CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: KBA
Vendor Number:
JD Edwards Number
Contract Number: PVC/ 1`5 ` 233 ~ 03
This is assigned by City Clerk's Office
I
Project Name: Central Ave. S Pre-Con LAG Agreement
Description: ❑ Interlocal Agreement ❑ Change Order ® Amendment ❑ Contract
❑ Other:
Contract Effective Date: June 29, 2015 Termination Date: 9/1/2016
Contract Renewal Notice (Days):
Number of days required
Contract Manager: Eric Connor Department: Engineering
Contract Amount: N/A
Approval Authority: (CIRCLE ONE) Department Director,_ Mayor City Council
Detail: (i.e address, location, parcel number, tax id, etc.):
Central Ave S Pavement Preservation and Utility Improvements LAG Agreements with
KB
�LMIDIQM/1R�VltQ..Q �tG1V'e'C�Wl2�Vl�' NU. '�-
As of: 08/27/14
i
_ MEMORANDUM
KBA,Inc.(Bellevue Office) Tel (425)455-9720
11201 SE 8th Street,Suite 160 Fax(425)455-9732
Bellevue,Washington 98004 KBACM.com
Date: August 5, 2015
To: Eric Connor, City of Kent
Subject: Central Ave S. Pre-Con LAG Agreement & CM LAG Agreement changes
From: Deborah Ottum, Contracts Administration Manager, KBA, Inc.
Hi, Eric,
This memorandum is to outline the changes made to the Pre-con Supplemental 2 and the CM
LAG doc packages, per our discussion yesterday.
The following changes were made:
• Hours (and budget) were moved from the CM Agreement to the Pre-con Agreement,
increasing the Pfe-con Agreement budget by$28,300, and reducing the CM Agreement hours
(and budget) by same dollar amount. This was accomplished by moving the first week of time
in August, and the remaining hours from the end (September 2016).
• The estimate included in Supplement 2 reflects "Actuals"through July and adds the
estimated cost to complete into August. The highlighted box at the bottom of this estimate
reflects the amount needed for Supplement 2.
• The first page of the CM LAG was revised to show$571,700.00 (a reduction of$28,300), to
reflect the adjustment moved to the Pre-Con LAG.
• The Budget Assumption term in KBA's Scope was revised to show, "from August 10, 2015 into
September 2016," as the revised Pre-con budget will fund KBA through this Friday, August 7.
• KBA's field office assumption was added back into our Scope, should KBA provide the field
office. We agreed that the budget for this would be added via Supplement later.
If there is anything else you need in this regard, or if you have any questions or concerns, please
feel free to call Ve directly at 425-214-5079. Thank you.
,st regards,
Deborah Ottum, CPCM
Contracts Administration Manager
11201 SE 8th Street, Suite 160, Bellevue, WA 98004
T 425.455.9720 x120 1 Direct 425.214.5079 1 F 425.455.9732 1 dottum@kbacm.com
KBA, Inc. I Construction Management Specialists I www.kbacm.com
5;\Communications\Forms-KBA-masters\General\2015KSATemplate-Memorandum.docx Page 1 of 2
Amok
Mm Washington State
-'/ Department of Transportation
Supplemental Agreement Organization and Address
KBA, Inc.
Number 2 11201 SE 8th St.,Suite 160
Bellevue,WA 98004
Original Agreement Number
LA 8224 Phone: 425-455-9720
Project Number Execution Date Completion Date
STPUL-1071(006) 6/29/15 9/1/15
Project Title New Maximum Amount Payable
Central Ave. S. Pavement Preservation and Utility $ 62,224.00
Description of Work
Continuation of pre-con services through August 7, 2015. No change in Scope,only a change in the level of effort needed for
this phase of work,as reflected in the revised estimate,attached as Exhibit A.
The Local Agency of the City of Kent
desires to supplement the agreement entered into with KBA, Inc.
and executed on 6/29/15 and identified as Agreement No. LA 8224
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
No change.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: No change.
III
Section V, PAYMENT, shall be amended as follows:
an increase of$28,300.00 to the authorized Maximum Amount Payable, effective July 24,2015,
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By. KBA, Inc. By. City of Kent
Consultant Signature .t Approving Authority Signature
Roger Smith, PE, Principal
DOT Form 140-063 EF Date
Revised 912005
EXHIBIT A-SUMMARY OF PAYMENTS
Basic Agreement Supplement 1 Supplement 2 i. Total
Direct Salary Cost $ 12,192 $ $ 10,190 $ 22,382
Overhead
(Including Payroll Additives) $ 16,869 $ - $ 14,097 $ 30,966
Direct Non-Salary Costs $ 1,206 $ $ 956 $ 2,162
Subconsultants $ - $ $ - $ -
Fixed Fee $ 3,658 $ $ 3,056 $ 6,714
Management Reserve $ - $ $ - $
TOTAL $ 33,925 $ $ 28,299 $ 62,224`
Date Extension
I
II
I
SUPPLEMENTAL EXHIBITA
I
Project Name: Central Ave.S.Pavement Month Jun-15 Jul-15 Aug-15 Sep 15 Oct-15
A o
Client Project No.: Fed Aid#STPUL1071(006) osysmta 22 22 21 21 22
KBA Project No.: 015014-01 €,= HnMo 176 176 'I 168 168 176
CONSTRUCTION Contract Type: Cost+Fixed Fee(on DEC only) d Exire walk 12% 12% 12% 12% 11%
MANAGEMENT Date Prepared: 8/4/2015 AaJ Nr1Mo 197 197 ': 188 `188 195
Prepared by: Sam Schuyler ACTUALS ':Estimated I'
t n-
KBA Labor Hours Ph 15etvicss Only(CTC) Ph services '
Employee , Title 2015 Rates Total Hours 2015 Total Jun75 Jub15 Aug15 Sep-15 Oct-15
K.Adams (M4)Principal $80,00 - '- - - - -
Sam Schuyler (M2)Project Manager $56.48 41 41 , - 29 12 - -
Cameron Bloomer (E4)RE/OE $36.48 177 177 , -r fT `; - 137 40 - -
Steve Cox (P4)Inspector $41,00 180 180 -�_, 125 55 - -
Nsharra Key (P2)Project Admin $28.48 198 198 ,."_,y"r 3 - 158 40 -
Deborah Ottum M1 Contract Admin $48.00 13 13 „',-,*x;. 11 2 - -
Subtotal-KBA Labor Hours -
Direct Expenses
Item Total Costs 2015 Total s `; Jun-15 Jul-15 ;Aug-15 Sep15 OCI15
Vehicles @$5.76lhour $ 2,056 2056 s+ s - 1,509 547
Mileage(for non-Ins actor) $ 106 106 n 50 56 -
Subtotal-Direct Expenses $ 2,162 2,162 { _ - 1,559 603 -
Subconsultant s
I Subconsultants Total Costs 2015 Total Jun 15 Jul 15 Aug 15 Sep-15 Oct-is
Materials Testing Services-TEDSpecialty Inspection Services-TBD $ - - - - -
Subtotal-Subconsultant Costs $ - - - - -
Combined Costs
Employee This 2015 Rate Total DSC 2015 TQtel Jun-15 Jul-15 Aug-15 Sep15 00115
,
K.Adams (M4)Principal $80.00 $ "'
Sam Schuyler (102)Project Manager $56.48 $ 2,287 2,287 R,,I: - 1,610 678 - -
Cameron Bloomer (E4)REJOE $36.48 $ 6,472 6,472 '«r ' - 5,012 1,459 - -
Steve Cox (P4)Inspector $41.00 $ 7,360 7,360 5,105 2,255 -
Nsharra Key (P2)Project Admin $28A8 $ 51639 51639 s+ - 4,500 1,139 - -r
Deborah Ottum M1 Contract Admin $48.00 $ 624 624 ', - 528 96 -
Direct Salary Cost $ 22,3821 22,382 'rs - 16,754 5,627 - -
Overhead @ 138.36% $ 30,967 30,967 r,L` r jF - 23,181 7,786 -
Fixed Fee on DSC only)@ 30.00% $ 6,?i4 6,714 ,r r "`v3. - 5,026 1,688 - -
Subtotal(DSC+OH+FF) $ 6Q,D631 60,063 44,962 15,101 -
Direct Costs(No Markup) $ 2,162 2,162 + w - 1,559 603 - -
Subconsultant(s) $Management Reserve $ -
TOTAL ESTIMATED COSTS 1 $ 62,224 L 62 z24 rl- 46,520 15,704
Original Authorized Budget - $ 33,925i
Less'Actuals+CTC Estimate'through August 7,2015 ': $ (62224). ;
Supplement 2-additional budget.needed $ (28,300) 4f,
CONFIDENTIAL AND PROPRIETARY TO KBA,INC.
i
Printed B14/20156:00 PM s,a srmxze c�resxmismeoweanesu Ww „slma. u.sv�nw.r�wxs rznams e.m,soava
REQUEST FOR MAYOR'S SIGNATURE
IT
;-
1
.Routing Information.(ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAWIf3EPOT)NENW
Appr K- 'y D-ectorF
Originator: Eric Connor Phone (Originator): 5533 f d�
Date Sent: r... :1 {,s+'- Date Reciuired:
Return Si ned Document to:Nancy Yoshitake Contract Termination Date:,9/1/16
VENDOR NAME: Date Finance Notified:
KBA, Inc. (only required on contracts 7/23/15
i0 ODO and over or oo an Grant
DATE OF COUNCIL APPROVAL- Date Risk Manager Notified:N/A
8/4/15 (Required onr Non-City Standard Contracts/Agreements)
Has this Document been;Specifica11 Account Number: R90100, W90100, 590100*
Authorized in the Bud et? * YES t NO
Brief Explanation of Document:
*D90100
The attached agreement is for KBA to provide construction management services for the Central Ave. S.
Pavement Preservation and Utility Improvements project.
All Contracts Must Be Routed Through The Law Department
(This area to be completed by the Law Department) 1
Received: r t0' z t,£
y t 4"A
s Approval of Law Dept.: �fr t tom„• .� � , '1
Law De t. Comments: