HomeMy WebLinkAboutPW14-203 - Change Order - #7 - SCI Infrastructure, LLC - SR 516 to S 231st Way Levee Improvements - 03/16/2015 I
® e r s Management ,
"*f�K��T
WAS„INGTON ' f Document ,
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: SCI, Infrastructure, LLC,
i
Vendor Number:
JD Edwards Number
Contract Number: PW14-203 - (YfL4
This is assigned by City Clerk's Office
Project Name: SR 516 to S 231" Way Levee/Rusell Road Upper Levee
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 8/27/2014 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Toby Hallock Department: PW Engineering
Contract Amount: 2,176,334.02
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order#7
As of: 08/27/14
KEAIT
CHANGE ORDER NO. #7
NAME OF CONTRACTOR: SCI Infrastructure, LLC, ("Contractor")
CONTRACT NAME& PROJECT NUMBER:SR 516 to S 231" Way Levee Imo /Russell Road Upper Levee
ORIGINAL CONTRACT DATE: August 27, 2014
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Place 18" amd 12" sleeves for private utility sleeves under concrete
retaining wall to save the city approximately $2000.00 versus
trenching all the way around the wall termination to the south.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $2,176,334.02
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $60,744.79
(incl, applicable WSST)
Current Contract Amount $2,237,078.81
(incl. Previous Change Orders)
Current Change Order $4,600.00
Applicable WSST Tax on this Change $437.00
Order
Revised Contract Sum $2,242,115.81
CHANGE ORDER - 1 OF 3
Original Time for Completion 120 working days
(insert date)
Revised Time for Completion under 125 working days
prior Change Orders
(insert date)
Days Required (f) for this Change 0 calendar days
Order
Revised Time for Completion 125 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear .below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF ENT:
S � a
gy
i
(signature) 01'' ( nature)
Print Name: 1-,0 n �s�S AL(-CD Pri Name: ,tt.
Its ))rb �1' P Its i
(title) itle) _
DATE: 2. ` 2 h /67 DATE: / 15_
CHANGE ORDER - 2 OF 3
• FILE NO: 200.2
KENT
w.,.. . . , CHANGE ORDER WORKSHEET NO. 7
Construction Management Division — Public Works
Project: SR 516 to S. 231" Way Levee Project No.: 09-3006.2
Improvements - James/Russell
Project Engineer: Toby Hallock Fed-Aid No.:
Owners Rep: Jason Barry Contractor: SCI Infrastructure, LLC
Date: 12/26/14
I
I. PROPOSED CHANGE
Place 18" and 12" sleeves for private utility sleeves under concrete retaining wall; STA. 1+94,
18 ft. RT.
II. REASON AND BACKGROUND FOR CHANGE
Saves the City approximately $2000 versus trenching all the way around the wall termination to
the south.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. - j FOR ACCOUNTING USE ONLY
Sch. No. Item Description I Total i City this .i Unit Unit Price Total Estimated Cost of
i Est. City PE Item
-------- ---------- ,..., -.__..__-. �. ------ -...-.- - ------ ------ _.... -------�. . ...-. .--------------
6 Private utility sleeves STA. 1 1 LS $4,600.00 $4,600.00
1+94
® I Independent Estimate Attached ❑ CREATE PAY ITEM ONLY- Payment to be made ® PAY THIS PAY ESTIMATE
-REQUIRED __ _ --_ -at a later date upon_complehon of-work _--_- I __
❑ t Material Submittals Required - CC: Construction Coordinator New Sub Regrd4 No
DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable
Change Order No. - ! FOR ACCOUNTING USE ONLY
Sch No. 1 B I No. Item Description City.- Unit Unit Price Cost of Item
C
I
❑ Independent Estimate Attached -REQUIRED ❑
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
Change Order No. ! -i FOR ACCOUNTING USE ONLY
Sch. No. B I No. ! Item Description Qty- _ Unit Unit Price Cost of Item _
_.-. --
_ j I f I _.
- - -- I
_ _ . ----- -- -
1 REV. DATE: 4/01/10
I
i
I
• FILE NO: 200.2
KENT
Independent Estimate Attached - REQUIRED
TOTAL ESTIMATED COST OF CHANGE ORDER * $4,600.00
*Total of the cost of Item Columns
THIS PAY ESTIMATE $4,600.00
IV. WORKING DAYS
Original Contract 120 Due This Change Order* Q Previous Total 1125
-- j--- _ -..._ - -
DATE T_7 i6 14 ____. _..___ _.._)_DATE !:_10/25/14 .....
* Ex lanation Justification Required.,
TOTAL WORKING DAYS* 125
*This Change Order + Previous Total li
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
I
Prepared By: Date:
J o yarr
Construction Supervisor: Date:
Paul uehne
Construction Manager: - ✓ _ rr�. Date:
Eric Connor
I
2 REV. DATE: 4/01/10
7
�. ✓t-"v9ziJti."� N9����s,%y�`.� JeS /�rr�-rPJ�'S97A� �`�L v -
5 a-f-vk- ��---
I
!
P
Mier` �pov'v-, a+a;; 6a^n� v-E4a�v s€;.�P ► b NR_ �6�1� = 3 �
f N v' cL ,Cer PHei Fh2 6 V z 4 b
L-asr�
4�r�Se a�F-1fRU� rraruu �a HqL S �� y' 7
i
$12g�
szo
12.0
730 �
i
I Li" I
'°
16G1
Iv 658
®i o L r
-3, 5`6
� OT- ri3 saLF 757'
6u4 j f P 3" zH,75 fZ 8
i
CIO C-0
i
IJ(� OF
I
. r
s mq«aSRmrsa, Lev ear+aawrk\A« c%Add Casing
Lump
Emprice roll @ for added cas m. °
Item races . ^
5 Ada Casing Inst£ A L/
Total Lump Sum me m. >
The price shown includes all workoutside of original con tscope.
S:IJOBS\1414-SR516 to S 231 Levee S Reach\05 Extra Work\Add CasingAdd Casing
Price Includes supplying one SCH 80 1 8" casing I V Long with Install, One 12" DI sleeve for clearance on
utilities left over from existing storm removal
Price Includes end seals with neoporene boots.
Price Includes Delivery to Jobsite
I Labor: Rate/MH No. Hours / Day Days Subtotal:
Operator 61.33 2. 8.00 0.75 735.96
Pipelayer 52.24 1 8.00 1.00 417.92
Foreman 64.17 1 8.00 0.75 385.02
Teamster 55.86 1 2.00 1.00 111.72
Subtotal Labor: 7,650.62
Labor Markup 29% 476.68
I Equipment: Rate/Hr No. Hours / Day Days Subtotal:
Komatsu PC 200 78.00 1 8.00 0.75 468.00
Ford 1 Ton Tool Truck 45.41 1 8.00 1,00 363.28
Foreman Truck 16.48 1 8.00 0.75 98.88
Mack Truck and Trailer 95.14 1 2.00 1.00 190,28
Subtotal Equipment: 1,680.44
Equipment Markup 21% 352.89
1C Subcontractors Quantity UM Cost/Unit Subtotal:
Subtotal Subs: -
Subcontractor Markup 12% -
1 D Materials Quantity UM Cost/Unit Subtotal:
18"SCH 80 Casing 11 LF $ 76.00 1.00 836.00
12"End Seals 2 EA 135.00 1.00 270.00
18"End Seals 2 EA 195.00 1.00 390,00
ll Subtotal Materials: 1,496.00
�Z a"' "�f� Materials Markup 21% 314.16
Subtotal Items IA-ID 5,972.79
1'ota1,Ctid'tlittonat cost 1tA-1'b . "