Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW15-184 - Original - Buckley Nursery Company, Inc - Contract - 5/14/2015
to i. . em ecords . KEN T --- Document WASHING7ON CONTRACT COVER SHEET This is to 'be completed by the Contract Manager prior to submission to City Clerks Office.;All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Buckley Nursery Company, Inc. Vendor Number: JD Edwards Number Contract Number: 1 '� This is assigned by City Clerk's Office Project Name: Upper Mill Creek Dam Project/Alvin's Pond Description: ❑ Interlocal Agreement. El Change`Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 5/14/15 Termination Date: 12/31/1.5 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Matt Knox Department: Engineering Contract Amount: $9,356.78 Approval Authority: (CIRCLE ONE)(Department Director . Mayor City Council Detail: (i.e. address, location, parcel number, tax id,i etc.): Contractors will remove the non-native trees at ,Upper Mill Creek Darn Mitigation at Alvin's Pond and treat the re-sprouted plants with herbicide to prevent regrowth. As of: 08/27/14 ENT -WASHINGTON - PUBLIC WORKS AGREEMENT between City of Kent and Buckley Nursery Company, Inc. THIS AGREEMENT is made by; and between the City .of Kent, a Washington municipal corporation (hereinafter.the ":City"), and Buckley Nursery Company, Inc. organized under the laws of the State of Washington, located and doing business at 16819 92nd Street East, Sumner, WA 98390, Phone: (253) 863-9563/Fax: (253) 863-1545, Contact: Dave Hemmings (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Contractors will remove the non-native trees at Upper Mill Creek Dam Mitigation at Alvin's Pond and treat the re-sprouted plants with herbicide to prevent regrowth. For a description, see the Contractor's Scope of Work which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance With generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. IY. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by December 31, 2015. III. COMPENSATION. The City shall pay the Contractor'a total amount not to exceed Nine Thousand, Three Hundered Fifty Six Dollars and seventy eight cents ($9,356.78), including any .applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. i The City shall pay the Contractor.fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine isz appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed 'below and throughout this Agreement. PUBLIC WORKS AGREEMENT - 1 (Under$I OK and No Performance Bond) t x Y a A. No Payment and Performance Bond. , Because this contract, including applicable sales tax, is less than $10,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing` the City a payment and performance bond, has elected to have the City retain the final fifty percent (50%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whi"chever, is later. B. Defective or Unauthorized Work. The City ,reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by;contract or otherwise, and Contractor shall be liable to the City for a'ny,additional costs incurred by the City. "Additional costs shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work,; including any Additional Costs, from`any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims: THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE'A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED :BY ;CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IVN INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance' with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability ,to control and direct 'the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and:`pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established'and independent business that is eligible fora business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or theContractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agrreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies,.including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Under$1OK and No Performance Bond) t � i a E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. i D. The Contractor's persistent disregard of federal, state or local laws, rules or ` regulations. [ E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. f F. The Contractor's breach of any portion of this Agreement. I If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to E commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code well as an other applicable prevailing wage rate provisions. The latest of Washington, as Y Pp p 9 g_ prevailing wage rate revision issued by the Department of Labor and Industries is attached. f VII. CHANGES. The City may issue a-written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary,. Contractor must submit a written change order request to the person listed in the notice provision 'section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have _known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City l PUBLIC WORKS AGREEMENT - 3' (Under$I OK and No Performance Bond) swill determine the equitable adjustment as it deems appropriate. The Contractor.shalt proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in' the way this section provides. A change order that is accepted by Contractor, as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs., including costs of delays related to any work, either covered or affected by the change. VIII. 'CLAIMS If the. Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or, events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or, otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 1i The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The'City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that .a claim is valid, the City will adjust payment PUBLIC WORKS AGREEMENT - 4 (Under$1OK and No Performance Bond) L A for work or time by an eq.uitab1e adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete . Protested Work. In spiteY of an claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely,waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX LIMITATION OF ACTIONS. -.CONTRACTOR MUST, IN -ANY -EVENT FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR'SUIT SHALL BE FOREVER BARRED. THI'S SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LLIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials; (1)' when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or 'discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overallwork. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City-of the defect. If the Contractor does not accomplish the corrections (within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City .in order to accomplish the correction. XI. DISCRIMINATION. In the hiringof employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental,'or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor'shall execute the attached City of Kent' Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2,` and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses' or suits, including' all legal costs and attorney fees, arising out of or In connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. i PUBLIC WORKS AGREEMENT - 5 (Under$10K and No Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER'ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, ;including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration' or' termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the 'contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code,' the City requires its contractors and consultants' to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants Iand agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or,options, and the same shall be and remain i.n full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the 'parties' performance of this PUBLIC WORKS AGREEMENT - 6 (Under$10K and No Performance Bond) t 'Agreement, the exclusive means of resolving that dispute. difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington,` unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the, parties' performance of this Agreement, each party .shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written' notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning 'party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly' authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements' shall not be effective or be construed as entering into or ,forming a Ipart of or altering in any manner this Agreement. ' All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and Municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the 'performance of those operations. I. City Business License Required.. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city, of Kent business License pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7' (Under$10K and No Performance Bond) y J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective`on the last date entered below. CONTRACTOR: CIT F 'KEN T: By: B V. ¢ (si atu ) ignat re) Print Name: will am D. Hem inas II Print Name: Timothy J LaPorte, P.E. Its VP Its: P` lic -orks Director (title) DATE: 5/8�15 DATE NOTICES;TO BE SENT TO: NOTICES,TO BE SENT TO: CONTRACTOR: CITY OF KENT: Dave Hemmings Timothy J. LaPorte, P.E. Buckley Nursery Company, Inc. City of Kent 16819 92d Street East 220 Fourth Avenue South Sumner, WA 98390 Kent, WA 98032 (253) 863-9563 (telephone) (253) 856-5500 (telephone) (253) 863-1545 (facsimile) (253) 856-6500 (facsimile); [In this field,you may enter the electronic filepath where the contract has been saved] PUBLIC WORKS'AGREEMENT 8 (Under$1OK and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to `conform to Federal and State laws regarding equal` opportunity. As such all contractors,' subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the Cit 's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or 'supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be-valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it_will be r considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as.follows:, 1. I .have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex race color national origin., a e or the presence of all sensor mental or physical 9 p_ Y, P Y disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before, acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, agree to fulfill the five requirements referenced above. By: William H min s II For: Buckley Nursery Co. Title: VP', Date: 5/'8/1 5 EEO COMPLIANCE DOCUMENTS_- 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if`holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Worksi Departments,to assume the following duties for their respective departments: 1. Ensurin'4 that contractors, subcontractors., consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 t CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT I This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of. Buckley Nursery 'Co.' Company, hereby `acknowledge and declare that the before-mentioned company was the prime Upper Mill , Creek :Dam Mitigatio contractor for the Agreement known as at Alvin's Pond that was entered into on the (date), between the firm I represent 'and', the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City Of Kent Administrative Policy 1.2 and the Declaration City, of Kent Equal Employment Opportunity Policy:,that was part of the before -mentioned Agreement. By: William D. Hemmings II For: Buckley Nurg ^n Title: VP - -- Date i I 'i ,I I I I I EEO COMPLIANCE DOCUMENTS - 3 I I :I EXHIBIT A Buck[Ey te INCO 16819-_92nd Street East e Sumner,WA 98390-8154 Phone(253)863-9563 FAX(253)863-1645 April 17,2015 REVISED PROPOSAL#2 PER SITE WALK WITH CITY CITY OF KENT ALVIN'S POND BLACKBERRY REMOVAL ADDENDUMS ACKNOWLEDGED 0 ITEM DESCRIPTION _Y CALC; PRICE TOTAL MOBILIZATION LS $L750.00 Cutting Blackberries 1 Acre $2,925,00 $2,925.00 Cutting/Chipping/Stamp Removal of Holly&Hawthorn LS $1,810,00 Site Trash Removal&Disposal" Calculated $500.00 Herbicide Application 1 Acre $2,060.00 $2,060.00 TOTAL $8,545.00 NOTES: - -Mowing and Herbicide Application Limits to be staked out by City - Posting of Herbicide Application to be by BNG -Herbicide Application to be 14 to 21 days after regrowth of blackberry canes from initial mowing and cutting operations - Bid based on working hours 7:00 AM to 3:30 PM,Monday through Friday. Price reflects one herbicide application no more then 1 acre in area Equipment access for mowing is based off of the use of site access from 108th Av SE - Per the City's directive at site walk,all Blackberry cutting and chipping operations can remain on site, There is no longer the requirement of hauling off site the mulch or chipping debris Should site require Trash Removal,bid reflects the use of Section 1-09.6 of the WSDOT Standard Specification Bid based on equipment access throughout entire site(Equipment:TL•-150 Tracked Skidsteer&mine Excay.) EXCLUSIONS: PERMITS,BONDING AND ADDITIONAL INSURANCE ABOVE 4000,000 AGGREGATE Insurance'Waiver of Subrogation'&'Primary and Non-Contributory',if required add$165.00-p/each p/entity Removal of concrete,asphalt,trash,abandon vehicles,contaminated soils or petrolium based containers Survey Property limits Removal/Repairs to existing fences Mud&Dust control Bond Fees Temporary Construction Access Road Sales Tax/Use Tax Traffic/Pedestrian Control/Barricades/Temp Fencing TESC measures HVF Installation Haul away of motorized equipment or metal implements Estimator Dave Hemmings An Equal Opportunity Employer EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the,work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute'form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual Iiability coverage. 2. Commercial General Liabitlty insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance 'shall be endorsed to provide the Aggregate Per Project Endorsement 'ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or'a substitute endorsement providing equivalent coverage. 3 Workers' Compensation coverage,as required by the Industrial Insurance laws of the State of=Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of 1 000 000,per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 'products-completed operations aggregate limit. t EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional:Liability) as respects,work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additionaiiiI insured shall be attached to the Certificate of Insurance. The City reserves the right to 'receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall aiso contain a clause statin that coverage shall a se aratel to each 9ap ply separately insured against whom claim is made or suit is brought, except with' respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than AVII." E. Verification of Coverage Contractor shall furnish the City with original`certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance. requirements as stated herein for the Contractor. AC�® CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY)5ATEZo15 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE'AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATEOF 'INSPRANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)`must be endorsed. If SUBROGATION 1S WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Cargl Danell PLC Insurance, LLC PHONE (425)712-3664 AAiC No:(425)712-3786 4211` Alderwood Mall Blvd, #210 E=MAILADDRESS:carol@plcins.com INSURERS AFFORDING COVERAGE NAIC# Lynnwood WA 98036 INSURERA:American EConoIR Ins. CO. A XV INSURED INSURER B nerican States Insurance Cg#p A XV Buckley Nursery Company, Inc. INSURER C 16819 - 92nd Street East INSURER D INSURER E Sumner WA 9,8�9 0 INS'RER F. COVERAGES CERTIFICATE NUMBER:15/16 REVISION NUMBER: TH(S IS TO CERTIFY THAT THE PQLI�IES QF'INSYJ 76E`LISTED BEI,QW HAVE BEEN ISSIjEQ TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INS�JRANCE AFFORDED BY THE POLICIES DESCRIBED HE IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS: 1NSR ADDL BR' "" T° POLICY FF .\POLICY EXP LTR TYPE OF INSURANCE POLICYNUMBER MM/DD/YYYY MM/DD/YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TORENTEO PREMISES Ea occurrence $ 0,000 A CLAIMS-MADE X❑OCCUR X lr1692761-3 /1/2015 /1/2016 MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY X PRO- LOC $ AUTOMOBILE LIABILITY `CQMBINED SINGLE LIMIT Ea accident 1,000,000 B ANY AUTO BODILY INJURY(Per person)' $ ALL OWNED X' SCHEDULED X 1C1692761-3 /1/2015 /1/2016 BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PRQPERTY DAMAGE $ X HIRED AUTOS x AUTOS (Per accident) $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 4,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $ 4,000,000 B X 10,00 X' Q1SU429989-3 /1/2015 /1/2016 DED RETENTION$ $ A JBEDC WC STATU- OTH- XXX EMPLOYERS'LIABILITY Y/N ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? N/A 1CI692761-3 /1/2015 /1/2016 ` (Mandatory in NH) E,L..DISEASE-EA EMPLOYE $ 1 000 000 If:yes,describe finder A Stop Gap ' DESCRIPTION OF OPERATIONS below P P E.L.DISEASE-POLICY LIMIT $ 2,000(000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) Re:, Upper Mill Creek Dam Mitigation at Alvin's Pond The City of Kent is added as Additional Insured per attached CG7680 1:002, CG8672 1002 CA7110 0307, ,And CU2294 0210. 'Coverage is Primary and Non-Contributory.Per Project Aggregate applies per attached-CG2503 0509 CERTIFICATE HOLDER CANCELLATION nyoshitake@kentwa gov SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 'City of Kent Attn: Nancy Yoshitake 400 We S t Gowe AUTHORIZED REPRESENTATIVE Kent, WA 98032' Mike Rucker/MONICA ' ACORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. INR025 t9n1r1nsi n1 Thu Ar-npn noma anel'Innn am ranicfornel marke of Ornior1 i REPRINTED ROM THE ARCHIVE.THE f3RI MNALTRANSACTIONMAY INGtUDEAPDITLqNALFORMS POLICY NUMBER:01C1692761-3 iL,iber y CG 76 8.0 10 02 Nor���est, THIS ENDORSEMENT CHANGES` THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED PRIMARY COVERAGE This endorsement modifies Insurance provided under the following: GQMMERCIAI_ GENERA. LIABILITY COV.,ERAGE PART SCHEDULE Name of"person or OrganizMlon: Any;person or Q:pgan zat.ion for w„h.om you are rec-nixed by written contract, agreement, :or peal It o provide a primary and non- contributory additional. insured endorsement, (If no;entry`appears above, information required to complete this endorsement will be shown`in the Declarations as applicable to.this endorsement.) SECTION '11 WHO IS AN INSURED is amended you. Coverage shall, be limited to the extent of your to include as an additional insured the person or negligence or fault according to the applicable pn'nci- organization shown in the Schedule suhject to the Ales of comparative fault. following provisions: The insurance provided will not exceed the lesser of: 1. The additional insured is an insured bot only for liability directly resulting from: a. The coverage and/or limits of this policy,.or a. your ongoing operations.-for the additional in- b.. The`coverage and/or limits required by the sured whether the wont;is performed by you contract, agreement or permit. or for you; or With respect to the insurance afforded the additional t b. the general supervision of,your ongoing op- insured, paragraph'4. of SECTION IV COMME - . era#ions by the additional"lrisured.. CIAL .GENERAL LIABILITY CONDITIONS is. de- 2. This insurance does not apply to;: leted and replaced by the following: a. "B.odiiy',injury" or "property damage" arising 4. Other.insurance out.of any.act or omission of; or tor defects 1. a. This: insurance" is primary and rtoncon#rib- in design furnished by or for, the additional utory; and our obligations are.not affected by insured or any other insurance where the additional ln- b "Bodily injury" or "property damage". in cured is the Named Insured, whether pri- eluded within the "products-completed open many, excess, contingent, or on any other atons hazard," basis;however, the'defense of any claim or "suit" must be tendered as soon as practi- A person's� or organization% status as an.additional cable. to all other insurers which potentially Insured under this.endorsement ends: when your op7 provide insurance for such claim or Gsult". eratiorts for' 11at insured are completed.. b. This additional provision applies only to the additional insured shown in the Schedule, No coverage.will be. rovided if,in the absence of this g P and the coverage provided by this endorse- endorsement, no'liability would be imposed by law on merit. Gd 76 80 to 02 EP AFP-META2-16-PRINTOa1-2229,0153.1 .tl i ty CG 66 72 10 02 .. �mttictratfiu*YliitltLsttowm ,. POLICY NUMBER: OIC1692761-3 THIS ISNOORSEMEW CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED OWNER$, LESSEES OR CONTRACTORS COMPLETED OPERATIONS This en0orsement modifies insurance prouided under the following, COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Person or Organization: Any parson or org, for ; wham you are required by written contract, agreement or permit to aside completed operations coverage. Locaflon and Description of Completed Operation%- Your work on all' jobs at all, locations f:or the named gers+an or organilaticn. Additional Premium':: (if no,entry appears above, information required to complete this endorsernent will be shown in the Declarations as,spplie'able to this endorsement,) j SECTION tl --'ENO IS AN NSURED is amended to include as an insurad the person or organization shown in the Schedule, but only to the extent you are held liable dve to "your Work" at the location designated and described in the schedule of this endorsement for that insured and included In the "product-completed operations hazard". NAM NNW Includes Copyrighted Information of 180 Properties, Inc., -. 2001 with permission NOW GG 8 1210 02 EP ,. r�r:.n7.carniTi�m_�ra_nnr,�.0 POLICY NUMBER: 01C1692761-3 COMMERCIAL,GIENERAL LIABILITY CQ 25 03 05 00 THIS ENDORSEMENT OHANGES THE POLICY, PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJE GENERA.L AGGREGATE. LIMIT: This enrtorsement modifies'insurance provided under the following.- COMMERCIAL GENERAL LIABILITY COVERAQE PART WkEIDULE- De 1'led Consfi'Uction rcfect(s). EACH OF Y.OU1Z ,CONSTRUCTION PROJECTS LOCATED AWAY FROM PREMSSMS OWNED ,BY QR RENTED TO YOU e larat'o Information required to com.lete this Soheduie,if not sh+awn above,will be shown(n the D c ns. I A. For all suds which.;the insured becomes 1egally 3. Any patlertts made under Coverage A for obligated to pay as damages; paused damages or, under Coverage C for medical I� occurrences cinder Section f — Coverage A,. and expenses shall reduce the l es[cgnated far all medical expenses caused by accidents under Construction Project General Aggregate Litt Section f - Coverage C, which Gan be attributed for'that designated construction project'. Bach only to ongoing operations at a single de$ignated payments shall not reduce the General , construction project shown in the Schedule above: Aggregate Limit shown in the Qeclarations nvr >` A separate; Designated Construction Project shall they reduce any. other Designated General Aggregate re ate Limit applies to each Construction Project General Aggregate Limit designatedanstructian project, and that limit is for any other designated construction project equal to the amount of. the General Aggregate sh4�vn in the Schedule above. Lirit-shown(n the Qeclaratotls. The (units shown in the Declarations for Each A i g Z The [designated'Construction Project General Occurrence, Damage To Pfemises Ron#ed. To Aggregate Limit is the most we will pay for the You and Medical B(pense continue tq apply• all damages under Coverage A except However, instead of being subject to the SUM of; . u a General Aggregate Limit shownn tl e damages because of bodily 1nlury or property Qeclaratrons, ,f fl such limits ►((( be subject to tha damage included in the products-completed operations h p applicable besignated Construction project azard, and for medioal ex eases general Aggregate Limit, Dow== under.Coverage C regardless of the number of: �r insureds; fa Claims made or suits"brought;or C, or j or organizations making Maims or .�. bringing!suits." I C 25 03 tf5 g Copyright,Insurance Services Office, Inc.,2008 Page 1 of 2 B. Rr all sums which the Insured becomes legally C. When coverage for liability arising out of the obligated to pay as damages caused by products-completed operations hazard" is xoccurrences" under Section I -- Coverage A, and provi0ed, any payments for damages because of for all medical expenses caused by ascldents under "bodily injury' or"property damage" Included in the Section 117 Coverage C,which cannot be attributed "`products-completed operations hazard"will reduce only to ongoing operations at a single designated the Products-completed Operations Aggregate construction project shown in the 89hedule above: Limit, and not reduce:the General Aggregate Limit 1. Any payments made under Coverage A for nor the Designated Construction Project General damages or under Coverage;C for medical Aggregate Limit. expenses shall reduce the amount available C. if the applicable designated construction project under the General Aggregate- Limit or the has been abandoned, delayed, or abandoned and Products-completed Operations Aggregate then restarted, ;or if the authorized contractng- Limit,whichever is applicable;and parties deviate from plans, blueprints, designs, . Such payments shall not reduce any specifloations or,timetables, the project will still be Designated Construction project General deemed to be the same construction project. Aggregate Limit, E. The provisions of Section 8i11Limits Of Insurance not otherwise modified by this endorsement shall oontinve to_apply`as stipulated. Page 2 of 2 Copyright,Insurance Services Office, Inc.,2008 CG 26 03 05 09 POLICY NUMBER:01C1692761-3 COMMERCIAL AUTO CA 71 10 03 07 THIS ENDORSEMENT CHANCES THE POLICY.'"PLEASE READ IT CAREFULLY, AUTO PLUS ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. EXTENDED CANCELLATION CONDITION $�ANKET ADDITIONAL INSURED Paragraph 2.b. of the CANC4LATION Common SECTION II LIABILITY COVERAGE AA, WHO Policy CQndition is replaced by the following: IS AN INSUREQ provision is amended by the addition of the following: b. 60 days before the effective date of cancellation if we cancel for any other reason., e. Any person or organization for whom you are re- quired by an "insured contract►'to provide insur- TEMPORARY SUBSTITUTE AUTO` -- PHYSICAL ance is, an "insured", subject to the following DAMAGE COVERAGE additional provisions: I} The "insured contract" must be in effect Under- paragraph C. -- CERTAIN TRAILERS, MO_ =the policy period shown in the Decla- IPMENT AND TEMPQRAFRY SUBSTITUTEBILE EQtJ , and must have been executed prior AUTOS of. SECTION. 1 - COVERED ALTOS, the to the "bodily injury" or "property damage", following is added: (2) This person or organization is an "insured" If Physical Damage coverage is provided by this Cov- only to the extent you are liable due to your erage Form, fiber you have coverage far: ongoing operations-for that insured, whether the work is performed by you or for you,and Any "auto" you do not own while used with the per only to the extent,you are held liable for an miss(on of its owner as a temporary substitute for st uacpident occurring while a covered auto' covered "auto" you own that is out of service be- is being driven by you or one of your em- cause of its breakda�,un, repair, servicing, loss" or ployees. destruction. {3 There Is no coverage provided to this person ' or, organization for 'bodily injury" to its em- OR AID PORM NAMED INSURED ployees, nor far "property darnege" to its LITY COVERAGE --• A.I. WHO SECTION'! party. pro I' AN INSURED'' provision is amended by the addition (4) dQverage for this person or Organization of the following: shall be limited to the extent of your negli- gence or fault according to the applicable d. Any business entity newly acquired or formed by principles of comparative negligence or fault. you during the policy period provided you c?wrt The defense of any claim or "suit" must be 50% Or more of the business entity and the: tendered by this person or organization as business entity is not separately insured for soon as practicable to all other insurers usirtess Auto Coverage. Coverage is extended which tentiali po y provide insurance for such .p xirnum of 60 days following acqufsi claim or "suit'. u to a rna ton or fiorrnation of the business entity. Coverage under this provlsion is afforded only until the end; of the policy period. Includes copyrighted material of Insurance_Services Office, Ino., with its permission. Copyright, Insurance Services Office, Inc., 1997 CA 71 10 os 0 V , Page 1016 i (6) The coverage provided will not exceed the PERSONAL EFFECTS COVERAGE aesser of: A. SECTION III PHYSICAL DAMAGE COVER- (a) The coverage and/or limits of this policy; AGE, A.4. COVERAGE EXTENSIONS, is °r amended by adding the following: (b) The Coverage and/or limits required b q Y C. Personal'Effects Coverage the "Insured contract". For any Owned "auto" that is involved in a (7) A person's or organizatlon's. status as an covered "loss", we will pay up to $500 for "Insured" under this subparagraph d ends "personal effects"' that are lost or damaged when your operations for that "insured" are as a result of the covered 'loss", without completed. applyir►g a deductible. EMPLOYEE AS INSURED EXTRA EXPENSE — BROADENED COVERAGE Under Paragraph A. of Section II — LIABILITY COV Paragraph A. COVERAGE of SECTION [II -- ERAGE .item fi, is added as follows: PHYSICAL DAMAGE COVERAGE is amended to add: Your "employee" while.using his owned "auto", or an ""auto" owned by a member of his or her household, 5. we will pay for the expense of returning a stolen in your business or,your personal affairs, provided you covered "auto"to you. do not own, hire.,or borrow that "auto".This coverage is excess to any other collectible insurance coverage. AIRBAG COVERAGE FELLOW EMPLOYEE COVERAGE Under paragraph B. —'EXCLrUSIONS of SECTION` III PHYSICAL DAMAGE COVERAGE, the following is Exclusion 5. FELLOW EMPLOYEE of SECTION ll -r' added: LIABILITY COVERAGE `-- B. EXCLUSIONS is amended by theaddition of the following: The exclusion relating to mechanical breakdown does not apply to the accidental discharge of an airbag,' However, th is exclusion does not apply if the "bodily injury" results from the use of a covered "auto" you NEW VEHICLE REPLACEMENT COST own or hire., and provided that any coverage under ,this provision only applies in excess over any other lender Paragraph C LIMIT OF INSURANCE of oollectilale Insurance.', Section Ill PHYSICAL DAMAGE COVERAGE sec- tion 2 is amended as follows:` BLANKET W-AIVER OF SUBROGATION 2. An adjustment for depreciation and physical con- We waive the right of recovery we may have for pay dit on will be made in determining actual cash ments made for "bodily injury" or "property damage" value in the event of a total loss.However, In the on behalf-of the persons or organizations added as event of a total loss to your "new vehicle"'to "Insureds".finder Section 11 --LIABILITY COVERAGE which this coverage applies, as shown in the --W A.1 D. BROAD FORM NAMED INSURED and declarations,we will pay at your option: A.9.e. BLANKET' ADDITIONAL INSURED, ai. The verifiable' 'new.vehicle" purchase price you paid for your damaged vehicle, not in- PHYSICAL DAMAGE ADDITIONAL TRANS cluding any insurance or warranties pur- 1 PORTATION I EXPENSE COVERAGE chased; The first sentence of paragraph A.4. of SECTION 111 b. The purchase price, as negotiated by us of �- PHYSICAL DAMAGE COVERAGE is amended as a new vehicle of the same make, model and follows; equipment, not including any furnishings, parts or equipment not installed by the • manufacturer or manufacturer's dealershi We will pay up. to $50 per day to a maximum of P• $1,500 for temporary transportation expense incurred If the same model is not available pay the by you because of the total theft of a covered "auto" purchase price of the most similar model of the private passenger type... available•, I I Page 2016 I ....., c. The;market value of your damaged vehicle, a. Actual cash value of the damaged or stolen not indludirtg.any furnishings, parts or'equ€p property as of the time of the "loss", less an m6nt not installed by.the manufacturer or adjustment for depreciation and physical manufacturer's dealership. c9ndition; or This coverage applies only tc; a covered "auto b. Balance due.under the terms of the lean'or of the private passenger, light`truck-or medium lease that the damaged covered "auto" is truck type (201000 lbs or less gross vohlple' Subject to,at the time of the "loss", less.-any weight) and does not apply to Initiation or set up' one or all of the following adjustments: costs associated with loans or leases. (1) Overdue payment and financial T1iV( t�i MORE Q'EDUCI'iDLES penalties associated' with those payments as of the date of the - Under SECTION [if — PHYSICAL DAMAGE COV- "lass". ERAGE, If two or more "company" policies or cover- (2)' Financial penalties imposed under a age"forms apply to the same accident, the following lease due to high mileage, excel- Applies to paragraph D. Dedoctiole: - sive use or abnormal wear:and tear. a. if the applicable Business Auto deduct' (3) 'Casts for extended warranties, Cre= ible is the smaller'{o"r smallest} deduct dit Life Insurance, Health, Accident €ble it will be waived;or or Disability Insurance purchased, b. If the applicable Business Auto deduct with the loan or lease. €ble is not the smaller (or smallest) de (rf) Transfer or rollover balances from ductible it will be reduced by the amount previous loans or leases. of the smaller (or smallest) deductible; (5) Final payment due under a "Balloon or Loan". c. If the loss Involves two or more_Bt.Jsi (G) The dollar amount of any Hess Auta coverage forms or pol€cies un-repaired damage that occurred the smaller (or smallest) deductible will prior to the "total Ions" of a covered be waived. "auto".. For the purpose of this endorsement:, "company" mean"s: (7) Security deposits not refunded by a lessor.. a. Safeco Insurance Company,of America (8) All refunds'payable or paid to you b. American States Insurance Company as a'result'of the early termination a. General Insurance Company of America of a lease agreement or any war- ranty. or extended service agree- & American Economy Insurance Company I ment on a covered "auto e. First National insurance Company of (g) Any amount representing taxes. America. 1 Loan or le ase.termination fees c) f. American States Insurance Company of Texas GLASS.REPAIR — WAIVER OF DEDUCTIBLE g. American States Preferred insurance Under paragraph D. -- DEDUCTI1.BLE of SECTION' lfl Company —PHYSICAL DAMAGE COVERAGE, the following is h. Safeco Insurance Company of Illinois added: LOANIL;EASE GAP COVERAGE No deductible applies to,glass damage if the glass is repaired rather than replaced. Under paragraph 0. `-= LIMIT OF INSURANCE of SECTION III PHYSICAL DAMAGE COVERAGE, AMENDED DUTIES IN TIE EVENT OF ACCI- the following is added: DENT. CLAIM, SNIT OR LC)SS 4. The most we will pay fora total "loss" in any one The. requirement In LOSS' coNDITION 2.a. -- "accident" is the greater of the.following, subject DUTIES IN THE EVENT OF ACCIDENT, CLAIM, to a$1,500 maximum limit. SUIT OR LOSS of; SECTION 1V BUSINESS AUTO CONDITIONS, that yP01 must notify: us of an CA 71 9 03 07 page 3 of B PP -L "accident" applies only when the "accident" is known deductible and excess provisions, we will provide to: coverage equal to the broadest coverage applicable to any covered "auto" you own. (1) You, if you are an individual; (2) A partner, if you are a partnership; or HIRE_AUTO PHYSICAL DAMAGE COVERAGE LOSS OF USE (3) An .executive officer,or Insurance manager,if you are a corporation. SECTIQN III — PHYSICAL DAMAGE A.4b. Form does not apply. UNINTENTIONAL FAILURE TO DISCL()SE HAZARDS, Subjept to a maximum-af$1,000 per accident, we will cover lass of use of a hired "adto" if it results from SECTION IV BUSINESS AUTO CONDITIONS — an accident,''you are legally liable and the lessor in- B.2. is amended by the addition of the following: curs an actual financial loss. If you unintentionally fail to disclose any hazards ex, RENTAL REIMBURSEMENT COVERAGE !sting at the inception date of your policy,.we will not A. We will pay far rental reimbursement expenses deny coverage under this.Coverage Form becawse of Incurred by you for the rental of an "auto" be- such failure. However, this 'provision does not affect caese of a coasted "loss." to a coverod "auto". our right to collect additional premium or exercise our Payment 1.applies in addition to the'otherwise ap- right of oanoellation or non=renewal. pllcab[e amount of each coverage you have on a HIRED AUTO —LIMITED WORLD`WIDE COVER-! covered; "auto". No deductibles apply to ,this AGE coverage. B. We will pay only;for those expenses incurred Under Section IV — Business Conditions, ;Paragraph during the policy period beginning 24 hours after B.7.b.e(1) Is replaced by the following: the "loss" and ending, regardless of the policy's (1) The "accident" or "loss" results expiration,with the lesser of the following number from the use of an 'auto" hired for of days: 30 days or less. 1. The! number of .days reasonably required to repair or replace the covered "auto". If RESULTANT MENTAL ANGUISH COVERAGE "loss" is' caused by theft, this number of days is added to the number of days it takes SECTION V DEFINITIONS C. is;replaced by the to Igcate the covered `auto" and return,it to following: You, "Bodily Injury" means bodily injury, sickness or dis 2. 3Q days.' ease-sustained by a person Including mental.anguish or death resulting from any of these. C. our payment is limited to the lesser of the fol- lowing amounts: HIRED AUTO PHYSICAL. DAMAGE COVERAGE 1.' Necessary and actual expenses incurred: 2. $50 If hired "autos" are covered "autos"-for LIab[lity coy per day. erage and if Comprehensive, Specified Causes of D. This coverage does not apply while there are Loss or Collision coverages are provided under this spare or reserve "autos"available to you for your Coverage Form for any "auto" .you' own, then the operations. Physical Damage Coverages provided are extended to "autos' you.hire or borrow. E. If "loss" results from the total theft of a covered "auto" Qf the private passenger type, we will pay The most we will pay for loss to any hired "auto" is under this coverage only that amount of your $50,000 or, Actual Cash Value or, Cost ,of Repair, rental reimbursement expenses which is not al- whichever is smallest, minus a deductible. The de- ready provided for under the PHYSICAL DAM- ductible will be equal to the largest deductible'appli- AGE COVERAGE Coverage Extension. cable to any owned "auto" of the private passenger' F. The Rental Reimbursement Coverage described or light truck type for that coverage. Fired Auto Phy- sical Damage coverage is excess over any other'col above does not apply to. a covered "auto" that is lectible insurance. Subject to the above limit, described or designated as a covered "autoon Page 4;at 6 S t Rental Reimbursement Qoverage Form the manufacturer for the installation of a CA 99 234 radio. AUDIO* VISTJAR AND DATA ELECTRONIC Cd Limit of insdrance EQUIPMENT COVERAGE With respect to this coverage, the LIMIT QF IN- A. Coverage SE.IRAiVCE prevision of PHYSICAL DAMAGE COVERAGE is replaced by the following: 1. We will pay with respect to a covered "auto'' 1; The most we will pay for "loses" to audio, vi- for� "loss" to any electronic equipment that sual or data electronic equipment and any receives or transmits audio, visual or data accessories used with this equipment as a signals and that is not designed solely for the result of.any one "accident" is the lesser of: reproduction of sound.This coverage applies only if the equipment is permanently installed a.:The actual cash value of the damaged in the covered "auto" at the time of the or stolen property as of the time of the "Ions".or the equipment is removable from a "loss; or, housing unit which is permanently installed In the covered "auto" at the time of the b. The cost of repairing or replacing the "loss", and,such equipment Is designed to damaged or stolen property with other, be solely operated by use of the power from property of like kind and quality. the "auto's"electrical system, In or upon the o. 1,Qou. covered "auto"., 2 An adjustment for depreciation and physical 2. We will pay wlfth respect to a covered "auto condition will be made in determining actual for "loss" to any accessories used with the cash value at the time of the "loss" electronic equipment described in paragraph 3, If a repair or replacement results in better A1. aoove, than like kind or,quality, we will not pay for However, this does not include .tapes, the amount of the betterment,'! records or discs. 3. If Audio, Visual and Data'Electronic Equlp� 0. Deductible ment Coverage dorm CA 9 &f or CA 9 I If "loss" to the audio, visual or data Alec- is attached to this policy, then the Audio, Vi- tronic equipment or accessories used with sual and data Electronic Equipment ,CpVer- this equipment is the result of a "loss" to the age described above does not apply. covered "auto" under the Business Auto Coverage Form's Gomprehensiue for Colli B. Exetusivns slon Coverage, then For each covered "auto" Thai.exclusions that apply to PHYSICAL DAIS- our obligation to pay for, repair, return or re- AGE AVERAGE, except for the exclusion relat-' plage damaged or stolen property will be re- duced by the applicable deductible sho€�vn in ing to Audio, Visual and Data Electronic Irquiprnent, also apply to this coverage; In addi the Declarations. Any Comprehensive Cov- tion; the ftlfowing exclusions apply: erage deductible shown in the Declarations does not apply to "lass" to audio, :visual or e will not pay for either any electronic equip- data electronic equiprrzent caused by fire or menu',or accessories ;used with such electronic lightning. equipment that.is: 2. If "loss" to the audio, visual or data elec- 1. Necessary for the normal operation'of the Ironic equipment or accessories used with covered "auto" for the monitoring of the this equipment is the result of a "loss" to the covered "auto's"operating system; or covered "auto" under, the 'Business Auto 2. Both: Coverage Form's Specified Causes of Loss Coverage, then for each covered "auto" our ` a. an integral part of the same unit housing obligation to pay for, repair, return or replace any sound reproducing equipment de- damaged or stolen property will be reduced signed solely for the reproduction of by a$100 deductible. sound if the 1, sound reproducing u „ ecuiprnent is permanently installed in 3. If loss occurs solely to the audiv,`viscral or tl�e covered "auto"; and data electronic equlprnent or accessories used with this equipment, then'forieach cov " �x .9 P Y b. permanently installed in the opening of Bred auto our obii ation to a far, repair, the dash or console normally used by GA 71 10 03,07 Page Sol 6 EP return or replace damaged or stolen property SECTION V -- DEFINITIONS is amended by adding will be reduced by a$100 deductible. the following: . In the'event that there ismore than one ap- Q. "Personal effects" means your tangible plicable deductible, only the highest- deduct--� property that is worry or,carried by you, ex,," ible will apply. In no event will more than one cept for tools,jewelry, money, or securities. deductible apply. R., "New vehicle" means any "auto" of which you are the original owner and the "auto" has not been previously titled and is ;less than 305 days past the purchase date. Raga 6 of f I POLICY NUMBER:01 SV429989-3 y$: ii�c�t•t Cal 22 94 02 10 t rNyl,..ii 1iiWe iZ vans+ahl.yS THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULIY. AMENDMENT OF OTHER MUCE DESIGNATED PERSONS OR OROANIZATIONS This endorsement modifies insurance provided tinder the following: COMMERCIAL UMBRELLA LIABILITY COVMA E PANT CHEQUIL Name of Person or Orcgantzatiors: The City of Kent i I, I The fcbliow!ing i added to Condition E. Other Insurance under SECTION I — CONDITIONS: - How fiver, with respect to a parson car organization shown in the Schedule, that qualifies as an additional insured riderparagraph CV I1 _�of CTIO '�PHO IS AN INS RED if a written contract in �,�h"h' o you hayei abre6&to provide insurance for that person or organization expressly,re quires that this insurance ap- plies �f p plies l ort a';primary or a primary and non-contributory lJasis, this insurance will apply as if other insurance a va! a I I ble to th t arson Qr or anization whic�h`desi'designates that ersan or or anizatic�n as a I�arrEeti I e I � P 9 � P 9 In ur d dt�es�!not exist, ;and we will not share with that other insurance. Regardless of the written contract between you and the person or organization shown in the Schedule, this insurance is still excgss�over an other valid ' oliec ' P � t _ � c y d and 'I'ts le insurance available to that person or organization, whether s gph insurance is primary, cony u, m tribu llidd, excess contingent or otherwise, as respects "autom�obiles" or when that person or o g Lion is an„additional insured under such other insurance. r an�za ICI �IIII i i Ij i All ether'l rris and provisions remain the same. :t. i 2Q10 Liberty Mutual Insurance Qpmpan�r. All rights reserved. Inclddes copyrighted material of Insurance Services Office, Inc., with its permission. i Page 1of17 State of Washington Department of Labor & Industries ' Prevailing Wage Section - Telephone 360-902-5335 k PO Box 44540 Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits`. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. I Journey Level Prevailing Wage Rates for the Effective Date: 5/5/2015 JLounty Trade Job Classification Wa a Holiday Overtime Note King Asbestos Abatement Workers Journey Level $4267 5D 1 H z King Boilermakers Journey Level $64.29 5N 1 C tt x King Brick Mason Brick And Block Finisher $44.46 5A 1 M King Brick Mason Journey Level $5132 5A 1M King Brick Mason Pointer-Caulker-Cleaner $5132 5A 1M' King Building Service Employees Janitor $21:29 5S 2F King Building Service Employees Traveling Waxer/Shampooer $21.70 5S 2F =King Building Service Employees Window Cleaner (Non- $24.94 5S 2F, Scaffold) King Building Service Employees Window Cleaner (Scaffold) $25.80 5S 2F 1 King Cabinet Makers (In Shop) Journey Level $22.74 1 l King Carpenters Acoustical Worker $52.32 5D 4C King Carpenters Bridge, Dock And Wharf $52.32 5D; 4C Carpenters Kin Car enters Carpenter $52.32 5D 4C x g p P — — King I! Carpenters Carpenters on Stationary Tools $52.45 5D 4C King Carpenters" Creosoted Material $52.42 5D 4C' King Carpenters Floor Finisher $52.32 5D 4C' King Carpenters Floor Layer $52,32 5D 4C King Carpenters Scaffold Erector $52.32 5D 4C l King Cement Masons Journey Level $52.38 7A 11 M King Divers Et Tenders - Diver $105.37 5D 4C' 8A King Divers Et Tenders Diver On Standby, $59.50 5D; 4C' K King Div ers'Et Tenders Diver Tender $5482 5D 4C' King Divers Et Tenders Surface Rcv Et Rov Operator $54.82 5D 4G King Divers)Et Tenders Surface Rcv Et Rov Operator $51.07 5A 4C Tender n King' Dredge Workers Assistant Engineer $54.75 5D 3F %King Dredge Workers'` Assistant Mate (Deckhand) $54.33 5D 3F tt King Dredge Workers Boatmen $54.75 5D 3F 5/5/2015 https //fortress wa.gov/lni/wagelookup/prvWagelookup.aspx Page 2 of 17 King Dredge Workers Engineer Welder $55.79 5D 3F King Dredge Workers Leverman, Hydraulic $56.92 5D 3F King Dredge Workers Mates $54.75 5D 3F King Dredge Workers Oiler $54.33 51) 3F x King Drywall Applicator Journey Level $52.32 5D 1H King Drywall Tapers Journey Level $52.37 5P 1 E - - King Electrical Fixture Maintenance Journey Level $26.59 5L 1 E Workers King Electricians = Inside Cable Splicer $66.76 7C 4E King Electricians Inside Cable Splicer (tunnel) $71.67 7C 4E King Electricians Inside Certified Welder $64.54 7C 4E King Electricians Inside Certified Welder(tunnel) $69.22 7C 4E x King Electricians '- Inside Construction Stock Person $37.19 7C 4E l King Electricians Inside Journey Level $62.301 7C 4E F11 King Electricians -Inside Journey Level (tunnel) $66.761 7C 4E King Electricians Motor Shop Craftsman $15.37 1 a King Electricians Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $69.95 5A ' 41) Construction x King Electricians Powerline Certified Line Welder $63.97 5A 4D Construction King Electricians Powerline Groundperson $43.62 5A 4D Construction King Electricians'- Powerline Heavy Line Equipment $63.97 5A 4D Construction Operator King Electricians'- Powerline Journey Level Lineperson $63.97 5A 4D Construction King Electricians Powerline Line Equipment Operator $53.81 54 4D Construction King Electricians Powerline Pole Sprayer $63.97 5A 4D F Construction King Electricians Powerline Powderperson $47 55 5A 4D Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $82`.67 7D 4A u King Elevator Constructors Mechanic In Charge $89.40 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.90 5B 1�R Products Work Only King Fence Erectors fence Erector $15.18 1 King Flaggers Journey Level $36.17 7A 31 King Glaziers Journey Level $54.91 7L 1Y King Heat Et Frost Insulators And Journeyman $61.18 5J is Asbestos Workers King Heating Equipment Mechanics Journey Level $70.37 7F' 1 E M€ I King Hod Carriers Et Mason Tenders Journey Level $44.00 7A 31 King Industrial Power Vacuum Journey Level $9.47 1 Cleaner l King Inland Boatmen Boat Operator 1 $54.571 513 1 1 K https://fortress.wa.gov/1ni/wagelookup/prvWagelookup.aspx 5/5/2015 Page 3of17 King Inland Boatmen Cook $50.95 13 11 K l King Inland Boatmen Deckhand $51.19 513 11KK I King Inland Boatmen Deckhand Engineer $52.18 513 1 K I King Inland Boatmen Launch Operator $5340 5B 1 K King Inland Boatmen Mate $53.40 56 11 K King Inspection/Cleaning/Sealing Cleaner Operator, Foamer' $31.49 1 I Of Sewer £t Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Grout Truck Operator $11.48 1 x Of Sewer 8t Water Systems By Remote Control King Inspection/Cleaning/Sealing Head Operator $24.91 1 Of Sewer Et Water Systems By Remote Control IKing Inspection/Cleaning/Sealing Technician $19.33 1 Of Sewer Et:Water Systems`By Remote Control M R - King Inspection/Cleaning/Sealing Tv Truck Operator $20.45 1 l Of Sewer 8t Water Systems By 0 Remote Control King Insulation Applicators Journey Level $5232 5D' 4C, 1,King Ironworkers Journeyman $61.62 7N 10' z King Laborers Air, Gas Or Electric Vibrating $42.67 7A' 31 Screed z King Laborers Airtrac Drill Operator. $44.00 7A 31 King Laborers Ballast Regular Machine $42.67 7A 31 King Laborers Batch Weighman $36.17 7A 31 i; I King Laborers Brick Pavers $4267 7A 31' King Laborers Brush Cutter $42.67 7A 31 King Laborers Brush Hog Feeder $42.67 7A 31 King Laborers Burner $4267 7A 31 King Laborers Caisson Worker $44.00 7A 31 Kin' Laborers Carpenter Tender $42.67 7A 31 1 g p King Laborers Caulker $42.67 7A 31_' n ' King Labo're'rs Cement Dumper-paving $43.46 7A 31- MKing Laborers Cement Finisher Tender $42.67 7A 31 k E King Laborers Change House Or Dry Shack $42.67 7A 31 j King Laborers Chipping Gun (under 30 Lbs.) $42.67 7A 31 j Kin g Laborers Chipping Gun(30 Lbs. And $43.46 7A 31 Over) I King Laborers Choker Setter $4267 7A 31 King Laborers Chuck Tender $42.67 7A 3l King Laborers Clary Power Spreader $43.46 7A 31 I King Laborers Clean-up Laborer $4267 7A 31 I I King Laborers Concrete Dumper/chute $43.46 7A 31 r Operator I King Laborers Concrete Form Stripper $42.67 7A 31' j 'King Laborers Concrete Placement Crew $43.46 7A 3 https://fortress.wa.gov/lni/wagelookup/pr.vWagelookup.aspx 5/5/2015 ----------------- Page 4 of 17 F x King Laborers Concrete Saw Operator/core $43.46 7A 31 x Driller' King Laborers Crusher Feeder $36.17 7A 31 King Laborers Curing Laborer $42.67 7A 31 King Laborers Demolition: Wrecking Et $42.67 7A 31 Moving (incl. Charred tt Material) King Laborers Ditch Digger $4267 7A 31 King Laborers Diver $44.00 7A 31 King Laborers Drill Operator $43.46 7A 31 (hydraulic,diamond) King Laborers Dry Stack Walls $42.67 7A 31 King Laborers Dump Person $42.67 7A ' 31 King Laborers Epoxy Technician $42.67 7A 31 - X King Laborers Erosion Control Worker, $42.67 7A 31 ' M 'King Laborers Fatter Et Bucker Chain Saw $43.46 7A 31 King Laborers Fine Graders $42.67 7A 31 [ K King Laborers Firewatch $36.17 7A 31 I King Laborers' Form Setter $42.67 7A 31 King Laborers' Gabian Basket Builders $4267 7A 31 King Laborers General Laborer $42.67 7A 31 King Laborers Grade Checker Et Transit $44.00 7A 31 Person 4 Laborers Grinders $42.67 7A 31 King x I King Laborers Grout Machine Tender $42.67 7A 31 j tt King Laborers Gen (pressure) ncluding $43.46 7A 31 Post Tension Beams King Laborers Guardrail Erector $4267 7A 31 IKing " Laborers Hazardous Waster Worker $44.00 7A 31 (level A) King Laborers Hazardous Waste Worker $43.46 7A 31 tt '(level B) King Laborers Hazardous Waste Worker $42.67 7A 31 (level C) m 'King Laborers High Scaler $4400 7A 31 King ,; Laborers Jackhammer $43.46 7A 31 I:King," Laborers Laserbeam Operator $43.46 7A 31 King'' Laborers Maintenance Person $42.67 7A 31 IXing Laborers Manhole Builder-mudman $43.46 7A 31 King Laborers Material Yard Person' $42.67 7A 31 x. King Laborers Motorman-dinky Locomotive $43.46 7A, 31 x King Laborers Nozzleman (con'crete Pump, $43.46 7A 31 Green Cutter When Using gPressure Combination Of Hi h a Air Et Water On!Concrete Et Rock, Sandblast Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker! $43.46 7A 31 k s ti https://fortress.wa.gov/Ini/`wagelookup/prvWagelookup.aspx 5/5/2015 Page 5 of 17 King Laborers Pilot Car $36.171 7A 1 31 King Laborers Pipe Layer Lead $44.00 7A 31 King Laborers Pipe Layer/tailor $43:46 7A 31 King Laborers Pipe Pot Tender $4346 7A 31 King Laborers Pipe Reliner $43.46 7A 31 King Laborers Pipe Wrapper. $43.46 7A 31 x _ _a I King Laborers Pot Tender $42.67 7A 31 King Laborers Powderman $44.001 7A 31 King Laborers Powderman's Helper , $42.67 7A 31 King Laborers Power Jacks $43.46 7A 31 I King Laborers Railroad Spike Puller- Power $43.46 7A 31 King Laborers Raker - Asphalt $44.00 7A 31 King Laborers Re-timberman $44.00 7A " 31 King Laborers Remote Equipment Operator $43.46 7A 31 King Laborers Rigger/signal Person $43.46 7A 31 King Laborers Rip Rap Person $42.67 7A 31 King Laborers Rivet Buster $43.46 7A 31 King Laborers Rodder $43.46 7A 31 King Laborers Scaffold Erector $42.67 7A 31 King Laborers Scale Person $42.67 7A 31' King Laborers Sloper (over 20") $43.46 7A 31 King Laborers Sloper Sprayer $42.67 7A 31 King Laborers Spreader (,concrete) $43.46 7A; 31 King Laborers Stake Hopper $42.67 7A 31 King Laborers Stock Piler $42.67 7A 31 King Laborers Tamper &t Similar Electric, Air $43.46 7A 31 &t Gas operated Tools King Laborers Tamper (multiple &t Self- $43.46 7A 31 propelled) I King Laborers Timber Person -Sewer $43.46 7A 31 . (gagger, Shorer &t Cr,ibber) r King Laborers Toolroom Person(at Jobsite) $4267 7A 31 King Laborers Topper $42.67 7A 31 King Laborers Track Laborer $42.67 7A 31 I King Laborers Track Liner (power) $43.46 7A 31 King Laborers Traffic Control Laborer $38.68 7A 31' 8R King Laborers Traffic Control Supervisor` $3868 7A 31 8R F King Laborers Truck Spotter $42.67 7A 31 King Laborers Tugger Operator $43.46 7A' 31 `King Laborers Tunnel Work-Compressed Air $64.99 7A_ 31_ Worker 0-30 psi King' Laborers Tunnel Work-Compressed Air $70.02 7A 31 8� Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $73.70 7A 31 F Worker 44.01-54.00 psi R King Laborers Tunnel Work-Compressed Air $79.40 7A 31 Worker 54.01-60.00 psi - - i 5/5/2015 https //fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx Page 6 of 17 R King Laborers Tunnel Work-Compressed Air $81.52 7A 31 x Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $86.62 7A 31 Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $88.52 7A 31 Worker 68.01-70.00 psi x King Laborers Tunnel Work-Compressed Air $90.52 7A 31 _Q Worker 70.01-72.00 psi tt -King Laborers Tunnel Work-Compressed Air `$92.52 7A 31 Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock _ $44.10 7A 31 8Q Tender King Laborers Tunnel Work-Miner $44.10 7A 31 King Laborers Vibrator $43.46 7A 31 IKing Laborers Vinyl Seamer $42.67 7A 31 R - 1 xKing Laborers Watchman $32.87 7A 31 King Laborers Welder - $43.46 7A 31 King Laborers Well Point Laborer $43.46 7A 31 King Laborers Window Washer/cleaner $32.87 7A 31 g p an $42:67 7A 31 Kin Laborers - Underground Sewer General Laborer &t To rn Et Water King Laborers - Underground Sewer. Pipe Layer $43.46 7A 31 I &t Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 x Installers x K x King Landscape Construction Landscape Equipment $28.17 1 x Operators or Truck Drivers 3 m i King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $52.32 5D 1 H King Marble Setters Journey Level $51.32 5A: 1 M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 %King Metal Fabrication (In Shop) Machine Operator $13.04 1 Kin g MetaL Fabrication (In Shop) Painter, $11.10 1 i King 1 Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $53.4-2 5D 4C King Modular Buildings Cabinet Assembly $11.56 1 King j j Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 %Kin ; Modular Buildings Plumber $11:56 g King Modular Buildings Production Worker $9.47 1 King' Modular Buildings Tool.Maintenance $11.56 1 Kin Modular Buildings Utility Person $11.56 1 g y - King Modular Buildings Welder $11.56 1 1 King Painters Journey Level $37.80 6Z 2B King Pile Driver Journey.Level $52.57 5D 4C King Plasterers Journey Level $50.421 Zq1 R M https://fortress.wa.gov/Ini/wageIookup/prvWageIookup.aspx 5/5/2015 Page 7 of 17 K I King Playground Et Park Equipment Journey Level $9.47 1 Installers King Plumbers Et Pipefitters Journey Level $74:69 6Z 1 G King Power Equipment Operators Asphalt Plant Operators $5524 7A 3C 8P King Power.Equipment Operators Assistant Engineer $5197 7A 3C_ 8P x 'King Power Equipment Operators Barrier Machine (zipper) $54.75 7A 3C 8P King Power Equipment Operators Batch Plant.Operator, $54.75 7A 3C 8P Concrete King Power Equipment Operators Bobcat $51.97 7A 3C 8P R King Power Equipment Operators Brokk - Remote Demolition $51.97 7A 3C 8P m Equipment King Power Equipment Operators Brooms $51.97 7A 3C 8P x King Power Equipment Operators Bump Cutter $5475 7A 3C : 8P I King Power Equipment Operators Cableways $55.24 7A 3C 8P King Power Equipment Operators Chipper $54.75 7A 3C` 8P King Power Equipment Operators Compressor $5197 7A 3C 8P i w King Power Equipment Operators Concrete Pump: Truck Mount $55.24 7A 3C 8P x With Boom Attachment Over 42 M g King Power Equipment Operators Concrete Finish Machine -laser $5197 7A 3C 8P x Screed I King Power Equipment Operators Concrete Pump Mounted Or $54.33 7A 3C 8P x Trailer High Pressure Line Pump, Pump High Pressure. :King Power Equipment Operators Concrete Pump: Truck Mount $54.75 7A 3C 8P With Boom'Attachment Up To 42m I King Power Equipment Operators Conveyors $54.33 7A 3C_ 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $54.75 7A 3C 8P tt Tons With Attachments I King Power Equipment Operators Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) x King Power Equipment Operators Cranes. 206 Tons To 300 Tons, $56.36 7A 3C 8P Or 250' Of Boom (including Jib g With Attachments) King Rower Equipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Tons, Under 150' Of Boom (including Jib With T Attachments) x King Power Equipment Operators Cranes: A-frame - 10 Tons And $51.97 7A 3C 8P - Under I King Power Equipment Operators Cranes: Friction 100 Tons $56.36 7A 3C- 8P Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $56.92 7A 3C 8P x King Power;Equipment Operators Cranes: Over 300 Tons Or 300' $5692 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators $54.33 7A 3C 8P R f https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/5/2015 Page 8 of 17 A x Cranes: Through 19 Tons With x Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $54.75 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $54.75 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P .King Power Equipment,Operators Dozers D-9 &t Under $54.33 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Or Crane Mount x King Power Equipment Operators Drilling Machine $54.75 7A 3C 8P King Power,'Equipmentoperators Elevator And Man-lift: $51.97 7A 3C 8P Permanent And Shaft Type King Power Equipment.Operators Finishing Machine, Bidwell $54.75 7A 3C 8P u And Gamaco &t Similar Equipment King Power;Equipment Operators Forklift: 3000 Lbs And Over $54.33 7A 3C 8P — — With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P With Attachments King Power Equipment Operators Grade Engineer: Using Blue $54.75 7A 3C 8P Prints, Cut Sheets, Etc I King Power Equipment Operators Gradechecker/stakeman $51.97 7A 3C 8P King Power'Equipment Operators Guardrail Punch $54.75 7A 3C 8P 11 • r Hard Tail End Dum $55.24 7A 3C 8P 0 erato s Kin Power E ui merit p g q p — — Articulating Off Road tt p Eq ui merit 45 Yards. &t Over _ < e r Equipment' O erators Hard Tail End Dump $54,75 7A 3C 8P Kin Pow g Articulating Off-road Equipment Under 45 Yards g 'zontal/directional Drill $54.33 7A 3C 8P Kin Power Equipment Operators Hors — Locator K ' v ' E ui meet 0 erators Horizontal/directional Drill $5475 7A 3C 8P Kin Power — g Operator 54.3 3 8P; King Power Equipment Operators Hydrahfts/boom Trucks Over $ —7A 3C— — x 10 Tons Kin Power E ui merit Operators Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P g � Tons And:Under — — — I King Power Equipment Operators Loader, Overhead 8 Yards. &t $55.79 7A 3C 8P Over • 3C 8P • Yards. 5 5.2 4 7A Overhead, 6 r Ov — g t Operators Loader, $ — — Kin Power Equ�pmen : But Not Including 8 Yards g 'p ent Operators Loaders, Overhead Under 6 $54.75 7A 3C 8P m Km Power EQui Yards T m K King Power Equipment Operators Loaders, Plant Feed $54.75 7A- 3C 8P g ower Equipmen Kint Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P ; P King Power Equipment Operators Locomotives, All $54.75 7A 3C 8P Kin PowerlEquiprnent Op . g Operators Material Transfer Device $5475 7A 3C 8P � King Power Equipment Operators $55.79 7A 3C 8P ,x https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/5/2015 Page 9of 17 Mechanics, All (leadmen $0.50 Per Hour Over Mechanic) lKing Power Equipment Operators Motor Patrol Grader -Non $54.33< 7A 3C 8P finishing King Power'`Equipment Operators Motor Patrol Graders, $55.24 7A 3C 8P Finishing King Power Equipment Operators Mucking Machine, Mole, $55.24 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $51.97 7A 3C 8PNO Distribution a Mulch Seeding Operator M King Power Equipment Operators Outside Hoists (elevators And $54.33 7A 3C 8P Manlifts), Air Tuggers,strato x King Power Equipment Operators Overhead,Bridge Type Crane: $54.75 7A 3C_ 8P 20 Tons Through`44 Tons tt King Power Equipment Operators Overhead, Bridge Type: 100 $55.79 7A 3C 8P R Tons And Over King Power.Equipment Operators Overhead,`Bridge Type: 45 $5524 7A 3C 8P a - - Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $51.97 7A 3C 8P King Power;Equipment Operators Pile Driver (other,Than Crane $54.75 7A 3C 8P g Mount) x ; King Power,Equipment Operators Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P King Power Equipment Operators Posthole Digger,'Mechanical $51.97 7A 3C' 8P King Power Equipment Operators Power Plant $5197 7A 3C 8P King Power Equipment Operators Pumps - Water $51..97 7A 3C 8P11 King Power Equipment Operators Quad 9, Hd 41, D10 And Over $55.241 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $51.97 7A- 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $55.24 7A 3C 8P s Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And'Bellman $5197 7A 3C` 8P King'` Power'Eguipment Operators Rollagon $5524 7A 3C 8P King' Power';Equpment Operators Roller, Other Than Plant Mix $5197 7A 3C 8P King Power''Equipment Operators Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P Materials King Power,Equipment Operators Roto-mill, Roto-grinder $54,75 7A 3Q 8P King' Rower'Equipment Operators Saws Concrete $54.33 7A; 3C 8P King', Power'Equi'pment Operators Scraper, Self Propelled Under $54.75 7A 3C 8P x - x 45 Yards King, Power'Equipment Operators Scrapers - Concrete Et Carry $54.33 7A 3C 8P - tt All g King Power Equipment Operators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P x Yards And Over King Power Equipment Operators Service Engineers - Equipment $54.33 7A 3C 8P q King Power Equipment Operators Shotcrete/gunite Equipment $51.971 7A 3C 8P https://fortress.wa.gov/1ni/wagelookup/prvWagelookup.aspx 5/5/2015 'd , w Page 10 of 17 King` Power Equipment Operators Shover, Excavator, Backhoe, $54.33 7A 3C 8P Tractors Under 15 Metric Tons. I King Power Equipment Operators Shover, Excavator, Backhoe: $55.24 7A 3C 8P R Over 30 Metric Tons To 50` a x Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons I King Power Equipment Operators Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Over 90 Metric Tons gEquipment• P p $5524 7A 3C 8P R Kin Power 0 erators Sli form Pavers King Power Equipment Operators Spreader, Topsider Et' $55.24 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $54.75 7A 3C 8P 4 King Power Equipment Operators Tower Bucket Elevators $54.33 7A 3C 8P 1 King Power Equipment Operators Tower Crane Over 175'in $56.36 7A 3C 8P m Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $55.79 7A 3C 8P I Height Base To.Boom x King Power Equipment Operators Transporters, All Track Or $5524 7A 3G 8P _F Truck Type King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P x King PowerEquipment Operators Truck Crane Oiler/driver - 100 $54.75 7A 3C, 8P I � Tons And Over R King Power'Equipment Operators Truck Crane Oiler/driver $54.33 7A 3C 8P x Under 100 Tons King Power,,Equipment,Operators Truck Mount Portable $54.75 7A 3C 8P Conveyor King Power"Egwipment Operators Welder $55.24 7A 3C 8P 1 King Power!Equipment Operators Wheel'Tractors,',Farmall Type $51.97 7A 3C 8P I I I King Power Equipment Operators Yo Yo Pay Dozer $54.75 7A 3C 8P 1 King Power'Eguipment Operators- Asphalt Plant Operators $55.24 7A 3C` 8P Underground Sewer Et Water i x King Power'Equipment Operators- Assistant Engineer $51,97 7A 3C 8P Underground Sewer.8t Water King Power Equipment Operators- Barrier Machine (zipper) $54.75 7A 3C 8P ` — — Under round Sewer Et Water King ower q 'p ent Operators- Batch Plant Operator, $54.75 7A 3C 8P in P' E dip'm Underground Sewer Et Water Concrete King Power!Equipment Operators- Bobcat $51.97 7A 3C 8P Underground Sewer a Water I. King Power Equipment Operators- Brokk- Remote Demolition $51.97 7A 3C 8P Underground Sewer Et Water Equipment uipment Operators- Brooms $51.97 7A 3C 8P King � Power Eq Underground Sewer Et Water j %King Power'Equipment Operators- Bump Cutter $54.75 7A 3C 8P g a x Underground Sewer Et Water x I https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/5/2015 Page 11of17 King Power Equipment Operators- Cableways $55.24 7A ` 3C 8P x Underground Sewer Et Water King Power`Equipment Operators- Chipper $54.75 7A 3C 8P Underground Sewer Et Water k $51 King Power Equipment Operators- Compressor 97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $55.24 7A 3C 8P x u Underground Sewer Et Water With Boom Attachment Over 42M King Power Equipment Operators- Concrete Finish Machine -laser $51.97 7A 3C' 8P Underground Sewer Et Water Screed ' King q P P Power E ui merit Operators- Concrete PumpMounted Or $5433 7A 3C 8P tt Underground Sewer Et Water Trailer High Pressure Line x Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $54.75 7A 3C 8P Underground Sewer Ft Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors" $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20'Tons Through 44 $54.75 7A' 3C 8P z Underground Sewer Et Water Tons With'Attachments 1 King Power Equipment Operators- Cranes: 100 Tons Through' 199 $55.79 7A 3C 8P ,I. x Underground Sewer8L Water Tons, Or 150' Of Boom (Including Jib With Attachments) I King Power Equipment Operators- Cranes: 200 Tons To 300 Tons,' $56.36 7A 3C 8PI. Underground Sewer'Et Water Or 250' Of'Boom (including Jib With Attachments) King Power. Equipment Operators- Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of.Boom (including Jib With Attachments) K King Power Equipment Operators- Cranes:A-frame - 10 Tons And $51.97 7A 3C 8P y Underground Sewer Et Water Under u King Power Equipment Operators- Cranes: Friction 100 Tons $56.36 7A 3C 8P ' Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C 8P s Underground,Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $56.92 7A -3C 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $54.33 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons I King Power Equipment Operators- Crusher $54.75 7A 3C 8P r Underground Sewer Et Water IKing Power Equipment Operators- Deck Engineer/deck'Winches $54.75 7A 3C 8P x Underground Sewer Et Water. (power) King Power Equipment Operators- Derricks, On Building Work $55.24 7A 3C 8P Underground Sewer Et Water King Poweril Equipment Operators- Dozers D-9 Et Under $54.33 7A 3C 8P Under round Sewer Et Water M ,g https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/5/2015 Page 12 of 17 King Power'Equipment Operators- Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $54.97 7A 3C 8P x Underground Sewer Et Water Permanent And Shaft Type y King Power Equipment Operators- Finishing Machine, Bidwell $5475 7A 3C 8P y Underground Sewer Et Water And Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $54.33 7A 3C° 8P Underground Sewer Et Water With Attachments F King` Power Equipment Operators- Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Grade Engineer: Using Blue $54.75 7A 3C' 8P i Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $51.97 7A 3C 8PER Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $54.75 7A 3C 8P' Underground Sewer Et Water tt King Power Equipment Operators- Hard'Tail End Dump $55.24 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $54.75 7A 3C 8P Underground Sewer Ft Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $54.33 7A` 3C 8P Underground Sewer Et Water Locator tt King` Power Equipment Operators- Horizontal/directional Drill $54.75 7A 3C 8P Underground Sewer Et Water Operator I King Power Equipment Operators- Hydralifts/boom Trucks Over $54.33 7A' 3C 8P Underground Sewer Et Water 10 Tons '11111(i Power Equipment Operators- Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P x Underground Sewer Et Water Tons And Under %King Power Equipment Operators- Loader, Overhead 8 Yards. Et $55.79 7A 3C 8P Underground Sewer Et Water Over x King Power Equipmenti Operators- Loader, Overhead, 6 Yards. $55.24 7A 3C 8P` Underground Sewer Et Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $54.75 7A 3C 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P Underground Sewer Et Water i King Power Equipment Operators- Loaders: Elevating Type Belt $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $54.75 7A 3C 8P' Underground Sewer Et Water — — Ki1.ng Power Equipment Operators- Material Transfer Device $54.75 7A 3C 8P w Underground Sewer Et Water 1 King '.Power Equipment Operators- - Mechanics, All (leadmen - $55.79 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) x King Power Equipment Operators- Motor Patrol Grader- Non- $54.33 7A 3C 813 Underground Sewer Et Water finishing https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/5/2015 Page 13 of 17 King Power Equipment Operators- Motor Patrol Graders, $55:24 7A 3C- 8P x Underground Sewer Et Water Finishing King Power Equipment Operators- Mucking Machine, Mole, $55.24 7A 3C 8P Underground Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield 1 King Power Equipment Operators- Oil Distributors, Blower $51.97 7A 3C 8P Underground Sewer_Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $54.33 7A 3C 2P w° Underground Sewer Et Water Manlifts), Air Tuggers,strato x King Power Equipment Operators- Overhead, Bridge Type Crane: $5475 7A 3C 8P M Underground Sewer Et.Water 20 Tons Through 44 Tons I , King Power Equipment Operators- Overhead, Bridge Type: 100 $55.79 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead,Bridge Type: 45 $55,24 7A ` 3C 8P Underground Sewer°Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $54.75 7A'- 3C 8P Underground Sewer 8t Water Mount) King Power Equipment Operators- Plant!Oiler - Asphalt, Crusher $54.33 7A 13C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $51.97 7A 3C 8P r - I Underground Sewer Et Water King Power Equipment Operators- Power Plant $51`.97 7A 3C 8P Underground Sewer Et Water I King Power Equipment Operators- Pumps - Water $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P Underground Sewer Et Water King` Power Eq-uipment Operators- Quick Tower - No Cab, Under $51.97 7A 3C 8P Underground Sewer Water 100 Feet In Height Based To Et Boom King Power.Equipment Operators- Remote Control Operator On $55.24 7A 3C 2P ,i Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And BeRman- $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $55.24 7A 3C 8P- Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $51.97 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P A 3C — Underground Sewer &_Water Materials _ P I g Equipment Operators- Roto-mill, Roto grinder $54.75 7A 3C 8 Km Power Eq — Underground Sewer Et Water Kin Power E u merit 0 `erators- Saws - Concrete $54.33 7A 3C 8P g — — — Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $54.75 7A 3C 8P Underground Sewer Et Water 45 Yards 8P King $54.33 7A 3C — R , Y https://fortress wa.gov/lni/wagelookup/prvWagelookup.aspx 5/5/2015 Page 14 of 17 Power Equipment Operators- Scrapers - Concrete Et Carry Underground Sewer Et Water All King Power Equipment Operators- Scrapers,Self-propelled: 45 $55.24 7A 3C 8P x Underground Sewer Et Water Yards And Over, I King Power Equipment Operators- Service Engineers - Equipment $54.33 7A 3C 2P Underground Sewer &t Water Mn King Power Equipment Operators- Shotcrete/gunite Equipment $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric x Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $55.24 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons ns l King Power Equipment Operators- Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Underground Sewer Et Water Tractors: 15 To'30 Metric'Tons I King Power Equipment Operators- Shovel, Excavator, Backhoes: $55.79 7A 3C 8P nn Underground Sewer Et Water Over 50 Metric Tons To 90 i Metric Tons s King Power Equipment Operators- Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons x King,' g p s $55.24 7A 3C 8P �n Power Equipment Operators- Sli form Paver Underground Sewer Et Water 'King , Power Equipment Operators- Spreader, Topsider&t $55.24 7A 3C 8P nn Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader'Trimmer, $54.75 7A 3C 8P Underground Sewer Et Water g Operators- Tower Bucket Elevators $54.33 7A 3C 8P, Kin Power Equipment ' Underground Sewer Et Water King` Power Equipment Operators- Tower Crane Over 175'in $56.36 7A 3C 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $55.79 7A 3C 813 Underground Sewer &t Water Height Base To Boom I King Power Equipment Operators- Transporters, All Track Or $55.24 7A 3C 8P 11 x Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching'Machines $54.33 7A 3C 8P Underground Sewer'a Water 1 King rs- Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P in Power Equipment Operato Underground Sewer Et Water Tons And Over ' King Power Equipment Operators- Truck Crane Oiler/driver $54.33 7A 3C 8P e P Underground Sewer Et Water Under 100 Tons ------------- 'Kin Power Equipment Operators- Truck Mount Portable $54.75 7A 3C. 8P g — Underground Sewer Et Water Conveyor King Power Equipment Operators- Welder $55.24 7A 3C 8P x Underground Sewer'&Water King Power Equipment Operators- Wheel Tractors, Farmall Type $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P Underground Sewer;Et Water K King Power Line Clearance Tree Journey Level In Charge $45.75 5A 4A Trimmers , https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/5/2015 Page 15 of 17 King Power Line Clearance Tree Spray Person $43.38 5A 44A Trimmers King Power Line Clearance Tree Tree Equipment Operator $45.75 5A 4A Trimmers 2 King Power Line Clearance Tree Tree Trimmer $40.84 5A 4A n Trimmers King, Power Line Clearance Tree Tree Trimmer Groundperson $30.74 5A 4A nn Trimmersnn 2 King Refrigeration Ft Air Journey Level $73.51 6Z 1 G Conditioning Mechanics King Residential Brick Mason Journey Level $51.32 5A 1 M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 I King Residential Drywall Journey Level $40.14 5D 4C Applicators In King Residential Drywall Tapers Journey Level $52.37 5P 1`E ni King Residential Electricians Journey'.Level $30.44 1Fn Kin gi Residential Glaziers Journey Level $37.30 7L 1 H King Residential Insulation Journey Level $26.28ni 1 y AQplicators i King' Residential Laborers Journey Level $23.03 1nn King Residential Marble Setters Journey Level $24.09 1 King ,, Residential Painters Journey Level $24.46 1 I Kin!g Residential Plurn'bers.Et Journey Level $34.69 1 Pip efitters King Residential'Refrigeration 8t Air Journey Level $73.51 6Z 1 G - - x Conditioning Mechanics King Residential:Sheet Metal Journey Level (Field or Shop) $42.58 7F 111 Workers King Residential Soft'Floor Layers Journey Level $42.41 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 2_11 (Fire Protection] King' '' Residential=Stone Masons Journey Level $51.32 5A 1 M 'King Residential Terrazzo`Workers Journey Level $46.96 5A 1M g Kin Residential'Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile'Setters Journey Level $25.17 1 x King Roofers Journey Level $45.71 5A 3H King Roofers Using Irritable Bituminous $48.71 5A 3H Materials I King' Sheet Metal Workers Journey Level (Field or'Shop) $70.37 7F 1 E King 1 Shipbuilding Et Ship Repair Boilermaker $39.82 7M' 1 H King Shipbuilding Et Ship'Repair Carpenter $39.24 7T` 2B King Shipbuilding F Ship Repair' Electrician $40.16 7T 4B HKing Shipbuilding Et Ship Repair Heat Et Frost Insulator $61.18 5J 1Snn u King Shipbuilding Et Ship Repair Laborer $40.19 77T 4B King. Shipbuilding Et Ship Repair Machinist $40.18 7T 4B King Shipbuilding Et Ship Repair Operator $40.11 7T- -4B 5/5/2015 https.//fortress,wa,.gov/ini/wagelookup/prvWagelookup.aspx Page 16 of 17 King ' Shipbuilding Et Ship Repair Painter $40.16 7T 4B King Shipbuilding Et Ship Repair Pipefitter $40.11 7T 4B King Shipbuilding Et Ship'Repair Rigger $40.19 7T 4B IKing Shipbuilding Et Ship Repair Sheet Metal $40.14 7T 413 K King Shipbuilding Et Ship Repair Shipftter. $40.19 7T 4B King Shipbuilding Et Ship Repair Trucker $40.03 7T 4B C %King ' Shipbuilding Et Ship Repair Warehouse $40.08 7T 4B King Shipbuilding Et Ship Repair Welder/Burner $40.19 7T 4B King Sign Makers £t Installers Sign Installer. $22.92 1 ,(Electricals King Sign Makers Et Installers Sign Maker $21.36 1 g M (Electrical) King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical King Sign Makers Et Installers (Non- Sign Maker $33.25 1 x I Electrical lKing Soft Floor Layers Journey Level $42.41 5A 3D IKKing Solar Controls For Windows Journey Level $1244 1 ' King Sprinkler Fitters (Fire Journey Level $69.74 5C 1X Protection) King: Stage!Rigging Mechanics (Non Journey Level $13.23 1 a — Structural) King. Stone Masons Journey Level $51.32 5A 1M King Street And Parking Lot Journey Level $19.09 1 x Sweeper Workers _ King Surveyors Assistant Construction Site $54.33 7A. 3C 813 Surveyor King Surveyors Chainman $53.81 7A 3C 8P King Surve, Construction Site Surveyor $55.24 7A: 3C 8P King Telecommunication Journey Level $22.76 1 Technicians I King Telephone Line Construction Cable Splicer $36.96 5A 2B Outside 7 King Telephone Line Construction Hole Digger/Ground Person $20.49 5A 2 Outside I King' Telephone Line Construction Installer (Repairer) $35.40 5A 2B Outside King` Telephone'Line Construction - Special Aparatus Installer l $36.96 5A 2B Outside King Telephone Line Construction- Special Apparatus Installer II $36.19 5A 2B Outside 1 King Telephone Line Construction - Telephone Equipment $36.96 5A 213 Outside Operator (Heavy) King Telephone Line Construction - Telephone Equipment $34.34 5A 2B Outside Operator (Light) King Telephone Line`Construction - Telephone Lineperson $34.34 5A 213 Outside 11 I King Telephone Line Construction Television Groundperson $19.45 5A 2B Outside, https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/5/2015 Page 17 of 17 x King Telephone Line Construction - Television" $25.89 5A' 2B Outside Lineperson/Installer King Telephone Line Construction Television System Technician $30.97 5A 2B r Outside , King Telephone:Line`Construction Television Technician $27.77 5A` 2B u Outside King, Telephone Line Construction - Tree Trimmer $34.34 5A 2B I Outside King Terrazzo Workers Journey Level $46.96 5A 1M 71 King Tile Setters Journey Level $21.65 1 King Tile, Marble &t Terrazzo Finisher $37.79 5A 1 B Finishers m_ King Traffic Control Stripers Journey Level $43.11 7A 1 K - King Truck Drivers Asphalt Mix Over 16 Yards (W. $49.85 5D` 3A 8L WA-Joint Council 28) King' Truck Drivers Asphalt Mix To'16 Yards (W. $49.01 5D 3A 8L WA-Joint Council 28) King' Truck Drivers Dump Truck Ft Trailer $49.85 5D 3A 8L , x King Truck Drivers Dump Truck (W WA Joint $49.01 5D 3A 8L e Council 28) u King Truck Drivers Other Trucks (W. WA-Joint $49.85 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 King Well Well'Drillers &t Irrigation Pump Irrigation Pump Installer $17.71 1' Installers King Well Drillers &t'Irrigation Pump Oiler $12.97 1 Installers n King Well Drillers £t Irrigation.Pump Well Driller $18.00 1 Y Installers i https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/5/2015 Benefit Code Key Effective 3-4-2015 thru 9-1-2015 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker.On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid atone,and one-half times the hourly rate of wage.; All other overtime hours and all hours worked on Sundays and holidays shall be paid at double.the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The:first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. 'All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The:first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four.-ten hour schedule,shall be paid atone and one-half times the hourly rate of wage.All hours worked in excess of ten(10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All ;hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown)shall be paid atone and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. L. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage.' J. The first two(2)hours after eight(8)regular.hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage.' K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key-Effective 3-4-2015 thru 9-1-2015 1. N. All hours worked on Saturdays-(except makeup days) shall be paid"at one and one-.half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 0. The first ten(10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10) hours per,day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas'day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and'holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate-of wage. All hours worked on holidays and all other overtime''hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours;worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.,All hours worked on Sundays and holidays(except Labor Day) shall be paid at two times the hourly rate of;wage.;All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas,day)shall be paid at one and one-half times the hourly rate of wage.All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on.Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8)'regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked over twelve(12)hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage.When holiday falls on Saturday or'Sunday,the day before Saturday,Friday,and the day after Sunday,Monday,shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm(or such other hours as may be agreed upon by any employer,and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate g, ,(except for employees who are absent from work without prior approval on a scheduled,workday during of wa e. the workweek shall be paid at the straight-time rate until they have worked 8 hours in a: day (10 in a 4 x'10 workweek)or 40 hours during that workweek.)All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 5 t Benefit Code Key=Effective 3-4-2015 thru 9-1-2015 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays,shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall;be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on"Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday,schedule;all hours worked after ten shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shall be,paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and;holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and'midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 I Benefit Code Key-Effective 3-4-2015 thru 9-1-2015 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,.Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid atone and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th,and October 14th and all Holidays shall be compensated for at two'(2)times the regular rate of pay.Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. I All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight ime rate: However,Saturday shall not be utilized as a make-up',day when a holiday falls on Friday.All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday,the first four(4)hours of overtime after eight(8)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four,(4)day ten(10)hour workweek`has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday,the first two(2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday,the first twelve(12)hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay,except that if the job is down on Monday through Friday due'to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay.-All hours worked over twelve(12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)'times the straight time rate of pay. 4 r Benefit Code Key-Effective 3-4-2015 thru 9-1-2015 4. D. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturday,Sundays and holidays shall be paid at double the hourly rate of pay.' Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines,switching stations,regulating,capacitor stations,generating plants,industrial plants,associated installations and substations,except those'substations whose primary function is to feed a distribution system,will be paid overtime under the following ratesc The first two(2)hours after eight(8)regular hours Monday through Friday of overtime on a regular workday,shall be paid at one and one-half times the hourly rate of wage.All hours in excess of ten(10)hours will be at two(2) times the hourly rate of wage.The first eight(8)hours worked on Saturday will be paid at one and one-half'(1-1/2) times the hourly rate of wage.All hours worked in excess of eight(8)hours on Saturday,and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized,shall be paid at the double the hourly rate of wage. E. The first two(2)hours after'eight`(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other,hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four'day,ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage.The Monday or Friday not utilized in,the normal four-day,ten hour work week,and Saturday shall be paid at one and one half(1'/2)times the regular shift rate for the first eight'(9)hours.All other hours worked Monday through,Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. All hours worked between the hours of 6.00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium rate of 20%over the hourly rate of wage.All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, 'Thanksgiving Day, Friday 'after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays; New Year's Day, Presidents' Day, Memorial'Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8): H. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day.after Thanksgiving Day, And Christmas(6). I. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, and::Christmas Day J. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). 5- l Benefit Code Key-Effective 3-4-2015 thru 9-1-2015 5. K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). L. Holidays:-New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving bay,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day,The Day Before Christmas,And Christmas Day (9). If A Holiday,Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's, Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day, Christmas Day,And The Day Before Or After Christmas (9). Z. Holidays: New Year's Day,Memorial Day, Independence Day,',Labor Day, Veterans Day,Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). Holiday Codes Continued 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or,.After New Year's Day, Presidents Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Day After Thanksgiving Day,'Christmas Day,And A Half-Day On Christmas Eve Day.(9 1/2). G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day,'Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And Christmas Eve Day'(11).' H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,,Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). I. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day,. Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day,The Last Working Day Before Christmas Day, And Christmas Day(9). 6 Benefit Code Key-Effective 3-4-2015 thru 9-1-2015 6. Z. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day(7). If a holiday falls on Saturday;the preceding Friday'shall be considered as the holiday.If a holiday'falls on Sunday,the following>Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays;"New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday 'Shall-Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. I B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday.and Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays:;New Year's Day, Martin Luther King Jr. Day, 'Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And IChristmas Day.(8). Any holiday,which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday,shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day; Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays:"President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any paid holidaywhich falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday: Any holiday which falls on a,Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day,before Christmas day and Christmas day(8).Any holiday which falls on a Sunday shall`be observed as a holiday on the ifollowing'Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays: New Year's Day, Martin Luther King Jr. Day,- Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday;shall be observed as a holiday'on the following Monday.Any holiday which falls on a`Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,'President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday'After Thanksgiving Day,The Day Before Christmas Day And Christmas Day(9).Any holiday which falls on a Sunday shall be observed as`a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays:New Year's Day, Independence Day, Memorial Day,Labor Day,Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 7 ° t Benefit Code Key=Effective 3-4-2015 thru 9-1-2015 7. K. Holidays: New Year's Day,'Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which,falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays:New Year's Day,Memorial Day,Labor Day,Independence`Day,Thanksgiving Day,the Last Work Day before Christmas Day,And Christmas Day(7).Any holiday which falls on a Sunday'shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays:'New Year's Day, The Day after or before New Year's Day, President's'Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New'Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays:.New Year's Day, Memorial Day,, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday: Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday``which falls on a Sunday shall be observed as a holiday 'on the following Monday.If any of the listed holidays falls on a.Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. T. Paid Holidays:New Year's Day,The Day After Or Before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,and The Day After Or Before Christmas Day.(10).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be;considered a holiday and compensated accordingly.Any holiday which falls'on a Saturday shall be observed as a holiday on the preceding Friday. Note Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To'100'-$2.00 per Foot for Each Foot Over':50 Feet Over.100'To 150'-$3.00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet 8 Benefit Code Key Effective 3-4-2015`thru 9-1-2015 8. C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$1.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1.50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$0.75,Level B:$0.50,And Level C $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows:Levels A&B:$1.00,Levels C&D: $0.50. I N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00,Level B:;$0.75 Level C:$0.50,And Level D:$0.25. P. Workers on hazmat projects'receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1.50,Class C Suit:$1.00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall'be used in determining the scale paid. R. Effective August 31,;2012 A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,'bicycle, and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012: S. Effective August 31,2012-A Traffic Control Supervisor shall be present onthe project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a;current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. T. Effective August 31,2012-A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. 9