HomeMy WebLinkAboutPW15-240 - Change Order - #16 - Marshbank Construction, Inc.- Central Ave S Pavement Preservation and Utility Improvements - 11/26/2016 100 Records ana e ent KENT ' Document wA9 HiHGTON _ CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Marshbank Construction, Inc. Vendor Number: JD Edwards Number Contract Number: PW 15-240 - () 1-1 This is assigned by City Clerk's Office Project Name: Central Ave S Pavement Preservation and Utility Improvements Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 7/6/2015, Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mark Madfai Department: PW Engineering Contract Amount: $5,819,698.74 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #16 _ As of: 08/27/14 z erg' KEN ■ wws�i�c.oH CHANGE p�/� NO. q CHANGE ORDER 16 NAME OF CONTRACTOR: Marshbank Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Central Avenue S Pavement Preservation and Utility Imp. ORIGINAL CONTRACT DATE: July 6, 2015 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Equitable adjustment to Schdule A-I bid item 1060 and Schedule B-I bid item 1062. Final quantities of both items were less than 75% of the quantity showed in the bid proposal. The City and contractor agreed to adjust the quantity of Al-1060 to $48.97 per CY and B1- 1062 to $62.00 per CY. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $5,819,698.74 (including applicable alternates and WSST) Net Change by Previous Change Orders $172,515.87 (incl. applicable WSST) Current Contract Amount $5,992,214.61 (incl. Previous Change Orders) Current Change Order $26,935.77 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $6,019,150.38 CHANGE ORDER - 1 OF 3 Original Time for Completion 180 working days (insert date) Revised Time for Completion under 13.5 prior Change Orders (insert date) Days Required (f) for this Change o calendar days Order Revised Time for Completion 193.5 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: z<K P ( ignature) , (signa ure) Print Name:. ikk� Print Name: Timothy J. LaPorte, P.E. Its PIA Its Public Works Director �tleJ (title) DATE: (o('V k6 DATE: il/` 3& CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department ffsfsf[In this field,you may enter the eleRronic fllepath where me contrail has been saved) CHANGE ORDER - 3 OF 3 • FILE NO: 200.2 KENT Wn5N1v CHANGE ORDER WORKSHEET NO. 016 Construction Management Division - Public Works Project: Central Ave. S. Pavement Project No.: 13-3004 Preservation and Utility Improvement Project Project Engineer: Cameron Bloomer, PE Fed-Aid No.: STPUL-1071(006) Owners Rep: KBA, Contractor: Marshbank Construction, Inc Inc Date: 10/10/2016 1. PROPOSED CHANGE This Change makes an equitable adjustment to Roadway Excavation Bid Items Al-1060 and B1- 1062. Final quantities are agreed to at 1,234.3 CY for bid item Al-1060 and 153.4 CY for bid item B1-1062. Both final quantities are less than 75% of the quantity shown in the bid proposal. In accordance with Section 1-04.6 of the Standard Specification, the unit prices of the items are being adjusted. Bid item Al-1060 is adjusted to $48.97 per CY, and B1-1062 to $62.00 per CY. For ease of payment, new bid items representing the difference in cost between the bid proposal unit prices and unit prices agreed to in this Change Order are being created. II. REASON AND BACKGROUND FOR CHANGE The calculations used to determine the quantities shown in the bid proposal for roadway excavation contained assumptions that differed from the actual lines and grades in the field. This ultimately leading to an over-estimation of the proposal quantity. These assumptions included: • The thickness of the existing roadway at 6" thick, it was observed in the field at 10" • A 6" of removal under the curb and roadway that ended up being accounted for under a separate bid item, BI Al-1065 Unsuitable Foundation Excavation • A 6" Excavation under sidewalks and driveways, actual was 4" per the Standard Plans. The actual quantities of roadway excavation work were measured in the field and paid accordingly. The final quantity of BI Al-1060 is 1,234.30 CY and bid proposal quantity is 2,600 CY. The final quantity of BI B1-1062 is 154.30 CY, and the bid proposal quantity is 450 CY. The Contractor requested an equitable adjustment to the unit price of Bid Items Al-1060 and Bl-1062 in accordance with Section 1-04.6 of the Standard Specifications. They noted the work is linear in nature, and they used a cost estimation method that divided their expected liner production cost by the quantities of pay items. Because the final quantity is half or less than the proposed quantity and the linear footage remained the same, the Contractor argued that the unit prices should be doubled, or less to get to 75% of the total bid proposal dollar amount. The City reviewed and agreed to the Contractors proposal. The changes in unit prices result in the following new payments. BI 1060 = $48.97 - $31.00 = $17.97 * 1,234.3 CY = 22,180.37 in new payments. 1 REV. DATE: 4/01/10 e FILE NO: 200.2 ICETIT w. $22,180.37 + $38,263.30 (previously paid) = $60,443.67 or 75% of the $80,600.00 total shown on the bid proposal. BI 1062 = $62.00 — $31.00 = $31.00 * 153.4 CY = $4,755.40 in new payments, $4,755.40 + $4,755,40 (previously paid) = $9,510.80 or 68% of the $13,950.00 total shown on the bid proposal. III. METHOD OF PAYMENT NEW PAY ITENI(S) ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of Qty PE Item Al Equitable Adjustment BI 1060 1234.3 1234.3 CY $17.97 $22,180.37 Roadway.Excavation Bl Equitable Adjustment BI 1062 153.4 153.4 CY $31.00 $4,755.40 _Rqqqway Excavation Independent Estimate Attached CREATE PAY ITEM ONLY— Payment to be made PAY THIS PAY ESTIMATE __REQUIRED at a later date upon completion of work _ Material Submittals Required—CC:•Construction Coordinator New Sub Reqrd? No DELETE EXISTING PAY ITEMS) per 1-09.5 Not Applicable Change Order No. - ( I I I FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item �] Independent Estimate Attached -REQUIRED INCREASE/DEGREASE TO EXISTING PAY ITEMS) ® Not Applicable Change Order No. I I - I I I I FOR ACCOUNTING USE ONLY Sch.No. B.I.No. Item Description Qty Unit Unit Price Cost of Item Independent Estimate Attached -REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * 0 *Total of the Cost of Item Columns THIS PAY ESTIMATE IV. WORKING DAYS 2 REV. DATE: 4/01/10 • FILE NO: 200.2 KNIT Original Contract 180 Due This Change Order* 0.0 Previous Total 196 DATE: * x lanation ca]ustifitfan Required: TOTAL WORKING DAYS* 196 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Date: Construction Supervisor: Date: Construction Manager: c Date: 3 REV. DATE: 4/01/10 MARSHBANK September 2,2016 Cameron Bloomer, PE . City of Dent 400 West Gowe Kent, WA 98032 RE: Central Ave S Pavement Preservation& Utility Improvements Project No. 13-3004 Federal Aid Number: STPUL-107](006) Roadway Excavation Bid Item Payment Serial Letter No. 32 Cameron. As noted in Serial Letter 14, we were in disagreement with how the quantity of Roadway Excavation bid items have been measured and paid. At the time we resolved as a project team to deter the discussion until the Roadway Excavation items were complete based on field measurement. Given the nature of the work,small quantities with litnited production, the severe tinder run in these quantities directly impacted the anticipated costs and productions we proposed to complete the work. Per WSDOT Standard Speci 6cation 1-04,6—Variation in Estimate Quantities, we are requesting - equitable adjustment to both Roadway Excavation hie Haul bid items, A]-1060 and BI-1062. Given the linear progress the project required to complete, we had estimated our productions and costs based on how many lineal feet we could progress down the project in it given time frame. From there we worked our way back into n productiorT based on the quantities in the contract documents. Given that the amount of material was half or less than the bid item quantities,we can approximate our unit price at twice the amount in the contract. Each bid item was contracted at the same unit price of$31 per CY. Based on the way we outlined the cost as described in the previous paragraph,we would propose a revised unit price of$62 per CY. For bid item Al-1060 this equates to a revised payment amount of$76,526.60(1234.3 CY x $62) For bid item B 1-1062 this equates to a revised payment amount of$9,510.80 (153.4 CY x$62) For bid item AI-1060, this number exceeds the 75%equitable compensation amount as stated raider the SSS 1-04.6.. so we are requesting that item be paid at its maximum or approximately$60,450. Please review and le us know what questions you have. Sincerely, Jason Heide V[arshbanl< . nstr t t on Inc. MARSHBANK C0NSTRUC: '1I0N Can[.Mc AiAkS7/!.'/`(ii10!/Oiil:%Ili/i Nn 11hH90/1.511T December 11,2015 Cameron Bloomer,PE City of Kent 400 West Gowc Kent, WA 98032 RE: Central Ave S Pavement Preservation&Utility Improvements Project No. 13-3004 Federal Aid Number: STPUl,1071(006) Roadway Excavation Quantity Calculation Serial Letter No. 14 Cameron, We first brought the issue of payment for roadway excavation to the City's attention at weekly meeting in September, At that point we requested a review of the quantities,how the items are being measured and also a copy of the quantity calculations. Measurement for roadway excavation is outlined in Standard Specification Section 2.03-4 and is defined by comparing original ground versus design by either digital modeling or cross section measurement. Generally this information is made available to the contractor after award, It is our position that the measurement and payment of the roadway excavation items are underunning and are not being measured and ultimately paid in relation to the design calculations. Consider this our official request for the design calculations-and measurement review of the roadway excavation bid items. Please let us know what questions you have. Sincerely. Ja or; ide Marshbank Construction Inc. PUBLIC WORKS CONSTRUCTION ENGINEERING Eric Connor Construction Manager 400 West Gowe Kent,WA 98032 KENT Fax: 253.856-6500 W I.9111tt niON ' PHONE: 253-856-5533 February 2, 2016 Serial Letter 9 Jason Heide Marshbank Construction, Inc. 3304 Old Hartford Rd Lake Stevens, WA 98258 Re: Serial Letter No. 014 Roadway Excavation Quantity Calculation Central Ave. S. Pavement Preservation and Utility Improvements Contract No.: STPUL-1071 (006) Project No.:13-3004 Dear Mr. Heide, The City of Kent is in receipt of Marshbank Construction Inc.'s (MCI) Serial Letter No. 014 Roadway Excavation Quantity Calculation, in which MCI is requesting the design calculations and a measurement review of Roadway Excavation Inc]. bid items. The calculations for Bid Item 1060 are atta :hed. i Section II, Curb and Gutter, of the original bid proposal calculations assumed 20 Inches of material would be removed. This quantity mistakenly included the unsuitable foundation excavation (6 Inches) which is paid for separately, and not encountered, and assumed only 6 inches of asphalt instead of 10 inches. Additionally, the actual quantity was even lower because the gravel borrow (6 inches) was used only sparingly. Section III, Driveway and Sidewalk, assumed a removal depth of 6 inches under the sidewalk and driveways. The section details show 4 inches of removal under both the Driveways and Sidewalk. Field Note Records, showing the measurements and calculations for the actual quantity of work performed, have been available to MCI via the project's SharePoint site. Please contact me if you have any questions or would like to discuss this matter further. Sincerely, Eric Connor o Cc: Cameron Bloomer, PE, KBA Resident Engineer m Chad Bieren, PE, City Engineer 3 Mark Madfai, PE, Design Engineerir,j Supervisor c v Y 33 3 7 MAYOR SUZETrE COOKS City of Kent Public Works Department Timothy J. LaPorte,P.E.Public Works Director Ix Ce:vqi�ciG ' lye, i? O-TeL� \OCL vUt ' X6LCL�TIL'yL �1Lt•Oe'Y}fi t,{ t Is�u d 2. 2 5 S<,�. Pt VM 2-2 5 6 x I. x C y 3524 L F buid �A 36 4 X 6 -- x S. 5 x '� 162 % C . Y o _ �p �r 4 ( L F � C'c �co�e�f e.� ��m�1 C r�o) 162e� - gq4 E d � C. Y