HomeMy WebLinkAboutPW14-203 - Change Order - #10 - SCI Infrastructure, LLC - SR 516 to S 231st Way Levee Improvements - 06/30/2015 Records . �t ���� Document � CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: SCI Infrastructure, LLC. Vendor Number: JD Edwards Number Contract Number: PW 14-203 OI This is assigned by City Clerk's Office Project Name: SR 516 to S 231't Way Levee Imp/Russell Road Upper Levee Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 8/27/2014 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Toby Hallock Department: PW Engineering Contract Amount: $2,176,334.02 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order#10 As of: 08/27/14 T wa�� o,o CHANGE ORDER NO. # 10 NAME OF CONTRACTOR: SCI Infrastructure, LLC. ("Contractor") CONTRACT NAME & PROJECT NUMBER:SR 516 to S 231't Way Levee Imp./Russell Road Upper Levee ORIGINAL CONTRACT DATE: August 27, 2014 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: City required Saturday water connections for newly relocated main. Overtime premium, additional .50 time, reimbursement for labor to perform work during non-business hours due to shutting off the water supply to the City of Kent Shops building during normal work hours being prohibited. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,176,334.02 (including applicable alternates and WSST) Net Change by Previous Change Orders $79,562.36 (incl. applicable WSST) Current Contract Amount $2,255,896.38 (incl. Previous Change Orders) Current Change Order $2,622.52 Applicable WSST Tax on this Change $249.14 Order Revised Contract Sum $2,258,768.04 j CHANGE ORDER - 1 OF 3 Original Time for Completion 120 working days (insert date) Revised Time for Completion under 127 working days prior Change Orders (insert date) Days Required (f) for this Change 0 calendar days Order Revised Time for Completion 127 working days (insert date) In accordance with Sections 1-04.4 and 1-04,5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. i 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: I By (signatur ) � (sr Print Name: Print Name Its t 'C® ittt$' Its 14.r t fr Gig (title) j {title) DATE: C�1 _ f-�_ /. DATE; � .,I�1%Cc%/S CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department I [In this Meld,you may enter the electronic Blepath where the contract has been sa arl III ill CHANGE ORDER 3 OF 3 • FILE NO: 200.2 ICENT CHANGE ORDER WORKSHEET NO. 10 Construction Management Division — Public Works Project: SR 516 to S. 2315f Way Levee Project No.: 09-3006.2 Improvements - James/Russell Project Engineer: Toby Hallock Fed-Aid No.: Owners Rep: Jason Barry . Contractor: SCI Infrastructure, LLC Date: 1/26/15 I. PROPOSED CHANGE City required Saturday water connections for newly relocated main, Overtime premuim, additional 0.5 time, reimbursement for labor to perform work during non-business hours. II. REASON AND BACKGROUND FOR CHANGE Shutting off water supply to the City of Kent Shops building during normal work hours was prohibited. The City directed SCI to make the physical connections requiring existing main shutdown Saturday, February 14In. III. METHOD OF PAYMENT NEW PAY ITEM(S) ❑ Not Applicable Change Order No. I I - i I FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Qty this Unit Unit Price Total Estimated Cost of Est. city PE j Item -- __---- --._---------- ------_ -..-- --- -------" ------- 1 Labor premuim 1 1 FA j $2,622.52 $2,622.52 reimbursement for water ---, connections -- --- Independent Estimate Attached CREATE PAY ITEM ONLY- Payment to 6e made ; ® I PAY THIS PAY ESTIMATE RE UYRED at a later date upon com�letion_of work - i Material Submittals Required - CC N Constructlon Coordinator i ew Sub Reqrd? No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. - ! FOR ACCOUNTING USE ONLY Sch No. B.I. No. Item Description I ,, city __ 1 Unit Unit Price Cost of Item Independent Estinate Attached--REQUIRED INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch No. i B.I. No. I Item Descr x n Qty -- i Unit i _-Unit Price Cost of Item -- ------ ------------- ----------- 1 REV, DATE: 4/01/10 • FILE NO: 200.2 KENT r�! Independent Estimate Attached - REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * 2 622.52 *Total of the Cost of Item Columns THIS PAY ESTIMATE $2,622.52 IV. WORKING DAYS Original Contract 112p Due This Change Order* ® Previous Total 127 - _ ._ . --------- TOTAL--- . .._ ,--. _-. -- _- DATE 7 16 14 _„ DATE; L10/25/14 .. I, * Ex lanation Justification Re uired: WORKING DAYS* 127 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. LPrepared By: _ Date: 2� itConstruction Supervisor: aBarr� Date: _ l0 Pa I Kuehn j Construction Manager: _ Date. >. Eric Connor 2 REV. DATE: 4/01/10 SCE Infrastructure; L L C Cost Record 1 „ t„r Project: SR516 to S 231 M, Kent Job# 1414 Date: C. Description: Ovedimo Pay for water lte-!ns on a Saturday. HOURS DETAIL COST RECORD CODE S.T. O.T. I D.T. I Total RATE EXTENSION Jim Crabtree premium only PL OT 9 9 18.73 168.57 i Mike Hickerson promium only LA OT 9 9 18.28 164.52 Casey Dale premium only FM OT 9 9 21.41 192.69 Andy Pare premium only FM OT 10 10 21.41 214.10 Jesse Sellers premium only OP OT 9 9 21.20 190.80 Eric Haulet premium only LF OT 9 9 19.87 178.83 Ken Fieidstad premium only OP OT 9 9 21,20 190,80 m Stan Rutherford premium only OP OT 9 9 21.20 190.80 O Garrett Gunsauls premium only PL OT 9 9 18.73 168.57 m Colleen Dove premium only FL OT 10 10 14.62 146.20 ¢ Danielle Cecchini premium only TCSOT 10 10 11.59 115,90 Marty Adams prennium only TM OT 6 6 18.53 111.18 Sub-Total 2,032.96 Travel Time 0.00 j Labor Markup 689 56 Total Labor Costs 2 622.52 co 1/2 Ton Truck wismali Tools 0 15.09 0.00 1 Ton Truck w/toois 0 19.40 0.00 O 138 Excavator 0 70.27 0.00 O Dump Truck 0 79.68 0.00 � Backhoe w/Hoe ack 0 47.70 0.00 T300 Skid Steer Loader 0 37.44 0.00 PC 200 Excavator r~• ;;. -. .-. 0 86.41 0.00 Rental Trucking ;� m. y N =n+a„�- 0 13ROq 0.00 460 Excavator 0 179,43 0.00 I-- Double Drum Roller 0 22.96 0.00 z 930 Loader a , 0 52.85 0.00 w 310 Backhoe � 0 36.90 0.00 0 0.00 0 0.00 Sub-Total 0.00 C7 Equipment Marku 0.00 w Total Equipment&Tools Costs $0.00 Dump Fees cy 0 3.00 Goo 2x4 S alls Cadman tons D 15.25 0.00 1-114" Rock tons 0.0 7.50 0.00 D 0,00 0 0.00 w 0 0.00 t- Sub-Total 0.00 O Saie Tax if applicable) 0,00 Markup 0-00 'Other Costs $0.00 Contractor's.Representative Sub-Total 2.622.52 Sales Tax on Rented Equipment Sub-Total 2-622.52 Subcontractors Representative i Owner's Representative No. Sheet 1 of 1 ITOTAL $2,622.52 Daily Cost Record 1508 VALENTINE AVE SE • PACIFIC,WA 08047• (253)210-0444 FAX:(253)218-0454 21067 ro ocl m /r L Y Date Z / _/5 Weather L G ��1� '>`Y� :�� / ✓G Job_#_/��/t DOscriplion(must be complole) DETAIL COST RECORD HOURS CODE �s.Ti C.T. D.T. TOTAL RATE EXTENSION corn'e_.%C P r r � ,� ), i t '•- ��� --- ���- - -- -- Sub-Total �--- _--- —_-- — Labor Taxes& Fringe Benefits Travel Time Labor Markup - — —�- --- -- Total Labor Costs Q "" --_-_...... __.-___ qK Z Ltl Sub Total d Equipment Markup — Total Equipment Costs Q -- - X W 2 Sub-Total Sales Tax(It applicable) I Material Markup Total Material Costs Ir O Total Other Costs - - Sub-Total Bond Insurance Taxes_ M'rscalari Costs _- -( �' Contractor's Representative Sub-Total Overhead �3'bcontraclol s RopresontaGvo --. Owner's Representative Sub-Total -_ Sales Tax No. Sheet of - TOTAL 3 I i I ! I 7 , 6 - i I a i i I i 1 i � I i I I i f { I 1 i i � I i i 1 j 1 I I 1 i ( f F I I • l i I i