Loading...
HomeMy WebLinkAboutPW16-067 - Change Order - #10 - Rodarte Construction, Inc. - James Street Pump Station - 11/10/2016 r Recordsanagement KENT Document` WASHINGTON it CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Rodarte Construction, Inc. Vendor Number: JD Edwards Number Contract Number: PW 16-067 - 011 This is assigned by City Clerk's Office Project Name: James Street Pump Station Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 2/29/16 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Garrett Inouye Department: PW Engineering Contract Amount: $2,329,398.98 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #10 As of: 08/27/14 ENT WASHING70H CHANGE ORDER N . #10 NAME OF CONTRACTOR: Rodarte Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: James Street Pump Station ORIGINAL CONTRACT DATE: February 29, 2016 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: The installation of additional storm piping and structures to help alleviate flooding on Woodford Avenue North. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,329,398.98 (including applicable alternates and WSST) Net Change by Previous Change Orders $106,801.28 (incl. applicable WSST) Current Contract Amount $2,436,200.26 (incl. Previous Change Orders) i Current Change Order $45,000.00 Applicable WSST Tax on this Change $4,275.00 Order Revised Contract Sum $2,485,475.26 CHANGE ORDER - 1 OF 3 Original Time for Completion 120 working days (insert date) li Revised Time for Completion under 11 prior Change Orders (insert date) Days Required (f) for this Change 5 calendar days Order Revised Time for Completion 136workingdays (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. �I The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CIT11 OF KE T: By: l gy; xf , ( i_ + r (signature) i, (s gnatur 2 Print Name: �� c✓'� �cti^�� Prin Name: J� (?E ItS J r G NI A L ei c/ Its @ I ce �:�" (—� itle) C,htie)f DATE: "e DATE: r' dt _ r I I CHANGE ORDER - 2 OF 3 APPROVE® AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [In this field,you may enter the electronle fleGath where the contraa has been saved] III I i i I CHANGE ORDER 3 OF 3 • T FILE No: 200.2 KEN W 9X1XOTON CHANGE ORDER WORKSHEET NO® 1 Construction Management Division - Public Works Project: James Street Pump Station Project No.: 10-30o9 Project Engineer: Garrett Inouye Fed-Aid No.: N/A Owners Rep: Phil McConnell Contractor: Rodarte Construction Date: 9/26/2016 I. PROPOSED CHANGE The installation of additional storm piping and structures II. REASON AND BACKGROUND FOR CHANGE i To help alleviate flooding on Woodford Ave N; not included in the original contract III. METHOD OF PAYMENT NEW PAY ITEM(S) ® Not Applicable Change Order No. I - I I FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est City this Unit Unit Price Total Estimated Cost of City PE Item — --- -:-_._ .-- -- -- -- - — --- -- --- 4 Addition storm piping on 1 : 0 EA $45,000 00 $45,000 00 Woodford Ave N __ 1 Independent Estimate Attached ! CREATE PAY ITEM ONLY- Payment to he made PAY THIS PAY ESTIMATE -REQUIRED �-at a later date upi n_co=letion of work __� — ---.___ _ _ - — -_ ------ __.......... .........______-__.- Material Submittals Required CC. Construction Coordinator I New Sub Reqrd? No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. I B 1 No. Item Description City Unit Unit Price Cost of Item _— I I --. .. ___ __— ---I ----� ___ ____ ...---- -- Independent Estimate Attached -REQUIRED INCREASE/DECFiEASETO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. I l - I iI I FOR ACCOUNTING USE ONLY Sch No. B.I.No. Item Description city Unit Unit Price Cost of Item - J-- - _ _- _ -- - - -............ _. -- _ ...._.. .__ ___ __ Independent Estimate Attached -REQUIRED [J 1 REV. DATE: 4/01/10 • FILE NO: 200.2 KETLT TOTAL ESTIMATED COST OF CHANGE ORDER * $45,000.00 *Total of the Cost of Item Columns THIS PAY ESTIMATE $45,000.00 IV. WORKING DAYS Original Contract 120 Due This Change Order* ! 5 Previous Total 1 131 DATE:—L-TBD * Ex lanation Justification Re wired: Additional work added to the contract TOTAL WORKING DAYS* �136 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: v a-A/" L'W Date: j- lfd Construction Supervisor: �'- V l/ _ Date: Paul Kuehne Construction Manager: Date: _71zC1101 ric Connor i i I 2 REV. DATE: 4/01/10 i McConnell, Phillip From: Bieren, Chad Sent: Friday,September 23, 2016 9:43 AM To: Connor, Eric Cc: McConnell, Phillip Subject: Re:James Street Pump Station -Added work Eric/Phil: I spoke with Tim by phone this morning. We're good to go with the changes. As Eric and I discussed, please proceed with separate change orders for each type of work. Thank you, Chad Sent from my Fhone On Sep 21, 2016, at 1:25 PM, "Connor, Eric" <EConnor@kentwa.Bov>wrote: Good Morning Chad, Below is,a summarization of the added work items that we are looking at on the James Street Pump Station Project.-All work scopes combined,the total cost of the added work is$93,033. Please be reminded that we are already moving forward with the revisions to the generator shelter($16,552) and the addition of the catwalk for the generator ($30,090). On Site Revisions/Additional Scope Added French Drain on the North Property Line: $8,068 Revised 4" Roof Drain ($10,954 add/$3,69S deduct): $7,259 1" Water Service (for irrigation): 2 977 New Contractor Pricing $18 304 Added Concrete Flatwork on West and South Sides of Property Residential Driveway (1 ea): $3,041 Commercial Driveway(1 ea): $3,489 Wheel Chair Ramp (1 ea): $2,081 Pedestrian Curb@ Ramp (18If): $1,080 Curb & Gutter(90 If @ contract unit price): $4,050 Sidewalk (50 sy @ contract unit price): $3,750 Sawcut Asphalt(250 If @ contract unit price): $1,750 Sawcut Concrete (50 If @ contract unit price): $ 500 Remove Sidewalk (70 sy @ contract unit price): $1,050 Remove Curb & Gutter(45 If @ contract unit price): $ 675 Remove Existing Asphalt(200 sy @ contract unit price): $1,000 CSTC (35 to @ contract unit price): $1,050 CSBC (135 to @ contract unit price): $4,050 HMA (40 to @ contract unit price): $4,800 Total: $32,336 1 New Contractor Pricing: $9,691 Existing Contract Unit Price Increases: $22,675 Added Storm Piping on Woodford (restoration included above) 48" Type 2 Catch Basin (1 ea): $3,000 Solid Locking Frame & Cover(1 ea): $ 550 Inlet Protection (5 ea contract unit price): $ 225 Thru Curb Inlet Casting (2 ea): $ 646 Connect to Existing 12" Storm Pipe (1 ea) $2,182 18" PVC Storm Pipe (94 If) $12,575 Clean &Test Storm Pipe $1,646 Catch Basin, Type 1L (1 ea): $1,743 Remove Existing 12" Storm (10 If @ contract unit price): $ 200 Remove Existing 6" Storm (6 If @ contract unit price): $ 200 Gravel Borrow Backfill (135 to @ contract unit price): $4,050 54" Type 2 Catch Basin (1 ea @ contract unit price): $6,500 Connect Existing 24" Storm Pipe to New 54" CB (1 ea): $6,034 Traffic Control Labor (48 hrs @ contract unit price): $2,304 Traffic Control Supervisor (6 hrs @ contract unit price): $ 288 Traffic Control Devices: 250 Total: $42,393 New Contractor Pricing: $22,567 Existing Contract Unit Price Increases: $19,826 - Please let me know,jf,you would like to review any of this work with Phil and me_ We are looking to give the Eontractor authorization to proceed with this work as early as possible: ' Thank you, Eric Eric Connor, Construction Engineering Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Phone 253-856-5533 1 Cell 253-797-0693 EConnor@KQrILWA.gov CITY OF KENT,WASHINGTON KentWA.aov Faceboo YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 2 RODARTE CONSTRUCTION, INC. P.O. BOX 1875 AUBURN,WA 98071-1875 ph 253-939-0532 fax 253-939-0557 Change Order PROPOSAL. PG 1 Customer Name Phil McConnell Date 9/15/2016 Company The City of Kent Job Name: James Street Pump Statio Address 220 Fourth Ave South State WA Zip 98032_ Revision 1 Phone 253 8554542 Fax We hereby submit specifications and estimates for the following items: i ITEM Description Quantity Unit UNIT PRICE AMOUNT 1 Woodford Ave Storm Drain Improvements Revision 1 1 LS $51,741.00 $ 51,741.00 TOTAL $ 51,741.00 NOTES: Price is for the Storm Drain improvements along Woodford Avenue as shown on the drawings 9/15/2016. Pricing does not include pipe bedding, trench backfill, 54in CB Type II, Traffic Control labor, etc.or other items already having a Contract Unit Price. These items are to be tracked and paid for under their respective bid items. Water Service Meter to be supplied by City of Kent. Roderic Construction,Inc. Page 1 JAMESPUMPCO James Street Pump Station Additional War 09/15/2016 15.12 Joan F.IIs Woodford Storm(Nmi Biditcm)Revl Activity Dese Quantity Unit Perm Constr Equip Sub- Resoume PCs Unit Cost Labor Material Matl/F_xp Ment Contract Total BID ITEM = 2 Description Woodford Storm Improvements(Non-Biditom Unit= LS Takeoff Qumr 1.000 Engr Quan: LOCO 2A 8in French Brain Quam 105.00 LF Ilrs/Shf: 8,00 Cal: 508 NYC:NONE PIP04 Slnd Water Main Crew 3.00 CII Prod: 13,1250 UH [.all PCs: 4.00 Eqp PCs: 4.00 2AGW0t 7/8"Washed Rock@ 121% 100.00 1 N 14.800 1,791 1,791 2DUMPI Dump fee clean fr@121% 70.00 CY 12.500 1,059 1,059 2GE02 Gcotextile Fabric@121% 1.00 RL 250.000 303 303 2PIPE Pipe Material@121% 105.00 LP 8,000 1,016 1,016 811420 420 Cat Backhoc 1.00 8.00 IIR 50 040 400 400 8E309 Caterpillar 308 Excava 1.00 9.00 HR 5T580 461 461 I SLI Caterpillar 9240 Loade 1.00 8.00 IIR 57,320 459 459 8PU350 Ford F350 Suporduty 1.00 8.00 IIR 22.590 181 181 GL General Laborer 2.00 16.00 MH 66.050 t,057 1,057 OP Operator 2.00 I6.0o MH 83.890 t,342 1.3,12 58,06T73 0.3047 MIULF 32.00 MH 122.8481 2,399 4,168 1,500 8,068 2B 4in BI Storm Quail: 1.00 LS Ilrs/Shft: 8.00 Cal: 508 WC:NONE Pipe Bedding, Trench Backfill to be paid at Contract unit, prices. MCO2 Mise Crew(B575) 16.00 CII Prod: 0.0625 UH lab PCs: 3.00 Eqp Pcs:. 3.00 2PIPE Pipe,Muteriat@121% 1.00 I's 4,475.000 5,415 - 5.415 8B420 420 Cat Backhoe Lo0 16.00 HE 50.040 _ 80t .._ 801 8E308 Caterpillar 309 HNeava 1.00 16.60 HR 57.580 92t 921 8PU350 Ford F350 Superduty 1.00 16.00 IIR 22.590 361 361 GI. General Laborer 2.00 32,00 MH 66.050 2,114 2,114 OP Operator 1.00 t6.00 M11 83,890 1.342 1,342 $10,953.95 - 48,0000 MH/LS 48.00 MH [3455.84] 3,456 5,415 2,083 10,954 2C Credit far 4in and Cores a t Structures Quail: -1.00 LS Hrs/Shft: 8,00 Cal: 508 WC:NONE PIP04 Stud Water Main Crew -4,00 CH Prod: 0,2500 IJH Lab PCs: 4.00 Eqp PCs: 2.00 2PIPE Pipe Material -75.00 LF 15,960 -1,197 -1,197 4CORE Coring SU➢@112% -3.00 EA 300.000 -1,008 -1,008 HR420 420 Cat➢actdrme 1,00 4.00 HR 50.040 -200 -200 8PU350 Ford F350 Superduty 1.00 4.00 HR 22,590 -90 -90 GL General Laborer 2.00 -8.00 NEI 66,050 -528 -528 OP Operator 2,00 -8.00 MII 83.890 -671 -671 .$-3,695.04 16.0000 -16.00 [ ] -1,200 -1,197 -291 -1,008 -3,695 2D Tluu Curb Inlet Casting Quam: 1.00 EA Hrs/Shft: 8,00 Cal: 508 WC:NONE MCO2 Mise Crew(B575) 1.00 CH Prod: 1.0000 UH Lab PCs: 3.00 Eqp Fes: 2.00 2THRU(JJRB Thin Curb Inlet@I21% 1.00 EA 295A00 357 357 811420 420 Cat Backhue Loo L00 HR 50.040 50 50 8PU350 Ford F350 Superduty Loo L00 HR 22.590 23 23 GL General Laborer 2.00 2.00 MI1 66.050 132 t32 OP Operator 1.00 1.00 MH 83.890 84 84 $645.57 10000 MH/EA 3.00 MH [215.991 216 357 73 646 2E Connect to Existing 12in SD Quail: 1.00 EA Hrs/Shft: 8.00 Cal: 508 WC:NONE PIPot Stnd.Sewer Crew 2.00 CII Prod: 0.5000 UH Lab PCs: 5.00 Eqp PCs. 5.00 2PIPE Pipe Material@121% 1.00 LS 70U00 847 847 8R420 420 Cat➢ackhoe 1.00 2.00 HR 50.040 Pon 100 8E320 Caterpillar 320U Excav L00 200 HR 106.340 20 2t3 8MBOX Trench Box 1.00 2.00 IIR t h200 22 22 SPU350 Ford F350 Superduty L00 2.00 HR 22.590 45 45 8TSOLO Solo Dump Truck Leo 100 IIR 103 680 207 207 Rodarte Construction,Inc. Page 2 JAMF.SPUMPCO lames Street Pump Station Additional War 09/I S/2016 15:t2 Jahn Ells Woodford Storm(Non-Biditenr)Rev1 Activity Dese Quantity Unit Perm Corear Equip Sub- Resource PCs Unit Cost Labor Material Mad/Exp Ment Contract Total I BID ITEM = 2 ' Description Woodford Stonn Improvements(Non-➢iditem Unit= LS Takeoff Quan: L000 Engr Quan: L000 GL General Laborer 2.00 4.00 MH 66.050 264 264 OP Operator 2.00 4.00 MH 83.890 336 336 TD2 Truck Driver-Solo 1.00 2.00 MI-I 73.970 148 148 $2,t82/10 10.0000 MH/FA 10.00 MH [747.71 748 847 588 2,182 2F Hill PVC Pipe Quan: 93.00 LF Hrs/Shft: 8.00 Cal: 508 WC:NONE PIP01 Stnd.Sewer Crew 12.00 CH Prod: 7.7500 UH Lab PCs: 6.00 Fop PCs: 6.00 2PIP6 Pipe Maleria]@121% 93.00 LF 29.390 3,307 3,307 8R420 420 Cat Backhoe Loo 12.00 HE 50.040 600 600 8E228 Komatsu PC228 Excavato 1.00 12.00 IIR 120.030 1,440 1,440 811XP Pipe Laser Lo0 [2.00 HR 7,000 84 84 8MROX 'french Box 1.00 12.00 HR 11,200 134 134 8PU350 Ford F350 Superduly 1.00 t2.00 HR 22.590 271 271 8TSOLO Salo Dump Truck 1.00 12.00 IIR 103.680 1,244 1,244 GL General Labeler 2.00 24.00 MH 66.050 1,585 1.585 OP Operator 3.00 36.00 MH 93.990 3,020 3,020 TD2 'frock Driver-Soto L00 t2.00 MH 73.970 888 888 $12,574.62 0.7741 MH/LF 72.00 MII [59.063] 5,493 3,307 3,774 12,575 2G Pi essure'Pcst and Cleaning', Quan: 1.00 LS Hrs/Shft: 8,00 Cal: 508 WC:NONE" MCO2 Miso Crew(8575) _ _ 4.00 CH Prod: 0.2500 UH Lab PCs: 200-1,_t Eqp PCs: 2.00 4If1'IL 'Utility SUB( 1.00I.5 675.000 "" 756 756 8B420 420 Cat Backhoe 1.00 4.00 HR 50.040 200 200 8PU350 Ford F350 Superduty 1.00 4.00 HR 22590 90 90 GL, General Laborer L00 4.00 MH 66.050 264 264 OP Operator 1.00 4.00 MH 83.890 336 336 $1,64628 8.0000 MHA,S 8.00 MH [599.761 600 291 756 1,646 211 CB Type 11, Quan: 1.00 EA Hrs/Shft: 8.00 Cal: 508 WC:NONE j PIP01 Said,Sewer Crew L50 CH Prod: 0.6667 I1H Lab Pcs: 6.00 Eqp PCs: 6.00 2FNG Franrc and Grateab 121% 1.00 EA 150 000 192 182 2PIP6 Pipe Material@121% 1.00 EA 350.000 424 424 SB420 420 Cat Backhoe 1.00 1.50 HR 50.040 75 75 8E320 Caterpillar 320U Excav, 1.00 L50 HR 106.340 t60 160 8LXP Pipe Laser 1.00 L50 HR T000 11 11 8MBOX Trench Box L00 1.50 IIR 11.200 17 17 9PU350 Ford F350 Superduty, 1.00 1 50 HR 22.590 34 34 8TSOLO Solo Dunrp'frock 1.00 L50 HR 103.680 156 156 GL General Laborer 2.00 3.00 MH 66.050 199 198 OP Operator 3.00 4 50 MH 93.890 378 378 TD2 'Truck Driver-Solo L00 1.50 MH 73.970 111 t l t $L742.89 9.0000 MIUEA 9-00 MH [686621 687 605 451 1,743 21 Residential Driveway Quan: 1.00 LS Hrs/Shfi: 8.00 Cal: 508 N1'C:NONE MCO2 Misc Craw(R575) 2.00 CII Prod: 0.5000 U11 Lab PCs: 3.00 Bop Pcs: 2.00 4CONC Concrete SU➢@I t2% 1.00 1.8 2,200,000 2A64 2,464 8B420 420 Cat Backhee Lo0 200 FIR 50.040 t00 too 8PU350 Find F350 Superduty I.00 2.00 IIR 22,590 45 45 GL General Laboiur 2.00 L00 MH 66.050 264 264 OP Operator 1.00 2.00 MH 93,890 168 168 $3,041.24 6.0000 MH/LS 6.00 MH [431,981 432 145 2,464 3,041 2K Commercial Driveway Quan: 1.00 LS Hrs/ShR: 8.00 Cal: 503 WC:NONE MCO2 Misc Crew(B575) 2.00 CH Prod: 0.50001JH Lab PCs: 3.00 Eqp PCs: 2.00 t Redarte Construction,Inc. Page 3 JAMF.SPUMPCO James SbeetPmnp Station Additional Wor 09/t5/2016 15:12 John Ells Woodford Storm(Non-Bidi(mu)Revl Activity Ease Quantity Unit Perin Conor Equip Sub- Resource Pas Unit Cost Labor Material Mad-Exp Ment Contract Total BID ITEM = 2 Description Woodford Storm Improvements(Non-Biditem Unit= LS TakcnffQuan: 1.000 Engr Quan: 1.000 4CONC Concrete SUBCa,112% 1.00 LS 2,600.000 2,912 2,912 813420 420 Cat Dackhue 1.00 2.00 FIR 50.040 100 100 8PU350 Ford F350 Superduty 1.00 2.00 HR 22,590 4S 45 GL General Laborer 2.00 4.00 ME 66.050 264 264 OF Operator 1.00 2.00 MII 83.890 168 168 $3,48924 6,0000 MUFFS 600 MH [431.98] 432 145 2,912 3,489 2L Romp WDOT F40.12-03 Quail: 1.00 LS Hrs/Shft•. 8.00 Cal: 508 WC:NONE MCO2 Misc Crew(B575) 1.00 CH Prod: 1.0000 UH Lab Pcs: 3.00 Eqp Pox: 2.00 4CONC Concrete SOB@112% L00 LS 1,600.000 L792 1,792 813420 420 Cat Bacldme 1,00 1 00 HR 50.040 50 50 8PIJ350 Ford F350 Superduty L00 1.00 HR 22590 23 23 GL General Laborer 2.00 2.00 MH 66.050 132 132 OP Operator 1.00 1.00 MII 83.890 84 84 $2,080.62 3,0000 MH/IS 3.00 MH [215.99] 216 73 1,792 2.091 2M New l in Service including Abandon Exist Qnmr: 1.00 LS Hrs/Shft: 8.00 Cad: 508 WC:NONE City of Kent to Supply Meter. MCO2 Misc Crew(B575) 6U0 CH Prod: 0.1667 UH Lab PCs: 13,00 Eqp Pea: 3.00 2PIPE Pipe Material 1.00 LS 900.000 900 900 811420 420 Cat Backhoe 1.00 6.00 HR 50.040 300 300 8E308 Caterpillar 308 Excava 1.00 6.00 HR 57.580 - 345 345 8PLL350 Ford F350 Superduty 1.00 6.00 HR 22.590 136 136 GL General Laborer 2.00 12.00 MII 66.050 793 793 OP Operator 1.00 6.00 MU 83,890 503 503 $2,977.20 18.0000 MIl/LS 18.00 MH [ 1295.94] 1,296 900 781 2,977 20 Reconnect Existing Pipe to New Manhole Quail: 2.00 EA Hrs/Shft: 8.00 Cal; 508 WC:NONE 24in DI to be paid at Contract Unit prices (CBV) PIP01 Stud.Sewer Crew L00 CH Prod: 0,5000 UH Lab Pcs: 6.00 Fqp Pcs: 6.00 2ROMAC Romac Fittings 2.00 EA L500.000 3,000 3,000 8B420 420 Cat Backhne 1.00 F00 IIR 50.040 200 200 8E320 Caterpillar 320I 1 Excav IA0 4.00 IIR 106340 425 425 8LXP Pipe Laser 1.00 4.00 HI2 7.000 28 28 SMBOX Trench Box 1.00 4,00 HR 11200 45 45 8PU350 Ford F350 Superduty 1.00 F00 IIR 22.590 90 90 8TSOLO Solo Dump Truck 1.00 4.00 IIR 103.680 415 415 GL General Laborer 2.00 8.00 MII 66.050 528 528 OP Operator 3.00 12.00 MH 83.890 1,007 1,007 TD2 Track Drivor-Solo IA0 4.00 MII 73.970 296 296 56,03436 12.0060 MH/FA 2490 MII [915.48] 1,831 3,000 1,203 6,034 I, > Item Totals: 2 - Woodford Storm Improvements(Non-Biditem $51,74106 22.3.0000 MH/LS 22300 MII [17804.681 16,605 17402 10,817 6,916 51,741 51,74L060 I IS 16,605A6 17,102A1 10,817.49 6,916.00 fL74lU6 $m,741.06 -- Report Totals ... 223.00 MH 16,605 t7,402 10,817 6,916 51,741 >>>indicates Non Additive Activity ------Report Notes------ 'file estimate was prepared with TAKEOFF Quantities - 'Ihis report shows TAKEOFF Quantities with the resources. Redone Construction,tire. Page 4 i JAMESPUMPCO .lames Street Pump Station Additional Wor 09/15/2016 15:12 .total Ells Woodford Smoun(Non-Biditenr)RevJ - i Activity Dose Quantity Unit Penn Constr Equip Suh- Resource Pcs Unit (lost Labor Material Matl/Cxp Ivent Contract Total BIDITEM = 2 Description- Woodford Storm Improvements(Non-Didnem Unit= LS 'I'akeoffQuan: 1.000 Hngr Quan: I.000 Bid Date: Owner: Engineering Firm: Estimmur-ln-Charge:JR RODARTP, SOB NOTES Estimate created on: 05/07/2008 by User#: 1 - John El.Is Source estimate used: 1:\11EAVYBID\EST\CHNGMAST created on: 08/26/2016 by User#: 1 - John F11s Source estimate used: L:\HF7WYBID\EST\PORCEACCOUNT `on units of MH indicate average labor unit cost%vas used rather than base rate. [ ]in the Unit Cost Commit-Labor Unit Cost Without Labor Burdens Tn equipment resources, renL ij and EOE % not = 100% are represented as XXX96YYY cohere XXX=Rent% and YYY=EOE% ------Calendar Codes------ 507 5 Day Week-7 Hour Day 508 8Hour Day-5 Day Week(Default Calendmr) 510 l0 Hour Day/5 Day Week 512 12 Hour Day-5 Day Week 610 10 Hour Day-6 Day Week I