HomeMy WebLinkAboutPW14-118 - Change Order - #8 - Tapani, Inc. - Briscoe-Desimone Levee Improvements Reach 2 & 3 - 05/20/2016 •
rd s M anar n
SCENT
WASH INC,TOM Document
CONTRACT COVED. SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Ta ani, Inc.
Vendor Number:
JD Edwards lumber
Contract Number: PW 14-118 - 001
This is assigned by City Cleric's Office
Project Name: Briscoe Desimone Levee Improvements Reach 2 and 3
Description: ❑ Interlocal Agreement E Change Order ❑ Amendment ❑ Contract
❑ Other:.
Contract Effective bate: 1/3012014 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Kelly Casteel Department: PW Engineering
Contract Amount: 6 7a'g 555.56
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #8
As of: 08/27/14
•
KENT
Wns Hiworon
CHANGE ORDER NO. #8
NAME OF CONTRACTOR: Tapani, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Briscoe Desimone Levee Improvements Reach 2 and 3
ORIGINAL CONTRACT DATE: January 30, 2014
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Equitable adjustment--complete and final settlement to resolve all
claims related to plant die-off that may have been caused by flooding
of the Green River and abnormal heat in 2015, as claimed by Derek
Kemppainen in his letter dated November 10, 2015. No further
compensation will be made for any future plant die-off should it occur
in subsequent years. The contractor will water the plants as specified
in the contract to maintain the plants in a thriving condition. The
contractor shall meet all requirements to water the plants as specified
under KSP 8-03.3(15) Temporary Irrigation and as provided by KSP
Plant Establishment 8-02.3(13) and as shown on the plans. The
contractor shall contact the City 24 hours prior to arriving on-site to
water the plants and shall provide water meter readings and water
billing statements to collaborate plant watering compliance. Plant
establishment is extended by 157 days for the period that the
contractor failed to maintain the plants in a thriving condition per KSP
Plant Establishment 8-02.3(13).
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $6,709,555.56
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $403,264.63
(incl. applicable WSST)
Current Contract Amount $7,112,820.19
(incl. Previous Change Orders)
Current Change Order $32,802.75
CHANGE ORDER - 1 OF 4
Applicable WSST Tax on this Change $3,116.26
Order
Revised Contract Sum $7,148,739.20
CHANGE ORDER - 2 OF 4
Original Time for Completion 200 working days
(insert date)
Revised Time for Completion under mm m 210 working days
prior Change Orders
(insert date)
Days Required (±) for this Change 0 calendar days
Order
Revised Time for Completion 210 working days
(insert date)_
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from, strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied,
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written b low.
"o
CONTRACTOR: CITYUF KENT:
By: By: V1.
(Signatur4l ature)
e-V"i k k
Print il�me: TZ, Pri N a m e-.7�r'�&
k-
Its Its TA
�
le) 0 (title
DATE:.o DATE:��i� 5rl
6 6V
CHANGE ORDER - 3 OF 4
APPROVED AS TO FORM:
(applicable If Mayors signature required)
Kent.Law Department
[In this field,you may enter the electronic Rlepath where the contract has been saved]
CHANGE ORDER - 4 OF 4
KENT CONTRACT CHANGE ORDER WORKSHEET
w.sw��orow
Project Name: Briscoe-Desimone Levee Improvements Reach 2 & 3. Project Number: 09-3010
Approvals:
(CM Supervisor):Paul Kuehne (cm Manager):Paul Kuehne for Eric Connor
Equitable Adjustment Contract Change Order
This equitable adjustment is complete and final settlement to resolve all claims related to plant
die-off that may have been exasperated by flooding of the green river and abnormal heat in
2015, as claimed by Derek Kemppainen in his letter dated November 10, 2015. No other
compensation will be made. No further compensation will be made for any future plant die-off
should it occur in subsequent years. The Contractor will water the plants as specified in the
Contract to maintain the plants in a thriving condition. The Contractor shall meet all
requirements to water the plants as specified under KSP 8-03.3(15) Temporary Irrigation and as
provided by KSP Plant Establishment 8-02.3(13) and as shown on the plans. The Contractor
shall contact the City 24 hours prior to arriving on site to water the plants and shall provide
water meter readings and water billing statements to collaborate plant watering compliance.
Plant establishment is extended by 157 days for the period that the Contractor failed to maintain
the plants in a thriving condition per KSP Plant Establishment 8-02.3(13).
COST
QUANTITY PRICE UNIT(S)
One $32,802.75 Equitable Adjustment = 32 802.75
TOTAL
TIME
Extension of Contract Time Due to This Change Order-Number of Working Days Added: 0
Prepared By: Paul Kuehne
R.Tubli6PROJECTSM-3010& I I Briscoe-Desmoine Levee ImprovementslPlant CO WORKSHEET.doc April 8,2016
Kuehne, Paul
From: Derek Kemppainen <derekk@tapaniunderground.com>
Sent: Friday, April 15, 2016 1:57 PM
To: Kuehne, Paul
Cc: Bryant,Jason;Connor, Eric
Subject: Re:Change Order 8 - C&R Plant Replacement Equitable Adjustment
Attachments: Briscoe 2&3 - CO#8 Signed by Kevin Tapani.pdf
Paul,
Kevin Tapani, the vice president, signed the change orders. Three copies will be mailed to you.
Thanks!
Derek Kemppainen
Project Manager, Tapani Inc.
Cell:(360)975-2011
Email: derekk(abtapani.com
Office: (360)-687-1148
On Fri, Apr 15, 2016 at 12:25 PM, Kuehne, Paul <PKuehne a,kentwa-ov> wrote:
Hello Derek Kemppainen,
Three inked originals must be physically delivered to the City for further processing. The
signature must be by an agent of Tapani explicitly empowered in writing to contractually bind
Tapani.
Hello Jason Bryant,
Do you have written documentation naming Derek Kemppainen as a Tapani agent authorized to
contractually bind Tapani?
Paul Kuehne, construction Management Supervisor
Construction Management I Public Works Department
1
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-5015
PKuehne(@KentWA.aov
CITY OF KENT,WASHINGTON
KentWA.4ov Facebook YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS EMAIL
From: Derek Kemppainen [mailto:derekkC-Otapaniunderground.com]
Sent: Friday, April 15, 2016 10:59 AM
To: Kuehne, Paul
Cc: Bryant, Jason
Subject: Re: Change Order 8 - C&R Plant Replacement Equitable Adjustment
Paul,
Please see attached signed change order.
I will have three signed copies mailed today.
Thank you?
From: Kuehne, Paul
Sent:Thursday, April 14, 2016 1:35 PM
To: 'Derek Kemppainen'
2
Cc: Bryant,Jason
Subject: Change Order 8 - C&R Plant Replacement Equitable Adjustment
Hello Derek ,
Please provide Contractor's signature(s) by authorized individual and return three inked hard
copies.
Thank you.
Paul Kuehne, Construction Management Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-SS43 I Cell 253-740-5015
PKuehne@KentWA.gov
CITY OF KENT,WASHINGTON
KentWA.nov Facebook YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Derek Kemppainen [maiito:derekk(iltapaniunderground.com]
Sent: Wednesday, April 13, 2016 1:13 PM
To: Kuehne, Paul
Cc: Bryant, Jason
Subject: Re: Change Order 8 - C&R Plant Replacement Equitable Adjustment
Jason,
3
Could you give me a call sometime today?
Thanks!
From: Kuehne, Paul
Sent: Tuesday, April 12, 2016 12:41 PM
To: 'Derek Kemppainen'
Cc: Bryant, Jason
Subject: Change Order 8 - C&R Plant Replacement Equitable Adjustment
Hello Derek,
Included below please find excerpt from Change Order #8 describing the C&R Plant Replacement
Equitable Adjustment. Three copies of the change order are presiding at the front counter
awaiting Contractor's authorized signature. Upon Contractor's signature a progress payment will
be initiated.
Please feel free to call me with any questions, comments or concerns about these or any other
matters.
Equitable Adjustment, Contract Change Order #8
This equitable adjustment is complete and final settlement to resolve all claims related to plant
die-off that may have been exasperated by flooding of the green river and abnormal heat in
2015, as claimed by Derek Kemppainen in his letter dated November 10, 2015. No other
compensation will be made. No further compensation will be made for any future plant die-off
should it occur in subsequent years. The Contractor will water the plants as specified in the
Contract to maintain the plants in a thriving condition. The Contractor shall meet all
requirements to water the plants as specified under KSP 8-03.3(15) Temporary Irrigation and as
provided by KSP Plant Establishment 8-02.3(13) and as shown on the plans. The Contractor
shall contact the City 24 hours prior to arriving on site to water the plants and shall provide
4
water meter readings and water billing statements to collaborate plant watering compliance.
Plant establishment is extended by 157 days for the period that the Contractor failed to maintain
the plants in a thriving condition per KSP Plant Establishment 8-02.3(13).
Equitable Adjustment: $32,802.75 Total
Paul Kuehne, Construction Management Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-SOJ.5
PKuehne@KentWA.gov
CITY OF KENT, WASHINGTON
KentWA.aov Facebook YouTube
PLEASE CONSIDER THL ENVIRONMENT RE FOR L PRIN I ING THIS E-MAIL
From: Derek Kemppainen [mailto:derekk(a tapaniunderground.com]
Sent: Monday, April 11, 2016 2:47 PM
To: Kuehne, Paul
Cc: Bryant, Jason
Subject: Re: C&R Plant Replacement Change Order Request
Awesome! Thanks!
From: Kuehne, Paul
Sent: Monday, April 11, 2016 2:42 PM
5
To: 'Derek Kemppainen'
Cc: Bryant,Jason
Subject: RE: C&R Plant Replacement Change Order Request
The C&R pay request change order is nearly finished. Should have it to you this week.
Paul Kuehne, Construction Management Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-5015
PKuehne(o)KentWA.aov
CITY OF KENT, WASHINGTON
KentWA.aov Facebook YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PR!NTING THIS E-MAIL
From: Derek Kemppainen [mailto:derekk(6tapaniunderground.com]
Sent: Monday, April 11, 2016 11:43 AM
To: Kuehne, Paul
Subject: Fwd: C&R Plant Replacement Change Order Request
Paul - what's the latest with this change order?
Derek Kemppainen
Project Manager,Tapani Inc.
Cell: (360)975-2011
6
i
Email: derekkAtanani.com
Office: (360)-687-1148