HomeMy WebLinkAboutPW16-067 - Change Order - #8 - Rodarte Construction, Inc. - James Street Pump Station - 11/10/2016 i, Records T Document ' WA9 H�NGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Rodarte Construction, Inc. Vendor Number: JD Edwards Number Contract Number: PW 16-067- 00'", This is assigned by City Clerk's Office Project Name: James Street Pump Station Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 2/29/16 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Garrett Inouye Department: PW Engineering Contract Amount: $2,329,398.98 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #8 As of: 08/27/14 h KENT j wAS NiHo, CHANGE ORDER NO. #8 NAME OF CONTRACTOR: Rodarte Construction, Inc. (`Contractor") CONTRACT NAME & PROJECT NUMBER: James Street Pump Station ORIGINAL CONTRACT DATE: February 29, 2016 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any I prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Installation of a water service, french drain, and roof drain rerouting which are required to complete the project. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,329,398.98 (including applicable alternates and WSST) Net Change by Previous Change Orders $47,671.28 (incl. applicable WSST) Current Contract Amount $2,377,070.26 (incl. Previous Change Orders) Current Change Order $20,000.00 Applicable WSST Tax on this Change $1,900.00 Order i Revised Contract Sum $2,398,970.26 CHANGE ORDER - 1 OF 3 i Original Time for Completion 120 working days (insert date) Revised Time for Completion under 2 prior Change Orders (insert date) Days Required (f) for this Change 4 calendar days Order Revised Time for Completion 126 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: (signature) tf' (si nature) Print Name: / f Print Name: w(6 v e ItS Prcq1-L&f— Its �1��t! ( Ie, - ( tie) DATE: C DATE: / af� 74/4' CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [In this field,you may enter the electronic filepath where the ron[radt has been saved] 1 i I I CHANGE ORDER 3 OF 3 KEN T FILE NO: 200.2 CHANGE ORDER WORKSHEE'T NO. S _ Construction Management Division - Public Works Project: James Street Pump Station Project No.: 10-3009 Project Engineer: Garrett Inouye Fed-Aid No.: N/A Owners Rep: Phil McConnell Contractor: Rodarte Construction Date: 9/26/2016 I. PROPOSED CHANGE Installation of a water service, french drain and roof drain rerouting II. REASON AND BACKGROUND FOR CHANGE Items required to complete project; not included in the original contract III. METHOD OF PAYMENT NEW PAY ITEM(S) [:] Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of I City PE Item i 4 On site revisions / Additional T 0 EA $20,000.00 $20,000.00 Independent Estimate Attached ® I CREATE PAY ITEM ONLY— Payment to be made i PAY THIS PAY ESTIMATE - REQUIRED I at a later date upon completion of work Material Submittals Reauired — CC: Construction Coordinator New Sub Reqrd? i No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. i - FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description _ City Unit Unit Price Cost of Item El i Independent Estimate Attached - REQUIRED ❑ INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY rSch. No. B.I.No. Item Description City_ Unit Unit Price _ I _ _ _C_ost of Item i Independent Estimate Attached -REQUIRED I 1 REV. DATE: 4/01/10 I I T FILE NO: 200.2 TOTAL ESTIMATED COST OF CHANGE ORDER * $20,000.00 *Total of the Cost of Item Columns THIS PAY ESTIMATE $20,000.00 IV. WORKING DAYS Original Contract 120 Due This Change Order 4 Previous Total A. 122 DATE: FTBD LDATE_I TBD *-! Explanation 13ustification Re uired: Additional work added to the contract TOTAL WORKING DAYS* 126 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared..By: � T�ww..�— Date: Construction Supervisor: - Date: i Paul Kuehne Construction Manager: Date: Eric Connor 2 REV, DATE: 4/01/10 I McConnell, Phillip From: Bieren, Chad Sent: Friday, September 23, 2016 9:43 AM To: Connor, Eric Cc: McConnell, Phillip Subject: Re:James Street Pump Station -Added work Eric/Phil: I spoke with Tim by phone this morning. We're good to go with the changes. As Eric and I discussed, please proceed with separate change orders for each type of work. Thank you, Chad Sent from my iPhone On Sep 21, 2016, at 1:25 PM, "Connor, Eric" <EConnorlakentwa.aov> wrote: Good Morning Chad, Below is.a summarization of the added work items that we are looking at on the James Street Pump - Station Project.-All work scopes combined,the total cost of the added work is$93,033. Please be reminded that we are already moving forward with the revisions to the generator shelter($16,552)and the addition of the catwalk for the generator($30,090). on Site Revisions/Additional Scope Added French Drain on the North Property Line: $8,068 Revised 4" Roof Drain ($10,954 add/$3,695 deduct): $7,259 1" Water Service (for irrigation): 2 g77 New Contractor Pricing $18 804 Added Concrete Flatwork on West and South Sides of Property Residential Driveway (1 ea): $3,041 Commercial Driveway (1 ea): $3,489 Wheel Chair Ramp (1 ea): $2,081 Pedestrian Curb @ Ramp (18 If): $1,080 Curb & Gutter(90 If @ contract unit price): $4,050 Sidewalk (50 sy @ contract unit price): $3,750 Sawcut Asphalt(250 If @ contract unit price): $1,750 Sawcut Concrete (50 If @ contract unit price): $ 500 Remove Sidewalk (70 sy @ contract unit price): $1,050 Remove Curb& Gutter(45 If @ contract unit price): $ 675 Remove Existing Asphalt(200 sy @ contract unit price): $1,000 CSTC (35 to @ contract unit price): $1,050 CSBC (135 to @ contract unit price): $4,050 HMA (40 to @ contract unit price): 4 800 Total: $32,336 1 i, New Contractor Pricing: $9,691 Existing Contract Unit Price Increases: $22,675 Added Storm Piping on Woodford (restoration included above) 48" Type 2 Catch Basin (1 ea): $3,000 Solid Locking Frame & Cover (1 ea): $ 550 Inlet Protection (5 ea contract unit price): $ 225 Thru Curb Inlet Casting (2 ea): $ 646 Connect to Existing 12" Storm Pipe (1 ea) $2,182 18" PVC Storm Pipe (941f) $12,575 Clean &Test Storm Pipe $1,646 Catch Basin, Type 1L(1 ea): $1,743 Remove Existing 12" Storm (10 If @ contract unit price): $ 200 Remove Existing 6" Storm (6 If @ contract unit price): $ 200 Gravel Borrow Backfill (135 to @ contract unit price): $4,050 54"Type 2 Catch Basin (1 ea @ contract unit price): $6,500 Connect Existing 24" Storm Pipe to New 54" CB (1 ea): $6,034 Traffic Control Labor(48 hrs @ contract unit price): $2,304 Traffic Control Supervisor(6 hrs @ contract unit price): $ 288 Traffic Control Devices: 250 Total: $42,393 New Contractor Pricing: $22,567 Existing Contract Unit Price Increases: $19,826 Please let me know.ifyou would like to review any of this work with Phil and me__, We are looking to give -the contractor authorization to proceed with this work as early 8'possible: Thank you, Eric Eric Connor, Construction Engineering Manager Construction Management I Public Works Department il 220 4th Avenue South, Kent, WA 98032 Phone 253-856-5533 1 Cell 253-797-0693 EConnor@KentWA oov CITY OF KENT,WASHINGTON KentWA.go Facebook 7witte€ YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 2 RODARTE CONSTRUCTION, INC. P.O. BOX 1875 AUBURN,WA 98071-1875 ph 253-939-0532 fax 253-939-0557 _ Change Order PROPOSAL PG 1 Customer Name Phil McConnell Date 9/15/2016 Company The City of Kent _ Job Name: James Street Pump statio Address 220 Fourth Ave South State WA _ Zip 98032 Revision 1 Phone 253 856-5542 _ Fax We hereby submit specifications and estimates for the following items: I ITEM Description Quantity Unit UNIT PRICE AMOUNT 1 Woodford Ave Storm Drain Improvements Revision 1 1 LS $51,741.00 $ 51,741.00 $ TOTAL - $ 5174100 NOTES: Price is for the Storm Drain improvements along Woodford Avenue as shown on the drawings 9/15/2016. Pricing does not include pipe bedding, trench backfill, 54in CB Type II, Traffic Control labor, etc, or other items already having a Contract Unit Price. These items are to be tracked and paid for under their respective bid items. Water Service Meter to be supplied by City of Kent. Rodarte Construction,Inc. Page I JAMESPUMPCO James Street Pump Shation Additional War 09/15/2016 15:12 John Ells Woodford Storm(Non-Riditem)Rev1 Activity Dese Quantity Unit Penn Constr Equip Sub- Resource Pcs Unit Cost Labor Material Matl/Exp Ment Contract Total BID ITEM = 2 Description= Woodford Storm Improvements(Non-Bidilem Unit= LS Takeoff Quan: 1.000 Engr Quan: 1.000 2A 8m French Drain Quan: 105.00 LF Hrs/Slift: 8.00 Cal: 508 WC:NONE PIP04 Stnd Water Main Crew 8.00 CH Prod: 13.1250 UII Lab Pcs: 4.00 Eqp Pes: 4.00 2AGW01 7/8"Washed Rock@l21% 100.00 TN 14.800 1,791 1,791 2DUMPI Dump fee clean fi@121% 70.00 CY 12,500 1,059 1,059 2GE02 Geotextile Fabric@121% 1.00 RL 250.000 303 303 2PIPE Pipe Material@12l% 105.00 LF 8.000 1,016 1,016 8B420 420 Cat Backhoe 100 8.00 HR 50.040 400 400 8E308 Caterpillar 308 Excava 1.00 8,00 IDd 57.580 461 461 SLI Caterpillar 924G Loade 1.00 8.00 HR 57,320 459 459 8PU350 Ford F350 Superduty 1.00 5,00 HR 22.590 I81 191 GL General Laborer 2.00 16,00 NEI 66,050 1,057 1,057 OP Operator 2.00 16.00 MH 83.890 1,342 1,342 $8,067.73 0.3047 M1-11F 32.00 MH [22848] 2,399 4,168 1,500 8,068 2B 41n DI Storm _ Quill: 1.00 LS Hi s/Shftn 8.00 Cal: 508 WC:NONE Pipe Bedding, Trench Backfill to be paid at Contract unit prices. MCO2 Mise Crew(11575) - 16.00 CH Prod: 0.0625 UH Lab Pcs: 3.00 Eqp Fes: 3.00 2PIPE Pipe Material@121% 1.00 LS 4,475.000 5;4d5 - 5,415 8B420 420 Cat Backhoe L00 16.00 HR 50.040 801 _ 801 8E308 Caterpillar 308 Excava 1.00 16.00 HR 57,590 921 921 8PU350 Ford F350 Superduty 1,00 16.00 HR 22,590 361 361 GL General Laborer 2.00 32.00 MH 66.050 2,114 2,114 OP Operator 1.00 [6.00 MH 83,890 1,342 1,342 $10,953.95 48,0000 MH/LS 48.00 MH [3455.84] 3,456 5,415 2,083 10,954 2C Credit for 4in and Cares at Structures Quan: -1.00 LS Hrs/SLft: 8.00 Cal: 508 WC:NONE PIP04 Sind Water Main Crew -4,00 CH Prod: 0.2500 UH Lab Pcs: 4.00 Eqp Fes: 2.00 2PIPE Pipe Material -75.00 LF 15.960 -1,197 -1,197 4CORE Coring SUB@[12% -3.00 EA 300.000 -1,008 -1,008 SB420 420 Cat Backhoc 1,00 -4.00 HR 50T40 -200 -200 8PU350 Ford F350 Superduty 1.00 -4.00 HR 22.590 -90 -90 GL General Laborer 2.00 -8.00 MH 66.050 -528 _528 OF Operator 2.00 -8.00 MII 83.890 -671 -671 $-3,695.04 16.0000 -16.00 [ ] -1,200 -1,197 -291 -1,008 -3,695 2D Thru Curb Inlet Casting Quan: 1.00 EA Hrs/Shft: 8.00 Cal: 508 q'C:NONE MCO2 Mise Crew(13575) 1.00 CH Prod; 1.0000 UH Lab Pox: 3.00 Eqp PCs: 2.00 �I 2THRUCURB Thor Curb Inlet@121% 1.00 EA 295.000 357 357 8B420 420 Cat Backhoe 1.00 L00 HR 50.040 50 50 8PU350 Ford F350 Superduty 1,00 LOD HR 22.590 23 23 GL General Laborer 2.00 2.00 MH 66.050 132 132 OP Operator 1.00 1.00 MH 83,890 84 84 $645.57 3.0000 MH/EA 3.00 MH [215.99] 216 357 73 646 2E Connect to Existing 12in SD Quan: 1.00 EA Hrs/Sluff: 8.00 Cal: 508 WC:NONE PRO 1 Stnd.Sewer Crew 2.00 CII Prod: 0.5000 UII Lab Pcs: 5.00 Eqp Fes: 5.00 2PIPE Pipe Material@ 12 1% 1.00 LS 700.000 847 847 813420 420 Cat Backhoc 1.00 2.00 IIR 50.040 100 100 8E320 Caterpillar 320U Exeav 1.00 2.00 HR 106.340 213 213 811111 Trench Box 1.00 2,00 HR 11.200 22 22 8PU350 Ford F350 Superduty 1.00 2.00 HR 22.590 45 45 8TSOLO Solo Dump Truck 1.00 2.00 HR 103.680 207 207 Rodarte Construction,Inc. o I� Page 2 JAMESPUMPCO James Street Pump Station Additional Wor 09/152016 15:12 John Ells Nroodfard Star'm(Nono-Biditem)RerQ Activity Desc Quantity Unit Perm Constr Equip Sub- Resource PCs Unit Cost Labor Material Matl/Bxp Merit Contract Total BID ITEM = 2 Description= Woodford Storm Improvements(Non-Biditem Unit= LS Takeoff Quan: 1.000 Engr Quan: 1,000 GL General Laborer 2.00 4.00 MH 66.050 264 264 OP Operator 2.00 4.00 MH 83.890 336 336 TD2 Truck Driver-Solo 1.00 2.00 MH 73.970 148 148 $2,182.40 10.0000 MH/EA 10.00 MH [747.7] 748 847 598 2,182 2F ISin PVC Pipe Quan: 93.00 LF Hrs/ShfC 8.00 Cal: 508 WC:NONE PIPOI Solid.Sewer Crew 12.00 CH Prod: 7.7500 LIII Lab Pcs: 6.00 Eqp PCs: 6.00 2PIPE Pipe Material@121% 93.00 LF 29.390 3,307 3,307 813420 420 Cat Backhoe 1.00 12.00 HR 50.040 600 600 8E228 Komatsu PC228 Excavato 1.00 12.00 HR 120.030 1,440 1,440 SLXP Pipe Laser 1.00 12.00 HR 7.000 84 84 8MBOX Trench Box 1.00 12A0 HR 11.200 134 134 8PU350 Ford F350 Superduty 1.00 12.00 HR 22,590 271 271 8TSOL0 Solo Dump Truck 1,00 12.00 HR 103.680 1,244 1,244 GL General Laborer 2.00 24.00 MH 66.050 1,585 1,585 OP Operator 3.00 36.00 MH 83.990 3,020 3,020 TD2 Truck Driver-So[o Lou 12.00 MH 73.970 888 888 S12,574.62 0.7741 MH/LF 72.00 MH [59.063] 5,493 3,307 3,774 12,575 2G Pressure Test and Cleaning-. rI, Quan: 1.00 LS Hrs/Shf: 8.00 Cal: 508 WC:NONE, MCO2 Misc Crew(BS75) 4.00 CH Prod: 0.2500 UH Lab PCs: 1002a.t Eqp Pcs: 2.00 4UTIL Utility SUB@I 12% 1.00 IS 675.000 - '- 756 756 8B420 420 Cat Backhoe - 1.00 4.00 HR 50.040 200 200 8PU350 Ford P350 Superduty, 1.00 4.00 HR 22.590 90 90 GL General Laborer 1.00 4.00 MH 66,050 264 264 OF Operator 1.00 4.00 MH 83.890 336 336 $1,646 28 8.0000 MH/LS 8.00 MH [599.76] 600 291 756 1,646 2H CB Type IL Quan: 1,00 EA Hrs/Shft: 8,00 Cal: 508 WC:NONE PIP01 Stnd.Sewer Crew 1.50 CH Prod: 0.6667 UH Lab PCs: 6.00 Eqp PCs: 6.00 2FNG Franre and Grate@121% 1.00 EA 150.000 182 182 2PIPE Pipe Material@121% 1.00 EA 350.000 424 424 813420 420 Cat Backhoe 1.00 1.50 HR 50.040 75 75 8E320 Caterpillar 32OU Exeav 1.00 1.50 HR 106,340 160 160 8LXP Pipe Laser 1.00 1.50 HR 7000 11 11 8MBOX Trench Box 1.00 1.50 HR IL200 17 17 8PU350 Ford F350 Superduty LOO 1.50 HR 22.590 34 34 8TSOLO Salo Dump Truck LOo 150 HR 103.680 156 156 GL General Laborer 2.00 3.00 MH 66.050 199 198 OP Operator 3.00 4.50 MH 83.890 378 378 TD2 Truck Driver-Solo 1.00 1.50 MH 73,970 111 111 $1,742.89 9.0000 MH/EA 9.00 MH (686,62] 687 605 451 1,743 2J Residential Driveway Quail: 1.00 LS Hrs/Shft: 8.00 Cal: 508 WC:NONE MCO2 Misc Crew(13575) 2.00 CH Prod: 0.5000 U1I Lab Pcs: 3.00 Eqp PCs: 2.00 4CONC Concrete SUB@112% 1.00 LS 2,200.000 2,464 2,464 SB420 420 Cat Backhoe 1.00 2.00 HR 50.040 100 100 8PU350 Ford F350 Superduty 1.00 2.00 HR 22.590 45 45 GL General Laborer 2.00 4.00 MII 66.050 264 264 OF Operator 1.00 2.00 MH 83,890 168 168 $3,041.24 6.0000 MIDLS 6.00 MH [431.98] 432, 145 2,464 3,041 2R Commercial Driveway Quail: 1.00 LS Hrs/ShfC 8.00 Cal: 508 WC:NONE i MCO2 Misc Crew(R575) 100 CH Prod: 0S000 UH Lab Pcs: 3.00 Eqp PCs: 2.00 Rodarte Construction,Inc. Page 3 JAMF,SPUMPCO James Street Pump Station Additional Wor 09/15/2016 15:12 John Ells Woodford Storm(Non-Biditem)Revl Activity Dese Quantity Unit Perm Consu Equip Sub- Resource PCs Unit Cast Labor Material Mad/F.xp Ment Contract Total BID ITEM = 2 Description= Woodford Stara Improvements(Non-Biditem Unit= LS Takeoff Qum: 1.000 Engr Quan: 1.000 4CONC Concrete SUD@112% 1.00 LS 2,600.000 2,912 2,912 813420 42.0 Cat Backhoe 1.00 2.00 HR 50.040 100 100 8PU350 Ford F350 Superduty 1.00 2.00 HR 22,590 45 45 GL General Laborer 2.00 4.00 MH 66.050 264 264 OF Operator 1.00 2.00 MH 83.890 168 168 $3,48%24 6.0000 MH/LS 6.00 MH [43 L98] 432 145 2,912 3,489 2L Ramp WDOT F40.12-03 Qn2111 1.00 LS Hrs/Shft: 8.00 Cal: 508 WC:NONE MCO2 Mice Crew(B575) 1.00 CH Prod: 1.0000 UH Lab Pea: 3.00 Eqp PCs: 2.00 4CONC Concrete SUB@112% 1.00 LS 1,600.000 1,792 1,792 813420 420 Cat Backhae 1.00 1.00 HR 50.040 50 50 8PU350 Ford F350 Superduty 1.00 1.00 HR 22.590 23 23 GL General Laborer 2.00 2.00 MH 66,050 132 132 OP Operator 1.00 1.00 MII 83.890 84 84 $2,080.62 3.0000 MH/LS 3,00 MIl [215.99] 216 73 1,792 2,081 2M New lin Service including Abandon Exist Quan; 1.00 LS Hrs/Shft• 8.00 Cal: 508 WC:NONE City of Kent to Supply Meter. MCO2 Mise Crew(B575) _ 6.00 CII Prod: 0.1667 UH Lab Pes: 13.00 Eqp Pes: 3.00 - 2PIPE Pipe Material 1.00 LS 900,000 900 900 811420 420 Cat Dackhoc 1.00 6.00 HR 50.040 300 300 8E308 Caterpillar 308 Excava 1.00 6.00 HR 57.580 345 345 8PU350 Ford F350 Superduty 1.00 6.00 HR 22.590 136 136 GL General Laborer 2.00 12.00 MH 66,050 793 793 OF Operator 1.00 6.00 MH 83.890 503 503 $2,977.20 18,0000 MII/LS 18.00 MH [ 1295.94] t,296 900 781 2,977 20 Reconnect Existing Pipe to New Manhole Quan: 2.00 EA Hrs/Sl ft: 8.00 Cal: 508 WC:NONE 24in DI to be paid at Contract Unit prices (CBff7) FIFO Stnd.Sewer Crew 4.00 CH Prod: 0.5000 U1I Lab PCs: 6.00 Eqp PCs: 6.00 2ROMAC Romac Fittings 2.00 EA 1,500.000 3,000 3,000 8B420 420 Cat Backhoe 1.00 4.00 HR 50.040 200 200 8E320 Caterpillar 32OU Excav 1.00 4.00 HR 106.340 425 425 8LXP Pipe Laser 1.00 4.00 HR 7.000 28 28 8MBOX Trench Box 1.00 4.00 HR 1L200 45 45 8PU350 Ford F350 Superdul 1.00 4.00 HR 22.590 90 90 ET90LO Solo Dmnp Truck 1.00 4.00 HR 103.680 415 415 GL General Laborer 2.00 8.00 MH 66.050 528 528 OP Operator 3.00 t2.00 MH 83.890 1,007 1007 TD2 Truck Driver-Soto 1.00 4.00 MI1 73.970 296 296 $6,034.36 12.0000 MH/EA 24.00 M11 [915.48] 1,831 3,000 L203 6,034 > Bear Totals: 2 - Woodford Storm Improvements(Non-Biditem $51,741.06 223,0000 MH/LS 223.00 MH [ 17804.68] 16,605 17,402 10,817 6,916 51,741 51,741,060 1 LS 16,605A6 17,402.41 10,817.49 6,916.00 51,741.06 $51,741.06 *** Report'Potals **" 223.00 MII 16,605 17,402 10,917 6,916 51,741 >>>indicates Nan Additive Activity -----Report Notes:------ The estimate was prepared with TAKEOFF Quantities. This report shows TAKEOFF Quantities witb the resources. Rodarte Construction,Inc. Page 4 lAMESPUMPCO .Issues Street Pump Station Additional War 09A 5/2016 15:12 John Ells Woodford Stm9n(Non-Biditem)Revl Activity Dese Quantity Unit Perm Constr Equip Sub- Resource PCs Unit Cost Labor Material Matl/Exp Ment Contract 'total BID ITEM = 2 Description= Woodford Storm Improvements(Nan-Biditem Unit= LS Takeoff Quart: 1.000 Engr Quan: 1.000 Bid Date: Owner: Engineering Finn: j Estimator-In-Charge:JR RODARTE JOB NOTES Estimate created on: 05/07/2008 by User#: 1 - John Ells Source estimate used: L:\HEAVYHID\EST\CHNGMAST ************Estimate created on: 08/26/2016 by User#: 1 - John Ells Source estimate used: L:\HEAVYEID\EST\h'ORCEACCOUNT *on units ofMII indicate average labor unit cost was used rather than base rate. [ )in the Unit Cost Column=Labor Unit Cost Without Lahor Burdens In equipment resources, rent % and EOE % not - 100% are represented as XXX%YYY where XXX=Rent% and YYY=EOE% ------Calendar Codes------ 507 5Day Week-7Hour Day 508 8 Hour Day-5 Day Week(Default Caleudaa) 510 10 Hour Day/5 Day Week 512 12 Hour Day-5 Day Week 610 10 IIour Day-6 Day Week i