Loading...
HomeMy WebLinkAboutPW16-285 - Original - WA State Dept of Transportation (WSDOT) - S 228th ST UPRR Grade Separation (STPD-1216(004)) - 06/15/2016 Y Records snagM eenj K�NT Document W....NGTON q f } 3 r CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Washington State Department of Tranportation Vendor Number: JD Edwards Number Contract Number: Nits ® vs This is assigned by City Clerk's Office Project Name: S. 228th St Union Pacific Railroad Grade Separation Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ❑ Contract ❑ Other: Project Prospectus `i 11,1 4 l 1p Contract Effective Date: Date of Mayor's signature Termination Date: i Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mark Madfai Department: Engineering Contract Amount: $0.00 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): The project prospectus is to obligate construction funds for the project. As of: 08/27/14 �. Local Ager1 ederal Aid MAW DeparhnWt of UM016YUMOn Project Prospectus Date 6/15/2016 Prefix Route Federal Aid STPD-1216(004) DUNS Number 020253613 Protect Number Local Agency tWSDOT Federal Employer Pro act Number LA7173 \Use only Tax ID Number 91-6001254 Agency CA Agency Federal ProgramTifle CITY OF ICF.NT JR Yes ❑No ® 20.205 ❑ Other Project Title Stan Latitude N47,23',51" Stan Longitude W-122,14'34" S.228th Street Union Pacific Railroad Grade Separation W-122,13'S$" End Latitude N47,23 ,51' End Lon itude Project Termini From-To Nearest City Name Project ZIp Code(+4) 4th Ave N&S.228th St 72nd Ave.S&S.228th St ICTNI 98032 Begin Mile Post End N8Is Post Length of Project Award Type a roximatel 0.3 mi 19 Local ❑ Local Forces ❑ State IN Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 0615 17 ICING WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Northwest Re ion 1 5 3l 33 and 47 8 and 9 1 Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date Nearest Hundred Dollar Nearest Hundred Dollar earest Hundred Dollar Month Year P.E. $3 520 000 $3 397 500 $122,500 1/2013 _ RNV $4 600 000 $1600 000 $3,000,000 2/2016 Const. $_1 187 522 $0 $0__ 9/2016 Total $9,307 522 $4 997 500 $3 122 500 Descri Lion of Existing Faci6 (Existing Design and Present Condition Roadway Width Number of Lanes 46' _ 4 -- Currently,S.228th Street is 44anes wide,approximately 46 feet in width with separate left-turn pockets at the intersections. The Union Pacific railroad trucks cross the read at grade. The UP has one mainline track crossing the road. Sidewalks Wst in some locations predominantly on the south side of the road. No bike lanes exist in the vicinity. Driveways to businesses connect to the roadway in several locations. Description of Proposed Work Description of Proposed Work(Attach additional sheet(s)if necessary) The project will provide a grade separation between the UPRR tracks at S.228tb Street via an over-crossing.The railroad will operate at the existing track grade,and the roadbed for S.228th Street will be constructed over the rails. To accommodate the over-crossing,associated improvements will include driveway improvements for the access to adjacent businesses,concrete curbs,gutters,and sidewalks,storm drainage improvements,goo-grid reinforced block walls,and new lighting.The project will be constructed in phases,the fast phase will allow for the construction of the center pier drilled shafts to accommodate a scheduled Dewey F-hiddiximh ft- ginsmissionlines The remainder of the project 3millbo caustraLtid inafuture Local Agency Contact Person Title Phone Mark Madfai _ En ecriflg Supervisor 253-856-5521 Mailing Address City State Zip Code 220 Fourth Ave.S. Kent WA 98032 B — Project Prospectus Approval Approving Authority / Title Public Works Director Date DOT Form 140-101 ®Previous Editions Obsolete 0 Page t Revised 0412016 Agency Project Title � ®� CITY OF KTiNT 3.228th Sleet Union Pacific Railroad Grade � 6/1 S1L016 C e of Pro osed Work - Project Type(Check afl that Apply) Roadway Width Number of Lanes ® New Construction ❑Path/Trail ❑3-R 46-58' 4-5 ❑ Reconstruction ❑ Pedestrian/Facilities ❑2-R ❑ Railroad ❑ Parking ❑ Other ®Bridge . Geometric Design Data Dascrl tion Through Route Crossroad ❑ Principal Arterial ❑Principal Arterial Federal ®Urban ®Minor Arterial ❑ Urban ❑Knor Arterial Functional ❑Rural ❑Collector ❑Rural ❑Collector ❑NHS ❑Major Collector ❑NHS ❑Major Collector Classification ❑Minor Collector ❑Minor Collector ❑Local Access ❑Local Access Terrain ®Flat ❑Roll ❑Mountain ❑Flat ❑Roll ®Mountain Posted Speed 5 Design Speed 40 -- Existin ADT 9,000 Desi nYearADT 14000 - -- — Design Year — Design Houri Volume(DH�6 1,50D Performance of Work Preliminary Engineering W01 Be Performed By Others Agency TheCi of Kent 30 % 70 Construction Will Be Performed By Contract Agency Private Contractor 100 % 0 Environmental Classification ❑ Class I-Environmental Impact Statement(EIS) J@ Class II-Categorically Excluded(CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III-Environmental Assessment(EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement Environmental Considerations Wetlands exist in the roadway ditches north and south of the roadway. No titling of wetlands is anticipated to occur as a result of this project. Noise and air quality will be addressed in the BA and may be affected due to an increase in traffic,although the reduction in traffic delays at the tacks and the associated train noise may decrease the noise and air impacts. i DOT Form 140-101 Previous Editions Obsolete® Page 2 Revised 04/2015 i Agency ProJord`fide P CITY OF ICENT S.228th Street Union Pacific Railroad Olude 6/15/2016 Right of a -- - - i ®No Right of Way Needed D Right of Way Needed All construction required by the ❑No Relocation M Relocation Required contract can be accomplished within the existing r ht of way, fJlili@i®a Railroad D No utility work required l.]No railroad work required D All utility workwill be completed prior to the start of the D All railroad work will be completed prior to the start of the construction contract construction Contract *All utility work will be completed in coordiinatlon with the 0 All railroad work vall be completed In coordination vuth the eonstmrtloa contract construction contract Description of Utility Relocation or Adjustments and Brisling Major Structures Involved in the Project ' At the UP crossing,there are various anderground utilities that will need to be Mounted. These include fiber optic lines,water,gas and storm sewer mains. Coordination with PSE regarding their overhead power lines will require temporary relocation of some feeder lines for the installation of the bridge shafts,and eventual permanent relocation of main transmission lines for the installation of the bridge, FAA Involvement Is any al)lgi lose#ad within 3.�Mometers(2 mtiss)of the proposed project? ® Yes W No Remarks This project has been reviewed by the legislative body of the administration agency or agencies,or its designee,and is not Inconsistent with the agencies comprehensive plan for community development. Agency CITY OFIWNT Date O ,�� /' MayorlGhalrperson L-' DDT Form 140-101 PF page 3 Revised 04/2015 0 Previous Editions Obsolete� ,I ^Y III r i ( - Ir REQUEST FOR MAYORS SIGNATURE i - i t } RoUCinq� t1�tt72aL�9R CALL REQutstT fi1U97 FIR^sT sE ROUTED THROUGH THE�AW Ol T� �•� t t 1 AFP wad y niheetor xc 0 i ,irl toitl ar `Nfadfai Phone Ori 'inator . 552 nb Startz r Date Re uiied; t r Retui ,Si n ptamont �Nen Yb�nu�e ContractTerrnintit�n Date:N1A R NI' y Date FinanceNatified: t aSh 7 ,1��f7,Stbt Dept. of Ti'atlSportation trio 400 nly r�and over op otn ra any Grant) /A �0 7 Ou CIL�tAPPROVAL: Date Risk Manager lotified.fu/A Re: aired on Non-rit Standard Gontt'acts A reements ' MB th it Uc4ltlt1o*ht b n,Specificall Account Nu ber; R94067 #�aotfized in`th ;l3ud et? `YES N0 rldFt KIPAJattOf�ont: �, ; ft e"atta hid hocaM A6ebcyI'Eederal Aid Project Prospectus is to obligate construction ads for the S. ;�2 "8thrSh: rtmn f' ,o'ific,Ra iroao Grade Separation project, I „i . Y , ! ',i,tPrlf trbta�iaacts Must Be Routed Through The La`wdepartment=- a '• r , � ,,, , Yr i �'o d'by the iaw Department) , I et�ect li Y Lava lof Law L3eiiit » ;, Y � YY Qe � GorS�fner,�#� I 1 ` e totvarded to Ih3$ h �hd 4i as a Gtl'r f l�terl By F+rl#> tpiW,_V6h 5 aff pq ' -�' K' -s, r e7 t r tY '#t y} t 1�r f='F gr4 ,. p .� s x � ` r tri t to a 1��`5it� fSc � r I p t f e c a r v��. ms Fo-btvrta}ri rya my Auer�oe� s�tnaw,e uu , i, i