HomeMy WebLinkAboutPW14-203 - Change Order - #4 - SCI Infrastructure, LLC - SR 516 to S 231st Way Levee Improvements - 01/12/2015 r r
Records Ma
Oagemi�fttl.l
K�N`
WASNINGTON Document {CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: SCI Infrastructure, LLC
Vendor Number:
JD Edwards Number
Contract Number: 14-203_,U6�<_�-.
This is assigned by City Clerk's Office
Project Name: SR 516 to S 231't Way Levee/Russell Road Upper Levee
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 8/27/2014 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
I
Contract Manager: Toby Hallock Department: PW Engineering
I
Contract Amount:
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order#4
I
AS of: 08(27f 14
ICE 4 T
WAHINGTON
CHANGE R ER NO. #4
I
NAME OF CONTRACTOR: SCI Infrastructure, LLC. ("Contractor")
I
CONTRACT NAME & PROJECT NUMBER:SR 516 to S 2315t Way Levee Imp.fRussell Road Upper Levee
ORIGINAL CONTRACT DATE: August 27, 2014
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Remove and dispose of two large douglas fir trees due to the proximity
of the new retaining wall,
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $2,176,334.02
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $25,401.05
(incl. applicable WSST)
Current Contract Amount $2,201,735.07
(incl, Previous Change Orders)
Current Change Order $7'809.00
Applicable WSST Tax on this Change $741.86
Order
i
Revised Contract Sum $2,210,285.93
CHANGE ORDER - 1 OF 3
i
Original Time for Completion 120 working days
(insert date) j
Revised Time for Completion under 123 working days
prior Change Orders
(insert date)
Days Required (t} for this Change 0 calendar days
Order
Revised Time for Completion 123 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits, This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
�T" `
By ry � � By " 1
J y (srgna ure) (93 {signature
Print Name: a.k c r : 41-4/ Print Name.
Its u „r €Er rr - L.I/?y- &J'f' Its 1�/
(title) it )
DATE: --o'2�-"fg, DATE:
CHANGE ORDER - 2 OF 3
• FILE NO: 200.2
KENT
o.o. CHANCE ORDER WORKSHEET NO. 4
Construction Management Division — Public Works
Project: SR 516 to S. 231st Way Levee Project No.: 09-3006.2
Improvements - James/Russell
Project Engineer: Toby Hallock Fed-Aid No.:
Owners Rep: Jason Barry Contractor: SCI Infrastructure, LLC
Date: 11/26/14
I. PROPOSED CHANGE
i
Remove and dispose of 2 Large Douglas Fir Trees
II. REASON AND BACKGROUND FOR CHANGE
Proximity to new retaining wall requires it, approx. 3 feet from wall foundation to tree trunk.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch. No. Item Description Total Qty this Unit Unit Price Total Estimated Cost of
Est. Qty PE Item
r_ spsal 1 ---
1 Doug Fi _Remov_al_& Dio _ _ _ 1_ LS $7,809 00 _ $7,809.00_______
® Independent Estimate Attached I ❑ ! CREATE PRY ITEM ONLY- Payment to be made ® i PAY THIS PAY ESTIMATE
REQUIRED at a later date upon completion of work— __ _ _I__
Material Submittals Required - CC Construction Coordinator rNew Sub Reqrd? No
DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable
Change Order No. - ! FOR ACCOUNTING USE ONLY
-Sch. No_I B I No. !_ Item Dri tion _ Qty Unit Unit Price Cost of Item
- esc — -
' ! I
- I i
Independent Estimate Attached - REQUIREDI El
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch No. , BA No. 1 Item Description __ Qty _ Unit 1 Unit Price Cost of Item _
- -
Independent Estimate Attached - REQUIRED
1 REV. DATE: 4/01/10
FILE NO: 200.2
�K FE ZNOOT
TOTAL ESTIMATED COST OF CHANGE ORDER 00
*Total of the Cost of Item columns
THIS PAY ESTIMATE $7,809.00
IV. WORKING DAYS
Original contract 120 Due This Change order* 0 Previous Total ] 123
-DATE 11 .-1 :---------1----------
wired.-- ---------
TOTAL WORKING DAYS* 123
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: L L-�- — Date: 414
o Barry
Construction supervisor: j Date: 12 V& rq
I K ne I V
Construction Manager: Date: IA'
Eric Connor
2 REV. DATE:4/01/10
HE6:—, e)v
I CCU} C.J1fZ r _ IC4 iF"J ilv tyC� !� v y3ome,ruJ apt
1 Al C t �N?�ttr i G '� C->f'2_v as' 1 A?�,. 9 r t�J�S E viP
A r? STl�z iZl �1{7 t 4 - ttJr?� � _e tJl( ZA- 5-,9Fg
rT
�—,`j(,�"n✓t � '?nor Y�'1t'J�t_--- _ � I C1�3U1��, `� ���^�,
/000
66
r
ti
S:\JOBS\1414 -SR516 to S 231 Levee S Reach\05 Extra Work\remove added treesremove added trees
Com i
Lump Sum price roll up for added tree removal
Item Total Cost
5 Added Tree Removal c 7,809.00 i LS
i
n`
Total Lump Sum for Tree Removal
4 � �
The price shown includes all work outside of original contract scope.
i
S:\JOBS\1414-SR516 to S 231 Levee 5 Reach\05 Extra Workkemove added treesremove added trees
Scope: Remove toti'sfl0rtioes zm0 Qhj',; ar,tf*d - dllth'4ttm)ps EA
Price includes all cost to cut, remove stumps and haul away debris
IA Labor: Rate/MH No. Hours / Day Days Subtotal:
Operator 6133 2 8.00 1.00 981.28
Climber/Laborer 52.24 1 8.00 1.00 417.92
Foreman 64.17 1 8.00 1.00 S13.36
Subtotal Labor: 1,912.56
Labor Markup 29% 554.64
1 B Equipment: Rate/Hr No. Hours/ Day Days Subtotal:
Komatsu PC 200 78.00 1 8.00 1.00 624.00
Ford 1 Ton Toot Truck 16.48 1 8.00 1.00 131.84
Foreman Truck 16.48 1 8.00 1.00 131.84
Rental Man Lift 767.11 1 1.00 1.00 767.11
Subtotal Equipment: 2,214.79
Equipment Markup 21% 465.11
1C Subcontractors Quantity UM Cost/Unit Subtotal:
Subtotal Subs: -
Subcontractor Markup 12%
1D Materials Quantity UM Cost/Unit Subtotal:
DumpFee's 2 LDS S 1,100.00 1.00 2,200.00
Subtotal Materials: 2,200.00
Materials Markup 21% 462.00
Subtotal Items lA-iD 7,809.TO
i
I
Total Addtforal tosi lA-1D S 7?3Qb CQ=
P i f
Y6Z .tx>
yt,S, rr
53 r1r '(W ,
8_1 _3
� t5 ;5m
I
Barry, Jason
From: Tyson Lashbrook <tyson@sciinfrastructure.com>
Sent: Monday, November 17, 2014 3:49 PM
To: Barry,Jason
Cc: Jennifer Scoccolo
Subject: Pricing for Changes
Attachments: 0305_001.pdf
Jason
Here is the change order pricing
From: copier@sciinfrastructure.com [mailto:copier@sciinfrastructure.com]
Sent: Monday, November 17, 2014 3:49 PM
To:Tyson Lashbrook
Subject:Attached Image
I
1