HomeMy WebLinkAboutPW15-086 - Original - Skycorp, LTD - 1st Avenue Awning Removal - 3/6/15 n�a�i�fiiFsa' 'af'
Records e rn eft;;=�k
KENT
WA9rviNGTOH Document
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Skycorp LTD
Vendor Number:
JD Edwards Number
Contract Number: Fwk s p
This is assigned by City Clerk's Office
Project Name: 1st Ave Awning Removal
Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract
❑ Other:
Contract Effective Date: 03/06/2015 Termination Date: 03/21/15
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Bill Thomas Department: Operations
Contract Amount: $6,900.00
Approval Authority: (CIRCLE ONE) Department Dire r Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Mobilization, demolition and removal of existing canopy over sidewalk along 1st Ave. The
canopy pillars will be cut flush to the ground without any removal underground.
As of: 08/27/14
ICENT
WgHNIN�i ON
PUBLIC WORKS AGREEMENT
between City of Kent and
Skycorp LTD
THIS AGREEMENT is made by and between the City of Kent, a Washington municipal
corporation (hereinafter the "City"), and Skycorp LTD organized under the laws of the State of
Washington, located and doing business at 526 NW Ave Suite #11 Arlington, WA 98223, Phone:
(360) 926-8989/Fax: (360) 926-8987, Contact: Skyler Waldal (hereinafter the "Contractor").
AGREEMENT
The parties agree as follows:
I. DESCRIPTION OF WORK.
Contractor shall perform the following services for the City in accordance with the
following described plans and/or specifications:
Mobilization, demolition and removal of existing canopy over sidewalk along 1st Ave.
The canopy pillars will be cut flush to the ground without any removal underground.
For a copy of the Contractor's quote, see Exhibit A which is attached and
incorporated by this reference..
Contractor further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices within the Puget Sound
region in effect at the time such services are performed.
II. TIME OF COMPLETION. The parties agree that work will begin on the tasks
described in Section I above immediately upon execution of this Agreement. Upon the effective
date of this Agreement, Contractor shall complete the work described in Section I
within 15 days.
III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed
Six Thousand, Nine Hundred Dollars ($6,900.00). Applicable Washington State Retail Sales Tax
on this contract shall be governed by WAC 458-20-171 and its related rules for the work
contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the
Contract amount upon completion and acceptance of the work by the City, or at such earlier
time as the City may determine is appropriate. The City will pay the remaining Contract amount
upon fulfillment of the conditions listed below and throughout this Agreement.
A. No Payment and Performance Bond. Because this contract, including
applicable sales tax, is less than $10,000, and pursuant to Chapter 39.08
PUBLIC WORKS AGREEMENT - 1
(Roadway/Pedestrian Path - Under$10K and No Performance Bond)
RCW, the Contractor, in lieu of providing the City a payment and
performance bond, has elected to have the City retain the final fifty percent
(50%) of the Contract amount for a period of thirty (30) days after the date
of final acceptance, or until receipt of all necessary releases from the State
Department of Revenue, the State Department of Labor & Industries, and the
State Employment Security Department, and until settlement of any liens
filed under Chapter 60.28 RCW, whichever is later.
B. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work. Defective
or unauthorized work includes, without limitation: work and materials that
do not conform to the requirements of this Agreement; and extra work and
materials furnished without the City's written approval. If Contractor is
unable, for any reason, to satisfactorily complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the City for any additional costs incurred by the City. "Additional
costs" shall mean all reasonable costs, including legal costs and attorney
fees, incurred by the City beyond the maximum Contract price specified
above. The City further reserves its right to deduct the cost to complete the
Contract work, including any Additional Costs, from any and all amounts due
or to become due the Contractor.
C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF
FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A
WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE
TIME FINAL PAYMENT IS MADE AND ACCEPTED.
IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor-Employer Relationship will be created by this Agreement. By their execution of this
Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following
representations:
A. The Contractor has the ability to control and direct the performance and
details of its work, the City being interested only in the results obtained
under this Agreement.
B. The Contractor maintains and pays for its own place of business from which
Contractor's services under this Agreement will be performed.
C. The Contractor has an established and independent business that is eligible
for a business deduction for federal income tax purposes that existed before
the City retained Contractor's services and is a service other than that
furnished by the City, or the Contractor is engaged in an independently
established trade, occupation, profession, or business of the same nature as
that involved under this Agreement.
D. The Contractor is responsible for filing as they become due all necessary tax
documents with appropriate federal and state agencies, including the Internal
Revenue Service and the state Department of Revenue.
PUBLIC WORKS AGREEMENT - 2
(Roadway/Pedestrian Path - Under$10K and No Performance Bond)
E. The Contractor has registered its business and established an account with
the state Department of Revenue and other state agencies as may be
required by Contractor's business, and has obtained a Unified Business
Identifier (UBI) number from the State of Washington.
F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW
or an electrical contractor license pursuant to Ch. 19.28 RCW.
G. The Contractor maintains a set of books dedicated to the expenses and
earnings of its business.
V. TERMINATION. The City may terminate this Agreement for good cause. "Good
cause" shall include, without limitation, any one or more of the following events:
A. The Contractor's refusal or failure to supply a sufficient number of properly
skilled workers or proper materials for completion of the Contract work.
B. The Contractor's failure to complete the work within the time specified in this
Agreement. j
C. The Contractor's failure to make full and prompt payment to subcontractors
or for material or labor.
D. The Contractor's persistent disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
F. The Contractor's breach of any portion of this Agreement.
If the City terminates this Agreement for good cause, the Contractor shall not receive any
further money due under this Agreement until the Contract work is completed. After
termination, the City may take possession of all records and data within the Contractor's
possession pertaining to this project which may be used by the City without restriction.
VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the
bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code
of Washington, as well as any other applicable prevailing wage rate provisions. The latest
prevailing wage rate revision issued by the Department of Labor and Industries is attached.
VII. CHANGES. The City may issue a written change order for any change in the
Contract work during the performance of this Agreement. If the Contractor determines, for any
reason, that a change order is necessary, Contractor must submit a written change order
request to the person listed in the notice provision section of this Agreement, section XV(D),
within fourteen (14) calendar days of the date Contractor knew or should have known of the
facts and events giving rise to the requested change. If the City determines that the change
increases or decreases the Contractor's costs or time for performance, the City will make an
equitable adjustment. The City will attempt, in good faith, to reach agreement with the
Contractor on all equitable adjustments. However, if the parties are unable to agree, the City
will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed
PUBLIC WORKS AGREEMENT - 3
(Roadway/Pedestrian Path - Under$1OK and No Performance Bond)
with the change order work upon receiving either a written change order from the City or an oral
order from the City before actually receiving the written change order. If the Contractor fails to
require a change order within the time specified in this paragraph, the Contractor waives its
right to make any claim or submit subsequent change order requests for that portion of the
contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must
complete the change order work; however, the Contractor may elect to protest the adjustment
as provided in subsections A through E of Section VIII, Claims, below.
The Contractor accepts all requirements of a change order by: (1) endorsing it, (2)
writing a separate acceptance, or (3) not protesting in the way this section provides. A change
order that is accepted by Contractor as provided in this section shall constitute full payment and
final settlement of all claims for contract time and for direct, indirect and consequential costs,
including costs of delays related to any work, either covered or affected by the change.
VIII. CLAIMS. If the Contractor disagrees with anything required by a change order,
another written order, or an oral order from the City, including any direction, instruction,
interpretation, or determination by the City, the Contractor may file a claim as provided in this
section. The Contractor shall give written notice to the City of all claims within fourteen (14)
calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14)
calendar days of the date the Contractor knew or should have known of the facts or events
giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for
any reason, or extension of time, whether under this Agreement or otherwise, shall be
conclusively deemed to have been waived by the Contractor unless a timely written claim is
made in strict accordance with the applicable provisions of this Agreement.
i
At a minimum, a Contractor's written claim shall include the information set forth in
subsections A, items 1 through 5 below.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY
CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS
SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY.
A. Notice of Claim. Provide a signed written notice of claim that provides the following
information:
1. The date of the Contractor's claim;
2. The nature and circumstances that caused the claim;
3. The provisions in this Agreement that support the claim;
4. The estimated dollar cost, if any, of the claimed work and how that
estimate was determined; and
5. An analysis of the progress schedule showing the schedule change or
disruption if the Contractor is asserting a schedule change or
disruption.
B. Records. The Contractor shall keep complete records of extra costs and time
incurred as a result of the asserted events giving rise to the claim. The City shall
have access to any of the Contractor's records needed for evaluating the protest.
The City will evaluate all claims, provided the procedures in this section are
followed. If the City determines that a claim is valid, the City will adjust payment
for work or time by an equitable adjustment. No adjustment will be made for an
PUBLIC WORKS AGREEMENT - 4
(Roadway/Pedestrian Path - Under$10K and No Performance Bond)
i
invalid protest.
C. Contractor's Duty to Complete Protested Work. In spite of any claim, the
Contractor shall proceed promptly to provide the goods, materials and services
required by the City under this Agreement.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides,
the Contractor also waives any additional entitlement and accepts from the City any
written or oral order (including directions, instructions, interpretations, and
determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures
of this section, the Contractor completely waives any claims for protested work and
accepts from the City any written or oral order (including directions, instructions,
interpretations, and determination).
IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY
LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR
DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO
FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY
APPLICABLE STATUTORY LIMITATIONS PERIOD.
X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all
work provided under this Agreement in accordance with the provisions of this Agreement. The
Contractor shall promptly correct all defects in workmanship and materials: (1) when Contractor
knows or should have known of the defect, or (2) upon Contractor's receipt of notification from
the City of the existence or discovery of the defect. In the event any parts are repaired or
replaced, only original replacement parts shall be used—rebuilt or used parts will not be
acceptable. When defects are corrected, the warranty for that portion of the work shall extend
for an additional year beyond the original warranty period applicable to the overall work. The
Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of
notice from the City of the defect. If the Contractor does not accomplish the corrections within a
reasonable time as determined by the City, the City may complete the corrections and the
Contractor shall pay all costs incurred by the City in order to accomplish the correction.
XI. DISCRIMINATION. In the hiring of employees for the performance of work under
this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on
behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age,
sexual orientation, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates.
Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy
Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract
work, file the attached Compliance Statement.
XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits, including all legal costs and attorney fees, arising out of or in
connection with the Contractor's performance of this Agreement, except for that portion of the
injuries and damages caused by the City's negligence.
PUBLIC WORKS AGREEMENT - 5
(Roadway/Pedestrian Path - Under$10K and No Performance Bond)
The City's inspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor
and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF
THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
In the event Contractor refuses tender of defense in any suit or any claim, if that tender
was made pursuant to this indemnification clause, and if that refusal is subsequently determined
by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the
Contractor's part, then Contractor shall pay all the City's costs for defense, including all
reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and
fees incurred because there was a wrongful refusal on the Contractor's part.
The provisions of this section shall survive the expiration or termination of this
Agreement.
XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the
Agreement, insurance of the types and in the amounts described in Exhibit B attached and
incorporated by this reference.
XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all
necessary precautions and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of the contract work and shall utilize all protection necessary
for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be
responsible for any loss of or damage to materials, tools, or other articles used or held for use in
connection with the work.
XV. MISCELLANEOUS PROVISIONS.
A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City
requires its contractors and consultants to use recycled and recyclable products whenever
practicable. A price preference may be available for any designated recycled product.
B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of
any of the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a waiver or
relinquishment of those covenants, agreements or options, and the same shall be and remain in
full force and effect,
C. Resolution of Disputes and Governing Law. This Agreement shall be governed by
and construed in accordance with the laws of the State of Washington. If the parties are unable
to settle any dispute, difference or claim arising from the parties' performance of this
Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by
PUBLIC WORKS AGREEMENT - 6
(Roadway/Pedestrian Path - Under$10K and No Performance Bond)
filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court,
King County, Washington, unless the parties agree in writing to an alternative dispute resolution
process. In any claim or lawsuit for damages arising from the parties' performance of this
Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award
provided by law; provided, however, nothing in this paragraph shall be construed to limit the
City's right to indemnification under Section XII of this Agreement.
D. Written Notice. All communications regarding this Agreement shall be sent to the
parties at the addresses listed on the signature page of the Agreement, unless notified to the
contrary. Any written notice hereunder shall become effective three (3) business days after the
date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated in this Agreement or such other address as may be
hereafter specified in writing.
E. Assignment. Any assignment of this Agreement by either party without the written
consent of the non-assigning party shall be void. If the non-assigning party gives its consent to
any assignment, the terms of this Agreement shall continue in full force and effect and no
further assignment shall be made without additional written consent.
F. Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of
the City and Contractor.
G. Entire Agreement. The written provisions and terms of this Agreement, together
with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or
other representative of the City, and such statements shall not be effective or be construed as
entering into or forming a part of or altering in any manner this Agreement. All of the above
documents are hereby made a part of this Agreement. However, should any language in any of
the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms
of this Agreement shall prevail.
H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable
to Contractor's business, equipment, and personnel engaged in operations covered by this
Agreement or accruing out of the performance of those operations.
I. City Business License Required. Prior to commencing the tasks described in Section
I, Contractor agrees to provide proof of a current city of Kent business license pursuant to
Chapter 5.01 of the Kent City Code.
PUBLIC WORKS AGREEMENT - 7
(Roadway/Pedestrian Path - Under$10K and No Performance Bond)
i
J. Counterparts. This Agreement may be executed in any number of counterparts,
each of which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS, the parties below execute this Agreement, which shall become
effective on the last date entered below.
CONTRACTOR: CITY OF KENT:
By: / By: '
fr �
( grature) ' (sig ature)
Print Name: $dtrw / G�wId4 J Print Name: Timothy J. LaPorte, P.E.
Its: N5,b'4—� � Its: Public Works Director
(title) f
DATE: 3.fbf/S DATE �f j
a
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
CONTRACTOR: CITY OF KENT:
Skyler Waldal Timothy J. LaPorte
Skycorp LTD City of Kent
526 NW Ave Suite #11 220 Fourth Avenue South
Arlington, WA 98223 Kent, WA 98032
(360) 926-8989 (telephone) (253) 856-5500 (telephone)
(360) 926-8987 (facsimile) (253) 856-6500 (facsimile)
I
[In Nis field,you may enter the electronic file0ath where the contract has been saved]
PUBLIC WORKS AGREEMENT - 8
(Roadway/Pedestrian Path - Under$1OK and No Performance Bond)
DECLARATION
CITY OF (CENT EQUAL EMPLOYMENT OPPORTUNITY POLICY
The City of Kent is committed to conform to Federal and State laws regarding equal opportunity.
As such all contractors, subcontractors and suppliers who perform work with relation to this
Agreement shall comply with the regulations of the City's equal employment opportunity
policies.
The following questions specifically identify the requirements the City deems necessary for any
contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative
response is required on all of the following questions for this Agreement to be valid and binding.
If any contractor, subcontractor or supplier willfully misrepresents themselves with regard tc the
directives outlines, it will be considered a breach of contract and it will be at the City's sole
determination regarding suspension or termination for all or part of the Agreement;
The questions are as follows:
1. I have read the attached City of Kent administrative policy number 1.2.
2. During the time of this Agreement I will not discriminate in employment on the basis of
sex, race, color, national origin, age, or the presence of all sensory, mental or physical
disability.
3. During the time of this Agreement the prime contractor will provide a written statement to
all new employees and subcontractors indicating commitment as an equal opportunity
employer.
4. During the time of the Agreement I, the prime contractor, will actively consider hiring and
promotion of women and minorities.
5. Before acceptance of this Agreement, an adherence statement will be signed by me, the
Prime Contractor, that the Prime Contractor complied with the requirements as set forth
above.
By signing below, I agree to fulfill the five requirements referenced above.
J n
l /f
By.
For: ' > , Gc
Title: (�
Date:T 306//J-"
I
EEO COMPLIANCE DOCUMENTS - 1
CITY OF KENT
ADMINISTRATIVE POLICY
NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998
SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996
CONTRACTORS APPROVED BY Jim White, Mayor
POLICY:
Equal employment opportunity requirements for the City of Kent will conform to federal and
state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee
equal employment opportunity within their organization and, if holding Agreements with the City
amounting to $10,000 or more within any given year, must take the following affirmative steps:
1. Provide a written statement to all new employees and subcontractors indicating
commitment as an equal opportunity employer.
2. Actively consider for promotion and advancement available minorities and women.
Any contractor, subcontractor, consultant or supplier who willfully disregards the City's
nondiscrimination and equal opportunity requirements shall be considered in breach of contract
and subject to suspension or termination for all or part of the Agreement.
Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public
Works Departments to assume the following duties for their respective departments.
1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these
regulations are familiar with the regulations and the City's equal employment opportunity
policy.
2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines.
EEO COMPLIANCE DOCUMENTS - 2
CITY OF KENT
EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT
This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the
Agreement.
I, the undersigned, a duly represented agent of
Company, hereby acknowledge and declare that the before-mentioned company was the prime
contractor for the Agreement known as that was entered into on
the (date), between the firm I represent and the City of
Kent.
I declare that I complied fully with all of the requirements and obligations as outlined in the City
of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity
Policy that was part of the before-mentioned Agreement.
r
By:
I
For:
Title: (ems dw
Date:
EEO COMPLIANCE DOCUMENTS - 3
i
i
EX I IT
SKYCOR PT.
1)eh1p)Itwoo nvwopMenta AGenerAJContractors
Vebruary 18,2015 j
Tw City of Kent—)3111 Thomas
Re: Demolition and Removal of canopy
Site Address: I'W Meeker and GroW,lCeiit, WA
I
SkyCorp,Ltd. proposes to hrnish all materials and.perforin all labor necessary to complete the
following:
Scope ofrvoik:
Mobilization,demolition aud,removal of existing:
e Canopy over sidewalk along 0 Ave. The canopy pillars will be cut#rush to the
ground without aty removal underground,
Total Price: $0,900.00(ENcludiMg Sales Tax)
Clarifications:
I., Proposal is based on one mobilization.
2. Proposal valid for 30 days
3. Additional work performed per hourly rate sheet
Page 2 February 18 2015
Exclusions,
1. Engineering,soils testing,lay out and surveying
2. Traffic Control
3. Sidewalk Closures
4, Erosion Control
5. Compaction test
6. Fencing or security
7. All fees mid special inspections
8.. Underground utilities
9. private locates;
10.Export of contaminated or imsuitable soils or import to replace exported quantity
11.Import or export of any fill material
12,Dewatering
13.All permits
14, Sales Tax
15. Landscaping
16.Hydro seeding andniulcl
17.Hazardous materials
18.Removal and emptying of any Underground Storage Tanks
19, Removal and emptying of any Abovegrotuld Storage Tanks
20.Asbestos Survey orremoval
21.Unforeseen or presumed asbestos materials
21,All other work not included in this proposal
Thank you for considering our proposal,
Sincerely;
Skyler Waldal
SkyCorp Ltd
425.367-78$7 cell
360.926-8989 office
360-926-8987 fax
1 i
EXHIBIT B
INSURANCE REQUIREMENTS FOR
CONSULTANT SERVICES AGREEMENTS
Insurance
The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which
may arise from or in connection with the performance of the work hereunder
by the Consultant, their agents, representatives, employees or
subcontractors.
A. Minimum Scope of Insurance
Consultant shall obtain insurance of the types described below:
1. Automobile Liability insurance covering all owned, non-owned,
hired and leased vehicles. Coverage shall be written on Insurance
Services Office (ISO) form CA 00 01 or a substitute form providing
equivalent liability coverage. If necessary, the policy shall be
endorsed to provide contractual liability coverage.
2. Commercial General Liability insurance shall be written on ISO
occurrence form CG 00 01 and shall cover liability arising from
premises, operations, independent contractors, products-completed
operations, personal injury and advertising injury, and liability
assumed under an insured contract. The City shall be named as an
insured under the Consultant's Commercial General Liability
insurance policy with respect to the work performed for the City
using ISO additional insured endorsement CG 20 10 11 85 or a
substitute endorsement providing equivalent coverage.
3. Workers' Compensation coverage as required by the Industrial
Insurance laws of the State of Washington.
4. Professional Liability insurance appropriate to the Consultant's
profession.
a. Minimum Amounts of Insurance
Consultant shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined single
limit for bodily injury and property damage of $1,000,000 per
accident.
2. Commercial General Liability insurance shall be written with limits
no less than $1,000,000 each occurrence, $2,000,000general
I
I
EXHIBIT B (Continued)
aggregate and a $1,000,000 products-completed operations
aggregate limit.
3. Professional Liability insurance shall be written with limits no less
than $1,000,000 per claim and $1,000,000 policy aggregate limit.
C. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following
provisions for Automobile Liability and Commercial General Liability
insurance:
1. The Consultant's insurance coverage shall be primary insurance as
respect the City. Any Insurance, self-insurance, or insurance pool
coverage maintained by the City shall be excess of the Consultant's
insurance and shall not contribute with it.
2. The Consultant's insurance shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30) days prior
written notice by certified mail, return receipt requested, has been given
to the City.
3. The City of Kent shall be named as an additional insured on all policies
(except Professional Liability) as respects work performed by or on behalf
of the Consultant and a copy of the endorsement naming the City as
additional insured shall be attached to the Certificate of Insurance. The
City reserves the right to receive a certified copy of all required insurance
policies. The Consultant's Commercial General Liability insurance shall
also contain a clause stating that coverage shall apply separately to each
insured against whom claim is made or suit is brought, except with
respects to the limits of the insurer's liability.
D. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not
less than A:VII.
E. Verification of Coverage
Consultant shall furnish the City with original certificates and a copy of the
amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of
the Contractor before commencement of the work.
F. Subcontractors
Consultant shall include all subcontractors as insureds under its policies or
shall furnish separate certificates and endorsements for each subcontractor.
All coverages for subcontractors shall be subject to all of the same insurance
requirements as stated herein for the Consultant.
SKYCO-1 OP ID: BR
CERTIFICATE OF LIABILITY INSURANCE D0310 4/2ATE 0 1 6Y)
�,— 03/04/2015
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY.OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: if the certificate holder Is an ADDITIONAL INSURED,the policy(ies) must he endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this Certificate does not confer rights to the
certificate holder In lieu of such endorsements.
PRODUCER CONTACT
NAME:
Soundvlew Insurance Agency Inc PHONE Fnz
18927 33rd Ave W.Suite C
:Lynnwood,WA 98036-4726 E+4WL
Tony Conti ADDRESS:
INSURERIS)AFFOROINO CGVERAGE __. _ NAICB
INSURER A;Hudson Specialty Ins Co
INSURED SKYCORP,LTD INSURERa:ZuHch Amcdcanlnsurance Co
526 NW Ave Ste 11
Arlington,WA 98223 INSURER C:Great American lnaumnce Co
INSURER D
INSURERE.
NSURERF: 'i
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
ILT, TYPE OF INSURANCE IADD HRR POLICY NUMBER L..AA,,YSEE MM100 EXY - LIMITS
GENERALLIABILITY EACH OCCURRENCE S 1,000,00
GES(EaocTED
A : X COMMERCIAL GENERAL LIABILITY I X X ESB4318131401 04/04/2014 04/0412015 PREMISES(Ea aqc ence $ 60,000
_ CLAIMS-MADE rX IOCCUR MED EXP(Any one person) _ ll 5,000
X Pollution Liab ESB4318131401 0410412014 04104/2015 PERSONAL&ADV INJURY S 1,000,00
X IPro(eeelonal Llab IESe4318131401 04/04/2014 04/0412015 GENERAL AGGREGATE S 2,000,00
GEHL AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,00
I POLICY X PRO- LOC I Prof/E&O $ 1,000,00
JEGTAUTOMOBILE LIABILITY CO BIN€OSINGLE LIMIT 1,000,00
B ANYAUTO X RK-9016076 04104/2014 04/04/2015 BODILY INJURY(Perperson) III
ALL OWNED SCHEDULED BODILY INJURY(Perew;dent)I$
L_ AUTOS X AUTOS X DAMAGE
$
HIREDAUTOS X AUTOS — -
I IS .-
UMBRELLALIAB EACH OCCURRENCE $
; OCCUR ,
EXCESS LIAR CLAIMS-MADE AGGREGATES .
LIED RETENTIONS q
WORKERS COMPENSATION i WC STADRY M
AND EMPLOYERS'LIABILITY A ANY PROPRIETORIPARTNERIEXECUTIVEYINESS4318131401 0410412014 04/0412015 EL EACH ACC 1,000,00OFFICERIMEMBEREXClUDEOe NIA ASTOP GAP E.L.DISEASE- 1,000,00(Mandatory In NHI
IfyS6desv;beundet E.L DISEASE- 1,00000
DESCRIPTION OF OPERATIONS below
C Rentedl Leased IMP448837704 0410412014 04/04/2015 Limit 1,000,000
Equipment DED 1100
I
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ARach ACORD 101,AdlItIonal Remarks Schedule,If more space Is requlrod)
City of Kent is included as Primary & Non-Contributory Additional
Insured. Waiver of Subrogation in their favor including both ongong and
completed operations applies on a per project basis as required by written '
contract, per ESB-COM-0913-279, ESB-COM-1108-261, ESE-COM-1108-228 Blanket
endorsemente attached.
11
CERTIFICATE HOLDER CANCELLATION
CITYOKE
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
City of Kent ACCORDANCE WITH THE POLICY PROVISIONS.
220 Fourth Avenue South
Kent,WA 98032 AUTHORIZED REPRESENTATIVE
M 1988-2010 ACORD CORPORATION. All rights reserved.
ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD
f i
I
HUDSON SPECIALTY INSURANCE COMPANY
(A New Yotk Domiciled Corporation)
ECO-PAID
Additional Insured Owners, Lessees or Contractors
Automatic Assignment Endorsement
In consideration of the premium paid,it is hereby understood and agreed that the following sliall
apply to:
Policy Number: ESB 431813-14-01
Effective Date: April 04,2014
This endorsement modifies insurance provrided under the applicable Police coverage part(s)
I
SCHEDULE
Any person(s) or organization(s)whom the NAMED INSURED agrees,in a written contract, to
name as an additional insured, shall be deemed an INSURED. However,this status exists only for
the project specified in that contract but only with respect to that person's or organization's
vicarious liability arising out of ongoing or completed operations performed for that additional
insured.
This endorsement does not apply to the Environmental Professional Liability coverage part.
A/1 other policy terms and conditions shall remain the some,
�13�
A i'1' ORRESENTATIVE
;I
i
M-CONt-0913-279 Page 1 of 1
IIUDSON SPECIALTY_INSURANCE COMPANY
(A New York Domiciled Corporation)
ECO-PAK
i
.Automatic Primary Non-Contributory Endorsement
(Blanket Coverage)
In consideration of the premium paid, it is hereby understood and agreed that the following shall
apply to:
i
Policy Number:ESB 431813-14-01
Effective Date: April 04, 2014
This endorsement modifies insurance provided under the applicable Policy coverage part(s).
SCHEDULE
i
Name of Person or Organization;
Any person(s) or organization(s) whom the NAMED INSURED agrees, in a written
contract,to provide Primary and/or Non-contributory status of this insurance.
However, this status exists only for the project specified in that contract and as long
as that Project is covered under any applicable Policy coverage part.
Notwithstanding anything contained in this policy to the contrary„it is hereby agreed that this policy
shall be considered primary to any similar insurance held by third parties in respect to wort:
performed by you under any written contractual agreement with such third party. It is further
y
agreed that any other insurance which the petson(s) or organization(s) as referenced above may
i
hate,is excess and non-contributory to this insurance.
1
j All otherpolicy terms and conditions shall remain the some,
i
ATO ORIZED RESENTrATIVE
l ESB-CONI-1108-261 Page I of 1
HUDSON SPECIALTY INSURANCE COMPANY
(A New York Domiciled Corporation)
ECO-PAK
Subrogation
Automatic Waiver Endorsement
THIS ENDORSEMFNT CHANGES THE POLICY, PLEASE READ IT CAREFULLY
In consideration of the premium paid,it is hereby understood and agreed that the following shall
apply to:
Policy Number: ESB 431813-14-01
Effective Date: April 04,2014
i
This endorsement modifies insurance provided under the applicable policy coverage part(s).
The Company waives any right of recovery it may have against the person or organization shown in the
Schedule below because of payments the Company makes for injury or damage arising out of the
i INSURED'S work done under a contract with that person or organization.
This endorsement does not apply to the Environmental Professional Liability coverage part.
The waiver applies only to the person or organization in the Schedule below.
I
j SCHEDULE
Name of Person or Organization:
Any person(s) or organization(s) to whom the NAMED INSURED agrees,in a written contract,to
provide a waiver of subrogation. However,this status exists only for the project specified in that
contract.
Under no circumstances shall this endorsement act to extend the policy period,change the scope of
amerage,or increase the Aggregate Limits of Insurance shown in the Declamations.
All otherpolicy tetras and conditions shaiiremain the same.
A T ORIZED RESENTATIVE
ESB-CONI-1108-228 Page t of I
Page 1 of 17
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate
of fringe benefits. On public works projects, worker's wage and benefit rates must add to
not less than this total. A brief description of overtime calculation requirements are
provided on the Benefit Code Key.
Journey Level Prevailing Wage Rates for the Effective Date: 2/25/2015
County Trade Job Classification Wa a HolidayOvertimeNote'
King Asbestos Abatement Workers Journey Level $42.67 5D 1 H
King Boilermakers Journey Level $64.44 5N 1C
King Brick Mason Brick And Block Finisher $44.46 5A 1M
King Brick Mason Journey Level $51.32 5A 1M
'King Brick Mason Pointer-Caulker-Cleaner $51.32 5A 1M
IKing Building Service Emplovees Janitor $21.29 5S 2F
,King Building Service Employees Traveling Waxer/Shampooer $21.70 5S 2F
King Building Service Employees Window Cleaner (Non- $24.94 5S 2F
Scaffold)
'King Building Service Emplovees Window Cleaner (Scaffold) $25.80 5S 2F
King Cabinet Makers (In Shop) Journey Level $22.74 1
King Carpenters Acoustical Worker $52.321 5D 4C
"King Carpenters Bridge, Dock And Wharf $52.32 5D 4C
Carpenters
King Carpenters Carpenter $52.32 5D 4C
King Carpenters Carpenters on Stationary Tools $52.45 5D 4C
King Carpenters Creosoted Material $52.42 5D 4C
King Carpenters Floor Finisher $52.32 5D 4C
King Carpenters Floor Layer $52.32 5D 4C
King Carpenters Scaffold Erector $52.32 5D 4C
yKing Cement Masons Journey Level $52.38 7A 1M
;King Divers Ft Tenders Diver $105.37 5D 4C 8A
King Divers Ft Tenders Diver On Standby $59.50 5D 4C
King Divers Et Tenders Diver Tender $54.82 5D 4C
King Divers Ft Tenders Surface Rcv 8 Rov Operator $54.82 5D 4C
King Divers 8 Tenders Surface Rcv & Rov Operator $51.07 5A 4C
Tender
King Dredge Workers Assistant Engineer $53.00 5D 3F
King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F
King Dredge Workers lBoatmen $52.30 5D I 3F
King Dredge Workers Engineer Welder $54.04 5D 3F
https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 2/25/2015
Page 2 of 17
King Dredge Workers Leverman, Hydraulic $55.17 5D 3F
King Dredge Workers Mates $52.30 5D 3F
King Dredge Workers Oiler $52.58 5D 3F
King Drywall Applicator Journey Level $52.32 5D 1H
King Drywall Tapers Journey Level $52.37 5P 1 E
King Electrical Fixture Maintenance Journey Level $25.84 5L 1E
Workers
King Electricians - Inside Cable Splicer $65.69 7C 2W
King Electricians - Inside Cable Splicer (tunnel) $70.52 7C 2W
King Electricians - Inside Certified Welder $63.49 7C 2W
King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W
King Electricians - Inside Construction Stock Person $35.69 7C 2W
King Electricians - Inside Journey Level $61.30 7C 2W
King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W
King Electricians - Motor Shop Craftsman $15.37 1
King Electricians - Motor Shop Journey Level $14.69 1
King Electricians - Powerline Cable Splicer $68.33 5A 4A
Construction
King Electricians - Powerline Certified Line Welder $62.50 5A 4A
Construction
King Electricians - Powerline Groundperson $42.56 5A 4A
Construction
King Electricians - Powerline Heavy Line Equipment $62.50 5A 4A
Construction Operator
King Electricians - Powerline Journey Level Lineperson $62.50 5A 4A
Construction
King Electricians - Powerline Line Equipment Operator $52.47 5A 4A
Construction
King Electricians - Powerline Pole Sprayer $62.50 5A 4A
Construction
King Electricians - Powerline Powderperson $46.55 5A 4A
Construction
King Electronic Technicians Journey Level $31.00 1
King Elevator Constructors Mechanic $80.14 7D 4A
King Elevator Constructors Mechanic In Charge $86.77 7D 4A
King Fabricated Precast Concrete All Classifications - In-Factory $15.25 5B 1 R
Products Work Only
King Fence Erectors Fence Erector $15.18 1
King Et_aggers Journey Level $36.17 7A 31
King Glaziers Journey Level $54.91 7L 1Y
King Heat 8 Frost Insulators And Journeyman $60.93 5J 1S
Asbestos Workers
King Heating Equipment Mechanics Journey Level $70.37 7F 1E
King Hod Carriers 8 Mason Tenders Journey Level $44.00 7A 31
King Industrial Power Vacuum Journey Level $9.47 1
Cleaner
King Inland Boatmen Boat Operator $54.57 5B 1K
King Inland Boatmen ICook $50.95 5B 1K
https://fomess.wa.gov/hii/wagelookup/prvWagelookup.aspx 2/25/2015
Page 3 of 17
King lintand Boatmen Deckhand $51.191 5B I 1K
King Inland Boatmen Deckhand Engineer $52.18 5B 1K
'King Inland Boatmen Launch Operator $53.40 5B 1K
'King Inland Boatmen Mate $53.40 5B 1K
,King Inspection/Cleaning/Sealing Cleaner Operator, Foamer $31.49 1
Of Sewer a Water Systems By Operator
Remote Control
King Inspection/Cleaning/Seating Grout Truck Operator $11.48 1
Of Sewer £t Water Systems By
Remote Control
King Inspection/Cleaning/Sealing Head Operator $24.91 1
Of Sewer Ft Water Systems By
Remote Control
King Inspection/Cleaning/Sealing Technician $19.33 1
Of Sewer 8 Water Systems By
Remote Control
'King Inspection/Cleaning/Sealing Tv Truck Operator $20.45 1
Of Sewer Ft Water Systems By
Remote Control
King Insulation Applicators Journey Level $52.32 5D 4C
King Ironworkers Journeyman $61.62 7N 10
King Laborers Air, Gas Or Electric Vibrating $42.67 7A 31
Screed
King Laborers Airtrac Drill Operator $44.00 7A 31
King Laborers Ballast Regular Machine $42.67 7A 31
King Laborers Batch Weighman $36.171 7A 31
;King Laborers Brick Pavers $42.67 7A 31
"King Laborers Brush Cutter $42.67 7A 31
King Laborers Brush Hog Feeder $42.67 7A 31
Nng Laborers Burner $42.67 7A 31
King Laborers Caisson Worker $44.00 7A 31
King Laborers Carpenter Tender $42.67 7A 31
King Laborers Caulker $42.67 7A 31
King Laborers Cement Dumper-paving $43.46 7A 31
King Laborers Cement Finisher Tender $42.67 7A 31
King Laborers Change House Or Dry Shack $42.67 7A 31
King Laborers Chipping Gun (under30 Lbs.) $42.67 7A 31
King Laborers Chipping Gun(30 Lbs. And $43.46 7A 31
Over)
King Laborers Choker Setter $42.67 7A 31
,King Laborers Chuck Tender $42.67 7A 31
King Laborers Clary Power Spreader $43.46 7A 31
King Laborers Clean-up Laborer $42.67 7A 31
King Laborers Concrete Dumper/chute $43.46 7A 31
Operator
'King Laborers Concrete Form Stripper $42.67 7A 31
,IKing Laborers Concrete Placement Crew $43.46 7A 31
King Laborers $43.46 7A 31
https://fortress.wa.gov/lni/wagelooktip/PrvWageloolcup.aspx 2/25/2015
Page 4 of 17
Concrete Saw Operator/core
Driller
King Laborers Crusher Feeder $36.17 7A 31
King Laborers Curing Laborer $42.67 7A 31
King Laborers Demolition: Wrecking 8 $42.67 7A 31
Moving (incl. Charred
Material)
King Laborers Ditch Digger $42.67 7A 31
King Laborers Diver $44.001 7A 31
King Laborers Drill Operator $43.46 7A 31
(hydraulic,diamond)
King Laborers Dry Stack Walls $42.67 7A 31
King Laborers Dump Person $42.67 7A 31
King Laborers Epoxy Technician $42.67 7A 31
King Laborers Erosion Control Worker $42.67 7A 31
King Laborers Faller & Bucker Chain Saw $43.46 7A 31
King Laborers Fine Graders $42.67 7A 31
King Laborers Firewatch $36.17 7A 31
King Laborers Form Setter $42.67 7A 31
King Laborers Gabian Basket Builders $42.67 7A 31
King Laborers General Laborer $42.67 7A 31
King Laborers Grade Checker 8 Transit $44.00 7A 31
Person
King Laborers Grinders $42.671 7A 31
King Laborers Grout Machine Tender $42.67 7A 31
King Laborers Groutmen (pressure)including $43.46 7A 31
Past Tension Beams
King Laborers Guardrail Erector $42.67 7A 31
King Laborers Hazardous Waste Worker $44.00 7A 31
(level A)
King Laborers Hazardous Waste Worker $43.46 7A 31
(level B)
King Laborers Hazardous Waste Worker $42.67 7A 31
(level C)
King Laborers High Scaler $44.00 7A 31
King Laborers Jackhammer $43.46 7A 31
King Laborers Laserbeam Operator $43.46 7A 31
King Laborers Maintenance Person $42.67 7A 31
King Laborers Manhole Builder-mudman $43.461 7A 31
King Laborers Material Yard Person $42.671 7A 31
King Laborers Motorman-dinky Locomotive $43.46 7A 31
King Laborers Nozzleman (concrete Pump, $43.46 7A 31
Green Cutter When Using
Combination Of High Pressure
Air Et Water On Concrete ft
Rock, Sandblast, Gunite,
Shotcrete, Water Bla
King Laborers Pavement Breaker $43.461 7A 31
https://fortress.wa.gov/lni/wagelookLLp/prvWagelookup.aspx 2/25/2015
Page 5 of 17
;King Laborers Pilot Car $36.171 7A 1 31
King Laborers Pipe Layer Lead $44.00 7A 31
King Laborers Pipe Layer/tailor $43.46 7A 31
King Laborers Pipe Pot Tender $43.46 7A 31
King Laborers Pipe Reliner $43.46 7A 31
King Laborers Pipe Wrapper $43.46 7A 31
King Laborers Pot Tender $42.67 7A 31
King Laborers Powderman $44.00 7A 31
,King Laborers Powderman's Helper $42.67 7A 31
'King Laborers Power Jacks $43.46 7A 31
King Laborers Railroad Spike Puller - Power $43.46 7A 31
King Laborers Raker - Asphalt $44.00 7A 31
King Laborers Re-timberman $44.00 7A 31
King Laborers Remote Equipment Operator $43.46 7A 31
King Laborers Rigger/signal Person $43.46 7A 31
King Laborers Rip Rap Person $42.67 7A 31
King Laborers Rivet Buster $43.46 7A 31
King Laborers Rodder $43.46 7A 31
King Laborers Scaffold Erector $42.67 7A 31
'King Laborers Scale Person $42.67 7A 31
King Laborers Sloper (over 20") $43.46 7A 31
King Laborers Sloper Sprayer $42.67 7A 31
'King Laborers Spreader (concrete) $43.46 7A 31
King Laborers Stake Hopper $42.67 7A 31
King Laborers Stock Piler $42.67 7A 31
King Laborers Tamper a Similar Electric, Air $43.46 7A 31
a Gas Operated Tools
King Laborers Tamper (multiple a Self- $43.46 7A 31
propelled)
King Laborers Timber Person - Sewer $43.46 7A 31
(lagger, Shorer a Cribber)
King Laborers Toolroom Person (at Jobsite) $42.67 7A 31
King Laborers Topper $42.67 7A 31
,King Laborers Track Laborer $42.67 7A 31
King Laborers Track Liner (power) $43.46 7A 31
IKing Laborers Traffic Control Laborer $38.681 7A 31 8R
King Laborers Traffic Control Supervisor $38.68 7A 31 8R
King Laborers Truck Spotter $42.67 7A 31
King Laborers Tugger Operator $43.46 7A 31
King Laborers Tunnel Work-Compressed Air $64.99 7A 31 8g
Worker 0-30 psi
King Laborers Tunnel Work-Compressed Air $70.02 7A 31 SS
Worker 30.01-44.00 psi
King Laborers Tunnel Work-Compressed Air $73.70 7A 31
Worker 44.01-54.00 psi
King Laborers Tunnel Work-Compressed Air $79.40 7A 31
Worker 54.01-60.00 psi
I
https://fortress.wa.gov/lni/wageloolcup/prvWageloolcup.aspx 2/25/2015
Page 6 of 17
King Laborers Tunnel Work-Compressed Air $81.52 7A 31 `
Worker 60.01-64.00 psi
King Laborers Tunnel Work-Compressed Air $86.62 7A 3I
Worker 64.01-68.00 psi
King Laborers Tunnel Work-Compressed Air $88.52 7A 31 29
Worker 68.01-70.00 psi
King Laborers Tunnel Work-Compressed Air $90.52 7A 31 89
Worker 70.01-72.00 psi
King Laborers Tunnel Work-Compressed Air $92.52 7A 31 9
Worker 72.01-74.00 psi
King Laborers Tunnel Work-Guage and Lock $44.10 7A 31 8�
Tender
King Laborers Tunnel Work-Miner $44.10 7A 31 8�
King Laborers Vibrator $43.46 7A 31
King Laborers Vinyl Seamer $42.67 7A 31
King Laborers Watchman $32.87 7A 31
King Laborers Welder $43.461 7A 31
King Laborers Well Point Laborer $43.46 7A 31
King Laborers Window Washer/cleaner $32.87 7A 31
King Laborers - Underground Sewer General Laborer 3 Topman $42.67 7A 31
a Water
King Laborers - Underground Sewer Pipe Layer $43.46 7A 31
Et Water
King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1
Installers
King Landscape Construction Landscape Equipment $28.17 1
Operators Or Truck Drivers
King Landscape Construction Landscaping or Planting $17.87 1
Laborers
King Lathers Journey Level $52.32 5D 1H
King Marble Setters Journey Level $51.32 5A 1M
King Metal Fabrication (In Shop) Fitter $15.86 1
King Metal Fabrication (In Shop) Laborer $9.78 1
King Metal Fabrication (In Shop) Machine Operator $13.04 1
King Metal Fabrication (In Shop) Painter $11.10 1
King Metal Fabrication (In Shop) Welder $15.48 1
King Millwright Journey Level $53.421 5D 4C
King Modular Buildings Cabinet Assembly $11.56 1
King Modular Buildings Electrician $11.56 1
King Modular Buildings Equipment Maintenance $11.56 1
King Modular Buildings Plumber $11.56 1
King Modular Buildings Production Worker $9.47 1
King Modular Buildings Tool Maintenance $11.56 1
King Modular Buildings Utility Person $11.56 1
King Modular Buildings Welder $11.56 1
King Painters Journey Level $37.80 6Z 2B
King Pile Driver Journey Level $52.57 SD 4C
King Plasterers Journey Level $50.42 7�C 1R
https://fortress.wa.gov/tni/wageloolcup/prvWageloolcup.aspx 2/25/2015
Page 7 of 17
I
King Playground Et Park Equipment Journey Level $9.47 1
Installers
,King Plumbers & Pipefitters Journey Level $74.69 6Z 1G
:King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3C 8P
King Power Equipment Operators Assistant Engineer $51.97 7A 3C 8P
King Power Equipment Operators Barrier Machine (zipper) $54.75 7A 3C BP
King Power Equipment Operators Batch Plant Operator, $54.75 7A 3C 8P I;
Concrete
King Power Equipment Operators Bobcat $51.97 7A 3C 8P
King Power Equipment Operators Brokk - Remote Demolition $51.97 7A 3C 8P
Equipment
King Power Equipment Operators Brooms $51.97 7A 3C 8P 'r
King Power Equipment Operators Bump Cutter $54.75 7A 3C 8P
King Power Equipment Operators Cableways $55.24 7A 3C 8P
King Power Equipment Operators Chipper $54.75 7A 3C 8P
King Power Equipment Operators Compressor $51.97 7A 3C 8P
King Power Equipment Operators Concrete Pump: Truck Mount $55.24 7A 3C 8P
With Boom Attachment Over
42 M
King Power Equipment Operators Concrete Finish Machine -laser $51.97 7A 3C 8P
Screed
King Power Equipment Operators Concrete Pump • Mounted Or $54.33 7A 3C 8P
Trailer High Pressure Line
Pump, Pump High Pressure.
:King Power Equipment Operators Concrete Pump: Truck Mount $54.75 7A 3C 8P
With Boom Attachment Up To
42m
King Power Equipment Operators Conveyors $54.33 7A 3C 8P
King Power Equipment Operators Cranes: 20 Tons Through 44 $54.75 7A 3C 8P
Tons With Attachments
'King Power Equipment Operators Cranes: 100 Tons Through 199 $55.79 7A 3C 8P
Tons, Or 150' Of Boom
(Including Jib With
Attachments)
King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P
Or 250' Of Boom (including Jib
With Attachments)
King Power Equipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C 8P
Tons, Under 150' Of Boom
(including Jib With
Attachments)
:King Power Equipment Operators Cranes: A-frame - 10 Tons And $51.97 7A 3C 8P
Under
,King Power Equipment Operators Cranes: Friction 100 Tans $56.36 7A 3C BP
Through 199 Tons
King Power Equipment Operators Cranes: Friction Over 200 Tons $56.92 7A 3C 8P
King Power Equipment Operators Cranes: Over 300 Tons Or 309 $56.92 7A 3C 8P
Of Boom (including Jib With
Attachments)
King Power Equipment Operators $54.33 7A 3C 8P
https://forness.wa.gov/lni/wagelookup/pivWagelookup.aspx 2/25/2015
Page 8of17
Cranes: Through 19 Tons With
Attachments A-frame Over 10
Tons
King Power Equipment Operators Crusher $54.75 7A 3c 8P
King Power Equipment Operators Deck Engineer/deck Winches $54.75 7A 3C 8P
(power)
King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P
King Power Equipment Operators Dozers D-9 Et Under $54.33 7A 3C 8P
King Power Equipment Operators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P
Or Crane Mount
King Power Equipment Operators Drilling Machine $54.751 7A 3C 8P
King Power Equipment Operators Elevator And Man-lift: $51.97 7A 3C 8P
Permanent And Shaft Type
King Power Equipment Operators Finishing Machine, Bidwell $54.75 7A 3C 8P
And Gamaco Et Similar
Equipment
King Power Equipment Operators Forklift: 3000 Lbs And Over $54.33 7A 3C 8P
With Attachments
King Power Equipment Operators Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P 'v
With Attachments
King Power Equipment Operators Grade Engineer: Using Blue $54.75 7A 3C 8P
Prints, Cut Sheets, Etc
King Power Equipment Operators Gradechecker/stakeman $51.97 7A 3C 8P
King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P
King Power Equipment Operators Hard Tail End Dump $55.24 7A 3C 8P
Articulating Off- Road
Equipment 45 Yards. Et Over
King Power Equipment Operators Hard Tail End Dump $54.75 7A 3C 8P
Articulating Off-road
Equipment Under 45 Yards
King Power Equipment Operators Horizontal/directional Drill $54.33 7A 3C 8P
Locator
King Power Equipment Operators Horizontal/directional Drill $54.75 7A 3C 8P
Operator
King Power Equipment Operators Hydralifts/boom Trucks Over $54.33 7A 3C 8P
10 Tons
King Power Equipment Operators Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P i
Tons And Under
King Power Equipment Operators Loader, Overhead 8 Yards. 8 $55.79 7A 3C 8P
Over
King Power Equipment Operators Loader, Overhead, 6 Yards. $55.24 7A 3C 8P
But Not Including 8 Yards
King Power Equipment Operators Loaders, Overhead Under 6 $54.75 7A 3C 8P
Yards
King Power Equipment Operators Loaders, Plant Feed $54.75 7A 3C 8P
King Power Equipment Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P
King Power Equipment Operators Locomotives, All $54.75 7A 3C 8P 'f
King Power Equipment Operators Material Transfer Device $54.75 7A 3C 8P
King Power Equipment Operators $55.79 7A 3C 8P
ht(ps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 2/25/2015
Page 9 of 17
Mechanics, All (leadmen -
$0.50 Per Hour Over
Mechanic)
King Power Equipment Operators Motor Patrol Grader - Non- $54.33 7A 3C 8P
finishing
,King Power Equipment Operators Motor Patrol Graders, $55.24 7A 3C 8P
} Finishing
'King Power Equipment Operators Mucking Machine, Mole, $55.24 7A 3C 8P
Tunnel Drill, Boring, Road
Header And/or Shield
'King Power Equipment Operators Oil Distributors, Blower $51.97 7A 3C 8P
Distribution 8 Mulch Seeding
Operator
King Power Equipment Operators Outside Hoists (elevators And $54.33 7A 3C 8P
Manlifts), Air Tuggers,strato
King Power Equipment Operators Overhead, Bridge Type Crane: $54.75 7A 3C 8P
20 Tons Through 44 Tons
King Power Equipment Operators Overhead, Bridge Type: 100 $55.79 7A 3C 8P L
Tons And Over
King Power Equipment Operators Overhead, Bridge Type: 45 $55.24 7A 3C 8P
Tons Through 99 Tons
King Power Equipment Operators Pavement Breaker $51.97 7A 3C 8P
!King Power Equipment Operators Pile Driver (other Than Crane $54.75 7A 3C 8P
Mount)
IKing Power Equipment Operators Plant Oiler - Asphalt, Crusher $54.331 7A 3C 8P
'King Power Equipment Operators Posthole Digger, Mechanical $51.971 7A 3C 8P
King Power Equipment Operators Power Plant $51.971 7A 3C 8P
King Power Equipment Operators Pumps - Water $51.97 7A 3C 8P
King Power Equipment Operators Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P
King Power Equipment Operators Quick Tower - No Cab, Under $51.97 7A 3C 8P
100 Feet In Height Based To
Boom
King Power Equipment Operators Remote Control Operator On $55.24 7A 3C 8P
Rubber Tired Earth Moving
Equipment
;King Power Equipment Operators Rigger And Bellman $51.97 7A 3C 8P
",King Power Equipment Operators Rollagon $55.24 7A 3C 8P
King Power Equipment Operators Roller, Other Than Plant Mix $51.97 7A 3C 8P
'King Power Equipment Operators Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P
Materials
King Power Equipment Operators Roto-mill, Roto-grinder $54.75 7A 3C 8P
King Power Equipment Operators Saws - Concrete $54.33 7A 3C 8P
King Power Equipment Operators Scraper, Self Propelled Under $54.75 7A 3C 8P
45 Yards
King Power Equipment Operators Scrapers - Concrete Et Carry $54.33 7A 3C 8P
All
King Power Equipment Operators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P
Yards And Over
King Power Equipment Operators Service Engineers - Equipment $54.33 7A 3C 8P
;King Power Equipment Operators Shotcrete/gunite Equipment $51.97 7A 3C 8P
https://fortress.wa.gov/lni/wagelookup/prvWageloolcup.aspx 2/25/2015
Page 10 of]7
King Power Equipment Operators Shovel , Excavator, Backhoe, $54.33 7A I 3C 8P "
Tractors Under 15 Metric
Tons.
King Power Equipment Operators Shovel, Excavator, Backhoe: $55.24 7A 3C 8P
Over 30 Metric Tons To 50
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes, $54.75 7A 3C BP
Tractors: 15 To 30 Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes: $55.79 7A 3C 8P
Over 50 Metric Tons To 90
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes: $56.36 7A 3C 8P
Over 90 Metric Tons
King Power Equipment Operators Slipform Pavers $55.24 7A 3C 8P
King Power Equipment Operators Spreader, Topsider Et $55.24 7A 3C SIP
Screedman
King Power Equipment Operators Subgrader Trimmer $54.75 7A 3C 8P
King Power Equipment Operators Tower Bucket Elevators $54.33 7A 3C 8P
King Power Equipment Operators Tower Crane Over 175'in $56.36 7A 3C 8P j
Height, Base To Boom
King Power Equipment Operators Tower Crane Up To 175' In $55.79 7A 3C 8P
Height Base To Boom
King Power Equipment Operators Transporters, All Track Or $55.24 7A 3C 8P
Truck Type
King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P
King Power Equipment Operators Truck Crane Oiler/driver - 100 $54.75 7A 3C 813
Tons And Over
King Power Equipment Operators Truck Crane Oiler/driver $54.33 7A 3C 813
Under 100 Tons
King Power Equipment Operators Truck Mount Portable $54.75 7A 3C 8P j
Conveyor
King Power Equipment Operators Welder $55.24 7A 3C 8P
King Power Equipment Operators Wheel Tractors, Farman Type $51.97 7A 3C SP
King Power Equipment Operators Yo Yo Pay Dozer $54.75 7A 3C 8P
King Power Equipment Operators- Asphalt Plant Operators $55.24 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Assistant Engineer $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Barrier Machine (zipper) $54.75 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Batch Plant Operator, $54.75 7A 3C 8P
Underground Sewer Et Water Concrete
King Power Equipment Operators- Bobcat $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Brokk - Remote Demolition $51.97 7A 3C 8P
Underground Sewer Et Water Equipment
King Power Equipment Operators- Brooms $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Bump Cutter $54.75 7A 3C 8P
Underground Sewer 8: Water
hitps://fortress.wa.gov/hu/wagelookup/prvWagelooktip.aspx 2/25/2015
Page 11 of 17
King Power Equipment Operators- Cableways $55.24 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Chipper $54.75 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Compressor $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Concrete Pump: Truck Mount $55.24 7A 3C 8P
Underground Sewer Et Water With Boom Attachment Over
42 M
King Power Equipment Operators- Concrete Finish Machine -laser $51.97 7A 3C 8P
Underground Sewer Et Water Screed
King Power Equipment Operators- Concrete Pump - Mounted Or $54.33 7A 3C 8P
Underground Sewer Et Water Trailer High Pressure Line
Pump, Pump High Pressure.
King Power Equipment Operators- Concrete Pump: Truck Mount $54.75 7A 3C 8P
Underground Sewer Et Water With Boom Attachment Up To
42m
King Power Equipment Operators- Conveyors $54.33 7A 3C 8P
Underground Sewer Et Water
=King Power Equipment Operators- Cranes: 20 Tons Through 44 $54.75 7A 3C 8P
Underground Sewer Et Water Tons With Attachments
;King Power Equipment Operators- Cranes: 100 Tons Through 199 $55.79 7A 3C 8P
Underground Sewer Et Water Tons, Or 150' Of Boom
(Including Jib With
Attachments)
King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P '!
Underground Sewer Et Water Or 250' Of Boom (including Jib
With Attachments)
King Power Equipment Operators- Cranes: 45 Tons Through 99 $55.24 7A 3C 8P
Underground Sewer EL Water Tons, Under 150' Of Boom
(including Jib With
Attachments)
(King Power Equipment Operators- Cranes: A-frame - 10 Tons And $51.97 7A 3C 813
Underground Sewer Et Water Under
King Power Equipment Operators- Cranes: Friction 100 Tons $56.36 7A 3C 8P
Underground Sewer Et Water Through 199 Tons
King Power Equipment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P
Underground Sewer Et Water Of Boom (including Jib With
Attachments)
King Power Equipment Operators- Cranes: Through 19 Tons With $54.33 7A 3C 8P it
Underground Sewer Et Water Attachments A-frame Over 10
Tons
King Power Equipment Operators- Crusher $54.75 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Deck Engineer/deck Winches $54.75 7A 3C 8P
Underground Sewer Et Water (power)
King Power Equipment Operators- Derricks, On Building Work $55.24 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Dozers D-9 £t Under $54.33 7A 3C 8P
Underground Sewer Et Water
https://fortress.wa.gov/lni/wagelool,up/prvWageloolcup.aspx 2/25/2015
Page 12 of 17
King Power Equipment Operators- Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P
Underground Sewer & Water Or Crane Mount
King Power Equipment Operators- Drilling Machine $54.75 7A 3C 8P
Underground Sewer & Water
King Power Equipment Operators- Elevator And Man-lift: $51.97 7A 3C 8P f
Underground Sewer Ft Water Permanent And Shaft Type
King Power Equipment Operators- Finishing Machine, Bidwell $54.75 7A 3C 8P
Underground Sewer ft Water And Gamaco Ft Similar
Equipment
King Power Equipment Operators- Forklift: 3000 Lbs And Over $54.33 7A 3C 8P
Underground Sewer 8 Water With Attachments
King Power Equipment Operators- Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P
Underground Sewer & Water With Attachments
King Power Equipment Operators- Grade Engineer: Using Blue $54.75 7A 3C 8P
Underground Sewer Ft Water Prints, Cut Sheets, Etc
King Power Equipment Operators- Gradechecker/stakeman $51.97 7A 3C 8P V
Underground Sewer 8 Water
King Power Equipment Operators- Guardrail Punch $54.75 7A 3C 8P
Underground Sewer Ft Water
King Power Equipment Operators- Hard Tail End Dump $55.24 7A 3C 8P
Underground Sewer & Water Articulating Off- Road
Equipment 45 Yards. 8 Over
King Power Equipment Operators- Hard Tail End Dump $54.75 7A 3C 8P
Underground Sewer 8 Water Articulating Off-road
Equipment Under 45 Yards
King Power Equipment Operators- Horizontal/directional Drill $54.33 7A 3C 8P
Underground Sewer Et Water Locator
King Power Equipment Operators- Horizontal/directional Drill $54.75 7A 3C 8P
Underground Sewer & Water Operator
King Power Equipment Operators- Hydralifts/boom Trucks Over $54.33 7A 3C 8P
Underground Sewer Ft Water 10 Tons
King Power Equipment Operators- Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P
Underground Sewer Ft Water Tons And Under
King Power Equipment Operators- Loader, Overhead 8 Yards. & $55.79 7A 3C 8P
Underground Sewer Ft Water Over
King Power Equipment Operators- Loader, Overhead, 6 Yards. $55.24 7A 3C 8P 'p
Underground Sewer Et Water But Not Including 8 Yards
King Power Equipment Operators- Loaders, Overhead Under 6 $54.75 7A 3C 8P
Underground Sewer Et Water Yards
King Power Equipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P
Underground Sewer & Water
King Power Equipment Operators- Loaders: Elevating Type Belt $54.33 7A 3C 8P
Underground Sewer & Water
King Power Equipment Operators- Locomotives, All $54.75 7A 3C 8P
Underground Sewer 8 Water
King Power Equipment Operators- Material Transfer Device $54.75 7A 3C 8P
Underground Sewer Ft Water
King Power Equipment Operators- Mechanics, All (teadmen - $55.79 7A 3C 8P I
Underground Sewer 8 Water $0.50 Per Hour Over
Mechanic)
King Power Equipment Operators- Motor Patrol Grader - Non- $54.33 7A 3C 8P
Underground Sewer & Water finishing
https://fortress.wa.gov/lni/wagelookup/prvWageloolcup.aspx 2/25/2015
Page 13 of 17
4:ing „ Power Equipment Operators- Motor Patrol Graders, $55.24 7A 3C 8P
Underground Sewer £t Water Finishing
King Power Equipment Operators- Mucking Machine, Mole, $55.24 7A 3C 8P
Underground Sewer Et Water Tunnel Drill, Boring, Road
Header And/or Shield
King Power Equipment Operators- Oil Distributors, Blower $51.97 7A 3C 8P 'r
Underground Sewer Et Water Distribution 8 Mulch Seeding
Operator
King Power Equipment Operators- Outside Hoists (elevators And $54.33 7A 3C 8P
Underground Sewer Et Water Manlifts), Air Tuggers,strato
`',King Power Equipment Operators- Overhead, Bridge Type Crane: $54.75 7A 3C 8P
i Underground Sewer Et Water 20 Tons Through 44 Tons
King Power Equipment Operators- Overhead, Bridge Type: 100 $55.79 7A 3C 8P
Underground Sewer a Water Tons And Over
King Power Equipment Operators- Overhead, Bridge Type: 45 $55.24 7A 3C 8P
Underground Sewer Et Water Tons Through 99 Tons
'King Power Equipment Operators- Pavement Breaker $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Pile Driver (other Than Crane $54.75 7A 3C 8P
Underground Sewer Et Water Mount)
King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P
Underground Sewer Et Water
!King Power Equipment Operators- Posthole Digger, Mechanical $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Power Plant $51.97 7A 3C 8P
Underground Sewer 8 Water
King Power Equipment Operators- Pumps - Water $51.97 7A 3C 8P
Underground Sewer 8 Water
King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Quick Tower - No Cab, Under $51.97 7A 3C 8P
Underground Sewer Et Water 100 Feet In Height Based To
Boom
King Power Equipment Operators- Remote Control Operator On $55.24 7A 3C 8P
Underground Sewer Et Water Rubber Tired Earth Moving
Equipment
King Power Equipment Operators- Rigger And Bellman $51.97 7A 3C 8P
Underground Sewer Et Water
,King Power Equipment Operators- Rollagon $55.24 7A 3C 8P
Underground Sewer 8 Water
King Power Equipment Operators- Roller, Other Than Plant Mix $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P
Underground Sewer Et Water Materials
King Power Equipment Operators- Roto-mill, Roto-grinder $54.75 7A 3C 8P
Underground Sewer 8 Water
iKing Power Equipment Operators- Saws - Concrete $54.33 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Scraper, Self Propelled Under $54.75 7A 3C 8P
Underground Sewer Et Wate 145 Yards
'King $54.33 7A 3C 8P
https://fortress.wa.gov/lni/wagelool,up/prvWageloolcup.aspx 2/25/2015
Page 14 of 17
Power Equipment Operators- Scrapers - Concrete 8: Carry i
Underground Sewer & Water All
King Power Equipment Operators- Scrapers, Self-propelled: 45 $55.24 7A 3C 8P
Underground Sewer Et Water Yards And Over
King Power Equipment Operators- Service Engineers - Equipment $54.33 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Shotcrete/gunite Equipment $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Shovel , Excavator, Backhoe, $54.33 7A 3C 8P
Underground Sewer Et Water Tractors Under 15 Metric
Tons.
King Power Equipment Operators- Shovel, Excavator, Backhoe: $55.24 7A 3C 8P
Underground Sewer Et Water Over 30 Metric Tons To 50
Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes, $54.75 7A 3C 8P
Underground Sewer Et Water Tractors: 15 To 30 Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes: $55.79 7A 3C 8P
Underground Sewer Et Water Over 50 Metric Tons To 90
Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes: $56.36 7A 3C 8P
Underground Sewer Et Water Over 90 Metric Tons
King Power Equipment Operators- Slipform Pavers $55.24 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Spreader, Topsider 8 $55.24 7A 3C 8P
Underground Sewer it Water Screedman
King Power Equipment Operators- Subgrader Trimmer $54.75 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Tower Bucket Elevators $54.33 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Tower Crane Over 175'in $56.36 7A 3C 8P
Underground Sewer Et Water Height, Base To Boom
King Power Equipment Operators- Tower Crane Up To 175' In $55.79 7A 3C 8P
Underground Sewer 8 Water Height Base To Boom
King Power Equipment Operators- Transporters, All Track Or $55.24 7A 3C SP
Underground Sewer Et Water Truck Type
King Power Equipment Operators- Trenching Machines $54.33 7A 3C 8P
Underground Sewer 8 Water
King Power Equipment Operators- Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P
Underground Sewer Et Water Tons And Over
King Power Equipment Operators- Truck Crane Oiler/driver $54.33 7A 3C 8P f
Underground Sewer Et Water Under 100 Tons
King Power Equipment Operators- Truck Mount Portable $54.75 7A 3C 8P
Underground Sewer Et Water Conveyor
King Power Equipment Operators- Welder $55.24 7A 3C 8P
Underground Sewer 8 Water
King Power Equipment Operators- Wheel Tractors, Farman Type $51.97 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P l
Underground Sewer Et Water
King Power Line Clearance Tree Journey Level In Charge $44.86 5A 4A
Trimmers
https://fortress.wa.goN,Ani/wagelookup/prvWagelookup.aspx 2/25/2015
Page 15 of 17
King Power Line Clearance Tree Spray Person $42.58 5A 4A
Trimmers
King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A
Trimmers
!King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A
Trimmers
King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A
Trimmers
King Refrigeration rt Air Journey Level $72.46 6Z 1G
Conditioning Mechanics
King Residential Brick Mason Journey Level $51.32 5A 1M
King Residential Carpenters Journey Level $28.20 1
King Residential Cement Masons Journey Level $22.64 1
King Residential DrVwalt Journey Level $40.14 5D 4C
Applicators
King Residential DrVwall Tapers Journey Level $52.37 5P 1 E
King Residential Electricians Journey Level $30.44 1
'King Residential Glaziers Journey Level $36.201 7L 1H
=King Residential Insulation Journey Level $26.28 1
Applicators
King Residential Laborers Journey Level $23.03 1
King Residential Marble Setters Journey Level $24.09 1
'King Residential Painters Journey Level $24.46 1
King Residential Plumbers Ft Journey Level $34.69 1
Pipefitters
King Residential Refrigeration Ft Air Journey Level $72.46 6Z 1G
Conditioning Mechanics
King Residential Sheet Metal Journey Level (Field or Shop) $42.58 7F 1R
Workers
King Residential Soft Floor Lavers Journey Level $42.41 5A 3D
King Residential Sprinkler Fitters Journey Level $42.48 5C 211
(Fire Protection)
King Residential Stone Masons Journey Level $51.32 5A 1M
,King Residential Terrazzo Workers Journey Level $46.961 5A 1M
'King Residential Terrazzo/Tile Journey Level $21.46 1
Finishers
King Residential Tile Setters Journey Level $25.17 1
King Roofers Journey Level $44.71 5A 3H
'King Roofers Using Irritable Bituminous $47.71 5A 3H
Materials
King Sheet Metal Workers Journey Level (Field or Shop) $70.37 7F 1E
King Shipbuilding Ft Ship Repair Boilermaker $40.72 7M 1H
King Shipbuilding Ft Ship Repair Carpenter $39.24 7T 2B
_I ing Shipbuilding £t Ship Repair Electrician $39.28 7T 4B
a King Shipbuilding a Ship Repair Heat £t Frost Insulator $60.93 5J 15
Ang Shipbuilding 8 Ship Repair Laborer $39.34 7T 4B
King Shipbuilding 8 Ship Repair Machinist $39.32 7T 4B
King Shipbuilding & Ship Repair Operator $39.22 7T 4B
https:Hfortress.wa.gov/lni/wageloolcup/prvWageloolcup.aspx 2/25/2015
Page 16 of 17
King Shipbuilding Ft Ship Repair Painter $39.311 7T 4B l
King Shipbuilding Ft Ship Repair Pipefitter $39.22 7T 4B
King Shipbuilding & Ship Repair Rigger $39.30 7T 4B
King Shipbuilding 8 Ship Repair Sheet Metal $39.27 7T 4B
King Shipbuilding Et Ship Repair Shipfitter $39.30 7T 4B
King Shipbuilding Et Ship Repair Trucker $39.10 7T 4B
King Shipbuilding Et Ship Repair Warehouse $39.17 7T 4B
King Shipbuilding 8 Ship Repair Welder/Burner $39.30 7T 4B
King Sign Makers 8 Installers Sign Installer $22.92 1
(Electrical)
King Sign Makers 8 Installers Sign Maker $21.36 1
fElectrical)
King Sign Makers 8 Installers (Non- Sign Installer $27.28 1
Electrical)
King Sign Makers 8 Installers (Non- Sign Maker $33.25 1
Electrical)
King Soft Floor Lavers Journey Level $42.41 5A 3D
King Solar Controls For Windows Journey Level $12.44 1
King Sprinkler Fitters (Fire Journey Level $69.59 5C 1X
Protection)
King Stage Rigging Mechanics (Non Journey Level $13.23 1
Structural)
King Stone Masons Journey Level $51.32 5A 1M
King Street And Parking Lot Journey Level $19.09 1
Sweeper Workers
King Surveyors Assistant Construction Site $54.33 7A 3C 8P
Surveyor
King Surveyors Chainman $53.81 7A 3C 8P
King Surveyors Construction Site Surveyor $55.24 7A 3C 8P
King Telecommunication Journey Level $22.76 1
Technicians
King Telephone Line Construction - Cable Splicer $36.96 5A 2B
Outside
King Telephone Line Construction - Hole Digger/Ground Person $20.49 5A 2B
Outside
King Telephone Line Construction - Installer (Repairer) $35.40 5A 2B
Outside
King Telephone Line Construction - Special Aparatus Installer 1 $36.96 5A 2B
Outside
King Telephone Line Construction - Special Apparatus Installer II $36.19 5A 2B
Outside
King Telephone Line Construction - Telephone Equipment $36.96 5A 2B
Outside Operator (Heavy)
King Telephone Line Construction - Telephone Equipment $34.34 5A 2B
Outside Operator (Light)
King Telephone Line Construction - Telephone Lineperson $34.34 5A 2B
Outside
King Telephone Line Construction - Television Groundperson $19.45 5A 2B
Outside
https://fortress.wa.gov/lni/wageloolmp/prvWagelookup.aspx 2/25/2015
Page 17 of 17
King Telephone Line Construction - Television $25.89 5A 2B
Outside Lineperson/Installer
King Telephone Line Construction - Television System Technician $30.97 5A 2B
Outside
;King Telephone Line Construction - Television Technician $27.77 5A 2B
Outside
jKing Telephone Line Construction - Tree Trimmer $34.34 5A 2B
Outside
King Terrazzo Workers Journey Level $46.96 5A 1M
King Tile Setters Journey Level $21.65 1
King Tile, Marble & Terrazzo Finisher $37.79 5A 1B
Finishers
King Traffic Control Stripers Journey Level $43.11 7A 1 K
King Truck Drivers Asphalt Mix Over 16 Yards (W. $48.87 5D 3A 8L
WA-Joint Council 28)
King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03 5D 3A 8L
WA-Joint Council 28)
King Truck Drivers Dump Truck 8 Trailer $48.87 5D 3A 8L
King Truck Drivers Dump Truck (W. WA-Joint $48.03 5D 3A 8L
Council 28)
King Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L
Council 28)
King Truck Drivers Transit Mixer $43.23 1
King Welt Drillers Ft Irrigation Pump Irrigation Pump Installer $17.71 1
Installers
King Well Drillers 8 Irrigation Pump Oiler $12.97 1
Installers
;King Well Drillers 8 Irrigation Pump Well Driller $18.00 1
Installers
https://fortress.wa.gov/lni/wageloolcup/prvWagelookup.aspx 2/25/2015
Benefit Code Key—Effective 8-31-2014 thru 3-3-2015
Overtime Codes
Overtime calculations are based on the hourly rate actually paid to the worker.On public works projects,the hourly rate
must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for
the worker.
1. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-IIALF TIMES THE HOURLY RATE OF WAGE.
B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
on Sundays and holidays shall be paid at double the hourly rate of wage.
C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage.
D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and
the first eight(8)hours worked the next day alter either workweek shall be paid at one and one-half times the hourly
rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly
rate of wage.
E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day,
shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the
hourly rate of wage.
G. The first ten (10) hours worked on Saturdays and the first ten(10) hours worked on a fifth calendar weekday in a
four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage.All hours worked in excess
of ten(10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or
equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday
through Saturday over twelve (12)hours and all hours worked on Sundays and holidays shall be paid at double the
hourly rate of wage.
L All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage.
J. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday
through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage.
K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All
hours worked on holidays shall be paid at double the hourly rate of wage.
M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be
paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
1
Benefit Code Key—Effective 8-31-2014 thru 3-3-2015
1. N. All hours worked on Saturdays (except makeup days) shall be paid at one mud one-half times the hourly rate of
wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All
hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on
Saturday shall be paid at double the hourly rate of wage.
F. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and
one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage.
Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on
Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall
be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half
times the hourly rate of wage.
R. All hours worked on Sundays mud holidays shall be paid at two times the hourly rate of wage.
S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday,
shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other
overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on
Labor Day shall be paid at three times the hourly rate of wage.
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on
Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on
Labor Day shall be paid at three times the hourly rate of wage.
V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and
one-half times the hourly rate of wage.All hours worked on Thanksgiving Day mud Cluistmas day shall be paid at
double the hourly rate of wage.
W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the
employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be
paid at double the hourly rate of wage.
X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12)hours
Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage.When holiday fells
on Saturday or Sunday,the day before Saturday,Friday, mid the day after Sunday,Monday, shall be considered the
holiday and all work performed shall be paid at double the hourly rate of wage.
Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any
employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10
workweek) and on Saturdays mid holidays(except labor day)shall be paid at one and one-half times the hourly rate
of wage. (except for employees who are absent from work without prior approval on a scheduled workday during
the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10
workweek)or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve(12)hours
mud all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage.
Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All
hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay.
2
Benefit Code Key—Effective 5-31-2014 thru 3-3-2015
2. ALL HOURS WORKED 1N EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEED SHALL i
BE PAID ATONE AND ONFYHALF TIMES THE HOURLY RATE OF WAGE,
B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage.
C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on
holidays shall be paid at two times the hourly rate of wage.
F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the
holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of
wage.
G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays
shall be paid at two and one-half times the hourly rate of wage including holiday pay.
H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall
be paid at one and one-halftimes the hourly rate of wage.
O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage.
R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double
the hourly rate of wage.
U. All hours worked on Saturdays shalt be paid at one and one-half times the hourly rate of wage.All hours worked
over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage.
W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday
shall be paid atone and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day,
ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten
shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shall be paid at one
and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on j
holidays shall be paid at double the hourly rate of wage.
3. ALL HOURS WORICED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID
AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when
four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or
outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours
worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday
and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm
and midnight shall receive an additional one dollar($1.00)per hour for all homy worked that shift The employer
shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall
be given to employees regularly assigned to the work to be performed on overtime situations.After an employee has
worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate
until such time as the employee has had a break of eight(8)hours or more.
3
Benefit Code Key—Effective 8-31-2014 thru 3-3-2015
3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when
four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or
outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage.
All work performed after 6:00 pin Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate
of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at
the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more.
D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium
rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays, shall be paid at one
and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the
hourly rate of wage.
E. All hours worked Sundays mid holidays shall be paid at double the hourly rate of wage.Each weep,once 40 hours of
straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid
at double the hourly wage rate-
F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on
Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two
and one-half tunes the hourly rate of wage including holiday pay.
H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at
two(2)times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be
compensated at one and one half(1-1/2)times the regular rate of pay.
I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is
down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work
week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate.
However,Saturday shall not be utilized as a make-up day,when a holiday falls on Friday.All hours worked Monday
through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the
hourly rate of wage.
4. ALL HOURS WORKED IN EXCESS OF EIGHT (8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID
AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly
rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage.
B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly
rate of wage.
C. On Monday through Friday,the first four (4)hours of overtime after eight(8)hours of straight time work shall be
paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has
been established. On a four (4) day ten (10) hour workweek scheduled Monday tlurough Thursday, or Tuesday
through Friday,the first two(2)hours of overtime after ten (10)hours of straight time work shall be paid at one and
one half(1-1/2)times the straight time rate of pay. On Saturday,the first twelve(12)hours of work shall be paid at
one and one half(1-1/2)times the straight time rate of pay, except that if the job is down on Monday through Friday
due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on
Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12)hours in a day, and all
hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay.
4
Benefit Code Key—Effective 8-31-2014 thru 3-3-2015
Holiday Codes
5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day,and Christmas Day(7).
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday alter
Thanksgiving Day,the day before Christmas,and Christmas Day(8).
C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
the Friday alter Thanksgiving Day,And Christmas Day(8).
D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day,And Christmas Day(8).
H. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day alter Thanksgiving Day,
And Christmas(6).
1. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, and Christmas Day
(6)
J. Holidays: New Year's Day,Memorial Day, Independence Day,Thanksgiving Day, Friday alter Thanksgiving Day,
Christmas Eve Day,And Christmas Day(7).
K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9).
L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8).
N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, I,
Thanksgiving Day,The Friday After Thanksgiving Day, And Christmas Day(9).
P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday
After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The
Following Monday Shall Be Considered As A Holiday.
Q. Paid Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day, and Christmas
Day(6).
R. Paid I-Iolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After
Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 1/2).
i
S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, 'Thanksgiving
Day,And Christmas Day(7).
T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas
(9)
Z. Holidays: New Year's Day,Memorial Day, Independence Day,Labor Day, Veterans Day, Thanksgiving Day, the
Friday after Thanksgiving Day,And Christmas Day(8).
Holiday Codes Continued
5
Benefit Code Key—Effective 8-31-2014 thru 3-3-2015
6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day,The Friday After Thanksgiving Day,And Christmas Day(8).
E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day,
Independence Day,Labor Day, Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day
On Christmas Eve Day.(9 1/2).
G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day,Independence Day,
Labor Day, Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And Christmas
Eve Day(11).
H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating
Holiday(10).
I. Paid Holidays:New Years Day,Memorial Day,hndependence Day, Labor Day,Thanksgiving Day,Friday
After'1'hanksgiving Day,And Christmas Day(7).
T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day,
And Christmas Day(9).
Z. holidays:New Year's IJay,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after
Thanksgiving IJay, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be
considered as the holiday, if a holiday falls on Sunday, the following Monday shall be considered as the
holiday.
Holiday Codes Continued
7. A. Holidays: New Year's Day, Memorial Day, independence Day, Labor Day, Thanksgiving Day, The Friday And
Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Palls On A Sunday Shall Be
Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding
Friday shall be a regular work day.
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as
a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday.
C. Holidays: New Yea's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day;
Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid
holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any paid holiday which
falls on a Saturday shall be observed as a holiday on the preceding Friday.
E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which fills on a Saturday shall be observed as a holiday on the preceding
Friday.
6
Benefit Code I<ey—Effective 8-31-2014 thru 3-3-2015
7. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day,the last working day before Christmas day and Christmas day(8).Any holiday which falls oil a
Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.
H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day,
Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas
Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday
which falls on a Saturday shall be observed as a holiday on the preceding Friday.
I. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,'I'hanksgiving Day,The '....
Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9). Any holiday which falls
on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall
be observed as a holiday on the preceding Friday.
J. Holidays: New Year's Day, Independence Day,Memorial Day,Labor Day,Thanksgiving Day and Christmas Day
(6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday
which falls on a Saturday shall be observed as a holiday on the preceding Friday.
K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after
Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday.
L. Holidays:New Year's Day,Memorial Day,Labor Day, Independence Day,Thanksgiving Day, the Last Work Day
before Christmas Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday
on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday.
M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, '..
Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day
after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the
following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.
N. holidays: New Year's Day; Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday.
P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday.
Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday,
the preceding Friday shall be a regular work day.
R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day,
Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day
after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be
observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be
considered a.holiday and compensated accordingly.
7
Benefit Code Key—Effective 8-31-2014 thru 3-3-2015
7. S. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After
Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9).If any of the listed
holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated
accordingly.
T. Paid Holidays:New Year's Day,The Day After Or Before New Year's Day,President's Day,_Memorial Day,
Independence Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,and The
Day Alter Or Before Christmas Day.(10).If any of the listed holidays falls on a Sunday,the day observed by the
Nation shall be considered a holiday and compensated accordingly.Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
Note Codes
8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or
more
Over 50' To 100'-$2.00 per Foot for Each Foot Over 50 Feet
Over 100'To 150'-$3.00 per Foot for Each Foot Over 10o Feet
Over 150'To 220'-$4.00 per Foot for Each Foot Over 150 Feet
Over 220'-$5.00 per Foot for Each Foot Over 220 Feet
C. In addition to the hourly wage and Binge benefits,the following depth premiums apply to depths of fifty feet or
more:
Over 50' To 100'-$1.00 per Foot for Each Foot Over 50 Feet
Over 100'To 150'-$150 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Fect
Over 200'-Divers May Name Their Own Price
D. Workers working with supplied air on hazmat projects receive an additional$L00 per hour.
L. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$0.75,Level B:$0.50,And
Level C:$0.25.
M. Workers on hazmat projects receive additional.hourly premiums as follows:Levels A&B: $1.00,Levels C&D:
$0.50.
N. Workers on hazmat proj cots receive additional hourly premiums as follows-Level A:$1.00,Level B:$0.75,Level
C:$0.50,And Level D: $0.25.
P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit:
$1.50,Class C Suit:$1.00,And Class D Suit$0.50.
Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the
shift shall be used in determining the scale paid.
R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or
spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance
and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,
and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted whore shown on
approved Traffic Control Plans or where directed by the Engineer.All Faggers and spotters shall possess a current
flagging card issued by the State of Washington,Oregon,Montana,or Idaho.'fhese classifications are only effective
on or alter August 31,2012.
8
Benefit Code Key—Effective 8-31-2014 thru 3-3-2015
8. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or
spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where directed by the Engineer.All flaggcrs and spotters shall possess a current
flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on
or after August 31,2012.
T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all
temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian
traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traflic
Control Plans or where directed by the Engineer.All flaggcrs and spotters shall possess a current flagging card
issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after
August 31,2012.
I
9