Loading...
HomeMy WebLinkAboutPW15-284 - Supplement - #1 - KBA, Inc. - Central Ave S Pavement Preservation & Utility Improvements - 08/19/2015 Records anageent , K�NT .. WASH INGTON y� Docu ment` G� CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: KBA, Inc. Vendor Number: ID Edwards Number Contract Number: P IC ~ 1W a- 00 - This is assigned by City Clerk's Office Project Name: Central Ave. S. Pavement Preservation & Utility Improvements Description: ❑ Interlocal Agreement ❑ Change Order ® Amendment ❑ Contract ❑ Other: Contract Effective Date: 8/19/15 Termination Date: 9/1/16 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Eric Connor Department: Engineering Contract Amount: Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Add a subconsultant. As of: 08/27/14 I° AdW Mm Washington State -,A Department of Transportation Supplemental Agreement Organization and Address KBA, Inc. Number 1 11201 SE 8th Street,Suite 160 Bellevue,WA 98004 Original Agreement Number LA 8224 Phone: 425-455-9720 Project Number Execution Date Completion Date 8/10/15 9/1/16 Project Title New Maximum Amount Payable Central Ave.S.Pavement Preservation&Utility Improvement $582,700.00 Description of Work Zero dollar Supplement to add Terracon Consultants,Inc.to the Project. Materials testing was estimated as a reimbursable expense in KBA's original CM budget; however,KBA was not able to hire those services as such. The not-to-exceed dollar '.... amount estimated for materials testing services is hereby transferred to Terracon by this Supplemental 1. Exhibit E is replaced with the attached Exhibit E,adding Terracon as an authorized subconsultant,and includes their rate sheets. The Local Agency of the City of Kent desires to supplement the agreement entered into with KBA, Inc. and executed on 8/10/15 and identified as Agreement No. LA 8224 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: No change. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change, III Section V, PAYMENT, shall be amended as follows: No change to Total Amount Authorized;however,$45,875.00 is moved from Direct Non-Salary Costs to Subconsultant Costs, as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: KBA,Inc. By. The_CLty of Kent u Consultant Signature pAp v i n4,Authority Signature t ' 1 r ✓ DOT Form 140-063 EF Date Revised 912005 EXHIBIT A-SUMMARY OF PAYMENTS Basic Agreement Supplemetrt 1'i -lTotal Direct Salary Cost $ 163,056 $ 163,056 Overhead (Including Payroll Additives) $ 225,604 $ 225,604 Direct Non-Salary Costs $ 145,124 $ (45,875) $ 99,249 Subconsultants $ - $ 45,875 $ 45,875 Fixed Fee $ 48,916 $ 48,916 Management Reserve $ - $ - TOTAL $ 582,700 $ $ 582,700' Exhibit E Sub-consultant Cost Computations Authorized Subconsultant: Terracon Consultants, Inc., providing materials testing services. I it III Agreement Number: LA 8224 WSDOT Form 140-089 EF Exhibit E Page 1 of 1 Revised 1013012014 Terracon Labor Rates Central Avenue South Pavement Preservation and Utility Improvements Kent,Washington Employee Full Name Hourly Rate Billing Title Bauman,, Edwarr jL dward) ,w $29 40 n Technician Vct Manag er II _ m - Anderson Tristan T Tristan _ $27 64 Staff En sneer _ _ ., _ ,. Bernier David P David $27 65� rt Techrncian V Datum, Sabine Sabine W)s) $25 00 ^Staff Geolog Environmental Specialist MN D tterich David Alan Dave $2g 37 Project Manager LL"— - Blackbourn Ta for R Ta for $16 00 Administrative Dobner, Scott M (Scott) $31 25 Geotechnical S ecp ialist Dubcak Eric A Eri _$31 70 Project Manager _ Gadwa Heather R (Heather) $19 50 _Field Professional -- Garner Alexandra I (Alexandra) $29 81 __ Staff Professional �Hauk Travis AATravis _ .__ _ $27 91 Project Manager Hesedahl, Tori L(Tors $26 44 Staff En meer Hoffman, Taylor R (Ta for ...... $25 72 Field Engineer Kean, Chad D Chad)_ $44 47 _ Project Manager gler, _ Ko Sarah L Sarah $19 65 Administrative _ Kunz,-Eric D Eric) $67.31 Senior Principal - Le VanT iYan __$12.25 Technician Long Steve2 K le) $15 65 Technician I Luark Richard D (Richard) v $67 07 Senior Project Engineer —� _ Lukk en Serg_ey 5(Ser�eyt $16 50 Technician I Marsh Shannon Marie�Shannon�_ $28 75 En ineen� Specialist MMer Karen M (Karen $21.60 _ Administrative MRrder, Joel Steel (Joel) $14 00 Technician I Noll, Michael D (Mike) _ _ $39.90 _ _ Project Manager O'Bnen Brett C Brett) $25.72 Staff Engineer Price Caitlin LCaitlin)- _ $26.44 Staff Scientist Probert, Samuel G (Sam,)-,--------- ­-$29.33 ------,-Staff Engineer Sargent, Robert W (Rob) __ $37.36 Project Engineer II __ _ Scheffler, Rye MM (�yan) _-__ _ $32 45 Project Engineer I Scherting_Anthony WSTonyt _ _ � $15 25 �., Cad Operator Smith, Lannie R (Lannie) $39 66 Senior Project Manager I Solw Charles B�Charle� $26 40 Technician V Spencer, Julie A Julie) _ $20 50 Environmental Specialist Stauffer Adam A(Adam $24.16 Field Geologist -- _.- Stettler, Dennis R (Dennis) $66A 1 Senior Consulta . Swart, Lucas C (Lucas $30 87 Project Manager Tecle Medhame G Medhanie $45 67 Senior Protect Manager II Thomas, Nigel H Ni el _ $15 25 Technician I Th°meson, Curt R (Curd $36 00 Geotechnical Specalist _ Ward, Jeffrey K(Jeff _ _ ®$23 75 CMT Specialist Wheaton, Matthew Y(Math _ _ _ mm $53.37 Senor Project Manager II -- Zeman,Alvin R AI $79.25 Engineering Specialist Ziegler, Robert T (Rob) $44.23 Project Professional II Blakeway E�C Emily) $19 71 Field Scientist Davis Paul D (Pain _ _ $46 27 Senior Proeect Manager II Detterich, Lloyd A (Lloyd) $31 20 CMT Specialist _ _- _. Gadzia, Lauren B Lauren .__ $21 32 Environmental Specialist - .. ( . ._� Johnson Kew J welly) $17 25 Technician II Rachman Elizabeth A(L¢� $39 90 Senior Pro ect_Mana�er I_ -- Schmidt, Steven L(Stever $26 60 Technician V r Terracon Labor Rates Central Avenue South Pavement Preservation and Utility Improvements Kent,Washington Employee Full Name 1­16urly Rate Billing Title ;VanBlaricom, Jeffrey R (Jeffs s _ $22 75_ Technician 11 jBuce Christina A(Christina) $21 50 Technician III IFii[�patnck Kyle (Kyj2L $21 00 Technician II Foley Conor V(Conoq $34 64 Project Manager _ _ -- _e.. Kosoff, Michael A(Mike) $26 00 Technician V Parker, Scott R (Scott _ $43 63 Senior Project Manager II Rinear, Scott A Scott ` _ $37 52 Project Manager Snider, Peter T Peter $26 OD Technician IV ---.�. )__--- -- --- _ m _..-_-- Binuya, HeatherL Heather $15.20__ Administrative _ — _-- - Ferrell, Rebecca L Rebecca $17 05 Technician I Harkins Angela L (An ela $48.82 Senior Project Manager II _ Hartman, Eric SJEric $47.78 Senior Project Manager I� Jones Aaron P(Aaron $36.05 Engineering Specialist �^ Kahler, Emily P (Emily)_ $24 35 Technician III McCaslin John D (JohnL $29 62 Project Manager _ -- — - - Ng Cheuk VV Angela (Angela _ $21 50 Technician III _ Welch David L(Davin $29 36 Staff Professional Younc Camille E�CamilleZ $22 05 Admirnstratroe - �. r II Irerracon Cnneulling Cnginccrs&Seientlsls 2015 Standard Schedule of Charges SOILS/MATERIALS/LABORATORY TESTS FEE SCHEDULE Soil Moisture/Density Relationship(Modified Proctor)........................................................................................$205 each SieveAnalysis ............................................................................................................................................$100 each PlasticityIndex .............................................................................................................................................. $90 each #200 Wash ................................................................................................................................................... $55 each SpecificGravity ............................................................................................................................................. $55 each In-situ Density(ring sample) .........................................................................................................................$25 each Hydrometer .................................................................................................................................................$160 each MoistureContent .......................................................................................................................................... $10 each California Bearing Ratio (3 point)................................................................................................................$400 each OrganicContent ........................................................................................................................................... $55 each Concrete Testing WSDOT Concrete Aggregate Acceptance Testing.......................................................................................$90 each MixDesign ..................................................................................................................................Rates Upon Request Compressive Strength Standard Cylinder .................................................................................................... $30 each Compressive Strength Cored Sample ..........................................................................................................$45 each Flexural Strength Standard Beam ................................................................................................................ $40 each UnitWeight ..................................................................................................................._.............................. $55 each Shotcrete Panels Three Cores/Panel .........................................................................................................$125 each Aggregate Evaluation WSDOT Aggregate Acceptance Testing(SCTC, CSBS, Gravel Borrow, Pipe Bedding, etc..)..................$240 each RockCore Compressive Strength ................................................................................................................ $80 each MechanicalSieve Analysis ........................................................................................................................... $90 each #200 Wash ................................................................................................................................................... $55 each SpecificGravity Coarse ................................................................................................................................ $80 each SpecificGravity Fine .....................................................................................................................................$80 each Soundness Sodium or Magnesium Sulfate per Fraction (three fractions minimum) .................................... $80 each SandEquivalent ........................................................................................................................................... $80 each FracturedFace ............................................................................................................................................. $75 each Flat and Elongated Particles (per screen ....... 30 each UncompactedVoids/Angularity .............)......................................................................................................$90 each Clay Lumps and Friable Particles .................................................................................................................$80 each Alkali Reactivity(chemical method) .................................. ........................................................................$360 each Lightweight Pieces (<2.0 specific gravity, coal and lignite) $170 each OrganicImpurities ................................................................. ......................... ............................... .......... $50 each MOH's Hardness ..........................................................................................................................................$40 each UnitWeight(dry-rodded) ..............................................................................................................................$80 each Los Angeles Abrasion C ASTM C131 ........................................................................................................$160 each Los Angeles Abrasion C ASTM C535 ........................................................................................................$160 each MillAbrasion................................................................................................................................................$160 each NOTE: This schedule includes Terracon unit rates for laboratory testing requested most frequently. Our laboratories are equipped to perform a variety of other tests for soils,aggregates,concrete,masonry,asphalt,steel,fireproofing,roofing and painting. Should you desire unit rates for other testing, require results on a rush basis or wish to discuss quantity discounts,please contact Eric Kunz at(425)771-3304. Unit prices include standard sample preparation,internal quality control review and preparation of computer-generated reports, 'etrReleef$70 F tktia!-t�grti Laboratory unit unit costs noted are based upon standard time frames for completion. Unit-essfs-vi es-fec'+ash'-camples: III Page 1 of 2 Terracon—Searle I Tacoma Offices Revised January 5,2015 Irerracon Consulting l ngincers&&cienllsts 2015 Standard Schedule of Charges SOILS/MATERIALS/LABORATORY TESTS FEE SCHEDULE Structural Reinforced Masonry, Grout, and Mortar Testing Mix Design- Grout and Mortar(three points) .............................................................................Rates Upon Request MixDesign - Confirmation .........................................................................................................................$210 each Compressive Strength - 2x2 cubes .............................................................................................................$30 each Compressive Strength - 2x4 Grout and Mortar Cylinders .......................................... ................................ $30 each Compressive Strength - 4x8 Grout Cylinder ........................ $30 each Compressive Strength -4x8 Grout Prism UBC 24-28 .................................................................................$30 each Compressive Strength - Masonry Prism UBC 24-26 ...................................................................................$95 each CompressiveStrength - CMU ..................................................................................................................... $55 each Compressive Strength - Structural Brick .....................................................................................................$55 each Moisture Content,Absorption and Unit Weight of CMU ........................ ................................. $80 each Asphalt Evaluation Mix Design - Three Oil Contents (excluding aggregate testing) ...... .........................................Rates Upon Request Mix Design - One Point Confirmation ........................................................................................................$400 each Extraction &Gradation................................................................................................................................$175 each Marshall Density, Stability and Flow ........................................................................................................... $310 each GyratoryTesting .........................................................................................................................................$310 each Densityof Cores ........................................................................................................................................... $40 each Thicknessof Cores ...................................................................................................................................... $25 each Maximum Theoretical Specific Gravity .......................................................................................................$125 each StripTest ...................................................................................................................................................... $80 each Compressive Strength of Bituminous Mixtures ............................................................................................ $65 each Retained Stability of Bituminous Mixtures ..................................................................................................$260 each Index of Retained Strength ................................................................................................-........................$300each Calibration of HMA Mix Design to Ignition Oven .........................................................................................$575 each WSDOT HMA Aggregate Compliance Testing ...........................................................................................$250 each WSDOT HMA Acceptance Testing (Gradation/Asphalt Contenet, Rice, Air Voids)....................................$600 each Soil-Cement Testing MixDesign ..................................................................................................................................Rates Upon Request Freeze / Thaw(three briquettes) ..................................................................................................................$280/set Wet/Dry (three briquettes) .............................................................................................................................$260/set Unit Weight(three briquettes) .......................................................................................................................$150/set Compressive Strength (three briquettes) ...................................................................................................... $230/set Fireproofing Adhesion/Cohesion Test .............................................................................................................................. $60 each Densityand Thickness ................................................................................................................................. $60 each Equipment Per Day CoringMachine ...................................................................................................................................................$150 Generator ..............................................................................................................................................................$55 NuclearDensity Gauge .........................................................................................................................................$50 Ferroscan ............................................................................................................................................................$100 SchmidtHammer ..................................................................................................................................................$45 WindsorProbe ......................................................................................................................................................$80 PaintThickness Gauge .........................................................................................................................................$55 Skidmore ...............................................................................................................................................................$55 NDT Equipment(ultrasonic, manetic Torque Wpencloorflatness/levelness, incluldes operator)dye-penetrant) ................................... . ..................... ,, ,$1$00/our Daily Vehicle Charge (Resident Projects)............................... ......................................................... IRS Mileage rate Page 2 of 2 Tenacon—SealOe/Tamme Offices Rem dJanuary 5,2015