HomeMy WebLinkAboutPW15-307 - Original - Puget Sound Energy - Conservation Grant Agreement - 05/04/2015 E
' �� x 4.5411Q ,Ws,
ecords Mar., �� .
t
Document
VJpsHINGr00
xyr�2 4 f
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name;
Vendor Number:
)D Edwards Number
Contract Number:
This is assigned by City Clerk's Office
Project Name:
Description: ❑;nterlocal Agreement ❑ Change Order ❑ Amendment ❑ Contract
Other:
Contract Effective Date: Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Department: Pu"MIC. VVCnQ
Contract Amount:
Approval Authority: ❑ Department Director [Mayor []City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
adccW10877 8 14
E25
® � p T SOLI N ENERGY
GY AgrementConservation Schedule 4880
@� 8 j"� Agreement No.: C-t4880
Project No.: 101-2926
CONSERVATION
GRANT AGREEMENT
This AGREEMENT is made this day of 20 , by and between
PUGET SOUND ENERGY ("PSE") and CITY OF KENT ("Participant").
RECITALS
A. Under PSE's Electric Schedule 83 and Gas Schedule 183,as currently in effect and on file with the Washington
Utilities and Transportation Commission(collectively,"Tariffs"),PSE offers grants for certain conservation
measures installed or implemented at facilities that receive electric or natural gas service from PSE.
B. Participant intends to install or implement conservation measures and is requesting a grant from PSE.
AGREEMENTS
PSE and Participant agree as follows:
1. PROJECT PREMISES/METER LOCATION ADDRESS: 1220 CENTRAL AVE S KENT,OVA 98032 -
CITY OF KENT- STREET LIGHTING(Please note: meter location/address may dier fivin the site
mailing address). Participant will install or implement the conservation measures listed in paragraph 2
("Conservation Measm es") at the above located facilities(the"Premises").Participant represents either(a)that it
is the owner or otherwise has the lawful authority to make the statements herein on behalf of the owner of the
Premises,or(b)that it is the lawful tenant of the Premises and that it has obtained written authorization from the
owner of the Premises.
2. Conservation Measures.Participant represents that it will purchase equipment or materials or has entered or will
enter into an agreement with one or more contractors(the"Contractor")for the purchase and installation or
implementation at the Premises of the Conservation Measures which may be detailed in Attachment C.-
Attachment to Conservation Grant,at the following costs:
Measure
Conservation Measures Life Total Cost Eligible Grant
1 Street Lighting Standard with Controls 20 $1,734,143.84 $476,559.40
TOTAL(includes salestax) $1,734,143.84 $476,559.40
Participant represents that the total cost of the Conservation Measures is the net amount of its obligation with
respect thereto.
3. Grant.Subject to PSE acceptance,PSE will grant the Participant,after installation of the Conservation Measures,
an amount equal to the Eligible Conservation Grant(the"Grant")set forth on Attachment C,provided,however,
That such Conservation Measures must be installed, and Grant paid within 24 months or less of the signing of this
Conservation Grant Agreement.If for any reason the installed cost of the Conservation Measures is less than the
amount shown above and on Attachment C,PSE may decrease pro rata the amount of the Grant. Participant shall
be responsible for paying any amount in excess of the amount of the Grant.
4386 4t13 Agreement No.C-14880 Page t of 3
Conservation Schedule E250
ET
RGY
P „P6.„6 SOUND [ Agreement No.: C-14880
Project No.: 101-2926
CONSERVATION
GRANT AGREEMENT
4. Separate Contract.Participant acknowledges and agrees that PSE is not,and shall not be deemed to be,a party
to any purchase or installation contract relating to Conservation Measures,which shall be installed pursuant to a
contract between Participant and its Contractor(s).Participant expressly acknowledges that PSE's involvement
with respect to any aspect of the Conservation Measures is limited to the furnishing of the Grant. PSE HAS NOT
MADE AND DOES NOT MAKE(AND PARTICIPANT ACKNOWLEDGES THAT PSE DOES NOT
MAKE)ANY IMPLIED OR EXPRESS WARRANTY(INCLUDING BUT NOT LIMITED TO ANY
IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS)REPRESENTATION,OR PROMISE
WITH RESPECT TO EITIIER(A)THE CONSERVATION MEASURES,(B)ANY MATERIALS AND
LABOR REQUIRED FOR OR USED IN THE INSTALLATION OF THE CONSERVATION
MEASURES,OR(C)THE INSTALLATION OF THE CONSERVATION MEASURES.
5. Final Cost Documentation,Access&Inspection: Participant agrees to promptly provide PSE,upon request,and
for a period no shorter than the longest applicable measure life: (1) documentation verifying equipment purchased
and/or work performed in connection with the Conservation Measures installed;(2)reasonable access to and
inspection of the Facility and Conservation Measures installed therein before,during and/or after implementation;
and(3)reasonable access to,inspection and use of energy usage data related to the Conservation Measures
including release of utility bills and Facility energy consumption information following implementation.
6. Release.Participant releases PSE from any and all claims,losses,harm,costs,liabilities,damages and expenses
directly or indirectly resulting fi-om or in connection with(a)the Conservation Measures,(b)any materials and
labor required for or used in the installation of the Conservation Measures,(c)the installation of the Conservation
Measures,or(d)the identification,handling and disposal of any associated hazardous waste materials.
7. Disclaimer.PSE conducts energy analyses at the request of its customers to determine the extent to which
conservation measures are cost—effective.Any estimate of energy savings made by PSE in connection with any
such analyses is solely for the purpose of determining the cost—effectiveness of the particular conservation
measures and not to be used for any other purpose.PSE has not and does not make any promise,warranty or
representation with respect to any savings in energy consumption from Conservation Measures.
8. Termination.In the event a Participant's contribution to PSE's recovery of energy efficiency program costs is
affected by all or a portion of Participant's electric and/or gas delivery service being provided by a patty other
than PSE,then Participant shall refund to PSE an amount equal to the ratio of the unused Measure Life of the
measure(s)to the total Measure Life of such Conservation Measure(s)multiplied by the dollar amount of the
Grant with respect to such Conservation Measure(s).
9. Incorporation of tariffs by reference.This Agreement and the Attachment To Conservation Grant are subject to
the terms of the Tariffs,incorporated herein by reference. Specific terms and conditions from one or more
conservation schedules from similar filed tariffs may also apply, as determined by PSE at its sole discretion,based
on various criteria.A complete list of conservation schedules is available at:
httn'//use con>/aboutr)se,'Rates,,Pages/Electric-Rate-Schedules.aspx?Schedule x0020 Type=Conservation.
10, Entire Agreement.This Agreement and its attachments set forth the entire agreement between the parties and
supersede any and all prior agreements with respect to the Conservation Measures.No change,amendment or
modification of any provision of this Agreement shall be valid unless set forth in writing and signed by both
parties.
4386 4/13 Agreement No. C-14880 Page 2 of
I
s p`,q `�` $ ENERGY AgrementConservation Schedule 488E250
�`" J ,�,�„,� Agreement No.: C-14RR0
Project No.: 101-2926
CONSERVATION
GRANT AGREEMENT
PUGET SOUND ENERGY PARTICIPANT
� g ✓
By: By:
Name: Ryan Lambert pout--a ne;�
Titles Mgr.,Business Energy Management Title: A �-
r /� l
Federal Tax I.D.No.:
By:
i
Name: Bob Stolarsici
Title: Dir,Customer Solutions,Energy Efficiency
lil
4386 4/13 Agreement No.C-14880 Page 3 of
r PUCE�T SOUND G Conservation Schedule E250
,1 66 �,„f Agreement No.: C-14880
Project No.: 101-2926
I
ATTACHMENT C
TO CONSERVATION GRANT
Conservation Measure(s)shall consist of the following:
In City of Kent—Street Lighting:
Streetlight replacements:
• (1245) 40OW HPS with (1245) ATBM H • (5)70W HPS with (5)ATBSE II,
MVOLT R3 P7 NIL i (54) 70W HPS with (54) TGS screw in
• (22) 31OW HPS with (22)ATBM H MVOLT 3100812-G4
R3 P7 NL . (37) 100W HPS with (37) TGS screw in
• (324) 250W HPS with (324) ATBM H 3100812-G4
MVOLT R3 P7 NIL
• (23) 100W HPS with (23) TGS screw in
o (514) 20OW HPS with (514) ATBM H 3100812-G4
MVOLT R3 P7 NIL • (32) 150W HPS with (32) AAL-LED retro
• (152) 150W HPS with (152) ATBSF(77) 41KT5
100W HPS with (77)ATBSF
• (52) 250W HPS with (52) Gullwing LED GL
• (77) 10OW HPS with (77)ATBSF 18-PI(1-3-105LA-BW-UNV-NP
i
LED products must be on one of the following lists of qualifying products: Energy Star, Design Lights
Consortium, or the Lighting Design Lab approved products.
PLEASE NOTE: Projects installed by IntoLight and owned and maintained by PSE are not subject to
Sections 4 and 7 of the Grant Agreement.
The above specifications are solely for the purpose of defining energy-related components of Conservation Measure(s) for
which the Grant is offered. Puget Sound Energy Is not responsible for ensuring the health, safety, comfort, or well-being of
workers or facility occupants or the suitability of equipment selected for the intended application. It Is the responsibility of the
grant Participant and the Participant's hired designers, contractors, consultants to ensure compliance of the Conservation
Measure(s)with Participant's needs and all applicable codes and standards.
The following shall be submitted by Participant prior to Grant payment:
M Completed Request for Taxpayer I.D.Number("W-9").
M Copies of invoicing(no purchase orders,quotes,or estimates)for all expenses, including but not limited to equipment,
materials,and labor associated with installation of Conservation Measure(s).
❑ Other(specify):
III
60114/13 Page 1 of 2
® Conservation Schedule 40
/ GETSOUND ENERGY
AgreementNo.: C-1880
Project No.: 101-2926
ATTACHMENT C
TO CONSERVATION GRANT
Conservation Measure(s)shall be verified as follows prior to Grant payment:
A final site visit shall be conducted for projects greater than 25,000 kWh by a PSE Energy Management
Engineer to verify as built fixture types and quantities. PSE reserves the right to conduct on-site
verifications for projects with savings at or under 25,000 kWh. Projects installed by IntoLight will be
verified using the red line diagrams provided by IntoLight's contractor.
If intended energy savings are not being achieved by Conservation Measure(s) because specified equipment efficiency
parameters or performance parameters defined above are not used, Participant shall be required to correct such deficiencies
prior to Grant payment. Failure to comply with specified equipment efficiency or performance parameters may result in
forfeiture or reduction of Grant payment.
I
i
60114/13 Page 2 of 2
E
.a
eIN^Ixm vmeY. .n.....e...r...+n....gx.w+w..®u.+mwm �
..
1-1
Meoa..
Vm r.
.. sw
lid
�T Y�.1 Rtvvs.an a ¢ fn
- FSA1RIDnhu - . a
wz:a�v
�uY< rNpnmi ^ + aea nI R. a
[7-7 7
REQUEST FOR MAYOR'S SIGNATURE
li 9
Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAW DEPfKf2TME�iT) � r
Approveu by D ec o
Originator:Kelly Peterson Phone (Originator): 5547 --
Date Sent:August za 2015 Date Required; September 2,20 s
Return'Signed Document to: Steve Mullen, '�'1& 5 Contract Termination Date;August 30,2017
VENDOR NAME: Date Finance Notified:5�—:. C� (Only required on contract 5/4/q 15
r"'^� 1 000 and over or on an Grant)
DATE OF COUNCIL APPROVAL Date Risk`Manager:Notified:
May 19,2015 (Required on:Non City Standard Contracts/Agreements)
Has this Document been Specifically Account Number: R20615
Authorized In the Bud et? Q YES;f� NO
Brief Explanation of Document:
The City of Kent was successful in its application to the Washingion State Department of Commerce
for Energy Efficiency and Solar Grant for the maximum award of $500,000. A joint application was
submitted by the Public Works and Parks Departments. The Public Works Department's share of the
grant is $375,000 for the conversion of street lights from high pressure sodium lights to LED lights.
Puget Sound Energy also provides a utility incentive for the project, Early estimates of the rebate
were approximately $446,000. This Conservation Grant Agreement identifies $476,559,40 as the
rebate.
. ,Ajfbrics Must Be Rented Through The Law Department
(This area to be completed by the Law Department)
Received:
Approval oFi �u bt&p/i3'!s,'
l <
Law Dept. Comments:
Date Forwarded to Mayor;
Shaded Areas To Be Completed By Administration,Stat3Fi ,.
Received
Recommendations and Comments:
Z �;�
Disposition
Date Returned: c f +
PILL�¢enr50vaum IHior¢ss nP1P =I lo,. eyws 6nanre dOca