CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Washington State Department of Transportation (WSDOT)
Vendor Number:
JD Edwards Number
Contract Number:
This is assigned by City Clerk's Office
Project Name: Kent Regional Trails Connector
Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment' ❑ Contract
®'Other: Grant Agreement
Contract Effective Date: 10/30/2014 Termination Date:
Contract Renewal Notice (Days): N/A
Number of days required notice for termination or renewal or amendment
Contract Manager: Nick Horn Department: Public Works Design
Detail: (i.e. address, location, parcel number, tax id, etc.):
The Kent Regional Trails Connector Project will expand the pedestiran & bicycle network
by connecting two regional trails withing the City's street network. The trail will connect
the GR trail @ the S end of the GRNRA etc. It till include trail lighting, rapid flashing -
beacons & marked crosswalks mid-block on 641FF S 224th ST &'64 Ave S S7218 1 "St &
73rd Av S from 64th Ave S to Interurban Trail
S:Pu blic\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
PUBLIC WORKS ENGINEERING
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
N Fax: 253-856-6500
WAS"'"G T O N Address: 400 West Gowe
Kent, WA. 98032-5895
Memorandum
Date: November 6, 2014
From: Nick Horn
Subject: Kent Regional Trails Connector
Modifications to the TIP (Transportation Improvement Program) for the above
project were initiated to eliminate the numerical values (lengths and widths of the
trail) for specific items included in the project description. Instead, physical
features were used to identify the scope of work extents. The modifications were
accepted through PSRC on the TIP that was issued October 30, 2014. WSDOT
requires that the description of the proposed work shown on the Local Agency
Federal Aid Project Prospectus to match what is on the TIP. The modifications to
the Prospectus description of proposed work, has been done, and requires
signatures where noted, in order to resubmit to WSDOT.
Please return this document to me, for submittal to WSDOT once the Mayor's and
Tim's signatures have been obtained.
\ I .• np
Washington state Local Agency Federal Aid
TAP Department of Transportation Project Prospectus
Date 11/5/2014
1.3 Prefix Route
Federal Aid Central Contractor
Proect Number CM-0615 (008) Registration Exp.Date
Local Agency (WSDOT\ Federal Employer
Project Number LA 8128 Use only) Tax ID Number 91-6001254
_ Agency Federal Program Title
CITY OF KENT _ ® 20.205 ❑ Other
Project Title Start Latitude N47.402432 Start Longitude W 122.254867
KENI REGIONAL TRAILS CONNECTOR
End Latitude N47-406744 End Longitude W122.242169
Project Termini From-To Nearest City Name Project Zip Code
S.224th St R 64th Ave S S.218th St d 73rd Ave S KE_NP 99032
From: To: Length of Project Award Type
_64th Ave 5 Interurban 0.84 miles ® Local ❑ Local Forces ❑ State ❑ Railroad
y y County Name WSDOT Region
Federal Agency Cit Number Count Number �i
❑ FHWA ® Others STP/CMAQ 0615 17 KING Northwest Region
Congressional District Legislative Districts Urban Area Number TMA/MPO/RTPO
SR9 1133 and 47 1
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. $247 566 $34 286 $213 280 6/2013
RAN $0 $0 $0 na
Const. $1 054 437 _ $142 349 $912 088 3/2014
Total $1 302,003 $176 635 $1 125 368
Description of Existing Facility (Existing Design and Present Condition
Roadway Width Number of Lanes
12 foot wide multi-use trail Not applicable
Both the Interurban Trail and the Green River Trail are used by thousands of people each year,but they are both north/south
I
corridors in Kent,with no opportunities to transfer from one trail system to the other, except by using the bike facilities in the
street or on sidewalks.
j
Descri tion of Proposed Work
Description of Proposed Work(Attach additional sheet(s) if necessary)
The Kent Regional Trails Connector Project will expand the pedestrian and bicycle network by connecting two regional trails
within the City's street network. The trail will comtect the Green River Trail at the south end of the Green River Natural
Resources Area, on the west end,with the Interurban Trail at approximately S.218th St,on the east end. This multi-use hail will
include trail lighting, Rectangular Rapid Plashing Beacons with marked crosswalks installed where it crosses mid-block on 64th,
and 72nd Ave,with a pedestrian signal atstalled on 68th Ave(SR 181). The signal will include a camera for monitoring and
I controls for bicyclists and pedestrians. A brid Le will be installed across Mill Creek on the east end at the Interurban Trail.
Local Agency Contact Person Title Phone
Mark Ilowlett Design Bngineerhig Manager 253-856-5523
Mailing Address City State Zip Code
400 West Gowe St. —. Kent WA 98032
By a-" "
Project Prospectus Approval
Approving Authority
Title Director ofPublic Works Date
DOT Form 140-101 EF Page 1 of 3 ♦ Previous Editions Obsolete O
Revised 12/2012
Agency Project Title Date
CITY OF KENT KENT REGIONAL TRAILS CONNECTOR 11/5/2014
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
® New Construction E Path /Trail ❑ 3-R 12 foot not applicable
❑ Reconstruction ❑ Pedestrian/ Facilities ❑ 2-R —
❑ Railroad ❑ Parking ❑ Other
❑ Bridge
Geometric Design Data
Description Through Route Crossroad
❑ Principal Arterial ❑ Principal Arterial
Federal ❑ Urban E Minor Arterial ❑ Urban E Minor Arterial
Functional ❑ Rural ❑ Collector ❑ Rural ❑ Collector
❑ Major Collector ❑ Major Collector
Classification ❑ NHS ❑ Minor Collector ❑ NHS ❑ Minor Collector
❑ Local Access ❑ Local Access
Terrain E Flat ❑ Roll ❑ Mountain E Flat ❑ Roll ❑Mountain
Posted Speed n/a _..... _ n/a
Design Speed _- n/a n/a —
Existing ADT_ n/a _. . n/a _ I
Design Year ADT n/a ___.. n/a _
Design Year n/H _ n/a
Design Hourly Volume(DHV) n/a n/a
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
City of Kent % 100 %
Construction Will Be Performed By Contract Agency
Contractor 100 % %
Environmental Classification
❑ Class I-Environmental Impact Statement(EIS) ® Class II-Categorically Excluded(CE)
❑ Project Involves NEPA/SEPA Section 404 ® Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III-Environmental Assessment(EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
Environmental Considerations
The trail improvements will be constructed along the surfaces of existing right of ways. Pervious asphalt is proposed along
sections of the trail adjacent to environmentally sensitive areas. The installations of the Rectangular Rapid Flashing Beacons,
marked crosswalks,traffic signals for pedestrians on West Valley Highway(SR 181),and a pedestrian bridge installed across
Mill Creek will be the bulk of the physical construction associated with this project.
i
DOT Form 140-101 EF Page 2 of 3
Revised 12/2012
Agency Project Title Date
CITY OF KENT KENT REGIONAL TRAILS CONNECTOR 11/5/2014
Right of Way
® No Right of Way Required ❑ Right of Way Required
All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing riqht of way.
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
The trail will be constructed along the surface of the existing right of way, so no relocation of existing major
structures is anticipated. Should some existing utility structures be encountered, sufficient room exists to move the
trail in order to avoid conflict. Minor adjustment to the rims of existing underground structures is expected.
Placement location for the traffic signal pole and flashing beacon bases can be adjusted to avoid possible conflicts
with and existing structures.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ® No
Remarks
i
i
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and
is not inconsistent with the agency's comprehensive plan for community development.
Agency City Of� �
Date v�'`'r / /S BY % rn
MayodcFajrperson
DOT Form 140-101 EF
Revised 12/2012 Page 3 of 3 p Previous Editions Obsolete
I
REQUEST FOR MAYOR'S SIGNATUREV +'P
9C NT Please Fill in All Applicable xes"- ' }
6x
litepna F � 3q
s I [[
Renewed by Director
Originator's Name: N�� kfsra� r op x ,' Dept/Div. PW Engine,&ln Extension: -S-�2-9- ;
Date Sent: 11/07/2014 Date Required: 3/21/= 014
Return to horn t p CONTRACT TERMINATION DATE: N/A
VENDOR: Washington Stat6 Oepbrtment DATE OF COUNCIL APPROVAL:
of Transportation
ATTACH THE COUNCIL MOTION SHEET:FOR THE MAYOR - if applicable
Brief Explanation of Document:
Modifications to the TIP for the Kent Regional Trails Connector Project were initiated to
eliminate the numerical values (lengths & widths of the trail) for specific items included
in the project description'.
Modifications were accepted through PSRC on the TIP that was issued October 30,
2014. WSDOT requires that modifications to the Prospectus description be signed by
the Mayor and Public Works Director.
All Contracts Must Be Routed Through The Law Department
(This area to be completed by the Law Department)
Received:
- ,
Approval of Law Dept.:
Law Dept. Comments: `"„ .s � +., � ����t
71
Date Forwarded to Mayor: 1`` li
Shaded Areas To Be Completed By Administration Staff
Received:
Recommendations and Comments:
1 F
Disposition:' j` r Lis 2
Date Returned: