HomeMy WebLinkAboutPW15-284 - Supplement - #1 - KBA, Inc. - Central Ave S Pavement Preservation & Utility Improvements - 08/19/2015 Records anageent ,
K�NT ..
WASH INGTON y� Docu ment`
G�
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: KBA, Inc.
Vendor Number:
ID Edwards Number
Contract Number: P IC ~ 1W a- 00 -
This is assigned by City Clerk's Office
Project Name: Central Ave. S. Pavement Preservation & Utility Improvements
Description: ❑ Interlocal Agreement ❑ Change Order ® Amendment ❑ Contract
❑ Other:
Contract Effective Date: 8/19/15 Termination Date: 9/1/16
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Eric Connor Department: Engineering
Contract Amount:
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Add a subconsultant.
As of: 08/27/14
I°
AdW
Mm Washington State
-,A Department of Transportation
Supplemental Agreement Organization and Address
KBA, Inc.
Number 1 11201 SE 8th Street,Suite 160
Bellevue,WA 98004
Original Agreement Number
LA 8224 Phone: 425-455-9720
Project Number Execution Date Completion Date
8/10/15 9/1/16
Project Title New Maximum Amount Payable
Central Ave.S.Pavement Preservation&Utility Improvement $582,700.00
Description of Work
Zero dollar Supplement to add Terracon Consultants,Inc.to the Project. Materials testing was estimated as a reimbursable
expense in KBA's original CM budget; however,KBA was not able to hire those services as such. The not-to-exceed dollar '....
amount estimated for materials testing services is hereby transferred to Terracon by this Supplemental 1. Exhibit E is replaced
with the attached Exhibit E,adding Terracon as an authorized subconsultant,and includes their rate sheets.
The Local Agency of the City of Kent
desires to supplement the agreement entered into with KBA, Inc.
and executed on 8/10/15 and identified as Agreement No. LA 8224
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
No change.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: No change,
III
Section V, PAYMENT, shall be amended as follows:
No change to Total Amount Authorized;however,$45,875.00 is moved from Direct Non-Salary Costs to Subconsultant Costs,
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By: KBA,Inc. By. The_CLty of Kent
u
Consultant Signature pAp v i n4,Authority Signature
t '
1 r ✓
DOT Form 140-063 EF Date
Revised 912005
EXHIBIT A-SUMMARY OF PAYMENTS
Basic Agreement Supplemetrt 1'i -lTotal
Direct Salary Cost $ 163,056 $ 163,056
Overhead
(Including Payroll Additives) $ 225,604 $ 225,604
Direct Non-Salary Costs $ 145,124 $ (45,875) $ 99,249
Subconsultants $ - $ 45,875 $ 45,875
Fixed Fee $ 48,916 $ 48,916
Management Reserve $ - $ -
TOTAL $ 582,700 $ $ 582,700'
Exhibit E
Sub-consultant Cost Computations
Authorized Subconsultant:
Terracon Consultants, Inc., providing materials testing services.
I
it
III
Agreement Number: LA 8224
WSDOT Form 140-089 EF Exhibit E Page 1 of 1
Revised 1013012014
Terracon Labor Rates
Central Avenue South Pavement Preservation and Utility Improvements
Kent,Washington
Employee Full Name Hourly Rate Billing Title
Bauman,, Edwarr jL dward) ,w $29 40 n Technician Vct Manag er II _ m -
Anderson Tristan T Tristan _ $27 64 Staff En sneer _
_ .,
_ ,.
Bernier David P David $27 65� rt Techrncian V
Datum, Sabine Sabine W)s) $25 00 ^Staff Geolog Environmental Specialist
MN
D tterich David Alan Dave $2g 37 Project Manager LL"— -
Blackbourn Ta for R Ta for $16 00 Administrative
Dobner, Scott M (Scott) $31 25 Geotechnical S ecp ialist
Dubcak Eric A Eri _$31 70 Project Manager _
Gadwa Heather R (Heather) $19 50 _Field Professional
--
Garner Alexandra I (Alexandra) $29 81 __ Staff Professional
�Hauk Travis AATravis _ .__ _ $27 91 Project Manager
Hesedahl, Tori L(Tors $26 44 Staff En meer
Hoffman, Taylor R (Ta for ......
$25 72 Field Engineer
Kean, Chad D Chad)_ $44 47 _ Project Manager
gler, _
Ko Sarah L Sarah $19 65 Administrative _
Kunz,-Eric D Eric) $67.31 Senior Principal
-
Le VanT iYan __$12.25 Technician
Long Steve2 K le) $15 65 Technician I
Luark Richard D (Richard) v $67 07 Senior Project Engineer
—� _
Lukk en Serg_ey 5(Ser�eyt $16 50 Technician I
Marsh Shannon Marie�Shannon�_ $28 75 En ineen� Specialist
MMer Karen M (Karen $21.60 _ Administrative
MRrder, Joel Steel (Joel) $14 00 Technician I
Noll, Michael D (Mike) _ _ $39.90 _ _ Project Manager
O'Bnen Brett C Brett) $25.72 Staff Engineer
Price Caitlin LCaitlin)- _ $26.44 Staff Scientist
Probert, Samuel G (Sam,)-,--------- -$29.33 ------,-Staff Engineer
Sargent, Robert W (Rob) __ $37.36 Project Engineer II __ _
Scheffler, Rye MM (�yan) _-__ _ $32 45 Project Engineer I
Scherting_Anthony WSTonyt _ _ � $15 25 �., Cad Operator
Smith, Lannie R (Lannie) $39 66 Senior Project Manager I
Solw Charles B�Charle� $26 40 Technician V
Spencer, Julie A Julie) _ $20 50 Environmental Specialist
Stauffer Adam A(Adam $24.16 Field Geologist
-- _.-
Stettler, Dennis R (Dennis) $66A 1 Senior Consulta .
Swart, Lucas C (Lucas $30 87 Project Manager
Tecle Medhame G Medhanie $45 67 Senior Protect Manager II
Thomas, Nigel H Ni el _ $15 25 Technician I
Th°meson, Curt R (Curd $36 00 Geotechnical Specalist _
Ward, Jeffrey K(Jeff _ _ ®$23 75 CMT Specialist
Wheaton, Matthew Y(Math _ _ _ mm $53.37 Senor Project Manager II
--
Zeman,Alvin R AI $79.25 Engineering Specialist
Ziegler, Robert T (Rob) $44.23 Project Professional II
Blakeway E�C Emily) $19 71 Field Scientist
Davis Paul D (Pain _ _ $46 27 Senior Proeect Manager II
Detterich, Lloyd A (Lloyd) $31 20 CMT Specialist
_ _- _.
Gadzia, Lauren B Lauren .__ $21 32 Environmental Specialist
- .. ( . ._�
Johnson Kew J welly) $17 25 Technician II
Rachman Elizabeth A(L¢� $39 90 Senior Pro ect_Mana�er I_
--
Schmidt, Steven L(Stever $26 60 Technician V
r
Terracon Labor Rates
Central Avenue South Pavement Preservation and Utility Improvements
Kent,Washington
Employee Full Name 116urly Rate Billing Title
;VanBlaricom, Jeffrey R (Jeffs s _ $22 75_ Technician 11
jBuce Christina A(Christina) $21 50 Technician III
IFii[�patnck Kyle (Kyj2L $21 00 Technician II
Foley Conor V(Conoq $34 64 Project Manager
_ _ -- _e..
Kosoff, Michael A(Mike) $26 00 Technician V
Parker, Scott R (Scott _ $43 63 Senior Project Manager II
Rinear, Scott A Scott ` _ $37 52 Project Manager
Snider, Peter T Peter $26 OD Technician IV
---.�. )__--- -- --- _ m _..-_--
Binuya, HeatherL Heather $15.20__ Administrative
_ — _-- -
Ferrell, Rebecca L Rebecca $17 05 Technician I
Harkins Angela L (An ela $48.82 Senior Project Manager II _
Hartman, Eric SJEric $47.78 Senior Project Manager I�
Jones Aaron P(Aaron $36.05 Engineering Specialist �^
Kahler, Emily P (Emily)_ $24 35 Technician III
McCaslin John D (JohnL $29 62 Project Manager _
-- — - -
Ng Cheuk VV Angela (Angela _ $21 50 Technician III _
Welch David L(Davin $29 36 Staff Professional
Younc Camille E�CamilleZ $22 05 Admirnstratroe
- �. r
II
Irerracon
Cnneulling Cnginccrs&Seientlsls
2015 Standard Schedule of Charges
SOILS/MATERIALS/LABORATORY TESTS
FEE SCHEDULE
Soil
Moisture/Density Relationship(Modified Proctor)........................................................................................$205 each
SieveAnalysis ............................................................................................................................................$100 each
PlasticityIndex .............................................................................................................................................. $90 each
#200 Wash ................................................................................................................................................... $55 each
SpecificGravity ............................................................................................................................................. $55 each
In-situ Density(ring sample) .........................................................................................................................$25 each
Hydrometer .................................................................................................................................................$160 each
MoistureContent .......................................................................................................................................... $10 each
California Bearing Ratio (3 point)................................................................................................................$400 each
OrganicContent ........................................................................................................................................... $55 each
Concrete Testing
WSDOT Concrete Aggregate Acceptance Testing.......................................................................................$90 each
MixDesign ..................................................................................................................................Rates Upon Request
Compressive Strength Standard Cylinder .................................................................................................... $30 each
Compressive Strength Cored Sample ..........................................................................................................$45 each
Flexural Strength Standard Beam ................................................................................................................ $40 each
UnitWeight ..................................................................................................................._.............................. $55 each
Shotcrete Panels Three Cores/Panel .........................................................................................................$125 each
Aggregate Evaluation
WSDOT Aggregate Acceptance Testing(SCTC, CSBS, Gravel Borrow, Pipe Bedding, etc..)..................$240 each
RockCore Compressive Strength ................................................................................................................ $80 each
MechanicalSieve Analysis ........................................................................................................................... $90 each
#200 Wash ................................................................................................................................................... $55 each
SpecificGravity Coarse ................................................................................................................................ $80 each
SpecificGravity Fine .....................................................................................................................................$80 each
Soundness Sodium or Magnesium Sulfate per Fraction (three fractions minimum) .................................... $80 each
SandEquivalent ........................................................................................................................................... $80 each
FracturedFace ............................................................................................................................................. $75 each
Flat and Elongated Particles (per screen ....... 30 each
UncompactedVoids/Angularity .............)......................................................................................................$90 each
Clay Lumps and Friable Particles .................................................................................................................$80 each
Alkali Reactivity(chemical method) .................................. ........................................................................$360 each
Lightweight Pieces (<2.0 specific gravity, coal and lignite) $170 each
OrganicImpurities ................................................................. ......................... ............................... .......... $50 each
MOH's Hardness ..........................................................................................................................................$40 each
UnitWeight(dry-rodded) ..............................................................................................................................$80 each
Los Angeles Abrasion C ASTM C131 ........................................................................................................$160 each
Los Angeles Abrasion C ASTM C535 ........................................................................................................$160 each
MillAbrasion................................................................................................................................................$160 each
NOTE: This schedule includes Terracon unit rates for laboratory testing requested most frequently. Our laboratories are equipped to perform a
variety of other tests for soils,aggregates,concrete,masonry,asphalt,steel,fireproofing,roofing and painting. Should you desire unit rates for other
testing, require results on a rush basis or wish to discuss quantity discounts,please contact Eric Kunz at(425)771-3304. Unit prices include
standard sample preparation,internal quality control review and preparation of computer-generated reports, 'etrReleef$70
F tktia!-t�grti Laboratory
unit unit costs noted are based upon standard time frames for completion. Unit-essfs-vi es-fec'+ash'-camples:
III
Page 1 of 2
Terracon—Searle I Tacoma Offices Revised January 5,2015
Irerracon
Consulting l ngincers&&cienllsts
2015 Standard Schedule of Charges
SOILS/MATERIALS/LABORATORY TESTS
FEE SCHEDULE
Structural Reinforced Masonry, Grout, and Mortar Testing
Mix Design- Grout and Mortar(three points) .............................................................................Rates Upon Request
MixDesign - Confirmation .........................................................................................................................$210 each
Compressive Strength - 2x2 cubes .............................................................................................................$30 each
Compressive Strength - 2x4 Grout and Mortar Cylinders .......................................... ................................
$30 each
Compressive Strength - 4x8 Grout Cylinder ........................ $30 each
Compressive Strength -4x8 Grout Prism UBC 24-28 .................................................................................$30 each
Compressive Strength - Masonry Prism UBC 24-26 ...................................................................................$95 each
CompressiveStrength - CMU ..................................................................................................................... $55 each
Compressive Strength - Structural Brick .....................................................................................................$55 each
Moisture Content,Absorption and Unit Weight of CMU ........................ ................................. $80 each
Asphalt Evaluation
Mix Design - Three Oil Contents (excluding aggregate testing) ...... .........................................Rates Upon Request
Mix Design - One Point Confirmation ........................................................................................................$400 each
Extraction &Gradation................................................................................................................................$175 each
Marshall Density, Stability and Flow ........................................................................................................... $310 each
GyratoryTesting .........................................................................................................................................$310 each
Densityof Cores ........................................................................................................................................... $40 each
Thicknessof Cores ...................................................................................................................................... $25 each
Maximum Theoretical Specific Gravity .......................................................................................................$125 each
StripTest ...................................................................................................................................................... $80 each
Compressive Strength of Bituminous Mixtures ............................................................................................ $65 each
Retained Stability of Bituminous Mixtures ..................................................................................................$260 each
Index of Retained Strength ................................................................................................-........................$300each
Calibration of HMA Mix Design to Ignition Oven .........................................................................................$575 each
WSDOT HMA Aggregate Compliance Testing ...........................................................................................$250 each
WSDOT HMA Acceptance Testing (Gradation/Asphalt Contenet, Rice, Air Voids)....................................$600 each
Soil-Cement Testing
MixDesign ..................................................................................................................................Rates Upon Request
Freeze / Thaw(three briquettes) ..................................................................................................................$280/set
Wet/Dry (three briquettes) .............................................................................................................................$260/set
Unit Weight(three briquettes) .......................................................................................................................$150/set
Compressive Strength (three briquettes) ...................................................................................................... $230/set
Fireproofing
Adhesion/Cohesion Test .............................................................................................................................. $60 each
Densityand Thickness ................................................................................................................................. $60 each
Equipment Per Day
CoringMachine ...................................................................................................................................................$150
Generator ..............................................................................................................................................................$55
NuclearDensity Gauge .........................................................................................................................................$50
Ferroscan ............................................................................................................................................................$100
SchmidtHammer ..................................................................................................................................................$45
WindsorProbe ......................................................................................................................................................$80
PaintThickness Gauge .........................................................................................................................................$55
Skidmore ...............................................................................................................................................................$55
NDT Equipment(ultrasonic, manetic
Torque Wpencloorflatness/levelness, incluldes operator)dye-penetrant) ...................................
. ..................... ,, ,$1$00/our Daily Vehicle Charge (Resident Projects)............................... ......................................................... IRS Mileage rate
Page 2 of 2
Tenacon—SealOe/Tamme Offices Rem dJanuary 5,2015