Loading...
HomeMy WebLinkAboutPW14-203 - Change Order - #14 - SCI Infrastructure, LLC - SR 516 to S 231st Way Levee Improvements - 06/30/2015 Records � , WASH140TON Document - CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office, Vendor Name: SCI Infrastructure, LLC. Vendor Number; JD Edwards Number Contract Number: PW 14-203 -- 0iC3 This is assigned by City Clerk's Office Project Name: SR 516 to S 2315` Way Levee Imp/Russell Road Upper Levee Description: ❑ Interlocal Agreement M Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 8/27/2014 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Toby Hallock Department: PW Engineering Contract Amount: $2 176 334.02 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order#14 As of 08/27/14 ICE lod T CHANGE ORDER NO. #14 NAME OF CONTRACTOR: SCI Infrastructure, LLC. ("Contractor") CONTRACT NAME & PROJECT NUMBER:SR 516 to S 2315t Way Levee Imp./Russell Road Upper Levee ORIGINAL CONTRACT DATE: August 27, 2014 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Additional public parking lot striping, hatch painting at new curve and speed bumps added for excessive speed control in adjacent Parks' parking lot due to local traffic discovering bypass to road closure through Russell Road Park parking lot. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,176,334.02 (including applicable alternates and WSST) Net Change by Previous Change Orders $105,409.02 (incl. applicable WSST) Current Contract Amount $2,281,743.04 (incl. Previous Change Orders) Current Change Order $7,215.25 Applicable WSST Tax on this Change $685.45 Order Revised Contract Sum $2,289,643.74 i CHANGE ORDER - 1 OF 3 Original Time for Completion 120 working days (insert date) Revised Time for Completion under 129 working days prior Change Orders (insert date) Days Required (f) for this Change 0 calendar days Order Revised Time for Completion 129 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KE . l jf By f By signature) - � (signature _ Print Name: ry (,. Print Name: t i fr Its 1i 7,'� # '�E t,a o a eC Its cr 6 r e ��o t� �� 1�1 F r�C-7�em I, (title) '5 (title) DATE: —J/r/ DATE: L 26)z CHANGE ORDER - 2 OF 3 i APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [In this had,you may enter the electronic filepath where the contract has been saved] l CHANGE ORDER 3 OF 3 ® T FILE NO: 200.2 KEN " CHANGE ORDER WORKSHEET NO. 14 Construction Management Division - Public Works Project: SR 516 to S. 231" Way Levee Project No.: 09-3006.2 Improvements - James/Russell Project Engineer: Toby Hallock Fed-Aid No.: Owners Rep: Jason Barry Contractor: SCI Infrastructure, LLC Date: 5/26/15 I. PROPOSED CHANGE Additional public parking lot striping, hatch painting at new curve and speed bumps added for excessive speed control in adjacent Parks Parking Lot. H. REASON AND BACKGROUND FOR CHANGE Local traffic has discovered bypass to road closure through Russell Road Park parking lot. Excessive, unsafe speeds through the area were observed along with higher volumns of vehicles. Speed control through parking lot speed bumps was requested and required. III. METHOD OF PAYMENT NEW PAY ITEM(S) Not Applicable Change Order No. _ ( i FOR ACCOUNTING USE ONLY Sch. No. i Item Description Total city this its Unit Unit Price I Total Estimated Cost of - _-_ --- ....... -- - Est city -..PE --�- - - --- - _. Item -- -- 1 i Additional traffic safety 1 1 FA $7,215.25 C 7,215.25 control measures. I -- ----.-.. -------------- - ------ - ® Independent Estimate Attached I Q CREATE PAY ITEM ONLY Payment to be made ® 'I. PAY THIS PAY ESTIMATE REQUIRED at a later date upon completion of work — ___ _-__._._ ______. . .. ___. ____ _____-- ___.... Material Submittals Required CCi Construction Coordinator New Sub Req rd? 1 No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. I I - I i I FOR ACCOUNTING USE ONLY Sch No. B.I. No. Item Description_____, f ._Qty __ I Unit_-- Unit Price Cost of Item ❑ I Independent Estimate Attached -REQUIRED i INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. J _ I J ( FOR ACCOUNTING USE ONLY Sch No. 1 B I No. _ _ Item Description Qty-_ Unit Unit Price Cost of Item _ _ Independent Estimate Attached -REQUIRED 1 REV, DATE: 4/01/10 ®K1ENT FILE NO: 200.2 TOTAL ESTIMATED COST OF CHANGE ORDER *Total of the Cost of Item Columns THIS PAY ESTIMATE $7,215.25 IV. WORKING DAYS Original Contract ; 120 Due This Change Order* ® i Previous Total 129 - DATE.__�,7 16 14____ co _,j.DATE_�10 25 14,_ -- ._... _. _. . ... * I Explanation Justification Re red: _. TOTAL WORKING DAYS* 129 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: 9 Date: ] l Construction Supervisor: Bra Date: Paul Kuehne Construction Manager: - -- Date: ' Eric Connor i i 2 REV. DATE: 4/01/10 Barry, Jason From: Hallock, Tobias Qf' Sent: Thursday, April 02, 2015 2:48 PM \ To: Barry, Jason Cc: Murillo, Alex; ONeill, Rick Subject: FW: Speed Bumps Thru Parking Lot Attachments: 20150401075815860_0001jpg; SpeedBumps.jpg Jason, Great news! We have agreement on a design for speed bumps through the parking lot. Please see the attachments. We'll want asphalt speed bumps about every 150' through the parking lot. The speed bumps themselves should be 3-feet wide and 4"-6" in height. The 3-feet wide part is important so it's not too jarring for the vehicles according to Chris Hills,the City's Risk Manager. As we discussed, I think using an existing asphalt bid item would be the best approach, but I'll leave that up to you. Once you've got an install date, please let me know. Also, please let me know if you need anything else from me! Thanks! Toby From: Hallock, Tobias Sent: Thursday, April 02, 2015 2:37 PM To: Lee, Garin; Levenhagen, Brian Cc: Murillo, Alex Subject: RE: Speed Bumps Thru Parking Lot Great! Thank you for your input. I'll let Jason know to instruct the contractor to install these ASAP. Toby From: Lee, Garin Sent: Thursday, April 02, 2015 2:35 PM To: Hallock, Tobias; Levenhagen, Brian Cc: Murillo, Alex Subject; RE: Speed Bumps Thru Parking Lot Of course, always happy O Although on a personal level speed bumps in general do not make me happy. But in this case, thank you for working with us to manage traffic in the parking lot. I Garin From: Hallock, Tobias Sent: Thursday, April 02, 2015 2:33 PM To: Levenhagen, Brian; Lee, Garin i I Cc: Murillo, Alex Subject: RE: Speed Bumps Thru Parking Lot Garin, Are you happy? O Toby From: Levenhagen, Brian Sent: Thursday, April 02, 2015 2:32 PM To: Hallock, Tobias; Lee, Garin Cc: Murillo, Alex Subject: RE: Speed Bumps Thru Parking Lot I'm happy if Garin is happy. From: Hallock, Tobias Sent: Thursday, April 02, 2015 2:28 PM To: Lee, Garin; Levenhagen, Brian Cc: Murillo, Alex Subject: RE: Speed Bumps Thru Parking Lot Hi Garin, Yes, 3' in width would probably make it a bit less jarring for vehicles. As long as you guys are happy, we will move ahead. Brian, are you in agreement? Toby From: Lee, Garin Sent: Thursday, April 02, 2015 2:21 PM To: Hallock, Tobias; Levenhagen, Brian Cc: Murillo, Alex Subject: RE: Speed Bumps Thru Parking Lot Hi Toby, After a bit more discussion and a chance to chat with Chris Hills for some risk assessment, would you be okay with speed bumps closer to 3' in width and 4"-6" in height? Garin Lee, Park Operations Superintendent Operations I Park, Recreation and community Services 220 Fourth Avenue South, Kent, WA 98032 Direct Line 253-856-5131 1 Fax 2S3-856-6120 olee@KentWA.go_v CITY Or KENT, WASHINGTON KentWA.gov 7acebook YouTube 2 i From: Hallock, Tobias Sent: Wednesday, April 01, 2015 9:10 AM To: Levenhagen, Brian; Lee, Garin CC: Murillo, Alex Subject: Speed Bumps Thru Parking Lot Garin and Brian, From what I've found there are no specific guidelines to speed bumps. There tend to be ranges. The size of speed bumps generally range from 2" to 6" in height and from 1' to 3' in width. The spacing also was in ranges. Usually from 100-foot spacing to 300-foot spacing. At Kent Memorial Park the speed bumps are about 200-feet apart. I'm not sure how high and wide they are, but they are pretty jarring if you hit them with too much speed. I'm proposing we build 5 asphalt speed bumps 4" high and 1.5' wide spaced at 150-feet apart through the parking lot at Hogan Park where vehicles are cutting through. These will remain permanently in place after construction at the intersection is complete. Please let me know if this will work for you. Thanks! Toby Hallock, P.E., C.F.M., Environmental Englneer2 Environmental Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5536 1 thallockR KentWa oov CITY OF KENT, WASHINGTON KentWA.00v Facebook YouTube r i� �;PJTRO 1 f C� N"i[w -14NIL l I 3 SCI Infrastt•ucture, L L C Dgily Cost T'alty Project: SR516 to S 231st Job#1414 DATE DCR AMOUNT 04/23/15 23423 $ 5,662.93 � 04/23/15 $ 1,552.32 J5/0i" r;*,-`v! L/,L)& TOTAL $ 7,215.25 �C1 Infrastructure, L L C Daily Cost Record 023423 Project: SR516 to S 231st, Kent Job# 1414 Date: 04/23/15 Description: Flog for speed bumps, HOURS DETAIL COST RECORD CODE S.T. I O.T D.T. I Total RATE EXTENSION Eric Haulet PLF 1 0 58.54 0,00 Eric Haulet PLFOT 0 79.95 0.00 Andy Pace FM 0 64.17 0.00 AndV Pace FM OT 0 86.53 0.00 Jesse Sellers OP 0 61.33 0.00 Jesse Sellers OP OT 0 82.25 0.00 Jose Olvera LA 0 49.07 0.00 af Jose alvera LA OT 0 67.35 0.00 O Danielle Cecchlnl TCS 6 6 44.63 267,78 m Danielle Cecchini TCSOT 0 60.66 0.00 a Shaden Cannon FL 6 6 41.83 250,98 -� Shaden Cannon FL OT 0 56.45 0.00 Sub-Total 518.76 li Travel Time 0.00 Labor Markup 150.44 Total Labor Costs 1669.20 m Trailer 01 14.57 0,00 -� 1 Ton Truck w/tools 0 19A0 0.00 0 138 Excavator 0 70.27 0.00 O Dump Truck 0 79.68 0.00 F- Yanmar Mini-Excavator 0 25.19 0.00 T3 00 Skid Steer Loader 0 37.44 0.00 PC 200 Excavator 0 86.41 0.00 Roller 0 57.26 0.00 460 Excavator 0 179.43 0,00 112 Ton Pickup 0 28.72 0.00 z 030 Loader 0 52.85 0,00 w 310 Backhoe 0 36.90 0.00 M 2"Pump/Hose . 0 5.72 0.00 a 320 Excavator 0 92.95 0.00 n Sub-Total 0.00 0 Equipment Markup 0.00 w Total Equipment&Tools Costs T0.00 Dump Fees cV I of 3.00 0.00 2x4 S alls Renton Concrete tons 1 0 20.00 0,00 1-1/4"Rock tons 0.0 7.60 0.00 w Grout 1 0 0.00 0 0.00 w ICON Materials 1.0 1 4,458.69 4,458.69 x H Sub-Total 4:458.69 0 Sale Tax if applicable) 0.00 Marku SUB 12% 535.04 Othor Costs $4u993.73 Contractor's Representative Sub-Total 5662.93 Sales Tax on Rented Equipment Sub-Total 5 662.93 Subcontractor's Representative Owner's Representative No. Sheet 1 of 1 ITOTAL 15,662.93 Dafly Cost Record 1508 VALENTINE AVE 5E • PACIFIC,WA 98047• (253)218-0444 • FAX:(253)218-0454 Project - Job# Date Weather Description (must be complete) DETAIL COST RECORD CODE HOURS S.T. O.T. D.T. TOTAL RATE EXTENSION O m J Sub-Total - Labor Taxes& Fringe Benefits Travel Time Labor Markup Total Labor Costs J O O I a7 uj r z w - a j Sub Total O Equipment Markup Total Equipment Costs J Q I m w r — c Sub-Total Sales Tax(if applicable) - Material Markup Total Material Costs LLI L - I r O -- — Total Other Costs Sub-Total Bond Insurance Taxes Miscellaneous Costs Contractor's Representative Sub-Total Overhead Subcontractor's Representative Oviner's Representative Sub-Total Salas Tax No. Sheet of TOTAL ICON PATERIALS EXTRA WORK ORDER Isae VALENTINE AVE l.ciN�➢1>�;N1 tl�I 1N1�pI2I4TAT[e�N� u � tY. PACIFIC,WA 9D047 1'OR (N fl'sNI)L17 1.35CA'II-N'f tDNI.'Sr , , " (206)575-3200 Office o 1206J 575-3207 Fax pU NU P DISC LOS1; ICON Job# - _� ICON Fireman Mike_Fagel ICON EWO If Contractor SCI Infrastructure Contractor Ref# Project Name SR 596[0 5. 231st Way Levee Improvements Date 4127/2015 DESCRIP TON OFEXTRA WORK PERFORMED . Install 5 speed bumps approximately 21'x T x 3 Install walking Polh approximately t50'x i y Regular Hours Worked Overtime Hours Worked Employee Name Classlncation Quantity Unit Rate Quan(I(y Unit Rate Total Mike Flegel _General Forman(Operator) 6 hr $ 71.11 $ 426.60 _ .-. . __.._ ____ _ — ___ - g__ Lail]Jaswinder JOperalor Group IA 6 hr $ 66 3,5 Tiavls O'Connor , _Operator Group IA 6 hr $ 66 35 - $ $ 398.10 Andrew McKinney Operator Group III 6 hr $ 64.61 $ g 387.66 i _. . ._ — --. __._._ _ _ __—._. -- .._ Cammaron O'Connei Teamster<18 CY 6 hr $ $7,82 $ S 346,92 Total: $ 1,95'l.44 ... 'r YATERtAL:&RENTALS Material Description Quantity Unit Cost Tax% Cost Total PIMA Class 1!2" 16.94 ton $ 64.60 i $ $ 1,092,63 1"nisi: $ 1,092.63 EQUIPMENT Regular Hours Worked Hours on Standby Equipment Description(Year/Make/Mode)) Truck# Quantity Unit Rate Quantity Unll Rale Total 2006 Freightilner <16 CY Dump Truck 610530 6 Hr $ 46,41 4 g 278,46 2015 Ford F 450 Crew Truck 500593 6 k_Hr $ 20.52 I I $ - $ 123.12 Oistrlbutor Trailer Teck Pol --r-- ( 7 900093 8 �...,Hr S 1730 $ $ 103180 Total: $ 505,38 ' - -SUBCONTRACTORS Name Service Quantity Unit Cost Total I Total: $ t hereby certify lire!this Exha Work Order rapresenls the true and correct r .TOTAL COSTS AND MARKUPS - - quantlhos of work performed daring this period and that prevailing wages have been paid to all laborers, workers or mechanics on this project to LABOR $ 1,957.44 29,00°/ $ 2,525.10 __.. . .--' ---- accordereo with the Statement o(Intent in file with the Dlsldct. MATERIAL$RENTALS $ 1,08283 21.00% $ 1,322,08 EQUIPMENT $ 505.38 21.00% $ 611.51 SUBCONTRACTOR $ - 12,00% $ BOND MARKUP $ 4,458,69 0.00% $ - ICON MATERIALS Tolal:�$-!: 4;4j8.69- N .1 N V V U [L _ o 4r, m= o a � o N � ❑ � f��0 O) 1 E Ifi I n � 9j E o t a = D J y -- fit 31 d' ' ;iaE wc� ..z I AIN - I% v Om Q °nQ °n OrnO rn0 rn0 rn0 � OVJ Otn nrn nr� �,nl � -::Pu" # _ sit , 55 ` m In - u d R - # a s ro Concrate: Injudeus to eyes.Causns We IoiWticn.camflns Poolona Cement head file lollowng woming before using: Confect wh war,ai'i Sl9eTll�rEl unu>�IamEY'ad CLrlaEle,reciter,seam,I a cement reb(fi res can gl1.5e 51in mclam,.WIM Chamf o. sums a serious Eye damsye. Mod yjllaCt 4.1In eyes rIL xin.Vfrrel:valapic fgaLs.a IUh CatleneU,lol.'{I d�c JI'rl,fu9ldyfit vcuwR and 8gihfiN?1 one protvx�cn diet•arTeimj sd,Ui m malrmfs dycu nu'a0 IWld nvgl cpnorla usa valGpreol lrce*s Uta!arolglll aJ U+a rep andras,�toenwghto keep mrael ircpn'p/ni' onto Uianl. f Qltigllllg.RX co I,A'3&t Xnr aalstopm0.-t POaa_AdePmnloctlltdl any-rf 111CSLIIL':edd a,WashCffsl>r9laleywll Rc,.Y d2d'IV'Ie(r/.�((hpge �f[j Iltnxklh GCfiiixJ Is 3so a unr,so prmnp y mtse filek nta4xlels frun dEUlpty Seth iinnced(mla nwarJ adctilihr`i d yar hn<ra pelyLajenl u:rNwC "on In re v d.Cryc Ccri q 1iip11:EYa pion y r'amlrr IrL a edl 15 irieiAp.i:onm l phy5pan Inm�:marGy.I(EEP rut of rentro(�1areill User agidt� dal Is,nnls warn 19 to of nr poi i n U na(J59 R CXna nID t4allPrt t511 wet(un lafd61H1)POUE%a,naxav rv'rrRn a R11T 11 alxares, 1 / r-) Aonreoao, pmh�el Ina".m el do from rgh;ial hK(h61 may to I,ua Jon W)ow IxSw hexures la.mnlml Iwl five dun vd•eri rwdrv0, Ps Ciaiu 1. :lot Ass unit enr5 nu s:;l•ce funks AVNc urciUlry fimr-s.Alm,Asphal may rzLue se+ere bums,Wear protecYva - :alcty or',ilom'Ise,s nails arxl g.rvcs).If dumC',u+ wnh +alej and srx:a phys:nan. Water added at customer's own risk Additional water added to concrete will Property, Damage Indemnihealion & Release redduemwateits 9added aUorveda ees agnnlagrees lo accept rosponslUlllly lorraduoadstrenglh The f:peMeu 0tax r ce;-of.jlaay annl@anpfl,m pf{loaOgg dis RE ,Unloading&,Standby Excess unloading will be II s LEAEC to yar cryarsr naSUv.u„IU¢op.nra lhklne oF:mucn dlhs " chary'"' at posleil truck lime rates.Truck standby I1 arl rvoy to ae morner Ielainest to pwlanl cur ro'la✓:1 Wth yoo rely Illtar Cheta ao al d truc truck time fates Arrived at lob with inch slump. i.ra�.L4 ruse dttrpge to Wepaaruvsuhrcfarly it's cur wlsre to.he'G J ytwhaverynlrylhat re wl•.bulm incur In co dta uamlualorH Aru. Limited Warrantyy The. only,ilaefilp of the seller lot Added _ gal water at customer request. soonylindess list You sign lLs RELEASE.In cxiddetafco of she torforr once Of J c prodbcl defect Is I)te return of the purchase price in no: � sere&fats arl-Mcl MulYte,I We udarsgned,,Petehy-IND EM^IIFY Ore event shall Ills 8e11pr be liable far any direct Indirect, Other additions sa4szntl 16 emprole,'esfaaiyAvtn3e azdf�r*Ir{ams tolleprerrt:as, Incidental or_consequeral2l damages resuNng have xandcif,uOlty yips ms;W,acor mill ule fnss,drmvray cr whx the use of the�roducts or arising oil of oea e4&tarty Received appwtenances. at mrranly All c alms for Baniefpes or shortages must be. made wilhln 4 routs of del very'Ne do;not assiiiue Buyer's Agent ocel t of product and approval of an added Items_ ___ _,,r ra oonsipollj for am damage belend dtBLurb line, Y 9 ( P P PP Y I If t If and RELEASE the seller and its employees from The addition of any extra products to our mixer may vold am/warranty any Hardly. ii i oxpressed or lmpptled by the seller. The seller accepts no liability for any personal injury incuned by you while adding addldonal products to ouriLl ,+,I,, UP ,mixer. Signature Signature of Owner of Its Agent Signature of Owner or its Agent 4VGDCLTKTe9e-008 ry Leave Plant Arrive Job Sit Start Dlscharg Finish Discharge leave Job y51te Arrive PlantJ�1- 1 �!11I' 1J l -Drivers' r , Comments Company/ Customer P01 Order No. Lust. No. Customer Job Phase Code TICKET NO Driver Co. Pro. No. 131-4100at 98044 S10. 508 9><I11[ _r;,,i s1' OCOhBNELL, 51.4•a1� Jne �1'-1�eLpi doss. Day, FOP �0;1:3 S ,' C! %;_Lhi RUSu.. �m t W 3ph*1.s 5"h �MaG Dglivery Inslrurilona i I;1 7 rri 1 T t of I I Scale Is 3,r:lzI Load City Delivered Uty �Grclor(1ty PraductCogfe UGM Produa0eacnpllon ,Unit?nle Antqunl 16. 94 ;t<t 64 trl F;UPC;!r1AIE 1/r�r' PQ r I Al a4 ' n or,.,1. it r . Load Size Prod.No, DeaerlpuOm Slump Type _ CC Use Hml Cd. P�C1I t Sales Tax TOTALDUE `y..*411„f3tetoss Weight Tare Weight Troller Trailer Taken ry - —--�-- Check# bra..."_. .. e.a...,_..ra .`""'�a am ®r�r.a zn�� .a r.am sim,•:m--. III I i S'C1 Infrastructure, L L C Daily Cost Record Project: SR516 to S 231st, Kent Job# 1414 Date: 04/23/15 DesCflpllpn: Additional striping, painting in parking, etc HOURS DETAIL COST RECORD CODE S.T. O,T, D.T. Total RATE EXTENSION Eric Haulef PLF 0 58.54 0.00 Eric Haulet PLFOT 0 79.95 0,00 Andy Pace FM 0 64.17 0.00 Andy Pace FM OT 1 0 86.53 0,00 Jesse Sellers OP 0 61.33 0.00 Jesse Sellers 1OP OT 0 82.25 0.00 Jose Olvera ILA 0 49.07 0100 Jose Olvera LA Of 1 0 67.35 1 0.00 O Danielle Cecohini TCS 0 44.63 0.00 m Danielle Cecchini TCSOT 1 0 60.66 0.00 Shaden Cannon FL 0 41.83 0.00 -� Shaden Cannon FL OT 0 56.45 0.00 Sub-Total Travel Time 0.00 0.00 Labor Marku 0.00 Total Labor Costs $0:00 rn Trailer 0 14.57 0.00 1 Ton Truck w/tools 0 19.40 0.00 O 138 Excavator 0 70.27 0.00 O Dump Truck 1 0 79.68 0,00 F- Yanmar Mini-Excavator I 0 25.19 0.00 T300 Skid Steer Loader 1 0 37.44 0.00 PC 200 Excavator 0 86,41 0.00 Roller 0 57,26 0.00 460 Excavator 0 179,43 0.00 F-- 112 Ton Pickup 0 28,72 0.00 z 930 Loader 0 52.85 0,00. w 310 Backhoe I 1 0 36.90 0.00 2 2" Pume/Hose 0 5.72 0.00 o- 320 Excavator 0 92.95 0.00 n Sub-Total 0.00 0 E ui ment Markup 0.00. w Total Equipment&Tools Costs 0.00 Dum Fees cy 0 3.00 0.00 2x4 S alls Renton Concrete tons 0 20.00 0.00 1-1/4"Rock tons 0.0 7,50 0.00 m Grout 0 0.00 l o 0,00 w A l -A-Line 1.0 1 1,386.00 1,386.00 '.. I- Sub-Total 1386,00 O 13ale Tax (if a licable 0,00 Marku SUB 12°!0 166.32 Other Costs _ t552.32 Contractor's Representative Sub-Total 1,552.32 Sales Tax on Rented E ui ment Sub-Total 11552.32 Subcontractor's Representative Owner's Re resentalive No. Sheet 1 of 1 TOTAL $1.552.32 APPL Yw n3 , INC. NAWAPA •176 Roy Road SW, Bldg C a Paoilio, WA 88047 1yin,,nmmniam PhOn®(253)299•1209 a Fax(263)299-1260 �— malfOapplyallnCctlm 9 LIC.6APPLYV161AU PROPOSAL ATTENTION: ALL GENERAL CONTRACTORS PROJECT: SR 516 TO 231 ST WAY LEVEE BID DATE: 5/1/2015 ITEM OESCRIPTIO PLAN UN1T OTAL # QTY BID BID 001 PAVEMENT MARKING 1.00 LS 1386,00 $ 1,386.00 PAINT LINE 6"WHITE CROSSHATCH PAINTED BUMPS j TOTAL $ 1,386.00 STIPULATIONS: 1.GENERAL CONTRACTOR TO PROVIDE TRAFFIC CONTROL. 2.GENERAL CONTRACTOR TO PROVIDE PRELIMINARY MARKING FOR STRIPING LAYOUT, 3.THIS PROPOSAL TO 8E INCLUDED WITH CONTRACT DOCUMENTS 4.BOND NOT INCLUDED THANK YOU FOR THE OPPORTUNITY TO QUOTE THIS PROJECT WITH YOUR COMPANY. SINCERELY, PRICES INCLUDE MATERIAL, INSTALLATION$ INSURANCE. PRICES GOOD IF CONTRACT IS RECEIVED WITHIN 30 DAYS OF /✓ r —. AWARD. MIKE"SUS"SUSNER AFTER 30 DAYS PRICES MUST ESTIMATOR BE RENEGOTIATED. i