Loading...
HomeMy WebLinkAboutPW15-086 - Original - Skycorp, LTD - 1st Avenue Awning Removal - 3/6/15 n�a�i�fiiFsa' 'af' Records e rn eft;;=�k KENT WA9rviNGTOH Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Skycorp LTD Vendor Number: JD Edwards Number Contract Number: Fwk s p This is assigned by City Clerk's Office Project Name: 1st Ave Awning Removal Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 03/06/2015 Termination Date: 03/21/15 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Bill Thomas Department: Operations Contract Amount: $6,900.00 Approval Authority: (CIRCLE ONE) Department Dire r Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Mobilization, demolition and removal of existing canopy over sidewalk along 1st Ave. The canopy pillars will be cut flush to the ground without any removal underground. As of: 08/27/14 ICENT WgHNIN�i ON PUBLIC WORKS AGREEMENT between City of Kent and Skycorp LTD THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Skycorp LTD organized under the laws of the State of Washington, located and doing business at 526 NW Ave Suite #11 Arlington, WA 98223, Phone: (360) 926-8989/Fax: (360) 926-8987, Contact: Skyler Waldal (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Mobilization, demolition and removal of existing canopy over sidewalk along 1st Ave. The canopy pillars will be cut flush to the ground without any removal underground. For a copy of the Contractor's quote, see Exhibit A which is attached and incorporated by this reference.. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 15 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Six Thousand, Nine Hundred Dollars ($6,900.00). Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20-171 and its related rules for the work contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $10,000, and pursuant to Chapter 39.08 PUBLIC WORKS AGREEMENT - 1 (Roadway/Pedestrian Path - Under$10K and No Performance Bond) RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final fifty percent (50%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Roadway/Pedestrian Path - Under$10K and No Performance Bond) E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. j C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed PUBLIC WORKS AGREEMENT - 3 (Roadway/Pedestrian Path - Under$1OK and No Performance Bond) with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. i At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an PUBLIC WORKS AGREEMENT - 4 (Roadway/Pedestrian Path - Under$10K and No Performance Bond) i invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. PUBLIC WORKS AGREEMENT - 5 (Roadway/Pedestrian Path - Under$10K and No Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect, C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by PUBLIC WORKS AGREEMENT - 6 (Roadway/Pedestrian Path - Under$10K and No Performance Bond) filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Roadway/Pedestrian Path - Under$10K and No Performance Bond) i J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: / By: ' fr � ( grature) ' (sig ature) Print Name: $dtrw / G�wId4 J Print Name: Timothy J. LaPorte, P.E. Its: N5,b'4—� � Its: Public Works Director (title) f DATE: 3.fbf/S DATE �f j a NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Skyler Waldal Timothy J. LaPorte Skycorp LTD City of Kent 526 NW Ave Suite #11 220 Fourth Avenue South Arlington, WA 98223 Kent, WA 98032 (360) 926-8989 (telephone) (253) 856-5500 (telephone) (360) 926-8987 (facsimile) (253) 856-6500 (facsimile) I [In Nis field,you may enter the electronic file0ath where the contract has been saved] PUBLIC WORKS AGREEMENT - 8 (Roadway/Pedestrian Path - Under$1OK and No Performance Bond) DECLARATION CITY OF (CENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard tc the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. J n l /f By. For: ' > , Gc Title: (� Date:T 306//J-" I EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. r By: I For: Title: (ems dw Date: EEO COMPLIANCE DOCUMENTS - 3 i i EX I IT SKYCOR PT. 1)eh1p)Itwoo nvwopMenta AGenerAJContractors Vebruary 18,2015 j Tw City of Kent—)3111 Thomas Re: Demolition and Removal of canopy Site Address: I'W Meeker and GroW,lCeiit, WA I SkyCorp,Ltd. proposes to hrnish all materials and.perforin all labor necessary to complete the following: Scope ofrvoik: Mobilization,demolition aud,removal of existing: e Canopy over sidewalk along 0 Ave. The canopy pillars will be cut#rush to the ground without aty removal underground, Total Price: $0,900.00(ENcludiMg Sales Tax) Clarifications: I., Proposal is based on one mobilization. 2. Proposal valid for 30 days 3. Additional work performed per hourly rate sheet Page 2 February 18 2015 Exclusions, 1. Engineering,soils testing,lay out and surveying 2. Traffic Control 3. Sidewalk Closures 4, Erosion Control 5. Compaction test 6. Fencing or security 7. All fees mid special inspections 8.. Underground utilities 9. private locates; 10.Export of contaminated or imsuitable soils or import to replace exported quantity 11.Import or export of any fill material 12,Dewatering 13.All permits 14, Sales Tax 15. Landscaping 16.Hydro seeding andniulcl 17.Hazardous materials 18.Removal and emptying of any Underground Storage Tanks 19, Removal and emptying of any Abovegrotuld Storage Tanks 20.Asbestos Survey orremoval 21.Unforeseen or presumed asbestos materials 21,All other work not included in this proposal Thank you for considering our proposal, Sincerely; Skyler Waldal SkyCorp Ltd 425.367-78$7 cell 360.926-8989 office 360-926-8987 fax 1 i EXHIBIT B INSURANCE REQUIREMENTS FOR CONSULTANT SERVICES AGREEMENTS Insurance The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Consultant shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4. Professional Liability insurance appropriate to the Consultant's profession. a. Minimum Amounts of Insurance Consultant shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000general I I EXHIBIT B (Continued) aggregate and a $1,000,000 products-completed operations aggregate limit. 3. Professional Liability insurance shall be written with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Consultant's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not contribute with it. 2. The Consultant's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the Consultant and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Consultant's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Consultant. SKYCO-1 OP ID: BR CERTIFICATE OF LIABILITY INSURANCE D0310 4/2ATE 0 1 6Y) �,— 03/04/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY.OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: if the certificate holder Is an ADDITIONAL INSURED,the policy(ies) must he endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this Certificate does not confer rights to the certificate holder In lieu of such endorsements. PRODUCER CONTACT NAME: Soundvlew Insurance Agency Inc PHONE Fnz 18927 33rd Ave W.Suite C :Lynnwood,WA 98036-4726 E+4WL Tony Conti ADDRESS: INSURERIS)AFFOROINO CGVERAGE __. _ NAICB INSURER A;Hudson Specialty Ins Co INSURED SKYCORP,LTD INSURERa:ZuHch Amcdcanlnsurance Co 526 NW Ave Ste 11 Arlington,WA 98223 INSURER C:Great American lnaumnce Co INSURER D INSURERE. NSURERF: 'i COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILT, TYPE OF INSURANCE IADD HRR POLICY NUMBER L..AA,,YSEE MM100 EXY - LIMITS GENERALLIABILITY EACH OCCURRENCE S 1,000,00 GES(EaocTED A : X COMMERCIAL GENERAL LIABILITY I X X ESB4318131401 04/04/2014 04/0412015 PREMISES(Ea aqc ence $ 60,000 _ CLAIMS-MADE rX IOCCUR MED EXP(Any one person) _ ll 5,000 X Pollution Liab ESB4318131401 0410412014 04104/2015 PERSONAL&ADV INJURY S 1,000,00 X IPro(eeelonal Llab IESe4318131401 04/04/2014 04/0412015 GENERAL AGGREGATE S 2,000,00 GEHL AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,00 I POLICY X PRO- LOC I Prof/E&O $ 1,000,00 JEGTAUTOMOBILE LIABILITY CO BIN€OSINGLE LIMIT 1,000,00 B ANYAUTO X RK-9016076 04104/2014 04/04/2015 BODILY INJURY(Perperson) III ALL OWNED SCHEDULED BODILY INJURY(Perew;dent)I$ L_ AUTOS X AUTOS X DAMAGE $ HIREDAUTOS X AUTOS — - I IS .- UMBRELLALIAB EACH OCCURRENCE $ ; OCCUR , EXCESS LIAR CLAIMS-MADE AGGREGATES . LIED RETENTIONS q WORKERS COMPENSATION i WC STADRY M AND EMPLOYERS'LIABILITY A ANY PROPRIETORIPARTNERIEXECUTIVEYINESS4318131401 0410412014 04/0412015 EL EACH ACC 1,000,00OFFICERIMEMBEREXClUDEOe NIA ASTOP GAP E.L.DISEASE- 1,000,00(Mandatory In NHI IfyS6desv;beundet E.L DISEASE- 1,00000 DESCRIPTION OF OPERATIONS below C Rentedl Leased IMP448837704 0410412014 04/04/2015 Limit 1,000,000 Equipment DED 1100 I DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ARach ACORD 101,AdlItIonal Remarks Schedule,If more space Is requlrod) City of Kent is included as Primary & Non-Contributory Additional Insured. Waiver of Subrogation in their favor including both ongong and completed operations applies on a per project basis as required by written ' contract, per ESB-COM-0913-279, ESB-COM-1108-261, ESE-COM-1108-228 Blanket endorsemente attached. 11 CERTIFICATE HOLDER CANCELLATION CITYOKE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Kent ACCORDANCE WITH THE POLICY PROVISIONS. 220 Fourth Avenue South Kent,WA 98032 AUTHORIZED REPRESENTATIVE M 1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD f i I HUDSON SPECIALTY INSURANCE COMPANY (A New Yotk Domiciled Corporation) ECO-PAID Additional Insured Owners, Lessees or Contractors Automatic Assignment Endorsement In consideration of the premium paid,it is hereby understood and agreed that the following sliall apply to: Policy Number: ESB 431813-14-01 Effective Date: April 04,2014 This endorsement modifies insurance provrided under the applicable Police coverage part(s) I SCHEDULE Any person(s) or organization(s)whom the NAMED INSURED agrees,in a written contract, to name as an additional insured, shall be deemed an INSURED. However,this status exists only for the project specified in that contract but only with respect to that person's or organization's vicarious liability arising out of ongoing or completed operations performed for that additional insured. This endorsement does not apply to the Environmental Professional Liability coverage part. A/1 other policy terms and conditions shall remain the some, �13� A i'1' ORRESENTATIVE ;I i M-CONt-0913-279 Page 1 of 1 IIUDSON SPECIALTY_INSURANCE COMPANY (A New York Domiciled Corporation) ECO-PAK i .Automatic Primary Non-Contributory Endorsement (Blanket Coverage) In consideration of the premium paid, it is hereby understood and agreed that the following shall apply to: i Policy Number:ESB 431813-14-01 Effective Date: April 04, 2014 This endorsement modifies insurance provided under the applicable Policy coverage part(s). SCHEDULE i Name of Person or Organization; Any person(s) or organization(s) whom the NAMED INSURED agrees, in a written contract,to provide Primary and/or Non-contributory status of this insurance. However, this status exists only for the project specified in that contract and as long as that Project is covered under any applicable Policy coverage part. Notwithstanding anything contained in this policy to the contrary„it is hereby agreed that this policy shall be considered primary to any similar insurance held by third parties in respect to wort: performed by you under any written contractual agreement with such third party. It is further y agreed that any other insurance which the petson(s) or organization(s) as referenced above may i hate,is excess and non-contributory to this insurance. 1 j All otherpolicy terms and conditions shall remain the some, i ATO ORIZED RESENTrATIVE l ESB-CONI-1108-261 Page I of 1 HUDSON SPECIALTY INSURANCE COMPANY (A New York Domiciled Corporation) ECO-PAK Subrogation Automatic Waiver Endorsement THIS ENDORSEMFNT CHANGES THE POLICY, PLEASE READ IT CAREFULLY In consideration of the premium paid,it is hereby understood and agreed that the following shall apply to: Policy Number: ESB 431813-14-01 Effective Date: April 04,2014 i This endorsement modifies insurance provided under the applicable policy coverage part(s). The Company waives any right of recovery it may have against the person or organization shown in the Schedule below because of payments the Company makes for injury or damage arising out of the i INSURED'S work done under a contract with that person or organization. This endorsement does not apply to the Environmental Professional Liability coverage part. The waiver applies only to the person or organization in the Schedule below. I j SCHEDULE Name of Person or Organization: Any person(s) or organization(s) to whom the NAMED INSURED agrees,in a written contract,to provide a waiver of subrogation. However,this status exists only for the project specified in that contract. Under no circumstances shall this endorsement act to extend the policy period,change the scope of amerage,or increase the Aggregate Limits of Insurance shown in the Declamations. All otherpolicy tetras and conditions shaiiremain the same. A T ORIZED RESENTATIVE ESB-CONI-1108-228 Page t of I Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 2/25/2015 County Trade Job Classification Wa a HolidayOvertimeNote' King Asbestos Abatement Workers Journey Level $42.67 5D 1 H King Boilermakers Journey Level $64.44 5N 1C King Brick Mason Brick And Block Finisher $44.46 5A 1M King Brick Mason Journey Level $51.32 5A 1M 'King Brick Mason Pointer-Caulker-Cleaner $51.32 5A 1M IKing Building Service Emplovees Janitor $21.29 5S 2F ,King Building Service Employees Traveling Waxer/Shampooer $21.70 5S 2F King Building Service Employees Window Cleaner (Non- $24.94 5S 2F Scaffold) 'King Building Service Emplovees Window Cleaner (Scaffold) $25.80 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $52.321 5D 4C "King Carpenters Bridge, Dock And Wharf $52.32 5D 4C Carpenters King Carpenters Carpenter $52.32 5D 4C King Carpenters Carpenters on Stationary Tools $52.45 5D 4C King Carpenters Creosoted Material $52.42 5D 4C King Carpenters Floor Finisher $52.32 5D 4C King Carpenters Floor Layer $52.32 5D 4C King Carpenters Scaffold Erector $52.32 5D 4C yKing Cement Masons Journey Level $52.38 7A 1M ;King Divers Ft Tenders Diver $105.37 5D 4C 8A King Divers Ft Tenders Diver On Standby $59.50 5D 4C King Divers Et Tenders Diver Tender $54.82 5D 4C King Divers Ft Tenders Surface Rcv 8 Rov Operator $54.82 5D 4C King Divers 8 Tenders Surface Rcv & Rov Operator $51.07 5A 4C Tender King Dredge Workers Assistant Engineer $53.00 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F King Dredge Workers lBoatmen $52.30 5D I 3F King Dredge Workers Engineer Welder $54.04 5D 3F https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 2/25/2015 Page 2 of 17 King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King Dredge Workers Mates $52.30 5D 3F King Dredge Workers Oiler $52.58 5D 3F King Drywall Applicator Journey Level $52.32 5D 1H King Drywall Tapers Journey Level $52.37 5P 1 E King Electrical Fixture Maintenance Journey Level $25.84 5L 1E Workers King Electricians - Inside Cable Splicer $65.69 7C 2W King Electricians - Inside Cable Splicer (tunnel) $70.52 7C 2W King Electricians - Inside Certified Welder $63.49 7C 2W King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W King Electricians - Inside Construction Stock Person $35.69 7C 2W King Electricians - Inside Journey Level $61.30 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $68.33 5A 4A Construction King Electricians - Powerline Certified Line Welder $62.50 5A 4A Construction King Electricians - Powerline Groundperson $42.56 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $62.50 5A 4A Construction Operator King Electricians - Powerline Journey Level Lineperson $62.50 5A 4A Construction King Electricians - Powerline Line Equipment Operator $52.47 5A 4A Construction King Electricians - Powerline Pole Sprayer $62.50 5A 4A Construction King Electricians - Powerline Powderperson $46.55 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $80.14 7D 4A King Elevator Constructors Mechanic In Charge $86.77 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.25 5B 1 R Products Work Only King Fence Erectors Fence Erector $15.18 1 King Et_aggers Journey Level $36.17 7A 31 King Glaziers Journey Level $54.91 7L 1Y King Heat 8 Frost Insulators And Journeyman $60.93 5J 1S Asbestos Workers King Heating Equipment Mechanics Journey Level $70.37 7F 1E King Hod Carriers 8 Mason Tenders Journey Level $44.00 7A 31 King Industrial Power Vacuum Journey Level $9.47 1 Cleaner King Inland Boatmen Boat Operator $54.57 5B 1K King Inland Boatmen ICook $50.95 5B 1K https://fomess.wa.gov/hii/wagelookup/prvWagelookup.aspx 2/25/2015 Page 3 of 17 King lintand Boatmen Deckhand $51.191 5B I 1K King Inland Boatmen Deckhand Engineer $52.18 5B 1K 'King Inland Boatmen Launch Operator $53.40 5B 1K 'King Inland Boatmen Mate $53.40 5B 1K ,King Inspection/Cleaning/Sealing Cleaner Operator, Foamer $31.49 1 Of Sewer a Water Systems By Operator Remote Control King Inspection/Cleaning/Seating Grout Truck Operator $11.48 1 Of Sewer £t Water Systems By Remote Control King Inspection/Cleaning/Sealing Head Operator $24.91 1 Of Sewer Ft Water Systems By Remote Control King Inspection/Cleaning/Sealing Technician $19.33 1 Of Sewer 8 Water Systems By Remote Control 'King Inspection/Cleaning/Sealing Tv Truck Operator $20.45 1 Of Sewer Ft Water Systems By Remote Control King Insulation Applicators Journey Level $52.32 5D 4C King Ironworkers Journeyman $61.62 7N 10 King Laborers Air, Gas Or Electric Vibrating $42.67 7A 31 Screed King Laborers Airtrac Drill Operator $44.00 7A 31 King Laborers Ballast Regular Machine $42.67 7A 31 King Laborers Batch Weighman $36.171 7A 31 ;King Laborers Brick Pavers $42.67 7A 31 "King Laborers Brush Cutter $42.67 7A 31 King Laborers Brush Hog Feeder $42.67 7A 31 Nng Laborers Burner $42.67 7A 31 King Laborers Caisson Worker $44.00 7A 31 King Laborers Carpenter Tender $42.67 7A 31 King Laborers Caulker $42.67 7A 31 King Laborers Cement Dumper-paving $43.46 7A 31 King Laborers Cement Finisher Tender $42.67 7A 31 King Laborers Change House Or Dry Shack $42.67 7A 31 King Laborers Chipping Gun (under30 Lbs.) $42.67 7A 31 King Laborers Chipping Gun(30 Lbs. And $43.46 7A 31 Over) King Laborers Choker Setter $42.67 7A 31 ,King Laborers Chuck Tender $42.67 7A 31 King Laborers Clary Power Spreader $43.46 7A 31 King Laborers Clean-up Laborer $42.67 7A 31 King Laborers Concrete Dumper/chute $43.46 7A 31 Operator 'King Laborers Concrete Form Stripper $42.67 7A 31 ,IKing Laborers Concrete Placement Crew $43.46 7A 31 King Laborers $43.46 7A 31 https://fortress.wa.gov/lni/wagelooktip/PrvWageloolcup.aspx 2/25/2015 Page 4 of 17 Concrete Saw Operator/core Driller King Laborers Crusher Feeder $36.17 7A 31 King Laborers Curing Laborer $42.67 7A 31 King Laborers Demolition: Wrecking 8 $42.67 7A 31 Moving (incl. Charred Material) King Laborers Ditch Digger $42.67 7A 31 King Laborers Diver $44.001 7A 31 King Laborers Drill Operator $43.46 7A 31 (hydraulic,diamond) King Laborers Dry Stack Walls $42.67 7A 31 King Laborers Dump Person $42.67 7A 31 King Laborers Epoxy Technician $42.67 7A 31 King Laborers Erosion Control Worker $42.67 7A 31 King Laborers Faller & Bucker Chain Saw $43.46 7A 31 King Laborers Fine Graders $42.67 7A 31 King Laborers Firewatch $36.17 7A 31 King Laborers Form Setter $42.67 7A 31 King Laborers Gabian Basket Builders $42.67 7A 31 King Laborers General Laborer $42.67 7A 31 King Laborers Grade Checker 8 Transit $44.00 7A 31 Person King Laborers Grinders $42.671 7A 31 King Laborers Grout Machine Tender $42.67 7A 31 King Laborers Groutmen (pressure)including $43.46 7A 31 Past Tension Beams King Laborers Guardrail Erector $42.67 7A 31 King Laborers Hazardous Waste Worker $44.00 7A 31 (level A) King Laborers Hazardous Waste Worker $43.46 7A 31 (level B) King Laborers Hazardous Waste Worker $42.67 7A 31 (level C) King Laborers High Scaler $44.00 7A 31 King Laborers Jackhammer $43.46 7A 31 King Laborers Laserbeam Operator $43.46 7A 31 King Laborers Maintenance Person $42.67 7A 31 King Laborers Manhole Builder-mudman $43.461 7A 31 King Laborers Material Yard Person $42.671 7A 31 King Laborers Motorman-dinky Locomotive $43.46 7A 31 King Laborers Nozzleman (concrete Pump, $43.46 7A 31 Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete ft Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $43.461 7A 31 https://fortress.wa.gov/lni/wagelookLLp/prvWagelookup.aspx 2/25/2015 Page 5 of 17 ;King Laborers Pilot Car $36.171 7A 1 31 King Laborers Pipe Layer Lead $44.00 7A 31 King Laborers Pipe Layer/tailor $43.46 7A 31 King Laborers Pipe Pot Tender $43.46 7A 31 King Laborers Pipe Reliner $43.46 7A 31 King Laborers Pipe Wrapper $43.46 7A 31 King Laborers Pot Tender $42.67 7A 31 King Laborers Powderman $44.00 7A 31 ,King Laborers Powderman's Helper $42.67 7A 31 'King Laborers Power Jacks $43.46 7A 31 King Laborers Railroad Spike Puller - Power $43.46 7A 31 King Laborers Raker - Asphalt $44.00 7A 31 King Laborers Re-timberman $44.00 7A 31 King Laborers Remote Equipment Operator $43.46 7A 31 King Laborers Rigger/signal Person $43.46 7A 31 King Laborers Rip Rap Person $42.67 7A 31 King Laborers Rivet Buster $43.46 7A 31 King Laborers Rodder $43.46 7A 31 King Laborers Scaffold Erector $42.67 7A 31 'King Laborers Scale Person $42.67 7A 31 King Laborers Sloper (over 20") $43.46 7A 31 King Laborers Sloper Sprayer $42.67 7A 31 'King Laborers Spreader (concrete) $43.46 7A 31 King Laborers Stake Hopper $42.67 7A 31 King Laborers Stock Piler $42.67 7A 31 King Laborers Tamper a Similar Electric, Air $43.46 7A 31 a Gas Operated Tools King Laborers Tamper (multiple a Self- $43.46 7A 31 propelled) King Laborers Timber Person - Sewer $43.46 7A 31 (lagger, Shorer a Cribber) King Laborers Toolroom Person (at Jobsite) $42.67 7A 31 King Laborers Topper $42.67 7A 31 ,King Laborers Track Laborer $42.67 7A 31 King Laborers Track Liner (power) $43.46 7A 31 IKing Laborers Traffic Control Laborer $38.681 7A 31 8R King Laborers Traffic Control Supervisor $38.68 7A 31 8R King Laborers Truck Spotter $42.67 7A 31 King Laborers Tugger Operator $43.46 7A 31 King Laborers Tunnel Work-Compressed Air $64.99 7A 31 8g Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $70.02 7A 31 SS Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $73.70 7A 31 Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $79.40 7A 31 Worker 54.01-60.00 psi I https://fortress.wa.gov/lni/wageloolcup/prvWageloolcup.aspx 2/25/2015 Page 6 of 17 King Laborers Tunnel Work-Compressed Air $81.52 7A 31 ` Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $86.62 7A 3I Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $88.52 7A 31 29 Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $90.52 7A 31 89 Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $92.52 7A 31 9 Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $44.10 7A 31 8� Tender King Laborers Tunnel Work-Miner $44.10 7A 31 8� King Laborers Vibrator $43.46 7A 31 King Laborers Vinyl Seamer $42.67 7A 31 King Laborers Watchman $32.87 7A 31 King Laborers Welder $43.461 7A 31 King Laborers Well Point Laborer $43.46 7A 31 King Laborers Window Washer/cleaner $32.87 7A 31 King Laborers - Underground Sewer General Laborer 3 Topman $42.67 7A 31 a Water King Laborers - Underground Sewer Pipe Layer $43.46 7A 31 Et Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $52.32 5D 1H King Marble Setters Journey Level $51.32 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $53.421 5D 4C King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.47 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.80 6Z 2B King Pile Driver Journey Level $52.57 SD 4C King Plasterers Journey Level $50.42 7�C 1R https://fortress.wa.gov/tni/wageloolcup/prvWageloolcup.aspx 2/25/2015 Page 7 of 17 I King Playground Et Park Equipment Journey Level $9.47 1 Installers ,King Plumbers & Pipefitters Journey Level $74.69 6Z 1G :King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3C 8P King Power Equipment Operators Assistant Engineer $51.97 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $54.75 7A 3C BP King Power Equipment Operators Batch Plant Operator, $54.75 7A 3C 8P I; Concrete King Power Equipment Operators Bobcat $51.97 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $51.97 7A 3C 8P Equipment King Power Equipment Operators Brooms $51.97 7A 3C 8P 'r King Power Equipment Operators Bump Cutter $54.75 7A 3C 8P King Power Equipment Operators Cableways $55.24 7A 3C 8P King Power Equipment Operators Chipper $54.75 7A 3C 8P King Power Equipment Operators Compressor $51.97 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $55.24 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $51.97 7A 3C 8P Screed King Power Equipment Operators Concrete Pump • Mounted Or $54.33 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. :King Power Equipment Operators Concrete Pump: Truck Mount $54.75 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $54.33 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $54.75 7A 3C 8P Tons With Attachments 'King Power Equipment Operators Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) :King Power Equipment Operators Cranes: A-frame - 10 Tons And $51.97 7A 3C 8P Under ,King Power Equipment Operators Cranes: Friction 100 Tans $56.36 7A 3C BP Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $56.92 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 309 $56.92 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators $54.33 7A 3C 8P https://forness.wa.gov/lni/wagelookup/pivWagelookup.aspx 2/25/2015 Page 8of17 Cranes: Through 19 Tons With Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $54.75 7A 3c 8P King Power Equipment Operators Deck Engineer/deck Winches $54.75 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $54.33 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $54.751 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $51.97 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell $54.75 7A 3C 8P And Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $54.33 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P 'v With Attachments King Power Equipment Operators Grade Engineer: Using Blue $54.75 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $51.97 7A 3C 8P King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $55.24 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $54.75 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $54.33 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $54.75 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $54.33 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P i Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. 8 $55.79 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. $55.24 7A 3C 8P But Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $54.75 7A 3C 8P Yards King Power Equipment Operators Loaders, Plant Feed $54.75 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P King Power Equipment Operators Locomotives, All $54.75 7A 3C 8P 'f King Power Equipment Operators Material Transfer Device $54.75 7A 3C 8P King Power Equipment Operators $55.79 7A 3C 8P ht(ps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 2/25/2015 Page 9 of 17 Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Grader - Non- $54.33 7A 3C 8P finishing ,King Power Equipment Operators Motor Patrol Graders, $55.24 7A 3C 8P } Finishing 'King Power Equipment Operators Mucking Machine, Mole, $55.24 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield 'King Power Equipment Operators Oil Distributors, Blower $51.97 7A 3C 8P Distribution 8 Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $54.33 7A 3C 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $54.75 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $55.79 7A 3C 8P L Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $55.24 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $51.97 7A 3C 8P !King Power Equipment Operators Pile Driver (other Than Crane $54.75 7A 3C 8P Mount) IKing Power Equipment Operators Plant Oiler - Asphalt, Crusher $54.331 7A 3C 8P 'King Power Equipment Operators Posthole Digger, Mechanical $51.971 7A 3C 8P King Power Equipment Operators Power Plant $51.971 7A 3C 8P King Power Equipment Operators Pumps - Water $51.97 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $51.97 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $55.24 7A 3C 8P Rubber Tired Earth Moving Equipment ;King Power Equipment Operators Rigger And Bellman $51.97 7A 3C 8P ",King Power Equipment Operators Rollagon $55.24 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $51.97 7A 3C 8P 'King Power Equipment Operators Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $54.75 7A 3C 8P King Power Equipment Operators Saws - Concrete $54.33 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $54.75 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry $54.33 7A 3C 8P All King Power Equipment Operators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $54.33 7A 3C 8P ;King Power Equipment Operators Shotcrete/gunite Equipment $51.97 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWageloolcup.aspx 2/25/2015 Page 10 of]7 King Power Equipment Operators Shovel , Excavator, Backhoe, $54.33 7A I 3C 8P " Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $55.24 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $54.75 7A 3C BP Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $55.24 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et $55.24 7A 3C SIP Screedman King Power Equipment Operators Subgrader Trimmer $54.75 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $54.33 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $56.36 7A 3C 8P j Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $55.79 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $55.24 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $54.75 7A 3C 813 Tons And Over King Power Equipment Operators Truck Crane Oiler/driver $54.33 7A 3C 813 Under 100 Tons King Power Equipment Operators Truck Mount Portable $54.75 7A 3C 8P j Conveyor King Power Equipment Operators Welder $55.24 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $51.97 7A 3C SP King Power Equipment Operators Yo Yo Pay Dozer $54.75 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $54.75 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $51.97 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Bump Cutter $54.75 7A 3C 8P Underground Sewer 8: Water hitps://fortress.wa.gov/hu/wagelookup/prvWagelooktip.aspx 2/25/2015 Page 11 of 17 King Power Equipment Operators- Cableways $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $55.24 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $51.97 7A 3C 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $54.33 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $54.75 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $54.33 7A 3C 8P Underground Sewer Et Water =King Power Equipment Operators- Cranes: 20 Tons Through 44 $54.75 7A 3C 8P Underground Sewer Et Water Tons With Attachments ;King Power Equipment Operators- Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P '! Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Underground Sewer EL Water Tons, Under 150' Of Boom (including Jib With Attachments) (King Power Equipment Operators- Cranes: A-frame - 10 Tons And $51.97 7A 3C 813 Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $56.36 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $54.33 7A 3C 8P it Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $54.75 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 £t Under $54.33 7A 3C 8P Underground Sewer Et Water https://fortress.wa.gov/lni/wagelool,up/prvWageloolcup.aspx 2/25/2015 Page 12 of 17 King Power Equipment Operators- Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Underground Sewer & Water Or Crane Mount King Power Equipment Operators- Drilling Machine $54.75 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Elevator And Man-lift: $51.97 7A 3C 8P f Underground Sewer Ft Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell $54.75 7A 3C 8P Underground Sewer ft Water And Gamaco Ft Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $54.33 7A 3C 8P Underground Sewer 8 Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. $51.97 7A 3C 8P Underground Sewer & Water With Attachments King Power Equipment Operators- Grade Engineer: Using Blue $54.75 7A 3C 8P Underground Sewer Ft Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $51.97 7A 3C 8P V Underground Sewer 8 Water King Power Equipment Operators- Guardrail Punch $54.75 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Hard Tail End Dump $55.24 7A 3C 8P Underground Sewer & Water Articulating Off- Road Equipment 45 Yards. 8 Over King Power Equipment Operators- Hard Tail End Dump $54.75 7A 3C 8P Underground Sewer 8 Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $54.33 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $54.75 7A 3C 8P Underground Sewer & Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $54.33 7A 3C 8P Underground Sewer Ft Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P Underground Sewer Ft Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. & $55.79 7A 3C 8P Underground Sewer Ft Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. $55.24 7A 3C 8P 'p Underground Sewer Et Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $54.75 7A 3C 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Loaders: Elevating Type Belt $54.33 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Locomotives, All $54.75 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Material Transfer Device $54.75 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Mechanics, All (teadmen - $55.79 7A 3C 8P I Underground Sewer 8 Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $54.33 7A 3C 8P Underground Sewer & Water finishing https://fortress.wa.gov/lni/wagelookup/prvWageloolcup.aspx 2/25/2015 Page 13 of 17 4:ing „ Power Equipment Operators- Motor Patrol Graders, $55.24 7A 3C 8P Underground Sewer £t Water Finishing King Power Equipment Operators- Mucking Machine, Mole, $55.24 7A 3C 8P Underground Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $51.97 7A 3C 8P 'r Underground Sewer Et Water Distribution 8 Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $54.33 7A 3C 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato `',King Power Equipment Operators- Overhead, Bridge Type Crane: $54.75 7A 3C 8P i Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $55.79 7A 3C 8P Underground Sewer a Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $55.24 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons 'King Power Equipment Operators- Pavement Breaker $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $54.75 7A 3C 8P Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P Underground Sewer Et Water !King Power Equipment Operators- Posthole Digger, Mechanical $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $51.97 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Pumps - Water $51.97 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $51.97 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $55.24 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $51.97 7A 3C 8P Underground Sewer Et Water ,King Power Equipment Operators- Rollagon $55.24 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Roller, Other Than Plant Mix $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $54.75 7A 3C 8P Underground Sewer 8 Water iKing Power Equipment Operators- Saws - Concrete $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $54.75 7A 3C 8P Underground Sewer Et Wate 145 Yards 'King $54.33 7A 3C 8P https://fortress.wa.gov/lni/wagelool,up/prvWageloolcup.aspx 2/25/2015 Page 14 of 17 Power Equipment Operators- Scrapers - Concrete 8: Carry i Underground Sewer & Water All King Power Equipment Operators- Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $55.24 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider 8 $55.24 7A 3C 8P Underground Sewer it Water Screedman King Power Equipment Operators- Subgrader Trimmer $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $56.36 7A 3C 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $55.79 7A 3C 8P Underground Sewer 8 Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $55.24 7A 3C SP Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $54.33 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver $54.33 7A 3C 8P f Underground Sewer Et Water Under 100 Tons King Power Equipment Operators- Truck Mount Portable $54.75 7A 3C 8P Underground Sewer Et Water Conveyor King Power Equipment Operators- Welder $55.24 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Wheel Tractors, Farman Type $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P l Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $44.86 5A 4A Trimmers https://fortress.wa.goN,Ani/wagelookup/prvWagelookup.aspx 2/25/2015 Page 15 of 17 King Power Line Clearance Tree Spray Person $42.58 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A Trimmers !King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A Trimmers King Refrigeration rt Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $51.32 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential DrVwalt Journey Level $40.14 5D 4C Applicators King Residential DrVwall Tapers Journey Level $52.37 5P 1 E King Residential Electricians Journey Level $30.44 1 'King Residential Glaziers Journey Level $36.201 7L 1H =King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 'King Residential Painters Journey Level $24.46 1 King Residential Plumbers Ft Journey Level $34.69 1 Pipefitters King Residential Refrigeration Ft Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $42.58 7F 1R Workers King Residential Soft Floor Lavers Journey Level $42.41 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 211 (Fire Protection) King Residential Stone Masons Journey Level $51.32 5A 1M ,King Residential Terrazzo Workers Journey Level $46.961 5A 1M 'King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $44.71 5A 3H 'King Roofers Using Irritable Bituminous $47.71 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $70.37 7F 1E King Shipbuilding Ft Ship Repair Boilermaker $40.72 7M 1H King Shipbuilding Ft Ship Repair Carpenter $39.24 7T 2B _I ing Shipbuilding £t Ship Repair Electrician $39.28 7T 4B a King Shipbuilding a Ship Repair Heat £t Frost Insulator $60.93 5J 15 Ang Shipbuilding 8 Ship Repair Laborer $39.34 7T 4B King Shipbuilding 8 Ship Repair Machinist $39.32 7T 4B King Shipbuilding & Ship Repair Operator $39.22 7T 4B https:Hfortress.wa.gov/lni/wageloolcup/prvWageloolcup.aspx 2/25/2015 Page 16 of 17 King Shipbuilding Ft Ship Repair Painter $39.311 7T 4B l King Shipbuilding Ft Ship Repair Pipefitter $39.22 7T 4B King Shipbuilding & Ship Repair Rigger $39.30 7T 4B King Shipbuilding 8 Ship Repair Sheet Metal $39.27 7T 4B King Shipbuilding Et Ship Repair Shipfitter $39.30 7T 4B King Shipbuilding Et Ship Repair Trucker $39.10 7T 4B King Shipbuilding Et Ship Repair Warehouse $39.17 7T 4B King Shipbuilding 8 Ship Repair Welder/Burner $39.30 7T 4B King Sign Makers 8 Installers Sign Installer $22.92 1 (Electrical) King Sign Makers 8 Installers Sign Maker $21.36 1 fElectrical) King Sign Makers 8 Installers (Non- Sign Installer $27.28 1 Electrical) King Sign Makers 8 Installers (Non- Sign Maker $33.25 1 Electrical) King Soft Floor Lavers Journey Level $42.41 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69.59 5C 1X Protection) King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $51.32 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $54.33 7A 3C 8P Surveyor King Surveyors Chainman $53.81 7A 3C 8P King Surveyors Construction Site Surveyor $55.24 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $36.96 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20.49 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $35.40 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.96 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $36.19 5A 2B Outside King Telephone Line Construction - Telephone Equipment $36.96 5A 2B Outside Operator (Heavy) King Telephone Line Construction - Telephone Equipment $34.34 5A 2B Outside Operator (Light) King Telephone Line Construction - Telephone Lineperson $34.34 5A 2B Outside King Telephone Line Construction - Television Groundperson $19.45 5A 2B Outside https://fortress.wa.gov/lni/wageloolmp/prvWagelookup.aspx 2/25/2015 Page 17 of 17 King Telephone Line Construction - Television $25.89 5A 2B Outside Lineperson/Installer King Telephone Line Construction - Television System Technician $30.97 5A 2B Outside ;King Telephone Line Construction - Television Technician $27.77 5A 2B Outside jKing Telephone Line Construction - Tree Trimmer $34.34 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble & Terrazzo Finisher $37.79 5A 1B Finishers King Traffic Control Stripers Journey Level $43.11 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. $48.87 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck 8 Trailer $48.87 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $48.03 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Welt Drillers Ft Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers 8 Irrigation Pump Oiler $12.97 1 Installers ;King Well Drillers 8 Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/lni/wageloolcup/prvWagelookup.aspx 2/25/2015 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker.On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-IIALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day alter either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10) hours worked on Saturdays and the first ten(10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage.All hours worked in excess of ten(10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. L All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 1. N. All hours worked on Saturdays (except makeup days) shall be paid at one mud one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage. F. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays mud holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday, shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage.All hours worked on Thanksgiving Day mud Cluistmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12)hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage.When holiday fells on Saturday or Sunday,the day before Saturday,Friday, mid the day after Sunday,Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek) and on Saturdays mid holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve(12)hours mud all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 5-31-2014 thru 3-3-2015 2. ALL HOURS WORKED 1N EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEED SHALL i BE PAID ATONE AND ONFYHALF TIMES THE HOURLY RATE OF WAGE, B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-halftimes the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shalt be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on j holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORICED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all homy worked that shift The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pin Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays, shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays mid holidays shall be paid at double the hourly rate of wage.Each weep,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate- F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half tunes the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate. However,Saturday shall not be utilized as a make-up day,when a holiday falls on Friday.All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday,the first four (4)hours of overtime after eight(8)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday tlurough Thursday, or Tuesday through Friday,the first two(2)hours of overtime after ten (10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday,the first twelve(12)hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay, except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12)hours in a day, and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. 4 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday alter Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday alter Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). H. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day alter Thanksgiving Day, And Christmas(6). 1. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, and Christmas Day (6) J. Holidays: New Year's Day,Memorial Day, Independence Day,Thanksgiving Day, Friday alter Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, I, Thanksgiving Day,The Friday After Thanksgiving Day, And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day, and Christmas Day(6). R. Paid I-Iolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 1/2). i S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, 'Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9) Z. Holidays: New Year's Day,Memorial Day, Independence Day,Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). Holiday Codes Continued 5 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day,Labor Day, Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day.(9 1/2). G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day,Independence Day, Labor Day, Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And Christmas Eve Day(11). H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). I. Paid Holidays:New Years Day,Memorial Day,hndependence Day, Labor Day,Thanksgiving Day,Friday After'1'hanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9). Z. holidays:New Year's IJay,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving IJay, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday, if a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Palls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Yea's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day; Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which fills on a Saturday shall be observed as a holiday on the preceding Friday. 6 Benefit Code I<ey—Effective 8-31-2014 thru 3-3-2015 7. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day(8).Any holiday which falls oil a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,'I'hanksgiving Day,The '.... Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays: New Year's Day, Independence Day,Memorial Day,Labor Day,Thanksgiving Day and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays:New Year's Day,Memorial Day,Labor Day, Independence Day,Thanksgiving Day, the Last Work Day before Christmas Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, '.. Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. holidays: New Year's Day; Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a.holiday and compensated accordingly. 7 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 7. S. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. T. Paid Holidays:New Year's Day,The Day After Or Before New Year's Day,President's Day,_Memorial Day, Independence Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,and The Day Alter Or Before Christmas Day.(10).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Note Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50' To 100'-$2.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$3.00 per Foot for Each Foot Over 10o Feet Over 150'To 220'-$4.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and Binge benefits,the following depth premiums apply to depths of fifty feet or more: Over 50' To 100'-$1.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$150 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Fect Over 200'-Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional$L00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$0.75,Level B:$0.50,And Level C:$0.25. M. Workers on hazmat projects receive additional.hourly premiums as follows:Levels A&B: $1.00,Levels C&D: $0.50. N. Workers on hazmat proj cots receive additional hourly premiums as follows-Level A:$1.00,Level B:$0.75,Level C:$0.50,And Level D: $0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1.50,Class C Suit:$1.00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle, and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted whore shown on approved Traffic Control Plans or where directed by the Engineer.All Faggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.'fhese classifications are only effective on or alter August 31,2012. 8 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 8. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggcrs and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traflic Control Plans or where directed by the Engineer.All flaggcrs and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. I 9