HomeMy WebLinkAboutPW16-067 - Change Order - #1 - Rodarte Construction, Inc. - James Street Pump Station - 08/24/2016 Records7-7
�verne
rat
KEN1" Document
W.s nirvcron
ri 1
I
oFl � ryi.0
:i
CONTRACT COVER SWEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Rodarte Construction, Inc.
Vendor Number:
JD Edwards Number
Contract Number: PW 16-067—()b2-
This is assigned by City Clerk's Office
Project Name: James Street Pump Station
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
i
Contract Effective Date: 2129/16 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Garrett Inouye Department: PW Engineering
Contract Amount: $2,329,398.98
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #1
As of: 08/27/14
f
KNT
w.= , �T..
CHANGE ORDER NO. # 1
NAME OF CONTRACTOR: Rodarte Construction, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: James Street Pump Station
ORIGINAL CONTRACT DATE: February 29, 2016
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Deductive change order revision 1--Reducing the pipe size from 14
inch to 12 inch to increase availibility of parts for future maintenance
and repairs.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $2,329,398.98
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0.00
(incl. applicable WSST)
Current Contract Amount $2,329,398.98
(incl. Previous Change Orders)
Current Change Order $-18,165.66
Applicable WSST Tax on this Change $-1,725.74
Order
Revised Contract Sum $2,309,507.58
i
CHANGE ORDER - 1 OF 3
Original Time for Completion 120working days
(insert date)
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (t) for this Change 0 calendar days
Order
i
Revised Time for Completion 120 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
i
CONTRACTOR: CITY OF,K�ENT: J�
By: `'"�� By: r "
I!
(signature) t
� � � �°� ' �Fi (si aturq
Print Name: r44,4 1 + � Print Name: iYl t. LtAr� p
Its " "i7 P"i t 'Z o>l '' Its RAG ✓ `
(idle) ,I
DATE: 7p f DATE:
CHANGE ORDER - 2 OF 3
i
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[In this field,you may enter the eledranlc filepath where the comma has been saved]
i
I
CHANGE ORDER 3 OF 3
® FILE NO: 200.2
KENT
w,= ,.o.o CHANGE ORDER WORKSHEET NO.
Construction Management Division - Public Works
Project: James Street Pump Station Project No.: 10-3009
Project Engineer: Garrett Inouye Fed-Aid No.: N/A
Owners Rep: Phil McConnell Contractor: Rodarte Construction
Date: 5/23/2016
I. PROPOSED CHANGE
DEDUCTIVE CHANGE ORDER Revision 1; reducing the pipe size from 14 inch to 12 inch
II. REASON AND BACKGROUND FOR CHANGE
Increase availability of parts for future maintenance and repairs
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ® Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of
city PE I Item
Independent Estimate Attached I Q CREATE PAY ITEM ONLY - Payment to be made ® i PAY THIS PAY ESTIMATE
REQUIRED i_at a later date upon-completion of work _
Material Submittals Required - CC: Construction Coordinator I New Sub Re rd. No
DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch. No. I B.I. No. Item Description Qty Unit Unit Price _ Cost of Item
—- .-1— .— - --- .-.-.
-- - ---
I
I Independent Estimate Attached -REQUIRED ; ❑
INCREASE/DECREASETO EXISTING PAY ITEM(S) Not Applicable
Change Order No. I I _ FOR ACCOUNTING USE ONLY
Sch. No. B.I. No. Item Description Qty Unit Unit Price_ ___ Cost of Item
4 4220 120 inch diameter 1
--- — ----- -------- ---- ----- ------ --- LS ($19,891.40) ($19,891.40)- —
Storm Water Pump �ntlams. �ydzs tav
�Station _--
--
inde
pendent Estimate Attached - REQUIRED I E] I i
i
1 REV. DATE: 4/01/10
j
® FILE NO: 200.2
KENT
TOTAL ESTIMATED COST OF CHANGE ORDER * ($19,891.40)
*Total of the Cost of Item Columns
THIS PAY ESTIMATE ($19,891.40
IV. WORKING DAYS
Original Contract 1120 Due This Change Order* ® Previous Total
120
DATE_.
*TEx lanation justification Re cored: Doesn't change critical path
TOTAL WORKING DAYS* 120
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: LHk " ! tivw-1 Date: 2 '
Phi r1M1cConn`-I -y ,
Construction Supervisor: 7 Date: ( I
Paul ehne
Construction Manager: Date: '
Eric Connor
I
2 REV. DATE: 4/01/10
McConnell, Phillip
From: Kevin Durrant <Kevin@ rodarteconstruction.com>
Sent: Wednesday, April 20, 2016 9:27 AM
To: McConnell, Phillip
Subject: CO2 12 DIP CHANGE - HDFowler Estimate E294560 DOUGS EMAIL 03-21-16 15.05.29
(002).xls
Phil
That is fine with me.
Thanks
Kevin
From: McConnell, Phillip [mailto:PMcConnell@kentwa.govI
Sent: Monday, April 18, 2016 3:48 PM
To: Kevin Durrant<KevinC@rodarteconstruction.com>
Subject: FW: 12 DIP CHANGE- HDFowler Estimate E294560 DOUGS EMAIL 03-21-16 15.05.29 (002).xls
Kevin,
I need to formalize this into a change order. Are you okay with running this spreadsheet as the total dollar figure?
Phil McConnell, Owners Representative
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5542 1 Cell 253-261-5685
Imcconnell(a)KentWA gov
CITY of KENT, WASHINGTON
KentWA.gov Facebook -., YouTube
PLEASECJOGYDFn THE ENVSFO.4Pf CIVT IILFOkE PRINTING Tiffs F-PU I.
From: Kevin Durrant [ma ilto:Kevin@rodarteconstruction.com]
Sent: Tuesday, March 22, 2016 9:31 AM
To: McConnell, Phillip
Subject: 12 DIP CHANGE - HDFowler Estimate E294560 DOUGS EMAIL 03-21-16 15.05.29 (002).xls
Phil
Attached is a cost estimate from HD Fowler. I added the three columns on the right for comparison purposes. Doug at
HD Fowler revised his take off so not all of the items crossed over correctly. I am going to sit down with him to
straighten a couple of items out but dollar wise this will be pretty close (savings of$18,165.66). Will the underground
14" pipe from the new pump station to the old pump station be changed to 12"? If that is changed then there will be a
little bit there as well. If we are going this way for sure then I will sit down with him and finalize the take off and get an
exact dollar number.
Thanks
Kevin
1
Bid No:E294560 Page 1 of 1
I�
H.D. FOWLER
COMPANY
Customer: RODARTE CONSTRUCTION INC. Estimate: E294560
Estimator: Doug Solls Bid Date: 3/21/2016
Job Name: 12"DIP CHANGE
Location: KENT
Line City UoM Description Unit Price Extended Price Unit Price Extended Me Difference
1 2 EA 12 X 6 271EE EPOM FLOWING ARCH EXPJT 832,50 1,665.00 1028.47 2056.94 -391.94 l
2 2 EA RNG481 SET,15D9 RETAINING RING 172.50 345.00 0 0 345DD
3 2 EA CR491 ASSEMBY,LIMIT RODS,2 R005ET FOR 12XB 144.39 288.76 0 D 256.76
4 2 EA 12"ROMAC RESTRAINED FLANGED COUPLING ADAPTER,RFCA 514.92 1,029.84
13.20,STEEL,DIP,SHOPCOATW/STD.B&N,SBR GASKET 701.94 1403.88 -374.04
5 3 EA 12"ADI FLG PIPE SUPPORTSTANDON 4589304 STAINLESSSTEEL 247.55 742.65 430 1290 -547.35
6 2 EA 12"AWWA CSD8 SPRING&LEVER CHECK VALVE,WITH LIMITSWITCH(NEMA 3,780.00 7,560.00
4,UL/CSA SPDT) 4904 9808 4,248.00
7 2 EA 12"X 1'6"FLGXPE SPOOL P401ITNI40 318.00 636.00 369.32 739.64 402.64
8 3 EA 12"X 5'0"FLGXPE SPOOL P401/TN140 703.00 2,109.00 745.15 2235.45 426.45
9 1 EA 12"X 8'0"FLGXPE SPOOL P401/TN140 1,033.00 1,033.00 1214.77 1214.77 -181.77
10 2 EA 12"X WE"FLGXFLG SPOOL P401/711340 1,197.50 2,395.00 1090.91 2181.82 213.18
11 1 EA 12"X 1D'0"FLGXPE SPOOL P401/714340 1,253.00 1,253.00 1214.77 1214.77 38.23
12 1 EA 12"FLANGE AWWA C 504 BUTTER FLG VALVE.,W/HANDWHEEL,(FOR 1,449.41 1,449.41
VERTICAL INSTALLATION WITH GEAR OF&HADWHEELTURNED 90 DEGREES(
INCLUDES INTERNAL LIMIT SWITCH(NO.2 SINGLE PULL DOUBLE THROW
LIMIT SWITCH)PRATT 1931 1931 481.59
13 2 EA 12"FLG 90 REND 401 LINED/BLACK ASPHALT 677.25 1,354.50 901.86 1803.72 449.22
14 6 EA 12"FLG 90 REND 401 LINEDIT161-1211 COATED 677.25 4,063.50 901.86 5411.16 -1,347.66
15 1 EA 12"FLG CROSS 401 LINED/7361-1211 COATED 1,148.87 1,148.87 1580.75 1680,75 -531.88
16 1 EA 12"FLG TEED 401 LINED/T361-1211 COATED 962.50 962.50 1423.14 1423.14 -460.84
17 1 EA 12"MI 9D BEND 401 LIN ED/BLACK ASPHALT 438,37 438.37 662.3E 662.38 -224.01
18 1 EA 12"MI 45 BEND 401 LIN ED/BLACK ASPHALT 395,94 395.94 567.62 567.62 -171.68
19 1 EA 12"MIXFLG 90 BEN D 401 LINED/BLACK ASPHALT 593.25 S93.25 901.86 901.86 -308.61
20 1 EA 12"HUG X 24"MI CONCENTRIC REDUCER 401 UNED/BLACK ASPHALT 4,129.75 4,129.75
1946.74 1946.74 2,182.01
21 4 EA 12"FLANGE GATE VALVE WITH HANDWHEEL AWWA C515 RESILIENT SEAT, 1,917.71 7,670.84
NRS 4833 19332 -11,661.16
22 1 EA 24"WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS,GASKET,&WEDGE 356.24 356.24
ACTION GLAND 356.24 356.24 0.00
23 5 EA 12"WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS,WEDGE ACTION GLAND& 110.01 550.05
GASKET 110.D3 550.05 0.00
24 30 EA 12"BOLT KIT,304 STAINLESS STEEL,12 EA-7/8"X33/4"BOLT WITH 10833 3,249.90
NUT,IMPORT 161.14 4834.2 4,584.30
25 30 EA 12"1/8"FULL FACE Cl NEOPRENE FLANGE GASKET 175N 12,65 379.50 13.98 419A -39.90
26 4 EA DUG LUG 3.83 15.32 3.83 15.32 0.00
27 20 FT 3/4"304 STAINLESS STEEL ALLTHREAD,12 FT LENGTH 10.00 200.00 10 200 0.00
28 4 EA 3/4"304SS NUT 0.79 3.16 _ 0.79 3.16 0.00 !i
29 4 EA 3/4"304SS WASHER 0.77 3.08 0.77 3.D8 DIM
30 1 EA 12"COOPER 9 LINE CLAMP HOT DIPPED GALVANIZED MODEL#B3132 243.02 243.02
243.07 243.D2 0.00
31 10 EA 5/e"ALLTHREAD ROD 3045S 3.92 38.20 3.82 38.2 O.DO
32 4 EA 5/8"304SS NUT 0.33 1.32 0.33 1.32 0.00
33 4 EA 5/8"30455 WASHER 0.25 1.00 0.25 1 0.00
Approximate Total 46,303.97 -1R,165.66
18,165.66
Sales Tax 9.50% 172534
TOTAL 19,891.40
Igo
3I will
Ao #n axe`s .
Sag
8Ga
z
a i
gise d
m4 S5C& F
oil A
0 El
=k
�U••JJJ � � � u
9aiiii 1 � 1 1 II � e �� f
J� 2
W91A1 N3aM1
p 6
s g
F _
—
Q m - yi pia 6g j
C
n^ :rg6 a j
❑ 1 •O � ' \ lL� n4
Q
as
� 7^ Utz
cl
Sg ^ yaw
8
` ma
meg
qu
= g ?. e; �'a d3�a� n � � � a ` >gs'= �+� 4oea 3� � � � q• k� g.""�� 5 ' �-�
fOnR Cr 00^n:0s�§=�z Oa^zs,$ O =00a0ae^ ^ O5' e`"
F._ 0 a o -0w o =O a Oo n80 0 a36� e2�, ,§"g`s:mWti ea zy as s:s