HomeMy WebLinkAboutPW14-118 - Change Order - #6 - Tapani, Inc. - Briscoe-Desimone Levee Improvements Reach 2 & 3 - 12/07/2015 KENT Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Tapani, Inc Vendor Number: JD Edwards Number Contract Number: PW 14-118 ,(p/) This is assigned by City Clerk's Office Project Name: Briscoe Desimone Levee Improvements Reach 2 and 3 Description: ❑ Interlocal Agreement M Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 1/30/2014 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Kelly Casteel Department: PW Engineering Contract Amount: $6,709,555.56 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order#6 As of: 08/27/14 }C E I+ T CHANGE ORDER NO. #6 NAME OF CONTRACTOR: Tapani. Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Briscoe Desimone Levee Improvements Reach 2 and 3 ORIGINAL CONTRACT DATE: January 30, 2014 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Remove topsoil and sod at 6202 S 190`h Street and place 4" bark and fabric to restore private property disturbed by the construction to an acceptable condition, 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $6,709,555.56 (including applicable alternates and WSST) Net Change by Previous Change Orders $324,851.35 (incl. applicable WSST) Current Contract Amount $7,034,406.91 (incl. Previous Change Orders) Current Change Order $35,502.74 Applicable WSST Tax on this Change pp g $3,372.76 Order Revised Contract Sum $7,073,282.41 CHANGE ORDER - 1 OF 3 f Original Time for Completion 200 working days (insert date) Revised Time for Completion under 210working days prior Change Orders (insert date) Days Required (f) for this Change o calendar days Order Revised Time for Completion 210 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below..,, , CONTRACTOR: CITY OF KENT: (signature) _ (s) ture) Print Name: J05T/w MELLCL_ 4P Print Name: 11"CA11 Its Lv r MaW4CC-P- Its'Ptk-Via Wa L- (title) f /(titl ) DATE: I1 S�iS _ DATE: I� 7 r t CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM- (applicable if Mayor's signature required) Kent Law Department [In this held,you may enter the e!eRmnic filopoth where the contract has been saved] l CHANGE ORDER 3 OF 3 KEAIT FILE NO: 200.2 CHANGE ORDER WORKSHEET NO. C Construction Management Division - Public Works Project: Briscoe-Desimone Levee Improve Project No.: 09-3010 Project Engineer: Kelly Casteel Fed-Aid No.: N/A Owners Rep: Jason Bryant Contractor: Tapani Inc Date: 10/1/2015 I. PROPOSED CHANGE Remove topsoil and sod @ 6202 So 190t" St. Place 4" of Bark and fabric IL REASON AND BACKGROUND FOR CHANGE This work was necessary to return private property disturbed by construction to an acceptable condition compariable to before construction. III. METHOD OF PAYMENT NEW PAYITEM(S) ® Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch. No. 1 Item Description Total Est. Qty this Unit ( Unit Price T Total Estimated Cost of City PE Item --------- ----- ---------- Independent Estimate Attached i CREATE PAY ITEM ONLY- Payment to be made ® PAY THIS PAY ESTIMATE ___ I REQUIRED ---__ I at a later date upon completion of work. ___ '- ------- - ----- ----- -- - --'—_--- [] Material Submittals Required ---I CC: Construction Coordinator . New Sub Reqrd? I No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. _ ( FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price i Cost of Item I Independent Estimate Attached - REQUIRED INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® NotAppllcable Change Order No. _ FOR ACCOUNTING USE ONLY - - Sch No. I B.I, No. Item Description Qty Unit Unit Price I Cost of Item ---- -f--- '-._ .. .__.-..._. ----__.. ___'-_ _-.----- -..-.. __------... __.__.__...Ciost- —-------- _.....__ -- _.-_ _.-._. -..-----_ ------------- ----_I I Independent Estimate Attached -REQUIRED -- ----f 1 REV. DATE: 4/01/10 • -1" FILE NO: 200.2 ICEN TOTAL ESTIMATED COST OF CHANGE ORDER * F $35,502.74 *Total of the Cost of Item columns THIS PAY ESTIMATE $35,502.74 IV. WORKING DAYS Original contract 200 Due This Change Order* Q Previous Total DATE r_10 1 15 ._, - __ -.-.-. _DATE: 10 1 15 1210 -- -- * Explanation Justif On critical path for project completion TOTAL WORKING DAYS* = 210 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Date: D ] on ya Construction Supervisor: ,G Dater Paul K.LLehne Construction Manager: Date: Eric Connor I 2 REV, DATE: 4/01/10 DAILY REPORT OF FA Sheet No,: T-60 FORCE ACCOUNT WORKED «<cNT Project Name: Briscoe-Desimone Levee R-3 Project No: 09.3010 Item No.: Date: 7/28/2015 Descripflon of Work: Remove topsoil and dace fabric and bark @ Ralelgh Blko Work by Subcontractor?: NO Prime Contractor: Tapani Underground Sub-Contractor. LABOR STRAIGHTTIME OVERTIME DOLLAR NAME _ CODE OCCUPATION Hrs Hourly Rate Firs OT Rate AMOUNT R an Poreman 5.5 65.17 $ 358.44 Kyle Operator 17.6 64.07 $ 121.23 Kenneth Laborer 1.5 52A0 $ 70.34 Lane Laborer 6.5 52,89 $ 290.90 ICaInr011 Laborer 6.5 61.07 $ 336.89 SUBTOTAL-LABOR: $ 2,185.80 LABOR OVERHEAD&PROFIT @ 29% $ 633,88 LABOR TOTAL $ 2,019.68 EQUIPMENT EQUIPMENT ORAT I"ACHMENTS OPERATED STANDBY DOLLAR Equipment if Equipment Descripflon Hrs Hourly Rale firs Standby Rate AMOUNT JD75 221 385.00 Crew Truck 5.6 11.00 $ 60.50 $ S - S - SUBTOTAL-EQUIPMENT $ 445.50 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 93.50 EQUIPMENT TOTAL $ 530.06 MATERIALSIS CRVICESIRENTALS' i MATERIALS I SERVICES Quantity Units I Unit Price DOLLARAMOUNT C&R Tractor Invoice If 48514 . 1 LS $ 28,700.00 $ 28,700.00 $ �I SUBTOTAL 28,700.00 OVERHEAD&PROFIT @ / $ 3.444.00 Z OTAL $ 32,144.00 Verification of Hours Worked: TOTAL: $ 35,502.74 12%MARKUP (for prima when subcontract work) $ - Contractor's Represonialive _../ Dale ' 6 jj SHEET TOTAL: $ 36,502.74 Owners Represenwive Dale � I Pay E mate E Date: By. I 1 FA Sheet No.: T-60 DAILY REPORT OF FORCE_ ACCOUNT WORKED Project Name: Briscoe-Desimone Levee R-3 Project No: 09-3010 tern No.: Date: 7/28/2015 Description of Work: Remove topsoil and place fabric and bark @ Raleigh Bike Work by Subcontractor?: No Prime Contractor: Tapani Underground Sub-Contractor: LABOR STRAIGHTTIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OF Rate AMOUNT Ryan Foreman 5.5 65.17 $ 358.44 Kyle Operator 17.5 64.07 $ 1,121.23 Kenneth Laborer 1.5 52.89 $ 79.34 Lane Laborer 5.5 52.89 $ 290.90 Kamron Laborer 5.5 6107 $ 335.89 SUBTOTAL-LABOR: $ 2,185,80 LABOR OVERHEAD&PROFIT @ 29% $ 633.88 LABOR TOTAL $ 2,819.68 EQUIP.'.MENT,". t� EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT JD 75 22 17.50 $ 385.00 Crew Truck 5.5 11.00 $ 60.50 $ SUBTOTAL-EQUIPMENT $ 445.50 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 93.56 EQUIPMENTTOTAL $ 539.06 MATERIALS/SERVICES/RENTALS MATERIALS l SERVICES Quantity Units Unit Price DOLLARAMOUNT C&R Tractor Invoice#48514 1 LS $. 26,700.00 $ 28,700.00 $ $ SUBTOTAL $ 28,700.00 OVERHEAD&PROFIT @ 21% $ 3,444.00 TOTAL $ 32,144.00 Verification of Hours Worked: TOTAL: $ 35,502.74 12%MARKUP (for prime when subcontract work) $ - Contractors Representative Date SHEET TOTAL; $ 35,502.74 Owners Representalive Date d �f Pay Estjrr(ate� red: Date: I By: ' 10, P.O.Box 1900 TAPANI kp Ti angle croHna,wA 66604 UNDERGROUND, INC. Main ORloe (360)687-1tore Main(Mice)Fax)807-6740 Change Order Request Project Name Briscoe Desimone Levee Improvements Date 7 28/2015i, Contract No: 09-3010 TUI Job No. 141212 TUI.No. 15 Owner No. 0 General No. 0 Dose riplion: 4 Inches of dark over Erosion Control Fabric AEEM-;ucnrtt�-J�aI?US.ge.„=i.-..-..=s:�, Unp Rate Houm UNI Total - - 22-JUG _ - - - _ $ - 0 HRS S - Lea roan Kaman Hedval 5 61.07 4 HRS $ 24426 Foreman Ryan Nelson $ 55.17 4 HRS $ 260.68 Labor Lana Newblum $ 6289 5.6 HRS S 290DD Operator Kyle Pete $ 84.07 7.5 HRS $ 480,53 Labor IKBBn.th 011n9er $ 5289 1.5 HRS $ 7934 24-Jun $ - 0 HR5 $ - Laedman Kamron Hedval $ 61.07 1.5 HRS $ 91,61 Foreman Ryan Nelson $ 85A7 1.5 HR5 $ 97.76 Labor Lane Newbern $ 52.69 0 HRS $ Operator Kyle Pete $ 64.07 10 HRS $ 640.70 Labor IKenneth Olinger $ 52.89 0 HRS $ - 5 0 S Labor Sub Total $ 2,195.]0 29% Markup $ 63387 0% Small TOOIe $ - TotalLaborHours 36.5 Unll RI.L Ilonis Unit inlet Crew T,Lck .- $ 11Dn 55 HRS $ 80.50 JD 75 Ndni Excavator $ 22.00 17.5 HRS $ 39500 E ulpmenl Sub Total 5 445.5 21% Mark-Ups 93.56 'E9: {P aF.k6F.00. 'd.1a16t7d1`.09i6a6 if:B€'1L68 LE9 unu Rae Goa City unn Taml $ 0 $ Material Sub Total $ - 21% Mark-Up S F e.aa�r.'i;t2¢€¢:S.P.PeFtf-d[dr6 a e iF'F ep un9Ratc ooaanty net Tool C8R Tractor Invoice 16514 $23,]090n 1 LSU $ 28,700.00 $ D s S D $ Sub Contractors Sub Total $ 29,700.00 12% M1tark-U 5 3,444.00 IF62y$CNt:BSItEi11CVE0FlPNIfd13D:Bt1FPtp6°E66B6G51n.al" UHL Rate obaality Umt "'.1 $ o I $ - $ 0 $ 5 0 $ F $ 0 else.Total 0°, Mark-Up s EXCluslons mzenaaaa laneazez ue emzm tandem re.p,oietl by DDnvlzl We lctove the ralb to dalm mat and'o:echossio imp,o,a Isar data Total Coat $ 31 331.28 0% Overhead $ - SUbTotal $ 35,5027D $ General Liability neuranoe $ 0.00% Band $ - Total Amount $ 35,502.70 NOTE THIS CNM'GE Wrl R RLUL EST SH RT BE ACCEFtBD ASPPPROVED AND INCORPORATED IMOn LE COMRAGT 11NLFss WE RECEIVE A WRITTEN RESPONSE FROM YOU STATING 01HER OSENfTI IN 49 HOURS Str IA'CULO PREFERTHIBCH V43E ORDER REQUEST FORM TO BE SIGNED MD RETURNED). Prepared by.Derek Kemppalnen Accepted by: Date: 7I2W015 Dale: I I C & R TRACTOR and LANDSCAPE, INC. DATE: ` 22-Jun-15 TO: Tapani Underground, Inc 1904 SE 6th Place Battle Ground, WA 98604 I RE: BRISCOE-DESIMONE BARK CHANGE ORDER i BID: 4" BARK OVER EROSION CONTROL FABRIC $ 28,700.00 Services Provided By General Contractor clean (bare soil condition) and finish/subgrade +/-.10 foot, ready for landscaping de-compactlon of areas that become compacted by construction traffic control surveying laydown area permits (water, electrical etc.) Excludes use tax, washington state sales tax union agreement,wages, initiation fees or dues topsoll and/or placement subgrade preparation prior to landscape work Notes bid is based on attached erosion control fabric submittal if selected, conditions and exclusions of this proposal to be included in contract Respectfully Subm'4ed, Casey Fleaton /Alan K. Nakamura C&R Tractor and Landscape, Inc. 3928 Pleasant Hill Rd Kelso, WA 98626 360.577,8288 i i i Woro i SRW NW4.5 (Black, Non-Woven) SRW NW4.5 is a superior quality, non-woven geotextlle produced by needle punching together 100°fa polypropylene staple fibers In a random network to form a high strength dimensionally stable fabric.The polypropylene are specially formulated to resist ultravio- let light deterioration,and are Inert to commonly encountered soil chemicals.The fabric will not rot or mildew,is non-biodegradable,and is resistant to damage from Insects and rodents, SRW NW4.5 conforms to the physical property values listed below: . r rr Weight(Typical) ASTM D6261 oz/sy 4,2 Grab Tensile ASTM D4632 Ibs 120 Grab Elongation ASTM D4632 % 50 Trapezoidal Tear ASTM D4533 ins 50 Puncture Resistance ASTM D4833 Iles 70 Mullen Burst ASTM D3786 psi 240 Permittivity ASTM D4491 1/sec 1.8 Water Flow(Fri) AS]M D4491 gpm/sq ft 120 AOS ASTM D4751 US Sieve 70 UV Resistance ASTM D4355 %strength 70 (after 600hrs) retained Roll Dimonsions/Packaging (see catalog) I To the best of our knowledge, the information contained herein 18 accuralo, riowovoG SHW Products cannot an, ticlpale all conditions under which SRW product Information and our products or the products of other mama lacturers in combination with our products, may be used. We accept no responsibility for resulls obtained by the application of Ihls Information or the safety or suitability of our products either atone or In combination with other products. Final determination of the suitability of any information or material for the used contemplated, or Its manner of use, and vrhethar the suggested use Infringes any patents Is the sole responsibility of the user. e e / 1 ° '0 :11 • • e : ' a ee e it i Bryant, Jason From: Bryant,Jason Sent: Monday,June 22, 2015 1:34 PM To: Ryan Nelson (ryann@tapaniunderground.com) Cc: 'Casey@candrtractor.com' Subject: FW: Attachments: 20150622123723655.pdf Ryan, Here is the plan for the bark placement. I measured @ 31,000 sf total. We would like to place 3"-4" of bark with fabric or plastic underneath. Let me know if you need anything else from me. Thank you, Jason Bryant, Owners Representative Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 jbrvant@KentWA.gov www.KentWA,gov PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL I -----Original Message----- From: Pub-Works-Admin-Lobby@kentwa.gov [mailto:Pub-Works-Admin-Lobby@kentwa_gov] Sent: Monday, June 22, 2015 12:37 PM To: Bryant, Jason Subject: This E-mail was sent from "Pub-Works-Admin-Lobby" (Aficio MP C4500), I li Scan Date: 06.22.2015 12:37:23 (-0700) Queries to: Pub-Works-Admin-Lobby(cbkentwa.aov f I 2 Bryant, Jason From: Bryant, Jason Sent: Monday,June 22, 2015 12:14 PM To: Mark Subject: Re: 6020 South 190th street Irrigation_3rd Request Attachments: image001.jpg; image0Q2jpg; image003.Jpg Sounds great see you there. Thank you, Jason Bryant Sent from my I phone On Jun 22, 2015, at 12:03 PM, Mark <marks@ hrpproperties.com>wrote: How about 230? S�n-li nn n i}y Verizon Wircless 4G LTE smarthone c i I. Il -------- Original message -------- From: 'Bryant, Jason" <JBtyant@kentwa.gov> Date: 06/22/2015 11:58 AM (GMT-08:00) To: Mark<marksLi�,hrpproper ties.com> Subject: RE: 6020 South 190th street Irrigation 3rd Request Mark, I'm available for either time. Whatever works best for you? Thank you, Jason Bryant, Owners Representative Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 ENT y<image015.jpg>jbryant@KentWA.gov ...... www.KentWA.gav - PLEHSE ENNVMEIY THE ENV I HOW6f ENT fIEFORL PI(ANTI fIN THIS L- MAIL From: Mark [mailto:marks@hrpproperties.com] Sent: Monday, June 22, 2015 11:17 AM To: Bryant, Jason Subject: RE: 6020 South 190th street Irrigation_3rd Request 1 I can meet this afternoon if possible. I have a 1:30 meeting nearby and could meet before that or around 2:30. From: Bryant, Jason [mailto:JBryantnkentwa.gov] Sent: Monday, June 22, 2015 11:09 AM To: Mark Subject: Re: 6020 South 190th street Irrigation_3rd Request Mark, Yes please, as soon as possible so we can get it taken care of. Thank you, Jason Bryant Sent from my I phone On Jun 22, 2015, at 10:05 AM, Mark<marks@hrpproperties,com> wrote: Thanks Jason, yes I would be happy to meet. Would you like to do that this week? <image012.Jpg> Mark Scalzo C.O.O., Hill Investment Company P.O. Box 700 Mercer Island, Wa 98040 (206) 232-7509 From: Bryant, Jason [mailto:JBryant@kentwa.aov] Sent: Monday, June 22, 2015 9:54 AM To: Mark Subject: RE: 6020 South 190th street Irrigation_ 3rd Request Mark, I just received the go ahead on placing the bark. I spoke with our contractor and we are working on scheduling the work. We will place fabric under the bark to kill any thing that may want to grow. Would you like to meet on site to confirm the limits of the bark? I also forgot to let you know we completed the irrigation repairs last Tuesday. I did call your landscapers and let them know. Thank you, 2 I Jason Bryant, Owners Representative Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 <image003.jpg> Phone 253-856-5541 1 Cell 253-261-5663 <image013.jpg><image008.jpg><image010.jpg>jbryant@KentWA.gov_ www.KentWA.gov ' PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Mark [mailto:marks(@hrpprooerties.com] Sent: Friday, June 12, 2015 1:06 PM To: Bryant, Jason Subject: RE: 6020 South 190th street Irrigation_3rd Request Thank you very much........ Sent from my Verizon Wireless 4G LTE smartphone -------- Original message-------- From: "Bryant,Jason" <JBryant@l<entwa.gov> Date: 06/12/2015 12:55 PM (GMT-08:00) To: Mark <marks(@ hrpproperties.com> Subject: Re: 6020 South 190th street Irrigation_3rd Request Mark, I'm working with Ken and Kelly on resolving the issues. I measured the affected areas and provided the details to them. We are working on a cost analysis and a plan to provide to the contractor. I hope to have an answer first of next week.The irrigation crew will be on site on Tuesday next week to complete the repairs. I apologize for this process taking such a long time. Thank you, Jason Bryant Sent from my I phone On Jun 12, 2015, at 12:18 PM, Mark<marl<s@hrpproperties.com>wrote: Jason & Ken, I still have not heard back from anyone with the City. Our site continues to deteriorate.We need to get a response. The situation at the site cannot go unaddressed. <image012.jpg> 3 Mark Scalzo C.O.O., Hill Investment Company P.O. Box 700 Mercer Island, Wa 98040 (206) 232-7509 From: Mark Sent: Tuesday, June 09, 2015 9:59 AM To: Mark; 'Bryant, Jason' Cc: 'Langholz, Ken'; John Subject: RE: 6020 South 190th street Irrigation Jason, I We need to get some direction from the City. We are getting complaints from the tenants. As I stated earlier the cost to the City to prepare the soil, install irrigation and try to establish hydro seed this time of year seems prohibitive compared to treating the weeds and applying bark. Thank you- Mark From: Mark Sent: Thursday, May 28, 2015 3:44 PM To: 'Bryant, Jason' Subject: RE: 6020 South 190th street Irrigation Jason, I inspected the site with our landscapers today. It is clear that the City's landscaper contractor have left the areas that were worked on in an unsatisfactory condition. The grade is very uneven and there are more weeds than grass. I would be happy to forward photos but I assume you have seen the problem. Also, our irrigation system does not have the capacity to grow to the point of being able to consistently water the area in question. I would also note that I would not think that the City would want us to consume the huge amounts of water necessary to keep that area in turf, if the repair would continue. Therefore, I am requesting that the area in question pe prepped ( either scrape of the combination of substandard hydro seed and weeds or chemical spay and rototill) for bark, and then bark be laid down. Additional sparse planting like it appears the contractor did on the south side would be acceptable as well. If you would like me to speak to additional people at the City I would be happy to do so. We are anxious to get the area cleaned up as we continue to market the property for lease and the under repair nature of the site does not help. Thank you for your efforts- iI 4 <image012.Jpg> Mark Scalzo C.O.O., Hill Investment Company P.O. Box 700 Mercer Island, Wa 98040 (206) 232-7509 From: Bryant, Jason [mailto:JBrvant(&kentwa.aovI Sent: Tuesday, April 28, 2015 10:21 AM To: Mark Subject: FW: Irrigation Mark, I'm currently working on a final punch list for our contractor and would like to meet with your irrigation team. That way we can identify any all broken pipes and wires. Could you please have them contact me or provide me their information so I can contact them. Thank you, Jason Bryant, Owners Representative Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 <Image002,jpg> Phone 253-856-5541 1 Cell 253-261-5663 <i m age004.i pg><i ma ge014.j pg><i mage008.jpg>jbrva nt@ KentWA.gov www.KentWA.aov PLEASE CONSIDER THE ENVI RUN M ENT OF FOR E PRINTING,rl-is E-MAIL From: Bryant, Jason Sent: Thursday, April 16, 2015 10:01 AM To: marks(@hrpproperties.com Cc: Langholz, Ken; Casteel, Kelly Subject: Irrigation Mark, I would like to meet with your irrigation company and turn on the system so we can identify all of the broken or cut pipes and wires. Could you please provide my there contact information or have them contact me so we can set up a meeting. Thank you, 5 i Jason Bryant, Owners Representative Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 <irnage002.jpg> Phone 253-856-5541 i Cell 253-261-5663 <image004.ipg><ImageOI4.jpg><ImageOO8.ipg>lbryant@KentWA.gov www.l(entWA.gov PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS F-MAIL 6 Bryant, Jason From: Casteel, Kelly Sent: Thursday, June 18, 2015 4:36 PM To: Bryant,Jason Cc: Langholz, Ken Subject: RE: 6020 South 190th street Irrigation_3rd Request Chat w/Ken tomorrow...Mark, Ken and myself recommend making them whole. From: Bryant, Jason Sent: Thursday, June 18, 2015 1:15 PM To: Casteel, Kelly Cc: Langholz, Ken Subject: FW: 6020 South 190th street Irrigation_3rd Request Kelly, Have me made a decision on the bark yet? We repaired the irrigation on Tuesday and I would like to get back to Mark. Thank you, Jason Bryant, Owners Representative Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 -•}.�,.' K �T lbryant2KentWA.9o_v ��77 ... .. .e'a, www.KentWA.gov n 0a PLEASE CONSIDElt'I HL-ENVIRON11 ENT BEFORE PRLN11Nu THIS E-MAIL From: Bryant, Jason Sent: Friday, June 12, 2015 12:48 PM To: Casteel, Kelly Subject: Fwd: 6020 South 190th street Irrigation_ 3rd Request FYI i Thank you, Jason Bryant Sent from my I phone Begin forwarded message: From: Mark <marks@hrpproperties.com> Date:June 12, 2015 at 12:17:26 PM PDT To: Mark<marks@hrpproperties.com>, "Bryant,Jason" <JBryant@kentwa.gov> 1 Cc: "Langholz, Ken" <I<Langholz@kentwa.gov>,John <iohnp@hrpproperties.com> Subject: RE: 6020 South 190th street Irrigation_3rd Request Jason & Ken, I still have not heard back from anyone with the City. Our site continues to deteriorate. We need to get a response. The situation at the site cannot go unaddressed. Mark Scalzo C.O.O., Hill Investment Company P.O. Box 700 Mercer Island, Wa 98040 (206) 232-7509 From: Mark Sent: Tuesday, June 09, 2015 9:59 AM To: Mark; 'Bryant, Jason' Cc: 'Langholz, Ken'; John Subject: RE: 6020 South 190th street Irrigation Jason, We need to get some direction from the City. We are getting complaints from the tenants. As I stated earlier the cost to the City to prepare the soil, install irrigation and try to establish hydro seed this time of year seems prohibitive compared to treating the weeds and applying bark. Thank you- Mark From: Mark Sent: Thursday, May 28, 2015 3:44 PM To: 'Bryant, Jason' Subject: RE: 6020 South 190th street Irrigation Jason, I inspected the site with our landscapers today. It is clear that the City's landscaper contractor have left the areas that were worked on in an unsatisfactory condition.The grade is very uneven and there are more weeds than grass. I would be happy to forward photos but I assume you have seen the problem. Also, our irrigation system does not have the capacity to grow to the point of being able to consistently water the area in question. I would also note that I would not think that the City would want us to consume the huge amounts of water necessary to keep that area in turf, if the repair would continue. Therefore, I am requesting that the area in question be prepped ( either scrape of the combination of substandard hydro seed and weeds or chemical spay and rototill) for bark, and then bark be laid down. Additional sparse planting like it appears the contractor did on the south side would 2 be acceptable as well. If you would like me to speak to additional people at the City I would be happy to do so. We are anxious to get the area cleaned up as we continue to market the property for lease and the under repair nature of the site does not help. Thank you for your efforts- Mark Scalzo C.O.O., Hill Investment Company P.O. Box 700 Mercer Island, Wa 98040 (206) 232-7509 From Bryant, Jason [mailto:JBryantCa kentwa.00v] Sent: Tuesday, April 28, 2015 10:21 AM To: Mark Subject: FW: Irrigation Mark, I'm currently working on a final punch list for our contractor and would like to meet with your irrigation team. That way we can identify any all broken pipes and wires. Could you please have them contact me or provide me their information so I can contact them. Thank you, Jason Bryant, Owners Representative x Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 x bb ant0IKentWA.gov www.KentWA.gov PLEASE,CONSMERTI IE ENVIRONMENT DiroQE PRINTING THIS E-MA L From: Bryant, Jason Sent: Thursday, April 16, 2015 10:01 AM To: marks0hrpproperties.com Cc: Langholz, Ken; Casteel, Kelly Subject: Irrigation Mark, 3 I would like to meet with your irrigation company and turn on the system so we can identify all of the broken or cut pipes and wires. Could you please provide my there contact information or have them contact me so we can set up a meeting. Thank you, Jason Bryant, Owners Representative constructlon Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 brvantCDlKentWA oov www.KentWA.nov PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING TN is E- MAil- I I i f 4