Loading...
HomeMy WebLinkAboutPW15-185 - Original - Nature's Way Tree Service, LLC - Tree Removal - 05/19/2015 ecords IS KENT Document W A S H I N G T O N CONTRACT COVER SHEET This is to be completed by the Contract Manager prior,to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Nature's Way Tree Service, LLC Vendor Number: JD Edwards Number Contract Number:, W This 'is assigned by City Clerk's Office Project Name: Tree Removal Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑'Other: Contract Effective Date: Date of the Mayor's signature Termination Date: 30 days; Contract Renewal Notice (bays): Number of days required notice for termination or renewal or amendment Contract Manager: Scott Schroeder Department: PW Operatoins, Contract Amount: $13,140.00' Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Remove 20 cottonwood trees located by a stream channel near 11509 217th St. which are in the drainage tract, s As of: 08/27/14 • KENT W A S H I N G T.O.N -- PUBLIC WORKS AGREEMENT between City of Kent and Nature Way. Tree Service, LLC THIS AGREEMENT is made by and between the City `of Kent, a Washington municipal corporation (hereinafter the "City"), :and Nature's Way Tree `Service, LLC organized under the laws of the State of Washington, located and doing business at 1019 184t" Ave. Court ,E., Lake Tapps, WA 98391, Phone: (253) 740-4669, Contact: Mike Harrell (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall .remove 20 cottonwood trees located by a stream channel near 11509 217t" St. SE which are in the drainage tract. For a copy of the Contractor's bid, see Exhibit A which is attached and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, the Contractor shall complete the work described in Section I within 30 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Thirteen Thousand, One Hundred Forty Dollars ($13,140.00), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%') of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is _appropriate. The City will pay the remaining` Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment- and Performance Bond. Because this contract, including applicable sales tax, is iless than $35,000, and pursuant to Chapter 39.08 I � PUBLIC WORKS AGREEMENT - 1 I (Over,$1OK, under$35K, and No Performance Bond) RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final fifty percent (50%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all, necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State'Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or 'unauthorized work. Defective o'r unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished Without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of;the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S' CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE f TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. ' INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be .created .by this Agreement. By their execution of this Agreement, and in accordance With Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement.' B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement.will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that j furnished by the City, or. the Contractor, is engaged in an independently established trade, occupation; profes ion, or business of the same nature as I that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the 'state Department of Revenue. I PUBLIC WORKS AGREEMENT - 2 (Over$1OK, under$35K, and No Performance Bond) E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or. labor. D. The Contractor's persistent disregard :of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and' data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in.effect o'n the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Wash'in'gton, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a, written change order for any change in the Contract work during the performance of this Agreement; If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written 'change' order request to the person listed in the notice provision section of this Agreement, section XV(D), withini fourteen (14) calendar days of the date Contractor knew or should have known of the facts and'!!events giving 'rise to the requested change. If the City determines that the change increa',ses,'l or decreases the Contractor's costs or time for performance, the City will make an equitable' adjustment. The City will attempt, 'in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed PUBLIC WORKS AGREEMENT - 3 (Over$1OK, under$35K, and No Performance Bond) withtthe change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable'' adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or.(3) not protesting in the way,this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final- settlement of all claims for contract time and for direct, indirect and consequential costs, including, costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first: . Any claim for damages, additional payment for any , reason, or extension of time, whether under this Agreement o'r otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of. this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information 1. The date of the 'Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work, and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted' events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. 'If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an PUBLIC WORKS AGREEMENT - 4 (Over$1OK, under$3.5K, and No Performance Bond) invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or .oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement The Contractor shall promptly correctall defects in workmanship and materials: (1) when Contractor, knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or: discovery of the defect. In the event any parts are repaired or ponly, original p p e used—rebuilt or used parts will not be replaced, on anal replacement arts shall b acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original Warranty'period applicable to the overall work. The Contractor shall 'begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor, does not accomplish the corrections within a y y y y p e reasonable time as determined b the City, City may com lete the corrections and t Contractor shall pay all costs incurred by the City"in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color,,.sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and 'available to perform' the work to ;which the employment relates. Contractor shall execute the attached City. of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with!'the Contractor's performance of this Agreement, except for that portion of the E injuries and damages caused. by the City's negligence: f PUBLIC WORKS AGREEMENT - 5 (Over$1OK,' under$35K, and No Performance Bond) t The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification.` Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of Iiabi,lity for damages arising out of bodily injury to persons or damages to property caused' by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW," SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION.: THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the,event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that 'purpose. All work shall be done at Contractor's own `risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. -MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 180 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. 8. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any, of the covenants and agreements contained in this =Agreement,, or to exercise any option conferred by this Agreement in one or more 'instances shall not be construed' to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in �accordance with the laws of the State of Washington'. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means` of resolving that dispute, difference or claim, shall only be by PUBLIC WORKS AGREEMENT - 6 .(Over$1OK, under$35K, and No Performance Bond) filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its Iegal costs and attorney's 'fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses 'listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified Imail, and shall be deemed sufficiently given if sent to the addressee at the address stated in thi Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations-that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the 'performance of those operations. I. City' Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. i L i PUBLIC WORKS AGREEMENT - 7 (Over$10K, under$35K, and No Performance Bond) J. Counterparts This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute'this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: B Byde y s� nature) (signature) ( 9 Print Name: � �� Print am Su ette Cooke Its � v Its or (title) DATE: V!�` '7 - Z f DATE: .S NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Mike Harrell Timothy J. LaPorte, P.E. Nature's .Way Tree Service, LLC City of Kent 1019 184 " Ave. Court E. 220 Fourth Avenue South Lake Tapps, WA 98391 Kent, WA 98032` (253) 740-4669 {telephone) (253) 856-5500 (telephone) (253) 856-6500 (facsimile) APPR VED A TO ORM: 7 I Kent Law Department I Nature's Way-20.Tree Removal/Schroeder'" I I, f I I I PUBLIC WORKS AGREEMENT - 8 I (Over$1OK, under$35K, and No Performance Bond) DECLARATION CITY OF.KEN T EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific' Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During; the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer.' 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. For: Title: Date: Z EEO COMPLIANCE.DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY- NUMBER: 1.2 EFFECTIVE DATE: January '1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or-more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning,,Parks, and Public ' Works Departments to assume the following duties for their respective departments. i 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. i EEO COMPLIANCE DOCUMENTS - 2 I i CITY OF KENT EQUAL EMPLOYMENT'OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy'1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By• For: Title Date EEO COMPLIANCE DOCUMENTS - 3; EXHIBIT A Estimate sheet Nature's Way Tzee Service, LLC Customer information Date 1019184th./`eve Ct 3/26/201 S ppe Za Lake s WA 98391 City Of Xent 253-740-4669 Scott Schroeder 2S3-.856-5600 ,Services 9fours To Complete Price Pruning Tree evaluation Tree removal' Other comments emoval of 20 cotton wood trees at stream channel by 11509 21 7th street se kept wa 3 4 of the brush and wood to be removed from site (al wood and brush to be removed on trees in holding pond) Sub total $11,000.00 Tax $1,14000 Total $13,140.00 L i I EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to propertywhich may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and Leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2 Commercial General Liability insurance shall be written 'on ISO occurrence form CG 00 01 and ',shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury grid advertising injury, and liability assumed under an insuredcontract: The Commercial General Liability insurance shah be 'endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the' Contractor's Commercial General Liabilityinsurance` olic with i respect to the work performed for the p y City using ISO additional insu,r,ed ',endorsement CG 20 10 11 85 or a substitute endorsement providinq,equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance i Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. I EXHIBIT B (Continued). C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy, of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than AVII: E. Verification of Coverage Contractor shall furnish the City with original certificates and,a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all. subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. ® DATE(MM/DD/YYYY) A�Q► CERTIFICATE OF LIABILITY INSURANCE 04/02/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED`BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONT PRODUCER NAM EACT Dori Young YoungInsurance Agency, LLC PHONE (253) 893-0011 F A AX C No: (253) 893-0012 'E-MAIL ADDRESS:don@youngins.net PO BOX 5340 INSURERS AFFORDING COVERAGE NAIC# Kent WA 98064- INSURERA:Wesco Insurance Company INSURED INSURER B; Nature's Way Tree Service, LLC INSURER C: 1019 184t11 Ave Ct E INSURERD,: INSURER E Lake Tap s WA 98391- INSURERF;: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TOALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ADDL SUBR POLICY EFF POLICY EXP �LTR TYPE OF INSURANCE POLICY NUMBER MM/DD YYY MM/DD/YYYY LIMITS A GENERAL LIABILITY WPP114355300' 04/07/2015 04/07/2016 EACH OCCURRENCE $ 1,000,0.00 DAMAGE TO RENTED 100,000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ ry MED EXP Any one person); $ 5,000 CLAIMS-MADE �OCCUR PERSONAL'&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY PRO 'LOG / / / / $ AUTOMOBILE LIABILITY 03/14/2015 E�aacideDtSINGLE LIMIT ANY AUTO BODILY INJURY(Per person) $ FALL OWNED SCHEDULED / / / / BODILY INJURY(Per accident) $ AUTOS`_ AUTOS NON-OWNED / / / PROPERTY DAMAGE $ HIRED AUTOS -AUTOS Per accident UMBRELLA LIAR OCCUR / / / EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE / / / AGGREGATE $ DED RETENTION$ WC S $ WORKERS COMPENSATION / / / / TATU OTH LIMITS ER AND EMPLOYERS'LIABILITY' ORY J ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N / E.L.EACH ACCIDENT $ N/A OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE EA EMPLOYEE $ - If yes,describe under / / / / DESCRIPTION OF OPERATIONS below E.L.DISEASE POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS(VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space Is required) City of Kent is listed as an Additional Insured. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,"NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City Of Kent AUTHORIZED REPRESENTATIVE 499 West Gowe Kent WA 98032 ACORD 25(2010/05) O 1988-2010 ACORD CORPORATION. All rights reserved. INS025.(201005).ot The ACORD name and logo are registered marks of ACORD DATE(MM/DDIYYYY) ,�ca�zo CERTIFICATE OF LIABILITY INSURANCE 3/26/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:` If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the,policy,certain policies may require an endorsement. A statement on,this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT PRODUCER Liberty Mutual insurance NAME: PO BOX 188065 PHONE' 'o. t: 800-962-7132 A/c No): 800-845-3666 Fairfield,OH 45018 E-MAIL ADDRESS: CLServiceCenter@LibertyMutual.com` INSURERS)AFFORDING COVERAGE NAIC# INSURER A': Ohio Security.Insurance'Com an 24082 INSURED INSURER B: Nature's Way Tree Services LLG' 1019 184th`Avenue Ct.E INsuRERc: Lake Tapps WA 98391 INSURER D INSURER E. INSURER F;: COVERAGES CERTIFICATE NUMBER: 23959484 REVISION NUMBER:' THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS'SHOWN'MAY HAVE BEEN REDUCED BY PAID CLAIMS, IR TYPE OF'INSURANCE ADDL SUER POLICPOLICY NUMBER: MM DDY EFF IYYYY MM/DD/YYYY CY EXP LIMITS LTWVD LTR COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE a OCCUR PREMISES Ea occurrence $ MED EXP(Any one person) $ PERSONAL'&ADV INJURY $ GENL AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ El PRO- LOC PRODUCTS''-COMP/OP AGG $ POLICY JECT $ OTHER: A AUTOMOBILE LIABILITY BAS56527308 3/14/2015 3/14/2016 CO aBIN ED SINGLE LIMIT $ 1,000,000 ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS' AUTOS NON-OWNED PROPERTY'DAMAGE $ —'HIRED AUTOS AUTOS Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION STATUTE EERH AND EMPLOYERS'LIABILITY Y/N ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ E.L.EACH ACCIDENT $N/A OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) Certificate Holder is listed as Additional Insured perform CA2048. CERTIFICATE'HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Clty Of Kent THE EXPIRATION DATE .THEREOF, NOTICE WILL BE DELIVERED IN 499 W GOWe ACCORDANCE WITH THE POLICY PROVISIONS. Kent WA`98032 AUTHORIZED REPRESENTATIVE Joshua Mitchell ©1988-2014 ACORD CORPORATION All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD CERT NO.: 23959484 CLIENT CODE: 56527308 Joshua Mitchell 3/26/2015 9;07:46 AM',(PDT) Page 1 of 2 COMMERCIAL GENERAL LIABILITY POLICY NUMBER:WPP1143553 00 CG 20'10 0413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED `"'. OWNERS, LESSEES OR.. CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Persons) Or Or anization Locations Of Covered Oeraitions s City of Kent It is agreed�that such insurance as is afforded by this 499 West Gowe policy for the benefit of the additional insured shown: shall be primary insurance, and any other insurance Kent, WA 98032 maintained by the additional insureds)shall be excess and noncontributory as respects,to any claim, loss or liability, allegedly arising oust of tte operations of the named insured, provided however that this insurance will not apply to any claim loss or liability which is determined to be solely the additional insured'$. responsibility. Information required to complete this Schedule, if not shown above,will be.shown in the Declarations. A. Section lI — Who Is An Insured is amended to 1. The insurance afforded to such additional include as an additional insured the person(s) or insured only applies to the extent permitted by organizations) .shown in the .Schedule, but only law; and With respect to liability for"bodily injury "property 2. !f coverage provided to the additional insured is damage" or '"personal and, advertising injury„ required by a contract or agreement, the caused, in whole.or in part, by: insurance afforded to such additional insured 1. Your acts or omissions; or will not be broader', than that `which you are acts or omissions of those acting on your required by ttie contract or agreement to 2. The provide for such additional insured. behalf;` in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: Page.1;of 3 CG 2010 04'13 Insurance Services Office, Inc.,241`2 �. With respect to the insurance afforded to these- additional insureds, the following additional' exclusions apply: This insurance does not apply.to "bodily injury" or, 'property damage"occurring after; I. All work, including materials, parts or equipment furnished in connection with such work, an the project (other than service, maintenance or repairs) to be performed:'by or on behalf of the additional ihsured(s) at the location of the covered operations has been completed;or 2. That portion of "your work" out of which the injury or. damage arises has been put to its intended use by any person or organization other than another contractor or.subcontractor engaged in performing operations for a principal as a part of the same project. Page 2 of 3 ©Insurance Services Office, Inc., 2012 CG 201p 0413 1 r C. With respect to the insurance afforded to these Z. Available under the applicable Limits of additional insureds, the following is, added to Insurance shown in the Declarations; Section III-Limits Of Insurance: whichever is less. If coverage provided to the additional insured is This endorsement shall not increase the required by'a contract or agreement, the most we applicable Limits of Insurance shown in the will pay on behalf of the additional insured is the, Declarations'. amount of insurance:, 1. Required by the contract or agreement;or CC 20 10 07 04 0 ISO Properties, Inc,2004 Pagel of'3 Cl THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CA 20 48 02 99 DESIGNATED INSURED ENDORSEMENT The endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage`provided by this endorsement,the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement identifies person(s)or organization(s)who are"insureds"under the WHO IS AN INSURED provision of the Coverage Form. This endorsement 'does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective Policy Number BAS56527308 Named Insured Nature's Way Tree Services LLC Countersigned b (Authorized ori zed Representative) SCHEDULE Name of Pees0n(s)or Organizationis} The Cit�r of Kent 499 W Gowe Kent, WA 98032 {If no entry appears above, information required to complete this endorsement will be shown in the Dec- larations as applicable to this endorsement.f Each person or organization shown in the Schedule is an"insured for LIABILITY COVERAGE,but only to the extent that person or organization qualifies as an "insured" under the WHO IS AN INSURED provision contained in SECTION II of the Coverage Form. CA 20 48 02'99 Copyright, Insurance Services Office, Inc„ 1998 Page 1 of CERT NO.: 23959484 CLIENT CODE: 56527308 Joshua Mitchell ,3/26/2015 9:07:46 AM (PDT) Page 2 of 2 Page 1of17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540` Washington State Prevailing Wage The PREVAILING WAGES Aisted here include both the hourly wage rate and the hourly,rate of fringe benefits. On public works projects, worker's wage and benefit rates,must add to not less than this total. A brief description of overtime calculation requirements are' provided on the Benefit Code Key. Journey.Level Prevailing Wage Rates for the Effective Date: 4/20/2015 C .unt Trade . Job Classification attAr..e Holiday Overtime Note King Asbestos abatement Workers Journey Level $42.67 5D 1 H `King Boilermakers Journey Level $64.29 5N 1C King Brick Mason Brick And Block finisher $44.46 5A 1M King Brick Masan Journey Level $51.32 5A" 1M King Brick'Masan Pointer-Caulker-Cleaner $51.32 5A 1M King Buildin Service Em to ees Janitor $21.29 5S 2F King Building Seryice,Eg1p12yees Traveling Waxer/Shampooer $21.70 5S 2F King Building Service Employees, Window Cleaner (Non- $24.94 5S 2F 4 Scaffold) King Building Service EmEoyees Window Cleaner(Scaffold) $25.80 5S 2F King Cabinet Makers (in Shops Journey Level $22.74 1 i King Carpenters Acoustical Worker $52.32 5D 4C King Caroenters Bridge, Dock And Wharf $52.32 5D 4C Carpenters King Carpenters Carpenter $52.32 5D 4C King ' Carpenters Carpenters on Stationary Tools $52.45 5D 4C 'i a Kin Car enters Creosoted Mater a l $52.425D 4C King ;Carpenters Floor Finisher $52.32 56 4C King Carpenters Floor Layer $52.32 5D 4C King Camenters Scaffold Erector 1$52.32 50 4C King Cement Masons Journey Level $52.38 7A 1M t King 'Diyerst Tenders Diver $105.37 5D 4C 8A King Il ; Diverst Tenders Diver On Standby $59.50 5D 4C King ! Divers Tenders Diver Tender $54.82 5D 4C King Divers � Tenders Surface Rcv Et Rov Operator ,$54.82 5D 4C Kmg Divers E Tonders Surface Rcv Et Rov Operator $51.0777 5A 4C Tender i 3FKing Prod Assistant Engineer 5D e Workers $ a 54.75 King Dred` e Workers Assistant Mate (Deckhand) ;$54.33 5D 3F r King Dredge Workers Boatmen $54.75 5D 3F i httpsWfortress wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 2 of 17 King Dredge Workers Engineer Welder $55.79 5D 3F King Dredge Workers Leverman, Hydraulic $56.92 5D 2F King Dredge Workers Mates $54.75 5D 3F King Dredge Workers Oiler $54.33 5D 3F King Drywatt Appticator Journey Level $52.32 5D 1 H King Drywall Tapers Journey Level $52.37 5P 1 E King Electrical Fixture Maintenance Journey Level $26.59 5L 1 E Workers King Electricians - Inside Cable Splicer $66.76 7C 4E King Electricians - Inside Cable Splicer (tunnel) $71.67 7C 4E King Electricians - Inside Certified Welder $64.54 7C 4E King Electricians - Inside Certified Welder (tunnel) $69.22 ZC 4E King Electricians - Inside Construction Stock Person $37.19 7C 4E King Electricians - Inside Journey Level $62.30 7C 4E King Electricians - Inside Journey Level (tunnel) $66.76 7C 4E King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powertine Cable Splicer $69.95 5A 4D Construction King Electricians - Powertine Certified Line Welder $63.97 5A 4D Construction King Electricians - Powerline Groundperson $43.62 5A 4D Construction King Electricians - Powertine Heavy Line Equipment $63.97 5A 4D Construction Operator King Electricians - Powertine Journey Level Lineperson $63.97 5A 4D Construction King Electricians - Powertine Line Equipment Operator $53.81 5A 4D Construction King Electricians - Powertine Pole Sprayer $63.97 5A 4D Construction King Electricians - Powertine Powderperson $47.55 5A 4D Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $82.67 7D 4A King Elevator Constructors Mechanic In Charge $89.40 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.90 513 1 R Products Work Only King Fence Erectors Fence Erector $15.18 1 King Flagogers Journey Level $36.17 7A 31 King Gtaziers Journey Level $54.91 7L 1Y King Heat Et Frost Insulators And Journeyman $61.18 5J is Asbestos Workers King Heating Equipment Mechanics Journey Level $70.37 7F 1 E King Hod Carriers Et Mason Tenders Journey Level $44.00 7A 31 King Industrial Power Vacuum Journey Level $9.47 1 Cleaner King Inland Boatmen Boat Operator 1 $54.57 5B 1 K https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 3 of 17 r. King Inland Boatmen Cook $50.95 5B 1 K s King Inland Boatmen Deckhand $51.19 5B 11 K King Inland Boatmen Deckhand Engineer $52,18 5B 1 K i King Inland Boatmen Launch Operator $5340 5B 11 K King Inland Boatmen Mate $5340 5B 1 K King Inspection/Cleanin /Sealin Cleaner Operator, Foamer $31.49 1 l h Of Sewer Et Water S`stems B Operator r Remote'Control I King Ins `ection/Cleanin lSealn Grout Truck Operator $11' 48 1 Of Sewer'&- Water Systems B Remote Control ;King Ins ection/Cleanin /Sealin Head Operator $24.91 1 Of Sewer a Water Systems B Remote Control King Inspection[Cleanin 1Seal.in Technician $19.33 1 Of Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Tv Truck Operator $20.45 1 Of,Sewer E Water Systems By Remote Control l a King Insulation Applicators Journey Level $5232 5D 4C King Ironworkers Journeyman $6162 7N 10 I King Laborers Air, Gas Or Electric Vibrating $42.67 7A 31 Screed — : King Laborers Airtrac Drill Operator $44.00 7A 31 King Laborers Ballast Regular Machine $4267 7A 31 l King Laborers Batch Weighman $36`.17 7A 31 King Laborers Brick Pavers $4267 7A 31 King Laborers Brush Cutter $42.67 7A 31 King Laborers Brush Hog Feeder $42.67 7A 31 King Laborers Burner $42.67 7A 31 i King Laborers Caisson Worker $44.00 7A 31 King Laborers Carpenter Tender $4267 7A 31 King Laborers Caulker $42.67 7A 31 King Laborers Cement Dumper-paving $43`.46 7A 31 King Laborers. Cement Finisher Tender $42.67 7A 31 I King Laborers Change House Or Dry Shack $42.67 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $42.67 7A 31 y s King Laborers Chipping Gun(30 Lbs And $43.46 7A 31 Over) King Laborers Choker Setter $42.67 7A 31 King Laborers '; Chuck Tender $42.67 7A 31 King Laborers Clary Power Spreader $43:46 7A 31 n King Laborers.. ;, Clean-up Laborer $42.67 7A 31 King Laborers Concrete Dumper/chute $43.46 7A 31 Operator Kin Laborers Concrete Form Stripper $42.67 7A 31 g King Laborers Concrete Placement'Crew $43.46 7A 31 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 4of17 King Laborers Concrete Saw Operator/core $43.46 7A 31 Driller King Laborers Crusher Feeder $36.17 7A 31 King Laborers Curing Laborer $42.67 7A 31 King Laborers Demolition: Wrecking Et $42.67 7A 31 Moving (incl. Charred Material) King Laborers Ditch Digger $42.67 7A 31 King Laborers Diver $44.00 7A 31 King Laborers Drill Operator $43.46 7A 31 (hydraulic,diamond) King Laborers Dry Stack Walls $42.67 7A 31 King Laborers Dump Person $42.67 7A 31 King Laborers Epoxy Technician $42.67 7A 31 King Laborers Erosion Control Worker $42.67 7A 31 King Laborers Faller a Bucker Chain Saw $43.46 7A 31 _ King Laborers Fine Graders $42.67 7A 31 King Laborers Firewatch $36.17 7A 31 _ King Laborers Form Setter $42.67 7A 31 King Laborers Gabian Basket Builders $42.67 7A 31 King Laborers General Laborer $42.67 7A 31 King Laborers Grade Checker Et Transit $44.00 7A 31 Person King Laborers Grinders $42.67 7A 31 King Laborers Grout Machine Tender $42.67 7A 31 King Laborers Groutmen (pressure)including $43.46 7A 31 Post Tension Beams King Laborers Guardrail Erector $42.67 7A 31 King Laborers Hazardous Waste Worker $44.00 7A 31 (level A) King Laborers Hazardous Waste Worker $43.46 7A 31 (level B) King Laborers Hazardous Waste Worker $42.67 7A 31 (level C) King Laborers High Scaler $44.00 7A 31 King Laborers Jackhammer $43.46 7A 31 King Laborers Laserbeam Operator $43.46 7A 31 King Laborers Maintenance Person $42.67 7A 31 King Laborers Manhole Builder-mudman $43.46 7A 31 King Laborers Material Yard Person $42.67 7A 31 King Laborers Motorman-dinky Locomotive $43.46 7A 31 _ King Laborers Nozzleman (concrete Pump, $43.46 7A 31 Green Cutter When Using Combination Of High Pressure Air a Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $43.46 7A 31 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 5 of 17` King Laborers Pilot Car $36.17 7A 31 King Laborers Pipe Layer Lead $44.00 7A 31 King Laborers Pipe Layer/tailor $43.46 7A 31 King Laborers Pipe Pot Tender $43.46 7A 31 4 King Laborers Pipe Reliner $43.46 7A 31 King Laborers Pipe Wrapper $43.46 7A 31 King Laborers Pot Tender. $42.67 7A 31 :King Laborers Powderman $44.00 7A 31 r King Laborers Powderman's Helper $42.67 7A 31 King Laborers Power Jacks $43.46 7A 31 King Laborers Railroad Spike Puller Power $43.46 7A 31 King Laborers Raker- Asphalt $44.00 7A 31 s King Laborers Re-timberman $44.00 7A 31 u King Laborers Remote Equipment Operator, $43.46 7A 31 u King Laborers Rigger/signal Person $43.46 7A 31 King Laborers Rip Rap Person $42.67 i7A 31 King Laborers Rivet Buster $43.46 7A 31 King Laborers Rodder $43.46 7A 31 King Laborers Scaffold Erector $42.67 7A 31 King Laborers Scale Person $42.67 7A 31 King Laborers Sloper (over 20") $43.46 7A 31 King Laborers Sloper Sprayer $42.67 7A 31 King Laborers Spreader (concrete) $43.46 7A 31 King Laborers Stake Hopper $42.67 7A 31 ' King Laborers Stock Piler $42.b7 7A 31 King Laborers Tamper �t Similar Electric, Air $43.46 7A 31 Ft Gas Operated Tools King Laborers Tamper (multiple Ft Self- $43.46 7A 31 propelled) King Laborers Timber Person - Sewer $4346 7A 31 (lagger, Shorer;Et Cribber) King Laborers Toolroom Person (at Jobsite) $42.67 7A 31 King Laborers Topper $4267 7A 31 M -King Laborers Track Laborer $42.67, 7A 31 r King Laborers Track Liner (power) $4346 7A 31 King Laborers Traffic Control Laborer $38.68 7A 31 8R :King Laborers Traffic Control Supervisor $38.68 �7A 31 8R King Laborers Truck Spotter $42!67 7A 31 s King Laborers Tugger Operator $43.46 7A 31 King Laborers Tunnel Work-Compressed Air $64.99 7A 31 8g Worker 0-30 psi 80 King Laborers Tunnel Work-Compressed Air $70.02 '7A 31 Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $73.70 '7A 31 x Worker 44.01-54.00 psi s 31 8 £;King Laborers Tunnel Work-Compressed Air $79. 0 _ _ Worker 54.01-60.00 psi https://fortress.wa.gov/Ini/wagelookup/` prvWagelookup.aspx 4/20/2015 Page 6 of 17 King Laborers Tunnel Work-Compressed Air $81.52 7A 31 8� Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $86.62 7A 31 Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $88.52 7A 31 80 Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $90.52 7A 31 Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $92.52 7A 31 80 Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $44.10 7A 31 8 Tender King Laborers Tunnel Work-Miner $44.10 7A 31 8�( King Laborers Vibrator $43.46 7A 31 King Laborers Vinyl Seamer $42.67 7A 31 King Laborers Watchman $32.87 7A 31 King Laborers Welder $43.46 7A 31 King Laborers Well Point Laborer $43.46 7A 31 King Laborers Window Washer/cleaner $32.87 7A 31 King Laborers - Underground Sewer General Laborer Et Topman $42.67 7A 31 Et Water - - King Laborers - Underground Sewer Pipe Layer $43.46 7A 31 Et Wafter King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $52.32 5D 1 H King Marble Setters Journey Level $51.32 5A 1M King Metal Fabrication In Shopj Fitter $15.86 1 King Metal Fabrication {In Shop} Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication {1n 5hop} Painter $11.10 1 King Metal Fabrication Welder $15.48 1 King Millwright Journey Level $53.42 5D 4C King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular BuildinLs Production Worker $9.47 1 _ King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.80 6Z 2B King Pile Driver Journey Level $52.57 5D 4C King Plasterers Journey Level $50.42 Zq 1 R https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/20/2015 Page 7 of 17 King Pta ground Et Park E uipment Journey Level $9.47 1_ tnstatters King Plumbers EL Pipefitters Journey Level $74.69 6Z 1 G King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3CI 8P King Power Equipment Operators Assistant Engineer $51.97 7A 3C 8P King Power E ui ment O erators Barrier Machine (zipper) $54.75 7A 3C 8P King Power E ui went O erators Batch Plan_t Operator, $54.75 7A 3C 80 Concrete King Power E ui meet Operators Bobcat $51.97 7A 3C 8P King Power Equipment Operators Brokk - Remote Dernolition 1$51.97 7A 3C 8P i Equipment a; King Power E ui ment Operators Brooms $51.97 7A 3C 8P ;King Power E ui meat O erators Bump Cutter $5475 7A 3C 8P King Power Equipment 01?erators Cableways $55.24 7A 3C 8P King Power Equipment Operators Chipper $54.75 7A 3C 8P ' King Power E ui meet 012er6tors Compressor $51.97 7A 3C 8P King Power E ui ment fl erators Concrete Pump: Truck Mount ` $55.24 7A 3C 8P With Boom Attachment Over 42 M: King Power E ui went fl erators Concrete Finish Machine -laser $51.97 7A 3C 8P Screed l King Power.E ui ment o erators Concrete Pump - Mounted Or $54.33 17A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power E ui ment o erators Concrete Pump: Truck Mount $54.75 7A 3C 8P ; With:Boom Attachment Up To — 42m King Power Equipment operators Conveyors $5433 7A 3C 8P a King Power Equipment operators Cranes: 20 Tons Through 44 $54.75 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Tons, Or:150'Of Boom (Including Jib With Attachments) `King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $56.36 ` 7A 3C 8P Or 250' Of I Boom (including Jib With Attachments) King Power 'ui ment O erators Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Tons, Under 150' Of Boom i (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $51.97 7A 3C 8P Under King Power Equipment C3` erators Cranes: Friction 100 Tons $56.36 7A 3C 8P Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons; $56.92 7A 3C 8P i King Power Equipment 0 erators Cranes: Over 300 Tons Or 300' $56.92 7A 3C -8P 3 Of Boom (including Jib With Attachments) ,King Power Equipment Operators $54.33 7A 3C 8P I L i https://fortress.wa.gov/Ini/wagelookup/prvWagelooku'p.aspx 4/20/2015 Page 8 of 17 Cranes: Through 19 Tons With Attachments A-frame Over 10 Tons ......................---..__..........._.... King Power Equipment Operators Crusher $54.75 7A 8C 8P King Power Equipment Operators Deck Engineer/deck Winches $54.75 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $54.33 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $54.75 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $51.97 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell $54.75 7A 3C 8P And Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $54.33 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P With Attachments King Power Equipment Operators Grade Engineer: Using Blue $54.75 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $51.97 7A 3C 8P King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $55.24 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $54.75 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $54.33 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $54.75 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $54.33 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $55.79 7A 3C 8P Over ._........__....-....._ King Power Equipment Operators Loader, Overhead, 6 Yards. $55.24 7A 3C 8P But Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $54.75 7A 3C 8P Yards King Power Equipment Operators Loaders, Plant Feed $54.75 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P King Power Equipment Operators Locomotives, All $54.75 7A 3C 8P King Power Equipment Operators Material Transfer Device $54.75 7A 3C 8P King Power Equipment Operators $55.79 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 9 of 17 r Mechanics, All ( eadmen - $0.50 Per Hour Over Mechanic) King Power Eguipmgnt Operators Motor Patrol Grader Non- $54.33 7A 3C 8P finishing n King Power E ui ment O erators Motor Patrol Graders, $55.24 7A 3C 8P Finishing 3C 8P 7A 24` . l:King Power Eui ment O erators Mucking Machine, Mole, $55 — , Tunnel Drill, Boring, Road Header And/or Shield u' King Power Equipment Operators Oil Distributors, Blower $51.'97 7A 3C 8P Distribution Et Mulch Seeding Operator King Power E ui meat O erators Outside Hoists (elevators And $54.33 7A 3C 8P Manlifts), Air Tuggers,strato King Power E ui meat O erators Overhead, Bridge Type Crane: $54.75 7A 3C 8P 20 Tons Through 44 Tons g 7A 3C 8P g Type: — K�n Power E u� meat O erators Overhead, Bridge T e: 100 $55.79 Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $5524 7A 3C 8P Tons Through 99 Tons King Power E ui meet O erators Pavement Breaker $51.07 7A 3C 8P g Crane $5475 7A 3C 8P Kin Power Equipment ment Operators Pile Driver (other Than C — Mount) 4 King Power E ui ment O erators Plant Oiler- Asphalt; Crusher $54.33 7A 3C 8P S King Power EcuDment Operators Posthole Digger, Mechanical $5197 7A 3C 8P King Power Equipment Operators Power Plant $51.97 7A 3C 8P King' Power Ec�uiprrent Operators Pumps - Water $5197 7A 3C 813 -King Power Equipment Operators Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P King Power E uiQment Operators Quick Tower- No Cab, Under $51.97 7A 3C 8P F 100 Feet In Height Based To Boom King Power E ui meat O erators Remote Control Operator On $55.24 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Eqi meat Operators Rigger And Bellman $51.97 7A 3C 8P King Power Equipment Operators Rollagon $55.24 7A 3C 8P King PoweE Equipment Operators Roller, Other Than Plant Mix $51.97 7A 3C 8P King Power E ui ment Operators Roller, Plant Mix Or Multi-lift $54.33 7A 3C . 8P Materials King Power E ui ment Operators Roto-mill, Roto-grinder $54J5 7A 3C 8P King. Power E ui ment O erators Saws - Concrete $54.33 7A 3C_ 8P King Power E ui meat ( erators Scraper, Self Propelled Under $54.75 7A 3C 8P 45 Yards F King Power Equipment O erators Scrapers - Concrete Ft Carry $54.33 7A 3C 8P All A King Power E ui ment 0 erators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment; $54.33 7A' 3C 8P King Power Eouipment Operators Shofcrete/gunite Equipment $51.97 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelooku'p.aspx 4/20/2015 Page 10 of 17 King Power Equipment Operators Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $55.24 7A 3—C $P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $55.24 7A 3—C 8P King Power Equipment Operators Spreader, Topsider Et $55.24 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $54.75 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $54.33 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $56.36 7A 3C 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $55.79 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $55.24 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver $54.33 7A 3C 8P Under 100 Tons King Power Equipment Operators Truck Mount Portable $54.75 7A 3C 8P Conveyor King Power Equipment Operators Welder $55.24 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmall Type $51.97 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $54.75 7A 3C 813 King Power Equipment Operators- Asphalt Plant Operators $55.24 7A 3C 8P Under round Sewer Et Water King Power Equipment Operators- Assistant Engineer $51.97 7A 3C 8P Underground Sewer Et Water King Power E ui ment Operators- Barrier Machine (zipper) $54.75 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Batch Plant Operator, $54.75 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $51.97 7A 3C 8P Underground Sewer Et Water _ King Power Equipment Operators- Brokk - Remote Demolition $51.97 7A 3C 8P Underground Sewer in Water Equipment King Power Equipment Operators- Brooms $51.97 7A 3C 8P Underground Sewer Et Water _ King Power Equipment Operators- Bump Cutter $54.75 7A 3C 8P Under round Sewer 4 Water https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 11of17 King Power Eouioment Operators- Cableways $55.24 7A 3C 8P Underground Sewer €t Water King Power Equipment Operators- Chipper $54.75 7A 3C AP z Underground Sewer Et Water =King Power E ui merit O eratars- Compressor $51.97 7A 3C 8P Underground Sever Et Water King Power Equipment O eratars- Concrete Pump: Truck Mount $55.24 7A 3C 8P R _ — — Under round Sewer Et Water With Boom Attachment Over 42 M; King Power E ui meat Operators- Concrete Finish Machine -laser $51:97 7A 3C 8P Underground Sewer'Ft Water Screed King Power E ui went O erators- Concrete Pump Mounted Or $54.33 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure: King Power Equipment Operators- Concrete Pump: Truck Mount $54.75 7A 3C 8P , Under round Sewer Et Water With Boom Attachment-Up To 42m King Power E ui went 0 erators- Conveyors $54.33 7A = 3C 8P Underground Sewer'Et Water King Power E ui went 0 'erators- Cranes: 20 Tons Through 44 $54.75 7A 3C 8P _. -- —P Underground Sewer E.Water Tons With Attachments King Power E ui meat O erators- Cranes: 100 Tons Through 199 $55.79 7A 3C 8P llnderround Sewer'&.Water Tons, Or 150' Of Boom (Including Jib With Attachments) King Power E ui went Operators Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P Underground Sewer Et Water Or 250' Of Boom (including Jib z' With Attachments) King Power E ui went Operators- Cranes: 45 Tons Through 99 $55.24 7A 3C 8P C — Underground Sewer Et Water Tons; Under 150' Of Boorn (including Jib With Attachments) King Power Equipment Operators- Cranes: A4rame - 10 Tons.And $51.97 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100'Tons $5636 7A 3C 8P Underground Sewer Et Water Through 199 Tons r King Power Equipment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C 8P i .— — — Under round Sewer'Et Water King Power E ui ment O erators- Cranes: Over 300 Tons Or,300' $56.92 7A 3C 8P -P Under round Sewer'a Wafer Of Boom (including Jib With Attachments) King Power E 'ui ment Operators- Cranes: Through 19 Tons With $54:33 7A 3C " 8P Underground.Sewer'&Wafer Attachments A-frame Over 10 ' Tons i King Power E ''ui merit O'erators- Crusher $54.75 7A 3C 8P i Under round Sewer ft Water King Power E ui ment�O eratars- Deck Engineer/deck Winches $54.75 7A 3C 8P Underground Sewer'Et Water (power) King Power E 'ui rrient O eratars- Derricks, On Building Work $5524 7A 3C 8P Under rounds ewer a Water King Poer,E 'ui rnent O eratars- Dozers D-9 &t Under $54'.33 7A 3C 8P _ -- Under round;Sewer'Et Water. i htt-ps://fortress.wa.gov/Ini/wagelookup/prvWagelookup.as'px 4/20/2015 Page 12 of 17 King Power Equipment Operators- Drill Oilers: Auger Type, Truck $54.33 7A 3L 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $54.75 7A 3C 8P Underground Sewer Et Water — — — King Power Equipment Operators- Elevator And Man-lift: $51.97 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell $54.75 7A 3C 8P Underground Sewer Et Water And Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $54.33 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Grade Engineer: Using Blue $54.75 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $51.97 7A 3C 8P Underground Sewer Et Water — — King Power Equipment Operators- Guardrail Punch $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $55.24 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $54.75 7A 3C 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $54.33 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $54.75 7A 3C 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $54.33 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P Underground Sewer It Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $55.79 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. $55.24 7A 3C Underground Sewer Et Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $54.75 7A 3C 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $54.33 7A 3C 8P Underground Sewer Et Water — King Power Equipment Operators- Locomotives, All $54.75 7A 3C 8P Underground Sewer Et Water — — — King Power Equipment Operators Material Transfer Device $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $55.79 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $54.33 7A 3C 8P Underground Sewer Et Water finishing — — https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 13 of 17 King Power Equipment Operators- Motor Patrol Graders, $55.24 7A 3C 8P Under rg_ound Sewer Et Water Finishing King Power Equipment Operators- Mucking Machine, Mole, $55.24 7A 3C 8P ' Underground Sewer Et Water ' Tunnel Drill, Boring, Road i Header And/or'Shield i King Power E ui ment Operators Oil Distributors, Blower $5197 7A 3C 8P Underground Sewer Et Wafter Distribution Ft Mulch Seeding Operator King Power E ui ment O erators- Outside Hoists(elevators And $54.33 7A 3C 8P Under round Sewer a Water Manlifts),'Air Tuggers,strato King Power E ui went Operators- Overhead; Bridge Type Crane: $54.75 7A 3C , 8P — — Underground Sewer Et Water 20 Tons Through 44 Tons King Power E ui rnent Operators- Overhead, Bridge Type: 100 $55.79 74: 3C 1E. Under round Sewer E Water Tons And Over King Power E`ui went Operators- Overhead, Bridge Type:45 $55.24 7A 3C 8P Under round Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $5475 7A 3C 8P _ Underground Sewer a,Water Mount) King Power Equipment Operators- Plant Oiler-Asphalt, Crusher $54.33 7A 3C 8P Under round Sewer Et Water King Power E 'ui ment O'erators- Posthole Digger, Mechanical $51.97 7A 3C 8P x Underground Sewer iEt Water King Power E ui merit O' erators- Power Plant $51;97 7A 3C 8P — — Underground.Sewer'Et Water King Power Equipment Operators- Pumps - Water $51.97 7A 3C ' 8P i Underground Sewer.Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P Underground Sewer:,Et Water — — z N Cab, Under, 51.9 7 7A 3C 8P r irk Tower_ o C King . Power Egu,Carnent Operato s- Qu - $ — — Underground Sewer a Water 100 Feet In Height Based To Boom - 55.24 7A 3 G 8P r n trot Operator 0 r Remote Con — King Power Egu�ment Operators- p $ — Underground Sewer': Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellrnan $51.97 7A 3C 8P Under round Sewer a Water l 7Aerato 3C 8PKing Power E ui wentO Underground Sewer Ex Water 'King Power E ui ment Operators- Roller, Other Than Plant Mix $51.97 7A 3C 8P Under round Sewer Et iWater t Mix Or Multi-lift 54.33 7A 3C 8P ;.King Power E ui ment_Operators- Roller, Plan.. . . $ _ — — T Under round Sewer<&Water Materials -King Power Equipment O erators- Roto-mill, Roto-grinder $54.75 i 17A 3C 8P Un' er round Sewer EtVater - King Power E ui menfi O erators- Saws - Concrete $54.33 7A 3C 8P Under 'round Sewer Wafter .Kin Power 'ui rnent O erators- Scraper, Self Propelled Under $54.75 7A 3C 8P g — UnderroundSewer�t Water 45 Yards King $54.33 7A 3C 8P j { 4/20/2015 https://fortress.wa,gov/Ini/wagelookup/prvWagelookup.aspx Page 14 of 17 Power Equipment Operators- Scrapers - Concrete Et Carry Underground Sewer Et Water All King Power Equipment Operators- Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $55.24 7A 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Underground Sewer Ex Water Tractors: 15 To 30 Metric Tons _ King Power Equipment Operators- Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons "King Power Equipment Operators- Slipform Pavers $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $55.24 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $56.36 7A 3C 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $55.79 7A 3C 8P Under round Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $55.24 7A 3C 8P Under round Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Q erators- Truck Crane Oiler/driver $54.33 7A 3C 8P Underground Sewer Et Water Under 100 Tons King Power Equipment Operators- Truck Mount Portable $54.75 7A 3C 8P Underground Sewer Et Water Conveyor King Power Equipment Operators- Welder $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmall Type $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $45.75 5A 4A Trimmers https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page 15 of 17 v v King Power Line Clearance Tree Spray Person $43.38 5A 4A g Trimmers v King Power Line Clearance Tree Tree Equipment Operator $45.75 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $40.84 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Ground person $30.74 5A 4A E Trimmers King Refrigeration a Air Journey Level $73.51 6Z 1G Conditionin Mechanics F King Residential Brick Masan Journey Level $51.32 5A 1M King Residential Car enters Journey Level $28.20 1 King Residential Cement.Masons Journey Level $22.64 1 King Residential Prygall Journey Level $40.14 5D 4C Applicators King Residential Dr wall Tapers Journey Level $5.2.37 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $37.30 7L 1 H King Residential Insulation Journey.Level $26.28 1 Aw-ticators King Residential Laborers Journey Level $23.03 i King Residential Marble Setters Journey Level $24:09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters King ,'Residentia[7 Ref ri station Air Journey Level $73.51 6Z 1 G Conditionin Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $42.58 7F 1 R i Workers King Residential Soft Floor Lavers Journey Level $42.41 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 2R ire Protection} King Residential Stone Masons Journey Level $51.32 5A 1M King Residential Terrazzo Workers Journey Level $46.96 5A 1M s King Residential Terrazzo/Tice Journey Level $21.46 i Fine rKing Residential Tile.Setters Journey Level $2517 King Roofers Journey Level $4571 5A 3H - -- King Roofers Using Irritable Bituminous $48.71 5A 3H i Materials King Sheet Metal Workers Journey Level (Field or Shop) $70.37 7F 1 E King Ship buildan Shi Re air Boilermaker $39.82 7M 1 H King Shi buildin Shi Re air Carpenter, $39.24 7T 2B King Shi buikdin �Ship Re air Electrician $40.16 7T 4B 3 xKing Shi 'buildin Shi Re air Heat in Frost Insulator $61.18 5J 1S King Shi buikdin F'Shi Re air Laborer $40.19 7T 4B King Shi buikdin 'Shi Re air Machinist $40.18 7T 46 King Shi buitdin E Shi Re air Operator $40.11 7T- 4B https.//fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/20/2015 Page 16 of 17 King Shipbuilding Et Ship Repair Painter $40.16 7T 4B ..................... King Shipbuilding, Et Ship Repair Pipefitter $40.11 7T 4B King Shipbuilding Et Ship Repair Rigger $40.19 7T 4B King Shipbuilding Et, Ship Repair Sheet Metal $40.14 7T 4B King Shipbuilding EL Ship Repair Shipfitter $40.19 7T 4B King Shipbuilding Et Ship Repair Trucker $40.03 7T 4B King Shipbuilding Et Ship Repair Warehouse $40.08 7T 4B ................ King Shipbuilding Et Ship Repair Welder/Burner $40.19 7T 4B King Sign Makers Et Installers Sign Installer $22.92 1 (Electrical) King Sign Makers Et Installers Sign Maker $21.36 1 (Electrical) King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical) King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electr!La) King Soft Floor Layers Journey Level $42.41 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters ff!Le Journey Level $69.74 5C ix Protec coon King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $51.32 5A 1M King Street And Parking _Lot Journey Level $19.09 1 Sweeper Workers King Surveyors_ Assistant Construction Site $54.33 7A 3C 8P Surveyor King Surveyors Chainman $53.81 7A 3C 8P King Survevors Construction Site Surveyor $55.24 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $36.96 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20.49 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $35.40 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.96 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer 11 $36.19 5A 2B Outside King Telephone Line Construction - Telephone Equipment $36.96 5A 2B Outside Operator (Heavy) I King Telephone Line Construction - Telephone Equipment $34.34 5A 2B Outside Operator (Light) King Telephone Line Construction - Telephone Lineperson $34.34 5A 2B Outside King Telephone Line Construction - Television Groundperson $19.45 5A 2B Outside https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/20/2015 Page'17 of 17 King Telephone Line Construction - Television $25:89 5A 2B Outside Lineperson/Installer i King Telephone Line Construction - Television System Technician $30.97 5A 2B Outside King Tele hone Line Construction - Television Technician $27.77 5A 2B Outside l King `Telephone Line Construction Tree Trimmer $34.34 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A 1M q: King Tile Setters Journey.Level $21.65 1 King Tile Marble a Terrazzo Finisher $37.79 5A 1 B Finishers King Traffic Control Stri ers Journey Level $4311 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $49.85 5D 3A 8L a WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $49.01 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck a Trailer $4985 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $49.01 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $49.85 5D 3A 8L - - Council 28) i King Truck Drivers Transit Mixer $43.23 1 King Well Drillers a lrri ation Pump' Irrigation Pump Installer $1771 1 Installers` King Wel Drillers a Irrigation Pump Oiler $12.97 1 Installers' King Well Drillers a Irrigation Pump; Well Driller $18.00 1 Installers https://fortress.wa.gov/1ni,/wageIookup/prvWagelopkup.aspx 4/20/2015 Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 Overtime Codes Overtime calculations are based on the hourly rate actually,paid to the worker.On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. AL.I. HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR.FORTY (40) HOUJRS PER WEEK SHALL. BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of'wage. C. The first two(2) hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek clay and the first eight(8)hours worked the next day after either\vorkweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. I:. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday. and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two(2) hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10) hours worked on Saturdays and the first ten (10)hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wvage. J. The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of'wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of'wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key-Effective 3-4-2015 thru 9-1-2015 1. K All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage.All.hours worked on Sundays and holidays shall be paid:at double the hourly rate of wage. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten(10)hours,on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half tunes the hourly rate of wage. All hours worked.in excess of ten(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and. one-half tirr'es the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. "I he first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday, shall be paid at one and one-half times the hourly rate of wage. All hours worked; on holidays and all other overtime hours worked, except Labor bay, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. [J. All hours worked on Saturdays shall be,paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving;Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first,,'twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12)hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage.When holiday falls Oil Saturday or Sunday, the day before Saturday,Friday,and the day,after Sunday,Monday,shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per;day(10 hours per day fora 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate rom work without prior approval on a scheduled workday during of wage; (except for employees who are absent f the workweek shall be paid at the straight-time'rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or`40 hours during that workweek.)All,,hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 . v Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 2. AL,L, HOURS WORKED IN EXCESS OF FIGHT (8) HOURS PER DAY OR FORTY (40) HOI_iRS PER WEEK SHALL BE PAID AT ONE,AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.,. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of Nvage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-halftimes the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. 0. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked alter ten shall be paid at double the hourly,rate of wage.The first eight(8)hours worked on the fifth day shall be paid at one and one-halftimes the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. AL.L YOURS WORKI11.) IN EXCESS O1F 1:IGIIT (8) 1 IOURS PFR DAY OR FORTY (40) 1lOL)RS PL;R Wk'I K SlJALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATF_.OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through [Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate. Flours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 Benefit Code Key—Effective 3-4-2015'thru 9-1-2015 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)'hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall he paid at one and one-half times the hourly rate of wage. All work;per formed after 6:00 pm Saturday to 5:00`am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours of an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a'break of eight(8)hours or more. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays,shall be paid atone and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be,paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two titnes'the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times;the regular rate of pay: L All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five', lay work week(Monday through Friday,)or a four day-ten hour work wee l;(Tuesday through Friday,)then Saturday maybe worked as a voluntary make-up day at the straight time rate. However,Saturday shall not be utilized as a make-up day when a holiday falls an Friday.All hours worked Monday through Saturday over twelve(12)hours and all hours� orked on Sundays and holidays shall be paid at double the hourly rate of wage: 4. ALL HOURS WORKED IN EXCESS OF EIGIIT (8) HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID ATONE AND ONE-HALF TIMES THE I10URLY RATE Oh WAGE. A. All hours worked in excess of eight(8)hours'per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. B. A11 hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday, the first four(4)hours of overtime after eight(8)hours of straight time work shall be paid atone and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established. On a four (4) day"ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through,Friday,the first two(2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay.'On Saturday,the first twelve(12)hours of work shall be paid at one and one half(1-1/2)tunes the straight time rate of pay,except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. 4 Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 4. D. All hours worked in excess ofeight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturday. Sundays and holidays shall be paid at double the hourly rate ofpay. Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines,switching stations, regulating,capacitor stations.generating plants,industrial plants,associated installations and substations,except those substations whose primary function is to feed a distribution system,will be paid overtime under the following rates: The first two(2)hours after eight(8)regular hours Monday through Friday of overtime on a regular workday,shall be paid at one and one-half times the hourly rate of�yage. All hours in excess of ten(10)hours will be at two(2) times the hourly rate of wage.The first eight(8)hours worked on Saturday will be paid at one and one-half(1-1%2) times the hourly rate of wage.All hours worked in excess of eight(8)hours on Saturday,and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized,shall be paid at the double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of'«age.All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of'wage. On a four-day,ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. "The Monday or Friday not utilized in the normal four-day,ten hour work week, and Saturday shall be paid at one and one half(1'/z)times the regular shift rate for the first eight(8)hours. All other hours worked Monday through Saturday.and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. All hours worked between the hours of6:00 pm and 6:00 am. Monday through Saturday,shall he paid at a premium rate of 20%over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half ti mes the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Holidav Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day. I.,abor Day. Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day. Labor Day, Thanksgiving Day. the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day. Labor I)ay. 'Thanksgiving 1)ay, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). 11. Holidays:New Year's Day,Memorial Day, Independence Day.Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). 1. Holidays: New Year's Day, Memorial Day. Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. I-lolidays: New Year's Day, Memorial Day, Independence Day. "Thanksgiving Day. I'riday after Thanksgiving Da,,. Christmas Eve Day,And Christmas Day(7). 5 Benefit Code Key Effective 3-4-2015 thru 9-1-2015 5. K. Holidays:`New Year's Day, Presidents' Day. Memorial Day, Independence Day, Labor Day; Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). holidays: New Year's Day, Martin I:.,uther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, .Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday Alter"I'han]<sgiving Day, the Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The I`ollowing Monday Shall Be Considered As A Holiday. Q. Paid Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day, and Christmas Day(6). R: Paid holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 I/2). S. Paid Holidays:;New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday A ter Thanksgiving Day, Christmas Day, And The Day Before,Or Alter Christmas (9) Z. Holidays: New Year's Day, Memorial Day, Independence Day; Labor Day, Veterans Day, Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day:(8)... Holiday Codes'Continued 6. A. Paid Holidays New Year's .Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's'Day, Presidents Day, Memorial Day, Independence Day,Labor 'Thanksgiving Day,'Day.After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day.(9` /2). G. Paid Holidays:New Y ear's Day,'Martin Luther King Jr.Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas`Day,And Christmas Eve Day(I I). L.I. Paid, Holidays: New Years Day, New Year's Eve Day,"Memorial Day, Independence Day, Labor Day, Thanksgiving Day, 'Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). 1. Paid t olidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day;Friday After Thanksgiving Day,And Christmas Day(7). T. Paid holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Davy, Thanksgiving Day, The Friday After "Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9). 6 Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 6. Z. Holidays:New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After `Thanksgiving Day, And Christmas Day (8). Any holiday Which Falls On A Sunday Shall Be Observed As A holiday On'The 1�,'ollowing Monday. If any of the listed holidays falls on a Saturday,the preceding Friday,shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day. Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday, which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday, which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Year's Day, Martin I..,uther King Jr., Day. Memorial Day, Independence Day, I_,abor Day. Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on'a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, 'Thanksgiving I:)ay, the l ridgy after 'Thanksgiving I:)ay, And Christmas I)ay (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday alter Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Iolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, 'Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day(8). Any holiday which Palls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday, shall be observed as a holiday on the preceding Friday. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after"Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the followin M g onday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays: New Year's Day.President's Day, Independence Day, Memorial Day, Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 7 Benefit Code Key—Effective,374.-2015 thru 9=1-2015 T. "1{. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which,falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays:New Year's Day,Memorial Day, Labor Day,Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day,And.Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on'the following Monday.`Any holiday which falls on a.Saturday shall be observed as a holiday on the Preceding Friday. M. Paid Holidays: New Year's Day, The Day after or,before New Year's Day, President's Day, .Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day after.or.'before Christmas Day 10). Any holiday which falls on a Sunday shall be observed' as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday`on the preceding Friday. N. Holidays New Year's Day, Memorial'Day, independence Day, Labor Day, Thanksgiving Day, the Friday after "Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after "Thanksgiving Day, And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day., Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on aSunday shall be observed as a holiday on the following'Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall he a regular workday ' R. Paid I-Iolidays:New Year's Day,the day after or before New Year's Day,President's Day, Memorial Day, ' Independence Day,Labor Day,Thanksgiving Ddy,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday. If any of the listed holidays;falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated acco►d ngly. S. Paid I Ioldays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Phanksgiving Day,Christmas Day;The Day After Christmas,And A Floating holiday(9). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. Paid i Iolidays:New Year's Day,The Day After Or.Before New Year's Day,President's Day,Memorial Day, independence Day,I.,abor Day,Thanksgiving Day,The Friday After Thanksgiving Day,'Christmas Day,and The Day After Or Before Christmas Day. (10).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding.ridgy. Note Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50°To 100'-$2.00 Pei-Foot`for Each Foot Over 50 Feet Over 100'To 150'-$3.00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4.00 per Foot for Each-Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet Benefit Code Key—Effective 3-4-2015 thru 9-1-2015 8. C. In addition to the hourly wage and fringe benefits.the following depth premiums apply to depths of fifty feet or more: Over 50' To 100'-$1.00 per Foot for Each Foot Over 50 Feet Over l 00'To 150'-$1.50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Toot for Each Foot Over 150 Feet Over 200'-Divers Mav Name Their Own Price D. Workers working xvith supplied air on hazmat projects receive an additional $1.00 per hour. L,. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B:$0.50,And Level C:$0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A&13: %1.00,Levels C&D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00. Level 13:$0.75. Level C: $0.50.And Level D:$0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit: $2.00,Class B Suit: $1.50,Class C Suit:$1.00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. R. Effective August 31,2012--A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A'Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle. and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington.Oregon, Montana,or Idaho.These classifications are only effective on or after August 31,2012. S. E11'ective August 31,2012--A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where sho"vn on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon, Montana,or Idaho.This classification is only effective on or after August 31,2012. T. Effective August 31,2012—A'Traffic Control Laborer performs the setup, maintenance and removal ofall temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho."Phis classification is only effective on or after August 31,2012. 9 I REQUEST FOR MAYOR'S SIGNATURE i •. P r t c ri Ci on lb PO er KENT' I , � — I Routing Information (ALL REQUESTS MUST FIRST BE ROUT THROUGH",THE LAW EPAR Approved D r r ina or: Scott Schroeder Phone Oriinator5675 . S' nt: �5 Date Re' uire'd ���. rn Si ned ,Document to NancyYosNi ake ' Co'ntract'Termina'tion'`Date:30:d s D R NAME: Date Finlance' Notified ur S. Tr y ee :Servrce; LLC (Only required on'contrac is /r si 1000Oand over.or on anGra'nt E' F COUNCIL APPROVh►L.: Date Risk an Notifie�.d 1/,� :I Re re Oh' standard Contracts/'A reerrients thi Document'been ;sp,ecificall Account `Number:' ' e 44 74606nn e ' 1 f I f E planation of Document: Co tractor. shall `remov,e 201cottonwood trees located by a stream channe riea'r 1!1509 217th St , h a e.in' th'e,drainage trait f: , 1 f f I tl f , Al/ Contracts Must BeRoutedThrough The Law.Deparfinent{ r I 1 a � cmpleted by the Law Depart n 4 ued I I f' I I s va�l of Law.°Dept: MA e Comments:' r I I I, I it I 1 i I , f . f For arded to Mayor. 1 I r �I Shaded Areas.lTo Be Comp/eted:By,.4dmnisfration S a III I , t m n-dations and Comments z a Sltic lh 1 I t,ProcessingARequest,forMayor'�yS{gnature;docx P:1Ci it\Forms.., � 1 Documen r f I I; I ' , r;