HomeMy WebLinkAboutPW15-246 - Original - RL Alia Company - Change Order - 7/16/15 1 1 1 1 1 1 Records Mlanagem ,ent� ,". W f.5M1110TON DOClvll 1Ie1 I l CONTRACT COVER SHEET E This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: RL Alia Company Vendor Number: JD Edwards Number Contract Number: PW 15-246 - OCG ? This is assigned by City Clerk's Office Project Name: W Gowe St-4th Ave S to 6th Ave S Drainage i Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 7/16/2015 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Paul Kuehne Department: PW Engineering Contract Amount: $312 030.00 + tax $29,642.85 = $341,672.85 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order#1 I, As of: 08/27/14 i 7 1 RENT CHANGE ORDER NO. 1 NAME OF CONTRACTOR: RL Alia Company ("Contractor") CONTRACT NAME & PROJECT NUMBER: W Gowe Street-4th Ave S to 6th Ave S Drainage ORIGINAL CONTRACT DATE: July 16, 2015 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Road restoration utilizing overlay paving instead of inlay paving due to the cost to pave inlay patch became near equal to the cost to repair the road using full width overlay. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III,"Compensation," are hereby modified as follows: Original Contract Sum, $341,672.85 (including applicable alternates and WSST) Net Change by Previous Change Orders $0.00 (incl. applicable WSST) Current Contract Amount $341,672.85 (incl. Previous Change Orders) Current Change Order $1,299.87 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $342,972.72 CHANGE ORDER - 1 OF 3 i Original Time for Completion 45 working days (insert date) Revised Time for Completion under 45 working days prior Change Orders (insert date) Days Required (f) for this Change 0 calendar days Order Revised Time for Completion 45 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OP KEW . j f By: 1,��LI- f� By: f✓°w.� + (si nature) (signature) Print Name: Print Name: GsiAn &ca>Enk Its Its CITY 15MIXaEF9 ^(title) (title) r DATE: ,;tt et- v' 'u t DATE: ldlaldS CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department i [In this field,you may enter the eleetrorou filepath where the eontraR has been saved] I I CHANGE ORDER 3 OF 3 ® T FILE NO: 200.2 o. CHANGE ORDER WORKSHEET NO. I Construction Management Division - Public Works Project: Gowe St. - 4n' to 6th Drianage Project No.: 15-3004 Project Engineer: Paul Kuehne Fed-Aid No.: Owners Rep, Paul Kuehne Contractor: R. L. Alta Company Date: 10/06/2015 I. PROPOSED CHANGE Road restoration utilizing overlay paving instead of inlay paving. II. REASON AND BACKGROUND FOR CHANGE An opportunity presented itself as the cost to pave inlay patch became near equal to the cost to repair the road using full width overlay. In this instance overlay paving will provide the City with a like new road surface for almost the same cost. Paving at Contract unit bid pricing. III. METHOD OF PAYMENT NEW PAY ITEMI(S) ❑ Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of j Qty I PE I Item _--- __- _- —.- ----- -------J. .------- ------------- 1 1 1100B 360 Tons $143.00 $51,480.00 HMA For Full Width Overlay i I � Independent Estimate Attached CREATE FyAY ITEM ONLY Payment to be made PAY THIS PAY ESTIMATE REQUIRED ; at a later date upon compledon_of work _ -.-.--.. .-.-- __-__ ❑ Material Submittals Required - CC: Construction Coordinator New Sub Reqrd? No DELETE EXISTING PAY ITENi(S) per 1-09.5 ® Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch No B.I. No. I Item Description 1 Qty Unit l Unit Price Cost of Item -_ __- .-1-- ------- ----. .. .----- ------ ------ -------__... . .-- I I _ Independent Estimate Attached - REQUIRED ❑ INCIRCA,SE/DECREASE TO EXISTING PAY ITEM(S) NotApplr'cable Cshangee Order No.. -- Item- T- — ( ' FOR ACCOUNTING USE ONLY m Description Qty Unit Unit Price Cost of Item Tonsi $143 DO ($48,620 00) - 1 1100 JHMA ForInlay 340 1 REV. DATE: 4/01/10 i i �' T FILE NO: 200.2 Independent Estimate Attached - REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * 1 $0.00 *Total of the Cost of Item Columns THIS PAY ESTIMATE �0 IV. WORKING DAYS Original Contract 1_45 i_Due This Change Order* 0 Previous Total 145 DATE - _ _-- ._.--- DATE * � Ex lanation Justification Re wired: TOTAL WORKING DAYS* �— 0 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: S t ` Date: Construction Supervisor: I f E c _.� t.: Date: j Construction Manager: Date: I, 2 REV, LATE- 4/01/10 Public Works Committee Minutes August 17, 2015 Item 1 - Call to Order: The meeting was called to order at 4:01 p.m. by Committee Chair, Dennis Higgins, Item 2 - Roll Call: Committee members present: Higgins Ralph and Fincher were present. Item 3 - Changes to the Agenda: There were no changes to the agenda. Item 4 - Approval of Meeting Minutes Dated August 3, 2015: Committee member Fincher MOVED to approve the minutes of August 3, 2015. The motion was SECONDED by Committee member Ralph and PASSED 3 - 0. Item 5 -Consultant Agreement with GEI for Construction Support for Briscoe-Desimone Reach 4: Kelly Casteel, Design Engineering Supervisor briefly touched on where the Briscoe-Desimone Levee is located and provided a brief funding history. Casteel went on to note that the City is continuing to pursue accreditation of the Briscoe- Desimone Levee from the Federal Emergency Management Agency (FEMA). As part of this accreditation effort, the City prepared a Conditional Letter of Map Revision (CLOMR) which identified 4 areas, or reaches, of the levee that do not meet current FEMA standards. These areas will be repaired utilizing sheet piles to construct a secondary floodwall. At the August 4, 2015 Council meeting, the construction contract for Reach 4 was awarded to Razz Construction. Under this consultant services agreement, GEI will provide construction engineering support for Reach 4. Committee Member Ralph MOVED to recommend Council authorize the Mayor to sign a Consultant Services Agreement with GEI Consultants, Inc. in an amount not to exceed $47,688 to provide engineering services for the Briscoe-Desimone Levee Reach 4 project, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. The motion was SECONDED by Committee member Fincher and PASSED 3 - 0. Item 6 - Consultant Agreement with GeoEngineers for Engineering: Kelly Casteel, Design Engineering Supervisor noted that this project is in the same location as item S. GeoEngineers will provide materials testing and inspection services related to this project. Committee member Fincher MOVED to recommend Council authorize the Mayor to sign a Consultant Services Agreement with GeoEngineers, Inc, in an amount not to exceed $57,541 to provide engineering services for the Briscoe-Desimone Levee Reach 4 project, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. The motion was SECONDED by Committee member Ralph and PASSED 3 - 0. Item 7 - Consultant Agreement with AECOM for Upper Mill Creek Dam Improvements: Stephen Lincoln, Engineer II, noted that this contract will allow AECOM to continue working on the project, with focus on obtaining permits from the Department of Ecology and the Army Corps of Engineers. The permits that are required have a long lead time and are needed in order to construct the dam improvements. i I Public Works Committee Minutes August 17, 2015 Committee member Ralph MOVED to recommend Council authorize the Mayor to sign a Consultant Services Agreement with AECOM in the amount not to exceed $64,127.56 to provide additional design services related to the Upper Mill Creek Dam Project, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. The motion was SECONDED by Committee member Fincher and PASSED 3 - 0. Item 8 — Railroad Agreement for Milwaukee II Levee: Mark Madfai, Design Engineering Supervisor noted that this is a long awaited agreement with the Railroad for the Milwaukee II Levee segment, which lies between 3rd Avenue and the west side of the Union Pacific Railroad Embankment and connects the Horseshoe Bend Levee with the Foster Park Levee. A portion of the proposed levee would consist of a levee wall constructed on the east side of the Union Pacific railroad track embankment. Within the railroad right of way the levee would then cross the embankment using concrete jet grouting to connect with the Foster Park Levee on the west side. In this way the levee would be considered continuous by FEMA, which is necessary for accreditation of the levee system. This agreement allows for the construction and maintenance of the levee within the railroad right of way. Committee member Fincher MOVED to recommend Council authorize the Mayor to sign the Levee Facility Construction and Maintenance Agreement with the Union Pacific Railroad for the Milwaukee II Levee, subject to final approval by the City Attorney and Public Works Director. The motion was SECONDED by Committee member Ralph and PASSED 3 - 0. Item 9 - Transportation Improvement Board — Grant Applications: Chad Bieren, City Engineer noted that it's that time of year again to apply for project funding through the Transportation Improvement Board (TIB). Bieren noted that grant agencies are tightening down on funding, therefore we want to make sure that we apply for grants for projects that we can have shovel' ready. To that end, Public Works staff members have looked at the current TIB scoring criteria and determined which projects would most likely score well and have potential funding for the city's share of the costs. Staff is proposing street widening/pavement restoration on 80th Avenue South and a non- motorized project on James Street. The 80th Avenue South Improvements project extends from - S, 180th Street to S. 196th Street. The project includes street widening and new sidewalks along with pavement restoration. It is currently on the TIP to include widening from S. 188th Street to S. 196th Street, we will Include pavement restoration and channelization from S. 188th Street to S. 180th Street in the TIB application. The James Street non-motorized project would include in- lane bike lanes and separated path for pedestrians to link Lakeside Boulevard with the Green River Trail. This is a significant missing link in the non-motorized network. No match has yet been identified; we are looking at a possible $50,000 match. Committee member Ralph MOVED to recommend Council authorize the Mayor to direct staff to complete Transportation Improvement Board grant applications for the 80th Avenue Improvements, S. 180th Street to S. 196th Street and James Street Non- Motorized Improvements, Lakeside Boulevard to the Green River Trail. The motion was SECONDED by Committee member Fincher and PASSED 3 - 0. 2 Public Works Committee Minutes __--- - -- August 17, 2015 Item 10 — Information Only/Stormwater Utility Analysis Update: Kristin Lykken, Financial Analyst and Alex Murillo, Environmental Engineering Supervisor provided an informational PowerPoint following up on questions at the June 15, 2015 Public Works Committee meeting regarding FEMA flood insurance, businesses with Stormwater facilities, and a comparison of Kent's stormwater utility rate with other local jurisdictions. Murillo noted that he spoke to Delores Christianson regarding the questions that she'd asked at the June 15 meeting. He spoke to her in advance of this meeting. Information Only/No Motion Required Item 11 — Information Only/Russell Road Update: Toby Hallock, Environmental Engineer II gave a brief update on the Upper Russell Road Levee project. Hallock noted that this project is beginning the final stage of construction necessary to meet FEMA Accreditation standards. Two phases have been completed, and the third phase extending north from James Street to the Neely Soames House, is beginning construction the week of August 24 and will be completed this year. Property access rights to construct the third phase have been acquired. Hallock stated that there are still some property negotiations underway. A condemnation ordinance will be presented to the City Council at the Council Meeting on Tuesday, August 18, to ensure acquisition will be able to be concluded. Information Only/No Motion Required Item 12 — Information Only/Thermoplastic Change Order: Joe Araucto, Pavement Manager noted that we are 99.9% complete with our construction season and that we are projecting to be well under the approved budget for the 2015 list of Business & Occupation projects. Araucto provided area maps of proposed sites for where the remaining dollars could be spent for the 2015 Plastic Marking contract and the asphalt overlay program. If council concurs, staff recommends adding additional work to our current contracts thus taking advantage of favorable weather and contractor availability. Staff will come back to the Committee with the final amount after the estimate is complete. Information Only/No Motion Required q $ K 0 �r ®a oe �. C Jci.v O y The meeting was adjourned at 5:25 p.m. Cheryl Viseth p Council Committee Recorder i 3 Gowe St Draiange -Overlay Cost Comparison Oneida,Bsumakc Inlay Pan Contract Engineer's Estimate Paul Kuehne Engineer's Estimate R.L.Alia Company Quantity Increase 102 Williams Ave South '.. Renton,WA 98057 8/13/2015 Ovii TOTAL $295,795.00 Inlay TOTAL $312,030.00 ITEM DESCRIPTION QTY UNIT UNIT TOTAL QTY UNIT TOTAL NO, PRICE AMOUNT PRICE AMOUNT '.. SCHEDULE I:STREET IODD Mobilization 1 LS 10,000,00 $10,000.00 1 $10,000.00 $10,000.00 1005 Clearing&Grubbing 1 LS 10,000,00 $10,000.00 1 $10,D00.00 $10,000.00 1005 Remove&Dispose of Existing Mailbox&Post 1 LS 100.00 $100.00 1 $100.00 $100 OD .15 Remove Existling`Ceme?f �n Concrete Dd<kd�Ffay9.`5D,'trfSY 20.00 $3,,00?0 .00 '$D3D00rXD 1015 Remove Existing Cement Concrete Driveway SSD SY 20.00 $3,000.00 I5o $20.00 $3,000.00 1020 Remove Cement Concrete Sidewalk 450 SY 20.00 $9,000.00 450 $20.00 $9,000OD 1025 Remove Cement Concrete Curb&Gutter 1,200 LF 20.00 $24,000.00 1,200 $20.00 $24,000.00 1040 Removal of Raised Pavement Markers&/or I LS 2,500.00 $2,500.00 1 $2,500.00 $2,500.OD ThermQolast,(c Trask,Marking 1053 utExistingCe Cement awment=s .c Soo SIBS . $2,�0:0k .00 1053 Saw Cut Existing Cement Concrete Pavement 500 LF 5.00 $2,500.00 SOD $5.00 $2,500.00 1080 Crushed 5/8"Minus,(Crushed Surfacing) 90 TON 30.00 $2,700.00 90 $30.00 $2,700.00 1100 HMA for Inlay Patch Class 1/2 PG 64 22 425 TON 143.00 $6D JJS 00 40D $143 OD $57 200 00 WIRE „4>an(ititibtt rtau's''PS'w 1125 Cold Plant Mix for Temporary Pavement Patch 5 TON 100.00 $500.00 5 $100.00 $500.00 1135 Cement Concrete Driveway,8"Depth,Reinforced 400 LF 22.00 $10,800.00 400 $27,00 $10,800OD Gutter Only 1140 Cement Concrete Driveway,8"Depth,Reinforced 10D SY 27.00 $7,700.00 100 $77.00 $7,200.00 1145 Cement Concrete Sidewalk 450 SY 33.00 $14,85D.00 450 $33.00 $14,850.00 1150 Cement Concrete Sidewalk Ramp 1 EA 2,D00.0D $2,000.00 1 $2,ODO.00 $2,000.00 1205 Cement Concrete Curb&Gutter 840 LF 20.00 $16,800.00 SOD $20.00 $16,000,00 1227 Adjust Existing Vault Lid to Finished Grade 1 EA 1,000.00 $1,000.00 1 $I,DD0.00 $1,000.00 1228 Adjust Existing Catch Basin Grate or Curb Inlet Grate ] EA 100.00 $700.00 2 $100.00 $700,00 to Finished Grade 1229 Adjust Existing Manhole Cover to Finished Grade 4 EA 100.00 $400.00 4 $IDO.00 $400,00 1230 Adjust Existing Valve Box Top Section&Lid to ] EA 100.00 $700.00 ] $100.00 $700.00 Finished Grade 1240 Adjust Existing Junction Box t0 Finished Grade 4 EA 100.00 $400.00 4 $100.00 $400.00 1245 Adjusting Existing Monument,Case Is Cover to 1 EA 1,000.00 $1,000.00 1 $1,OD0.00 $1,000.00 Finished Grade 1250 Install New Monument,Case&Cover to Finished 1 EA 1,000.00 $1,000.00 1 $I,O00.00 $1,000.00 Grade 1315 Pothole Utilities 10 EA 30.00 $300.00 10 $30.00 $300.00 1320 Project Sign Installation 2 EA 500.00 $1,000.00 2 $500.00 $1,0DO.00 1355 Minor Changes 1 CALC 13,000.00 $15,000.00 1 $15,00.00 $15,ODO.00 SCHEDULE I TOTAL $224,725.00 $227,350.00 SCHEDULE III:STORM SEWER - p 4£9^I$fg15R` 9$r4®1s41�3i%+PlFi $5( `ot` rc !)"r 1, 4r[Lf i �€ v+;{g�pb wwd� 4 U 1sv rr rti to t sT�,07iXn-og'd*`'fitltFt`ix, . a i vR- _ , ,^, ..:<a „' l m'.:,' . , ,�4e.,oa< .# i$ ;$ ----- <�44ADD! 3090 Concrete Inlet 1 EA 1,500.00 $1,300.00 1 $1,500.00 $1,500.00 3125 Crushed 5/8 Minus (Pip a Zone bedding) 60 TON 15.00 $900 OD 60 $15 00 $900 00 ",(m recipe sl$y,Fil.. a. ._. r,ur. =i : t $9iAPt „�0 p,= SCHEDULE III TOTAL $7,450.00 $17,800.00 SCHEDULE IV:TRAFFIC CONTROL 4(0£'f'L f ,z'w t{pSLekA�, �",hi s r.. , �`^.,x'� ?.? 13�i'd :t kip;.<`„' r. .�.-'. 4fY•h ... ,19 'i .{. a4p ?fps x'A" L 4020 Temporary Traffic Cont#roll O.evices 1 L5 500i0y00 $5000TII 1 $5,00000 $500000 k✓(R&$, 9re � { „"$$�I§ ` $'4e .Y1' rS4 �JNa, ssh ''. g4,"e 'v ris ,ir. y �S rxY ssn)`1;w `�L a, .�' �s 50m, s ,>r'," Y,,9 4106 Plastic 4"White Line 360 LF 2.00 $720.00 360 $2.00 $720.00 4105 Plastic Double Yellow Center Line with Raised 670 LF 5.00 $3,350A0 670 $5A0 $3,350.00 Pavement Markers 4115 Plastic Stop Bar Line 20 LF 14.00 $280.00 20 $14.00 $280.00 4120 Plastic Crosswlak Line 144 SF 7.50 $1,080.00 144 $7.50 $1,030.00 SCHEDULE IV TOTAL $34,570.00 $37,830.00 SCHEDULE V:TEMPORARY EROSION&SEDIMENTATION CONTROL 5015 Inlet Protection 9 EA 5D.00 $450.00 9 $50.00 $450.00 5055 Erosion/Water Pollution Control 1 FA 5,000.00 $5,000.00 1 $5,000.00 $5,000.00 SCHEDULE V TOTAL $5,450.00 $5,450.00 SCHEDULE VI:ROADSIDE RESTORATION 6000 Street Tree Stump Gdnding/Root Removal Pit SO'L x 20 EA 500.00 $10,000.00 20 $500.00 $10,000.00 5'W x 18"Deoth 6002 Street Tree Planting&Staking 20 EA 400.00 $8,000.00 20 $400.00 $8,000.00 6005 Topsoil Type 10 CY 30.00 $300.00 10 $30.00 $300.00 6015 Beauty Bark 10 CY 30.00 $300.00 10 $30.00 $300.00 SCHEDULE VI TOTAL $18,600.00 $18,600.00 SCHEDULE VII:ELECTRICAL 7002 Induction Loops 2 EA 1,000.00 $2,000.00 2 $1,000.00 $2,000.00 7006 Video Detec0on System,Installation Only 1 LS 3,000.00 $3,000.00 1 $3,000.00 $3,000.00 SCHEDULE VII TOTAL $5,000.00 $5,000.00 SUMMARY: i Gooye St Draiange-Overlay Cost Comparison Overlay F Ihnaee Inlay Per Co Oeract Engineer's Estimate Paul Kuehne Engineer's Estimate R.L.Alla Company 'I Quantity increase 107 Williams Ave South Renton,WA 98057 8/13/2015 Overlay TOTAL $295,795.00 Inlay TOTAL $312,030.00 ITEM DESCRIPTION QTY UNIT UNIT TOTAL QTY UNIT TOTAL NO. PRICE AMOUNT PRICE AMOUNT SCHEDULE I TOTAL $224,725.00 $227,350.06 SCHEDULE III TOTAL $7,450.00 $17,800.00 SCHEDULE IV TOTAL $34,570.00 $37,830.00 SCHEDULE V TOTAL $5,450.00 $5,450.00 SCHEDULE VI TOTAL $18,600.00 $18,600.00 SCHEDULE VII TOTAL $5,000.00 $5,000.00 TOTAL $295,795.00 $312,030.00 i Kuehne Paul From: Kuehne, Paul Sent: Thursday, August 13, 2015 4:40 PM To: Bieren, Chad Cc: Connor, Eric Subject: FW: Gowe St Drainage - Cost Reduction Proposal and Quality/Durability Improvement Attachments: Overlay vs Inlay Cost Comparison - 150811 As Hello Chad, Shall the City overlay or inlay Gowe St? The Contractor will begin demoing curb, gutter, sidewalk and driveway on the north side of Gowe starting Monday. The extent of curb and gutter replacement varies as well as the elevations depending upon which option is chosen; (inlay vs. overlay). Forms for new curb and gutter will be set as early as the end of next week or more likely sometime the following week. Survey needs time to do their thing. I recommend the City takes advantage of the cost savings, quality improvements and functionality benefits of overlay, I apologies for the tight time constraints. But time is running out. Paul Kuehne, construction Management Supervisor Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5543 1 Cell 253-740-5015 PKuehne@KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube N L,UF LWg';icLa Tne eiavrc+ mu m��krr i+r FIRM rnvo Hlsr.-MAIL From: Kuehne, Paul Sent: Tuesday, August 11, 2015 6:20 PM To: Bieren, Chad Cc: Connor, Eric Subject: Gowe St Drainage - Cost Reduction Proposal and Quality/Durability Improvement Hello Chad, Shall I adjust new curb and gutter elevations to optimize the drainage benefits of overlay and accept the Contractor's cost reduction proposal to overlay instead of inlay? Overlay would reduce overall project cost by $15,000 (see attached analysis) and increase overall project quality. Benefits of overlay vs. inlay would include: 1. No-cost opportunity to improve flow-line and thereby improving drainage over the constraints of the original road design 2. No-cost opportunity to enhance roadway cross slope and thereby improve drainage over the constraints of the original road profile 3. One to two week reduction of street parking closure i i 4. Reduced overall project time (one to two weeks) 5. Smoother roadway surface - smoother ride 6. Structure would be added to the roadway making it stronger more durable with lower future maintenance costs 7. Greatly reduces seams/cold joints - thereby reducing entry points for moisture leading to lower maintenance cost and better durability 8. The road is overdue for resurfacing - resurfacing could be accomplished at no extra cost 9. Overlay is estimated to reduce overall project cost by $15,000 I am aware of no detriments to the overlay option vs. inlay. I recommend we accept the Contractor's proposal to overlay in lieu of inlay. Paul Kuehne, Construction Management Supervisor I!, Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5543 1 Cell 253-740-5015 PKLiehne@KentWA.aov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube I,u.1,Econemi r. �iii:errvzwnNnir.nr CtrFORE 111UNIING HISe-MAU From: David Pankiewicz [mailto:dpank@rlalia.com] Sent: Tuesday, August 04, 2015 12:34 PM To: Kuehne, Paul Cc: 'Gary Pankiewicz' Subject: RE: West Gowe Street - Asphalt Paving Hi Paul, Rick asked me to send you the following: Talked to my asphalt sub regarding the original paving scheme vs full on overlay. He said tonnage is the same and his work time to do either way is the same. He said he will perform either way but does not have any rebate for either scheme. This leaves the paving scheme/curb grade up to your choice. Let me know. Thanks, David for Rick From: David Pankiewicz [mailto:dpank@rlalia.com] Sent: Monday, August 03, 2015 2:15 PM To: 'Kuehne, Paul' Cc: 'Gary Pankiewicz' Subject: West Gowe Street- Asphalt Paving Hi Paul, 2 Our asphalt sub is going down to look at the site again to consider the two paving options. He will get back to us by the end of the week and we'll let you know. Thanks, David for Rick 3