Loading...
HomeMy WebLinkAboutPW14-304 - Original - Performance Contracting, Inc. - UPRR Trestle Watermain Insulation - 11/21/2014 ® R e c o r e KENTWASHtNGTON Document tt Hr t& t i CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Performance Contracting Inc. Vendor Number: JD Edwards Number Contract Number: ?v t ;5?7 ( - 0 C This is assigned by City Clerk's Office Project Name: UPRR Trestle Watermain Insulation Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 11/21/14 Termination Date: 90 days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Ryan Ball Department: PW Operations Contract Amount: $8 751 90 Approval Authority: (CIRCLE ONE)t Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Insulate approximately 30 linear feet of 12" ductile iron pipe at the UPRR trestle. As of: 08/27/14 KENT PUBLIC WORKS AGREEMENT between City of Kent and Performance Contracting, Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Performance Contracting, Inc. organized under the laws of the State of Washington, located and doing business at 422 S. Forest St., Seattle, WA 98134, Phone: (206) 623-8750/Fax: (206) 623-2091, Contact: Jeff Craker (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: l I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: I The Contractor shall insulate approximately 30 linear feet of 12" ductile iron pipe at the UPRR Trestle. For a description and Contractor's bid, see the Scope of Work which is attached as Exhibit A and incorporated by this reference. i Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within ninety (90) days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Eight Thousand, Seven Hundred Fifty One Dollars and ninety cents ($8,751.90), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. PUBLIC WORKS AGREEMENT - 1 (Under$10K and No Performance Bond) i A. No Payment and Performance Bond. Because this, contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Under$1 OK and No Performance Bond) E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW, G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business, V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive 'any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City PUBLIC WORKS AGREEMENT - 3 (Under$1 OK and No Performance Bond) will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events j giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment PUBLIC WORKS AGREEMENT - 4 (Under$10K and No Performance Bond) for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. PUBLIC WORKS AGREEMENT - 5 (Under$10K and No Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by PUBLIC WORKS AGREEMENT - 6 (Under$1OK and No Performance Bond) filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Cade. PUBLIC WORKS AGREEMENT - 7 (Under $1OK and No Performance Bond) I J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: (signature) (signature) Print Name: Print Name: David-A—Brork,-PL.E. Its Its: ntelim,,Operations Manager (title) r' l d"" pr� DATE: DATE: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Jeff Craker Timothy J. LaPorte, P.E. Performance Contracting, Inc. City of Kent 422 S. Forest St. 220 Fourth Avenue South Seattle, WA 98134 Kent, WA 98032 (206) 623-8750 (telephone) (253) 856-5500 (telephone) (206) 623-2091 (facsimile) (253) 856-6500 (facsimile) Performance ConV ding-UPRR Tres008.11 At No� PCl/ its U-'A 13 subcontradt er»�,ndment is her inc iomed into r go nt bN ttlis reference nitimi _ �mitial i PUBLIC WORKS AGREEMENT - 8 (Under$1OK and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. i 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to I all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below a ree to fulfill the five requirements referenced above. By: For: Title: Date: i EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. i 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. i EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 EXHIBIT A Scope of work - UPRR Trestle Ductile Iron Water-Main Insulation Insulation of approximately 30 linear feet of 12" ductile iron pipe between ground level and existing insulated section of pipeline. The work areas are located on both the north and south ends of the UPRR train trestle. In addition to straight pipe scope includes (3 - 90* Bends, 1 - 45*Bend, 1 --Tee, & 1 Cross) of 12" pipe. Also included are a total of 12 — 12"flanges which connect the fittings and straight pipe together, and two small sections of 2" brass pipe that will need to be insulated up to aluminum enclosures, i All pipes to be insulated will be wrapped in 2.0" Polyisocyanurate Pipe insulation and covered with a .020"Aluminum Jacket. The aluminum jacket will be banded in place along all installed areas and secured over the top of existing insulation/jacket at both ends of the bridge to prevent unwrapping of existing material. IIII, i I I I ..,PC 1 422S.PorpstSt PROPOSAL Seattle,WA,9el34 r rINTRA(NIA INQ os-623-0750 INSULATION & SPECIALTY SERVICES DIVISION t CrN rI:AGIING INCIMtJ I ful ce jobrison@PCE.Com To Customer: City of Kent Public Works Date: 9/17/2014 Ryan Ball Page One Architect/Engineer: Job Name Train Bridge 12" Water Main Location ocation Kent, WA Performance Contracting,Inc.(hereinafter designated as"CONTRACTOR")proposes to furnish all materials and labor required for the application of the following(hereinafter designated as the"Work")for the amount stated below: specification Sections : Per notes below Pipe Insulation $ 7,266.00 Scone Inclusions • Insulation of roughly 30 LF (3-90's, 1-45, 2-Ts) of 12" pipe with 2" thick Polyisocyanurate insulation and finished with .020 SE Aluminum Jacket banded in place. i Scope Exclusions • Price does not include Sales Tax and Use Tax. If bonds are required, add 1% to the base price. • Painting/coatings, identification, sleeves,fire stopping, heat tracing, shift work and overtime. • Repair or replacement of insulation except at point of tie-ins • Removal or demolition of existing insulation systems • Equipment Insulation Pricing leased on complete package and work released in a timely manner and proper sequence,allowing PC[to achieve expected productionlevels, i In the event CONTRACTOR'S pdca Is induded vrlthfn your bid,then CONTRACTOR's bid will be deemed to have been cc aepted. i This proposal le Sub)ed to change and will be witttdI Bra 3o nt--degree days of the above dare; subject It Is to and Indudes all terms and candllfons described herein farad such other terms as mev be rn rally agreed upend. Contract Price$ See Above PERFORMANCE CONTRACTING, INC. Acceptance Date: By; j By: Title: Senior Estimator '.... Customer Name: By. Title: _ Approval Date: %F�Prros� I 08-04-03 PAAO MAtdt{ i i i EXHIBIT Commercial General Liability insurance. Commercial general liability (CGL) with a limit of not less than $5,000,000 each occurrence and an aggregate limit of not less than $10,000,000. CGL insurance must be written on ISO occurrence form CG 00 01 12 04 (or a substitute form providing equivalent coverage). The policy must also contain the following endorsement, which must be stated on the certificate of insurance: • Contractual Liability Railroads ISO form CG 24 17 10 01 (or a substitute form providing equivalent coverage) showing "Union Pacific Railroad Company Property" as the Designated Job Site. • Designated Construction Project(s) General Aggregate Limit ISO Form CG 25 03 03 97 (or a substitute form providing equivalent coverage) showing the project on the form schedule. I' ACC® CERTIFICATE OF LIABILITY INSURANCE DATE IMMIDON"Y) l � 4/1/2015 1 11/19/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER LODkton Companies CONTACT 444 W.47th Street,Suite 900 PHONE FAX C o Eu L___._.,_ AIC.No: KaIlSBS City MO 641124906 E-MAIL (816)960-9000 ADDRESS: INSURERS)AFFORDING COVERAGE NAIC Is INSURER A:Arch Insurance Company 11150 INSURED PERFORMANCE CONTRACTING,NO. INSURERS:First Specialty Insuranceortion 34916 17807 102-ISSD INSURER C:*INCLUDES USL&II 422 SOUTH FOREST STREET INSURER D: SEATTLE WA 98134 MSuRER E: INSURER F COVERAGES CERTIFICATE NUMBER: 13174805 REVISION NUMBER: XXXXXXX THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LIS rED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD '.. INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSft TYPE OF INSURANCE ADD SUER POLICY EFF POLICY EXP LIMITS LTR IN SD WVD POLICY NUMBER MMIDDITYTI A'MMIDDYYY A X COMMERCIAL GENERAL LIABILITY Y N 41GPP8895503 4/1/2014 4/1/2015 EACH OCC1RRENCE 1 DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES(Ed peon e.) 300,000 X CONTRACTUAL,,XCU MED EXP(Any one pamona X CROSS LIABILITY/EIFS PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGAT E LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY X' PRO- ' JEGT 0 LOG PRODUCTS-G9MPIOP AGO OTHER: $ A AUTOMOBILE LIABILITY N N 41CAB8895603((AOS) 4{I/2014 4/1/2015 $ A — 41CAB8fi95703(MA) 4/1/2014 4/1/2015 (Ea aooidani) 2,000,000 X ANY AUTO BODILY INJURY(Per person) $ xxxx Xs� X ALL OWNED SCHEDULED BODILY INJURY Per accident) $ XXXXXXX _ AUTOS NONOWNED PROPERTY DAMAGE $ XiXrX.XXXX X HIRED AUTOS PXXX AUTOS $ XXXXXXX Contractual B UMBRELLA LIAR 1 X' OCCUR N N IRF200027101 4/1/2014 4/1/2015 EACH OCCURRENCE $ 10000000 B x EXCESS LIAB GLAIMS-MADE (FOLLOW FORM) AGGREGATE $ 10,000,000 DED I X I RETENTION$ 10,000 1$ XXXXXXX WORKERS COMPENSATION - A AND EMPLOYERS'LIABILITY N 41WC18895403 4/1/2014 4/1/2015 X STATUTE EIR A ANY PROPRIETORIPARTNERIEXECUTIVE YIN eLAOR&WA.(JSL&Hil E.L.EACH ACCIDENT $ A OFFICERIMEMBER EXCLUDED? N NIA CL.UDES ONOPO ISTIC$ ATFS 1.000.000 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1 000 000 If yes,tlospibe Under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT 1$ ] 000 000 A EMPLOYERS LIABILITY N N 41GPP8895503 4/1/2014 4/1/2015 $1,000,000 EA.ACC/EAENIPL. (STOP GAP) DISEASE&POLICY LIMIT- INCLUDES ALL MONOPOLISTIC STATES DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ADDED 101,Additional Remarks Schedule,may be ailachod if more space Is required) '.. THIS CERTIFICATE SUPERSEDES ALL PREVIOUSLY ISSUED CERTIFICATES FOR THIS HOLDER,APPLICABLE 10 THE CARRIERS LISTED AND THE POLICY'FERMIS)REFERENCED, FOR CANCELLATION,THE INSURER(S)WILL SEND 30 DAYS NOTICE OF CANCELLATION AND WILL SEND 10 DAYS NOTICE FOR NONPAYMENT OF PREMiUM'Po THE CERITFICATE BOLDER LISTED BELOW, PCI 010102-1019 RE:(CENT UPRR TRESTLE WATER*CITY OF KENT IS/ARE ADDITIONAL,INSURED AS RESPECTS LIABILITY COVERAGE FOR THIS PROJECT, INSURANCE SHOWN APPLIES ONLY TO EXTENT OF WRITTEN CONTRACT. CERTIFICATE HOLDER CANCELLATION See Attachments 13174805 CITY OF KENT SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 400 WEST GOWE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN KENT WA 98032 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTAT E ©1988.2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: 41GPP8895503 COMMERCIAL GENERAL LIABILITY CG 25 03 05109 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECTS(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Projects: ALL OF YOUR DESIGNATED CONSTRUCTION PROJECTS. Information required to completed this Schedule, if not shown above, will be shown in the Declarations. A. For all sums which the insured becomes legally obligated to pay as damages caused by"occurrences"under Section I-Coverage A, and for all medical expenses caused by accidents under Section I-Coverage C,which can be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. A separate Designated Construction Project General Aggregate Limit applies to each designated construction project, and that limit is equal to the amount of the General Aggregate Limit showin in the Delcarations. 2. is the most we will pay for the sum of all damages under Coverage A,except damages because of "bodily injury"or"property damage" included in the"products-completed operations hazard",and for medical expenses under Coverage C regardless of the number of: a. Insureds; b. Claims made or"suits"brought;or c. Persons or organizations making claims or bringing"suits". 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall �'.... reduce the Designated Construction Project General Aggregate Limit for that designated construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated Construction Project General Aggregate Limit for any other designated construction project shown in the Schedule above. 4. The limits shown in the Declarations for Each Occurrence, Damage To Premises Rented To You and Medical Expense continue to apply. However,instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated Construction Project General Aggregate Limit. B. For all sums which the insured becomes legally obligated to pay as damages caused by"occurrences"under Section I -Coverage A,and for all medical expenses caused by accidents under Section I -Coverage C,which cannot be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limmit or the Products-Completed Oprations Aggregate Limit,whichever is applicable; and Miscellaneous Attachment:M38703 Certificate ID: 13174805 j 2. Such payments shall not reduce any Designated Construction Project General Aggregate Limit. C. When coverage for liability arising out of the"products-completed operations hazard"is provided,any payments for damages because of"bodily injury"or"property damage" included in the"products-completed operations hazard" will reduce the Products-Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated Construction Project General Aggregate Limit. D. If the applicable designated construction project has been abandoned, delayed or abandoned and then restarted, or if the authorized contracting parties deviate from plans,blueprints,designs, specifications ro timetables,the project j will still be deemed to be the same construction project. E. The provisions of Section III-Limits of Insurance not otherwise modified by this endorsement shall continue to apply as stipulated. i CG 25 03 05 09 I I i II i Miscellaneous Attachment: M38703 Certificate ID: 13174805 i POLICY NUMBER: 41GPP8895503 COMMERCIAL GENERAL LIABILITY CG 24 17 10t01 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTUAL LIABILITY - RAILROADS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Scheduled Railroad: Designated Job Site: RAILROAD AND LOCATIONS WHERE REQUIRED BY WRITTEN CONTRACT. i (If no entry appears above, information required to complete this endorsement will be shown in the j Declarations as applicable to this endorsement.) With respect to operations performed for, or affec- Paragraph f. does not include that part of any ting, a Scheduled Railroad at a Designated Job Site, contract or agreement: the definition of"insured contract" in the Definitions section is replaced by the following: (1)That indemnifies an architect, engineer or 9. "Insured Contract"means: surveyor for injury or damage arising out of: a. A contract for a lease of premises. However, (a)Preparing, approving or failing to pre- that portion of the contract for a lease of pare or approve maps, shop drawings, premises that indemnifies any person or opinions, reports, surveys, field orders, organization for damage by fire to premises change orders or drawings and specifi- while rented to you or temporarily occupied by you cations; or with permission of the owner is not an (b)Giving directions or instructions, or "insured contract"; failing to give them, if that is the b. A sidetrack agreement; primary cause of the injury or damage; c. Any easement or license agreement; (2) Under which the insured, of an architect, d. An obligation, as required by ordinance,to engineer or surveyor, assumes liability for indemnify a municipality, except in connection an injury or damage arising out of the in- with work for a municipality; sured's rendering or failure to render pro- e. An elevator maintenance agreement; fessional services, including those listed f. That part of any other contract or agreement in Paragraph (1)above and supervisory, pertaining to your business (including an in- inspection, architectural or engineering demnification of a municipality in connection activities. with work performed for a municipality)under which you assume the tort liability of another party to pay for"bodily injury"or"property damage"to a third person or organization. Tort liability means a liability that would be imposed by law in the absence of any con- tract or agreement. CG 24 17 10101 @ ISO Properties, Inc., 2000 Page 1 of 1 Attachment Code:D496801 Certificate ID: 13174805 Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902.5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 10/8/2014 ,County Trade Job Classification Wage Holiday Overtime Note! 'King Asbestos Abatement Workers Journey Level $42.67 5D 1H King Boilermakers Journey Level $64.44 5N 1C King Brick Mason Brick And Block Finisher $44.46 5A 1M King Brick Mason Journey Level $51.32 5A 1M ;King Brick Mason Pointer-Caulker-Cleaner $51.32 5A 1M ',King Building Service Employees Janitor $21.29 5S 2F King Building Service Employees Traveling Waxer/Shampooer $21.70 5S 2F 'King Building Service Employees Window Cleaner (Non-Scaffold) $24.94 5S 2F i King Building Service Employees Window Cleaner (Scaffold) $25.80 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 ;King Carpenters Acoustical Worker $52.32 5D 1M ?King Carpenters Bridge, Dock And Wharf $52.32 5D 1M Carpenters s 'King Carpenters Carpenter $52.321 5D I 1M King Carpenters Carpenters on Stationary Tools $52.451 5D 1M King Carpenters Creosoted Material $52.42 5D 1M 'King Carpenters Floor Finisher $52.32 5D 1M ;King Carpenters Floor Layer $52.32 5D 1M King Carpenters Scaffold Erector $52.32 5D 1M King Cement Masons Journey Level $52.38 7A 1M King Divers Et Tenders Diver $105.37 5D 1M 8A ;King Divers Et Tenders Diver On Standby $59.50 5D 1M King Divers Et Tenders Diver Tender $54.82 5D 1M King Divers a Tenders Surface Rcv Et Rov Operator $54.82 5D 1M 'King Divers Et Tenders Surface Rcv Et Rov Operator $51.07 5A 1 B ! Tender z King Dredge Workers Assistant Engineer $53.00 5D 3F 'King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F i https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 2 of 17 King Dredge Workers Boatmen $52.30 5D 3F King Dredge Workers Engineer Welder $54.04 5D 3F King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King Dredge Workers Mates $52.30 5D 3F King Dredge Workers Oiler $52.58 5D 3F King DmNallApplicator Journey Level $52.32 5D 1H King Drywall Tapers Journey Level $52.37 5P 1 E King Electrical Fixture Maintenance Tourney Level $25.84 5L I E Workers King Electricians - Inside Cable Splicer $65.69 7C 2W King Electricians - Inside Cable Splicer (tunnel) $70.52 7C _2W King Electricians - Inside Certified Welder $63.49 zC_ 2W King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W King Electricians - Inside Construction Stock Person $35.69 7C 2W King Electricians - Inside Journey Level $61.30 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shoo Journey Level $14.69 1 'King Electricians - Powerline Cable Splicer $68.33 5A 4A Construction King Electricians - Powerline Certified Line Welder T62-.50_5A 4A Construction King Electricians - Powerline Groundperson $42.56 5A 4A Construction King Electricians - Powerline Heavy Line Equipment _$62.50 5A 4A - Construction Operator King Electricians - Powerline Journey Level Lineperson $62.50 5A 4A Construction King Electricians - Powerline Line Equipment Operator _$52.47 5A 4A Construction King Electricians - Powerline Pole Sprayer $62.50 5A 4A Construction King Electricians - Powerline Powderperson $46.55 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $80.14 LD 4A King Elevator Constructors Mechanic In Charge $86.77 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.25 5B JR Products Work Only King Fence Erectors Fence Erector _$l 5 18 King FIac!Qers Journey Level $36.17 7A 31 King Glaziers Journey Level $54.91 7L ly King Heat Et Frost Insulators And Journeyman _$60 93 5_1 1S Asbestos Workers King Heating Equipment Mechanics Journey Level $70.37 7F 1E King Hod Carriers 8: Mason Tenders Journey Level $44.00 7A 31 King industrial Power Vacuum lJourney Level $9.32 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 3 of 17 ICleaner King inland Boatmen Boat Operator $54.57 5B 1K King Inland Boatmen Cook $50.95 5B 1K King Inland Boatmen Deckhand $51.19 5B 1K King inland Boatmen Deckhand Engineer $52.18 5B 1K 'King Inland Boatmen Launch Operator $53.40 5B 1K King Inland Boatmen Mate $53.40 5B 1K King Inspection/Cleaning/Sealing Of Cleaner operator, Foamer $31.49 Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning Grout Truck Operator $11.48 Sewer 8: Water Systems B Remote Control �King Inspection/Cleaning/Sealing Of Head Operator $24.91 Sewer Et Water Systems By Remote Control 'King Inspection/Cleaning Inspection/Cleaningl5ealing Of Technician $19.33 Sewer Et Water Systems B Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 Sewer Et Water Systems B Remote Control King Insulation Applicators Journey Level $52.32 5D I IM 'King Ironworkers Journeyman $61.62 7N — I i—O 'King Laborers Air, Gas Or Electric Vibrating $42.67 7A Screed 'King Laborers Airtrac Drill Operator $44.00 7A 31 King Laborers Ballast Regular Machine $42.67 7A 31 jKing Laborers Batch Weighman $36.17 7A 11 King Laborers Brick Pavers $42.67 7A 31 :King Laborers Brush Cutter $42.67 7A 31 !King Laborers Brush Hog Feeder $42.67 7A 1 King Laborers Burner $42.67 7A 31 jKing Laborers Caisson Worker $44.001 7A 31 :King Laborers Carpenter Tender $42.67 7A 31 ,King Laborers Caulker $42.67 7A 31 King Laborers Cement Dumper-paving $43.46 7A 31 :King Laborers Cement Finisher Tender $42.67 7A 31 King Laborers Change House Or Dry Shack $42.67 7A 31 '.King Laborers Chipping Gun (under 30 Lbs.) $42.67 7A 31 King Laborers Chipping Cun(30 Lbs. And $43.461 7A 0 King Laborer Choker Setter $42.671 ZA Over) r) ver) 1 31 King Laborers Chuck Tender $42.67 7A 11 King Laborers Clary Power Spreader $43.46 7A 11 'King Laborers Clean-up Laborer —$42,67 7A 1 King Laborers Concrete Dumper/chute $43.46 7A 31 https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 4 of 17 Operator King Laborers Concrete Form Stripper $42.67 7A 31 King Laborers Concrete Placement Crew $43.46 7A 31 King Laborers Concrete Saw Operator/core $43.46 7A 31 Driller King Laborers Crusher Feeder $36.17 7A 31 King Laborers Curing Laborer $42.67 7A 31 King Laborers Demolition: Wrecking Et Moving $42.67 7A 31 (incl. Charred Material) King Laborers Ditch Digger $42.67 7A 31 King Laborers Diver $44.00 7A 31 King Laborers Drill Operator $43.46 7A 31 (hydraulic,diamond) King Laborers Dry Stack Walls $42.67 7A 31 King Laborers Dump Person $42.67 7A 31 King Laborers Epoxy Technician $42.67 7A 31 King Laborers Erosion Control Worker $42.67 7A 31 King Laborers Faller & Bucker Chain Saw $43.46 7A 31 King Laborers Fine Graders $42.67 7A 31 King Laborers Firewatch $36.17 7A 31 King Laborers Form Setter $42.67 7A 31 King Laborers Gabian Basket Builders $42.67 7A 31 King Laborers Genera[ Laborer $42.67 7A 31 King Laborers Grade Checker£t Transit $44.00 7A 31 Person ;King Laborers Grinders $42.67 7A 31 King Laborers Grout Machine Tender $42.67 7A 31 King Laborers Groutmen (pressure)including $43.46 7A 31 Post Tension Beams King Laborers Guardrail Erector $42.67 7A 31 King Laborers Hazardous Waste Worker (level $44.00 7A 31 A) King Laborers Hazardous Waste Worker (level $43.46 7A 31 B) King Laborers Hazardous Waste Worker (level $42.67 7A 31 C) King Laborers High Scaler $44.00 7A 31 King Laborers Jackhammer $43.46 7A 31 lKing Laborers Laserbeam Operator _ _p $43.46 7A 31 King Laborers Maintenance Person $42.67 7A 31 King Laborers Manhole Builder-mudman $43.46 7A 31 King Laborers Material Yard Person $42.67 7A 31 King Laborers Motorman-dinky Locomotive $43.46 7A 31 King Laborers Nozzleman (concrete Pump, $43.46 7A 31 Green Cutter When Using Combination Of High Pressure Air & Water On Concrete 8: https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 10/8/2014 Page 5 of 17 Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $43.46 7A 31 King Laborers Pilot Car $36.17 7A 31 King Laborers Pipe Layer Lead $44.00 7A 31 �King Laborers Pipe Layer/tailor $43.46 7A 31 'King Laborers Pipe Pot Tender $43.46 7A it ,King Laborers Pipe Reliner $43.46. 7A it King Laborers Pipe Wrapper $43.461 7A 31 :King Laborers Pot Tender $42.67 7A 31 ,King Laborers Powderman $44.00 7A it King Laborers Powderman's Helper $42.67 7A 31 King Laborers Power Jacks $43.46 7A 31 King Laborers Railroad Spike Puller- Power $43.46 7A 31 King Laborers Raker - Asphalt $44.00 7A 31 King Laborers Re-timberman $44.00 TA 31 King Laborers Remote Equipment Operator $43.46 7A 31 King Laborers Rigger/signal Person $43.46 7A 31 4'King. Laborers Rip Rap Person $42.67 7A 31 King Laborers Rivet Buster $43.46 7A 31 King Laborers Rodder $43.46 7A 31 !King Laborers Scaffold Erector $42.67 7A 31 King Laborers Scale Person $42.67 7A 31 King Laborers Stoper (over 20") $43.46 7A 31 :King Laborers Stoper Sprayer $42.67 7A 31 *ing Laborers Spreader(concrete) $43.46 7A 31 King Laborers Stake Hopper $42.67 7A 31 King Laborers Stock Piter $42.67 7A 31 )King Laborers Tamper Et Similar Electric, Air $43.46 7A 31 Et Gas Operated Toots 'King Laborers Tamper (multiple 8: Self- $43.46 7A 31 propelled) King Laborers Timber Person - Sewer (tagger, $43.46 7A 31 Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $42.67 7A 31 King Laborers Topper $42.67 7A 31 ;King Laborers Track Laborer $42.67 7A 31 King Laborers Track Liner (power) $43.46 7A 31 'King Laborers Traffic Control Laborer $38.68 7A 31 811 I I I King Laborer Traffic Control Supervisor $38.68 7A I jR ;King Laborers Truck Spotter $42.67 7A 31 King Laborers Tugger Operator $43.46 7A 31 King Laborers Tunnel Work-Compressed Air $64.99 7A it 8Q Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $70.02 7A 31 80 https://fortress.wa.gov/ini/wagelookup/prvWagelookup.aspx 10/8/2014 Page 6 of 17 Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $73.70 7A 31 Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $79.40 7A 31 8 Worker 54.01.60.00 psi King Laborers Tunnel Work-Compressed Air $81.52 7A 31 Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $86.62 7A 31 B Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $88.52 7A 31 Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $90.52 7A 31 8Q Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $92.52 7A 31 88t Worker 72.01.74.00 psi King Laborers Tunnel Work-Guage and Lock $44.101 7A 31 B Tender King Laborers Tunnel Work-Miner $44.10 7A 3I King Laborers Vibrator $43.46 7A 31 King Laborers Vinyl Seamer $42.67 7A 31 King Laborers Watchman $32.87 7A 31 King Laborers Welder $43.46 7A 31 King Laborers Well Point Laborer $43.46 7A 31 King Laborers Window Washerlcteaner $32.87 7A 31 King Laborers - Underground Sewer General. Laborer at Topman $42.67 7A 31 Et Water King Laborers - Underground Sewer Pipe Layer $43.46 7A 31 Et Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $52.32 5D 1H King Marble Setters Journey Level $51.32 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shoo} Painter $11.10 1 King Metal Fabrication (In Shop} Welder $15.48 1 King Millwright Journey Level $53.42 51) 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 https:Hfortress.wa.gov/lni/wagelookup/prvWagelookUp.aspx 10/8/2014 Page 7 of 17 King Modular Buildings Tool Maintenance $11.56 1 'King Modular Buildings Utility Person $11.56 1 ?King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.80 6Z 2B i King Pile Driver Journey Level $52.57 SD 1M King Plasterers Journey Level $50.42 1R 'King Playground Et Park Equipment Journey Level $9.32 1 Installers (King Plumbers Et Pipefitters Journey Level $74.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3C 8P King Power Equipment Operators Assistant Engineer $51.77 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $54.75 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $54.75 7A 3C 8P s's Concrete King Power Equipment Operators Bobcat $51.77 7A 3C 8P jKing Power Equipment Operators Brokk - Remote Demolition $51.77 7A 3C 8P Equipment 'King Power Equipment Operators Brooms $51.77 7A 3C 8P ' ;King Power Equipment Operators Bump Cutter $54.75 7A 3C 8P King Power Equipment Operators Cableways $55.24 7A 3C 8P King Power Equipment Operators Chipper $54.75 7A 3C 8P jKing Power Equipment Operators Compressor $51.77 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $55.24 7A 3C 8P With Boom Attachment Over 42 M !King Power Equipment Operators Concrete Finish Machine -laser $51.77 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $54.33 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $54.75 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $54.33 7A 3C BP I ,King Power Equipment Operators Cranes: 20 Tons Through 44 $54.75 7A 3C 8P i Tons With Attachments 'King Power Equipment Operators Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Tons, Or 150'Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P Or 250' Of Boom (including Jib j With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C 8P Tons, Under 150'Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $51.77 7A 3C 8P Under https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 8 of 17 King Power Equipment Operators Cranes: Friction 100 Tons $56.36 7A 3C 8P Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $56.92 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons or 300' $56.92 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $54.33 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $54.75 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $54.75 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P King Power Equipment Operators Dozers D-9 B: Under $54.33 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $54.75 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $51.77 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $54.75 7A 3C 8P Gamaco a Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $54.33 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $51.77 7A 3C 8P Attachments 'King Power Equipment Operators Grade Engineer: Using Blue $54.75 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradecheckerlstakeman $51.77 7A 3C 8P King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $55.24 7A 3C 8P Articulating Off- Road Equipment 45 Yards. 8t Over King Power Equipment Operators Hard Tait End Dump $54.75 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontatldirectional Drill $54.33 7A 3C 81) Locator King Power Equipment Operators Horizontat/directional Drill $54.75 7A 3C 8P ` Operator King Power Equipment Operators Hydraliftslboom Trucks Over $54.33 7A 3C 8P 10 Tons King Power Equipment Operators Hydraliftslboom Trucks, 10 $51.77 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. B: $55.79 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $55.24 7A 3C 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $54.75 7A 3C 8P Yards https:Hfortress.wa.govJlni/wagelookup/prvWagelookup.aspx 10J8J2014 Page 9 of 17 'King Power Equipment Operators Loaders, Plant Feed $54.75 7A 3C BID King Power Equipment Operators Loaders: Elevating Type Belt $54.33 7A X 8P King Power Eauinment Operators Locomotives, All $54.75 7A 3C ,King Power Equipment Operators Material Transfer Device $54.75 7A 3C 8P King Power Equipment Operators Mechanics, AtI. (teadmen - $55.79 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Grader - Non- $54.331 7A 3C _8P . finishing ,King Power Equipment Operators Motor Patrol Graders, Finishing $55.24 7A X 8P King Power Equipment Operators Mucking Machine, Mote, Tunnel $55.24 7A 3C 8P Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $51.77 7A 3C 8P Distribution Et Mulch Seeding Operator King Power Eguipment Operators Outside Hoists (elevators And $54.33 7A X 8P Manlifts), Air Tuggers,strato King Power Eguinment Operators Overhead, Bridge Type Crane: $54.75 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $55.79 7A 3C Ep Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $55.24 7A I 3C 8P Tons Through 99 Tons FKing Power Equipment Operators Pavement Breaker $51.77 ZA 3C 8p King Power Equipment Operators Pile Driver (other Than Crane $54.75 7A 3C S_P Mount) King Power Equipment Operators Plant Offer-Asphalthalt,, Crusher Crusher $54.33 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $51.77 7A Ec 8P i :King Power Equipment Operators Power Plant $51.77 7A 3_c SP King Power Equipment Operators Pumps - Water $51.77 7A 3C 8P i {King Power Equipment Operators Quad 9, Hd 41, D1 0 And Over $55.24 7A 3C 8P 'King Power Equipment Operators Quick Tower- No Cab-,-Under _$_51.77 ZA _3C SIR 100 Feet In Height Based To Boom 'King Power Equipment Operators Remote Control Operator On $55.24 7A X ISP Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Beltman $51.77 7A 3C 8P 1'King Power Equipment Operators RoUagon $55.24 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $51.77 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $54.33 7A 3C 8P Materials 'King Power Equipment Operators Roto-mitt, Roto-grinder $54.75 7A 3C 8P -C �King Power Equipment Operators Saws - Concrete $54.33 7A 3C 2P King Power Equipment Operators Scraper, Self Propelled Under $54.75 7A 3C 8p 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry AR $54.33 7A X 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 10 of 17 Yards And Over King Power Equipment Operators Service Engineers - Equipment $54.33 7A 3C 8P King Power Equipment Operators Shotcrete/gunite Equipment $51.77 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $54.33 7A 3C 8P 9111111 Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $55.24 7A 3C 8p Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $55.24 7A 3C 8P King Power Equipment Operators Spreader, Topsider Ft $55.24 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $54.75 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $54.33 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $56.36 7A 3C 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $55.79 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $55.24 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $54.33 7A 3C 8P 11 100 Tons I King Power Equipment Operators Truck Mount Portable Conveyor $54.75 7A 3C SP King Power Equipment Operators Welder $55.24 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmall Type $51.77 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $54.75 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $55.24 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $51.77 7A 3C 813 Underground Sewer Et Water I King Power Equipment Operators- Barrier Machine (zipper) $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $54.75 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $51.77 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Brokk- Remote Demolition $51.77 7A 3C 8P Underground Sewer It Water Equipment King Power Equipment Operators- Brooms $51.77 7A 3C 8P Underground Sewer 8: Water https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 11 of 17 King Power Equipment Operators- Bump Cutter $54.75 7A 3C 8P Underground Sewer 8: Water ,King Power Equipment Operators- Cableways 8P$55.24 7A 3C Underground Sewer Et Water King Power Equipment Operators- Chipper $54,75 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Compressor $51.77 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Concrete Pump: Truck Mount $55.24 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $51.77 7A 3C 8P Underground Sewer a Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $54.33 7A 3C Sp Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $54.75 7A 3C 8P Underground Sewer Ft Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $54.331 LA 3C LP Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $54.75 7A 3C 8_p Underground Sewer It Water Tons With Attachments 'King Power Equipment Operators- Cranes: 100 Tons Through 199 $55.79 7A 3C 8P Underground Sewer Et Water Tons, Or 150'Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P Underground Sewer Ft Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $55.24 ZA 3C 8P Underground Sewer Et Water Tons, Under 150'Of Boom (including Jib With Attachments) 'King Power Equipment Operators- Cranes: A-frame - 10 Tons And $51.77 7A 3C 8P Underground Sewer Et Water Under King Power Operators- Cranes: Friction 100 Tons $56.36 7A 3C LP Underground Sewer Et Water Through 199 Tons ,King Power Equipment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $54.33 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $54.75 7A 3C Lp Underground Sewer & Water I King Power Equipment Operators- Deck Engineer/deck Winches $54.75 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $55.24 7A 3C 8P 4 https:Hfortress,wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 12 of 17 Underground Sewer ft Water King Power Equipment Operators- Dozers D-9 Ft Under $54.33 7A 3C 8P Underground Sewer £t Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $54.75 7A 3C 8P I Underground Sewer &Water King Power Equipment Operators- Elevator And Man-lift: $51.77 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $54.75 7A 3C 8P Underground Sewer Bit Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $54.33 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $51.77 7A 3C 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $54.75 7A 3C 8P Underground Sewer Ft Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradecheckerfstakeman $51.77 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $55.24 7A 3C 813 Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $54.75 7A 3C 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directionat Drill $54.33 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $54.75 7A 3C 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydraliftslboom Trucks Over $54.33 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydratifts/boom Trucks, 10 $51.77 7A 3C 8P Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $55.79 7A 3C 8P Underground Sewer & Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $55.24 7A 3C 2P Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $54.75 7A 3C 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, Alt $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Mechanics, All (teadmen - $55.79 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 10/8/2014 Page 13 of 17 Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $54.33 7A XC 8P Underground Sewer B:Water finishing rKing Power EouiDment Operators- Motor Patrol Graders, Finishing $55.24 7A ic BID Underground Sewer Et Water ,King Power Equipment Operators- Mucking Machine, Mote, Tunnel _$55.24 _7A _3C _8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $51.77 7A 3C 8P Underground Sewer a Water Distribution a Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $54.33 7A 3C 8P Underground Sewer P Water Manlifts), Air Tuggers,strato _ _ Kingg �54 75 Power Equipment Operators- Overhead, Bridge Type Crane: 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 _$5_539 _7A _3C 8p Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge _$55.24 7A _3C 8P Underground Sewer Et Water Tons Through 99 Tons 'King Power Equipment Operators- Pavement Breaker $51.77 7A 3C 2P Underground SewerEt Water King Power Equipment Operators- Pile Driver (other Than Crane $54.75 7A 3C 8P K K n n g g King W: Underground Sewer Et Water Mount) ;King Power Equipment Operators- Plant Oiler - Asphalt, _$_5433 _7A _3C Underground Sewer Et Water Kingg _�51.77 _7A 3C 8P ing Power Equipment Operators- Posthole Digger, Mechanical Underground Sewer a Water I g I;jKingPower Equipment Operators- Power Plant $51.77 7A 3C 8P Underground Sewer a Water !King Power Equipment Operators- Pumps - Water $51.77 7A 3C 813 i Underground Sewer Et Water j King And Over $55.24 _7A _3C 8P King Power Equipment Operators- Quad 9, Hd 41, D10 Underground Sewer Ft Water King Power Equipment Operators- Quick Tower- No Cab, Under $51.77 !A Ec 8P Underground Sewer a Water 100 Feet In Height Based To Boom :King Power Equipment Operators- Remote Control Operator on $55.24 7A 3C 8P Underground Sewer Ft Water Rubber Tired Earth Moving Equipment 'King Power EEquipmentEOperators- Rigger And Gellman $51.77 _7A _3C _8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $55.24 7A 3C 8P Underg round Sewer Ft WAtpr King ".King gPower Equipment Operators- Roller, Other Than Plant Mix $51.77 7A 3C Underground Sewer Et Water 8p King Power Equipment Operators- Rotter, Plant Mix Or Multi-lift $54.33 7A 3C 8P Underground Sewer a Water Materials King Power Equipment Operators- Roto-milt, Roto-grinder $54.75 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Saws - Concrete _$54.33 7A https://fortress.wa.gov/Inl`/wagelookup/prvWagelookup.aspx 10/8/2014 Page 14 of 17 Underground Sewer 8:Water King Power Equioment Operators- Scraper, Self Propelled Under $54.75 7A 3C 8P Underground Sewer £t Water 45 Yards King Power Equipment Operators- Scrapers - Concrete a Carry All $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $55.24 7A 3C 8P Underground Sewer& Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shotcretelgunite Equipment $51.77 7A 3C 8P Underground Sewer it Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $54.33 7A 3C 8P Underground Sewer Ft Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $55.24 7A 3C 8P Underground Sewer & Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $54.75 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $55.79 7A 3C 8P Underground Sewer & Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $56.36 7A 3C 8P Underground Sewer & Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider 8 $55.24 7A 3C 8P Underground Sewer & Water Screedman King Power Equipment Operators- Subgrader Trimmer $54.75 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Tower Bucket Elevators $54.33 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Tower Crane Over 175'in $56.36 7A 3C 8P ? j Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $55.79 7A 3C 8P ! Underground Sewer £t Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $55.24 7A 3C 8P Underground Sewer Ft Water Truck Type King Power Equipment Operators- Trenching Machines $54.33 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $54.75 7A 3C 8P Underground Sewer Ft Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $54.33 7A 3C 8P Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $54.75 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Welder $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmall Type $51.77 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 15 of 17 Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $44.86 5A 4A Trimmers King Power Line Clearance Tree Spray Person $42.58 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A lTrimmers 'King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers King -5A 4A Power Line Clearance Tree Tree Trimmer Groundperson $30.20 Trimmers King Refrigeration 8:Ai $72.46 6Z Journey Level IG Conditioning Mechanics 'King Residential Brick Mason Journey Level $51.32 5A IM 'King Residential Carpenters Journey Level $28.20 King Residential Cement Masons Journey Level $22.64 'King Residential Drywall Applicators Journey Level $40.14 5D King Residential Drywall Tapers Journey Level $52.371 5p LE !King Residential Electricians Journey Level $30.441 ;King Residential Glaziers Journey Level $36.20 71. 1H 'King Residential Insulation Journey Level $26.28 Applicators *ing Residential Laborers Journey Level $23.03 1 'King Residential Marble Setters Journey Level $24.09 1 `King Residential Painters Journey Level $24.46 1 ing Residential Plumbers Et Journey Level $34.69 1 Pipefitters ,King Residential Refrigeration 8: Air Journey Level $72.46 6Z IG Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) -$42.58 7F 1R Workers King Residential Soft Floor Layers Journey Level $42.41 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 2R (Fire Protection) ;King Residential Stone Masons Journey Level $51.32 5A IM ,;King Residential Terrazzo Workers Journey Level $46.96 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 Finishers ;King Residential Tile Setters Journey Level $25.17 King Roofers Journey Level $44.71 5A 3H King Roofers Using Irritable Bituminous $47.71 5A 3H Materials King ISheet Metal Workers Journey Level (Field or Shop) $70.37 7F I E King Shipbuilding Ft Ship Repair Boilermaker $40.72 7M LH i King Shipbuilding Et Ship Re air Carpenter -$39.24 ZT 213 King Shipbuilding a Ship Repair Electrician $39.28 7T 4B �'King Shipbuilding Et Ship Repair Heat Et Frost Insulator $60.93 5J 1S https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 16 of 17 King Shipbuilding 8: Ship Repair Laborer $39.341 ZT— 4B I King Shipbuilding F± Ship Repair Machinist $39.32 7T 4B King Shipbuilding Et Ship Repair Operator $39.22 7T 4B King Shipbuilding & Ship Repair Painter $39.31 7T 4B King Shipbuilding & Ship Repair Pipefltter $39.22 7T 4B King Shipbuilding Et Ship Repair Rigger $39.30 7T AD King Shipbuilding B Ship Repair Sheet Metal $39.27, 7T 4B King Shipbuilding B: Ship Repair Shipfitter $39.30 7T 4B King Shipbuitclinc! Et Ship Repair Trucker $39.10 7T 4B King Shipbuilding Et Ship Repair Warehouse $39.17 7T 4B King Shipbuilding 8: Ship Repair Welder/Burner $3930 7T AD King Sign Makers Et Installers Sign Installer $22.92 1 (Electrical) King Sign Makers a Installers Sign Maker $21.36 1 jEectricall King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electricalj King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electricall King Soft Floor Layers Journey Level $42.41 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69.59 5C Ix Protection) King Stage Rigging Journey Level $13.23,,Mechanics (Non I 5Lructurall King Stone Masons Journey Level $51,321 5A IM King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $54.33 7A 3C 8P Surveyor King Surveyors Chainman $53.81 7A 3C 8P King Surveyors Construction Site Surveyor $55.24 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians I King Telephone Line Construction - Cable Splicer $36.96 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20.49 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $35.40 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.96 SA 2B Outside King Telephone Line Construction - Special Apparatus Installer 11 $36.19 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $36.96 5A 213 Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $34.34 5A 213 Outside (Light) https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 Page 17 of 17 King Telephone Line Construction - Telephone Lineperson $34.34 5A 2B Outside King Telephone Line Construction - Television Groundperson $19.45 5A 213 Outside King Telephone Line Construction - Television Lineperson/Installer $25.89 5A 2B Outside King Telephone Line Construction - Television System Technician $30.97 5A 2B Outside King Telephone Line Construction - Television Technician $27.77 5A 2B Outside King Telephone Line Construction - Tree Trimmer $34.34 5A 2B Outside ,King Terrazzo Workers Journey Level $46.96 5A im King Tile Setters Tourney Level $21.65 1 ,King Tile, Marble Et Terrazzo Finisher $37.79 SA 1B Finishers King. Traffic Control Stripers Journey Level $43.11 7A I K King Truck Drivers Asphalt Mix Over 16 Yards (W. —$48.87 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03 5D 3A 8L WA-Joint Council 28) ,King Truck Drivers Dump Truck Et Trailer $48.871 51) 3A King Truck Drivers Dump Truck(W. WA-Joint $48.03 5D 3A 8L Council 28) iKing Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L Council 28) �King Truck Drivers Transit Mixer —$43,23 King Well Drillers Et Irrigat ion Pump Irrigation Pump Installer $17.71 Installers King Well Drillers Et Irrigation Oiler $12.97 Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 Installers https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 10/8/2014 i Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker.On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for j the worker. '... 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked.on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double die hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. i F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four-ten hour schedule,shall be paid at one and one-half times the hourly rate of wage.All hours worked in excess . of ten(10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown)shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. j 1 I Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 1. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. O. The first ten(10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8)regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shalt be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on. Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays(except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day)shall be paid at one and one-half times the hourly rate of wage.All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall.be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve(12)hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage.When holiday falls on Saturday or Sunday,the day before Saturday,Friday,and the day after Sunday,Monday, shall be considered the '.... holiday and all work performed shall be paid at double the hourly rate of wage. '... Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and tlue employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from wort:without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 hours during that workweek.)All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 2. ALI,HOURS WORKED 1N EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. 1-l. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. '.... 0. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked.on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. '.... U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a clay or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours alter eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. '.... 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. i A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.hoours worked over twelve hours(12)in a single shift and all work performed after 6:00 For Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift The employer shall have the sole discretion to assign overtime work to employees,Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forly(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked.Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay.Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1t2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate. However,Saturday shall not be utilized as a make-up day when a holiday falls on Friday.All hours worked Monday '.. through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the '..... hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanks0ving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). 4 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 5. D, Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). H. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). L Holidays:New Year's Day, Memorial Day,Independence Day, Labor Day, Thanksgiving Day, and Christmas Day '... (6) J. Holidays:New Year's Day, Memorial Day,Independence Day,Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). - K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas,And Christmas Day(9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day,Memorial Day,Independence Day,Labor Day, Thanksgiving Day, and.Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 112). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, ' Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9)• Z. Holidays: New Year's Day, Memorial Day, Independence Day,Labor Day, Veterans Day,Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). i Holidav Codes Continued 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day,(9 112). j G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And Christmas Eve Day(I 1), I 5 i Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 6. H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday Afier Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). 1. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last working Day Before Christmas Day, And Christmas Day(9). Z. Holidays:New Year's Day, Memorial Day,'Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day,And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Chrislanas Day (8). Any Holiday which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding '.. Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And.Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the '.. preceding Friday. '..... C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which '.. falls on a Saturday shall be observed as a holiday on the preceding Friday. I E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays:New Year's Day, Memorial Day,Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday oiler Thanksgiving Day,the Last working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 6 Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 7. I. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday, li J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day,Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday '.. which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays:New Year's Day, Memorial Day, Labor Day, Independence Day,Thanksgiving Day,the Last Work Day before Christmas Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,'17ianksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Clu•istmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. T. Paid Holidays:New Year's Day,The Day After Or Before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,and The Day After Or Before Christmas Day.(10).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 7 ' I Benefit Code Key—Effective 8-31-2014 thru 3-3-2015 Note Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'42.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'43.00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-54.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-SL00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1.50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May,Dame Their Own Price D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$0,75,Level B:$0.50,And Level C:$0.25. M. Workers an hazmat projects receive additional hourly premiums as follows:Levels A&B:$L00,Levels C&D: $0.50. N. Workers on ha=at projects receive additional hourly premiums as follows-Level A:$1.00,Level B:$0.75,Level C:$0.50,And Level D:$0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1.50,Class C Suit:$1.00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. '..... R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle, and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. i T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian j traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. 8 ATTACHMENT I AMENDMENT TO SUBCONTRACT AGREEMENT BETWEEN THE CITY OF KENT,WA AND PERFORMANCE CONTRACTING,INC. This atta lunent constitutes an amendment to that certain Subcontract(the"Subcontract")by and bet 'ecn THE CITY OF KENT,WA lle"Contractor")and PERFORMANCE CONTRACTING,INC. (the"Subcontractor" for work to be performed w th resp ct to such projects as may,from time to time,be pending between Contractor and S contractor. Notwithstanding any lai guage in the contract documents to the contrary,the provisions of this Amen ent shall be controlling in the event of any discre ancies, inconsistencies or ambiguities between this Amendment and any of er contract document. References in this Amend nt to specific sections in the Subcontract Agreement are by way of illx(tration and not intended to limit the applicability of pro�'sions contained herein. 1. In the event Contractor is no aid for reasons other than the fault of Subcontractor i or t'ractor shall nevertheless pay Subcontractor within a reasona-le time,which shall be defined as no greater than niro$ty(90)days from the date of invoice. f 2. Subcontractor's obligations of in(e mification and defense shall be only to.the extent of the negligence or willful misconduct of Subcontractor or Subcontractor's lower tier subcontractors. SuPbontractor shalt have no obligation to indemnify or defend Contractor or the\ini'eg wrier their own negligence or p4illful misconduct or the negligence and willful misconduct of those under their contrnt shall Subcontractor lzresponsible for the costs of indemnity or defense of Contractor unless and rmtilned that Subcontract.F is, in whole or in part responsible for the damages sought, and then only to the extent of e or willful misco, net of Subcontractor or Subcontractor's lower tier subcontractors. 3. In the event Subcontractor is interrupte , eayed, ,isrupted,� spended,obstructed or is otherwise required to accelerate or resequence its work for reasons other than the fault c�� Subcontractor or others under Subcontractor's control, or where Contractor directs Subcontractor to accelerate or re! e cc its work for the convenience or benefit of Contractor or Owner Subcontractor shall be entitled to additional c i ensation an extension of time or both. 4. Subcontractor shall not assume risk of loss for its'. stalle�ork or be responsible for any damage to,loss or destruction of its work by others,weather or environmental coLitions. If r airs to installed work are made necessary by the actions or inactions of others,or due to any cause beyo�Subcontractor's .ontrol, Subcontractor shall be reimbursed for the costs in performing such repair or replacement w & If such repair work 's necessitated by the acts or omissions of Subcontractor, such work shall be performed at Subbcc9rl°tractor's expense. 5. Subcontractor's obligation to in�trn' rify the Contractor and Owner agar st claims against the property, acid any waiver of lien rights,shall apply only too lie extent that Subcontractor has been pai yfor its work, G. Subcontractor's responsib ity for liquidated or other damages resulting fror\ clay shall be limited to the extent that Subcontractor is the direct cause of the event giving rise to the imposition of sup damages, and Subcontractor will in no event be liable or r sponsible for any consequential, incidental or special damage of any kind. 7. Any special n urance coverage, including primary coverage to additional insureds�erenced endorsements or waivers of subrogatio ;provided by Subcontractor's insurer pursuant to the insurance requirement's of the contract documents shall be applicab e only to the extent of Subcontractor's indemnification obligations. / IN W TNESS WHEREOF,the undersigned have caused this Agreement to be executed this �) y of G/C tt ,2014. CONTRACTOR: SUBCONTRAC THE CITY OF KENT,WA PERFORM CE C T C IN ,INC. By: By: e� Title: Title: Jeff Craker, General Manager CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Performance Contracting, Inc. Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as UPRR Trestle Watermain Insulation that was entered into on the November 21, 2014 (date) between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1,2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. ICE By: -- — h— For: :�J''\,) i Title: Date: L / 5— I I 17` qL J 7C i. i EEO COMPLIANCE DOCUMENTS - 1