HomeMy WebLinkAboutPW15-240 - Change Order - #15 - Marshbank Construction, Inc.- Central Ave S Pavement Preservation and Utility Improvements - 11/23/2016 Klecords aria : e KENT Document V�g9HINGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Marshbank Construction, Inc. Vendor Number: ID Edwards Number Contract Number: PW 15-240 - Of 1p This is assigned by City Clerk's Office Project Name: Central Ave S Pavement Preservation and Utility Improvements Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 7/6/2015 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mark Madfai Department: PW Engineering Contract Amount: $5,819,698.74 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #15 As of: 08/27/14 KENT CHANGE ORDER NO. 15 NAME OF CONTRACTOR: Marshbank Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Central Avenue S Pavement Preservation and Utility Imp. ORIGINAL CONTRACT DATE: July 6, 2015 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Provide compensation to the contractor for production losses suffered during the installation of CO 009-Sanitary Sewer Addition at 259th (Reimbursable from BLT Transport) due to a gas line shown on the plans as a 2" line that was found to be a 6" line. The gas line slowed the contractor's production by impacting the size and location of shoring and their equipment causing sluffing of the trench walls and being physically in the way of the excavation bucket. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $5,819,698.74 (including applicable alternates and WSST) Net Change by Previous Change Orders $163,265.07 (incl. applicable WSST) Current Contract Amount $5,982,963.81 (incl. Previous Change Orders) Current Change Order $8,448.22 Applicable WSST Tax on this Change $802.58 Order Revised Contract Sum $5,992,214.61 CHANGE ORDER - 1 OF 3 Original Time for Completion 180 working days (insert date) Revised Time for Completion under 13 prior Change Orders (insert date) Days Required (f) for this Change .50 calendar days Order Revised Time for Completion 193.5 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: ✓ � u �y�r' r�- ( ignature) >r (signature) Print Name: �)P' Vv IL7l Print Name: Timothy J. LaPorte, P.E. Its Vl`'t Its Public Works Director {title DATE: !� � �IG DATE: r'( �3C/� (title) CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM' (applicable if Mayor's signature required) Kent Law Department ffsfsf[In this field,you may enter the eledronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 KENT FILE NO: 200.2 w„ ,.o.o. CHANGE ORDER WORKSHEET NO. 015 Construction Management Division - Public Works Project: Central Ave. S. Pavement Project No.: 13-3004 Preservation and Utility Improvement Project Project Engineer: Cameron Bloomer, PE Fed-Aid No.: STPUL-1071(006) Owners Rep: KBA, Contractor: Marshbank Construction, Inc Inc Date: 9/19/2016 I. PROPOSED CHANGE This Change adds a Lump Sum bid item to the Contract to provide compensation to the contractor for production losses suffered during the installation of CO 009 - Sanitary Sewer Addition at 2591t'. This Change also adds 0.5 working days to the Contract. II. REASON AND BACKGROUND FOR CHANGE The City directed the Contractor to install a 48 inch diameter manhole and 8 inch sewer main west from Central Ave down 259th St in Change Order 09. On 4/20/2016, the first day of CO 009 work, a gas line shown on the plans as a 2" line that turns West well north of the new trench was found in the field to be a 6" line that turned west within the trench and ran down the edge of the excavation. This gas line slowed the Contract's production by impacting the size and location of shoring their equipment, causing sluffing of the trench walls, and being physically in the way of the excavation bucket. The Contractor worked an 11 hour day on 4/20/2016. They successfully saw cut the asphalt for the trench, removed the asphalt, potholed the existing utilities, and core drilled the hole in the existing manhole for the installation of the new sewer line. Because of the Bluffing of the trench walls due associated with the 6" gas line, the contractor determined the trench could not be safely left overnight and they backfilled. This required the Contractor re-excavate the following day, which was not anticipated in their cost proposal for the work. III. METHOD OF PAYMENT NEW PAY ITEM(S) ❑ NotApplicab►e Change Order No. I - ! FOR ACCOUNTING USE ONLY Soh.No. ! Item Description Total Est City this Unit I Unit Price Total Estimated Cost of City PE ! Item B3 1 CO 015-01 Production j 1 I 1 ! LS $81448.22 $8,4448.22 Impacts During 259th Sewer ! Addition. ! : 1 REV. DATE: 4/01/10 • FILE NO: 200.2 KENT ................... ................ ---------------- —T ------- F1 Independent Estimate Attached r] CREATE PAY ITEM ONLY- Payment to be made PAY THIS PAY ESTIMATE - RE IRED at a later date upon completion of work ------------- F1 Material Submittals Required - CC: Construction Coordinator ; New Sub "qm? No DELETE EXISTING PAY ITEM(S) per IrO9.5 Z Not Applicable Change Order No. i i . FOR ACCOUNTING USE ONLY Soh.No. B.I.No. Item Description City. . Unit Unit Price Cost of Item -------------------- ------------ ............. ---- --- ............................ ----------- — ------ ---- Independent Estimate Attached -REQUIRED El INCREASE/DECREASE TO EXISTING PAY ITEM(S) Z Not Applicable Change Order No. FOR ACCOUNTING USE ONLY Soh.No. B.I.No. i Item Description Qty Unit Unit Price Cost of Item --------------------- ----------------------- ........... ............ ----------- ...... Independent Estimate Attached -REQUIRED 'I El 1 TOTAL ESTIMATED COST OF CHANGE ORDER *Total of the Cost of Item Columns THIS PAY ESTIMATE IV. WORKING DAYS i Due This Change Order* Original Contract 180 Previous Total ' 195.5 ---------- ....................... —DATE. DATE: 1 on- Sewer Required:The work ea with co Sanitary Addition at 259th is critical path work, 1 Ex 1 and delays to the completion of that would delay the completion of that project.The contractor worked an 11 hour day on 4/20, 6 of which were agreed to be impacted work associated with this change, leaving 5 hours of productive work. Because the contractor only had 5 productive hours of work, the critical path was impacted approximately 0.5 days. TOTAL WORKING DAYS* 1196 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Date: 10/17/2016 Construction Supervisor: Date: Construction Manager: Date: 2 REV. DATE: 4/01/10 ® A ■�T ® �nNseN�,craN --- �( �.rNT AANAn CMtt 4> WASHtNOTON MEMO TO FILE Project Name: Central Ave.S. Pavement Preservation and Utility Date: 7/26/2016 Improvements Contractor: Marshbank Construction;Inc:' Contract No: 13-3004 Owner: city of Kent Federal Aid No: STPUL-1071(006) Subject: Change Order 01X Chronology of Events Message 4/20/2016—The Contractor began work on CO 009-Sanitary Sewer Addition. Discovered gas line was mis marked for both size and location,causing impacts to their production. 4/22/2016—The Contractor issued Serial Letter#27, notifying the City of the production impacts suffered. 4/26/2016—The City discussed the production impacts,the RE put together a cost estimate based on 6 hours of crew time being impacted. 5/3/2016—The City issued Serial Letter 011 to the Contractor,requesting they submit their cost impacts for review. 7/22/2016—The RE sent an additional email request for the Contractor's production impacts. 7/26/2016—The RE sent their estimate to the Contractor,which totaled$5,544.22, and asked MCI to review and respond. MCI did agree to some of the items, but not the total. 9/13/2106—The City/RE reviewed and revised the cost. Proposing a total of$8,448.22. 9/14/2016—MCI agreed to the total cost of�8,448.22. Cameron Bloomer,PE Resident Engineer 7/26/2016 ---"'--' Date 1 of 1 P-11 (Rev, 8/11) Cameron Bloomer From: Jason Heide <jason@marshbankconst,com> Sent: Wednesday,September 14, 201612:40 PM To: Cameron Bloomer;JC Brown Cc: econnor@kentwa.gov Subject: RE:SL#27 259th Sewer Impacts Follow Up Flag: Follow up Flag Status: Flagged We're good with this, please get it on the next esti„ ate Thanks From: Cameron Bloomer [mallto:cbloomer@kbacm.com] Sent:Tuesday, September 13, 2016 8:47 AM To: 3C Brown; Jason Heide Cc: econnor@kentwa.gov Subject: RE: SL #27 259th Sewer Impacts JC/Jason, We took another look at the 2SP sewer impacts,see attached cost sheet and invoices. Changes made: 0 Upped our share of the Pro-Vac invoice to 50%.The duct banks would have required hydro excavating,and with - travel and dumping time,close to a full day of a vactor excavation would have been likely.Also note we paid for 8 potholes at$500 each on the CO,which accounts for some of the additional vactor work as well, ® We agree to the full cost of the additional shoring rental. • Added standby forthe equipment, Please review and let me know if this is acceptable.,; Thank you, Cameron Bloomer, PE T 425,990.2949 1 C 206.819.7148 I E cbloomer a kbacm.com I{BA, Inc. I Construction Management Specialists I www.kbacm.com From:JC Brown Imailto:brown marshbanl<const.com] Sent:Tuesday,July 26, 2016 4:45 PM To: Cameron Bloomer<cbloomer@kbacm.com>;Jason Heide<jason@marshbankconst.com> Cc:econnor@kentaa,- ov Subject: RE:SL#27 259th Sewer Impacts Cameron, We agree with the crew hour compensation& Del Mar Saw Cutting. The compensation for Provac&the additional shoring is not correct. Once the trench was opened and the gas line was discovered to be incorrect we had to > 1 order additional shoring and had to spend two day performing hydro ex. On the shoring invoices I have included our original shoring materials rented and the additional needed. On the Provac invoice we have subtracted 3hrs off of the bill to cover the contract potholing that was anticipated. Please let me know if you have any questions. Thank you, JC Brown Project Engineer Marshbank Construction, Inc. P.O. Box 97 3304 Old Hartford Road . Lake Stevens,WA 98258-0097 (425)499-6651 Cell (425)377-9708 Office (425)377-0709 Fax From:Cameron Bloomer[mailto:cbloomer@kbacm.coml Sent:Tuesday,July 26,2016 8:16 AM To:Jason Heide<iason@marshbankconst.com>;JC Brown<brown@marsh bankconst.com> Cc:econnor@kentwa.gov Subject: RE:SL#27 259th Sewer Impacts Hello Jason/JC, Attached is the FA sheet I put together on the production impacts suffered during the installation of the sewer on 259t". This would compensation MCI for the first day of the install being a partial loss due to the 6"gas line turning within the trench and running down its length. Saw cutting, pavement removal, potholing of existing utilities,and coring of the existing structure were all completed on this day,which account for the remaining hours. Please review. Thank you, Cameron Bloomer, PE T 425,990,2949 1 C 206.819,7148 1 E cbloomer@l<bacm.com KBA, Inc. I Construction Management5pecialists I www.kbacm.com From:Cameron Bloomer Sent: Friday,July 22,2016 9:46 AM To: 'jason@marshbankconst.com'<jasor@marshba nl<const.com>; 'JC Brown'<brown@ marsh ban kconst.com> Subject:SL#27 259th Sewer Impacts Hello Jason/JC, Going through my notes on the 259"sewer production impacts, it looks like the City requested MCI total the cost of the impacts and send them over for review. I don't see that we have received the cost.Can you please put those together and send them over?(or resend if I missed them). Thank you, Cameron Bloomer, PE T 425,990.2949 1 C 206.319.7148 1 E cbloomer(ftbacm,com KBA, Me, I Construction MonagementSpeclahsts I www.kbacm.com 2 From: Cameron Bloomer Sent:Tuesday, May 03, 2016 9:58 AM To: 'JC Brown'<brown marshbankconst.com> Cc:Jason Heide<'ason marshbanl<const.com> Subject: RE:SL#27 259th Sewer Impacts J C, Our response is attached, and has been uploaded to sharepoint. Please let me know if you have any questions. Thank you, Cameron Bloomer, PE T 425.990.2949 1 C 206,819.7148 1 E cbloomer a�l(NmLcom siE€ ,r Inc. Canstructton Management Specialists 1 sjvv�nr.lsaaern.cam From:JC Brown [mailto:brown@marshbankconst.com] Sent: Friday,April 22, 20161:23 PM To: Cameron Bloomer<cbloomer @kbacm.com>;econnor@kentwa.Bov Cc:Jason Heide<jason@marshbankconst.com> Subject:SL#27 259th Sewer Impacts Cameron/Eric, Please see the attached letter covering work impacts for the added sewer on 259' Thank you, JC Brown Project Engineer Marshbank Construction, Inc. P.O. Box 97 3304 Old Hartford Road Lake Stevens,WA 98258-0097 (425)499-6651 Cell (425)377-9708 Office (425)377-0709 Fax 3 FA Sheet No.: -_ DAILY REPORT OF Imo' FORCE ACCOUNT WORKED H4HI,°[M[Hi Project Name: central Ave S.Pavement Preservation and Utility Imnro Project No: 13-3004 Item No.: Date: 4/20/2016 Description of Work: Production Loss due to unmarked 6"Gas Line,which turned in trench during installation of CO 009 Sewer addition at 259th Work by Subcontractor?: (mark"x"if yes) Prime Contractor: Marshbank Sub-Contractor: :O- OverTime I Double Time DOLLAR FIRST NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT Steven S Operator Eng Grp2 6 64.33 86.23 $ 385.98 John Dump Truck&Trailer 6 63.83 85.48 $ 382.98 Kathy F General Laborer 6 51.08 70.05 $ 306.48 Marcus H Pipe Layer&Caulker 6 51.98 71.47 $ 311.88 James M Apprentice Operator 70 6 50.83 65.91 $ 304.98 Debbie Operator Eng Grp2 6 64,33 86.23 $ 385.98 SUBTOTAL-LABOR: $ 2,078.28 LABOR OVERHEAD&PROFIT @ 29°% $ 602.70 LABOR TOTAL $ 2,680.98 e HOURS HOURS ADJUSTED STANDBY DOLLAR EQUIPMENT AND ATTACHMENTS WORKING STANDBY RATE RATE AMOUNT MCI-1026 30SEZCR 6 $ 51.24 $ 14.27 $ 85.61 MCI-3012 930G 6 $ So.41 $ 9.83 $ 58.97 MCI-3017 420E 6 $ 43.40 $ 9.85 $ 59.09 - MCI-0023 Dump Truck 6 $ 71.26 $ 8.28 $ 49.67 MCI-0008 F-250 6 $ 17.04 $ 2.80 $ 16.78 SUBTOTAL-EQUIPMENT $ 270.12 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 56.73 EQUIPMENTTOTAL $ 326.85 MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE AMOUNT Pro-Vac 1 LS $ 2,125.00 $ 2,125.00 Del Mar 3 Hr $ 125.00 $ 375.00 Shoring Rental Agreement 11 LS 1 1996.191 $ 1,996.19 SUBTOTAL-MATERIALS $ 4,496.19 MATERIALS OVERHEAD&PROFIT @ 21% $ 944.20 MATERIALS TOTAL $ 5,440.39 Verification of Hours Worked: TOTAL: $ 8,448.22 12%MARKUP(for prime when subcontract work) $ - ContractorsRepiesenfefive(pooled name's -� ' SHEET TOTAL: $ 8,448.22 Contractors Re resentafive Signafure� v Date �. Owne%s Reprosantalive(rimed name) Prime Markup on Subcontractor: _ -- 12%: <$26,000 Oe,nels Reresentative signature Date 10%: $26,00O to$100,000 Pay Estimate Entered: 7%: >$100,000 Date: ❑ If checked,this work Is In dispute. By signing this form, parties are By: agreeing to the time and effort needed to accomplish the task. Entitlement Pro-Vac 6622 112th St E 1 Puyallup,WA 98373 1 nvo i ce Phone:(888)565-5665 Involcs Number: 160419-005 Invoice Date: 5N112016 Page: 1 of 1 elll7a: 006797 Ssrvlco 025366 i Marshbank Construction Location: Marshbank#1568 F PO Box 97 1415 Central Ave S Lake Stevens,WA 98258 Kent,WA r _ Work Order lD Com lete Date PO Number Tons Called In By 160410-005 04l21/2016 Net 30 Days JC I Description of Work 4120&4/21 Eductor truck to hydro excavate for utility trench for sewer main extension. Unit i Qty Item ID Description Data Price bisc°!o Amount j Services Performed ? 8.00 4/20-ET8.Ohrs@206.00/hr 4121/2016 205.00 1,640,00 i 1.00 OT 1.5hrs@235,001hr 4/21/2016 352.60 352.50 8.00 4/21-ET 8,Ohrs@206.00/hr 4121/2016 206,00 1,640.00 f 1100 OT 2.5hrs@235.00/hr 4/21/2016 587.50 587.60 I SubTotal 4,220.00 a Parts E 2.00 Tap fee 4/21/2016 15.00 30.00 SubTutal MOO i i p 7 .;m, r- 6 {5 EAPPR pryggEdt ?ii ! ' IE ,` C ASS ( U/�?t ( 1�� RA GOAlf r } We now offer Emergency Spill Response Services!Please call Invoice Subtotal 4,260.00 888.565-5665 Sales Tax 0.00 Invoice Total 4,250.00 Payment Received 0.00 Balance Due 4,250.0,0 !i I 7 , 1G.12904 1 MR0.416 4741OS21.01 110111 2 0 Rentals, PARTIAL RETURN .RENCH SAFETY INVOICE p10171 __# 136748636 00.1_- : Fax Customer # : 349011 Invoi.Ce Date : 05/02/16 Rental Out : 04/21/3.6 09:00 AM ANTRAL AVE ROAD PROJECT Rental In : 05/02/16 01:39 PM CENTRAL AVE & S 266TH ST ; UR Job Lee CENTRAL AVE & S 266T x:CENTRAL AVEVS 266TH ST .V0 +n UR Job # : 70 ,. �. Pu00. #er Job ID1 1568 FCENT WA 98030 Ordered By 1 JC Office: 425-377-9708 Cell: 9-6651 Written By ROGERS MCDOWELL r�rl It Salesperson ALF.XANDER DAVE DURNF MARSHBANK CONSTRUCTION INC Invoice Amount: $1,996.19 PO BOX 97 - - -' - LAKE STEVENS WA 98258-0097 Terms: Dun Upon RecalPt Payment opennn: Genteel our Cradil atlloo 212333 6600 Eq.84808 .. REMITTO: UNITED RENTALS(NORTH AMERICA),INC. FILE51122 LOS ANGELES CA 90074.1122 RENTAL ITEMS: Qty uip,eent Descrintion Minimum Dav week 4 week Amounc 7 942/1060 KIT:1.5' SHORE 52-88" CYL 21.00 57.40 172.00 803.60 7 940/5935 1.5' RAIL CS 7 940/5940 1.5' RAIL SS 7 940/6170 52"-88" CYLINDER ASSEMBLY 4 944/9930 ROAD PLATE 6' X 10' 35.35 104.30 219.80 834.40 Rental Subtotal; 1,638.00 SALES/MISCELLANEOUS ITEMS: Qty Item Price _ Unit of Measure Extended Amt. 1 DELIVERY CHARGE 185,000 EACH 185.00 " , ' Sales/Mist Subtotal: 1B5.00 Agreement Subtotal: 1,823.00 , Tax: 173.19 (�M Total: 1,996.19 COMMEN-SMOTES: CONTACT: OC CELL#: 425-499-6651 ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNTTTED ACADEMY TODAY 844-222-2345 OR NWW.UNITEDACADEMY.UR.COM TRAINING IS PLOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA. (� 1 f- �7-I Lid 0c, THIS INVOICE IS ISSUED SUBJECTTO THE TERMS AND CONDITIONS OF THE RENTAL AGREEMENT,WHICH ARE INCORPORATED HEREIN BY REFERENCE. A COPY OF THE RENTAL AGREEMENT ISAVAIIABLE UPON REQUEST. You Can Now Acceas Invoice MIsloq and Update Purchase Orders Onllas Page: 1 To Slgn Up,eonfael URCenbofOnpoda ueeanl Rentals° PARTIAL RETURN ,TENCH SAFETY INVOICE 136714414-001 TAX Customer A 349011 Invoice Date 05/02/1.6 sNTRAL AVE ROAD PROJECT Rental. out : 04/20/16 10:00 AM Rental In : 04/28/16 09:52 AM -'ENTRAL AVE & S 266TH ST UR Job Lou : CENTRAL 'AVE & S 266T x:CENTRAL AVEOS 266TH S'T UR Job 8 : 70 ICENT WA 98030 Customer Job ID: P,O. it : 1568 Office: 425-377-9708 Cell: 425 �..? 6651 Ordered By JC Written By ROGERS MCDOWELL 12.1.23041 ME 0.416 47470S21.P01 696001 1.2 0 t -7!' Salesperson ALEXANDER LAVE DURNP IIIIIIIIIIIIIIIIIIIIIIIILIId1I:IIlI1h hPudhlluP III�P ,t1Y ti' Invoice Amount. $1,298.89 MARSTIBANK CONSTRUCTION INC - - - Te(m.: QPeup.a Rwomt PO BOX 97 PRYMmN0PIm= CMIA010ttread140l11t9 212-033-66n Ex1.84Wm LAKE STEVENS WA 98258-0097 REMITTO: UNITED RENTALS(NORTH AMERICA),INO. PILE 51122 .I LOS ANGELES CA 00074-1122 RENTAL ITEMS; Bqu�ment Descriptiou _ Minimum Day Week 4 Week Amount 4 942/1030 KIT:1.5' SHORE 34-55" CYL 22,42 62.62 171,00 340.16 4 940/5935 1.5' RAIL CS 4 940/5940 1.5' RAIL SS 4 940/6120 34"-55" CYLINDER ASSEMBLY 3 942/1060 K1T:2,5' SHORE 52-88" CYL 21.00 57.40 172.00 235.20 3 940/5935 1,5' RAIL CS 3 940/5940 1.5' RAIL SS 3 940/6170 52"-68" CYLINDER ASSEMBLY 3 940/6974 CYLINDER EXTENSION 241 VERTICAL SAOR, 9.30 22.42 66.45 95,16 - 8 940/6960 FIN BOARD 4' X 8' 9.38 21.63 56.98 248.09 1 940/6950 SHORING PUMP HAND 14.70 43.40 114.80 58.10 1 940/6850 RELEASE TOOL 48" 9.01 20.73 57.68 29.74 �i 1 940/6910 REMOVAL HCOK 48" .a�);:�� 9.01 20.73 57.68 29,74 " SALES/MISCELLANEOUS ITEMS; 7 - - '`kI "3`` Rental Subtotal: 1,036,38 ` ..v � .,. ( - . Qty Item •- Price Unit of Measure Extended Amt. 1 DELIVERY CHARGE -'- - 75.000 EACH 75,00 1 PICKUP CHARGE 75.000 EACH 75.00 Sales/Misc Subtotal; 150.00 Agreement Subtotal: 2,186.18 Tax: 112.71 COMMENTS/NOTES: T. ( T Total: 11298.89 CONTACT: JO CELLS: 425-499-6651 ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWII.UNITEDACADEMY.OR,CON TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA. THIS INVOICE IS ISSUED SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTAL AGREEMENT,WHICH ARE INCORPORATED HEREIN BY REFERENCE, A COPY OF THE RENTAL AGREEMENT ISAVAIDIBLE UPON REQUEST. You Can N.WAccess l bko Hietoryand Update Purchase Orders Onllm Page; 1 To Sign Op,contact UflConbolSupporta uccom FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED MAIIAGLM[N} Project Name: Central Ave S.Pavement Preservation and Utility Imoro Project No: 13-3004 Item No.: Date: 4/20/2016 Description of Work: Production Loss due to unmarked 6"Gas Line,which turned In trench during installation of CO 009 Sewer addition at 259th Work by Subcontractor7: (mark'Y'if yes) Prime Contractor: Marshbank Sub-Contractor: LABOR Over Time Double Time DOLLAR FIRST NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT Steven S Operator Eng Grp2 6 64.33 86.23 $ 385.98 John H Dump Truck&Trailer 6 63.83 85.48 $ 382.98 Kathy F General Laborer < 6 51.08 70.05 $ 306.48 Marcus H Pipe Layer&Caulker 6 51,98 71.47 $ 311.88 James M Apprentice Operator 70 6 50.83 65.91 $ 304.98 Debbie W Operator Eng Grp2 6 64.33 86.23 $ 385.98 SUBTOTAL-LABOR: $ 2,078.28 LABOR OVERHEAD&PROFIT @ 29% $ 602.70 LAHORTOTAL $ 2,680.98 EQUIPMENT HOURS HOURS ADJUSTED STANDBY DOLLAR EQUIPMENT AND ATTACHMENTS WORKING STANDBY RATE RATE AMOUNT MCI-1026 308EZCR 6 $ 51.24 $ 307.42 MCI-3012 930G 6 $ 50.41 $ 302.43 MCI-3017 420E 6 $ 43.40 $ 260.37 - - MCI-0023 Dump Truck 6 $ 71.26 $ 427.53 MCI-0008 F-250 6 $ 17.04 $ 102.26 SUBTOTAL-EQUIPMENT $ 1,400.01 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 294.00 EQUIPMENT TOTAL $ 1,694.01 M RI ATE ALSISERVICE MATERIALS I SERVICE DESCRIPTION QUANTITY UNIT PRICE AMOUNT Pro-Vac 3 Hr $ 196.00 $ 588.00 Del Mar 1 3 1 Hr $ 125.00 $ 375.00 SUBTOTAL-MATERIALS $ 963.00 MATERIALS OVERHEAD&PROFIT @ 21% $ 202.23 MATERIALS TOTAL $ 1,165.23 Verification of Hours Worked: TOTAL: $ 5,540.22 12%MARKUP(for prime when subcontract work) $ - ConKactorsRepresen(alive(panted namej�J�� _ SHEET TOTAL: $ 5,540.22 Contractor's Re resanfafive Signature v� Date Owners Represantativee(pdnledname)��W�'� _ Prime Markup on Subcontractor: __... 12%: <$25,000 Owners Representative signature Date 10%: $25.000 to$100,000 Pay Estimate Entered: 7%: >$100,000 Date: ❑ If checked,this work is in dispute. By signing this form, partles are By: agreeing to the time and effort needed to accomplish the task. Entitlement PUBLIC WORKS CONSTRUCTION ENGINEERING Eric Connor 7 Construction Manager 400 West Gowe __- KENT Kent, WA 98032 Fax: 253-856-6500 -P HON E:x353-85&5533.-+ i May 3, 2016 Serial Letter 011 IC Brown Marshbank Construction, Inc. PO Box 97 3304 Old Hartford Rd Lake Stevens, WA 982S8 Re: MCI Serial Letter No. 27 Added Sewer on 259tb Production Impacts Central Ave. S. Pavement Preservation and Utility Improvements Project No. 13-3004 Federal Aid No.: STPUL-1071(006) i i Mr. Brown, Thank you for providing Serial Letter No. 27, regarding production Impacts experienced while installing the sewer work on S 2591h St. The City acknowledges there were production impacts associated with an unmarked 6" gas line. This gas line, which made a 90 degree turn within the excavation, was not shown on the plan sheet provided in the Request for Proposal. Unsuitable excavation and foundation material is included in the original contract, and efforts to remove unsuitable material and restore the trench bottom with foundation material will he paid for under new bid items at the original contract price, as noted in I Request for Proposal 011 and MCI Serial Letter No. 22. j MCI Serial Letter No. 27 requests for measurement and payment methods to be changed from those agreed to in Request for Proposal 011 and MCI Serial Letter No, 22, Because this request was made after the start of work, the City does not agree to alter the methods of measurement and payment. However, the City is willing to o discuss and negotiate fair compensation for production impacts resulting from the o, unmarked 6" gas line. Y 3 3 City of(Cent Public Works Department I Timothy J. LaPorte,P.E. Public Works Director .:. MAYOR Suzrrrr COOBF� Page 2 of 2 Added Sewer on 259" Production Impacts- MCI SL No, 27 Response Central Ave S. Pavement Preservation and Utility Improvements Please total the production Impacts associated with the unmarked 6" gas line and provide this information to the City for review, Sincerely, j Eric Connor i I Cc: Cameron Bloomer, PE, KBA Resident Engineer Chad Bieren, PE, City Engineer Mark Madfal, PE, Design Engineering Supervisor i I j I I i i 1 I MARSHBANK CONSTRUCTION Cont. Lic. MARSHCV05106 / DBE/MBE No, DIM0011507 April 22, 2016 Cameron Bloomer, PE KBA for: City of Kent 400 West Gowe Kent, WA 98032 RE: Central Ave S Pavement Preservation & Utility Improvements Project No. 13-3004 Federal Aid Number:STPUL-1071(006) Serial Letter No.27 Added Sewer on 2591h Production Impacts Cameron, During the first two'days of the installatidi of the additional 8"sewer line that runs west down South 259th Street, Marshbank has encountered some serious production Impacts. Below is a list of the change of conditions and how it impacted production: 1. Bid plans show the gas line as a 2"line and that it turns to the west well north ofthe existing SSMH a. This line is actually a 6" HP line and the location of the turn to the west is directly in our trench on the north edge. i. This impacted excavation & shoring requiring Provac to be onsite all day doing actual hydro excavation instead of just potholing at the seven locations agreed upon due to the proximity to the HP gas line. il. Shoring was increased as we were not able to use full size boards with our speed shoring coming out of the SSMH Ill. Del Mar was delayed in coring the existing MH due to the added difficulty shoring and excavating around the larger PSE line and the unexpected PSE line in the ditch 2. The existing base material is not suitable and has required over ex and building back with spalis a. This has required additional time to excavate,shore, pack spalls from stockpile, Provac to hydro exE.>•,vate inside our shoring due to the proximity to the PSE gas line. 3. Added utilities and larger size has caused more sluffing of the trench walls than anticipated. a. This has required additional shoring rental to properly maintain a safe ditch and allow for proper pipe installation. b. We were forced to change from wood shoring boards to steel sheets and order additional jacks Due to the unforeseen changes that have required changing equipment and methods we propose to do this work completely on F/A. We would like to discuss these issues in the meeting next Tuesday 4/26/2016 Please review and let us know what questions you have. Sincerely, 1C Brown Marshbank Construction Inc. Page 2 of 2