Loading...
HomeMy WebLinkAboutPW15-210 - Original - Petersen Brothers, Inc. - Guardrail Repair - 06/08/2015 Recordsem KENT Document - WASHIN:GTG-N CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Petersen Brothers, Inc. Vendor Number: JD Edwards Number Contract Number: �, �5 ✓� This i assigned by City Clerk's Office Project Name: Guardrail' Repair Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 6/8/15 Termination Date: 7/21/15 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Tom Rusbuldt Department: PW Operations Contract Amount: $7,981.74 Approval Authority: (CIRCLE ONE) epartment Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Repair guardrail at three locations: As of: 08/27/14 91 KEN T W A 5 H I N G T G N PUBLIC WORKS AGREEMENT between City of Kent and Petersen Brothers, Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Petersen Brothers, Inc. organized under the laws of the State of Washington, located and doing business at 2008 East Valley Highway, Sumner, WA 98390, Phone: (253) 833-2544, Fax (253) 863-5951, Contact: Ron Petersen (hereinafter the "Contractor") :AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall repair guardrail at the following locations: 1. 72na Ave. S. and 262nd St. 2. S. 272nd St., east of 26t" Ave. S. eastbound 3. S. 2.40t" St. and 94t"`Ave. S. Fora copy of the Contractor's bid, see Exhibit'A which is attached and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional 'practices within the Puget Sound region in effect at the time such services are 'performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by July 21, 2015. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Seven Thousand, Nine Hundred Eighty One Dollars and seventy four cents ($7,981.74). Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20- 171- and its related rules for,the work contemplated in this Agreement. i.The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will PUBLIC WORKS AGREEMENT - 1` (Roadway/Pedestrian Path Under$10K and No Performance Bond) f a the remaining Contract amount upon fulfillment of the conditions listed below and pay 9 p throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $10,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final fifty percent (50%) of the Contract amount for a period of thirty (30) days after the -date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and `until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred; by the City, "Additional costs shall mean all reasonable costs, including legal costs and attorney fees, incurred by .the City beyond the maximum'.. Contract price specified above,. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become 'due the'Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. IBy their execution of this Agreement, and in accordance with Ch. 51..08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work,- the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is, eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the .Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. PUBLIC WORKS AGREEMENT - 2 (Roadway/Pedestrian Path Under$10K and No Performance Bond) C4 !T D. The Contractor is responsible`for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department Of Revenue.` E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's 'business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor License pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or, more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials;for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor, D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work Js completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing '.the Contract work. -Contractor shall pay prevailing Wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The 'City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that; 'a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of th.is Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts' and events giving rise to the requested change. If the City determines that the change PUBLIC WORKS AGREEMENT - 3 (Roadway/Pedestrian Path Under$10K and No Performance Bond) t ( 1 increases or decreases the Contractor's costs or,time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However,,if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon 'receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract -work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; "ho'wever,l the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims,-below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and, for direct, indirect and consequential costs, including;costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to .the City of all claims within fourteen (14) calendar days of the occurrence of the events giving >rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance' with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the Information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER Of ,ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the. Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4.` The estimated dollar cost, Jf any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress 'schedule showing the schedule change or disruption if the Contractor is asserting. a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred` as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. PUBLIC WORKS AGREEMENT - 4 (Roadway/Pedestrian Path - Under.$10K and No Performance Bond) i The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C, Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE'` ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORRK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE`THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor, shall promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any 'parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period appli cable.to the overall work. The Contractor shall begin to correct any defects within seven (7) calendar, days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction XI. DISCRIMINATION. In` the hiring of employees for the performance of work under this Agreement o�rl any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf.of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory,. mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement: XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers,; officials, employees, agents and volunteers harmless from any and all claims, injuries, PUBLIC WORKS AGREEMENT - 5 (Roadway/Pedestrian Path Under$10K and No Performance Bond) damages, losses or, suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification.` Should a court of competent jurisdiction determine that this Agreement is subject to RCW , 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property: caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be on'y to the extent of th'e Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANC E, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY` HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the ;Contractor's.part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B 'attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage-to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of`the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon' strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and 'remain in full force and effect. i PUBLIC WORKS AGREEMENT - 6' (Roadway/Pedestrian Path Under$10K and No Performance Bond) C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington.,' If the parties are unable to settle any dispute, difference or claim arising from the parties performance of this Agreement, the exclusive means of resolving ;that dispute, difference or, claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any, claim or lawsuit for damages arising from the parties'' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law;, provided, however, nothing in this Iparagraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice: All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the-Agreement, unless notified -to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently. given if sent to the addressee at the address stated in this Agreement or such other address as may, be hereafter specified in writing. E. Assignment: Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment,' the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or,modification of any of the provisions of this Agreement shall 'be.' binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement.. . The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer'or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering' in any manner this Agreement. All of the above documents are hereby made'a part of this Agreement However, should any language' in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance' with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations` covered by this Agreement or accruing out of the performance of those operations: I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide 'proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Roadway/Pedestrian Path Under$10K and No Performance Bond) J. Counterparts. This Agreement may be executed in any number of counterparts, each"of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS,`;the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: Petersen Brothers, Inc. CITY OF'KENT: BY: Byj (signature) signature) Print Name: Ronald G. Petersen Print Name: David A. Brock, P.E. Its: President Its: Operations Manager (title) DATE: 5-28-15 DATE: ' NOTICES TO BE SENT TO: NOTICES TO BE'SENT TO: CONTRACTOR: CITY OF KENT: Ron Petersen Timothy J. LaPorte, P.E. Petersen`Brothers, Inc. City of Kent 2008 East Valley Highway 220 Fourth Avenue South Sumner, WA 98390 Kent, WA 98032 (253) 833-2544 (telephone) (253) 856-5500 (telephone) (253) 863-5951 (facsimile) (253) 856-6500 (facsimile) Petersen Brothers-Guardrail Repair-3 Sites/Rusbuldt-' -i PUBLIC WORKS AGREEMENT - 8 (Roadway/Pedestrian Path Under$1OK and No Performance Bond)` DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City,of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this- Agree ment shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City, deems necessary for any contractor, subcontractor or supplier on this specific 'Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor,: subcontractor o'r supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence ,of all sensory, mental or physical disability. 3. During the' time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I. the prime contractor, will actively consider hiring and promotion of women and minorities. p g i signed by me, the 5. Before 'acceptance of this A reement an adherence statement will 'be si ne Prime Contractor, that the Prime Contractor complied with the requirements as set forth above: By signing below, I a ree to fulfill the five requirements referenced above. By: Ronald G. Petersen, President For: Petersen Brothers,, Inc. ,Title: President Date: 5-28-15 EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding,Agreements with the City, amounting to $10,000 or more within 'any;given year, must take the following affirmative steps: 1. Provide a written statement to all new, employees2 and subcontractors indicating commitment as an equal i,opportunity employer. Z. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all, or part of the Agreement. Contract Compliance Officers- will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that .contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. 4 I, the undersigned, a duly; tersen Brothers Inc. Company, hereby acknowl "before-mentioned company was the prime contractor for the Agreeme t Rprs - 3 Loe's that was entered into on the ween the firm I represent and the City of Kent: I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: Petersen Rona G. For: Petersen Brothers, Inc Title: '.President Date EEO COMPLIANCE DOCUMENTS 3 EXHIBIT A Petersen Brothers, Inc. 2008 EAST VALLEY:HIGHWAY SUMNER,WASHINGTON 98390 (253)833-2544(253).863-8136 FAX(253)863-5951 Contractors#.CC-01 PETERB1187NZ Project Name: KENT REPAIR$APRIL,201S BID DATE: 05/0612Q15 PAY ITEM DESCRIPTION `;' QUANTITY UNIT UNIT PRICE EXTENSION sfr t: 72ndAva S a 2e2n sr 101 W-Beam.Guardrati 12.50 L.F, 6.07 .102. W-Beam Type 1 Anchor Plate 1.00 EACH 85.43 85.43 103. . Type1 Anchor Bracket 1.A0 EACH 66.57. ; 6..57 104" "G"End. 1.00 EACH „ 146.84 106,84' 105 6k8x3'64.Ali Post 1..00 '.EACH. 21.$9 21.39 1Q67. 6x8x6'.Wood Posts; 4.00 EACH. :28.98 i15,92 107 6x8e CRT Post 1.00 EACH. „ 33.12 33.12 108 518 X 18"Master Bolt 4 00 EACH 2 70 10.80 109 5M X 10"Master bolts 2.00 EACH 0.0(i. 0.00> 1:10 5I8.X 1 1/4,Splice BOIL 20.00 EACH 0.40 8.00' 5/8 Washers 6.00 0.90 112 U. 3t . 0 . 4 10.32: Crew Time Laty 5.00 HOUR 466,A1 2,334.55;, 114 Traffic Control Labor 10:00 :HOUR.: 52.40 524.00 11,5 Traffic Control Materials 1.00. L S 55.20 55.20 srrt=2 S.272nd St E!0 26th Ave S E9 At 1-5 Over Pass 201 W-Beam Guardrail 12.50 L.F. ;6.07. 75.88 202 E Plate#1: 1.00 EACH 150.34 150.34 203 Et;Head 1,00 EACH ; 1,127.52 1,127,52 2041 �6x8x6'CRT Post: 1.00 EACH'. 33.12 33,12', 205 ' 51$X 18'.Master Bolt 2.00 EACH 2.71 5.42' 206 5I8X 1.1/4'Splice,Boit 16.00 EACH.' 0.40 6.40 207 518 Washer 4.00 lACH 0:15 0.60 208 5/$Nut 20.00 EACH 0.43 20 6x$x3'9"Wood Fosts 2.00 , EACH 2,39 42.78.' III 1'618 X 10 Master boll 1.00 .:EACH 1.58 1.58 210 211, Crew Time Labor: 4.00 HOUR j 447.78 1,79i.12 212 i i' Traffic Control.Labor .5 00 HOUR 52.84 264 20: 213. Traffic Confroi Materials 1.00 L.S., 222.06 222 46. ' SITE 3 I. S 240th St 8 94th Ave 5 1=1/4 X 44"Steel:Posts '. . 3.00 EACH 37.50 112.50 3021 4':Chain Ilnk Fabric 16.00 L.F. ;! 7,82. ; 12512;, 303, 1.00 L.S.. Ties And Clips .. 37.58 37.58 C 17 . 304 6.40 528.00, rewTlmeLabor. . .. 3.00 HOURS '; TOTAL QUOTE. 7981.74' Email: Ti1is quote contains the following exclusions/qualifications; Pricing does riot`include Tax **Price doesinot Include traffic control unless specified. *Prices Include material&installation,bond and insurance. **This quote sheet to become part of any subcontract agreement. **Any deleti hange on or c t4..above bid Item s m s or.quantltieust be agreed to prior to.bfd opening. **Beam Cuardrail is`avallabte in 12.6'and 6,26'lengths.. "Prices are good if contract is received within 30 days after award of Job,after 30 days prices Must be renegotiated, i IF ACCEPTED PLEASE SIGN AND FAX BACK TO 263-863.5951 NO WORK WILL BE;PERFORMED;WITHOUT PROPER AUTHORIZATION . By., y Date: i Title. Phone: Company Name: Fax: J Address: _.. ....----- EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The. Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or. subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form 'CA 00 01 or'a substitute form providing equivalent liability``coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and sha i cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury.and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Cont,ractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. j 3. Workers' Compensation coverage a's;required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance'shall be written with limits no less than $1,000,000 each occurrence; $240001000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance", or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with 'it. 2 The Contractor's insurance shall be,endorsed to state that coverage shall not be cancelled by either party, except after thirty,(30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of he contractor and a copy of the endorsement naming the City a Sadditional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of aiil,required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately; to each insured against whom claim is made or suit is brought, except with''respects to the lim its'of,the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII E. Verification of Coverage Contractor shall furnish the City" with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. DATE(MM/DDIYYYY), +AC© CERTIFICATE OF LIABILITY INSURANCE 5i28i2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED'BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING JNSURER(S),'AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACTNAME: Karen Smith HENTSCHELL & ASSOC INC PHONE (253)272-1151 Fa/c No:(253)272-1225 ExtIv E-MAIL One Pacific Building ADDRESS:Karen.Smith@hentsche11.com 621 Pacific Ave. , Suite 4 0 0 INSURERS AFFORDING COVERAGE NAIC# Tacoma WA 98402 INSURERA:The Charter' Oak Fire Ins. Co. 25658 INSURED INSURER'E:Travelers Pro Cas CO of America' Petersen Brothers, Inc. INSURERC:Great American Insurance Co' 2008 East Valley Hwy INsuREaD: INSURER E: Sumner WA 98390 INSURERF: COVERAGES. , CERTIFICATE NUMBER:2014 GL/Auto/Umb/Excess REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.'LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUB POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCEINA& POLICY NUMBER MM/DD/YYYY MM/DD/YYYY GENERAL LIABILITY EACH OCCURRENCE $ X COMMERCIAL GENERAL LIABILITY DAMAGE TO,RENTED PREMISES(Ea occurrence) $ 300,000 A CLAIMS-MADE XI OCCUR X T-CO-526D9518-COF-14 11/1/2014 11/1/2015 MED EXP(Any one person) $ 10,;000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS'-COMP/OP AGG $ 2,000,000 POLICY X PRO JF T F-1 LOC $ A COMBINED SINGLE LIMIT AUTOMOBILE LIABILITY Ea accident $ 11000,000 X ANY AUTO BODILY INJURY(Per person) $ A ALL OWNED SCHEDULED T-810-526D9518-IND-14' 11/1/2014 11/1/2015 BODILY INJURY(Per accident) $ AUTOS AUTOS PROPERTY DAMAGE $ NON-OWNED Per accident X,' HIRED AUTOS X AUTOS Medica(pay ments $ 51000 B X UMBRELLA LIAB X', OCCUR TSM-CUP-526D9518-TIL-14 11/1/2014 11/1/2015 EACH OCCURRENCE $ 110001000 C X EXCESS!LIAB CLAIMS-MADE $10,000. Retention AGGREGATE $ 11000,000 DED. X RETENTION$ Traveler X UE0196246-04 (Excess) 11/1/2014 11/1/2015 Each Occurrence/Aggregate $ 5,000,'000 WORKERS COMPENSATION WC STATU- OTH- TORY LIMITS ER AND EMPLOYERS'LIABILITY' ANY PROPRIETOR/PARTNER/EXECUTIVE NIA - E.L.EACH ACCIDENT $ 11000,000 AOFFICER/MEMBER EXCLUDED? T C0-526D9518-COF-14 11/1/2014 11/1/2015 (Mandatory In NH) - E.L.DISEASE-EA EMPLOYE $ 11000,000 If yes;describe under �A-Sto DESCRIPTION OF OPERATIONS belowP Gap E.L.DISEASE-POLICY LIMIT $ 2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) RE: City of Kent Guardrail Repairs at 3 locations. Blanket Additional Insureds Primary and Non-Contributory basis as required by written contract or agreement,per 'the attached Endorsement #CGD24`6(8/0"5) and CAT474(2/12) . (#15-084) CERTIFICATE HOLDER CANCELLATION nyoshitake@kentwa.gov SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE `EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Kent 220 'Fourth Avenue South Kent, WA 98032 AUTHORIZED REPRESENTATIVE Thomas Hentschell/KJS ACORD 25(2010105) ©1988-2010 ACORD CORPORATION. All rights reserved. INS02519ninnr,1 n1 Tha Al`npn namc and Innn arc rcnictarcri marlrc of Ar.r)Pn INSURED: PETERSEN BROTHERS, INC. POLICY NUMBER DT-CO-526D9518-COF-14 TERM: 11/1/2014 TO 11/1/2015 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY ADDITIONALBLANKET (CONTRACTORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART 1. WHO IS.AN INSURED—(Section ll) is amended c) The insurance provided to the 'additional in- to include any person or organization that you sured does not apply to "bodily injury" or agree in a "written contract requiring insurance'' "property damage" caused by "your work" to include as an additional insured on this.Cover- and included in the "products-completed op- age,Part, but; erations hazard" unless the "written contract a) Only with respect to liability for"bodily injury", requiring insurance" specifically requires you "property damage"or"personal injury"- and. to provide such coverage for that additional insured, and then the insurance provided to b) If, and only to the extent that, the injury or the additional 'insured, applies only to such damage is caused by acts or omissions of "bodily injury" or "property damage" that oc= you or your subcontractor in the performance curs before the end of the period of time for of "your work" to which the "written contract which the "written contract requiring insur- requiring 'insurance" applies. The person or ante" requires you to provide such coverage organization does not qualify,as an additional or the end of the policy period, whichever is insured with respect to the independent acts earlier. or omissions of such person or organization. '3. The insurance provided to the additional insured 2. The insurance provided to the additional insured by"this endorsement is excess over any valid and by this endorsement is limited as follows: collectible "other insurance", whether primary, a) In the event that the Limits of Insurance of excess, contingent or on any other basis, that is this Coverage Part shown in the Declarations available to the additional insured fora loss lwe exceed the limits of liability required by the cover under this endorsement. However, if the "written contract requiring insurance"; the in- "written contract requiring insurance" specifically surance, provided to the additional insured requires that this insurance apply on a primary shall be limited to the limits of liability re- basis or a primary and non-contributory 'basis, quired by that "written contract requiring in- this insurance is primary to "other insurance" surance". This endorsement shall not in- available to the additional insured which covers crease the limits of:insurance described in that person or organization as a named insured Section III-Limits Of Insurance. for such loss, and we will not share with that "other insurance". But the insurance provided to b) The insurance provided to the additional in- the additional insured by this endorsement,still is sured does not apply to "bodily'injury "prop- excess over any valid and collectible "other in erty,damage" or "personal"injury" arising out surance", whether primary, excess, contingent or of the rendering of, or failure to render, any on Iany other basis, that is available to the addi- professional architectural,'engineering or sur- tional insured when that person or organization is veying services, including:. an additional` insured under ,such "other incur- i. The preparing, approving, or failing to ance prepare or approve, maps,;shop draw- 4. As a condition of coverage provided to the ings, opinions, reports, surveys, field or- additional insured by this endorsement: s ders or change orders, or the preparing, approving, or failing to prepare or ap- a) The additional insured must give us written 3 prove, drawings and specifications;and notice as soon as practicable of an "occur Ill. Supervisory, inspection, architectural or rence" or an offense which may result in a engineering activities. aim. To the ;;extent possible, such notice cl should include; 0 2005 The St. Paul Travelers Companies, Inc. Page 1 of 2 cG a2 46 08 05 ,r COMMERCIAL.GENERAL LIABILITY i, How, when and where the "occurrence" any provider of "other insurance"which would or offense took place; cover the additional insured for a loss we ii. The names and addresses of any injured cover under this endorsement. However, this persons and witnesses, and condition does not affect whether the insur- ance provided to the additional insured by Ill. The nature and Iodation of any injury or this endorsement is primary to "other Insur- damage arising out of the"occurrence"or ance" available to. the additional insured offense. which covers that person or organization as a b) If a claim is made or"suit"'is brought against named insured as described in paragraph 3 the additional insured, the additional insured above. must: 5. The following;definition is added to SECTION V. 1. Immediately record the specifics of the —DEFINITIONS. claim or"suit" and the date received; and "Written contract requiring;insurance" means H. Notify us as soon as practicable, that part of any written contract or agreement The additions( insured must see to it that we under which you are required to include a „ person or organization as an additional in- receive written'notice of the claim or"suit as sured on',this Coverage Part, provided that soon as practicable, bodi the " ly injury" and."property damage" oc= c) The additional insured must immediately curs and the"personal injury" is caused by an send us copies of all legal papers received in offense committed: connection with the claim or "suit", cooperate a.r After the signing and execution of the with us in the investigation or settlement of the claim or defense against the "suit", and contractor agreement by you; otherwise comply with all policy conditions. b. While that part of the contract or d) The additional insured must tender the de- agreement is in effect;and fence and indemnity of any claim or ''suit" to c. Before the end of the policy period. a Page 2 of 2`' ©2005 The St.Paul Travelers Companies, Inc. CG D2 46 08 05 _x i t l INSURED: PETERSEN BROTHERS, INC. POLICY NUMBER: DT-810-526D9518-IND-14 TERM: 11/1/2014 TO 11/1/2015 COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE REA.0 1T CAREFULLY. ADDITIONALBLANKET I NONWICONTRIBUTORY WITHT INSURANCE b..h'is endorse-rnent modifies insurance provided under the following- BUSINESS AUTO COVERAGE FORM With respect to c,overa'cge provided by this endorsement, the provisions of the (.,overage Form apply unless modi- fied by this endorsement: PROVISIONS The following is added to Paragraph 5., Other A. 'The following is added to Paragraph c. in A. 1., Insurance, in B. General Conditions of SEC- Who; Is Are Insured, of SECTION If-�- LIABILITY` SEC- TION IV-BUSINESS AUTO CONDITIONS: COVERAGE.- Regardless of the provisions of paragraph a. and Any Corson or o'rtdani ration who is rru'ir€�d unrtr r paragraph d. of this part 5 Other Insuraneo, this a tur tten contract car ,greerrr�:nt between,You and insurance is primary to and non contributory with [hat 'person or t�rg n atic r,r, ttrat is, igrtr d and other ins rranre. under wfii�h an ad&. executed by you before the "bodily injury" or tional insured person or organization is the first �t named insured when the written contract Or property damage occurs and that is in effect the policy period, to be,named as an addi-; agreement between you .aiid" that person or or- during tional insured is an "insured" far Liability Cover- gan:zatiOn, that is signed and executed by you age,;but only for damages to which this insurance before the "bodily injury" or "property damage" applies and only,to the extent that person or or- occurs and that is iri effect during -he policy pe_ r anization qual ltes as an "insured" under the riod, requires this insurance to be primary and Whc! IS An Insured provision contained in non-contributory. sect 6n 11. CA T4 74 02 12 2012 The Travelers indernnity compady.All rights reserved. Page I of 1 Includes copyrighted material of insurance Services office,Inc.with"its permis sion. n Page 1of17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540 Olympia, WA 98504-4540 - Washington State Prevailing Wage The PREVAILING WAGES listed` here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level' Prevailing Wage Rates for the Effective Date: 5/26/2015 out Trade Job Classification a,,e Holiday Overtime Note King Asbestos Abatement Workers Journey Level $42.67 5D 1 Fi King Boilermakers Journey Level $64.29 5N 1 C ;King Brick Masan Brick And Block Finisher $44.46 5A 1 M :King Briek'Mason Journey Level $51.32 5A 1M King BrickMason Pointer-Caulker=Cleaner $51.32 5A 1 M. King Buildin Service Em to ees Janitor $21.29 5S 2F King BuildingService Em to ees Traveling Waxer/Shampooer $21.70 55 2F: King Buildin Service Employees Window Cleaner (Non- $24.94 15S 2F Scaffold) S 2F ,Wind 5SKing Build' King Cabinet Makers In Shoo Journey Level $22.14 1 King Caenters Acoustical Worker $52.32 5D 4C 'King Car enters Bridge, Dock And Wharf $52.32 5D :4C Carpenters King Carpenters Carpenter $52.32 5D 4C King Carpenters Carpenters on Stationary Tools $52.45 5D 4C King Carpenters Creosoted Material $52.42 15D 4C King Carpenters Floor Finisher $52.32 5D 4G King Carpenters Floor Layer $52.32 5D 4C King Carpenters Scaffold Erector $52.32 5D 4C =King Cement Masons Journey Level $52.38 7A 1 M King Divers Et Tenders Diver $105.37 5D 4C 8A King livers Et Tenders Diver On Standby $59.50 5D 4C King livers Et Tenders Diver Tender $54.82 5D 4C King Divers Et Tenders Surface Rcv & Rov Operator $54.82 5D 4C King Divers Et Tenders Surface Rcv Et Rov Operator $51.07 5A 4C Tender King lredrkers Assistant Engineer $54.75 5D 3F King Dred' e Workers Assistant Mate (Deckhand) $54.33 5D 3F E King ' e Workers Boatmen $54.75 5D Dyed 3F https://fortre'ss.w'a.gov/lni/wagelooku P/p,rVWageIooku'0.aspX 5/26/2015 Page 2 of 17 .' King Dred e Workers Engineer Welder $55.79 5D 3F King Dredge Workers Leverman, Hydraulic $56.92 5D 3F King Dredge Workers Mates $54.75 5D 3F King Dredge Workers Oiler $54.33 5D 3F King D_,.,rywatt Applicator Journey Level $52.32 5D 1 H King Drywall Tapers Journey Level $52.37 5P 1 E King Electrical Fixture Maintenance Journey Level $26.59 5L 1 E Workers King Electricians - Inside Cable Splicer $66.76 7C 4E King Electricians - Inside Cable Splicer (tunnel) $71.67 7C 4E King Electricians - Inside Certified Welder $64.54 7C 4E King Electricians - Inside Certified Welder (tunnel) $69.22 7C 4E King Electricians - Inside Construction Stock Person $37.19 7C 4E King Electricians - Inside Journey Level $62.30 7C 4E King Electricians - Inside Journey Level (tunnel) $66.76 7C 4E King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - PowerliI-le Cable Splicer $69.95 5A 4D Construction - - King Electricians - Powerline Certified Line Welder $63.97 5A 4D Construction King Electricians - Powerline Groundperson $43.62 5A 4D Construction - - King Electricians - Powerline Heavy Line Equipment $63.97 5A 4D Construction Operator King Electricians - Powerline Journey Level Lineperson $63.97 5A 4D Construction - - King Electricians - Powerline Line Equipment Operator $53.81 5A 4D Construction King Electricians - Powerline Pole Sprayer $63.97 5A 4D Construction - - King Electricians - Powerline Powderperson $47.55 5A 4D Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $82.67 7D 4A King Elevator Constructor's Mechanic In Charge $89.40 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.90 5B 1 R Products Work Only King Fence Erectors Fence Erector $15.18 1 King FIaR-,ers Journey Level $36.17 7A 31 King ^ Glaziers Journey Level $54.91 7L 1y King Heat Et Frost insutators And Journeyman $61.18 5J is Asbestos Workers - - King Heating Equipment Mechanics Journey Level $70.37 7F 1 E _ King Hod Carriers & Mason Tenders Journey Level $44.00 7A 31 King Industrial Power Vacuum Journey Level $9.47 1 Cleaner _ King Inland Boatmen Boat Operator $54.57 5B 1 K https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/26/2015 Page 3. of 17 King Inland Boatmen Cook $50.95 5B 1 K King Inland Boatmen Deckhand $51.19 5B 11 K King Inland Boatmen Deckhand Engineer $52.18 5B 1 K King Inland Boatmen Launch Operator $53.40 513 1 K ...King Inland Boatmen Mate $53.40 5B 1K King Inspection/Cleani,n /Sealin Cleaner Operator, Foamer $31.49 1 l Of Sewer E.Water Systems By Operator - a Remote Control King Inspection/Cleaning/Sealing. Grout Truck Operator', $11.48 1 Of Sewer Et Water Systems` B Remote Control King Inspection/Cleanin /Sealin Head Operator $24:91 1 Of Sewer Et Water Systems B _ Remote Control King Ins ectionfCleanirig/Sfalin Technician $19.33 1 Of Sewer Ft Water S stems B Remote Control King InspectionlCleanin lSealin Tv Truck Operator $20.45 1 Of Sewer Et Water Systems B Remote Control King T-_.. Insulation Aoticators Journey Level $52.32 51) 4C King Ironworkersl Journeyman $61.62 7N 10 r King Laborers Air, Gas Or Electric Vibrating $42.67 7A 31 Screed King Laborers Airtrac Drill Operator. $44.00 7A 31 King Laborers Ballast Regular Machine $42.617 7A 31 :King Laborers Batch Weighman $36.17 7A 31 King Laborers Brick Pavers $42.67 7A 31 King Laborers Brush'Cutter $42.67 7A 31 3 King Laborers Brush Hog Feeder $42.67 7A 31 King Laborers Burner $42.67 7A 31 .,King Laborers Caisson Worker` $44.00 7A 31 =King Laborers Carpenter Tender $42.67 7A 31 King Laborers Caulker $42.67 7A 3111, 'King Laborers Cement Dumper-paving $43.46 7A 31 King Laborers Cement Finisher Tender $42.67 7A 31 .King Laborers Change House Or Dry Shack $42.67 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $42.67 7A 31 =King Laborers Chipping Gun(30 Lbs. And $43.46 7A 31 Over) King Laborers Choker Setter $42.b7 7A 31 King Laborers Chuck Tender $42.67 7A = 31 King Laborers Claryi.Power. Spreader. $43.46 7A 31 King Laborers Clean-up Laborer $42.'67 7A 31 King Laborers Concrete Dumper/chute $4346 7A 31 Operator' King Laborers Concrete Form Stripper $42.67 7A 31. King Laborers Concrete Placement Crew $43.46 7A 31 _ - u https://fortress.wa.gov/Ini/`wagelookup/prvWagelooku'p.aspx 5/26/201$ Page 4 of 17 King Laborers Concrete Saw Operator/core $43.46 7A 3-1 Driller King Laborers Crusher Feeder $36.17 7A 31 King Laborers Curing Laborer $42.67 7A 31 King Laborers Demolition: Wrecking Et $42.67 7A 31 Moving (incl. Charred Material) ............. King Laborers Ditch Digger $42.67 7A 31 King Laborers Diver $44.00 7A 31 King Laborers Drill Operator $43.46 7A 31 (hydraulic,diamond) King Laborers Dry Stack Watts $42.67 7A 31 King Laborers Dump Person $42.67 7A 31 King Laborers Epoxy Technician $42.67 7A 31 King Laborers Erosion Control Worker $42.67 7A 31 King Laborers Fatter Et Bucker Chain Saw $43.46 7A 31 King Laborers Fine Graders $42.67 7A 31 King Laborers Fi rewatch $36.17 7A 31 King Laborers Form Setter $42.67 7A 31 King Laborers Gabian Basket Builders $42.67 7A 31 King Laborers General Laborer $42.67 7A 31 King Laborers Grade Checker Et Transit $44.00 7A 31 Person King Laborers Grinders $42.67 7A 31 King Laborers Grout Machine Tender $42.67 7A 31 King Laborer's Groutmen (pressure)including $43.46 7A 31 Post Tension Beams King Laborers Guardrail Erector $42.67 7A 31 King Laborers Hazardous Waste Worker $44.00 7A 31 (level A) King Laborers Hazardous Waste Worker $43.46 7A 31 (level B) King Laborers Hazardous Waste Worker $42.67 7A 31 (level C) King Laborers High Scaler $44.00 7A 31 King Laborers Jackhammer $43.46 7A 31 King Laborers Laserbeam Operator $43.46 7A 31 ....................- King Laborers Maintenance Person $42.67 7A 31 ........... King Laborers Manhole Builder-mudman $43.46 7A 31 King Laborers Material Yard Person $42.67 7A 31 ................................ King Laborers Motorman-dinky Locomotive $43.46 7A 31 King Laborers Nozzteman (concrete Pump, $43.46 7A 31 Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker 1 $43.461 7A 1 31 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 Y 1 Page 5 of 17 King Laborers Pilot Car $36.17 7A 31 King Laborers Pipe Layer Lead $44.00 7A 31 King Laborers Pipe Layer/tailor $43.46 7A 31 King Laborers Pipe Pot Tender $43.46 7A 31 King Laborers Pipe Reliner $43:46 7A 31 y King Laborers Pipe Wrapper $43.46 7A 31 King Laborers Pot Tender $42.67 7A 31 King Laborers Powderman $44.00 7A 31 King Laborers Powderman's Helper. $42.67 7A 31 King Laborers Power Jacks $43.46 7A 31 King Laborers Railroad Spike Puller Power $43.46 7A 31 King Laborers Raker - Asphalt $44.00 7A 31 King Laborers Re-timberman $44.00 7A 31 King Laborers Remote Equipment Operator $43.46 7A 31 King Laborers Rigger/signal Person $43.46 7A 31 KingT� Laborers Rip Rap Person $42.67 7A 31 King Laborers Rivet Buster $43.46 7A 31 King �` Laborers Rodder $43.46 7A 31 ,King Laborers. Scaffold Erector il$42.67 7A 31 King Laborers Scale Person $42.67 7A 31 King Laborers, Sloper (over 20") $43.46 7A 31 Y King Laborers' Sloper Sprayer $42.67 7A 31 King Laborers' Spreader (concrete) $43.46 7A 31 King Laborers! Stake Hopper $42.67 7A 31 =King Laborers Stock Piler $42.67 7A 31 King Laborers' Tamper EtSimilar Electric,Air $43.46 1 7A 31 Ft Gas Operated Tools 31 King Laborers Tamper (multiple Et Self $ _ - .: - 43.46 A 7 x propelled) £ King Laborers Timber Person Sewer $43.46 7A 31 (lagger, Shorer &Cribber) King Laborers Toolroom Person (at Jobsite) $42.67 7A 31 King Laborers Topper $4267 7A 31 King Laborers Track Laborer. $42.67 7A 31 King Laborers Track Liner (power) $43:46 7A 31 King Laborers Traffic Control Laborer $38.68 7A 31 8R King- Laborersi, Traffic Control Supervisor $38.68 7A 31 8R King Laborers Truck Spotter $42.67 7A 31 King Laborers Tugger Operator $43.46 7A 31 King Laborers Tunnel Work-Compressed'Air $64.99 7A Worker 0-30 psi King a 'Laborers" Tunnel Work-Compressed Air $70.02 7A 3180 Worker 30.01-44.00 psi F King Laborers Tunnel Work-.Compressed Air $73.70 7A 31 Worker 44.01-54.00 psi Kin Laborers Tunnel Work-Compressed Air $79:40 7A 31 g - Worker 54.01-60.00 psi https://fortress`.wa.gov/Ihi/wageIOokup/prvWage'Iookup.aspx 5/'26/2015 Page 6 of 17 King Laborers Tunnel Work-Compressed Air $81.52 7A 31 80 Worker 60.01-64.00 psi ._................. King Laborers Tunnel Work-Compressed Air $86.62 7A 31 8g Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $88.52 7A 31 8� Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $90.52 7A 31 8 Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $92.52 7A 31 80 Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $44.10 7A 31 Tender King Laborers Tunnel Work-Miner $44.10 7A 31 8� King Laborers Vibrator $43.46 7A 31 King Laborers Vinyl Seamer $42.67 7A 31 King Laborers Watchman $32.87 7A 31 King Laborers Welder $43.46 7A 31 King Laborers Well Point Laborer $43.46 7A 31 ----------- King Laborers Window Washer/cleaner $32.87 7A 31 King Laborers - Unciergror=nci Sewer General Laborer It Topman $42.67 7A 31 Et Water King Laborers -�Underground wcr Pipe Layer $43.46 7A 31 Et Water King Landscape] Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $52.32 5D 1 H King Marble Setters Journey Level $51.32 5A 1 M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication In Sho Laborer $9.78 1 King Metal Fabrication In Sho Machine Operator $13.04 1 King Metal Fabrication In Shy Painter $11.10 1 King Metal Fabrication 6j Shopj Welder $15.48 1 King Millwright Journey Level $53.42 5D 4C King Modular Buildirs Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 _ King Modular Buildings Production Worker $9.47 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular BuAdin s Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.80 6Z 2B King Pile Driver Journey Level $52.57 5D 4C King Plasterers Journey Level $50.42 7q 1 R https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 i Page 7 of 17.. King Plaround Park Equipment Journey Level $9.47 1 Installers King Plumbers it Pipefitters Journey Level $74.69 6Z 1 G r King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3C 8P j King Power Equipment Operators Assistant Engineer $51.97 7A 3C 8P x King Pourer E ui merit 0 erators Barrier Machine (Zipper) $54.75 7A 3C 8P King Power E ui ment O erators Batch'Plant Operator, $54.75 7A 3C 8P Concrete l King Power E ui meat Operators' Bobcat. $51.97 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition ;$51.97 7A 3C 8P Equipment King Power E ui ment 0 erators Brooms 7A 3C 8P King Power E ui merit O erators Bump Cutter .'$54.75 7A 3C 8P A King Power Eouioment Operators Cableways I$55.24 7A: 3C 8P King Power E ui ment O erators Chipper $54.75 7A 3C 8P King Power E ui meet O erators Compressor $51.97 7A 3C SP x King Power E ui mein O 'erators Concrete Pump: Truck Mount :$55.24 7A 3C 8P With Boom`Attachment Over 42 M h King Power E Sri mcnt O erators Concrete Finish`Machine -laser $51.97 7A 3C 8P Screed King Power E u rnent Operators Concrete Pump Mounted Or $54.33 7A 3C ` 8P Trailer High Pressure Line — Pum Pum High Pressure p, P_ g :King Power E ui melt O erators Concrete Pump: Truck Mount $54.75 7A 3C 8P With.Boom Attachment Up To 42m l 'King Pourer.Equipment Operators Conveyors $54.33 7A 3C 8P i King Power Equipment Operators Cranes: 20 Tons Through 44 .$54.75 7A-, 3C 8P Tons With Attachments King Power Equipment Operators Cranes.: 100 Tons Through 199 $55.79 7A 3C 8P Tons,.Or 150'Of Boom :(Including Jib With Attachments) ,'King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $56.36 7A 3C H, 8P E Or 2510' Of`Boom (including Jib With Attachments) King Power E ui rnent 0 erators Cranes: 45 Tons Through 99 $5524 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A. frame - 10 To And $51.97 7A 3C i. 8P Under King ` Power E ui merit Operators Cranes: Friction 100 Tons $56.36 7A 3C I' 8P Through 199 Tons King Power Egbipr� ent Operators Cranes: Friction Over 200 Tons $56.92 , 7A 3C '' 8P King Power E 'jai merit Operators Cranes: Over 300 Tons Or 300' $561. 7A 3C 8P Of Boom (including Jib With (I i Attachments) Power E ui went Operators $54.33 7A 3C 8P "King https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 Page 8 of 17 .' Cranes: Through 19 Tons With Attachments A-f rame Over 10 Tons ............................. King Power Equipment Operators Crusher $54.75 ZA 8P_- King Power Equipment QDerators Deck Engineer/deck Winches $54.75 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $54.33 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $54.75 7A X 8P___ King Power_EIcLj t2Men t Dpf!Lators Elevator And Man-lift: $51.97 7A 3C 8P Permanent And Shaft Type King Power_E_qg pLient Operators Finishing Machine, Bidwell $54.75 7A 3C 8P And Gamaco Et Similar Equipment King _Power_�:�_ui mentDperaL_ors Forklift: 3000 Lbs And Over $54.33 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. $51.97 7A X 8P With Attachments King Power EauiDment Operators Grade Engineer: Using Blue $54.75 7A X 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $51.97 7A X 8P King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $55.24 7A X 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tait End Dump $54.75 7A 3C 8P Articulating Off-road Equipment Under 45 Yards ........... King Power Equipment Operators Horizontal/directional Drill $54.33 7A 3C 8P Locator King Power quuiDment Operators Horizontal/directional Drill $54.75 7A 3C 8P Operator King Power Equipment Operators Hydratifts/boom Trucks Over $54.33 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P Tons And Under King Power Equipment Loader, Overhead 8 Yards. Et $55.79 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. $55.24 7A X 8P But Not Including 8 Yards King Power Equipment QDerators Loaders, Overhead Under 6 $54.75 7A X 8P Yards King Power Equipment Operators Loaders, Plant Feed $54.75 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P King Power Eguipmeat Operators Locomotives, All $54.75 7A 3C 8P King Power Equi?Meit Operators Material Transfer Device $54.751 7A X 8P King Power Equipment operators $55.79 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 Page, 9of17 Mechanics,;All (leadmen - $0.50 Per Hour Over Mechanic) King Power E u went 0 erators Motor Patrol Grader- Non- King 7A 3C 8P finishing King Power E ui merit 0 erators Motor Patrol Graders, $55.24 7A, 3C 8P Finishing King Power E ui ment Operators Mucking Machine, Mole, $55.24 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield` King Power E ui meat 0 erators Oil Distributors, Blower $51.97 7A 3C 8P Distribution £t Mulch Seeding Operator King Power E ui me"nt Operators Outside Hoists (elevators And $54.33 7A 3C 8P i Manlifts), Air Tuggersstrato King Power E ui ment Operators Overhead,,Bridge Type Crane: $54.75 7A 3C 8P 20 Tons Through`44 Tons King Power E U meat Operators Overhead, Bridge Type: 100 $55.79 7A 3C 8P Tons And Over — Kin Power E ui meat 0 erators Overhead, Bridge Type: 45" $55.24 7A 3C 8P g — — Tons Through 99 Tons ^King Power E ui merit 0 `erators Pavement Breaker $51.97 7A 3C 8P King Power E ui me t 0 `erators Pile Driver (other Than Crane $54.75 7A 3C 8P r ' Mount) King Power E ui ment O erators 'Plant Oiler-Asphalt, Crusher $54.33 7A 3C 8P King Power E ui merit O erators Posth'ole Digger, Mechanical $51.97, 7A 3C 8P F King Power EE ui meet O erators Power Plant $51.97 7A 3C 8P King Power E ui ment Operators Pumps"- Water $51.97 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P King Power Equipment Operators Quick Tawer - No Cab,.Under $51.97 7A 3C 8P 100 Feet In Height Based To J r Boom King) Povver E ulDment Operators Remote Control Operator On $55.24 7A 3C"', 8P Rubber Tired Earth Moving Equipment', <King Power Equipment Operators Ri er And Bellman $51.97 7A 3C 8P gg — King Power Equipment Operators Rollagon " $55.24 7A 3C 8P King Power E ui merit O erators Roller, Other Than Plant Mix $51.97 7A 3C, 8P King Power E ii rnent O erators Roller,"Plant Mix Or Multi-lift $54.33 7A 3C' 8P Materials King Power�E "ui ment O erators Roto-mill, Roto-grinder $54.75 7A 3C' 8P x King Power E ui merit O erators Saws:-"Concrete $54.33 7A 3C 8P King , Power,1E ui ment O erators Scraper, Self Propelled Under $54.75 7A 3C 8P 45 Yards ' Concrete.Et.Car r 5 4.33 7A 3C, 8P '� ent 0 erators Scrapers C $ I ' P _p g All .. King Powwer E u� meat O erators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P 57 Yards And Over King Power'E ui"►sent 0 erators Service Engineers - Equipment $54.33 7A 3"C 8P r King Pb\+er:,!EOUJO.merit O erators Shoterete/gunite Equipment $51.`97 7A 3C I 8P c r; https://fortress wa.gov/lni/wagelbokup/prvWagelookup.aspx 5/26/2015 Page 10 of 17 King Power Equipment Operators Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $55.24 7A 3C Over 30 Metric Tons To 50 Metric Tons King Power E ui r gent Oeraurs Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power E rsi rp (r�tar r tors Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Over 90 Metric Tons King Power E ui ment Operators Slipform Pavers $55.24 7A 3C 8P King Power Equipment Operators._ Spreader, Topsider Et $55.24 7A 3C 8P Screedman King Power Equipment_Qperators Subgrader Trimmer $54.75 7A 3C 8P King Power Equi2ment Operators Tower Bucket Elevators $54.33 7A 3C 8P� King Power Equipment Operators Tower Crane Over 175'in $56.36 7A 3C 8P Height, Base To Boom King _QpPower EcLuipmentL�ators Tower Crane Up To 175' In $55.79 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $55.24 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P Tons And Over King Power_ ,auif.)rnent_QDera.Aors_ Truck Crane Oiler/driver $54.33 7A 3C 8P Under 100 Tons _ King Power Equipment Operators, Truck Mount Portable $54.75 7A 3C 8P Conveyor King Power Equipment Operators Welder $55.24 7A 3C 8P King Power Equipment Qperators Wheel Tractors, Farman Type $51.97 7A 3C 8P King Power Equipment Qperators Yo Yo Pay Dozer $54.75 7A 3C 8P King Power Equipment Qperators- Asphalt Plant Operators $55.24 7A 3C 8P Underground Sewer Et Water — — — King Power E ui ment Operators- Assistant Engineer $51.97 7A 3C 8P Underground Sewer Et Water — — — King Power Equipment Operators- Barrier Machine (zipper) $54.75 7A 3C 8P Underground Sewer E Water — — — King Power Equipment Q erators- Batch Plant Operator, $54.75 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $51.97 7A 3C 8P _ Underground Sewer E Water — — — King Power E umerit operators- Brokk - Remote Demolition $51.97 7A 3C 8P Under round Sewer Et Water Equipment King Power E ui rre► t opt erat:ors Brooms $51.97 7A 3C 8P Under round Sewer Et Water — — — King Power ciuipmst,,}peracarsT_ Bump Cutter $54.75 7A 3C 8P Und_ ergrounci Sewer �N—r I https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 Page 11of17 King Power Equipment Operators- ' Cableways $55.24 7A 3C 8P Uncle ground Sewer Et Water King _ Power EqiJpment Operators- Chipper $54.75 7A 3C 8P x Underground Sewer if Water — — — King Power E jai rne'nt O erators- Compressor , $51.97 7A 3C 8P Under round Sewer Et Water King Power E u merit O erators- Concrete Pump: Truck Mount ;$55,24 .7A 3C 8P Under round Sewer Et Water With Boom Attachment Over x .42 M King Power E� ui went Operators- Concrete Finish Machine -laser $51.97 7A 3C 8P Under round Sewer � Water Screed — — — =King Power E ui meat O 'erators- Concrete Pump - Mounted Or $54.33 7A 3C 8P Under round 5ewer,Et Water Trailer.High Pressure Line Pump`, Pump High Pressure. King Power Equipment 0 erators- Concrete Pump: Truck Mount $54.75 7A 3C 80 Underground Seiner Water With Boom Attachment Up To 42m King_T'Power E of merit Operators-, Conveyors ,$54.33 7A 3C 8P Under round Sewer E Water King r Power Egui merit O erators- Cranes: 20 Tons`Through 44 $54.75 7A 3C 8P Under round Sewer i Wa er Tons With Attachments — King Power Equipment Operators- Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Under round Sewer Water Tons, Or 150' Of Boom — — (Including Jib With Attachments) King Power E ui merit 0 erators- Cranes: 200'Tons To 300 Tons, $56.36 7A 3C 8P Under round Sewer Et Water Or.250' Of Boom (including Jib — —With Attachments) ;King Power E ui merit 0 erators- Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Underground Sewer Water Tons, Under 150'Of Boom — r (including Jib With Attachments) King Power E_�c uprrzent aerators- Cranes: A-frame 10 Tons And $51.97 7A 3C 8P Underground Seiner Et Waver Under f King Po�nrer E u pment Operators- Cranes: Friction 100 Tons $56.36 7A 3C 8P A Underground Sewer it Water Through 199 Tons Kin Power E u'i went 0 erators- Cranes: Friction Over 200 Tons '$56.92 7A 3C 8P g — — Underground Sewer Water g .92 7A 3C 8P Kin Power E u merit 0 `erators- Cranes: Over 300 Tons Or 300 $56 Under round Sewer £t Water Of Boom (including Jib With Attachments) ;. King Power E 71 ui merit a °erators- Cranes: Through 19 Tons With $54.33 7A 3C 8P Under round Sewer Water Attachments A-frame Over 10 Tons King Power E ui ment 0 erators- Crusher $54.75 7A 3C 8P Under round Sewer & Water King Power E i rnent a erators- Deck Engineer/deck Winches $54.75 7A 3C, 8P e Under round Sewer Water (power) King Power E a ui vent 0 erators- Derricks, On Building Work $55.24 !7A ! 3C 8P Under round'Sewer Water `King Power E ui merit 0 erators- Dozers D-9 Ft Under, $54.33 7A 3C 8P Under rountf Sewer dater n_ { https://fortress.wa.goy/Ini/wagelo'okup/` prvWagelookup.aspx 15 5/26/20 Page 12 of 17 King Power E ui went Q aerators- Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Underground Sewer & Water Or Crane Mount King Power E ui went O erators- Drilling Machine $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $51.97 7A KC 8P Underground Sewer Et Water Permanent And Shaft Type ..__.............. _.. King Power Equipment Operators- Finishing Machine, Bidwell $54.75 7A 3C 8P Underground Sewer & Water And Gamaeo Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $54.33 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P Underground Sewer Et Water With Attachments _ King Power Equipment Operators- Grade Engineer: Using Blue $54.75 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc _ King Power Equipment Operators- Gradechecker/stakeman $51.97 7A 3C 8P Undergrqund Sewer i Water — — —_ King Power Equi ment (�jjgia t r!ij Guardrail Punch $54.75 7A 3C 8P Underground Sewer Et Water. King Power E ui r errt erators- Hard Tail End Dump $55.24 7A 3C 8P Unde_wer round Sewer EL, Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $54.75 7A 3C 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Qperators- Horizontal/directional Drill $54.33 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $54.75 7A 3C 8P Underground Sewer Et Water Operator — — — King Power Equipment Operators- Hydralifts/boom Trucks Over $54.33 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P Underground Sewer Et Water Tons And Under _ King Power Equipment Operators- Loader, Overhead 8 Yards. Et $55.79 7A 3C 8P Underground Sewer & Water Over — — — King Power E ui went O erators- Loader, Overhead, 6 Yards. $55.24 7A 3C 8P Undero,raund Sewer Et Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $54.75 7A 3C 8P Undergroundi Sewer Et Wa�.e,_ Yards — — — King orer E ui -rert-O)erators- Loaders, Plant Feed $54.75 7A 3C 8P Underground Sewer E Water King Power E ui meat Qperators- Loaders: Elevating Type Belt $54.33 7A 3C 8P Underground Sewer a Water — — — King Power Equipment Operators- Locomotives, All $54.75 7A 3C — 8P Underground Sever Et Water — — ..._............. King Power Equipment Operators- Material Transfer Device $54.75 7A 3C 8P Underground Sewer Et Water — — — King Power Equipment Operators- Mechanics, All (leadmen - $55.79 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $54.33 7A 3C 8P Underground Sewer Et Water finishing — — — https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 Page 13 of 17` King Power Equipment Operators- Motor Patrol Graders, $55.24 7A 3C 8P Underground Sewer Et Water Finishing King Power Equipment Operators- Mucking Machine, Mole, $55.24 7A 3C 8P Underground Sewer Et Water Tunnel Drilt, Boring, Road Header And/or Shield K King Power E ui ment O erators- Oil Distributors, Blower $51.97 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power E ui went Operators- Outside Hoists (elevators And $54.33 7A 3C 8P Underground Sewer Water Manlifts), Air Tuggers,strato King Power E ui meat Operators - Overhead, Bridge Type Crane: $54.75 7A 3C 8P Under round Sewer'Et Water 20 Tons Through 44 Tons King Power E ui merit (J"erators- Overhead, Bridge Type: 100 $55.79 7A 3C 8P Underground Sewer E.Water Tons And Over ;King Power Ea ui ment Operators- Overhead, Bridge Type: 45 $55.24 7A 3C 8P Under round Sewer Et Water Tons Through 99 Tons King Power E ui meat n 'erators- Pavement Breaker $51.97 7A 3C 8P —Underground Sewer Et Water King Power E u merit Operators- Pile Driver (other Than Crane $54.75 7A 3C 8P Underground Sewer Water Mount) King Power E u ment Q 'eratc�rs- Plant Oiler:- Asphalt, Crusher $54.33 7A 3C 8P Under round Sevrer Water — Power E u` "King i meat Operators- Posthole Dgger,.Mechanical $51.97 7A 3C 8P Under round Sewer Water — King Power. ui meet O erat®rs- Power Plant $51.97 7A 3C 8P Under round Sewer Water King Power 'ui went 0 erator's- Pumps - Water $51.97 7A 3C 8P Underg W round Sew er ater King Power E'�uipment Operators- Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P Underground Sewer'&Water r a - 8P ors- uick Tower No Cab Under 51.97 7A 3C era to $ King Power Equipment Q� Q � — — — Underraund Sewer. Water 11.00 Feet In Height Based To Boom' King Power Egui,�ment Oberators- Remote Control'Operator On $55.24 7A 3C 8P Underground Sewer Water Rubber Tired Earth Moving Equipment r tors- Rigger And Bellman 51.97 7A 3C 8P King Power Eq^ujpment_Qpe a gg $ Under rou rid Sewer Water King Power E u ment Q erators- Rollagon $55.24 7A 3C 8P — — — Underground Sewer: Water King Power Equipmbnt Qperators- Roller, Other Than Plant Mix $51.97 7A 3C 8P t Under round Sewer a Water — — — King Power E ui me'nt Opera Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P Under round Sewer Water Materials — — — P w r E.ui merit o erators- Roto-mill Roto rinder $54.75 7A 3C 8P King o e g — — — Underground Sewer,�Et Water King Power E'ui me'nt Q erators- Saws Concrete $54.33 7A 3C 8P Under round Sewer Water — — — King Power EI merit O erators- Scraper, Self Propelled Under $54.75 7A 3C 8P Under rgnd Sewer t dater 45 Yards — — — King $54.33 7A 3C 8P f https://fortresswa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 Page 14 of 17 Power Equipment Operators- Scrapers - Concrete Et Carry Underground Sewer Ex Water All King Power Equipment Operators- Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equil2ment Operators- Service Engineers - Equipment $54.33 7A 3C Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $51.97 7A 3C 8P Underground Sewer Et Water — — King Power Equipment Operators- Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Under round Sewer £t Water Tractors Under 15 Metric Tons. King Power E ui went Operators- Shovel, Excavator, Backhoe: $55.24 7A 3C 8P Underground Sewer it Water Over 30 Metric Tons To 50 Metric Tons King Power E ui rp Went Aerators- Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $55.24 7A 3C 8P Underground Sewer Et Water — — — King Power Equipment Operators- Spreader, Topsider Et $55.24 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $54.75 7A 3C 8P Underground Sewer Et Water — — —_ King Power E ui went Orators- Tower Bucket Elevators $54.33 7A 3C 8P Under round Sewer a Water — — King PowerLjjarrLent Oar atop Tower Crane Over 175'in $56.36 7A 3C 8P Under r t,Ln(. Sewer�:t Wat,'N Height, Base To Boom — — — King Power Equiment Ope rators- Tower Crane Up To 175' In $55.79 7A 3C 8P Undera,_Lound Sewer Et Water Height Base To Boom King Power_Equiprnent Operators__ Transporters, All Track Or $55.24 7A 3C 8P Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $54.33 7A KC 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P Underground Sewer Et Water Tons And Over King Power E ui went O erators: Truck Crane Oiler/driver $54.33 7A 3C 8P Underground Sewer £t Water Under 100 Tons King Power Equipment Operators- Truck Mount Portable $54.75 7A 3C 8P Und�und Sewer Et Water Conveyor King Power Equipment Operators- Welder $55.24 7A 3C 8P Underground Sewer Et Water — — — King Power Equipment Operators- Wheel Tractors, Farmall Type $51.97 7A 3C 8P Under round Sewer Et Water — — —_ King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P Under roundSewer Et dater — — — King Power Lire CIearance Tree Journey Level In Charge $45.75 5A 4A Trimmers — — https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 • Page 15 of 17 King Power Line Clearance Tree Spray Person $43.38 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator :$45.75 5A 4A Trimmers King Pourer Line Clearance Tree Tree Trimmer $40.84 5A 4A Trimmers King Pourer Line Clearance Tree Tree Trimmer Groundperson $30.14 5A 4A k Trimmers King Ref ri eration Et.Air Journey Level $73.51 6Z 1G Conditioning Mechanics x .King Residential Brief Masan Journey Level $51.32j 5A 1M 'King Residential carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Journey Level $40.14 5D 4C Applicators King Residential Dr wall Ta ers Journey Level $52.37 5P 1 E King Residential Electricians" Journey Level $30.44 1 A King Residential Glaziers Journey Level $37.30 7L 1 H King^� Residential Insulation Journey Level $26.28 1 _. — licato s King Residential Labcarers Journey Level $23.03 1 King mm Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $2446 1 King Residential Plumbers Et Journey Level $34.69 1. Pipefitters King Residential Ref ri eration Et Air Journey Level $73,51 6Z 1G Conditioning Mechanics 4 58 7F 1 R King Res�dent�al Sheet Metal , Journey Level (Feld or Shop) $ 2. oilers King Residential Soft Floor Lavers Journey Level $42.41 5A 3D F King Residential Sprinkler Fitters Journey Level $42.48 5C 2R 3 LFire Protection) x King Residential Stone Masons Journey Level' $51.32 5A 1M x King Residential Terrazza Workers Journey.Level $46.96 5A 1 M King Residential Terrazzoffile Journey Level $21.46 1 Finishers King, Residential Tile Setters Journey Level $25 17 1_ King Roofers Journey Level $45.71 5A 3H King Roofers Using Irritable Bituminous $48.71 5A 3H materials, I Kin Sheet,Metal Workers Journey Level (Field'or Shop) $10.37 7F 1 E _ .g King Shi buildin £ Ship Re ai'r Boilermaker $3982 7M 1 H I King Shi 'buildi Ship Re air Carpenter $39,24 7T 2B King Shi buildin 'Shi Repair Electrician $4016 7T 46 King Shi building Ex Ship Repair Heat F Frost Insulator $61.18 5J 1S King hi 'blai[din Shi Re air Laborer $40.19 7T 4B ` King Shi buildi'n Shi e air Machinist $40.18 7T 4B — — 'King Shi 'buildin -Sht Re air Operator $4011] 7T 4B i 5/26/2015 https://fortress'`.wagoy/Ini/wagelookup/prvWagelookup.aspx Page 16Of17 .' ' .. . King 5hiDbuilding Et Ship Repair Sheet Metal $40.14 7T 413 King �h King Shipbuilding Et Ship ��ajr Warehouse $40.081 7T 4B King Sio,,n Makers Et Installers Sign Installer $22.92 1 King Sign Makers EL Installers Sign Maker $21.36 1 King Sip Makers Et Installers (Non- Sign Installer $27.28 1 ElectriLajt King Siqn Makers Et Installers (Non- Sign Maker $33.25 1 King Soft Floor Layers Journey Level $42.41 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler FjtteLLLf]re Journey Level $69.74 5C ix King Stone Masons Journey Level $51.32 5A 1M King Street And ParkinR Lot�- Journey Level $19.09 �weeper Workers King S U ry ey—O li� Assistant Construction Site $54.33 7A 3C 8P Surveyor King Surveygrs Construction Site Surveyor $55.24 7A 3C 8 P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $36.96 5A 2B Outside King TeteDhone Line Construction - Hole Digger/Ground Person $20.49 5A 2B Outside King Tttephone Line ConstEuction - Installer (Repairer) $35.40 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.96 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer 11 $36.19 5A 213 Outside King Tetephone Line Constructon - Telephone Equipment $36.96 5A 2B King Telephone Line ConStrL]Ctjon Telephone Equipment $34.34 5A 2B Outside Operator (Light) King Telephone Line Construction - Telephone Lineperson $34.34 5A 2B Outside King TeteDhone Line Construction - Television Groundperson $19.45 5A 2B Outside i i, Page 17 of.17 King Telephone Line Construction - Television $25.89 5A 2B Outside Lineperson/Installer King Telephone Line Construction - Television System Technician $30.97 5A 2B Outside — King Telephone.Line Construction - Television Technician $27.77 5A 2B Outside King Telephone:Line Construction - Tree Trimmer $34.54 5A 28 Outside King Terrazzo Workers Journey Level $46.96 5A 1M King Tile Setters Journey Level $21.65 1 King Tile Marble Terrazzo Fi"Wisher $37.79 5A 1 B Finishers King Traffic Control:stripers Journey Level $43.11 7A 1 K 71, King Truck Drivers Asphalt Mix Over 16 Yards(W. $49,85 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $49.01 51) 3A 8L x WA-Joint Council 28) — — — King Truck Drivers Dump Truck Et Trailer $49.85 5D 3A 8L King Truck Drivers Dump Truck (W WA-Joint $49.01 5D 3A 8L Council 28.) r rs Other Trucks W. WA-Joint $49.85 5D 3A 8L King Truck Dave - . Council 28) King Truck Drivers Transit Mixer $43:23 1 , :King Well Drillers Irrigation I um Irrigation Pump'Installer $17.71 1 Installers King Well Drillers t lrri ation Pum Oiler $12.97 1 i. Installers King Well'Dril'lers ;Irriq Lion Pump Well Driller, $18.00 1 Installers https://fortress,wagov/Ini/wagelookup/prvWagelookup.aspx 5/26/2015 Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 Overtime Codes Overtime calculations are based on the hourly'rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. Al,L, HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHAI_J, BE PAID ATONE AND ONE-I-IALF"TIMES Tl IE I-IOURLY RAIL OF WAGE. 13. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2) hours after eight(8) regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and Al hours worked on Sundays and holidays shall he paid at double the hourly rate of wage. D. The first two(2)hours before or after a live-eight(8)hour workweek day or a lour-ten (10)hour\yorkweek day and the first eight(8) hours worked the next day after either workweek shall be paid at one and one-half times the hour]\, rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. L. The first two(2)hours after eight(8) regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly,rate of wage. All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. it. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of w age. I. All hours worked on Sundays and holidays shall also he paid at double the hourly rate of wage. J. The first two(2) hours after eight (8) regular hours Monday through Friday and the first ten (I 10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if'work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key-Effective 3-4-2015'thru 9-1-2015 1. N. All hours worked on Saturdays (except: makeup days) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 0. The first ten (10) hours worked on Saturday,shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays, holidays and after twelve,(12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except nnalceup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked'on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess often(10) hours per,day Monday through Saturday and all hours worked on Sundays and holidays(except,Christmas day)shall be: aid at double the hourly rate'of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All'hours:worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first «o(2)hours after eight;(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the,hourly rate of wage. All hours worked'on holidays and all other oveitiine hours worked, except Labor Day, shall be paid at double the hourly rate of«gage. All hours worked on Labor Lay shall be'paid at three tirnes the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked'on Sundays and holidays (except Labor I.7ay) shall be paid at two times the hourly rate of wage.All hours worked on I..,ahor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times'the hourly rate of wage, All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of w�age. W. A11 hours worked on Saturdays and Sundays (except make-upAays due to conditions beyond the control of the employer)) shall be paid at and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage, fhe first (our 4 hours af.Ier eight 8 regular hours Monday through Friday and the first twelve' 12 hours on X. O g O g Y g Y ` O Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve(12):hours Monday through Saturday,'Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls ze Oil -day, Sunday,the day before Saturday,Friday, and the day,after Sunday,Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00`pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked.in excess of eight(8)hours per day(10 hours per day for a 4 x;10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times-the hourly rate of we. (except for<employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (I0 in a 4 x'10 Workweek)or 40 hours during that workweek.)All hours worked Monday through Saturday over twelve(12)hours r �` id at double the hourly rate of wage., Labor Da shall.be a n I� .o and all hours worked ked on Sundays and y p y g Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage:All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 2. ALL HOURS WORKED IN EXCESS OF FIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE,PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-hall times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-halt'timcs the hourly rate ofvagc. All hours worked on holidays shall be paid at two times the hourly rate ofwage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall he paid at double the hourly rate of wage.. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of 4.\/age including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-halftimes the hourly rate of�-vage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one N.�,eck shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of vv,age. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday. and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours\,vorked after ten shall be paid at double the hourly rate of,.vage.The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of\.\;age. 3. AL.,L I1OURS WORKI'D IN I"XCI SS OF LIGIIT (8) 1IOURS PI;R DAY OR h'OJ "TY (40) 1101-JRS PI R WL;L;K SHALL, BE PAID AT ONE,AND ONE,-HALF TIMES THE.,HOt;RLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day v..\hen four ten(10)hour shifts are established,or forty(40)hours of straight time per week. Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour fior all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the NN!ork to be performed on overtime situations. After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hOUrs or more. 3 ti Benefit Code Key Effective 3-4-2015 thru 9-1-2015 3. C. Work performed in excess of eight(8)hours of straight time per day,cr ten(10)hours of straight time;per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or, outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6;00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wa e.After an employee has worked ei ht 8 hours at an a licable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break o1'eight(8)hours or more. ). All hours'worked between the hours of 6:00 pm and 6:00 any,Monday through Saturday,shall be paid at a premium rate of'15%over the hourly;rate of wage'.All other hours worked after 6:00 am on Saturdays,shall be paid at one and one-,half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. L. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved.then any hours worked over I0 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All',hours worked on Saturday shall be paid at and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate;of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All-work performed on Sundays between Mauch loth and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay. Work performed on Sundays between October 15th and March 1.5th shall be compensated atone and one half(l-1/2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through l riday,)then Saturday may be worked as a voluntary make`-up day at the straight time rate. ` However Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8)HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAIL)ATONE AND ONE-IIALF TIMES TOIL I-IOURLY RA'1 E OF WAGE. A. All hours worked in excess of eight(8)hours per day or•forty(40)hours per week shall be paid at double the hourly rate of v�rage. All hours worked on Saturdays.Sundays and holidays shall be paid at double the hourly,rate of wage. 13. All hours worl<ed over twelve(12)hours per day and all hours worked on holidays shall be paid-at double the hourly rate or wage. C. On Monday through Friday, the .first four(4)hours of overtime'after eight (8) hours of.straight time work shall be paid at one,and one half(1-'1/2)times the straight time rate of pay,unless a`four(4)day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday,the frst two(2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(171/2)times the straight time.rate of pay. On Saturday,the first twelve(12)hours of work shall be paid at one-and one half(1-1/2)tithes the straight tirne rate of pay,except that if the job is down on Monday through Friday due to weather, conditions' or other conditions outside the control of the employer; the first ten;(10) hours on Saturday may be worked at the straight time rate of pay. Al] hours worked over twelve (12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. 4 Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 4. D. All hours worked in excess of eight(8)hours per day or•forty (40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturday, Sundays and holidays shall he paid at double the hourly rate of pay. Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines,switching stations.regulating,capacitor stations,generating plants, industrial plants,associated installations and substations,except those substations whose primary function is to feed a distribution system, will be paid overtime under the following rates: The first two(2)hours after eight(8)regular hours Monday through Friday of overtime on a regular workday,shall be paid at one and one-half times the hourly rate of wage. All hours in excess of ten(10)hours will be at two(2) times the hourly rate of wage.The first eight(8)hours worked on Saturday will be paid at one and one-half(]4/2) times the hourly rate of wage.All hours worked in excess of eight(8)hours on Saturday,and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized,shall be paid at the double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-halftimes the hourly rate of wage.All other hours worked Monday,through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day,ten-hour weekly schedule.either Monday thru Thursday or Tuesday thru Friday schedule. all hours worked after ten shall be paid at double the hourly rate of wage. The Mondav or Friday not utilized in the normal four-day.ten hour work week.and Saturday shall be paid at one and one half(I V_')times the regular shift rate for the first eight(8)hours. All other hours v-vorked Monday throu(.'h SatUrda\.and all hours worked on Sunday's and holidays shall be paid at double the hourly rate of wage. F. All hours worked between the hours of'6:00 pm and 6:00 am. Monday through Saturday.shall be paid at a premium rate of 20%over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Holidav Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day. Thanksgiving Day. Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day. Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: Ne\v Year's Day. Presidents' Day, Memorial Day, independence Day, Labor Day, Thanksgiving Day. the Friday after Thanksgiving Day,And Christmas Day(8). I.). I-lolidays: New Year's Day, Memorial Day, Independence Day. Labor Day. Thanksgk ing Day, the Friday and Saturday after Thanksgiving Day. And Christmas Day(8). If. Holidays:New, Year's Day.Memorial Day, Independence Day.Thanksgiving Day.. the Day after Thanksgiving Day. And Christmas(6). I. Holidays: New Year's Day, Memorial Day. Independence Day, Labor Day. Thanksgiving Dav, and Christmas Day (6) .1. Holidays:New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day. Christmas Eve Day,And Christmas Day(7). 5 Benefit Cade Key-Effective 3-4-2015 tlru 9-1-2015 5. K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day Labor Day, Thanksgiving Day, Fridav After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9.). f..,. Holidays: New Year's I:)ay, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,.h'ridav After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day; Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays;New Year's C)ay,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,`Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A i-Lolday Falls On Sunday, The Following Monday Shall Be Considered As A holiday. CQ. Paid Holidays:New Year's`Day,Memorial Dav, Independence Day,Ilabor Day, Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial`Day, Independence Day, Labor Day, "Thanksgiving Day, Day After Thanksgiving Day One-LIaIf Day Before Christmas Day,And Christmas Day.(7 1/2). S. Paid Holidays:'New'Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, And,Christmas Da (7). T. Paid holidays New Year's Day, Washington's Birthday, 'Memorial Day, Independence Day, Labor Day, . Thanksgiving a)ay, The Friday After'Thanksgiving Day, Christmas Day. And The Day Before Or After Christmas Z.,, Holidays: New Year's Day.; Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). Holiday Codes'Continued 6. A. Paid I lol idays: New'Year's Day, Presidents' Day; Memorial Day, Independence Day, Labor Day; Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays New Year's Day, Day Before Or After Now Year's Day, Presidents Day, Memorial Day, (ndependence Day;Labor Day,Thanksgiving Day,,Day After Thanksgiving Day,;Christmas Day,And A`Half-Day On Christmas Eve Day.(9 I/2). I G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial.Day,Independence Day, Tabor Day,VeteransDay,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,'And Christmas Eve Day,(11). I-1. Paid Holidays: New Year's Day, New Year's Eve Day, :Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After "Thanksgiving Day, Christmas Day, The Day After Christmas, 'And A' Floating Holiday(10). }, y v g ' g . ' Friday 1. Paid llolida,s: New Years Day,Memorial Day,. Inds ende.nce I.�a , Labor I7a�, Thanks iv m Dav, After Thanksgiving )ay,And Christmas I.)ay`(7). T. Paid Holidays: New Year's 'Day, Presidents' Day, Memorial Day, Independence.Day, Labor Day, Thanksgiving Day, '1`'he Friday After 'Thanksgiving Day, The Last Worlciig Day Before Christmas Day; And Christmas Day(9). 6 Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 6. L. I-Iolidays:New Year's Day,Memorial Day. Independence Day, Labor Day,Thanksgiving Day.. Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday. the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Ilolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturda}1 After Thanksgiving Day. And Christmas Dm (8). Any Holiday Which halls On A Sunday Shall Be Observed As A Holiday On The hollowing Monday. If any ofthe listed holidays falls oil a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day. Independence Day, Labor Day. Thanksgiving Day. the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holidav on the preceding Friday. C. Holidays: New Year's I)ay. Martin Luther King Jr. Day. Memorial I)ay, Independence I)ay, I.,abor Day. Thanksgiving Day. The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holidav, on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day. Labor Day, Veteran's Day, "Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas I:)ay (8). Unpaid Ilolidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's 1)ay, Memorial Day. Independence Day. I,abor Day. Thanksgiving Day, the Friday after Thanksgiving Day, the last working day bef()re Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturda" shall be observed as a holidav on the preceding Friday. G. Ifolidays: New Year's Day, Memorial Day. Independence Day, Labor Day, "Thanksgiving Day. and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. 1-I. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day. Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,President's Day.Independence Day,Memorial Day, Labor Day. hhanksgiving Day.'The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. .1. holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holidav on the preceding Friday. 7 Benefit Code Key-Effective 3-4-2015 thru 9-1-2015 7. K. holidays: New Year's Day., Memorial Day, Independence Day,Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas.Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which `falls on a Saturday shall be observed as-a holiday on the preceding Friday. I_.. Iclidays:New Year's Day, Memorial Day, Labor Day, Independence Day,Thanksgivingg Day, the Last Work Day . before Christmas Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls'on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day; The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be Observed.,as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as.a holiday on the preceding Friday. N. holidays:' New Year's Day. Memorial Day, Independence Day, Labor.Day, "Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day.(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be:observed as a holiday. P. Holidays: New Year's Day, Memorial. Day; Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day.And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day.and Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday, If any ofthe listed holidays falls on a Saturday. the*preceding Friday shall be a regular work day. IL. Paid 1-Iolidays:'New Year's Day,the day after or before New Year's Day,President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday'shatl be observed as the holiday.if any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid If olidays:New Year's'Day,Memorial Day, Independence Day,Labor Day,'Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating holiday(9). If any of the listed holidays falls can a Sunday,the day observed by the Nation shall'be considered a holidayand compensated accordingly. 1: Paid 1-Iolidays:New Year's Day,The Day After Or T efore New Year's Day,President's Day,Memorial Day, Independence Day,I..abor Day,"I hanksgiving,I)ay,The Friday After Thanksgiving Day,Christmas Day,and The Day After•Or Before Christmas Day. (10).If any of'the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. An holiday which falls on a Saturday shall be observed as aholiday on the preceding Friday`: Mote Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth.premiums apply to depths of fifty feet or more: Over 50'To 100'42'00 per Foot for Mach Toot Over 50 Feet Over 100'To 150'-$3.00 per Foot for Each Foot Over 100 Feet Over,150'To 220'-$4.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per 1`oot;for Each Foot Over 220 Feet 8 y Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 8. C. In addition to the hourly wage and fringe benefits,the follo\-ving depth premiums apply to depths of fifty feet or more: Over 50'To 100'-51.00 per Foot for Each hoot Over 50 Feet Over 100''To 150'-$1.50 per Foot for Each Foot Over 100 Feet Over 150'"I'o 200'-$2.00 per Foot for Fach Foot Over 150 Erect Over 200'-Divers May Name Their Oven Price D. Workers working with supplied air on hazmat projects receive an additional $I.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B:50.50,And Level C:$0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A&B: $1.00.Levels C&D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A: 51.00.level 13: $0.75, level C:$0.50.And Level D: 50.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00.Class B Suit: $1.50,Class C Suit: $1.00,And Class D Suit$0.50. Q. The highest pressure registered on the uauge Jor an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. R. Effective August 31.2012--A Traffic Control Supervisor shall be present on the protect whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle. and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of'Vl-ashington.Oregon, Montana,or Idaho. ['here classifications are only effective on or after August 31,2012. S. Effective August 31.2012 —A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon, Montana,or Idaho.This classification is only effective on or after August 31,2012. T. l"ffective August 31.2012—A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved"Traffic Control Plans or Nwhere directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon, Montana,or Idaho.This classification is only effective on or after August 31.2012. 9