Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW15-119 - Original - Petersen Brothers, Inc. - Col. Joe Jackson Bridge Attenuator Repair - 03/25/2015
ININ �. Records M e m e3 KENT WASHINOTON N. Document x: + .o ,ts CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Petersen Brothers Vendor Number: JD Edwards Number if jttit`m: - f FC Contract Number: r f4 !- rr , This is assigned by City Clerk's Office Project Name: Col Joe Jackson Bridge Attenuator Repair Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 03/23/15 Termination Date: 04/23/15 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Tom Rusbuldt Department: Operations Contract Amount: $8,668.95 Approval Authority: (CIRCLE ONE Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): The Contractor shall replace the quad guard attenuator. As of: 08/27/14 i KENT W�.H..a TON PUBLIC WORKS AGREEMENT between City of Kent and Petersen Brothers, Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Petersen Brothers, Inc. organized under the laws of the State of Washington, located and doing business at 2008 East Valley Highway, Sumner, WA 98390, Phone: (253) 833-2544/Fax: (253) 863-5951, Contact: Ronald Petersen (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall replace the quad guard attenuator. For a description, see the Scope of Work which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 30 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Eight Thousand, Six Hundred Sixty Eight Dollars and ninety-five cents ($8,668.95). Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20-171 and its related rules for the work contemplated in this Agreement. The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City's payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. PUBLIC WORKS AGREEMENT - 1 (Roadway/Pedestrian Path - Under$I0K and Performance Bond) A. Payment and Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a payment and performance bond for the full contract amount. B. Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of Contractor's signature on the Agreement. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. PUBLIC WORKS AGREEMENT - 2 (Roadway/Pedestrian Path - Under$10K and Performance Bond) D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the PUBLIC WORKS AGREEMENT - 3 (Roadway/Pedestrian Path - Under$I0K and Performance Bond) facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. PUBLIC WORKS AGREEMENT - 4 (Roadway/Pedestrian Path - Under$1OK and Performance Bond) B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. PUBLIC WORKS AGREEMENT - 5 (Roadway/Pedestrian Path - Under$IOK and Performance Bond) XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24,115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or PUBLIC WORKS AGREEMENT - 6 (Roadway/Pedestrian Path - Under$10K and Performance Bond) re!inquis;lment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or-award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Roadway/Pedestrian Path - Under$1OK and Performance Bond) J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: r " (signature) (signature) Print Name: Ronald G. Petersen Print Name: David A. Brock, P.E. Its: President Its: Interim terim Operations Manager (title) DATE: 3-2-15 DATE: � '. . NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Ronald Petersen Timothy J. LaPorte, P.E. Petersen Brothers, Inc. City of Kent 2008 East Valley Highway 220 Fourth Avenue South Sumner, WA 98390 Kent, WA 98032 (253) 833-2544 (telephone) (253) 856-5500 (telephone) (253) 863-5951 (facsimile) (253) 856-6500 (facsimile) p m,flod,you may enter the eleamni filepath where the mnVad has been saved] PUBLIC WORKS AGREEMENT $ (Roadway/Pedestrian Path - Under$10K and Performance Bond) i EHIITA en Brothers, , Inc. 2008 EAST VALLEY HIGHWAY SUMNER,WASHINGTON 98390 (253)833-2544(263)863.8136 FAX(253)863-5951 Contractors #CC-01 PETERS1187NZ Project Name: JOE JACKSON BRIDGE ATTENUATOR REPAIR BID DATE: 0 2/0 312 014 PAY ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION 1 Crew Time Labor 5.00 HOUR 262.67 1,313.35 2 Quadguard Cartridge Assembly Type 1 4.00 EACH 852.00 3,408.00 3 Quadguard Cartridge Assembly Type II 3.00 EACH 896,00 2,688.00 4 Plastic Nose Assembly 1.00 EACH 783.00 783.00 5 Traffic Control Labor 5.00 HOUR 66,32 331.60 6 Traffic Control Materials 1.00 L.S. 145.00 146.00 TOTAL QUOTE 8,668.95 Name: TOM CITY OF KENT Phone: 253-856-5673 Email: trusbuldt@kentwa.gov This quote contains the following exclusions/qualifications: "Price does not Include traffic control unless specified. *"Prices Include material&installation,bond and Insurance. Beam Guardrail is available In 12.5'and 6.25'lengths, *"Prices are good if contract Is received within 30 days after award of Job,after 30 days prices must be renegotiated. IF ACCEPTED PLEASE SIGN AND FAX BACK TO 253-863.5951 NO WORK WILL BE PERFORMED WITHOUT PROPER AUTHORIZATION By: Date: Phone: Title: Fax: Company Name: Address: DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. d Ronald G. Petersen For: Petersen Brothers, Inc. Title: President Date: 3-2-15 i i EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. b EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Petersen Brothers, Inc. Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as U. ,toe .hdr sm Br Atten Rp that was entered into on the (date), between the firm I represent and the City of Kent. i I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By. Ronald G. etersen For: Petersen Brothers, Inc. Title: President Date: EEO COMPLIANCE DOCUMENTS - 3 I EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. A�H CERTIFICATE F LIABILITY INSURANCE ziz6�zo1JYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Karen Smith NAME: HENTSCHELL & ASSOC INC PHONE (253)272-1151 FAX One Pacific Building E"MAIL .Karen.Smith@hentschell.com 621 Pacific Ave. , Suite 400 INSURERS AFFORDING COVERAGE NAICa Tacoma WA 98402 INSURERA:The Charter Oak Fire Ins. Co. 25658 INSURED INSURERS Travelers Pro Cas Cc of America Petersen Brothers, Inc. INSURERC:Great American Insurance Co. 2008 East Valley Hwy INSURERD: INSURER E Sumner WA 98390 INSURER F: COVERAGES CERTIFICATE NUMBER:2014 GL/Auto/Umb/Excess REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN 15 SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSR VAID POLICY NUMBER 11VI ID LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED 300,000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ A CLAIMS-MADE OCCUR X T-CO-526D9518-COF-14 11/1/2014 11/1/2015 MED EXP(An ane person) $ 10,000 PERSONAL 6ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'LAGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG $ 2,000,000 POLICY X PRO LOC $ A COMBINED SINGLE LIMIT AUTOMOBILE LIABILITY Ea accIdenl 1,000,000 A P ANY AUTO BODILY INJURY(Per person) S ALL OWNED SCHEDULED X T-810-526D9518-IND-14 11/1/2014 11/1/2015 BODILY INJURY(Per amdenq $ AUTOS AUTOS TOWNEU PROPERTY HIRED AUTOS AUO ecn $X Medical a menis $ 5,0001 B X UMBRELLA LIAB X OCCUR TSM-CUP-526D9518-TIL-14 11/1/2014 11/1/2015 EACH OCCURRENCE $ 1,000,000 C }{ EXCESS DADCLAIMS-MADE $10,000. Retention AGGREGATE $ 1,000,000 DED I `Y I RETENTION$ Travelers X UE01 9 62 4 6-04 (Excess) 11/1/2014 11/1/2015 Each OccurrencelAggregale $ 5,000,000 WORKERS COMPENSATION WC STATU- OTH- AND EMPLOYERS'LIABILITY ANY PROPRIETORIPARTNERIEXECUTIVE� NIA E,L.EACH ACCIDENT $ 1,000,000 A OFFICERIMEMBER EXCLUDED? T-CO-526D9518-COF-14 11/1/2014 11/1/2015 (Mandatory in NH) E.L DISEASE-EA EMPLOYEE $ 1,000,000 DESCRIPTION under ;?A-Stop Gap E.L.DISEASE-POLICY LIMIT $ 2,000,000 DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space Is required) RE: Col. Joe Jackson Bridge Attenuator Repair. Blanket Additional Insureds - Primary and Non-Contributory basis as required by written contract or agreement per the attached Endorsements #OGD246(8/05) and #CAT474(2/12) . (#15-031) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Kent 220 4th Ave. S. Kent, WA 96032 AUTHORIZED REPRESENTATIVE Thomas Hentschell/KJS ACORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. INS025(2atampi The ACORD name and logo are registered marks of ACORD '.. POLICY NUMBER: DT-CO-526D9518-COF-14 INSURED: Petersen Brothers, Inc. COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY BLANKET ADDITIONAL INSURED (CONTRACTORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART 1. WHO IS AN INSURED— (Section 11) is amended c) The insurance provided to the additional in- to include any person or organization that you sured does not apply to "bodily injury" or agree In a "written contract requiring insurance" "property damage" caused by your work" to include as an additional insured on this Cover- and included in the "products-completed op- age Part, but: erations hazard" unless the "written contract a) Only with respect to liability for"bodily injury" requiring insurance" specifically requires you "property damage"or"personal injury"; and to provide such coverage for that additional insured, and then the insurance provided to b) If, and only to the extent that, the injury or the additional insured applies only to such damage is caused by acts or omissions of "bodily injury" or "property damage" that oc- you or your subcontractor in the performance cure before the end of the period of time for of "your work" to which the "written contract which the "written contract requiring insur- requiring insurance" applies. The person or ance" requires you to provide such coverage organization does not qualify as an additional or the end of the policy period, whichever is insured with respect to the independent acts earlier. or omissions of such person or organization. 3. The insurance provided to the additional insured 2. The insurance provided to the additional insured by this endorsement is excess over any valid and by this endorsement is limited as follows: collectible "other insurance", whether primary, a) In the event that the Limits of Insurance of excess, contingent or on any other basis, that is m= this Coverage Part shown in the Declarations available to the additional Insured for a loss we a® exceed the limits of liability required by the cover under this endorsement. However, if the "written contract requiring insurance", the in- "written contract requiring insurance" specifically surance provided to the additional insured requires that this insurance apply on a primary shall be limited to the limits of liability re- basis or a primary and non-contributory basis, quired by that "written contract requiring in- this Insurance is primary to "other insurance" surance". This endorsement shall not in- available to the additional insured which covers crease the limits of insurance described in that person or organization as a named insured Section III—Limits Of Insurance. for such loss, and we will not share with that m "other insurance". But the insurance provided to b) The insurance provided to the additional in- � the additional insured by this endorsement still is ® sured does not apply to "bodily injury", "prop- excess over any valid and collectible "other in- arty damage" or "personal Injury' arising out surance", whether primary, excess, contingent or of the rendering of, or failure to render, any on any other basis, that is available to the addi- professional architectural, engineering or Sur- tional insured when that person or organization is veying services, including: an additional Insured under such "other insur- i. The preparing, approving, or failing to ance", prepare or approve, maps, shop draw- 4. As a condition of coverage provided to the ings, opinions, reports, surveys, field or- additional insured by this endorsement: ders or change orders, or the preparing, approving, or failing to prepare or ap- a) The additional insured must give us written prove, drawings and specifications; and notice as soon as practicable of an "occur- ii. Supervisory, inspection, architectural or rence" or an offense which may result in a claim. To the extent possible, such notice engineering activities. should include: CG D2 46 06 05 0 2005 The St. Paul Travelers Companies, Inc. Page 4 of 2 004146 COMMERCIAL GENERAL LIABILITY I. How, when and where the "occurrence" any provider of"other insurance" which would or offense took place; cover the additional insured for a loss we ii. The names and addresses of any injured cover under this endorsement. However, this persons and witnesses; and condition does not affect whether the insur- ance provided to the additional insured by III. The nature and location of any injury or this endorsement is primary to 'other insur- damage arising out of the"occurrence" or ance" available to the additional insured offense, which covers that person or organization as a b) If a claim is made or"suit" is brought against named insured as described in paragraph 3. the additional insured, the additional insured above. must: S. The following definition is added to SECTION V. I. Immediately record the specifics of the —DEFINITIONS: claim or"suit" and the date received; and "Written contract requiring insurance" means ii. Notify us as soon as practicable. that part of any written contract or agreement under which you are required to include a The additional insured must see to it that we person or organization as an additional in- receive written notice of the claim or"suit" as sured on this Coverage Part, provided that soon as practicable. the "bodily injury" and "property damage" oc- c) The additional insured most immediately curs and the "personal injury" is caused by an send us copies of all legal papers received in offense committed: connection with the claim or"suit', cooperate a. After the signing and execution of the with us in the investigation or settlement of contract or agreement by you; the claim or defense against the "suit', and otherwise comply with all policy conditions. b. While that part of the contract or d) The additional insured must tender the de- agreement is in effect; and fense and indemnity of any claim or "suit' to C. Before the end of the policy period. Page 2 of 2 0 2005 The St. Paul Travelers Companies, Inc. CG D2 46 08 05 POLICY NUMBER: DT-810-526D9518-IND-14 INSURED: Petersen Brothers, Inc. COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED — PRIMARY AND NON-CONTRIBUTORY WITH OTHER INSURANCE This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modi- fied by this endorsement. PROVISIONS B. The following is added to Paragraph 5., Other A, The following Is added to Paragraph c, in A. 1., Insurance, in B. General Conditions of SEC- Who Is An Insured, of SECTION II — LIABILITY TION IV-BUSINESS AUTO CONDITIONS: COVERAGE: Regardless of the provisions of paragraph a. and Any person or organization who is required under paragraph d.of this part 5.Other Insurance, this a written contract or agreement between you and insurance is primary to and non-contributory with that person or organization, that is signed and applicable other insurance under which an addi- executed by you before the "bodily injury" or tional insured person or organization is the first "property damage' occurs and that is in effect named insured when the written contract or during the policy period, to be named as an addi- agreement between you and that person or or- tional insured is an "insured" for Liability Cover ganization, that is signed and executed by you age, but only for damages to which this Insurance before the "bodily Injury' or ".property damage" applies and only to the extent that person or or- occurs and that is in effect during the policy pe- ganlzatlon qualifies as an 'insured" under the riod, requires this insurance to be primary and Who Is An Insured provision contained in non-contributory. Section 11. s CA T4 74 02 12 ©2012 The Travelers Indemnity Company-All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Sorvices Ofrrce,Inc with Its permission. i Bond No. 106224306 e T PAYMENT AND PERFORMANCE BOND TO CITY DE KENT KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, Petersen Brothers. Inc. as Principal, and Travelers Casualty and Surety Company of America a Corporation organized and existing under the laws of the State of Washington, as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $9,492.50 , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of Col, Joe Jackson Bridge Attenuator Repair (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by PAYMENT AND PERFORMANCE BOND Page 1 of 2 law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority of its governing body. TWO W NESSES: Petersen Brothers, Inc. PRINCIPAL (nkprprjn al's name above) BY: t r�l✓ � . ona Petersen TITLE: President _ DATE: February 26, 2015 DATE: February 26, 2015 , mot CORPORATE SEAL: PRINT NAME DATE: February 26. 2015 Travelers Casualty and Surety Company of America SURETY CORPORATE SEAL: By DATE: February 26, 2015 Karen J. Smith TITLE: Attorney-In-Fact ADDRESS: c/o Hentschell &Associates, Inc. 621 Pacific Ave. #400, Tacoma, WA 98402 CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within Bond; that Ronald G. Petersen Who signed the said bond on behalf of the Principal Petersen Brothers, Inc. Of the said Corporation; that I know his signature thereto is genuine, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. ECRETARY OR ASSISTANT SECRETARY Robin D. Petersen aaa,nfwmn�m. ,nm...enr.n.m«.oa.e.eeo ! PAYMENT AND PERFORMANCE BOND Page 2 of 2 WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER Aq� POii'FR OF ATTORNEY TRA V ELERS J Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Iusurance Company United States Fidelity and Guaranty Company I' St.Paul Guardian Insurance Company 218993 Attorney-hi Fact No. Certificate No. 005910858 � ICNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the ,State of Connecticut,that Fidelity and Guaranty Insurance Company is a Xp' corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwriters,Inc.,is a corporation duly organized under the '# laws of the State of Wisconsin(herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint n Karen Ingram, Karen.l. Smith,Julie Craker,Thomas P.Hentschell,Leslie A.Parks,Brad Roberts,and Joanne Reinkensmeyer a of the City of Tacoma ,State of Washington ,their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and 14 other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. i IN WITNESS WHEREOF,the Companies have caused this instrument to he signed and their corporate seals to be hereto affixed,this 21 st li dry of. May. 2014 - _ i 1 Farmington Casually Company St Paul Mercury Insurance Company Fidelity and GuarantyInsurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity mid Guaranty Company St,Paul Guardian Insurance Company 9 p6r amop SUBFn� .(� Y ° 6 1977 INC0.9PJA91E0 � o ^nn e m I onvoagre �� d( �u[ i tssa o 1977 "P xnnrro��' Poirumw�5 i +ao yagyrcc�S.° 'G 195 a - ,SE AG%ol SEAL s COxh crnrv. x $ 7 State of Connecticut By: City of Hartford ss. Robcr[L.Raney, cuior Vac Presidont 9 ° 21st May 2014 On this the day of y ,before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of Farmington Casualty Company; Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of Amcrica,and United States Fidelity and Guaranty Company,and that lie,as such,being authorized so to do,executed the foregoing insn'unrent for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. p,4lT r In Witness Whereof,I hereunto set my hand and official seal. �pTAR W w" My Commission expires the 30th day of June,2016. * '�f16L1� $ Marie C.Tbtreault,Nomry Public 'kVECI'�'S s 58440-8-12 Printed in U.S.A. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER i WARNING THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casually Company,Fidelity k& and Guaranty Insurance Company,Fidelity and Guaranty Insurance underwriters,Inc.,St.Paul Fire and Marine insurance Company,St. Paul Guardian Insurance Company, St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America, and United States +y' aFidelity and Guaranty Company,which resulutions are now in full force and effect,reading as follows: S RESOLVED;that the Chahman,the President, any Vice Chairman,any Executive Vice President, any Senior Vice President,any Vice President, any Second Vrce President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-ill-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with theS Company's seal bonds,recognizanceg,contracts of indernuty,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any 5 of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given hire or her;and it is q FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may �'. delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy g thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a band,recognizance,or conditional undertaking shall be valid and holding upon the Company when(a)signed by the Presidcnc,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and scaled with the Company's goal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if requited)by one or more Attorneys in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED,that the signature of each of the following officers:President,my Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President, any Secretary,any A36stant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Factfor purposes only of executing and attesting bonds t and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate hearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the Future with respect to any bond or understanding to which it is attached, I,Kevin E.Hughes,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty loom coca Undem,rucrs,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian insurance Company St.Paul Mercury Insnmuce Company,Travelers Casualty and q Surety Company,Ti avelers Ca sualty and Surety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is in full force and effect and has not been revoked. w ce IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies Chirz"yeay of� ' °`3s' 10 /n e Kevin�E uglier,Assistan[Sec nary g� 3 5 y LASUA�L v'"rv'P fi W fC l GA ,xi Sv q..... 9 riii 9110 J p�,wN�'NSWIiy� YMa -.4bci+` n 99 Xf4NVORhiEO @: ,£i f ry 1882 > $ 1951 Se AL o 3F S$AL :� COauaPO a naaa C N 1�X sy . nil P� I rm s,lsw.AX { +s -µ'a iO"t 'a "v9' 11XX 0 AIN gym✓ w Y I 'I'o verify the authenticity of this Power of Attorney,call I-800-421-3880 or contact us at www.ttavekrsbond.ernn.Please refer to The Attomey-In-Fact number,the ,]I above-named individuals and the details of the bond to which the power is attached. _ k e 5 m WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER 2Mi2015 aboutblank I State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 2/19/2015 Countv Trade Job Classification Wage Holiday Overtime Note King Asbestos Abatement Workers Journey Level $42.67 5D 1H King Boilermakers Journey Level $64.44 5N 1C ,King (Brick Mason Brick And Block Finisher $44.46 5A 1M King (Brick Mason Journey Level $51.32 5A 1M King (Brick Mason Pointer-Caulker-Cleaner $51.32 5A 1M King lBuilding Service Employ Janitor $21.29 5S 2F King Building Service Employee 'Traveling Waxer/Shampooer $21.70 5S 2F King Building Service Emplovees Window Cleaner (Non- $24.94 5S 2F Scaffold) King :Building Service Employee Window Cleaner (Scaffold) $25.80 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 Carpenters Acoustical Worker $52.32 King 5D 4C_ _ King (Carpenters Bridge, Dock And Wharf $52.32 5D 4C Carpenters King (Carpenters Carpenter $52.32, 5D 4C King Carpenters Carpenters on Stationary Tools , $52.45 5D 4C King Carpenters Creosoted Material $52.421 5D 4C King Carpenters Floor Finisher $52.32 50 14C King Carpenters Floor Layer $52.321 5D 4C King Carpenters Scaffold Erector $52.321 5D 4C King Cement Masons Journey Level $52.381 7A 1M King Divers Et Tenders Diver $105.37i 5D 4C 8A King Divers Et Tenders Diver On Standby $59.50 5D 4C King Divers Et Tenders Diver Tender $54.82 5D 4C King Divers Et Tenders Surface Rcv Et Rov Operator $54.82 5D 4C King Divers Et Tenders Surface Rcv a Rov Operator $51.07 5A 4C °Tender j King Dredge Workers Assistant Engineer $53.0011 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F https://fortress.wa.govhni/wagelwkup/prvWagelookup.aspx 1/17 2/19/2015 aboutblank "King Dredge Workers Boatmen $52.30 5D 3F King Dredge Workers Engineer Welder $54.04 5D 3F King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King Dredge Workers Mates $52.30 5D 3F King Dredge Workers «Oiler $52.58 5D 3F King Drywall Applicator jJourney Level $52.32 5D 1HH King Drywall Tapers (Journey Level $52.37 5P 1_E r _ King Electrical Fixture Maintenance IlJourney Level $25.84 5L 1E Workers King Electricians Inside !!Cable Splicer $65.69 7C 2W King Electricians - Inside ,Cable Splicer (tunnel) $70.52 7C 2W King Electricians - Inside Certified Welder $63.49 7C 2W King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W King Electricians - Inside Construction Stock Person $35.69 7C 2W King Electricians - Inside Journey Level $61.30 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W King Electricians - Motor Shop Craftsman $15.371 1 King Electricians - Motor Shop Journey Level $14.69I 1 King Electricians - Powerline Cable Splicer $68.33I 5A 4A Construction King Electricians - Powerline Certified Line Welder $62.50 5A 4A Construction King Electricians - Powerline Groundperson $42.56 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $62.50 5A 4A Construction Operator King Electricians - Powerline Journey Level Lineperson $62.50I 5A 4A !Construction I King (Electricians - Powerline Line Equipment Operator $52.471 5A 4A ,Construction 'King Electricians - Powerline Pole Sprayer $62.50I 5A 4A Construction King lElectricians - Powerline Powderperson $46.55I 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors ;Mechanic $80.14 7D 4A King Elevator Constructors Mechanic In Charge $86.77 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.25, 5B 1R !Products Work Only King iFence Erectors Fence Erector $15.18I 1 King Flaggers Journey Level $36.17I 7A 31 King !Glaziers Journey Level $54.91 7L 1Y King Heat Ft Frost Insulators And Journeyman $60.93I 5J 15 Asbestos Workers King Heating EouipmentMechanics Journey Level $70.37i 7F 1E King Hod Carriers 8 Mason Tenders Journey Level $44.00 7A 31 httpsV/fortress.wa.gov/1 r i/wagelookup/pNW agelookup.aspx 2/17 2/1912015 about:blank King Industrial Power Vacuum lJourney Level $9.47j 1 Cleaner King Inland Boatmen Boat Operator $54.57 9B 1_K King Inland Boatmen Cook I $50.95 5B 1_K King lInland Boatmen Deckhand $51.19; 5B 1_K King lInland Boatmen iDeckhand Engineer $52.181 5B 1_K King Inland Boatmen Launch Operator $53.40! 5B 1_K King Inland Boatmen Mate $53.40, 5B 1K King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing 0 'Grout Truck Operator $11.48 1 ;Sewer Et Water Systems By ;Remote Control -King I Operator nspection/Cleaning/Sealing Of Head 0erator $24.91 , _ Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Technician $19.33 1 Sewer Et Water Systems By Remote Control i King Inspection/Cleaning/Sealing Of ;Tv Truck Operator $20.45' 1 Sewer Et Water Systems By Remote Control King '_ P Insulation Applicators 'JourneyLevel $52.321 5D 4C King Ironworkers ;Journey $61.62 7N 10 _ man :King Laborers ;Air, Gas Or Electric Vibrating $42.67 7A 31 1Screed King Laborers Airtrac Drill Operator $44.00 7A 31 King Laborers Ballast Regular Machine $42.67 7A 31 King Laborers Batch Weighman $36.17 7A 31 King Laborers Brick Pavers $42.67 7A 31 King Laborers Brush Cutter $42.67 7A 31 King Laborers Brush Hog Feeder $42.67 7A 31 King Laborers Burner $42.67 7A 31 King Laborers Caisson Worker $44.00 7A 31 King Laborers Carpenter Tender 1 $42.671 7A : 31 King iLaborers Caulker $42.67 7A 31 King (Laborers Cement Dumper-paving ( $43.461 7A 31 King (Laborers Cement Finisher Tender $42.67 7A 31 King Laborers !Change House Or Dry Shack $42.67I 7A 31 .King Laborers Chipping Gun (under 30 Lbs.) $42.67I 7A 31 King Laborers Chipping Gun(30 Lbs. And $43.461 7A 31 (Over) King ;Laborers Choker Setter $42.67 7A 31 King Laborers Chuck Tender 7A 31 $42.67 King Laborers 3Clary Power Spreader $43.461 7A 31 King ILaborers 'Clean-up Laborer $42.6711 7A 1 31 https://fortress.wa.govAni/wagelookup/prvWagelookup.aspx 3/17 2/19/2015 about:blank - King Laborers Concrete Dumper/chute $43.46 7A 31 Operator King Laborers Concrete Form Stripper $42.67 7A 31 King Laborers Concrete Placement Crew $43.46 7A 31 King ,Laborers Concrete Saw Operator/core $43.46 7A 31 Driller King Laborers Crusher Feeder $36.17 7A 31 King Laborers Curing Laborer $42.671 7A 31 King Laborers Demolition: Wrecking Et $42.67:: 7A 31 Moving (incl. Charred Material) King laborers :Ditch Digger $42.67 7A 31 King Laborers Diver $44.00 7A 31 King Laborers Drill Operator $43.46 7A 31 (hydraulic,diamond) King Laborers 1Dry Stack Walls $42.67 7A 31 i King laborers Dump Person $42.67' 7A 31 King Laborers Epoxy Technician $42.67 7A 31 King (Laborers Erosion Control Worker $42.671i 7A 31 &King Laborers Faller Bucker Chain Saw $43.46 7A 31 King (Laborers Fine Graders $42.671 7A 31 King Laborers Firewatch $36.17 7A 31 King ,Laborers Form Setter $42.67� 7A 31 King (Laborers Gabian Basket Builders $42.67 7A 31 King Laborers General Laborer $42.671 7A 31 King Laborers Grade Checker Et Transit $44.00' 7A 31 Person King Laborers Grinders $42.67 7A 31 King Laborers Grout Machine Tender $42.67 7A 31 King Laborers Groutmen (pressure)including $43.46 7A 31 Post Tension Beams King Laborers Guardrail Erector $42.67 7A 31 King (Laborers 'Hazardous Waste Worker level $44.00 7A 31, A) King Laborers Hazardous Waste Worker (level $43.46 7A 31 B) - King Laborers Hazardous Waste Worker (level $42.67, C) King Laborers High Scaler $44.00 7A 31 King Laborers Jackhammer $43.46 7A 31 King Laborers Laserbeam Operator $43.46 7A 31 King Laborers Maintenance Person $42.67 7A 31 King Laborers Manhole Builder-mudman $43.46 7A 31 King Laborers Material Yard Person $42.67 7A 31 King Laborers Motorman-dinky Locomotive $43.46 7A 31 King Laborers Nozzleman (concrete Pump, $43.461, 7A 31 Green Cutter When Using https://fortress.wa.gov/lni/wagelookup/prvW@gelwkup.aspx 4/17 Z1572015 about:blank Combination Of High Pressure Air ft Water On Concrete & Rock, Sandblast, Gunite, Shotcrete, Water Bla King (Laborers Pavement Breaker $43.46 7A 31 King Laborers Pilot Car $36.17 7A 31 King (Laborers Pipe Layer Lead $44.00 7A 31 King Laborers Pipe Layer/tailor $43.46 7A 31 King Laborers Pipe Pot Tender $43.46 7A 31 King Laborers Pipe Refiner $43.46: 7A 31 King :Laborers Pipe Wrapper $43.46 7A 31 King (Laborers Pot Tender $42.67 7A 31 King Laborers Powderman $44.00 7A 31 King Laborers Powderman's Helper $42.67: 7A 31 i King Laborers Power Jacks $43.461 7A 31 King Laborers Railroad Spike Puller - Power $43.46 7A 31 King Laborers :Raker - Asphalt $44.00 7A 31 King Laborers ;Re-timberman $44.00 7A 31 King laborers Remote Equipment Operator $43.46 7A 31 King Laborers !Rigger/signal Person $43.46 7A 31 King :Laborers :Rip Rap Person $42.67 7A 31 King LaborersRivet Buster $43.46 7A 31 I King ;laborers HRodder $43.46 7A 31 King !Laborers Scaffold Erector $42.67 7A 31 King (Laborers Scale Person $42.67, 7A 31 King Laborers Sloper (over 20") $43.46: 7A 31 King Laborers Sloper Sprayer $42.67 7A 31 King Laborers Spreader (concrete) $43.461 7A 31 King Laborers Stake Hopper $42.67 7A 31 King Laborers Stock Piler $42.67j 7A 31 King Laborers Tamper sate Toots KingElectric, Air $43.461 7A 31 8 Gas Ope King Laborers Tamper (multiple Ft Self- $43.46 7A 31 ,propelled) King Laborers dTimber Person - Sewer (lagger, $43.46 7A 31 'Shorer 13 Cribber) ,King (Laborers 1yToolroom Person (atJobsite) $42.67 7A 31 `King Laborers Topper $42.67 7A 31 ' King Laborers Mack Laborer $42.67 7A 31 'King (Laborers `Track Liner (power) $43.46 7A 31 ;King ILaborers Traffic Control Laborer $38.68 7A 31 8R .King ILaborers Traffic Control Supervisor $38.68'' 7A 31 8R King :Laborers Truck Spotter $42.67 7A 31 ,King Laborers :Tugger Operator $43.46 7A 31 King (Laborers Tunnel Work-Compressed Air $64.99 7A 31 M https:l/fortress.wa.govAni/wagelookup/prvWagelwkup,aspx 5/17 2/19/2015 about:blank Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $70.02 7A 31 BD Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $73.70 7A 31 Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $79.40 7A 31 Worker 54.01.60.00 psi King Laborers (Tunnel Work-Compressed Air $81.52 7A 31 SD Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $86.62 7A 31 Sg gWorker 64.01-68.00 psi King Laborers "Tunnel Work-Compressed Air $88.52 7A 31 8D Worker 68.01-70.00 psi King Laborers 'Tunnel Work-Compressed Air $90.52 7A 31 8� I Worker 70.01-72.00 psi King Laborers IlTunnel Work-Compressed Air $92.52 7A 31 8D l Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $44.10 7A 31 8D Tender I _ - King Laborers Tunnel Work-Miner $44.10 7A 31 SD King Laborers Vibrator $43.461 7A 31 King Laborers Vinyl Seamer 1 $42.67 7A 31 King Laborers Watchman $32.87� 7A 31 King Laborers Welder $43.46' 7A 31 King Laborers 'Well Point Laborer $43.461i 7A 31 King Laborers Window Washer/cleaner $32.87 7A 31 King Laborers Underground Sewer General Laborer Ft Topman $42.67 7A 31 Et Water King Laborers - Underground Sewer Pipe Layer $43.46 7A 31 @ Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17, 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $52.32 5D 1_H King Marbte Setters Journey Level $51.32 5A 1M 'King Metal Fabrication (In Shop) Fitter $15.86 1 'King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 I King ,Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $53.42 9D 4C King Modular Buildings !Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 https://fortress.wa.gov4ni/wagelwkup/prvW agelwkup.aspx 6/17 2/19/20,15 aboutblank King Modular Buildings Equipment Maintenance $11.56 1 King (Modular Buildings Plumber $11.56' 1 King (Modular Buildings Production Worker $9.47 1 King (Modular Buildings Tool Maintenance $11.56 1 King iModular Buildings Utility Person $11.56 1 King Modular Buildings .Welder $11.56 9 King Painters Journey Level $37.8& 6Z 2B King Pile Driver Journey Level $52.57� 5D 4C King IP asterers Journey Level $50.42 7D 1R ;King Playground 8 Park Equipment Journey Level $9.47 1 Installers King Plumbers Et Pipefitters Journey Level $74.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3C ( 8P King Power Equipment Operators Assistant Engineer $51.97i 7A 3C 8P King !Power Equipment Operators Barrier Machine (zipper) $54.75 7A i 3C 8P King iPower Equipment Operators Batch Plant Operator, $54.751 7A 3C 8P Concrete King Power Equipment Operators Bobcat ( $51.971 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $51.97 7A 3C 8P Equipment King ,Power Equipment Operators Brooms $51.97: 7A 3C 8P King Power Equipment Operators pBump Cutter $54.75 7A 3C 8P King Power Equipment Operators (Cableways $55.24 7A 3C 8P King Power Equipment Operators (Chipper $54.75 7A 3C 8P King Power Equipment Operators Compressor $51.97, 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $55.24 7A 3C 8P With Boom Attachment Over i 42 M King Equipment 7A 3C 8P Power E ui ment s Concrete Finish Machine -laser $51.97, Screed King Power Equipment Operators Concrete Pump - Mounted Or $54.33I 7A 3C 8P Trailer High Pressure Line ,Pump, Pump High Pressure. P g i King Power Equipment Operators Concrete Pump: Truck Mount $54.75i 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $54.33 7A 3C 8P `King Power Equipment Operators GCranes: 20 Tons Through 44 $54.75 7A 3C 8P Tons With Attachments g p Tons Or Boom g Kin Power Equipment Operator Cranes: 100 Tons s Through 199 $55.79 7A 3C 8P (Including Jib With Attachments) King 'Power Equipment Operators Cranes: 200 Tons To 300 Tons, $56.36, 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C I 8P https:/Ifortress.wa.gov4ni/wagelookup/prvWagelwkup.aspx 7/17 2/19/2015 abouttlwk Tons, Under 150' Of Boom (including Jib With I Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $51.97 7A 3C 8P Under King Power Equipment Operators Cranes: Friction 100 Tons $56.36, 7A 3C 8P Through 199 Tons King (Power Equipment Operators Cranes: Friction Over 200 Tons 1 $56.92j 7A 3C 1 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $56.921 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $54.331 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $54.75 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $54.75 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P King Power Equipment Operators Dozers D-9 Ft Under $54.33 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $54.75 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $51.97 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $54.75I1 7A 3C 8P Gamaco £t Similar Equipment - King Power Equipment Operators Forklift: 3000 Lbs And Over $54.331 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $51.97 7A 3C 8P Attachments King (Power Equipment Operators Grade Engineer: Using Blue $54.75; 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $51.97 7A 3C 8P King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $55.24 7A 3C 8P Articulating Off- Road Equipment 45 Yards. 8: Over King Power Equipment Operators Hard Tail End Dump $54.75 7A 3C 8P Articulating Off-road Equipment Under 45 Yards ;King Power Equipment Operators Horizontal/directional Drill $54.33 7A 3C 8P Locator King (Power E ui ment Operators Horizontal/directional Drill $54.75 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $54.33; 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. 8 $55.79 7A 3C 8P hLtps://fortress.wa.gov/lniMagelwkuplprvWagelwkup.asp(( 8/17 2/19)2015 about blank Over King Power Equipment Operators Loader, Overhead, 6 Yards. $55.24 7A 3C 8P But Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $54.75 7A 3C 8P Yards King Power Equipment Operators Loaders, Plant Feed $54.75i 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P King (Power Equipment Operators Locomotives, All $54.75 7A 3C ( 8P King Power Equment Operators Material Transfer Device $54.751 7A 3C 8P King Power Eauinment Operators •Mechanics, All (Leadmen $55.79 7A 3C 8P $0.50 Per Hour Over Mechanic), j King Power Equipment Operators Motor Patrol Grader - Non- $54.331 7A 3C 8P I i finishing King Power Equipment Operators Motor Patrol Graders, Finishing ( $55.2411 7A 3C 8P i King Power Equipment Operators Mucking Machine, Mole, $55.241 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $51.97', 7A 3C 8P Distribution Et Mulch Seeding ,Operator King Power Equipment Operators Outside Hoists (elevators And $54.33, 7A 3C 8P Manlifts), Air Tuggers,strato King Power Equipment Operators !Overhead, Bridge Type Crane: $54.75 7A 3C 8P 120 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $55.79 7A 3C 8P ,Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $55.241 7A 3C 8P Tons Through 99 Tons g <LPOperators _ g _ - 1 7A 3C 8P .Kin 'Power Equipment ment Pavement Breaker � $51.97, King 1Power Equipment Operators Pile Driver (other Than Crane $54.75I 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $54.33, 7A 3C 8P King Power Equi pment Operators Posthole Digger, Mechanical $51.97 7A 3C 8P King Power Equipment Operators Power Plant $51.97 7A 3C 8P King Power Equipment Operators Pumps - Water $51.97 7A 3C 8P King Power Equipment Operators gQuad 9, Hd 41, D10 And Over $55.24 7A 3C 8P King Power E ui ment Operators ;Quick Tower - No Cab, Under $51.97: 7A 3C 8P 100 Feet In Height Based To ,,Boom g 9 P P 7A 3C 8P Rubber Tired Earth Moving Kin Power E ui ment Operator Remote Control Operator On $55.241 _ Equipment King Power Equipment Operators Rigger And Bellman $51.9711 7A 3C 8P King Power Equipment Operators Rollagon $55.24i 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $51.971 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $54.33� 7A 3C 8P 4Materials httpsJ/fortress.wa,gov4ni/wagelwkup/prvWagelwkup.aspx 9117 2/19/2015 about:blank King (Power Equipment Operators Roto-mill, Roto-grinder $54.75 7A 3C 8P King :Power Equipment Operators Saws - Concrete $54.33 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $54.75 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $54.33 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Yards And Over Kin Power Equipment 0 Operator Service Engineers - Equipment $54.33 7A 3C 8P gP y King Power Equipment Operators Shotcrete/gunite Equipment $51.97 7A 3C 8P King Power Equipment Operators (Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $55.24 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes $55.79, 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons u King Power Equipment Operators 'Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $55.24, 7A 3C 8P g _ qSpreader, Topsider _ p . Kin Power Equipment Operators To skier 8 $55.24, 7A 3C 8P Screedman King Power Equi pment Operators Subgrader Trimmer $54.75 7A 3C 8P King Power Eauipment Operators Tower Bucket Elevators $54.331 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $56.36 7A 3C 8P Height, Base To Boom King Power Eauipment Operators Tower Crane Up To 175' In $55.79 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $55.24 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P King Power Equipment Operators .Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P ' Tons And Over King Power Equipment Operators Truck Crane Oiler/driver $54.33 7A 3C 8P Under 100 Tons King Power Equipment Operators Truck Mount Portable $54.75 7A 3C 8P Conveyor King Power Equipment Operators Welder $55.24 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $51.97 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $54.75 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $55.24 7A 3C 8P Undereround Sewer Et Water King Power Equipment Operators- Assistant Engineer $51.97 7A 3C 8P Underground Sewer Et Water :King p (zipper) 7A 3C 8P (Power Equipment Operators- Barrier Machine zi r $54.75 https://fortress.wa.govAni/wagelookup/prvWagelmkup.aspx 10117 2/19/2015 about:blank Underground Sewer £t Water King Power Equipment Operators- Batch Plant Operator, $54.75 7A 3C 8P Underground Sewer a Water IXoncrete King ,Power Equipment Operators- ;Bobcat $51.97 7A 3C 8P (Underground Sewer Ft Water King !Power Equipment Operators- Brokk - Remote Demolition $51.97, 7A 3C 8P Underground Sewer Et Water i Equipment King Power Equipment Operators- Brooms $51.97 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Bump Cutter $54.75 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Cableways $55.241 7A 3C 1 8P Underground Sewer a Water King jPower Equipment Operators- Chipper $54.75 7A 3C 8P jUnderground Sewer a Water King Power Equipment Operators- Compressor $51.97 7A 3C 8P Underground Sewer a Water King 'Power Equipment Operators- Concrete Pump: Truck Mount $55.24 7A 3C 8P Underground Sewer a Water With Boom Attachment Over I 42 M King Power Equipment Operators- Concrete Finish Machine -laser $51.97, 7A 3C 8P Underground Sewer a Water Screed King Power Equipment Operators- 'Concrete Pump - Mounted Or $54.33' 7A 3C 8P Underground Sewer a Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equl�ment Operators- Concrete Pump: Truck Mount $54.75 7A 3C 8P Underground Sewer a Water With Boom Attachment Up To 42 m King !Power Equipment Operators- Conveyors $54.33 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $54.75� 7A 3C 8P Underground Sewer a Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 li $55.79 7A 3C 8P Underground Sewer a Water Tons, Or 150' Of Boom (Including Jib With Attachments) King _Power Equipment Operators- 'Cranes: 200 Tons To 300 Tons $56.36 7A 3C 8P Underground Sewer a Water 'Or 250' Of Boom (including Jib With Attachments) g !Power Equipment Operators- g 7A 3C 8P King Cranes: 45 Tons Through 99 $55.24 Underground Sewer a Water Tons, Under 150' Of Boom (including Jib With Attachments) $51.97 7A 3C 8P Undergrou d Sewer a Water Under King Power E of ment 0 erators Cranes: A-frame - 10 Tons And King Power Equipment Operators- !Cranes: Friction 100 Tons $56.36 7A 3C 8P Underground Sewer a Water 'Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons I $56.921 7A 3C 8P Underground Sewer a Water 'King Power Equipment Operators- :Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P https://fortress.wa.govllnilwagelwkupfprvWagelwkup.aspx 11/17 2/19/2015 about:blank Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $54.33 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $54.75 7A 3C 8P Underground Sewer Et Water King (Power Equipment Operators- Deck Engineer/deck Winches $54.75 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 Et Under $54.33 7A 3C 8P (Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P IUnderground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $54.75 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Elevator And Man-lift: $51.97 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $54.75 7A 3C 8P Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- +,Forklift: 3000 Lbs And Over $54.33 7A 3C 8P Underground Sewer Et Wate ilWith Attachments g Underero Sewer Et Water AttacihmenUt der 3000 Lbs. With $51.97 7A 3C 8P Kin Power Equipment 0 erators King Power EquiPment Operators- i'Grade Engineer: Using Blue $54.75I 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P Underground Sewer Et Water King iPower Equipment Operators Hard Tail End Dump $55.24 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over i King Power Equipment Operators- Hard Tail End Dump $54.75 7A 3C 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $54.33 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $54.75 7A 3C 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $54.33, 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $51.971 7A 3C 8P Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Ft $55.79 7A 3C 8P Underground Sewer Et Water Over King Power Eauipment Operators Loader, Overhead, 6 Yards. $55.24 7A 3C 8P Underground Sewer Et Water But Not Including 8 Yards https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1217 2/19/2015 about:blank .. King Power Equipment Operators- Loaders, Overhead Under 6 $54.75', 7A 3C I 8P Undereround Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P Undereround Sewer Et Water King Power Eauipment Operators Loaders: Elevating Type Belt $54.311 7A 3C 8P Underground Sewer Et Water King 'Power Equipment Operators- Locomotives, All $54.75 7A 3C ( 8P Undereround Sewer Et Water King (Power Equipment Operators- Material Transfer Device $54.75 7A 3C 8P :Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $55.79 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $54.331 7A 3C 8P underground Sewer Et Water finishing •King !Power Equipment Operators- Motor Patrol Graders, Finishing $55.24 7A 3C 8P !Underground Sewer Et Water King 'Power Eauipment Operators- Mucking Machine, Mole, $55.24 7A 3C 8P Undereround Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators- iOil Distributors, Blower $51.97 7A 3C 8P Undereround Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- !Outside Hoists (elevators And $54.33 7A 3C 8P Undereround Sewer Et Water HMantifts), Air Tuggers,strato King Power Equipment Operators- !Overhead, Bridge Type Crane: $54.75 7A 3C 8P Undereround Sewer 8t Water 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $55.79 7A 3C 8P (Underground Sewer Et Water Tons And Over ;King Power Equipment Operators- Overhead, Bridge Type: 45 $55.24 7A 3C 8P Underground Sewer It Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $51.97 7A 3C 8P Undereround Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $54.75 7A 3C 8P Undereround Sewer Et Water Mount) King Power Eauipment Operators- Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P Undereround Sewer Et Water King Power Equipment Operators- 'Posthole Digger, Mechanical $51.97 7A 3C 8P Undereround Sewer Et Water King ,Power Equipment Operators- Power Plant $51.97 7A 3C 8P Undereround Sewer Et Water King Power Equipment Operators- Pumps - Water $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $55.24� 7A 3C 8P Underground Sewer Et Water King Power Eauipment Operators- Quick Tower - No Cab, Under $51.971 7A 3C 8P Undereround Sewer It Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On i $55.241 7A 3C 8P i httpsWfortress.wa,gov/lni/wagelwkup(prvW agelwkup.aspx 13117 2/19/2015 aboutblank ,Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $51.97:: 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller,Plant Mix Or Multi-lift $54.331 7A 3C 8P Under round Sewer Et King Power gEquipme t Operators-l Roto-mill, Roto-grinder $54.75, 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws Concrete $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $54.75 7A 3C 8P Underground Sewer Ft Water 45 Yards King ,Power Equipment Operators- Scrapers - Concrete 8 Carry All $54.33', 7A 3C 8P Underground Sewer Et Water King (Power Equipment Operators- Scrapers, Self-propelled: 45 $55.24', 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers- Equipment $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $51.97 7A 3C 8P Underground Sewer Et Water King Power Eauipment Operators Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $55.24 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Eauipment Operators- Shovel,Excavator, Backhoes: j $56.36 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Shpform Pavers $55.24 7A 3C 8P Underground Sewer ft Water 1 King Power Equipment Operators Spreader, Topsider Et $55.24 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $56.36 7A 3C j 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $55.79 7A 3C 8P (Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $55.24 7A 3C 8P ;Underground Sewer Et Water Truck Type https:/Ifortress.wa.govAni/wagelookuWprvWagelookup.aspx 14/17 2/19/2015 a0out:6lank Vng !Power Equipment Operators- Trenching Machines $54.33 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $54.751 7A 3C 8P Underground Sewer &Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver $54.33, 7A 3C 8P Underground Sewer It Water Under 100 Tons King Power Equipment Operators- Truck Mount Portable $54.75 7A 3C 8P ;Underground Sewer it Water Conveyor King Power Equipment Operators Welder $55.24 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators 'Wheel Tractors, Farman Type $51.97 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P Underground Sewer it Water King Power Line Clearance Tree Journey Level In Charge $44.86 5A 4A Trimmers King IPower Line Clearance Tree Spray Person $42.581 5A 4A ,Trimmers King jPower Line Clearance Tree Tree Equipment Operator $44.86; 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A ;Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A Trimmers King Refrigeration&Air Journey Level $72.46 6Z 1G 'Conditioning Mechanics King Residential Brick Mason Journey Level $51.32 5A 1M King Residential Carpenters :Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King ,Residential Drywall Applicators Journey Level $40.14 5D 4C King (Residential Drywall Tapers Journey Level $52.371 5P 1E KingResidential Electricians Journey Level $30.44 1 King (Residential Glaziers Journey Level $36.20� 71. 1H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.031 1 :King (Residential Marble Setters Journey Level I $24.09I 1 King Residential Painters Journey Level $24.46I 1 King Residential Plumbers 8 Journey Level $34.69 1 Pipefitters King 'Residential Refrigeration Ft Air ;Journey Level $72.46 6Z 1G 'Conditioning Mechanics King Residential Sheet Metal Workers Journey Level (Field or Shop) $42.58 7F 1 R "King Residential Soft Floor Lavers Journey Level $42.41 I 5A 3D King ,Residential Sprinkler Fitters Journey Level $42.48 5C 211 (Fire Protection) King Residential Stone Masons Journey Level $51.32 5A 1M https://fortress.wa.gov/lni/wagelwkup/prvWagelwkup.aspx 15117 Z19/2015 about blank King Residential Terrazzo Workers Journey Level $46.96 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $44.71 9A 3H King Roofers Using Irritable Bituminous $47.71 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $70.37 7F 1 E --- - King Shipbuilding Et Shio Repair Boilermaker $40.72 7M 1H King Shipbuilding Et Ship Repair Carpenter $39.24 7T 2B King Shipbuilding Et Ship Repair Electrician $39.28i 7T 4B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $60.931 SJ 1S g - P - 7T 4B K1n Shipbuilding Et Shi Repair Laborer $39.34 _ King Shipbuilding 8 I $Ship Repair Machinist 39.32I 7T 4B King Shipbuilding Et Ship Repair Operator $39.22I 7T 4B King ,Shipbuilding Et Ship Repair Painter $39.31 ' 7T 4B King Shipbuilding Et Ship Repair Pipefitter $39.22 7T 4B King Shipbuilding & Ship Repair Rigger $39.30 7T 4B King Shipbuilding Et Ship Repair Sheet Metal $39.27 7T 4B King Shipbuilding Et Ship Repair Shipfitter $39.30 7T 4B King Shipbuilding Et Ship Repair Trucker $39.10 7T 4B King Shipbuilding Et Ship Repair Warehouse $39.17 7T 4B King Shipbuilding Et Ship Repair Welder/Burner $39.30 7T 4B King Sign Makers Et Installers Sign Installer $22.92; 1 (Electrical) King Sign Makers Et Installers Sign Maker $21.36 1 (Electrical) King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical King Soft Floor Layers Journey Level $42.41 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69.59 5C 1X Protection) King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) :King Stone Masons Journey Level $51.32 5A 1M King Street And Parking Lot Sweeper Journey Level $19.09 1 Workers King Surveyors Assistant Construction Site $54.33 7A 3C 8P Surveyor King Surveyors Chainman $53.81 7A 3C 8P King Surveyors Construction Site Surveyor 1 $55.241 7A 3C 8P King Telecommunication Journey Level $22.761 1 Technicians https://fortress.wa.gov/lnilwagelookupiprvWagelookup.aspx 16/17 2.M9/2015 about:blank King Telephone Line Construction - ;Cable Splicer $36.96 5A 2B Outside King Telephone Line Construction - 'Hole Digger/Ground Person $20.49 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $35.40 5A 2B Outside King (Telephone Line Construction - Special Aparatus Installer 1 $36.96 5A 2B ,Outside King 'Telephone Line Construction - (Special Apparatus Installer II 1 $36.191 5A 2B Outside King Telephone Line Construction Telephone Equipment Operator $36.961 5A 2B Outside (Heavy) King ,Telephone Line Construction - Telephone Equipment Operator $34.341 5A 2B ,Outside (Light) I King Telephone Line Construction - !Telephone Lineperson $34.34 5A 2B ,Outside King Telephone Line Construction - 'Television Groundperson $19.45, 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $25.89 5A 2B Outside King Telephone Line Construction - Television System Technician $30.97 5A 213 Outside King Telephone Line Construction - 'Television Technician $27.77 5A 2B I Outside King 'Telephone Line Construction Tree Trimmer $34.34 5A 2B Outside 1 King ;Terrazzo Workers Journey Level $46.96 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble Et Terrazzo Finisher $37.79 5A 1B Finishers King ;Traffic Control Stripers Journey Level $43.11, 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. $48.871 5D 3A 8L WA-Joint Council 28) 'King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03� 5D 3A 8L WA-Joint Council 28) King Truck Drivers 'Dump Truck a Trailer $48.87 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $48.03 5D 3A 8L Council 28) g Other l ( $48.87 5D 3A 8L _ Kin Truck Drivers Other Trucks W. WA-Joint �� King ;Truck Drivers Transit Mixer $43.231 1 King Well Drillers Et Irrigation Pump lirrigation Pump Installer $17.71 1 Installers 'King Well Drillers a Irrigation Pump !Oiler $12.97 1 Installers g B 1 '.Kin Well Drillers a Irritation Pum Well Driller $18.00 _ Installers https://fortress.wa.gov/ln!Avagelookup/prvWagelookup.aspx 17/17 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 +x�a**s*reo���*xt�*�*s*x*x��t+•���t*��zrtxrtx�m+z�r+x*�s�x*��rtx Mxa����+*��+*+*���x�����*�*�*���*����*x�����+*�x Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All horns worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All horns worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a fivc-tight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All Norms worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 1. N. All horns worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage_All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve (12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess often(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage- U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. Al]hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage- W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12)hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage.When holiday falls on Saturday or Sunday, the day before Saturday,Friday,and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or 40 hours during that workweek.)All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All howl worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. It. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. !, 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift.The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays, shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay.Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday.All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)horns per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday,the first four(4) hours of overtime after eight(8)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday,the first two(2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday,the first twelve(12)hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay,except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate ofpay. 4 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 Holidav Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). H. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). I. holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day,Memorial Day,Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). '.. L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9), P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day(6). it. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day. (7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving '.. Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas j (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). Holiday Codes Continued 5 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day. (9 1/2). G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And Christmas Eve Day(11). H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). 1. Paid Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9). Z. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. if a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Years Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, hidependencc Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 6 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 7. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Iolidays: New Year's Day,Memorial Day, independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H• Holidays: Now Year's Day, Martin Luther Ding Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day, Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6), Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Ilay, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day,Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day '.. after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day, and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. 7 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 7. S. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. T. Paid Holidays:New Year's Day,The Day After Or Before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,and The Day After Or Before Christmas Day. (10).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Note Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$2.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-S3.00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-S4.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$1.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1.50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. L. Workers on haznrat projects receive additional hourly premiums as follows -Level A: $0.75,Level B: $0,50,And Level C:$0.25. M. Workers on hazmat projects receive additional hourly premiums as follows:Levels A&B: S1.00,Levels C&D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A: $1.00, Level B:$0,75,Level C: S0.50,And Level D: $0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit: $2.00,Class B Suit: $1.50,Class C Suit:$1.00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid- R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle, and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012. 8 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 8. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers mid Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. 9