CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: GooclFellow Brothers, Inc.
Vendor Number:
JD Edwards Number
Contract Number: PW13-103
This is assigned by City Clerk's Office
Project Name: SE 256th Street Improvements
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other: #21
Contract Effective Date: 06/6/2013 Termination Date: 12/31/2014
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Phil McConnell Department: PW - ENGINEERING
Detail: (i.e. address, location, parcel number, tax id, etc.):
S:Publlc\RecordsManagement\Forms\ContractCover\adcc7832 11/08 Ali
I
KENT
WAS XINGTON
CHANGE ORDER NO. #21
NAME OF CONTRACTOR: Goodfellow Brothers Inc. ("Contractor")
- CONTRACT-NAME &-PRO2ECT-NUMBER:--- -- - --SE-256" Street-Improvements- --
ORIGINAL CONTRACT DATE: 3une 6, 2013
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
i
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
-Deductive change order to reimburse for city crew unplugging sewer
blockage caused by contractor and cost of re-tv of failed storm line.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $5,208,988.60
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $61,589,87
(incl, applicable WSST),
Current Contract Amount $5,270,578.47
(incl. Previous Change Orders)
Current Change Order $-225,70
Applicable WSST Tax on this Change $-21.44
Order
Revised Contract Sum $5,270,331.33
i
CHANGE ORDER - 1 OF 3
Original Time for Completion 300 working days
(insert date)
Revised Time for Completion under 304workingdays
prior Change Orders
(insert date)
Days Required (f) for this Change 0-calendar days
Revised Time for Completion 304 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract; Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits, This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied,
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract,
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
PI<
CONTRACTOR: CITY Kt`i_
By. By:
(signature) f, (Sig t
Print Name: E�4j he l.c^ Print Name: Timothy J aPorte P E.
ItsnJ=,-r4 Its Public Works Director
(title) (title)
DATE: 7�d Yb l DATE:
i
CHANGE ORDER - 2 OF 3
®KEA1T FILE NO: 200.2
W 5N1M" " CHANGE ORDER WORKSHEET NO. 21
Construction Management Division - Public Works
Project: SE 256th Street Improvements Project No.: 09-3012C
Project Engineer: Mark Madfai Fed-Aid NO.: N/A
Owners Rep: Phil McConnell Contractor: Goodfellow Brothers
_Date:--Various - - --= - ------
I. PROPOSED CHANGE
Deductive change order
II. REASON AND BACKGROUND FOR CHANGE
City crew unplug sewer blockage caused by contractor and cost of re-tving failed storm line
III. METHOD OF PAYMENT
NEW PAY ITEM(S) [] Not Applicable
Change Order No. _ ( FOR ACCOUNTING USE ONLY
Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of
Qty PE Item
— 9 City crew clean ser and re- I 1 I 1 Is ($225.70)— -- ($225.70)
we --
tv failed_ storm line _ r—
I
❑ Independent Estimate Attached Q I CREATE PAY ITEM ONLY- Payment to be made PAY THIS PAY ESTIMATE
_--at a later date upon completion of work — _
El Material Submittals Required - CC Construction Coordinator i New Sub Reqrd? No 'i,
�-— -
DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
i
Sch. No. B.I.No. -�_ _Item Description Qty Unit Unit PriceCvst of Item _-
- —
Independent Estimate Attached - REQUIRED I El
INCREASE/DECREASETO EXISTING PAYITEM(S) M NotApplicable
Change Order No. II _ I I FOR ACCOUNTING USE ONLY
Sch. No. I- B.I. No. Item Description _ Qty Unit I _ Unit-Price Cost of Item
i
J Independent Estimate Attached - REQUIRED
1 REV. DATE: 4/01/10
I
® T FILE NO: 200.2 ���
KEN
TOTAL ESTIMATED COST OF CHANGE ORDER * ($225.70)
*Total of the Cost of Item Columns
THIS PAY ESTIMATE
_. IV. —WORKING..DAYS------- -._
Original Contract 300 Due This Change Order* ® Previous Total
_ _ _ � � 304
_-_ --- ..— ----- ---------- --- --- —�------�-------------
1-;'�"fT]E'x—jl�—nation
DATE_p /Justification Required:
TOTAL WORKING DAYS* 1 304
*This Change order 4 Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described,
Prepared By: �'� Date: q-I
Phil McConnell
Construction Supervisor: / Date: 7
Construction Manager: Date:
Pa I KVedhqVeL
2 REV. DATE: 4/01/10
Sewer plug and vactor
LABOR
$47.78
$18.40
EQUIP $34.66
$100.84
total vactor unplug $100_S4-
Re-tv
LABOR $47.36
$45,62
EQUIP $28.52
$3.36
total re-tv $124.86
GRAND TOTAL $225.70
I
woo w w o 0 0 0 0 o m
DDD DDYD D D D D 3, m� A
N � NJ cJo � m W ro m ro # `; # ..N
.�
0 0 0 = m rn rn m o m rn rn
eo co to — btmmmwbtmot s
0 0 o O o 0 0 0 0 0 0 0 3
y o 0 0 0 0 o a o Q Q
oNNN A .JP A A A ,Jp .Jp .Vp a O'
NNNN N N N N 10 (�
0 0 0 0 0 0 0 0
m m Gl Co n (n S 0
nm m to � mw 0mia
D
� � O
r
R
N
Np 2 r
x �
N w J A m A A m
a m C.
o m w o rNn w o cNn
W w w sz e» ss to sv el ss t� " °'— �•
> ut to .SA WJAB A � � o ° r CQ
n
� ' O0 N OJCo O/N� •e � � I
(D
DDDDD z. � �
(D
„eA ys-. wwcorom �2a0 p
uoi 0 ton uoi
?"?CID
`F-s, rnmoimrn o m
l7] s �= 0 cOo too m coa 'm .7y.
o000o y
�y\• -G' f ��- m
.i
N cJ»
� c c
m n N
rn N w N 0 o�
o
y 09
61 N Co N w D
O
ay !A
� � m
. a
a
c z
S �
D
O
N
o C
Z A •' � 1
E o U
G C
3 F—' A C+ u
p �
2 � T
I
I
� I
I
I
I
i
d
> > m
W W S m O
W m C, 0
N N O o I
ro o # #
a a
o o �
� � m
o o #
to co m
O o 0 3 O
N o o
N N N m 0
0 o O
N
C N v
6J W
N W m
0
{y b9 £9 £9 m x N (9
O N caiiJ =.o m 1
�a W
CD
N
� I
L � 2 �
m m
a
:3
_ z�J yp mm
:ti �� Rt�. r� O O � � ♦t!
0 Q
o � ic3
m
> Con
'4 m
C
W Ut N o r I
-1 I
0
W m N
(\
k ° }
w p
§ ,
/
� j )
-
! \
\ ~ \ \ \ \