Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW15-084 - Original - Utilities Service Co., Inc. - Garrison Reservoir & 212th Treatment Plant - 03/10/2015
F.t � Records Manageme'ntry KENO Document Wasginoran P' x' t 1F CONTRACT COVER SHEET i This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Utilities Service Co., Inc. Vendor Number: ID Edwards Number Contract Number: VV(S " ' This is assigned by City Clerk's Office Project Name: Garrison Reservoir & 212th Treatment Plant Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment M Contract ❑ Other: Contract Effective Date: 3/10/15 Termination Date: 5/31/15 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment i Contract Manager: Kevin Swinford Department: PW Operations Contract Amount: $3,680.78 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Provide repair services at Garrison Reservoir and 212tt Treatment Plant. As of: 08/27/14 KENT PUBLIC WORKS AGREEMENT between City of Kent and Utilities Service Co., Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Utilities Service Co., Inc. organized under the laws of the State of Washington, located and doing business at 12608 E, Marginal Way S., Seattle, WA 98168, Phone: (206) 246-5674/Fax: (866) 783-4467, Contact: Cindy Larson (hereinafter the "Contractor"), AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. I Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall provide repair services for Garrison Reservoir and 212`h Treatment Plant. For a description, see the Contractor's quote which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by May 31, 2015. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Three Thousand, Six Hundred Eighty Dollars and seventy eight cents ($3,680.78), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. PUBLIC WORKS AGREEMENT - 1 (Under$10K and No Performance Bond) A. No Pa ment and Performance Bond. Because this contract including 9 applicable sales tax, is less than $10,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final fifty percent (50%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work,. the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Under $10K and No Performance Bond) i E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington, F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES, The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City PUBLIC WORKS AGREEMENT - 3 (Under $IOK and No Performance Bond) will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment PUBLIC WORKS AGREEMENT - 4 (Under$IOK and No Performance Bond) for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED, THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD, X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work, The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. PUBLIC WORKS AGREEMENT - 5 (Under $10K and No Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement, XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect, C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this PUBLIC WORKS AGREEMENT - 6 (Under$1OK and No Performance Bond) i Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Under$10K and No Performance Bond) J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: r�� au. 3 By: 9" s1g6t0re) (signature) Print Nye: �u.7iva lol(a. Print Name: David A. Brock, P.E. Its Its: Interim Operations Manager DATE: DATE: 6r = J` NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Cindy Larson Timothy J. LaPorte, P.E. Utilities Service Co., Inc. City of Kent 12608 E. Marginal Way S. 220 Fourth Avenue South Seattle, WA 98168 Kent, WA 98032 (206) 246-5674 (telephone) (253) 856-5500 (telephone) (866) 783-4467 (facsimile) (253) 856-6500 (facsimile) Wfities Service-Garrison&II2th/Swinford li i PUBLIC WORKS AGREEMENT 8 (Under$10K and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows; 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: For: Title: Date: ( EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1,2 EFFECTIVE DATE: January 1, 1998 i SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City j amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. I 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. i 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of I Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 EXHIBIT A UTILITIES SERVICE CO., INC. j 12608 E MARGINAL WAY S SEATTLE,WA 98168 PHONE: 206-246-5674 FAX: 866-783-4467 EMAIL: usci4@comeast.net February 27, 2015 City of Kent Attn: Kevin Swinford Re: Garrison Reservoir We are pleased to submit the following estimate for your consideration: Furnish labor and material to: 1. Manufacture, supply, and install new stainless steel vent screens as per sample. 2. Remove bolts from deck plating for inspection of membrane, Estimate: $1979.00 This estimate is good for 30 days and does not include taxes,permits, or shipping and handling if needed. This job is bid as close to actual requirements as possible; however, due to the nature of this particular j ob,we reserve the right to bill additional labor at our current labor rates and additional materials at cost plus 15%. Thank you, Ed Mola Estimator Please indicate acceptance by completing the information requested below and faxing or emailing estimate back to us. Thank you. Date Accepted By _ PO # .Title i UTILITIES SERVICE CO., INC. 12608 E MARGINAL WAY S SEATTLE,WA 98168 PHONE: 206-246-5674 FAX : 866-783-4467 EMAIL: usci4@comcast.net February 27, 2015 City of Kent Attn: Kevin Swinford Re: 212t� St Station We are pleased to submit the following estimate for your consideration: i Furnish labor and material to repair#1 compressor, Supply and install new valve assembly parts and test for operation. Estimate: $944.00 This estimate is good for 30 days and does not include taxes,permits, or shipping and handling if needed. This job is bid as close to actual requirements as possible;however, due to the nature of this particular job, we reserve the right to bill additional labor at our current labor rates and additional materials at cost plus 15%. Thank you. Ed Mola Estimator I Please indicate acceptance by completing the information requested below and faxing or emailing estimate back to us. Thank you. Date Accepted By. PO # _Title_ i EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $2,000,000 per accident. i EXHIBIT B (continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City, 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. i E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work, F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. I I ' ® DATE(MMIDONYYY) AC"R" CERTIFICATE OF LIABILITY INSURANCE 03/09/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the pollcy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the Certificate holder in lieu of such endorsement(s). PaeoucER CONTACT NAME: Ronald H Osborne ___ _ _ Osborne Insurance Agency PHONE xp 425-291-9176 qic,Ndc 425,-656.1556 . 8009 5 180th St,Ste 102 ADD R EMAIL ESS: 9 rosborne farmersa onLcom _.... INSURERS)AFFORDING COVERAGE HAD Kent WA 98032-1042 INSURER A: Mid Century Insurance Company j 21687 INSURED INSURER O: Truck Insurance Exchange ! 21709 UTILITIES SERVICE COMPANY INC INSURER C: 12608 E MARGINAL WAY S INSURER D: INSURER E TUKWILA WA 98168 INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS 15 TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, AbUINSR _ TYPE OF INSURANCE INSO S VD POLICY NUMBER POLICY �DD1Y1'YYY MMYDOI EX 1 LIMITS R X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE s 100,0 000 _J CLAIMS-MADE I MAGESI RENTED � �occuR PREMISES Ise ocmurenca S 10D,000 MED EXP(Any ono person) s 5,D00 A X 034724312 10/30/2014 10/30S?015 PERSONAL B ADV INJURY $ 2,000,000 GEN L AGGREGATE LIMIT APPLIES PER: GENERALAGOREGATE 5 4,000,000 POLICY X JECT ❑ too PRODUCTS-COMPIOP All S 4,000,000 S OTHER: COMDINED SINGLE UNIT 5 1,DOO,DDD AUTOMOBILE LIABILITY ea accltiem).. ANY AUTO BODILY INJURY(PIe,ers,e) S A ALL OWNED X SCHEDULED X 034724312 10/30/2014 10/3012015 BODILY INJURY(Per accident) $ AUTOS �AUTOS X NON-OWNED PROPERTY DAMAGE $ X HIRED AUTOS I'AUTOS Per acddgnl S X UMBRELLA LIAR X OCCUR EACH OCCURRENCE _ _ S_ B Excess MAB cuu,+s_-nwoe 605142776 10730/2014 10l30l2015 AGGREGAre S 1,000,000 DEC RETENTIONS S WORKERS COMPENSATION STATUTE IOERH _ AND EMPLOYERS'LIABILITY — — —� ANY PROPRIETOWPARTNERIEXECUTIVE YIN NIA E.L.EACH ACCIDENT 5 OEFICESUMEMBER EXCLUDED' (M.rel.ory In NHl EL.DISEASE-EA EMPLOYE $ II)�es,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT 5 DESCRIPTION OF OPERATIONS I LOCATIONS 1 VEHICLES (ACORD 101,Addlllonal Remarks Schodule,may be a Udnsd If more space is rogoirgd) The City of Kent shall be named as additional insured as respects to work performed by or on behalf of the contractor Jab:Garrison Reservoir-9615 S 218th St,Kent,WA 212th Treatment Plant-9001 5 212th St,Kent,INA Description: Station&pump repairs End Date:May 31,2015 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Kent Engineering ACCORDANCE WITH THE POLICY PROVISIONS. 400 West Gowe AUTHORIZED REPRESENTATIVE , Alishe Lenius Kent WA 9B032 � - '�J r'LJ..✓ ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of AGORD POLICY NUMBER: 034924312 BUSINESSOWNERS BP 04 48 01 97 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - DESIGNATED PERSON OR ORGANIZATION This endorsement modes insurance provided under the following: BUSINESSOWNER5 POLICY SCHEDULE" Name Of Person Or Organization: CITY OF KENT ENGINEERING I i Information required to complete this Schedule, if not shown on this endorsement, will be shown in the Decla- rations. The following is added to Paragraph C. Who Is An Insured in the Businessowners Liability Coverage Form: 4. Any person or organization shown in the Schedule is also an insured, but only with respect to liability arising out of your ongoing operations or premises owned by or rented to you. SP 04 48 0197 Copyright, Insurance Services Office, Inc., 1997 Page 1 of 1 ❑ Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504.4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 3/2/2015 Count Trade Jab Classification _Wa a Holiday Overtime Note' (King Asbestos Abatement Workers Journey Level $42.67 5D 1H King Boilermakers Journey Level $64.44 5N 1C King Brick Mason Brick And Block Finisher $44.46 5A 1M King Brick Mason Journey Level $51.32 5A 1M King Brick Mason Pointer-Caulker-Cleaner $51.32 5A 1M King Building Service Employees Janitor $21.29 5S 2F King Building Service Employees Traveling Waxer/Shampooer $21.70 5S 2F King Building Service Employees Window Cleaner (Non- $24.94 55 2F Scaffold) King Building Service Employees Window Cleaner (Scaffold) $25.80 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $52.32 5D 4C King Carpenters Bridge, Dock And Wharf $52.32 5D 4C Carpenters King Carpenters Carpenter $52.32 5D 4C King Carpenters Carpenters on Stationary Tools $52.45 5D 4C King Carpenters Creosoted Material $52.42 5D 4C King Carpenters Floor Finisher $52.32 5D 4C King Carpenters Floor Layer $52.32 5D 4C King Carpenters Scaffold Erector $52.32 5D 4C King Cement Masons Journey Level $52.38 7A 1M King Divers 8 Tenders Diver $105.37 5D 4C 8A King Divers Et Tenders Diver On Standby $59.50 5D 4C King Divers Et Tenders Diver Tender $54.82 5D 4C King Divers Et Tenders Surface Rcv Et Rov Operator $54.82 5D 4C King Divers Et Tenders Surface Rcv Et Rov Operator $51.07 5A 4C Tender King Dred e \Norkers Assistant Engineer $53.00 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F King Dredge Workers Boatmen $52.30 5D 3F https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/2/2015 Page 3 of 17 King Inland Boatmen Cook $50.95 5B 1K King Inland Boatmen Deckhand $51.19 5B 1K King Inland Boatmen Deckhand Engineer $52.18 5B 1K King Inland Boatmen Launch Operator r$31.49 5B 1K ;King Inland Boatmen Mate 5B 1K King Inspection/Cleaning/Sealing Cleaner Operator, Foamer 1 Of Sewer Et Water' Systems By Operator Remote Control King Inspection/Cleaning/Sealing Grout Truck Operator 1 Of Sewer 8 Water Systems By Remote Control King Inspection/Cleaning/Sealing Head Operator $24.91 1 Of Sewer a Water Systems By Remote Control King Inspection/Cleaning/Sealing Technician $19.33 1 Of Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Tv Truck Operator $20.45 1 Of Sewer & Water_SVstems By Remote Control King Insulation Applicators Journey Level $52.32 5D 4C King nonworkers Journeyman $61.62 7N 10 King Laborers Air, Gas Or Electric Vibrating $42.67 7A 31 Screed King Laborers Airtrac Drill Operator $44.00 7A 31 King Laborers Ballast Regular Machine $42.67 7A 31 King Laborers Batch Weighman $36.17 7A 31 King Laborers Brick Pavers $42.67 7A 31 King Laborers Brush Cutter $42.67 7A 31 King Laborers Brush Hog Feeder $42.67 7A 31 King Laborers Burner $42.67 7A 31 King Laborers Caisson Worker $44.00 7A 31 King Laborers Carpenter Tender $42.67 7A 31 King Laborers Caulker $42.67 7A 31 `King Laborers Cement Dumper-paving $43.46 7A 31 King Laborers Cement Finisher Tender $42.67 7A 31 King Laborers Change House Or Dry Shack $42.671 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $42.67 7A 31 King Laborers Chipping Gun(30 Lbs. And $43.46 7A 31 Over) King Laborers Choker Setter $42,67 7A 31 King Laborers Chuck Tender $42.67 7A 31 King Laborers Clary Power Spreader $43.46 7A 31 King Laborers Clean-up Laborer $42.67 7A 31 King Laborers Concrete Dumper/chute $43.46 7A 31 Operator King Laborers Concrete Form Stripper $42,67 7A 31 King Laborers Concrete Placement Crew $43.46 7A 31 https://fortress.wa.gov/lni/wagelool<up/prvWagelookup.aspx 3/2/2015 Page 5of17 King Laborers Pilot Car $36.17 7A 31 King Laborers Pipe Layer Lead $44.00 7A 31 King Laborers Pipe Layer/tailor $43.46 7A 31 King Laborers Pipe Pot Tender _ $43.46 7A 31 King Laborers Pipe Reliner $43.46 7A 31 King Laborers Pipe Wrapper $43.46 7A 31 King Laborers Pot Tender $42.67 7A 31 King Laborers Powderman $44.00 7A 31 King Laborers Powderman's Helper $42.67 7A 31 King Laborers Power Jacks $43.46 7A 31 King Laborers Railroad Spike Putter - Power $43.46 7A 31 King Laborers Raker - Asphalt $44.00 7A 31 King Laborers Re-tim berman $44.00 7A 31 King Laborers Remote Equipment Operator $43.46 7A 31 King Laborers Rigger/signal Person $43.46 7A 31 King Laborers Rip Rap Person $42.67 7A 31 King Laborers Rivet Buster $43.46 7A 31 King Laborers Rodder $43.46 7A 31 King Laborers Scaffold Erector $42.67 7A 31 King Laborers Scale Person $42.67 7A 31 King Laborers Sloper (over 20") $43.46 7A 31 ,King Laborers Sloper Sprayer $42.67 7A 31 King Laborers Spreader (concrete) $43.46 7A 31 King Laborers Stake Hopper $42.67 7A 31 King Laborers Stock Piler $42.67 7A 31 King Laborers Tamper a Similar Electric, Air $43.46 7A 31 Et Gas Operated Tools King Laborers Tamper (multiple a Self- $43.46 7A 31 propelled) King Laborers Timber Person - Sewer $43.46 7A 31 (lagger, Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $42.67 7A 31 King Laborers Topper $42.67 7A 31 King Laborers Track Laborer $42.67 7A 31 King Laborers Track Liner (power) $43.46 7A 31 King Laborers Traffic Control Laborer $38.68 7A 31 8R King Laborers Traffic Control Supervisor $38.68 7A 31 8R King Laborers Truck Spotter $42.67 7A 31 King Laborers Tugger Operator $43.46 7A 31 King Laborers Tunnel Work-Compressed Air $64.99 7A 31 Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $70.02 7A 31 Worker 30.01-44,00 psi King Laborers Tunnel Work-Compressed Air $73.70 7A 31 Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $79.40 7A 31 Worker 54.01-60.00 psi https://fortress,wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/2/2015 I Page 7of17 King Playground a Park Equipment Journey Level $9.47 1 Installers King Plumbers Et Pipefitters Journey Level $74.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3C L8PKing Power Equipment Dperators Assistant Engineer $51.97 7A 3C King Power Equipment Operators Barrier Machine (zipper) $54.75 7A 3C King Power Equipment Operators Batch Plant Operator, $54.75 7A 3C 8P Concrete King Power Equipment Operators Bobcat 15.247A 3C 8P King Power Equipment Operators Brokk - Remote Demolition 3C 8P Equipment King Power Equipment Operators Brooms 3C 8P King Power Equipment Operators Bump Cutter 3C 8P King Power Equipment Operators Cableways 3C 8P King Power Equipment Operators Chipper $54.75 7A 3C 8P King Power Equipment Operators Compressor $51.97 7A 3C 8P King (Power Equipment Operators Concrete Pump: Truck Mount $55.24 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $51.97 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $54.33 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power' Equipment Operators Concrete Pump: Truck Mount $54.75 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $54.33 7A 3C 8P I King Power Equipment Operators Cranes: 20 Tons Through 44 $54.75 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $51.97 7A 3C 8P Under King Power Equipment Operators Cranes: Friction 100 Tons $56.36 7A 3C 8P Through 199 Tons King Power Cquipment Operators Cranes: Friction Over 200 Tons $56.92 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators $54.33 7A 3C SP https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/2/2015 Page 9of17 Mechanics, All (teadmen - $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Grader - Non- $54.33 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, $55.24 7A 3C 8P Finishing King Power Equipment Operators Mucking Machine, Mole, $55.24 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $51.97 ZA 3C 8P Distribution Et Mulch Seeding Operator !King Power Equipment Operators Outside Hoists (elevators And $54.33 7A 3C 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $54.75 7A 3C 8P 20 Tons Through 44 Tons _ King Power Equipment Operators Overhead, Bridge Type: 100 $55.79 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $55.24 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $51.97 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $54.75 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanicat $51.971 7A 3C 8P + King Power Equipment Operators Power Plant $51,971 7A 3C 8P King Power Equir)ment Operators Pumps - Water $51.97 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $51.97 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $55.24 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Beltman $51.97 7A 3C 8P King Power Equipment Operators RoRagon $55.24 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $51,97 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P Materials King Power Equjjjment Operators Roto-mill, Roto-grinder $54.75 7A 3C 8P King Rower-Eq ipment Operators Saws - Concrete $54.33 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $54.75 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry $54.33 7A 3C 8P All King _Power Equipment Operators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $54.33 7A 3C 8P King Power Equipment Operators Shotcrete/gunite Equipment $51.97 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup,aspx 3/2/2015 Page 11 of 17 King Power Equipment Operators- Cableways $55.24 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Chipper $54.75 7A 3C 8P Un<Iround Sewer 8 Water King Power Equipment Operators- Compressor $51.97 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Concrete Pump: Truck Mount $55.24 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $51.97 7A 3C 8P underground Sewer fr Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $54.33 7A 3C 8P Underground Sewer & Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $54.75 7A 3C 8P Underground Sewer_& Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $54.33 7A 3C 8P Underground Sewer Et Water Kin Power Equipment Operators- Cranes: 20 Tons Through 44 $54.75 7A 3C 8P g L�_ _ g �I Underground Sewer 8 Water Tons With Attachments King Rawer Equipment Operators- Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P Underground Sewer a Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Underground Sewer & Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $51.97 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $56.36 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P Underground Sewer Er Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $54.33 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $54.75 7A 3C 8P Underground Sewer EL Water King Power Equipment Operators- Deck Engineer/deck Winches $54.75 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment operators- Derricks, On Building Work $55.24 7A 3C 8P Underground Sewer Et Water King Power_Equipment Operators- Dozers D-9 Et Under $54.33 7A 3C 8P Underground Sewer Et Water https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/2/2015 Page 13 of 17 King Power Equipment Operators Motor Patrol Graders, $55.24 7A 3C 8P Underground Sewer Et Water Finishing King Power Equipment Operators- Mucking Machine, Mote, $55.24 7A 3C 8P Und_eraround Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $51.97 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $54.33 7A 3C 8P Underground Sewer Et Water Man(ifts), Air Tuggers,strato King Power Equipment Operators_ Overhead, Bridge Type Crane: $54.75 7A 3C 8P Underground Sewer Ft Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $55.79 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $55.24 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $54.75 7A 3C 8P Underground Sewer ft Water Mount) 'King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Posthole Digger, Mechanical $51.97 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Power Plant $51.97 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Pumps - Water $51.97 7A 3C 8P Underground Sewer Ft Water _ King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Quick Tower - No Cab, Under $51.97 7A 3C 8P Under round Sewer Et Water 100 Feet In Height Based To Boom King Power E ui ment Operators- Remote Control Operator On $55.24 7A 3C 8P Underground Sewer a Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $51.97 7AF3C 8P Underground Sewer Ex Water King Power Equipment Operators Roller, Plant Mix or Multi-lift $54.33 7A8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $54.75 7A8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $54.33 7A 3C 8P Underground Sewer fi Water King Power Equipment Operators- Scraper, Self Propelled Under $54.75 7A 3C 8P + Underground Sewer Et Water 45 Yards King $54.33 7A 3C 8P I https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/2/2015 Page 15 of 17 King Power Line Clearance Tree Spray Person $42.58 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A Trimmers King Power line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers 'King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A Trimmers King Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics Ili King Residential Brick Mason Journey Level $51.32 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Journey Level $40.14 5D 4C Applicators King Residential Drywall Tapers Journey Level $52.37 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $36.20 7L 1 H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters King Residential Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $42.58 7F 1 R Workers King Residential Soft Floor Layers Journey Level $42.411 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 2R (Fire Protectionj King Residential Stone Masons Journey Level $51.32 5A 1M King Residential Terrazzo Worker's Journey Level $46.96 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $44.71 5A 3H King Roofers Using Irritable Bituminous $47.71 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $70.37 7F 1E King Shipbuilding Et Ship Repair Boilermaker $40.72 7M 1H King Shipbuilding Et Ship Repair Carpenter $39.24 7T 2B King Shipbuilding Et Ship Repair Electrician $39.28 7T 48 King Shipbuilding Et Ship Repair Heat 8: Frost Insulator $60.93 5J 15 King Shipbuildingli Ship Repair Laborer $39.34 7T 4B King Shipbuilding is Ship Repair Machinist $39.32 7T 4B King Shipbuilding & Ship Repair Operator $39.22 7T 4B https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/2/2015 Page 17 of 17 King Telephone Line Construction - Television $25.89 5A 2B Outside Lineperson/Installer King Telephone Line Construction - Television System Technician $30.97 5A ZB Outside King Telephone Line Construction - Television Technician $27.77 5A 2B Outside King Telephone Line Construction - Tree Trimmer $34.34 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A 1M IKing Tile Setters Journey Level $21.65 1 King Tile, Marble Ft Terrazzo Finisher $37.79 5A 1B Finishers King Traffic Control Stripers Journey Level $43.11 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $48.87 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03 5D 3A 8L WA-Joint Council 28) King 'Truck Drivers Dump Truck a Trailer $48.87 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $48.03 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers a Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers a Irrigation Pump Oiler $12.97 1 Installers King Well Drillers a Irrigation Pump Well Driller $18.00 1 Installers i https://fortress,wa.gov/lni/wagelookup/prvWagelookup.aspx 3/2/2015 i Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 I' Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL I-IOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF 77MES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. 'l he first two (2)hours after eight(8) regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid alone and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two (2)hours before or after a five-eight(8)hour workweek clay or a four-ton(10)hour workweek day and the first eight(8) hours worked the next clay after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two (2)hours after eight(8) regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(W) hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The fist ten (10) hours worked on Saturdays and the first ton (10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at ; double the hourly rate of wage. IL All (tours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions of equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All homy worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2)hours after eight(8)regular hours Monday through Friday and the fast ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 I Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 2. ALL HOURS WORKED IN EXCESS OF E161IT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE4 IAI.FTIMES THE HOURLY RAPE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half limes the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at Live times the hourly rate of wage. F. 'I-he first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid ut double the hourly rate of wage, G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage, All hours worked on holiclays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid ut one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60) in one week shall be paid at double the hourly rate of wage. U. All hours worked mr Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage,The first eight(8)hours worked on the fifth day shall be paid at one and onc-half times the hourly rate of wage. All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours worked over twelve hours(12)in a single shill and all work performed after 6:00 pin Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift.The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. I 3 Benefit Code I<ey—Effective 8-31-2014 thru 3-3-2015 Holiday Codes 5. A. Holidays; New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after, Thanksgiving Day,and Christmas Day(7). B. holidays; New Year's Day, Memorial Day, Independence Day, Labor Day, 'Thanksgiving Day, Friday after i Thanksgiving Day,the day before Christmas,and Christmas Day(8). i C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8), H. Holidays: New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). 1. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day, And Christmas Day(7), IC Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, 'Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). i L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day,Independence Day,Tabor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday, Q. Paid Holidays: New Year's Day, Memorial Day,Independence Day, labor Day, Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day. (7 1/2). i S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9) Z. Ilolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). Holiday Codes Continued 5 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 i T F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. 11, Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls mi a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:Now Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,The Day Before Christmas Day And Christmas Day (9), Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. i J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday alter Thanksgiving Day,And Christmas Day(8), Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which fells on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day,And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls oil a Saturday shall he observed as a holiday on the preceding Friday, N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday, the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after, Thanksgiving Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8). Any holiday which falls oil a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10),If any of the listed holidays fall on Saturday, the preceding Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. 7 i Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 8. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All Daggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic diving construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho."]'his classification is only effective on or after August 31,2012. 9 i