HomeMy WebLinkAboutPW14-215 - Change Order - #2 - Northwest Cascade, Inc. - SE 240th St Stabilization & Restoration Project - 02/12/2015 . Records
Document
Was Hixorox
CONTRACT COVER SHEET
This is to ,be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Northwest Cascade, Inc.
Vendor Number:
JD Edwards Number
Contract Number: PW14-215 — f"-
This is assigned by City Clerk's Office
Project Name: SE 24oth Slope Stabilization and Pavement Restoration Project
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 8/29/2014 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Stephen Lincoln Department: PW Engineering
Contract Amount: 562,676.00
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order#2
As of: 08/27/14
KIENT
W AS MiNOTON �/y�
CHANGE ORDER N O. #2
NAME OF CONTRACTOR: Northwest Cascade Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER:SE 240th Street Stabilization and Pavement Restoration Projec
ORIGINAL CONTRACT DATE: August 29, 2014
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Install jute matting and hand seed to improve the erosion control.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $562,676.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $224.00
(incl, applicable WSST)
Current Contract Amount $562,900.00
(incl. Previous Change Orders)
Current Change Order $494.23
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $563,394.23
II
CHANGE ORDER - 1 OF 3
i
Original Time for Completion 50
(insert date)
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (t} for this Change 0 calendar days
Order
Revised Time for Completion 50 worldng days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied,
i
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF ENT:
By: By:
(srgna u signature)
Print Name: t ' Prinf, Name: pC Td
Its M/4�AG F IN v L X2f&7-0
(title) title)
DATE: 2- / % iS DATE: t
I,
CHANGE ORDER - 2 OF 3
I
°KENT FILE NO: 200.2
CHANGE ORDER WORKS EET NO. 2
Construction Management Division - Public Works
Project: SE 240th St. Slope Stabilization Project No.: 14-3014
Project Engineer: Mark Madfai Fed-Aid No.:
Owners Rep: Alan Chau Contractor: NW Cascade, Inc.
Date: 1/19/15
I. PROPOSED CHANGE
Installed jute matting and hand seeding
H. REASON AND BACKGROUND FOR CHANGE
Improve the erossion control
III. METHOD OF PAYMENT
NEW PAY ITEM(S) [:] Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch. No. Item Description I Total ; Qty this Unit Unit Price Total Estimated Cost of
Est. Qty PE Item
-- - - - I -
1 - Installed_Iute---- matt----
ln and _ � $494 23
-- 8 FA-1_ � ---1 $49423 _--
hand_seeding --- — -
- -- --j---- --- - -- - 1 ---------
- -
® Engineers Estimate Attached - ❑ ' CREATE PAY ITEM ONLY- Payment to be made ® PAY THIS PAY ESTIMATE
_( at a later date upon completion of work
❑ l Material Submittals Required - CC Construction Coordinator F New Sub Reqrd? 1 No
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Not Applicable
Change Order No. ; _ FOR ACCOUNTING USE ONLY
Sch No. B I No _I.__ Item Description - Qty _ Unit_ I Unit Price l Cost of Item
_-- -I— - -. -- ---
❑ I Engineers Estimate Attached -REQUIRED i ❑ �'i
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch No.-I_B.-I. No -_--Item Description -_ .__ I --Qty _ i _ Unit- Unit Price Cost of Item
❑ Engineers Estimate Attached -REQUIRED ❑
1 REV. DATE: 7/07/09
i
(CENT FILE NO: 200.2
" TOTAL ESTIMATED COST OF CHANGE ORDER *� $494.23
*Total of the Cost of Item Columns
THIS PAY ESTIMATE $494.23
IV. WORKING DAYS
Original Contract ; 50 Due This Change Order* I ® Previous Total 1 50
* - Explanation Justification Re wired:
— .-..
TOTAL WORKING DAYS* 50
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: /� L _ Date:
Ala(j Cha % d /
Construction Supervisor: ,�!,,-1,' f r�' '� _ , Date;
Piul kyeh,nei
Construction Manager: may,-.y/ Date:
Eric Connor
2 REV. DATE: 7/07/09
FA Sheet No.: 2
DAILY REPORT OF
FORCE ACCOUNT WORKEDNT
Project Name: SE 240th Street Slope Stabilization Project No: 14.3014
Item No.: Date: 1/19/2015
Description of Work: Installed jute matting and hand seeding
Work by Subcontractor?: No
Prime Contractor: Northwest Cascade, Inc. Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Heudy Rate Hrs OT Rate AMOUNT
Guy Donaldson Operator Foreman 1 65.24 $ 65.24
Jared Long-A. Laborer Foreman 2 51.95 $ 103.90
Buck Studenan Laborer 1 49.67 $ 49.67
$
$
$
IS
SUBTOTAL-LABOR: $ 218.81
LABOR OVERHEAD&PROFIT @ 29% $ 63.45
LABOR TOTAL $ 282.26 '..
"EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
C532 Service Truck 1 25.06 $ 25.06
C531 Service Truck 2 25.06 $ 50.12
$
5
SUBTOTAL-EQUIPMENT $ 75.18
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 15.79
EQUIPMENT TOTAL $ 90.97
MATE RIALS/S ERVI C ES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Jute Matting 2 EA $ 50.00 $ 100.00
$
$
SUBTOTAL $ 100.00
OVERHEAD&PROFIT @ 21% $ 21.00
TOTAL $ 121.00
Verification of Hours Worked: TOTAL: $ 494.23
12%MARKUP (for
prime when subcontract work) $ -
Conlractoes Representative Date t� SHEET TOTAL: $ 494.23
Owners Representative Date I I
HOURLY LABOR RAT ES LATEST REVISION 07/12/2013
7,65% 0.60% S 2.41000 5,84% UNION BENEFITS
PT
otal
Workers Enafety, Perish Public
Scale FICA FUTA Camp. UC Laborers Operators Teamsters TTests Supplies Hourl C f
LABORERS I
Laborer Group 2A-Flaggers
Regular: S 25.79 1.97 0.15 2.41 1.51 10.44 0 0 $I 1.29 $ 1.2 �$ 44.65
Overtime: S 38.69 2.9G 0,23 2.41 2.26 10.44 0 0 $I 1.93 $ 1,9 i$ 6U.85
Laborer Group 2B-TCS
Regular: 8 28.30 2.16 0.17 2.41 1.65 10.44 0 0 S 42 S 1. 2 $ 47,97
Overtime: S 42.45 3.25 0.25 2.41 2A8 10.44 0 0 S 2t 12 $ 2J12 S 65,53
Laborer Group 3-General Laborer `\
Regular: $ 32.29 2.47 0.19 2.41 1.89 10.44 0 0 S Il $ ��61 $ 52.92 f
dd f
Overtime; $ 48,44 3.71 0.29 2.41 2.83 10.94 0 0 $ 2. � $ 42 $ 72.96
Labol'er Group 4-Pipe Layer
Regular. S 33.08 2.53 0.20 2.41 1.93 10.44 0 0 S 1.6 $ 1.65 $ 53,90 .
Overtime: $ 49.62 3,80 0.30 2.41 2.90 10.44 0 0 S 2.48 $ 2.49 $ 74.42
Laborer Group 5-Grade Checker 1
Regular; S 33.62 2.57 0.20 2.41 1.96 10.44 0 0 S 1.68 $ 1.68 $ 54.57
Overtime: $ 50.43 3.86 0.30 2.41 2.95 10.44 0 0 5 2.52 $ 2.52 $ 75.43 '(0. '$(,
Laborer Group X-Concrete Finisher
Regular: S 37.75 2.89 0,23 2.41 2.20 10M 0 0 S 1.89 1.89 �S 59.69 g,. ^t
Overtime; S 56.63 4.33 0.34 2.41 3.31 10.44 0 0 S 2.83 $ 2.83 'S 93.12
Laborer Foreman '
Regular: $ 34,29 2,62 0.21 2,41 2.00 10,44 0 0 $ 1.71 1.71 $ 55.40
Overtime; S 51.44 3.93 0.31 2.41 3.00 10.44 0 0 S 2.57 2.57 $ 76.68 f lli
OPERATORS
Operator Group I-Heavy/Heavy
Regular: S 37.84 2.89 0.23 2.41 2.21 0 17.4 0 $ 1.89�S 1.89 S 66.77
Overtime: S 56.76 4,34 0.34 2.41 3.31 0 17.4 0 $ 2.8� S 2.84 S 90.24 '[-
Opare Gr lor oup 2-Heavy 1
Regular; S 37.35 2.86 0.22 2.41 2,18 0 17.4 0 $ 1.8 $ .87 S 66.16 [,'L-•{-6
Overtime; S 56.03 4.29 0.34 2.41 3.27 0 17A 0 $ 2.8 $ .80 $ 89.33 >_,,[p
Operator Group 3-Light I
Regular: S 36.93 2.83 0.22 441 2.16 0 17.4 0 $ 1, 5 $ I. 5 S 65.64
Overtime: S 55.40 4.24 0.33 2.41 3.24 '0 17.4 0 S 2�99
R7 S 2, 7 S 88.55
m Operator Foraan 0
Regular. S 39.84 3.05 0.24 2.41 2.37 0 17.4 0 $ 99 $ 1.9l S 69.25 C �'
Ovellime: $ 59.76 4.57 0.36 2.41 149 0 17.4 0 $ S 2.99 $ 93.97 �,"( •j
TEAMSTER
Teamstcrtowboy Driver i
Regular: S 022 j 2.31 0.18 2.62 1.76 0 0 (IQ44 1.51 L51 �S 50.56
Overtime: $ 45A3 3.47 0.27 2.62 2.65 0 0 10.44 2,27 - 2.27�$ 6931 !
YYY l
( i
," -3o -2`I .r to,<i4 - .>Lu. �6 , .•�g,q.( � �'t:._�a�fl:�tic4 1_!..,3__ is"'�'t�
I
.Y✓ h. U_F '�-� -
�'��r"e. Ju 1;
CI`I'Y�1 It! I'frflCltiEEtlII�Cuf('1-,-� �
""HOP Clr l4'I d�lirl I[FIB L 5UI lul I I/1!. r
Ci AN t r 1/[�A� �UI141riL'p
B�ANTOVU)AS 140Kh
CJ/',P!! idDALC i:3,',ifsh+07
I
9 / /
NORTHWErr CASCAIJR,INC. Bill to: Cin-ofFa¢
NWC PROJECT H.3951 K\1':
DESCRIPTION: ed1 Mouing and Ilmrd Socdcd
LOCATION: SE SF24 2401h Slrcel
WORK DATEISI: 19.Lm
I.AHOR HOURS BAT AMOI NT
Lahore,Group 3-neanrul Lnhmcr REO 1 I 552,92 552.92
O.T. 0 572.96 50.00 r
Lnbarer Foreman REC _ 2 $5992` S11983 ( �•
O.T. 0 S8.1.45 50.00
Operator l'nrnnau REG 1 1 692. S9-15
3 , U00 (71
REG 0 50.00 S0.01)
O.J. 0 5000 A00
LABOR SUBTOTAL: 5242 00
29%, MARKUP: S9018
LIBOR 101 Al,: $312.18
E0UIPMENP HOURS RATE AMOUN-F
('532 2008 FORD MR ONE TON REO 1 1 52506 425.06
FOREMAN STNBY 0 S'2.46 S0.00
C5B1 2008 FORD P350 ONE ION RE.G ? 1 525.06 S50.12
FOREMAN STNBY 0 $2,46 SO.UO
REG 0 $0.00
STNBY a So00
(QUIP.\TENT StiBl'OTAL: 5]S.I N
21% \LIRKUP: $15.70
EQUIPMENT TOTAL: 590.97
NIA I EIl1Al'S HUMNITS RATE AMOUNT
Northwest Lmuips Jule Matting per LS _ I I 5100.00 SIOUR i
0 10.110 $0.00
NIATERIA L SU BTOTAL 5100.00 -
21% MARKUP: 521.00
NIATERAL TOTAL; 5121.00
SUBCONTRACTORS HRSUNI"Is RATE AMOUCT
SUBCON''RACTOR SUBTOTAL Sa.00
12% MARKUP: 50.00
SUBCONTR WI DR'I'O 1'AL: 50.00
LATEST REVISION 0013U2011
TOTAL SS2J,15
i
Yagc: 1
N, C A .S C A D E - Job No: 3951 - "40th. St. Pile & ^!eback
D A I L, Y P R O G R E S S R E P O R T
DFR NO: 30'GD Dare: 1/19/2025
Project E; mu: 240th. St. P'_le & Tieba�( Job No. 39c1
Foreman i:- me Guy Porialdsun Job Addr. ; 2i0th sc. V nt
Weather Conaition:, ; (Temp Arp rx. ) 55 (Cloar)
P_Ck up car trai ..er from yard. . . Jar-:d to North• est Li.n.ings for. =ctr matting
`or farce accoun' I ork for city. . . Cl. an up asn',aa.t .in bet,.:een pi Lns from
?eterser Bros auger;ng "o.x posts. . • Rt.ke nut, la, cord and jute rr;_te on east.
and west r,nC of bench and center of bens:h. C;:1'_ off Hone, Bucket. . . Jared
round trips to Ord with :: 2 PC1_5 board:. . . Guy and Suck dri-';s site and nick
up all Cass F. e_gnajo. . . Taae bac, to . a. d and unload. . .
--TABOR _ND EQU_P'ITT
'uop_ -, on Job Sours Egaip, Hours Pcrdien Work ^--po
DONhLD5O:4 - C1Y 8
OPER-_'OR?,
LONG - A. JARED _D-FORD
STUDEth\ - JOCK 8 A?PR. _ASR
SCBC3NTR5,CTR3S ON -OB
CHANGES TO CON'L'RAC^_ :N FIELD _ — --- -
CC:::IENT3
E?7i17 - Ir.a•:.alled jute mating for the Ci.: of Kent per thei - direction. 2 hours fcr crr,,.
SAFE'PY -----�----
Personal Inc_ ent
Person/Equipment:
Appro^a1 _—
JC W //207d
SC 1/2'l/2015
For Payrol'_ JC
Pa -roll Co*:.Meted: 11
NORTHWEST LINT.IGS&GEOTEXTILE PRODUCTS,INC 0054707-W
PO 8OX 1248
KENT,WA 98035-1248 1/20/2015
(253)87M244
GT5516
1/19/2015 ,
003D
NOR117
NORTHWEST CASCADE NORTHWEST CASCADE
P.O.BOX 7339D WILL CALL
PUYALLUP,WA 98371 Kent,WA 99032
JARED RAJ
3951 WILL CALL KENT NET 30 DAYS III
MUTE ROLL 2.00 2.00 0.00 50.000 100.00
Pen tcaTex JUTE-4' Wines: OW
III
i
Net Invoice: 100.D0 III
Less Discount: 0.00
Relght: 0.00
Sales Tax: 0.00
hrvolw Total: 100.00
Less Deposit: 0.00
100.00