HomeMy WebLinkAboutPW13-204 - Change Order - #6 - SCI Infrastructure, LLC - Hawley Rd Levee Improvements Phase II - 09/15/2014 z�r fFF� Xffiv`±' R
Records f0�i B e n� e gr
KEN7` Document
��
T5 �f y 0 y'N
*` afr?4�iYSu'4"zl� � �y�Y +
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: SCI Infrastructure, LLC
Vendor Number:
JD Edwards Number
Contract Number: PW3.4-282- F1yT;12--,.C7H 60-1
This is assigned by City Clerk's Office
Project Name: Hawley Rd Levee Improvements Phase II
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other: #6
Contract Effective Date: 09/15/2014 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Tim LaPorte Department: PUBLIC WORKS
Detail: (i.e. address, location, parcel number, tax id, etc.):
Original Contract date: 08/28/2013
S:Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
i
KNT
CHANGE ORDER. NO. #6
NAME OF CONTRACTOR: SCI Infrastructure LLC ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Hawley Rd Levee Improvements Phase II
ORIGINAL CONTRACT DATE: 8/28/2013
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this.Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Irrigation and landscape installation for disturbed areas, work required
to complete project.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $442,679.76
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $35,879.89
(incl. applicable WSST)
Current Contract Amount $478,559.65
(incl. Previous Change Orders)
Current Change Order $29,491.62
Applicable WSST Tax on this Change $2801.70
Order
Revised Contract Sum $510,852.97
CHANGE ORDER - 1 OF 3
Original Time for Completion 60 working days
(insert date)
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (f) for this Change 0 calendar days
Order
Revised Time for Completion 60 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
N�1-
CONTRACTOR: CITY OF KENT:
B By:7. r
(signot ) ,(¢ (signature)
P r i n Name: Tt,��re -� Print Name: Tim LaPorte, P.E.
Its !pcz3 rA-- oAOL Its Public Works. Director
k (title) % (y'tle)
DATE: DATE: 'FIZ "fV
CHANGE ORDER - 2 OF 3
F
APPROVED AS TO FORM:
(applicable If Mayor's signature required)
N/A
Kent Law Department
CHANGE ORDER - 3 OF 3
KENT FILE NO: 200.2
CHANGE ORDER WORKSHEET NO. 6
Construction Management Division — Public Works
Project: Hawley Road Levee Project No.: 10-3010.5
Improvements Phase 2
Project Engineer: Kelly Casteel Fed-Aid No.:
Owners Rep: Alan Chau Contractor: SCI Infrastructure, LLC
Date: 9/8/2014
I. PROPOSED CHANGE
Equitable adjustment.
II. REASON AND BACKGROUND FOR CHANGE
Required to complete the project.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch No Item Description ---- i Est.
City th I Unit Unit Price Total Estimate- d Cost of
E -
1 Irrlgation-and landscape 1 1 Eq. , $29,491.62-„� $29,491 62
installation for distubred
areas
❑ 1 Independent Estimate Attached i ❑ CREATE PAY ITEM ONLY- Payment to be made I ® PAY THIS PAY ESTIMATE
- REQUIRED at a later date upon completion-of work _
Material Submittals Required CC Construction Coordinator New Sub Regrd7 No
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
sch No. I B I No i Item Description Qty Unit Unit Price Cost of Item
--- -- _ -
i
❑ '; Independent Estimate Attached - REQUIRED i ❑
INCREASE/DECREASE TO EXISTING PAY ITEM(5) ❑ Not Applicable
Change Order No. _ I FOR ACCOUNTING USE ONLY
sch No7 B I No Item Description Qty- Unit Unit Pnce i Cost of Item
-- - _- - - - -- -- --- --
I t-------------
❑ I Independent Estimate Attached -REQUIRED , ❑
1 REV. DATE: 4/01/10
KEPT FILE NO: 200.2
TOTAL ESTIMATED COST OF CHANGE ORDER * $29,491.62
*Total of the Cost of Item Columns
THIS PAY ESTIMATE �29,491.62
IV. WORKING DAYS
Original Contract 60 1 Due This Change Order* 0 Previous Total i 60
-- _
TE �_12/20/13 � _ ,_DATE i.._12 20 13.__
la nation justification Re wired:
TOTAL WORKING DAYS* L 60
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: /� � `' _- _ Date:
14
Air Chou
Construction Supervisor: Date: P
ul ne '
Construction Manager: y�� '" _ Date:
ric Connor
i
2 REV. DATE: 4/01/10
i
DAILY REPORT OF
Landscaping Lump Sum 1<ENT
Project Name: Hawley Rd. Levee Improvements Phase 2 Project No: 10-3010.5
Item No.: Date: 7/18M4 to 8/12I14
Description of Work: Irrigation and landscape installation for disturbed areas
Work by SubcontractorT Yes
Prime Contractor: SCI Infrastructure, LLC Sub-Contractor: U eta Landscape and Maintenance
LABOR
STRAIGHTTIME OVERTIME DOLLAR
NAME CODE OCCUPATION HNI Hourly Rate Hrs OF Rate AMOUNT
$
$
SUBTOTAL-LABOR: $ -
LABOR OVERHEAD&PROFIT @ 29% $ -
LABOR TOTAL S
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
$
$ i
$
$
SUBTOTAL-EQUIPMENT $
EQUIPMENT OVERHEAD&PROFIT @ 21% $
EQUIPMENT TOTAL $ -
MATE RIALSIS E RV I CES/RENTALS
MATERIALS SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Irrigation and Landscape installation for disturbed areas 1 Eq, $ 26,331.80 $ 26,331.80
$
$
$
SUBTOTAL $ 26,331.80 L.
OVERHEAD&PROFIT @ 21% $ -
TOTAL $ 26,331.80 '
Verification of Hours Worked TOTAL: $ 26,331.80
12%MARKUP(for prime when subcontract work) $ 3,159.82
Contractor's Representative Date SHEET TOTAL: $ 29,491.62
E7,
Datete Entered:
Date:
By:
INVOICE 73873
UYETA LANDSCAPE Job At: Holmes Electric
AND MAINTENANCE 600 Washington Avenue South
Kent,WA 98032
19605 106th Avenue SE,Renton,WA 98055 ',.
Make checks payable to: UVETA LANDSCAPE&MAINTENANCE
Balance Due I Check Number
Bill To: $26,331.80 Is #
Nx.
SCI Infrastructure LLC - '-`A!' V15G! 3%surchnrge will he added to nil credit card Payments.
2825 South 154th Street
SeaTac, WA 98188 Credit Card No,
CW Number: /
p rod,on,nobs,e hho,vd) Exp.Date
Please check box if address is incorrect or has changed,and Name: Zip Code.
indicate change(s)on reverse.silo Current E-mail Address: Ivxon(alsciniFaslructurucom
UYETA LANDSCAPE& MAINTENANCE PLEASE DETACH AND RETURN TOP PORTION WITH PAYNIENT
19605 106TH AVE S.E.
RENTON, WA 98055
Invoice# Terms Due Dale Rep P.O.No. "...
Invoice Date: 8/28/2014 73873 Net 15 9/12/2014 SGM
Serviced Qty Unit Description Rate Amount
Irrigation and landscape installation for disturbed areas
per proposal.
Worked done between 07/18/2014 to 08/12/2014.
I Disturbed area landscaping 12,650.00 12,650.00
1 Plant material 4,950,00 4,950.00
1 Plant material installation 2,975.00 2,975.00
1 Prevailing Wage Premium 1,000.00 1,000.00
Subtotal 21,575.00
Irrigation System Installation
I Labor on irrigation installation 3,531.80 3,531,80
1 Irrigation Parts 1,050.00 1,050.00
Small Equipment Fee(s) 175.00 175.00
Subtotal 4,756.80
I
i
Pay online at: htt s;//il n,intuit,c m/j2ike4br
THERE WILL BE A $15 CHARGE FOR ALL RETURNED CHECKS. Subtotal 526,331.80
FINANCE CHARGE,OF 1.5%WILL BE ADDED TO PAST DUE Sales Tax (0.0%) 50.00
BALANCES(GRACE PERIOD OF 7 DAYS AFTER DUE DATE)
Total $26,331.80
Payments/Credits $D00
Billing Inquiries?Call(253)859-8589 or email: billing n uyetalandscape.cum. Balance Due $26,331.80