HomeMy WebLinkAboutPW14-203 - Change Order - #12 - SCI Infrastructure, LLC - SR 516 to S 231st Way Levee Improvements - 06/30/2015 ge Records Ma , ' me . Document wnsHirvoroe CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: SCI Infrastructure, LLC. Vendor Number: JD Edwards Number Contract Number: PW 14-203 -• 01 �) This is assigned by City Clerk's Office Project Name: SR 516 to S 231'f Way Levee Imp/Russell Road Upper Levee Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 8/27/2014 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Toby Hallock Department: PW Engineering Contract Amount: $2 176,334.02 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order#12 ----- ---- - _._.. - -------— ----------- - - As of, 08/27/14 ICE l�!T CHANGE ORDER NO. # 12 NAME OF CONTRACTOR: SCI Infrastructure, LLC. ("Contractor") CONTRACT NAME & PROJECT NUMBER:SR 516 to S 231" Way Levee Imp./Russell Road Upper Levee ORIGINAL CONTRACT DATE: August 27, 2014 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Provide and install non-woven geotextile fabric for separation of coarse and fine backfill materials at new cast-in-place concrete wall backfill area due to GEi's concerns over migration of fine materials from coarser, free draining material and non-permeable levee fill. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,176,334.02 (including applicable alternates and . WSST) Net Change by Previous Change Orders $99,018.39 (incl. applicable WSST) Current Contract Amount $2,275,352.41 (incl. Previous Change Orders) Current Change Order $1,273.71 Applicable WSST Tax on this Change $121.00 Order Revised Contract Sum $2,276,747.12 'I CHANGE ORDER - 1 OF 3 i Original Time for Completion 120 working days (insert date) Revised Time for Completion under 128worltingdays prior Change Orders (insert date) Days Required (f) for this Change 0 calendar days Order Revised Time for Completion 128 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT- ter'' p 11 J✓J y. —' (signature) v .__.(s nature) Print Name i im 1. 6(- (milt Print Name: "YY Its Its 1v6t,-- C %nu ism (tlt e) J ,f ,(title) DATE: 6- '"_ _ j DATE: f%mac J zrr;, I CHANGE ORDER - 2 OF 3 i APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department (In thls field,you mev enter the electronic Olepth where the contract has been saved] I I CHANGE ORDER - 3 OF 3 ® FILE NO: 200.2 KENT CHANGE ORDER WORKSHEET NO. 12 Construction Management Division — Public Works Project: SR 516 to S. 231" Way Levee Project No.: 09-3006.2 Improvements - James/Russell Project Engineer: Toby Hallock Fed-Aid No.: Owners Rep: Jason Barry Contractor: SCI Infrastructure, LLC Date: 5/26/15 I. PROPOSED CHANGE Provide and install non-woven geotextile fabric for separation of coarse and fine backfill materials at new cast-in-place concrete wall backfill area. II. REASON AND BACKGROUND FOR CHANGE GEI raised concerns over migration of fine materials from coarser, free draining material and non-permeable levee fill. To address concerns the addition of geotextile fabric is being added along levee limits at wall. III. METHOD OF PAYMENT C NEW PAY ITEM(S) E] Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch No i Item Description Est Total ' city this Unit Unit Price --- Total Estimated-Cost of Item PE 1 Geotextile Separation Fabric 1 1 LS $1 273.71 at new CIP wall I , ® Independent Estimate Attached l CREATE PAY ITEM 1 ONLY- Payment to be made ® j PAY THIS PAY ESTIMATE REQUIRED I at a later date upon completion of work _ JJ— Material Submittals Required - CO Construction Coordinator New Sub Reqrd? No DELETE EXISTING PAY ITEM(S) per 1-00.5 Not Applicable Change Order No. i - FOR ACCOUNTING USE ONLY Sch No B No. Item Description - __I Qty _ I Unit i Unit Price Cost of Item -._- Independent Estimate Attached - REQUIRED ❑ INCREASE/DECREASE TO EXISTING PAYITEIVI(S) Not Applicable Change Order No. I _ FOR ACCOUNTING USE ONLY — ---- Sch Item Description - - _i Qty_ _ Unit Unit Price _ Cost of Item ❑ I Independent Estimate Attached -REQUIRED 1 REV. DATE: 4/01/10 ® FILE NO: 200.2 6�rNT TOTAL ESTIMATED COST OF CHANGE ORDER— $1,273.71 *Total of the Cost of Item Columns THIS PAY ESTIMATE C $1,273.71 IV. WORKING DAYS Original Contract 120 Due This Change Order* C 1 Previous Total 128 _ _TE 7/16/14 .. _.._ .... __— _—_ .._._._ . _ DATE _10� /25/14 _— _..._ _............_. DA * Ex Ianation Justification Re cored. TOTAL WORKING DAYS* 128 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Date: I15 7a p arty ' Construction Supervisor: _ Date: Paul Kuehne Construction Manager: Date: Eric Connor 2 REV. DATE: 4/01/10 SCI Tnfrastructure;'L L C Daily Cost Rcaord 021079 Project: SR516 to S 231st, Kent Job# 1414 Date: 03/02/15 ;'C') Description: _Inslall filterfabnc between Levee MI and gravel borrowL)erEnq/noer's request. HOURS DETAIL COST RECORD CODE S.T. O.T. D.T, Total RATF EXTENSION Dick Daiker CA 0 58.54 0.00 Dick Daiker CA OT 0 79,95 0,00 Andy Pace FM 4 4 58.54 234.16 Andy Pace FM OT 0 79.95 0.00 Ken Fieldstad OP 0 61.33 0.00 Ken Fieldstad OP OT 0 82.26 0.00 Jerry Engstrom TM 0 55.86 0.00 cc Jer Engstrom TM OT 0 74.39 0.60 O Sven Carlsson OR 0 61.33 0.00 m Sven Carlsson OP OT 0 82.25 0.00 Chris Duesterbeck 'FL 4 4 49.95 199.80 - Chris Duesterbeck PL OT 0 68.68 0,00 Sub-Total 433.96 Travel Time 0,00 Labor Markup 125.85 Total Labor Costs $559.81 cn 1/2 Ton Truck w/small Tools 0 15,09 0.00 1 Ton Truck w/tools 0 19.40 0.00 0 138 Excavator 0 70.27 0.00 O DumpTruck 0 79,68 0.00 Backhoe w/Hoe ack 0 47.70 0.00 T300 Skid Steer Loader 0 37.44 0.00 PC 200 Excavator 0 86.41 0.00 Rental Trucking 0 130.00 0,00 460 Excavator 0 179.43 0.00 N Double Drum Roller - 0 22.96 0.00 z 930 Loader 0 52.85 0.00 w 310 Backhoe - - 0 36.90 0.00 2w 2" Pumofl-lose 0 5.72 0.00 a 0 0.00 D Sub-Total 0.00 O Equip mant Markup - 0.00 w Total Equipment&Tools Costs $0.00 Dump Fees - cv 0 3.00 0.00 2x4 5 alls Cadman tons 0 15.25 0.00 1-1/4" Rock tons 0.0 7.50 0.00 co Filter Fabric, Order#G75829 rolls 2 2 295.00 590.00 0 0.00 w 0 0.00 = I Sub-Total 590.00 0 Sale Tax if applicable) 0.00 Marku 123.90 Other Casts 8713.90 1 Contractor's Representative Sub-Total 1,273.71 Sales Tax on Rented Equipment Sub-Total 1,273.71 Subcontractor's Representative Owner's Representative No. Sheet 1 of 1 ITOTAL 1 773.71 f [ r G r ' Daaly Cost Record 1506 VALENTINE AVE SE PACIFIC,WA 98047• (253)218-0444 FAX:1253)218-0454 Project Job Date Weather ! Description (must be complete) DETAIL COST RECORD CODE HOURS RATE EXTENSION S.T. O.T. O.T. TOTAL Q (D O7 _. Sub-Total Labor Taxes& Fringe Benefits Travel Time Labor Markup Total Labor Costs cn J O 0 I 06 __ z I W 2 r I CL Sub Total LL Equipment Markup !� Total Equipment Costs - J LU LU Q —'— � Sub-Total Sales Tax(if applicable) Material Markup Total Material Costs LU O Total Other Costs L- 1 Sub-Total Bond Insurance Taxes Miscellaneous Costs Contractor's Representative Sub-Total Overhead Subcontractor's Representative Owner's Representative Sub-Total Sales Tax No. Sheet of TOTAL „, NORTHWEST LININGS & ram”lcking Sheet Page: 1 GEOTEXTILE PRODUCTS,INC. "7-Ielping to Protect the Environment"P.O.Be, 1248 /"l Order Number: G75829 P 21000 77th Avenue South (/ Kent, OVA 98032 ` Order Date: 2/23t2015 r (253)872-0244* (800)729-6954 Salesperson: 0030 ^ ;:, FAX: (253) 872-0245 Mice Accounts-NW&SW WA www,nortliwostlinings.com Warehouse: 000 KENT MAIN WAREHOUSE Sold To: SCO120 Ship To: SCI Infrastructure,LLC SCI Infrastructure,LLC 2825 South 154th Street 240TH&RUSSELL RD Seatac,WA 98188-2034 MIKE H TO DELIVER Kent,WA 98032 Confrm To: ANDY 206-730-0010 RAJ Ship Date: 2/23/2015 Ili Customer P.O. Ship VIA F-O.B. Terms KENT LEVEE MIKE H JOBSITE NET 30 DAYS Item Number quantity Ordered: Shipped Backordered GTR042-12.5 2 ROLL = 11000.00SY PermeaTex 4045/R042 4.5a¢Men-Woven Geotextlle 12.5'X 360'=500 SY i Roll 2 ROLLS Received by Signature: Warehouse: Name:(Printed): Pulled by: Ship Date: Checked by: f i Page: , Invoice NORTHWEST LININGS& CEOTEXTILE PRODUCTS,INC. Invoice Number; 0053321-IN "Helping to Pootecl Me Env7rmrmerb" Invoice Oate: 9/24/2014 N.O.Box 1248 21000 77th Avenue South RECEIVED Order Number: G73352 Kent,WA 9803'- Order Date: 912312014 !. (253)872-0244-(800)729-6954 .�FI> 5 /p)b FAX:(253)872-0245 Invoice Due Date: 1 012 4/2 0 1 4 www,northwestlinings,com Terms: NET 30 DAYS Sold To: Ship 70: '. KI Infrastructure, SCI Infrastructure,LLC 2825 South 1541h Street WILL CALL Sealac,WA 98188-2034 Kent,WA 98032 Confirm To: ROBBIE 206-793.4648 RAJ Customer P.O. Customer 0 Salesperson 1326 SCO120 0030 Miso Accounts-NW 8 SW VA- Item Number 3 Description Quantity Unit Price Ez tended Price 1 GTR042-12.5 1,000.00SY 6 0.590 $ 590.00 PermeaTex 4045 1 R042 4.5oz Non-Woven Geotextile 2ROLL 6 295.000 / X 360'=500 SY I Roll 2 R 2 ROLLS �NL_> I Partial Claim Release and Lon Waiver Please rLmit to: Net Invoice: 590.00 In considereflon of a check for payment in the amount stated on this Invoice,and Northwest Linings 8 Geotedle Freight: $ 0.00 effective upon its clearing the bank upon which II was drawn,Northwest Linings 8 Products,Ina ! Geoiex111e Products,Inc.waives and releases any Ilan of IIon rights acquired by P O.Box 1243 Sales Tex: $ 56,05 fumishing labor andfannaterials for the property referenced above to the extent of KenI,WA 98D35-1248 such payment This partial claim waiver does not operate to release or waive any Invoice Total: $ 646.05 rights In counsellors with vanes owed In excess of the above described considerllon, 120 7--7 y ' 3 I 1 j i � h t . 4 � 7 • 4. F i J ' a`• V 1 I S Y -p k� � i Avi Li A'• .. am C t , y', i f} T3-1 x Zg .� }ems .. i, -'"S a .Mw�✓`* c r ,� �` ` F. 1 �. e � ¢"5 try .ft r r4 � r I•,. Y• n if ..i! 4 `'y�'f{ `4`' I� / S dot a ,� �� .. 7 ��F„n e ,yP' t •'mac r r N��i �`� Y�f•l f 4 ' !x} ��z � �`. f,�t tr4 � � -� f � 3 +3_ r