HomeMy WebLinkAboutPW14-215 - Change Order - #1 - Northwest Cascade, Inc. - SE 240th St Stabilization & Restoration Project - 02/12/2015 ,
KENT Document r
WASHINOTON
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Northwest Cascade, Inc.
Vendor Number:
]D Edwards Number
Contract Number: PW14-215 -
This is assigned by City Clerk's Office
Project Name: SE 240th Slope Stabilization and Pavement Restoration Project
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 8/29/2014 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Stephen Lincoln Department: PW Engineering
Contract Amount: 562,676.00
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order#1
As of: 08/27/14
iCENT
CHANGE ORDER NO. #1
NAME OF CONTRACTOR: Northwest Cascade Inc ("Contractor")
CONTRACT NAME & PROJECT NUMBER:SE 240th Street Stabilization and Pavement Restoration Project
ORIGINAL CONTRACT DATE: August 29, 2014
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows;
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Install additional raised markers to provide nighttime visibility for
drivers.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $562,676.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0
(incl. applicable WSST)
Current Contract Amount $562,676.00
(incl. Previous Change Orders)
Current Change Order $224.00
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $562,900.00
i
CHANGE ORDER - 1 OF 3
Original Time for Completion 50
(insert date)
Revised Time for Completion under 0 j
prior Change Orders
(insert date)
Days Required (f) .for this Change 0 calendar days
Order
Revised Time for Completion 50 working days
(insert date)
In accordance with Sections 1-04A and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date,
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
i
i
The parties whose names appear below swear under penalty of perjury that they are j
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
Pg
CONTRACTOR: CXTYOF KENT: n " t14,M
By: By: p
(s�gna�'e7 � ��, (signature
Print Name: C--L-K'QI IMi 'tpl5 Print Name:
Its ' 1UF_P' 7 Its ,3[ic1AA 0ho-k7 e
(ide) (tile)
DATE: 2y i DATE: 2 1 `
CHANGE ORDER - 2 OF 3
K��.�-. FILE NO: 200.2 ,,..
w., " CHANGE ORDER WORKSHEET NO. 1
Construction Management Division — Public Works
Project: SE 240th St. Slope Stabilization Project No.: 14-3014
Project Engineer: Mark Madfai Fed-Aid No.:
Owners Rep: Alan Chau Contractor: NW Cascade, Inc.
Date: 1/16/15
I. PROPOSED CHANGE
Installed additional raised pavement markers
II. REASON AND BACKGROUND FOR CHANGE
Provide nighttime visibility for drivers
III. METHOD OF PAYMENT
NEW PAY ITEM(S) Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch, No. Item Description Total Qty this i Unit Unit Price i Total Estimated Cost of
Est. Qty 1 PE Item
1 Additional raised 1 1 FA I
-- --- — --- _$224 00 $224.00
pavement markers j__
Z Engineers Estimate Attached - I LJ CREATE PAY ITEM ONLY - Payment to be made PAY THIS PAY ESTIMATE
REQUIRED J at a later date upon completionof work
i -Mateeriri C tru n C
-- - ..-_ - --...---_ --..
al Submittals Reouired - C Conscti000rdinator ; New -R--
Sub eqrd? No
DELETE EXISTING PAY ITEM(S) per I-09.5 ❑ NotAppllcable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch No B I No Item Description _—I Qty_ i„ Unit Unit Price Cost of Item
-�- — -- -- -- - - -- r
I-_ r
Engineers Estimate Attached - REQUIRED
INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable
Change Order No. j _ I FOR ACCOUNTING USE ONLY
Sch No B No, ,,-_ — _Item Description _ __Qt� Unit_ Unit Price Cost of Item
— a-- -- — -- —
I I I I
i
❑ Engineers Estimate Attached -REQUIRED
i
I
1 REV. DATE: 7/07/09
i
i
i
i
• FILE NO: 200.2
KENT
w^ TOTAL ESTIMATED COST OF CHANGE ORDER * $224.00
*Total of the Cost of Item columns j
THIS PAY ESTIMATE $224.00
IV. WORKING DAYS
Original Contract 5p Due This Change Order* 0 I Previous Total I 5p
Explanation/Justification Required:
TOTAL WORKING DAYS* 50
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: A� Date: i
Alan-Chau f /
Construction Supervisor: _ I1g,L/�—A ;"/ '/_,+ � Date:
Construction Manager: /�-ram ����•-�� Date: Z;zl,�S
Eric Connor
2 REV, DATE: 7/07/09
FA Sheet No.: 1
DAILY REPORT OF
FORCE ACCOUNT WORKED �rT
Project Name: SE 240th Street Slope Stabilization Project No: 14-3014
Item No.: I Date: 1/1 612 01 5
Description of Work: Installed additional raised pavement markers
Work by Subcontractor?; Yes
Prime Contractor: Northwest Cascade, Inc. Sub-Contractor:
LABOR'
STRAIGHTTIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs I OT Rate AMOUNT
$
-SUBTOTAL-LABOR; $
LABOR OVERHEAD&PROFIT @ 29% $
LABOR TOTAL $
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs I Standby Rate AMOUNT
SUBTOTAL-EQUIPMENT $ -
EQUIPMENT OVERHEAD&PROFIT @ 21% $ -
EQUIPMENT TOTAL $ -
MATERIALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Raised pavement markers 25 EA $ 8.00 $ 200.00
$
$
SUBTOTAL $ 200.00
OVERHEAD&PROFIT @ 21% $
TOTAL $ 200.00
Verification of Hours Worked: TOTAL: $ 200.00
12%MARKUP (for
prime when subcontract work) $ 24.00
Contractors Representative Date (( SHEET TOTAL; $ 224.00
Owners Representative Al. Data
Northwest Traffic, Inca Invoice
Road Sign ng Contractors ,..'
- - Date Invoice #
Po Box 1915-Milton,WA 9$^3 x k �:w, ��.r,(+', 1/16/2015 13625
Ph:(253)862-4102-Fax:(253)863-1333
www,nwtraffic.net
Bill To Project Location
Northwest Cascade, Inc. SE 240th St Slope Stat'pization
PO Box 73399 Kent 4
Puyallup, WA 98373 City of Kentyy
t
o, No Terms Job#
Jeff Net 30 Days 15011 M
Item # Description m Qty Rate Amount
Concrete Curb -LF 215 12.00 2,580.00
Painted Yellow -LF 300 1,77 531,00
Painted White Edgeline -LF 476 137 652,12
Extra Per Type II Yellow RPM-EA 25 8.00 200.00
Inspector
PLEASE AF PROFS
l JAN 2 7 2015
Please make checks payable to Northwest Traffic,Inc. Subtotal
$3,963.12
Balance Due $3,963.12 Sales Tax (9.5%) $0.00