CONTRACT COVER SHEET
This is to be Completed by the Contract Manager, prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: SCI Infrastructure, LLC
Vendor Number:
JD Edwards Number
Contract Number: PW 15-256
This is assigned by City Clerk's Office
Project Name: SIB 516 to S 231st Way Levee Im r. - Russell Rd. Upper Levee-S. beach
Description: ❑ Interlocal Agreement E Change Order ❑ Amendment ❑ Contract
El Other:
Contract Effective Date: 4 2015 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract. Manager: Roby Haliock Department: PW Engineering
Contract Amount: $1,994,502.86
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order4
As of: 08/27/14
•
KENT
W A 3 M I N O T O N
CHANGE ORDER NO. # 4
NAME OF CONTRACTOR: SCI Infrastructure. LLC. ("Contractor")
CONTRACT NAME & PROJECT NUMBER:SR 516 to S 2315t Way Levee Impr.-Russell Rd Levee South Rc
ORIGINAL CONTRACT DATE: July 24, 2015
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Establish new pay item topsoil type 'B' for site topsoil. Possible
contract savings from reuse of existing topsoil strippings of $33.50/CY
or $33,500.00 overall.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $1,994,502.86
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $16,580.49
(incl. applicable WSST)
Current Contract Amount $2,011,083.35
(incl. Previous Change Orders)
Current Change Order $3,500.00
Applicable WSST Tax on this Change $332.50
Order
Revised Contract Sum $2,014,915.85
CHANGE ORDER - 1 OF 3
Original Time for Completion 80 worldna days
(insert date)
Revised Time for Completion under 0
prior Chiange Orders
(insert date)
Days Required (±) for this Change 0 calendar days
Order
Revised Time for Completion 80 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effect�ive date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract,
3. The Contractor will adjust the amount of 'its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
Bv B
(signet re) (11 '(signature)
Ell
Print Pri Name: hmo-V"LA Ro,4
Its T--) 5V00Ati 0 fC4�C
itle) title2
DATE: DATE:
AT �4�7
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[In this field,you may enter the electronic fflepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
• KENT• FILE NO: 200.2
CHANGE ORDER WORKSHEET NO. 4
Construction Management Division — Public Works
Project: SR 516 to S. 231s' Way Levee Project No.: 09-3006.2
Improvements
Project Engineer: Toby Hallock Fed-Aid No.:
Owners Rep: Jason Barry Contractor: SCI Infrastructure, LLC
Date: 01/06/16
I. PROPOSED CHANGE
Establish new pay item Topsoil Type 'B' for site topsoil.
II. REASON AND BACKGROUND FOR CHANGE
Contract savings possible from reuse of existing topsoil strippings of $33.50/CY or $33,500
overall.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch. No. Item Description Total Qty this Unit Unit Price : Total Estimated Cost of
Est.City PE Item
- _ -
-_ .. ._:.Topsoil Type. 'B' .. . 1,000 120 CY ...;._ $3.,50....._.. - -- -$3,500 00
................_. --- __----------------- .. ... __.-.
® Independent Estimate Attached i ❑ i CREATE PAY ITEM ONLY— Payment to be made ® PAY THIS PAY ESTIMATE
-REQUIRED ........_...........i.....at._a..dater date...upon completion of work..................................................:...................._......................._.,................_..................................................._...........................
Q....... ....... ......
❑ Material Submittals Renuired — CC; Construction Coordinator New Sub Reqrd? No
DELETE EXISTING PAY ITEM(S) per 1709.5 ® Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch. No B.I. No. Item Description Qty Unit Unit Price Cost of Item
.............. .. . . . .......... ... .... . ..... ... ............ ... ........ - ............. .. _....._ .........
f
❑ Independent Estimate Attached - REQUIRED Li
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch. No. B.I. No Item Description Qty Unit Unit Price Cost of Item
:..._......_._._._.---......_..._...... . .....
.... ...................... < .._....... .. . ........-. ............. ......... ........ _................
I
® Independent Estimate Attached -REQUIRED ❑
1 REV. DATE: 4/01/10
FILE NO: 200.2
SENT
NJnN Iai n�4 GM
TOTAL ESTIMATED COST OF CHANGE ORDER * $3,500.00
*Total of the c e CO,1�u.MT?S T....."ew
THIS PAY ESTIMATECc
1i
IV. WORKING DAYS
Original Contract So Due This Change Order* ;, 0 Previous Total gp
DATE: 08124115
* Explanation Justification Rj wired:
TOTAL WORKING DAYS* _ _ 80
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard' Specifications
and Contract Special. Provisions for the type of work described.
LPrepared By: -a-� Date:
so
Construction ,Supervisor: -�! Date:
Paul 5hne '
Construction Manager: Date: l��r
Eric Connor
2 REV. DATE: 4/0 /10
Ai -Y
I eFSr. 'F� CJ ra'i 2•�i �'Dc;.✓G �}�/S:�+
r
+ 37,
PaD
c3 t� Q E-UJ P"qy i 7-f-/--\.
I
355Q7 I