 3Y0 a3ilapu3 u10 31 AE NOIS-U{I3L' ON
A'l1NSisTa
5 11 WMY N M3413a LH91Y"ISNO] 'bJR31J3Mtld 5LL0tl8p
oM9Nlf wxl'9ao ,OZ=^l:ne6e 900C-60 -- 00. 03:
NO VgNI 3N0 SI ffi2 :3lYJ. 011193rCYd 1M13N °3Y]3Va 0311':6iG
C
'
\ `
Vl�
77
_ r _
- — - - 3iftsv
' N11SW - -
-YOIYN AY110 _
- 9816D946 I� ) r4Ry� -
9L'94 yma Ef'+ Ees°�Iv�-3fyaAy{33�Fi9£L4058L L.- — -e- � �
'�. bSIS Zl3 60'EZ tS - yolL �33 __ - OS47-. 554£-048d63 g6g„
-E _6P �_ 69Y'L Z LZOSbl J,
r� sbYLosYI N - _
--
0Y L61 3
1,
L cl,
1 - is e aqF-• . ' r •' 6126094t N r.1
\ o
_ kA�
ss :( vsow 3tV30,
3 60'9zo9ezt=3
8bOSM 3
g�g-�83� '601Sb! N aV31S3 OR- LLo9Yt N
S3WVO5- 133 ^ems.
8Zl 3 --
64l N-�� 6c 6t.,. O dvolON1M bS'G80S8ZC 3
lSbZt-N3, Zb'060541 N
1 YL I L8'66098Zt3
t
9 NI ` j £L"9E l9Yt i' -LZ'90 LSbi N j
h i- 64 61LUU=3 05-90t941=N_A I1
_IIV.N OHM M47.]V LLN110d-- \
se of ; a x V38V NMUI 01 NIVM301S 3dOIS 1
LL'VZ19RZL-3 j
F �y �q 1Z'bC ISv t=N
O1 NIV80 INfsl Yl'ae +• 9Y't�lS8Zl 3. 1 /I ,
SL 8q 1'q
EZ`S6lSblN j
N1VM301S 30 NOVO� HIM 3NII NI�30N33 131HS
58 Z°3 -
LSG6194-LN - - -'
N
)ZZ54tN - ., ! d NM30133MfoN00 - -- ,-
IE O°
_ �s � r�
I
I I I
r