Loading...
HomeMy WebLinkAboutPW15-240 - Change Order - #3 - Marshbank Construction, Inc.- Central Ave S Pavement Preservation and Utility Improvements - 03/10/2016 T Records Man, "a"" gem KEN WA9.H B N GTON Document n CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Dame: Marshbank Comstruction, Inc. Vendor Dumber: ]D Edwards Number Contract Dumber. PW I.5-240- ()i This is assigned by City Clerk's Office Project Dame: Central Ave S Pavement Preservation and Utility Improvements Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment El Contract El Other: Contract Effective Date: 7/6/2015 Termination bate: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mark. Madfai department: PuV' Engineering Contract Amount: 5 8I 9 59 .74 Approval Authority: (CIRCLE ODE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Carder As of; 08/27/14 • KENT W.g H 1 M O T O N CHANGE ORDER NO. 3 NAME OF CONTRACTOR: Marshbank Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Central Avenue S Pavement Preservation and Utility Imp. ORIGINAL CONTRACT DATE: July 6, 2015 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Adding restrained joint gaskets at each joint in the 12 inch diameter ductile iron, CL 52 water main pipe to provide a more rigid system. This change also adds 12 inch megalug followers at each mainline tee and 16 inch megalug followers at the connetion to the water main at Willis Street to provide a more rigid system. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $5,819,698.74 (including applicable alternates and WSST) Net Change by Previous Change Orders $-10,200.00 (incl. applicable WSST) Current Contract Amount $5,809,498.74 (incl. Previous Change Orders) Current Change Order $28,024.80 Applicable WSST Tax on this Change $2,662.36 Order Revised Contract Sum $5,840,185.90 CHANGE ORDER - 1 OF 3 Original Time for Completion 180 working days (insert date) Revised Time for Completion under 0 prior Change Orders (insert date) Days Required (±) for this Change 0 calendar days Order Revised Time for Completion 180 working days (insert date) In accordance with Sections 1-04.4 and 1-04,5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor, from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CiT* OF KENT: By: B re) 07� 7 a tUCe) 4V Print Nac.) Print Name: 7p ')�Asi!g(A' , 1--an D 17 Its N Its PILW r 6 (1516 DATE: DATE: CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 FILE NO: 200!.2 KENT CHANGE ORDER WORKSHEET NO. Construction. Management Division _ Public Works Proaect: Central Ave. S. Pavement Project No.: 13-3004 Preservation and Utility Improvement Project Project Engineer: Cameron Bloomer, PE Fed-Aid No.: STPUL-10 1(006) Owners Pep: KBA, Contractor: Marshbank Construction, Inc Inc Date: 1/22/2016 wi. PROPOSED CHANGE This change order adds restrained joint gaskets at each joint in the 12 Inch Diameter Ductile Iron, Ct. 52 Water Main Pipe. This change also adds 12 Inch Megalug followers at each mainline tee, and 16" Megalug followers at the connection to the water main at Willis St. ., REASON AND BACKGROUND FOR CHANGE Variable soil conditions are regularly encountered at the river valley in which the project is located. Due to this, the City of Kent elected to restrain each joint of the new 12 Inch water main to provide a more rigid system. The City elected to use restrained joint gaskets to accomplish this and sent Request for Proposal 006 to the contractor for pricing. Marshbank provided pricing in 'Serial Letter 013, which the City reviewed and found to be unacceptable. After negotiating with the contractor, a unit price of $175.45 per each restrained joint gasket was agreed to as fair and reasonable by both parties. III. METHOD OF PAYMENT NEW PAY ITEM( ) [:] Not Applicable Change Crider No. - FOR ACCOUNTING USE ONLY __ ..._. _ __.�..... �... _._ ...._ ..__._ .._....._..mm_�.. _.___....... _.. 5ch.No. Item Description Total Est. duty this unit Onit Price Total Estimated Cost of city PE Item 2 CO 003 - restrained Joint 144 0 EA $175.45 ';2S,265.88 Gaskets for 12 Inch Diameter Ductile Iron Water Main Pipe B2 CO 003 - 12 Inch Megalug 22 0 EA $75.00 $1,650.00 Mechanical Joint restraint for Water Main Pipe B2 CO 003 - Megalug Mechanical 6 0 EA $1 5.00 _ 117100 00 Joint restraint for 16" ..___.t.._ e Diameter Water Pipe __._.__. ._ _.._� __.. ...._.._—....._. ._._.._.__ independent Estimate Attached CREATE PAY ITEM ONLY Y — Payment to be maere PAY THIS PAY ESTIMATE - REQUIRED at a later clue upon completion of work Material Submittals Required — CC: Construction Coordinator New Sub Recgrd? No I REV. DATE: 4/01/10 FILE NO: 200.2 KF-NT DELETE EXISTI NG PAY ITEM(S) per 1-09.5 E] Not Applicable Change Order No. FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description City Unit Unit Price Cost of Item ........... ...... ------ ........... El : Independent Estimate Attached - REQUIRED [:] INCR'EASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable Change Order No. FOR ACCOUNTING USE ONLY -1111-1--.......... Sch. No. B.I. No. [tern Description City Unit Unit Price Cost of Itern BI ndep ndent Estimate Attached - REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER *Total of the Cost of Item Columns THIS PAY ESTIMATE &0.00 IV. WORKING DAYS Original Contract 180 Due This Change Order* 0I Previous Total 180 DATE: 9117Z2015 DATE: Explanation/Justification ft�irecL- TOTAL WORKING DAYS* 180 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Date: �Z/7-4) 44'Prepared By: Construction Supervisor: Date: Construction Manager: L Date: 2 REV. DATE: 4/01/10 KENT FILE NO: 200.2 w-1-10. DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description ; Qty j Unit I Unit Price Cost of Item _..._ _._._.. ...._........-._.........._...-.......................................__._._.._...__........__...._....--.......-...__........._..............._.....-........................................._.............,.......... - _ �._.........................-__...._._.__...................t.._._._.—._.._............_..... _._—.__................ _I - ---- ; Independent Estimate Attached - REQUIRED INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. - j FOR ACCOUNTING USE ONLY Sch.No. B.I.No. Item Description I Oty } Unit ; Unit Price Cost of Item BI _- _____._._.....-- -.__......._-..._..___....--- -..__........_.s.._.._....__----�..__.__................__..-- ........._.- __ _._._... ._..-._._.. --._.._...._.._.._.----_----.._.Lj ._...__..... E i Independent Estimate Attached - REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * , Le *Total of the Cost of Item Columns THIS PAY ESTIMATE 10.00 IV. WORKING DAYS Original Contract I igp ; Due This Change Order* 0 i Previous Total DATE: 1 9/17/2015 -.. _.._--..._. — --- -- -----_�_. _.—_— _--- - DATE * ! Explanation/Justification Required: --- - -- -.__. --- — - ----- TOTAL WORKING DAYS* 180 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: R. i, ,.r Date: //ZZ/26 Construction Supervisor: ��� �y' Date: Construction Manager: Date: Z REV. DATE: 4/01/10 MARSHBANK C 0 N S T R U C T 1 0 N Conr. Lic. MARSHC1.05106/ DBE/MBE No. D 1M0011507 November 25, 2015 Cameron Bloomer, PE City of Kent 400 West Gowe Kent, WA 98032 RE: Central Ave S Pavement Preservation & Utility Improvements Project No. 13-3004 Federal Aid Number: STPUL-1071(006) Restrained Gaskets and Megahig Proposal - RFP 6 Response Serial Letter No. 13 Cameron, Below is out proposed pricing for RFP 6. Item Description Units Qty Unit Price Total Price 1 12" Locking Gasket EA 144 $200 $ 28,800,00 2 12" MEGALUG EA 52 $85 $ 4,420.00 3 16" MEGALUG EA 6 $200 $ 1,200.00 Please Note, MEGALUGs are needed with the restrained joint gaskets at the tees. We have priced this proposal with removing the thrust blocking where the tees utilize MEGALUGs. Please review and let us know what questions you have. Sincerely, .- Dave Marshbank Marshbank Construction Inc. 2' CONSIRUCT MAMA OCMCHT NAOUICN7 Independent Cost Estimate Project Name: Central Ave S. Pavement Preservation Project No: 13-3004 Potential Issue No.: Date: 11/30/2015 Description of Work: RFP 006-Add RJ Gaskets for the water main,also add megalug restraint at hydrant tees. Called HD Supply on 11/30 and received price quote over phone. Assumptions: Description Quantity Unit Unit Price Total Sure Stop 350 Gasket 144 EA 130 $ 18,720.00 Installation 10 minutes of pipe layer time each 144 EA 7.47 $ 1,075.68 Me alu . 12Inch 24 EA 100 $ 2,400.00 Me alu , 16 Inch 6 EA 160 $ 900.00 $ - $ - Subtotal $ 23,095.68 Labor Markup 29% $ 311.95 Equipment Markup 21% $ 4,624.20 Materials Markup 21%) $ - Markup Total $ 4,936.15 Subcontractor Markup (12% if below$25,000 Estimate Totall $ 28,031.83 Estimate By: 6a-07e4,01t 6orr Pf Signature: �1�yyl, � � yrsT 1 of 1 P-13 (Rev. 7/12) MARSHBANK CONSTRUCTION Cont. bic. MARSHCh 05106 i DBEiN,76E No. D 1410011507 December 9, 2015 Cameron Bloomer, PE City of Kent 400 West Gowe Kent, WA 98032 RE: Central Ave S Pavement Preservation & Utility Improvements Project No. 13-3004 Federal Aid Number: STPUL-1071(006) Restrained Gaskets and Megalug Proposal - JtFP 61Zesponse Serial Letter No. 13 Cameron, Below revised pricing for RFP 6. Item Description Units Qty Unit Price Total Price 1 12" Locking Gasket EA 144 $185 $ 26,640.00 2 12" MEGALUG EA 52 $75 $ 4,420.00 3 16" MEGALUG EA 6 $185 $ 1,110.00 Please review and let us know what questions you have. Sincerely, Dave Marshbank Marshbank Construction Inc. Cameron Bloomer From: Cameron Bloomer Sent: Thursday, December 10, 2015 2:56 PM To: 'jason@marshbankconst.com' Cc: 'gammeli@marshbankconst.com;econnor@kentwa.gov Subject: RE: RFP 006 Revised Hi Jason, This email is to confirm our phone conversation in which we agreed to a unit price of$175.45 per each gasket.This is $145 plus a 21%markup. The unit prices as proposed for the 12" and 16" megalugs are accepted. A change order is being drafted to provide compensation to MCI for this change. Thank you, Cameron Bloomer, PE T 425.990.2949 I C 206.819.7148 I Ecbloomer(@kbacm.com KBA, I nc. I Construction Management Specialists I www.kbacin.cor From:gammeli@marshbankconst.com [mailto:gammell@marshbankconst.com] Sent:Wednesday, December 09, 2015 2:15 PM To:Cameron Bloomer<cbloomer@kbacm.com> Subject: RFP 006 Revised Revised Letter. Rob Gammell Projeci Engineer Marshbank Construction, Inc. P.O. Box 97 3304 Old Hartford Road Lake Stevens,WA 98258-0097 (425)209-8225 Cell (425)377-9708 Office (425)377-0709 Fax 1 Chapter 52 Local Administered Projects Appendix 52.106 Change Order Checklist Change Order Question Yes No : A 1. Docs the change Order alter the termini,character,or scope of the work? El If yes,you must have H & LP approval to be cli&,ible for federal funds. E [I EJ If Yes,You Must submit a revised 11age I of the proSJlCCtL1S. El 11 L) 2, Is the Change Order over$7,500.00 and outside the scope of work? El R, 0 ............ Ifycs, the chan-c cannot be a change order and must be,in independent work. 3. Does the Change Order detail all items involved with tile change" C] 13 4. Does the C g hane Order include all i4justinent in working days? ❑ E El If yes,the time extension must be stated in the Change Order. 0 El E0 Kyes,an independent engineer's estimate oftinic must be included to document the 0 rEl Ei extension. It'no.that must be ;rated in the Change Order. 0 0 ❑ 5. Does tfic Chanac Carder alter the DR E Con&flon Of Award? Ifycs,you must obtain concurrence form Local Programs. 0 0 11 I C yes, you must obtain the DBE's sipatUrC Oil the Change Order. 6. Does tile Change Order involve a material SUbStitUti011? El � 0 Ifyes, you must determine ira illawrial credit is appropriate. El 0 7. H'Chan-c Order work started 11601'to it's execution,prior verbal apI novil by the Approving AWhOrky must be granted and docurnented. 8. Flas the Change Order been signed by the contractor? ❑ E3 13 9. Has the Change Order been cxccLttcd by the Approving AW1101-ity? El 0 L) Ifyou are a"non CAA gency",you MUSt have the acting CA Authority's approval. FJ 11 El 10. Has an independent en-incer's estimate gustifying the costs and time extensions been z' 11 El completed and documented? 11, Fas a detailed memo outlining the chronology ofevcws, basis of need, costs and kv I d k in,,days been prepared and placed in the File accompanying the Change Order? Ilk I Appendix$2,106 Change Order Page I of 1 Revised 413012014 INSDOT Local Agency Guidelines M36-63.27 Page 52-19 April 2015 CONST RUC T ION KENT M,NW',=WEN T WAS 14 NGTO P# Emo To FILE Central Ave. 5. Pavement Preservation and UtilityProject Name: date. 2/5/2016 Improvements Contractor: Marshbank Construction, Inc. Contract No: 13-3004 Owner: City of Kent Federal Aid Nc: STPUL-1071(006) Subject: Change Corder 002 Chronology of Events Message October 2015—City brought up the possibility of Restrained Joint Caskets being added to the water main, November 5, 2015—Request for Proposal 006 was sent to MCI, requesting a cost proposal for the gaskets. November 24,2015—The City requested pricing for 24 Megalug followers, and to have the pricing added to RFP 006, November 25,2015--MCI provided Serial Letter 013, a cost proposal for the items requested in RFP 006,This included pricing for the Megalug followers November 30, 2015—CM Team obtains price quote from supplier of gaskets(HD Supply). Begins negotiations with MCI. December 9,2015—MCl provides revised Serial Letter 013,with new pricing. December 10,2015—MCI and City agree to unit prices of 175.45 per each restrained gasket, and the proposed price for the megalugs.The CM team verbally directs MCI to proceed with a work, noting a Change Order will be process. Cameron Bloomer, PE Resident Engineer 2/5/2016 ............. .. ...... ......w. _. Date lit 6'1VQI' t'C;,1. 1 of 1 P-11 (Rev. 8/11) RFP - Restrained Joint Gaskets Page 1 of 2 Share Point. Nevisfe(.d 01ieDrive Sites CameronB;Ocanaer- ? Request oi� 'r�cFP q rtrr�A Projec:t Number Project Federal Aid No. Cate 11/5/2015 RFP No. 006 Subject Restrained Joint Gaskets Spedrication(s) Plan Reference To: Provide: proposal M hin fifteen (15) days or as stated above fe,rr the sropc of work described NOTE: Thi:x i> NOT a change ordt-r-and does NOT c.oi0itute. ag.apr¢ovrat or rake to proceed on thv iss;iee. SCOPE F.nrn�snh and Install restrained joint gaskerls at c:adi joint ora the J 7lrach Diarneter Crr.ictile.Iron,CL 52 Water fain Pipe MATERIAL littp://www.kbal)oi-tal.cotii/project/CetitralAveSoLitli/1.,ists/RFP'/DispFoi-iii.asl)x?ID=8&SoLi,., 1/19/20I6 RFP-Restrained Joint Gaskets Page 2 of 2 Restrained Joint Gaskets meeting ANSI/AWWA C111/A21.11 requirements. Estimated quantity is 144. MEASUREMENT AND PAYMENT Measurement and Payment will be per each. Contractor Review Related GC Documents i Close I Version:2.0 Content Tyne.:Item Created at 11i 5,12015 3A 1:5(,PIVI by Cameron Bloomer I.asl modified at 111512C115 3:42:1.4 PM by Cameron Bloomer http://www.kbaportal.com/project/CentralAveSoutli/Lists/RFP/DispForm.aspx?ID=8&Sou... 1/19/201 G Cameron Bloomer From: McConnell, Phillip <PMcConnell@kentwa.gov> Sent: Tuesday, November 24, 2015 2:10 PM To: Cameron Bloomer Cc: Connor, Eric; Smith, Susanne Provencio Subject: RE: RFP 006 RJ Gaskets Follow Up Flag: Flag for follow up Flag Status: Flagged Cameron, I think ST 39+65 should be 39+48. 2 MJ sleeves, 2 retainer glands each,for a total of 4 not 2 Megalug followers. Phil McConnell, Owners Representative Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 l Cell 253-261-5685 pmmcconnell�KentWA.gov CITY OF KENT, WASHINGTON KentwA.gov Facebook YouTu fie PLEASF CONt;IDE'R'IYE ENVIROPIA7EM 'fNi);;c.PRINTING I HI-S E- TAIL From: Cameron Bloomer [mailto:cbloomer@kbacm.comj Sent: Tuesday, November 24, 2015 1:56 PM To:jason@marshbankconst.com Cc: gammell@marshbankconst.com; McConnell, Phillip; Connor, Eric Subject: RE: RFP 006 RJ Gaskets Hi Jason, With RFP 006, please add pricing for 12" DI Megalug followers at the following mainline tees: 14+68 (2) 16+69 (2) 18+40 (2) 20+74(2) 23+25(2) 24+87(2) 27+95 (2) 30+90(2) 34+26(2) 36+88(2) 39+65 (2) Phil, if I missed any or added any that are not required, please let us know. Thank you, i Cameron Bloomer, PE T 425.990.2949 1 C 206.819.7148 1 E cbloomerE kbacm.com KBA,Inc. I Construction Man agemen t Specialists I www.kbacm.com From:Cameron Bloomer Sent:Tuesday, November 24, 2015 9:12 AM To: 'jason@marshbankconst.com'<]ason@marshbankconst.com> Cc:Ram mell aC)marshbankconst.com Subject: FW: RFP 006 RJ Gaskets Hi Jason, Any issues with compatibility? Thanks, Cameron Bloomer, PE T 425,990.2949 1 C 206.819.7148 1 E cbloomer@kbacm.com KBA, Inc. I Construction Man agementSpecialists I www_kbacm.com From:Connor, Eric [mailto:EConnor@kentwa.gov] Sent:Tuesday, November 24, 2015 7:12 AM To:Cameron Bloomer<cbloomer@kbacm.com>; McConnell, Phillip<PMcConnell@kentwa.eov> Cc: Madfai, Mark<MMadfai@kentwa.gov>;Smith,Susanne Provencio <SPSmith@kentwa.eov> Subject: RE: RFP 006 RJ Gaskets Good Morning Cameron, Sorry about not responding to this sooner. We do not see an issue with this as long as their supplier can confirm compatibility of the products. Do you know if this is verified? Thank you, Eric Eric Connor, Construction Engineering Manager Construction Management I Public Works Department Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT, WASHINGTON PUIEA4E CONSIDER ME PPUN1-ENG MIS E-MAU. From: Cameron Bloomer[mailto:cbloomer5kbacm.com] Sent: Friday, November 20, 2015 3:46 PM To: Connor, Eric; McConnell, Phillip Cc: Madfai, Mark; Smith, Susanne Provencio Subject: RFP 006 RJ Gaskets 2