HomeMy WebLinkAboutPK14-107 - Change Order - #1 - FieldTurf USA, Inc. - Wilson Playfields Turf Replacement Project (Purchased Through KCDA) - 07/11/2014 4, V
-
Records M -' ern
KENT Document
WASNINOTONc. s
ryp g. Y dt
VX'j£iniy � $$ 4g}ip-A'x�j 2 t
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: King County Directors' Association (for FieldTurf USA)
Vendor Number: 34116
]D Edwards Number
Contract Number: PK14-107
This is assigned by City Clerk's Office
Project Name: Wilson Playfields Synthetic Turf Replacement
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 5/12/14 Termination Date: 7/25/14
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Brian Levenhagen Department: Parks Planning & Dev.
Detail: (i.e. address, location, parcel number, tax id, etc.):
CHANGE ORDER #1: Repair of parking lot added to scope; no time extension.
Total contract amount increased to $1,741,142.19 incl. WSST
RECEIVED
JUL I e ?j)14
oft1 nc=Nr
CITY CLERIC
PPD Contract# PPD14-11
I
S:Publlc\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
KENT
CHANGE ORDER NO. 1
NAME OF CONTRACTOR: FieldTurf USA ("Contractor")
CONTRACT NAME & PROJECT NUMBER:Wilson Playfields Synthetic Turf Replacement, #PPD14-11
ORIGINAL CONTRACT DATE: 5/12/2014
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
As described in Exhibit A, attached:
Sawcut, excavate, dewater, haul, demo asphalt to approved dump
site; Install drain pipe and rock; Repave sawcut area.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $1,716,511.53
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0
(incl. applicable WSST)
Current Contract Amount $1,716,511.53
(incl. Previous Change Orders)
Current Change Order $22,493.75
Applicable WSST Tax on this Change $2,136.91
Order
Revised Contract Sum $1,741,142.19
CHANGE ORDER - 1 OF 3
Original Time for Completion 7/25/2014
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required (f) for this Change 0 calendar days
Order
Revised Time for Completion N/A
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: ;,'' CITY OF KENT:
fyrt�({
y (signature) ( — (signatu e /
Print Name fr /
yjd t r � °J 'rc yy fln t Dlme: s "
its ^ � '' f f� d J F / f r'r'n __ Its
DATE DATE:
I
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable If Mayor's signatur require
t -&V�ck
Kent Law Department
P:\Planning\Wilson Playflelds\Turf\Fleld Tuff-KCDA 2013\PIeldTurf-CO 81.ancx
I
CHANGE ORDER 3 OF 3
i
Melffurf THE ULTIMATE
SURFACE EXPERIENCE
A Tarkett Sports Company
Contract Change Order Proposal
Date: Iuly 7,2014 - Change Order#1
From:I FieldTurf IJSA,Inc. To: City of Kent
7445 Cote-de-Liesse Road Suite 200 220 Fourth Ave S
Montreal Quebec H4T lG2 Kent,WA 98032
Phone:808-209-0065 Fax:503.692.0491
Project: lWilson Pla Fields Contact: Brian Levenha en
13028 SE 21Ist Street Phone: 253-856-5116
Kent,WA 98030 Fax: 253-856-6050
Email: Lenhagen@KentWA.F,OV
Original Contract: $ 1,567,590.44
Previous Change Orders: $ - j
Current Change Order: $ 22,493.75
Revised Contract Total: $ 1,590,084.19
SCOPE:Parking Lot-Sawcut,excavate,dewater,haul,demo asphatl to an approved dump site,
install drain pipe and rock.
Description Total Cost
Labor $ 5,679.15
Equipment $ 2,869.12
Material $ 3,748.27
Subcontractors $ 7,585.06
General Conditions $ 2,336.83
Pa ment and Performance Bond $ 275.3z
F
TOTALS S zz,49a.75
Notes/Exclusions:
Quote is valid for thirty(30)calendar days
The Contract Time will be increased by days.
It is mutually agreed that for the above-referenced changes to take place,the original contract price will be adjusted by the
above-referenced amount,which will become payable in accordance with the same terms and conditions as in the original
contract or purchase order:
$ 22,493.75
If all the terms of this change order are acceptable please have an authorized representative sign the bottom of this
document and return it to Field'Furfs Montreal office,or as otherwise provided in the contract documents.FieldTurf will,in
turn,provide a fully executed copy for your records.Once this documentis fully executed,itwill be considered a
revision/modification to the original contract or purchase orden
FieldTurf USA,Inc. Owner/General Contractor
Authorized Representative Authorized Representative
Date Date
"dt1G.StI iA ,.fi $,a,4p+t£' *, 'kk"n„•:�. `�,....,
Location:
Start Date TBD
End Date: TBD
Point of Contact for Customer
Labor Rate
Straight Time 110 $ 64.60 $ 7.106.00
Overtime $
Total Man Hours 0
Hotel-per-diem 4 days r $
Subcontractors
Saw Cut AC $ $626.00
Pave $ - $5,600.00
Trucking cost1 4 $ 125.00 1 $ 500.00
Rental Equipment
Piece of Equipment
Loader 2 $ 60.00 4 $480.00
Excavator- daily 4 $ 44.00 4 $704.00
bobcat- daily 8 $ 20.00 4 $640.00
dump truck- daily 2 $ 40.00 4 $320.00
Water Truck 8 $ 50.00 A $400.00
1 $ 4 $0.00
Total Equipment Costs °, 4a
Materials
Pipe and Fittings $419.00
Bedding $1,026.00
Base Rock for pave $1,092.00
Spoils $788.00
MOMHis+y c55.1 .sS :.£ri n
FT 0/P @ 141457% $2,792.75