Vendor Name: Marshbank Construction, Inc.
Vendor Number:
JD Edwards Number
Contract Number: PW 15-240 ® QjL4
This is assigned by City Clerk's Office
Project Name: Central Ave S Pavement Preservation and Utility Improvements
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 716/2015_ Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Mark Madfai Department: PW Engineering
Contract Amount: $5,819,698.74
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #13
As of: 08/27/14
i
KE•T
W ASHINOTON
CHANGE ORDER NO. 13
NAME OF CONTRACTOR: Marshbank Construction, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Central Avenue S Pavement Preservation and Utility Imp.
ORIGINAL CONTRACT DATE: July 6, 2015
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
1. Extend the handrail 18 LF (three panels) south from STA 73+36
RCL to overlap the existing pedestrian wall on the bridge for safety and
aesthetic reasons.
2. Terminate the handrail on either side of the luminaire pole located
at STA 72+38 RCL to allow approximately 6 inches of additional
sidewalk width.
3. Revise the handrail at the PSE vault located at STA 73+05 LCL from
a removable straight handrail in front of the vault to a permanent
handrail wrapping around the vault allowing for easier access and
provides fall protection.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $5,819,698.74
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $130,089.29
(incl. applicable WSST)
Current Contract Amount $5,949,788.03
(incl. Previous Change Orders)
Current Change Order $10,970.00
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $5,960,758.03
CHANGE ORDER - 1 OF 3
Original Time for Completion 180 working days
(insert date)
Revised Time for Completion under 11
prior Change Orders
(insert date)
Days Required (f) for this Change 0 calendar days
Order
Revised Time for Completion 191 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OFKENT:
By; By;
( ignatur .F�;� (signafure)
Print Name. Jmto EAIK Print Name:% Od-V J ? ,
Its P Its VLF UC, WDCY-6 iC(ChC
DATE: G�'L0�1� DATE: 111�)-M& (title)
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
ffsfsf[[n this field,you may enter the eledronic filenath where me contrail has been saved]
CHANGE ORDER - 3 OF 3
FILE NO: 200.2
KENT
WASHINOTOR
CHANGE ORDER WORKSHEET NO. 013
Construction Management Division --Public Works
Project: Central Ave. S. Pavement Project No.: 13-3004
Preservation and Utility
Improvement Project
Project Engineer: Cameron Bloomer, PE Fed-Aid No.: STPUL-1071(006)
Owners Rep: KBA, Contractor: Marshbank Construction, Inc
Inc
Date: 8/1/2016
x. PROPOSED CHANGE
This Change makes the following revisions to the handrail shown on Contract Drawing 30 of 37:
1. Extend the handrail 18 LF (three panels) South from STA 73+36 RCL to overlap the
existing pedestrian wall on the bridge. Set the southernmost base plate for the end post
just inside (east side) the wall. Allow for expansion in the railing segment crossing the
bridge deck expansion joint.
2. Terminate the handrail on either side of the luminaire pole located at STA 72+38 RCL.
Locate the handrail base plate as close to the luminaire pole as necessary to prevent the
passage of a 4" sphere between the luminaire pole and the handrail.
3. Revise the handrail at the PSE Vault located at —STA 73+05 LCL from a removable
straight handrail in front of the vault to a permanent handrail wrapping around the vault
and mounting to its outside edge.
This Change also adds a bid item to provide compensation to the Contractor for additional costs
associated with this Change.
11. REASON AND BACKGROUND FOR CHANGE
Item 1. Contract Drawing 30 of 37 calls for the handrail to match the existing railing at
73+36.93. The existing railing was scratched, dented, and had bases and anchors that were not
as strong as the new railing being installed. For both safety and aesthetic reasons, the City
elected to have the remained railing, approximately 15 LF, removed and replaced with the new
railing being installed under this Contract.
Item 2. Contract Drawing 30 of 37 calls for the handrail to pass in front of the luminaire at STA
72+38. The City elected to terminate the handrail on either side of the luminaire, which
provided approximately 6 inches of additional sidewalk width.
Item 3. Contract Drawing 30 of 37 calls for the handrail to utilize the existing base plates on the
PSE vault at STA -73+05 LCL, and to make the railing removable. Between the project bid and
start of construction, PSE replaced the vault lid, removing the existing base plates. While
redesigning the railing to work with the new lid, the City elected to install a railing around the
1 REV. DATE:
4/01/10
• FILE NO: 200.2
KENT
outside edge of the vault. This change makes accessing the vault easier and provides fall
I rotection for employees who may need to work in or around it.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. 7- 1 - 1 1 1 FOR ACCOUNTING USE ONLY
Soh.No. Item Description Total Est. city this Unit Unit Price Total Estimated Cost of
city PE Item
B-I CO 013-01 — Handrail 18 0 LF 185.00 $3,330.00
Extension at 73+36 RCL
B-I CO 013-02 — Handrail 1 0 LS 700.00 $700.00
—___I Termination at
B
- CO 013-03 — Handrail 1 0 LS 6,940.00 $6,940.00
Revision at PSE Vault
® Independent Estimate Attached i CREATE PAY ITEM ONLY- Payment to be made PAY THIS PAY ESTIMATE
RE UIRED �— II at a later date upon completion of work
�t_
Material Submittals Reauired -CC: Construction Coordinator New Sub Reqrd? ( No
DELETE EXISTING PAY ITEM(S)per 1-09.5 ® Not Applicable
Change Order No. - I I I FOR ACCOUNTING USE ONLY
Sch.No. B.I.No. Item Description City Unit Unit Price Cost of Item
Independent Estimate Attached -REQUIRED ❑
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
Change Order No. I - I I I i FOR ACCOUNTING USE ONLY
Sch.No. B.I.No. Item Description Qty ( Unit Unit Price Cost of Item
Independent Estimate Attached -REQUIRED I ❑
TOTAL ESTIMATED COST OF CHANGE ORDER * $10,970.00
*Total of the Cost of Item Columns
THIS PAY ESTIMATE 0
TV. WORKING DAYS
Original Contract 1 180 Due This Change Order* 0 Previous Total
DATE: -------------.--_—__ ._..___.. ._ .. ._ DATE:
* Ex lanation justification Re wired:
2 REV. DATE:
4/01/10
• T FILE NO: 200.2
KEN
TOTAL WORKING DAYS* 191
*This Change Order+ Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: � Date: 8/10/2016
�f '
Construction Supervisor: tv - s '� Date:
Construction Manager: b'� I r - s ,✓� Date:
3 REV. DATE:
4/01/10
`® f.MS T RICT 10H
KC N T rnr.aurcnr:zN:
WASHINGTO■N
MEMO To FILE
Project Name: Central Ave.S. Pavement Preservation and Utility Date: 8/1/2016
Improvements
Contractor: Marshbank Construction,Inc. Contract No: 13-3004
Owner: City of Kent Federal Aid No: STPUL-1071(006)
Subject: Change Order 01X Chronology of Events
Message
7/29/2015—Handrail Shop Drawing and Enginee-ed Calculations approved by City.
9/24/2015—RFP 005 is issued to Marshbank Construction, Inc(MCI),proposed changes included terminating the
handrail on either side of the luminaire pole at 72+38 RCL and the addition of 18 LF of railing by the driveway at 70+35
RCL.The RE team put together an Independent Cost Estimate(ICE).
10/6/2015—MCI Serial Letter 011 sent to the City regarding the proposal requested in RFP 005.
10/19/2015—The City issued FWD 012,directing MCI to perform the work noted in RFP 005 after reviewing the pricing
proposed in MCI Serial letter 011.
11/20/2015—the City issued RFP 007 to MCI requesting a proposal to install the handrail on top of the new PSE vault lid,
wrapping around the outside of the lid instead of a removable straight section in front of the vault.
1/27/2016—the RE team completes the ICE for RFP 007
2/4/2016—the City issues FWD 016 to add 18 LF of railing to the South termination point on the West side of Central.
3/29/2016—MCI provided Serial Letter 024 and 024,responding to RFP 007 and FWD 016. MCI and stating the payment
for the additional 18 LF of railing was not sufficient due to small batch pricing.
4/4/2016—The City reviewed the pricing provided in MCI Serial Letter 024 and 025,and agreed to the costs.
5/11/2016—MCI submitted SUB 028 shop drawings for the handrail at the PSE Vault.
5/18/2016—The City reviewed the submittal,and noted the handrail anchorage is different from that originally
submitted and evaluated by the handrail engineer of record.The submittal was returned at Amend and Resubmit.
6/13/2016—MCI provided an additional price quote,for the redesign of the handrail as the one provided by the City in
RFP 007 would not work.
6/17/2016—MCI provided a conceptual drawinF'of the proposed new mounting design for the handrail at the vault.
6/22/2016—The City reviewed the new mounting design with PSE,who agreed to allow the mounting of the railing to
their vault as proposed.The RE Team also provided an ICE for the additional costs.The City verbally agreed to MCIs cost
proposal and verbally directed them to proceed.
7/6/2016—MCI submitted SUB 032—Revised PSE Vault Handrail Layout and Calcs to the City.
7/13/2016—The City reviewed SUB 032 and approved the submittal.
Cameron Bloomer,PE Resident Engineer 7/26/2016
---- -----.
Date
1 of 1 P-11 (Rev. 8111)
Chapter 52 Local Administered Projects
Appendix 52.106 Change Order
Checklist
Change Order
Question Yes No NIA
1. Does the change order alter the termini,character,or scope of the work? El d
El
If yes,you must have H&LP approval to be eligible for federal finds.
if yes,you must submit a revised Page I of the prospectus.
2, is the Change Order over S7,500.00 and-inside the scope of work? 0 d El
If yes,the change cannot be a change order and must be an independent work. El El El
tw
3. Does the Change Order detail all items involved with the change? d -
4. Does the Change Order include an aQjustment in working days? d
If yes,the time extension must be stated in the Change Order. 0
El 0
If yes,an independent engineers estimate of time must be included to document the
extension.
If no,that must be stated in the Change Order. -
5. Does the Change Order alter the DBE Condition of Award?
if yes,you must obtain concurrence form Local Programs, El O d _
If yes,you mast obtain the DBE's signature on the Change Order.
6. Does the Change Order involve a material substitution? 0 Q,
If yes,you must determine if a material credit is appropriate. D 0 ❑
7. If Change Order work started prior to it's execution,prior verbal approval by the d
Approving Authority must be granted aril documented.
8. Has the Change Order been signed by the contractor?
9. Has the Change Order been executed by the Approving Authority`?
If you are a"non CA Agency",you must have the acting CA Authority's approval.
10. Has an independent engineer's estimate justifying the costs and time extensions been
completed and documented? -
11.Has a detailed memo outlining the chronology of events,basis of need,costs and LY ❑ E)
working days been prepared and placed in the file accompanying the Change Order?
Appendix 52.106 Change Order Page 1 of 1
Revised 413012014 g-
WSDOT Local Agency Guidelines M 36-63.27 Page 52-19
April 2015
!CENT
WASHINGTON
KCAS SUBMITTAL TRANSMITTAL
Project Name: Central Ave S.Pavement Pres.And Utility Impr. Contract No: 13-3004
Owner: City of Kent KBA Project No: 015014-01
Contractor: Marshbank Construction Federal Proj.No: STPUL-1071(006)
Submittal No: 007.1 TIB No: NA
Description: Handrail Shop Drawings
Result of Review:
❑ I Approved as Submitted -
® I Approved as Noted
❑ I Amend as Resubmit
Review is only for general conformance with the Contract Documents. Corrections or comments made do not
relieve contractor from compliance with the Contract Documents.Taking no exceptions on a specific item does
not imply approval of an assembly of which the item is a component. Contractor is solely responsible for
fabrication, dimensions, and installment; means, methods, techniques, sequences, and procedures of
construction; coordination of the Work; and for satisfactorily performing all work.
Review Comments:
1. Baluster shall be''/:"STD./ANSI S&iedule 40 pipe size per Kent Standard Plan 6-41M.Adjust
baluster count as required to maintain 4"'maximum gap.
2. %"Vent holes to be filled with Aluminum plug after galvanizing.
Date: 7/2 912 01 5 By:
Cameron Bloomer,PE
Resident Engineer
KBA, Inc.
1 of 1 P-45 (rev. 7112)
zzz
uoo
Zzz
tnNa m
i < ;.
yl
v.
N Ll
i o\
o n VI lm
of lN-( \J II
nIrn �l _2 1 1 od)i :
�- olj
�
N4-
I II rrL MBF DME.NI
p N D
o - -
A b1 N b
r (n o _I r<I rm fH
rq 0 w i�� � Di Ei'jvl.'j"i�, -9
r I F9 u
d Wn � . l't l_D
ti I'I'IN
LI e I _I Cl
w o ri
N� PI N
N
r�
r
irk \ c
I
rl
L N
b
I lb b
r b p b 11 hl _
f'I
G _ iAtJ -{
2 D
a -
.w�.,ee-• a z a, -
� 1
F
i
o n
o zo 33 D W Aa CO W <U o 0 1
_ Z �' N 41 2 SU fD -6
N ) (D Ct)
N C --I (6 b viii�
(f} 'u
DL�Z` u
r ._.Irk M E
- Cc_ ''I�1L] -
AE::' r
C7
Co
u
o D Z W
_o I ?N�rl < -- — 0 — — —
Li
C4 < ' ----
7 ()
PI
F-
P I
3
F9
v 0
i
Z
D
(,)
-
17
(a)
�f/XcV c�J
_ UJ
z�n; R
O Q. SU (D '6 n N N un
ti
3 Nco
N
ffi O a) '
(D lJ
o N '
O �
(1
Share Point Newsfeed OneDrive Sites Cameron Bloomer-
Request for Proposal (RFP)
Project Number Project
Federal Aid No.
Date 9/24/2015 RFP No. 005
Subject* Handrail Revisions
Specification(s) KSP 8-27
Plan Reference 30 of 37
To:
Provide proposal within fifteen(15) days or as stated above for the scope of work described:
NOTE:This is NOT a change order and does NOT constitute approval or notice to proceed on the issue.
SCOPE
1)ADD approximatly 18 of Handrail, Bid Item 1295,from 70+53 to 70+35 RT.
2) Revise the railing to end and begin on either side of the luminare pole located at approximatly 72+38 RT.Spacing at
the luminaire shall comply with all applicable IBC codes, including preventing the passage of a 4"diameter sphere.
MATERIAL
All material shall comply with the contract documents.
MEASUREMENT AND PAYMENT
Payment for additional handrail will be measured and paid at the contract price for Bid Item 1295- Handrail.
Provide a cost proposal with cost breakdowns aO line items for the additional cost to make the proposed changes.
Contractor Review
Related GC Documents
Close
Version:3.0
Content Type:Item
Cj eated at 9/24/2015 5:09:45 PM by Cameron Bloomer
Last modified at 9/24/2015 5:12:13 PM by Cameron Bloomer
A
`°"'A^°.C.T Independent Cost Estimate
Project Name: Central Ave S. Pavement Preservation Project No: 13-3004
Potential Issue No.: c>t2 Date: 9/24/2015
Description of Work: Modify Handrail as noted in RFP 005:Add 18 LF or railing, revise railing
to end and begin on either side of the lumimaire pole at 72+38
Assumptions: Material difference between end pieces and railing going through offsets
The 18 LF will be a bid item price,with shop reorganization fee
Desctiption Quantity Unit Unit Price Total
Shop Foreman 2 Hrs 40 $ 80.00
Shop Welder/Fabricator 12 Hrs 30 $ 360.00
Shop Drawing Drafter 2 Hrs 50 $ 100.00
Welding/Bending Equipment Use 12 Hrs 10 $ 120.00
Shop Line Re-organization 1 LS 200 $ 200.00
$
$
Subtotal $ 860.00
Labor Markup (29%) $ 156.60
Equipment Markup (21%) $ 25.20
Materials Markup(21%) $ -
Markup Total $ 181.80
Subcontractor Markup (12% if below$25,000) $ 125.02
Estimate Total I $ 1,166.82
Estimated By: van I3/ooMcw
Signature: 66�n .�y�
1 of 1 P-13 (Rev. 7/12)
MARSHBANK
r1,i r�>',`-IC1- '.`i r>6b'AV
October 6, 2015
Cameron Bloomer, PE
City of Kent
400 West Gowe
Kent, WA 98032 .
RE: Central Ave S Pavement Preservation &Utility Improvements
Project No. 13-3004
Federal Aid Number: STPUL-1071(006).
Handrail Revisions RFP 005
Serial Letter No. 11
Cameron,
RFP 005 outlined changes to the handrail located on the south end of the project. Item one proposes
adding 18 if at STA 70+53 to 70+35 RT. For the additional footage, this work can be performed at
existing bid item pricing for B1-1295.
Item two proposes adding two end sections at 72+38 RT due to a conflict with an existing luminaire
pole. We propose an additional $350 per each end section for labor and materials to revise the handrail
layout. This cost will cover the added fabrication and installation time required to build this break in the
handrail system.
Please review and let us know what questions you have.
Sincerely,
Marshbank Construction Inc.
Jason Heide
Project Manager
KENT
Y^5H 1 N'701n Field Work Directive FWD 012
Project Name: Central Ave S. Pavement Preservation PW Project Number: 13-3004
and Utility Improvements
Contractor: Marshbank Construction Federal Aid Number: STPUL-1071 (006)
Subject: Handrail Revisions Date: Oct. 19, 2015
Scope: Make the following changes to the Contract Documents:
• Contract Drawing 30 of 37: Extend the northern limit on the west side's Handrail frorn
70+S3 to 70+35.The handrail shall pass just east of the light pole base at approx. STA
70+50.
• Contract Drawing 30 of 37: Revise the railing to end and begin on either side of the
luminaire pole located at approximately 72+38 RT.Spacing at the luminaire shall comply
with all applicable IBC cod-:s, including preventing the passage of a 4" diameter sphere.
Measurement and Payment:
The following work will be measured and paid for in accordance with the Contract Documents for the
noted existing bid items:
• Bid Itern 1295— Handrail
• The price proposed in Marshbank's Serial Letter 011, response to Request for Proposal
005 Handrail Revisions, for the two added end sections at$3S0 each has been accepted
by the City. A Change Order will be processed to provide compensation for this work.
Attachment(s):
• None
Contractor Acknowledgement:
By: Date:
Jason Heide, Project Manager
Owner Approval:
By: UCCd1LaYC 72. P69 eP Date: 1��r�j�ZGlJ
Cameron Bloomer. PE. Resident Engineer
By: Date: 10/19/15
Eric Connor, City of Kent
THIS FIELD WORK DIRECTIVE DOES IJOT PROVIDE FOR EITHER ATIME EXTENSION OP.A CHANGE IN THE CONTRACT PRICE,LABOR,EQUIPMENT,AND/OR
MATERIAL OUTLINED IN THIS FIELDWORK DIRECTIVE SHALL BE PAID BY BID ITENI(S)OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR
CONTRACT PRICE INCREASES, ANY PROTEST TOTHE FIELD WORK DIRECTIVE SHALL FOLLOW 1-04.5 OF THE WSDOT STANDARD SPECIFICATIONS.
RFP - Handrail Revision at PSE Vault Page 1 of 2
Share.Point Ncv,,sfeed OneDrive Sites Cameron Bloomer- i
r Request for Proposal (RFP)
A
�t� " Project Number Project
Federal Aid No.
Date 11/20/2015 RFP No. 007
Subject * Handrail Revision at PSE Vault
Specification(s) 8-27 KSP
Plan Reference 30 of 37
To:
Provide proposal within fifteen(15) days or as stated above for the scope of work described:
NOTE:This is NOT a change order and does NOT constitute approval or notice to proceed on the issue.
SCOPE
Provide a cost proposal to revise the handrail as shown in attached RFP 007 Proposed Handrail Redesign a PSE Vault,
The vault is located at—STA 73+00,30' LCL
Please note,the railing must comply with all applicable IBC codes, including not allowing a 4" diameter sphere from
passing through the gap between the railing attached to the thickened edge sidewalk and that attached to the vault
lid,This requires off-centering the post on the base plate attached to the thickened edge sidewalk.The handrail
Engineer of Record shall evaluate and confirm that off-centering the post on the base plate will meet the meet
applicable structural code requirements.
i+? RFP 007 Proposed Handrail Redesign at PSE Vault,pdf
MATERIAL
https://wwwl,bapoital.com/proi ect/CentralAveSoutli/Lists/RFP/DispForm.aspx?ID=9&Sou... 8/1/2016
RFP - Handrail Revision at PSE Vault Page 2 of 2
No change is proposed to the materials.
MEASUREMENT AND PAYMENT
Handrail will be paid by the linear foot per the contract documents.
Provide a proposal for cost associated with the revision that are in additional to the increased quantity. Please provide
sufficent detail in the breakout to allow evaluation of costs for separate elements of the revision.
Contractor Review
Related GC Documents
• Close
Version:20
Content Type:Item
Created at 11,'(1/2015 3:54:28 PM by Cameron Bloomer
Last modified at 112012015 3:5-A4 PIA by Cameron Bloomer
https://www.kbaportal.com/project/CentralAveSouth/Lists/RFP/DisnForrn.asnx?ID=9PYSnii R/f nnu
000
�Ta
c n
g A3pm
§
PagS X
E.
AO 3m
nRp 3.1x5'0 -
3 ma EMEEOMEWEN!
11/4'
S A
«O
V p
z
T �
n � �
a _
z.
A
s,
i
v
® 1
`AAA." `M Independent Cost Estimate
Project Name: Central Ave S. Pavement Preservation Project No: 13-3004
Potential Issue No.: Date: 1/27/2016
Description of Work: RFP 007-Handrail Revision at PSE Vault
Assumptions:
Desctiption Quantity Unit Unit Price Total
Additional Handrail Ends 2 EA 350 $ 700.00
Engineering, Including Calcs and Revised Shop Drawings 4 Hrs 125 $ 500.00
$
$
$
$
$
$
fl$ 2
Sub0
Labor Markup (20
Equipment Markup (2
Materials Markup (20
Markup T00Subcontractor Markup (12% if below$25, 04
Estimate Total 1 $ 1,671.04
Estimate By: CCtMerart 3100na-er'
Signature: ItMd40-L TZ- W4&rL 4
1 of 1 P-13 (Rev. 7/12)
KENT
�« Field Work Directive FWD 016
Project Name: Central Ave S. Pavement Preservation PW Project Number: 13-3004
and Utility Improvements
Contractor: Marshbank Construction Federal Aid Number: STPUL-1071 (006)
Subject: Handrail Extension at Bridge Date: Feb 4, 2015
Scope: Make the following changes to the Contract Documents:
o Contract Drawing 30 of 37: Extend the Handrail 18 LF (3 panels) South to overlap the
existing pedestrian wall on the bridge, setting the base plate for the southernmost post
just inside (East) of the wall. Allow for expansion in the railing segment crossing the
bridge deck expansion joint.
® Contract Drawing 30 of 37: Per FWD 012, revise the railing to end and begin on either
side of the luminaire pole at approximately STA 72+38 RT. Rotate the base plate
connection to the railing post as shown in the design clarification attached. Mount the
railing base plate as close to the luminaire base plate as necessary to prevent the
passage of a 4" Sphere.
Measurement and Payment:
The following work will be measured and paid for in accordance with the Contract Documents for the
noted existing bid items:
P Bid Item 1295— Handrail.
Attachment(s):
® Design Clarification 013
Contractor Acknowledgement:
By: --- — Date:
-
Jason Heide, Project Manager
Owner Approval
KLWf h2.-�t - Date:% 12L-�
By: _..
Cameron Bloomer, PE, Resident Engineer
B r - ��;;� , �� Date: 2/4/16
Y: —
Eric Connor, City of Kent
1 HIS HELD WORK DIRECTIVE DOES NOT,, PROVIDE FOR Eni ER A TIME EXFFNSIONd OR A CHANGE IN ThIE CON'RACT PRICE.LABOR,CQUIPMENI,AND/OR
'MATERIAL.CW T LINED IN THIS FIELDWORK DIRECTIVE SHALL BE PAID B`'BID ITEM(S)OR A CHANGE ORDER SHALT BE DEVELOPED FOR TIME EXTEN51ohi OR
COF.TRACT PiRIC E INCREASES. ANY PROTEST I'O THE PI ELD WORK DIRECTIVE)HALL FOII UVV 1-045 OF THE WSDOT S'FAND,.RD SPECIIrICATIONS.
a.
-,On 5. N
(n 7 CD 7 Cr .n nl
CD M
O Al -0 CDO @^ C) [.
aCJO@ °
O
(n 5 fn a_ @ CrS CDCD •'.'•�•'.'•
D CD 7 C p @
O w p
N U) N O co
N n
@ p N N O
@ CD
o
� Q i
co -am
p _Al O @ X
� D m � a I o (A Z !
m o m = I �„� + v g
a g 9 o t
p- O O Q I ; to D
w I _
_ cl
@ � o <7 I N � 2 23o
U `c' co
m r (Ji fTi w
0 U) -n x
5 W I m n
co j x
asQ' I � 0
w @ � N > N W
C.M-p .� — I M p.
CUD) � � I �
@ ca
� ' ocD W@CD
I W
w I
MARSHBANK
CONSTRUCT ) ON
L'<ut[l_ic.I+°,473.iAG'i°OSt Uh J L7BEJr1dP,EIda.DdF76011s2'
March 29, 2016
Cameron Bloomer, PE
KBA for:
City of Kent
400 West Gowe
Kent, WA 98032
RE: Central Ave S Pavement Preservation & Utility Improvements
Project No. 13-3004
Federal Aid Number:STPUL-1071(006)
FWD 016—Handrail Extension Rev.
Serial Letter No. 24
Cameron,
We do not agree with payment method called out in FWD-016 for the additional 18LF of handrail.
Production and shipping costs of small quantities are significantly higher than the contract priced work.
Please see below for Marshbank's proposed cost for the added handrail.
Our revised unit cost before OH&P for the production and shipping of handrail is $126.11 per LF.
Item Description Unit Quantity Unit Price Total
1 Additional Handrail per FWD 016 LF 18.00. $ 185.00 $ 3,330.00
Please review and let us know what questions you have.
Sincerely,
Jason Heide
Marshbank Construction Inc.
MARSHBANK
Cant.l;A',I7,9K.Sr.'f..t`D.itDS;O.7F.,�h'Y,EA'a.IIIn51)O iSD'
March 29, 2016
Cameron Bloomer, PE
KBA for:
City of Kent
400 West Gowe
Kent, WA 98032
RE: Central Ave S Pavement Preservation & Utility Improvements
Project No. 13-3004
Federal Aid Number: STPUL-1071(006)
RFP 07— PSE Vault Handrail Modification
Serial Letter No. 25
Cameron,
In response to RFP 07, please see the proposed unit price below.
We would like to request that three (3)working days be added to the schedule for this work.
Item Description Unit Quantity Unit Price Total
1 Additional Handrail per RFP 07 LF 20.00 $ 237.00 $ 4,740.00
Assumptions and Notes
— Fastening method to vault lid to match allowed means and methods in contract
— Will follow IBC codes for railing spacing tolerances
— Pricing includes premium for small production handrail manufacturing
— Our direct unit cost is $167.50 per If of handrail which includes production, shipping and shop
drawings for the scope revision.
Please review and let us know what questions you have.
Sincerely,
Jason Heide
Marshbank Construction Inc.
Cameron Bloomer
From: Cameron Bloomer
Sent: Monday, April 04, 2016 3:43 PM
To: 'JC Brown'
Cc: Jason Heide
Subject: RE: Handrail CO Pricing
Attachments: SL 25 - RFP 07 -Added Handrail at Vault Rev 3-29-16.pdf, SL 24 - FWD 016 - Handrail
Extension Rev 3-29-16.pdf
Hello 1C,
The City accepts the pricing proposed in your letters SL 24 and SL 25. Please proceed with the work.
Regarding the 3 working days requested,the latest master schedule shows the handrail off of the critical path. Please
provide documentation showing the impact of the handrail at the PSE vault to the critical path.
Thank you,
Cameron Bloomer, PE
T 425990.2949 1 C 206.819.7148 1 E cbigomer, kbacm com
KBA, Inc. 1 Construction Management Specialists 1 www.kbacm.com
From:JC Brown [mailto:brown@marshbankconst.comj
Sent: Monday, April 04,2016 2:18 PM
To: Cameron Bloomer<cbloomer@kbacm.com>
Cc:Jason Heide <jason@marshbankconst.com>
Subject: Handrail CO Pricing
Cameron,
Do you have an update on the status of the handrail change orders?
Thank you,
JC Brown
Project Engineer
Marshbank Construction, Inc.
P.O. Box 97
3304 Old Hartford Road
Lake Stevens,WA 98258-0097
(425)499-6651 Cell
(425)377-9708 Office
(425)377-0709 Fax
1
KENTr
WASHINGTO.
KCAS SUBMITTAL TRANSMITTAL
Project Name: Central Ave S.Pavement Pres.And Utility Impr. Contract No: 13-3004
Owner: City of Kent KBA Project No: 015014-01
Contractor: Marshbank construction Federal Proj. No: STPUL-1071(006)
Submittal No: Sub 028 TIB No: NA
Description: Handrail at PSE Vault Layout -
Result of Review:
❑ A roved as Submitted .
❑ I Approved as Noted
® Amend as Resubmit
Review is only for general conformance with the Contract Documents. Corrections or comments made do not
relieve contractor from compliance with the Contract Documents. Taking no exceptions on a specific item does
not imply approval of an assembly of which the item is a component. Contractor is solely responsible for
fabrication, dimensions, and installment; means, methods, techniques, sequences, and procedures of
construction;coordination of the Work; and for satisfactorily performing all work.
Review Comments:
1) The drawing submitted shows 1-1/8"of concrete between the center of anchor bolt and
outside edge of concrete.This is less than the condition evaluated in the engineering
calculations provided under submittal 7.1, and requires re-evaluation by the Engineer of
Record.
Considerations:
o The depth of the concrete lid is 8 inches.
o To achieve the required breakout strength, longer anchor bolt length may be a part of
the solution.
o There is concern about the small section of concrete between the anchor bolt and the
outside edge of the lid breaking out during the drilling of the bolt holes.
♦ Longer anchor bolts on the inside and shorter on the outside may limit the
possibility of concrete breakout.
♦ Shifting the outside anchor bolts toward the center of base plate may also limit
concrete breakout.
Date: 5/18/2016 By: L MAV*t
Cameron Bloomer,PE _
Resident Engineer
KBA, Inc.
1 of 1 P-45 (rev. 7112)
L.,
I
I I'I
v;
ll
I`1 Id �
IU
r I
J v'
l �
A> < o
I
� I
o o P
/ (DI
- W
LI
I O
U I'I
tl
z NCD
, ),I
I l is I D i
L I
n I
I> t> N
D i L
-I ��pp
II
1__I ti
v
� n o m
1
T.
i
i
1 -
1�
- -- - -
m� ti zo u
lI) i N I v 3
I S s o
m n
ll
i J LI
IV
IlIMl U
C rn I
� y I
i
F,
CIILI
I Iv U Ll
m
1 .till
l I v 1
fu
LI-ply f� IU <1-
b A S 1, n
V Z' ' > I
! b LLI I'l
-
� -
1A11.1 I'9 U y 'N NI"lir
I I
At ri TI
At f'I 2
[1 AI T _ImPln .
.11
I O D_ bl l -
I'I
PI C Pl I_.
u _I� Pf yr
J = _I CI IIN O m
At T m
u
PI
1
�_I m
= m
N
m 1
m
bill IIU p N
I)� T n
(9,
U z' 1
v
D
d
I _ _
�'I
In
r
1 ,
l I
u: ILI i \
<
l I N G) U
I 1 li
i AI
Burly Products Corporation Quotation
3999 W. St.Joe Ave. Quote Number: 2016-06-13-01
Post Falls ID, 83854 - Quote Date: 6/13/2016
Washington State DBE MlMO023827 Page: 1 of 2
Voice: 208-262-9531
Fax: 208-262-9541 Central Avenue South pavement
preservation and utility improvements
Marshbank Construction Inc Cust.# 197
PO Box 97 ATI-N: Estimator
Lake Stevens WA 98258 Phone: 425-377-9708
Fax: 425-377-0709
Quantity Description . Unit Price Total Price
1 Modify Origianal Approved Railing Design to meet IBC Standards,Field Conditions $ 2,200.00 $ 2,200.00
of the vault secton on Centerial Ave. Includes Engineering Caculations for the new
mounting design.
Price Includes:
Anchor Bolts, Freight,Shop Drawings
Price Excludes:
Installation,Applicable Sales Taxes,Field Verifications,
Price good 15 days after award of contract
Quote is"all or nothing"without written approval
Tota l
$ 2,200.00
PRQ Bl 7
Terms and Conditions
1. Burly Products shall have no liability for late delivery caused by delayed or inaccurate field dimensions, delayed
shop drawing approvals,delayed approvals of any kind, delayed construction caused by others nor be held liable for
circumstances beyond our control such as accidents,fires or floods.
2.We are not responsible for any errors occurring through the use of our drawings by other trades.We assume no
responsibility as to measurements or details affecng anyone's work but our own.Approval of this job is based on
approval for fabrication or dimensions shown on our drawings.
3. Burly Products performance on design,ordering of materials, manufacturing and shipment time line will not start
until we receive shop drawing approvals and complete field verifications.
4.Cancelation of any or all of an order is subject to a cancelation charge and full payment for work completed prior
to cancelation. Interruptions caused by buyer or affiliate of buyer will be subject to additional charge and can delay
delivery schedule.
S. Burly Products bid is good for 15 days after award of project only to the addressed buyer and is revocable at any
time for any reason. Bid is binding only when Burly Products receives and signs purchase order referencing bid and
orjob number.
6.All field verifications must be provided 8 weeks prior to delivery.
7.Orders will be shipped in 1 shipment from Burly Products to project site or address specified by the buyer. Burly
Products will invoice for material on hand in our plant or stored off site or delivered to a job site and not yet
installed. If Burly Products chooses to ship multiple shipments each shipment will be invoiced separately and
immediately. If Buyer requires multiple shipment for project scheduling reasons, buyer shall pay the freight for all
additional shipments.
8. Unless otherwise agreed shipping will be F.O.B. Origin,freight prepaid-seller pays and bears freight charges buyer
owns goods in transit,files claims if any.
9. Payment terms are net 30 from time of invoice. Late charges will be assessed at a rate of 1 1/2%per month plus
any collection and/or attorney's fees accrued. Burly Products may stop work,cease deliveries or terminate the
contract for non-payment extending beyond credit terms. Payment to Burly Products is not contingent upon owner
payment to the general contractor and/or general contractor payment to sub contractor. Payments are due without
reference to project progress or project completic ;. Burly Products reserves the right to delay or refuse shippment
to customers with delinquent accounts regardless of the project or contract requirements.
10.This agreement shall be entered into in accordance with the laws of the state of Idaho. If any dispute shall arise
from this agreement it may be resolved before the Circuit Court of the state of Idaho in Kootenai County. Both
parties entering into this agreement consent to the jurisdiction and location of that court.Any suit against Burly
Products shall be filed within 90 days of delivery to seller.
11. Burly Products warrants to the original purchaser all goods sold to be free of defects in materials and
workmanship under normal use for a period of 90 days after delivery.Seller makes no warranty concerning paint or
other finish applied.Warranty shall be void on any goods misused, abused, modified by someone other than seller
or not installed in accordance with applicable codes or sellers instructions.Sellers liability to warranted items is
limited to repair and or replacement or at its option refund of purchase price
12.All terms and conditions outlined herein supersede any buyer terms and conditions and may not be waived or
altered except in writing by an officer of Burly Corporation signed by both buyer and seller.
Page: 2 of 2
Cameron Bloomer
From: Jason Heide <jason@ marsh bankconst.com>
Sent: Friday,June 17, 2016 10:38 AM
To: Cameron Bloomer
Cc: 'Connor, Eric (ECcnnor@kentwa.gov)';JC Brown;John Moff
Subject: Handrail @ Vault
Attachments: Unofficial Design.pdf
Cameron
Please see the attached. This isn't the official submittal but I think this will be the best option and alleviate some of the
clearance issues where the N/S run and the vault terminations meet. Take a look and let us know what you think. We
can proceed with the shops and engineering if you guys are on board
Thanks
Jason
1
J>
c
o °T -
TT
00
lzJ i�
h1 L_
� o o
D � �
I
o��o
� Il
I
Cameron Bloomer
From: Booth, Dennis <Dennis.Booth@pse.com>
Sent: Wednesday,June 22, 2016 4:S7 PM
To: Cameron Bloomer; econnor@kentwa.gov
Cc: Smith, Susanne Provencio (SPSmith@kentwa.gov); Swart, Brian - Transmission
Subject: RE: Kent Central ve Handrail @ PSE Vault
Perfect.
Thanks Cameron.
Thank you
Dennis Booth
r
y,
PSE/ Project Manager
South King
6905 5 228th St.
Kent, WA 98032
425-417-9188 cell
de n n i s.boothO-Pse.com
From: Cameron Bloomer [mailto:cbloomer@kbacm.com]
Sent: Wednesday,June 22, 2016 4:S3 PM
To:.econnor@kentwa.gov
Cc: Smith, Susanne Provencio (SPSmith@kentwa.gov); Booth, Dennis
Subject: RE: Kent Central Ave Handrail @ PSE Vault
Hello Eric,
Dennis and I spoke about the handrail mounting re-design. His concern is damage to the railing while opening the lid, as
they are heavy and difficult to gently rest on the railing.After confirming the railing,material is galvanized steel, Dennis
was CK with the re-design.
As we discussed, I will let MCI Know they can proceed,with a note that stamped engineering calculations are required.
Thank you,
Cameron Bloomer, PE
T 425,990.2949 1 C 206.819.7148 1 E cbloomer@kbacm.com
€CBA, Inc. I Con5t7UCU017 MranagementSpecialists I www,kbacm.corn.
From:Cameron Bloomer
Sent: Monday;June 20,2016 3:14 PM
To: Booth, Dennis<Dennis.Booth@pse.com>
Cc:econnor@Ientwa.gov; Smith,Susanne Provencio (SPSmith@kentwa.gov) <SPSmith@kentwa.gov>
Subject: FW: Kent Central Ave Handrail @ PSE Vault
i
Hello Dennis,
I am Cameron Bloomer, an engineer on the City of Kent's Central Ave project.We have been working with.Brian Swart
on a solution for installing a handrail on one of PSE's vaults, located just North of the green river bridge on Central Ave.
Brian is on vacation, and his voicemail told me to contact you if we need anything.
PSE didn't have any concerns with the use of 5/8" anchor bolts being installed in the top of the lid to support the railing.
Due to a thin concrete section between the outside edge of the lid and the anchor bolts,the handrail designer has
suggested we mount the base plates on the side of the vault lid, as shown in the attached drawing.Anchor bolts would
be the same 5/8" diameter, and stamped engineered calculations will be submitted to us prior to installation.
Does PSE have any concerns with us moving the anchor point to the side of the vault lid? Please call if you have any
questions or need any background information.
Thank you,
Cameron Bloomer, PE
T 425,990.2949 1 C 206.819.7148 1 E cbloomer<<kbacn..rpm
KBA, Inc, ; Construction Management Specialists I www.kbacm.com
From: Cameron Bloomer
Sent: Friday,June 17, 2016 2:06 PM
To: 'brian.swart@pse.com'<brian.swart@pse.com>
Cc:Smith,Susanne Provencio (SPSmith@kentwa.gov)<SPSmith@kentwa.gov>; Madfai, Mark<MMadfai@kentwa.eov>;
econnor@kentwa.gov
Subject: Kent Central Ave Handrail @ PSE Vault
Hello Brian,
Would PSE have any issues with the railing mounting to the sides of the vault lid instead of the top and shown?This will
give us a little thicker concrete section to work with, helping with concrete breakout.
Thank you,
Cameron Bloomer, PE
T 425.990.2949 1 C 206,819.7148 1 E cblopmer kbacm.com
KBA, Inc, I Construction Management specialists I wi-,vw.Etbacm.com
From:Jason Heide [mailto:iason@marshbanl<const.com]
Sent: Friday,June 17, 2016 10:38 AM
To: Cameron Bloomer<cbloomer@kbacm.com>
Cc: 'Connor, Eric(EConnor@kentwa.gov)'<EConnor@kentwa.gov>;JC Brown <brown@marshbankconst.com>;John
Moff<iohn@marshbankconst.com>
Subject: Handrail @ Vault
Cameron
2
Please see the attached. This isn't the official submittal but I think this will be the best option and alleviate some of the
clearance issues where the N/S run and the vault terminations meet. Take a look and let us know what you think. We
can proceed with the shops and engineering if you guys are on board
Thanks
Jason
3
Cameron Bloomer
From: Cameron Bloomer
Sent: Wednesday,June 22,2016 7:23 PM
To: econnor@kentwa.gov
Cc: Steve Cox
Subject: FW: PSE Vault Update
Attachments: Central Avenue South -Vault Railing Design and Engineering.pdf
Hello Eric,
Please see below from Jason.Attaches are the costs he is asking about.
I estimate:
Field Measuring of vault= 1 hour at$75 per hour=$75
Engineering re-calculations:4 hours at$175 per hour=$700 for engineering
Shop Drawings—Assume 5 sheets at$200 per sheet=$1000 (this includes conceptual drawings)
My estimated total is $1,750.
Please review and follow up with Jason tomorrow.
Thank you,
Cameron Bloomer, PE
T 425.990.2949 1 C 206,819.7148 1 E cbloomer@kbacm.com
KBA, Inc. I Construction Monagernent5pecia(ists 1 wwud.l:6acm.corn
From:Jason Heide [mailto:jason@marshbankconst.`com)
Sent:Wednesday,June 22, 2016 7:01 PM
To: Cameron Bloomer<cbloomer@kbacm.com>;JC Brown<brown@marshbankconst.com>
Cc:Steve Cox<scox@kbacm.com>
Subject: RE: PSE Vault Update
Cameron
Are we to assume that is an acceptance of the added cost of engineering?
Thanks
From: Cameron Bloomer [mailto:cbloomer(@kbacm com]
Sent: Wednesday, June 22, 2016 4:56 PM
To: JC Brown
Cc: Jason Heide; Steve Cox
Subject: RE: PSE Vault Update
Hello Jason/JC,
i
I spoke with Dennis Booth at PSE and they are OK with the redesign. Please proceed.
Please also note that stamped engineering calcula`,on are required.
Thank you,
Cameron Bloomer, PE
T 425,990,2949 1 C 206.819.7148 1 E cbloomer@kbacm,com
KBA, Inc, j Construction Monagement 5peciolists I wwv .hbacm.enm
From:JC Brown [mailto:brown@marshbankconst.com]
Sent: Wednesday,June 22,2016 2:38 PM
To: Cameron Bloomer<cbloomer@kbacm.com>
Cc:Jason Heide<jason@marshbankconst.com>
Subject: PSE Vault Update
Cameron,
Do you have any updates from PSE on the handrail design for the vault and the additional cost for design and
engineering from the city?
Thank you,
JC Brown
Project Engineer
Marshbank Construction, Inc.
P.O. Box 97
3304 Old Hartford Road
Lake Stevens,WA 98258-0097
(425)499-6651 Cell
(425)377-9708 Office
(425)377-0709 Fax
2
i l
KENT
WASHINGTON
KCAS SUBMITTAL TRANSMITTAL
Project Name: EAveS. ement:Andj I
lity Impr. Contract No: 13-3004Owner: KBA Project No: 015014-01Contractor: ructionFederal Proj. No: STPUL-1071(006)Submittal No: TIB No: NADescription: Handra Calcs
Result of Review:
�0 Approved as Submitted
® Approved as Noted
Amend as Resubmit
Review is only for general conformance with the Contract Documents. Corrections or comments made do not
relieve contractor from compliance with the Contract Documents. Taking no exceptions on a specific item does
not imply approval of an assembly of which the item is a component. Contractor is solely responsible for
fabrication, dimensions, and installment; means, methods, techniques, sequences, and procedures of
construction;coordination of the Work; and for satisfactorily performing all work.
Review Comments:
1. Calcs and shop drawings—No Exceptions Taken
2. CMO required upon delivery of material—Approved as Noted
3. Railing shall be Galvanized Steel-Approved as Noted
Date: 7/13/2016 By
Cameron Bloomer, PE
Resident Engineer
KBA, Inc.
f
1 of 1 P-45 (rev. 7/12)
LETTER OF TRANSMITTAL
C<�N�`TI�lJCT1C�f`.J a>E
P.O. Box 97 Wednesday,July 6,2016 - I568
Lake Stevens,WA 98258 A..
(425)377-9708 Fax(425)377-0709
Eric Connor
TO City of Kent RE Central Ave. S Pavement Preservation
400 West Gowe ST PROJECT# 13-3004
Kent, WA 98032 FEDERAL AID#STPUL-1070 006
LADIES/GENTLEMEN:
WE ARE SENDING YOU 0 Attached ❑Under separate cover via the following items:
0 Shop Drawings ❑Pints ❑Plans ❑Sample ❑Speedcations
❑Copy of Letter ❑Change Order ❑
COPIES DATE NO. DESCIUMON
1 71612016 Revised PSE Vault Hand Rail Design& Calcs
WEARE TRANSMITTED AS CHECKED BELOW:
O ForApprovai ❑Approved as Submitted ❑Resubmit copies for approval
O For your use ❑Approved as Noted ❑Submfl copiesfordistribution
❑As requested ❑Return forconections ❑Return corrected prints
❑For review and comment ❑
❑FOR BIDS DUE 20 ❑PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPYTO Contract File
SIGNED: Michael Eichenberger
Structural Calculations
Central Ave. Vault Railing
Client: Burly Products
�rcPHEN6
oF WAsy/c�T'
0 0
p N zt�U)
�S�ONAL E �
7-1-16
REV# DATE DESCRIPTION
7/1/16 Submitted to Client
Calculations Prepared By: Ted Bernards, SE
Calculations Reviewed By: Tony Stenlund, PE
TD&H Project No: S16-122
,�
303 East Second Avenue
TD& Spokane, WA 99202
Engineering" ,!'' Ph: (509) 622-2388
Web: tdhengineering.com
el�
1,4
IC7)
41
fj J 1,
10"'u
Z 55-,, 7/ 41�
Ir
\ ii f,«
. —ir
x ' lei
i
� �
www.mlti.us Profis Anchor 2.6.6
Company: Page: 1
Specifier:
Project:
Address: Sub-Project I Pos.No.;
Phone I Fax: Date: 7/1/2016
E-Mall;
Specifier's comments:
7 Input data
Anchor type and diameter: HIT-HY 200+HAS-R 316 3/8 -
Effective embedment depth: halopl=6.890 in.(haoueg=7.500 in.)
Material: ASTM F 693
Evaluation Service Report: ESR-3187
Issued I Valid: 3N/2016 1 3/1/201 6
Proof: Design method ACI 318-14/Chem
Stand-off Installation: eb=0.000 In.(no stand-off);t=0.500 in.
Anchor plate: I,x Iyx t=8.000 in.x 6.000 in.x 0,500 In.;(Recommended plate thickness:not calculated
Profile: S shape(AISC);(L x W x T x FT)=3.000In.x 2.330In.x 0.170 in.x 0.260 in.
Base material: cracked concrete,7000,i,'=7000 psi;h=24.000 in.,Temp,shorblong:32132 T
Installation: hammer drilled hole,Installation condition:Dry
Reinforcement: tension:condition B.shear:condition B;no supplemental splitting reinforcement present
edge reinforcement:none or<No.4 bar
Geometry[in.]&Loading fib,in.lb)
Z
nt
a Z .
0
z
z
t
3
16,
�i
x
Input dadaendresuIts all be checked roragreement with thesdait, mditl.na end for plausibllilyi
PROFI$Mchor(c)2W3-2009HIti AG,F49494Schaon HIM is a registered Trademark of HOU AG,Schoen
qa
www.hiltl.us Profis Anchor 2.6.5
Company: Page: 2
Specifier: Project:
Address: Suh-Project I Pos.No.:
Phone I Fax: Date! 7/1/2016
E-Mail:
2 Proof! Utilization (Governing Cases)
Design values[lb] Utilization
Loading Proof Load Capacity P /
Tension Bond Strength - 3723 3744 100 Status 1- OK
Shear - --
Loading Utilization
Combined tension and shear loads PN - p° - -- [le,v[�] Status
3 Warnings
• Please consider all details and hints/warnings given in the detailed report)
Fastening meets the design criteria!
4 Remarks; Your Cooperation Duties
• Any and all Information and data contained in the Software concern solely the use of Hilt]products and are based on the principles,formulas and
security regulations in accordance with Hilli's technical directions and operating,mounting and assembly instructions,etc.,that must be strictly
complied with by the user. All figures contained therein r_e average figures,and therefore use-specific tests are to be conducted prior to using
the relevant HIM product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore,you bear the sole responsibility for the absence of errors,the completeness and the relevance of the data to be put In by you.
Moreover,you bear sole responsibility for having the results or the calculation checked and cleared by an expert,particularly with regard to
compliance with applicable norms and permits,prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors,the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular,you must arrange for the
regular backup of programs and data and,if applicable,carry out the updates of the Software offered by Hiltl on a regular basis.If you do not use
the AutoUpdate function of the Software,you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hill!Website, Hilt!will not be liable for consequences,such as the recovery of lost or damaged data or
programs,arising from a culpable breach of duty by you.
Input rate and results must on checked rpragreemenl wllh the.1.9ng cordNons and ror plapeihiliry!
PROPS Anchar(c)2003-2009 Hilli AG,FL-9494 Schaan M!ii is areglsleretl Trademark or Hilli AG,Srhaan
w .hiltlam Profis Anchor 2.6.6
Company: Page: 1
Specifier: Project:
Address: Sub-Project I Pos.No.:
Phone Fax: J Dale: 7/112016
E-Mall:
Specifiers comments:
1 Input data
Anchor type and diameter; HIT-RE 500 V3+HAS-R 316 318
Effective embedment depth: hatara=6.929 In,(hmmm,=7.600 in.)
Material: ASTM F 593
Evaluation Service Report: ESR-3814
Issued I Valid: 2/1/2016 11/1/2017
Proof: Design method ACI 318-14/Chem
Stand-off installation: as=0.000 in.(no stand-of);t=0.500 in.
Anchor plate: Ix x ly x t=8.000 in.x 6,000 in.x 0.600 in.;(Recommended plate thickness:not calculated
Profile: S shape(AISC);(L x W x T x FT)=3.000 in,x 2.330 in.x 0170 In.x 0.260 in.
Base material: cracked concrete,7000.fa'=7000 psi;h=24,000 in.,Temp.short/long:32/32'F
Installation: hammer drilled hole,Installation condition:Dry
Reinforcement: tenslon:condition B,shear:condition B;no supplemental splitting reinforcement present
edge reinforcement:none or<No.4 bar
Geometry[in.]&Loading[lb,In.tb]
a
nt
�o
z
o Y
0.5
i,
( a
V
Input dale and results must be checked for agreement with the existing oondlums,and forpleusibutyl n
PROFIS Anchor(c)2003-200911iltiAG.FL5494Schaan Hill isaregislered Trademedc of the AG,Schean
www.hiftl.us Profis Anchor 2.6.5
Company: Page: 2
Specifier: -- Project:
Address: Sub-Project I Pos,No.:
Phone I Fax; Date: 711/2016
E-Mail:
2 Proof I Utilization (Governing Cases)
Design values lib] Utilization
Loading Proof Load Capacity ON I jtv t°(o] Status
Tension Bond Strength - 3723 - 3734 1001. OK
Shear 4.
Loading Utilization
- --- Px 4y S fW,v[°/] Status
Combined tension and shear loads
3 Warnings
• Please consider all details and hintslwamings given in the detailed reports
Fastening meets the design criteria!
4 Remarks; Your Cooperation Duties
• Any and all Information and data contained in the Software concern solely the use of Hilti products and are based an the principles,formulas and
security regulations in accordance with Hild's technical directions and operating,mounting and assembly instructions,etc.,that must be strictly
complied with by the user. All figures contained therein are average figures,and therefore use-specific tests are to be conducted prior to using
the relevant Hilt!product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore,you bear the sole responsibility for the absen >,of errors,the completeness and the relevance ofthe data to be put in by you,
Moreover,you bear sole responsibility for having the resuss of the calculation checked and cleared by an expert,particularly with regard to
compliance with applicable norms and permits,prior to using them for your specific facility. The Software serves only as an aid to Interpret norms
and permits without any guarantee as to the absence of errors,the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular,you must arrange for the
regular backup of programs and data and,If applicable,carry out the updates of the Software offered by Hilti on a regular basis.If you do not use
the AutoUpdate function of the Software,you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilt!Website. Hill!will not be liable for consequences,such as the recovery of lost or damaged data or
programs,arising from a culpable breach of duty by you.
Input data and results must be checked for agreement Who the existing conditions and for plausibility)
PROFIS Anchor(c)2003 2009 Hil I AG,FL-9494 Schoen Hilg is a registered Trademark of Hill AG,Smaan
i
I"
i
I � i
.I
CJ I
I f, ; III
i
f
- i
�I I
i L
- I
-e L TF
I
_ I
r -
_ ,-. .
- I I
-_ - ---- it
I