Vendor Name: Puget Sound Energy
Vendor Number:
JD Edwards Number
Contract Number: H. tJi
This is assigned by City Clerk's Office
Project Name: PSE Construction Revision Agreement
Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ❑ Contract
❑ Other: Agreement
Contract Effective Date: Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Toby Hallock Department: PW Environment
Contract Amount:
Approval Authority: ❑ Department Director ❑Mayor ❑City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
PSE Construction Revision Agreement for the James Street/Russell Road Levee
Improvements
adccW10877 8 14
® PUGET SOUND ENERGY
i
COST ESTIMATE REVISION # 1
To: City of Kent Date: 9/3012014
Project Number: 101088577
Attn: Tobias Hallock Project Manager: Dennis Booth
Project: James St i Russell Rd Realignment
Description of work: The original construction plan and pricing dated 8/13/2014 was based on two phases of construction.The
first phase was to Install the underground facilities and remove the overhead on James St and install taller
poles on Russell Rd.The cost of installing the temporary taller poles on Russell was priced at 100%City
cost because they were temporary.The current construction plan calls for all construction to be
completed in one effort and with no temporary facilities required. The new underground system will be
installed,the two existing services cutover to the underground system(by others)and than the existing
overhead facilities removed. This Cost Estimate Revision(CER)credits back that portion of the original
pricing that was listed as 100%City cost.CER#2 will update the project cost to include the entire project.
Item Amount Comments
Company
Labor $
Materials $
Equipment $
Inspection $
Service Provider Outside Services $ (12,861) Includes State Sales Tax
Operating Rights $ -
Overhead $ (2,706)
Company Total $ (22,226)
Government Entity
Labor $
Operating Rights $ -
Government Entity Total $ -
Total Revision to Estimate $ (22,226)
Allocation of Revision Total
Company 0% $ -
Government Entity 100% $ (22,226)
Total Revision $ (22,226)
Note: This Cost Estimate Revision will be effective only when signed by both parties:
Puget Sound Energy City of Kent
I
Signed: Signed: „✓ -" j
Title: Title:
Date: Date:
(Please sign and return one copy)
PUGET SOUND ENERGY
3591 704 Puget Sound Energy PO Box 90868 Bellevue,WA 98009-0868 a subsidiary of PUGET ENERGY
® PUGET SOUND ENERGY
COST ESTIMATE REVISION # 2
i
To: City of Kent Date: 1016/2014
Project Number: 101088677
Attn: Tobias Hallock Project Manager: Dennis Booth
Project: James St t Russell Rd Realignment
Description of work: The original construction plan and pricing dated 8/13/2014 was based on two phases of construction.The
first phase was to Install the underground facilities and remove the overhead on James St and install taller
poles on Russell Rd.The cost of installing the temporary taller poles on Russell was priced at 100%City
cost because they were temporary.The current construction plan calls for all construction to be
completed in one effort and with no temporary facilities required. The new underground system will be
Installed,the two existing services pullover to the underground system(by others)and then the existing
overhead facilities removed. This Cost Estimate Revision(CER)includes the project costs originally
anticipated for phase 2.The City's cost to install the Duct and Vault for the phase 2 portion Is included in
the"Government Entity"section below.CER#1 credited back the cost of the temporary facilities originally
anticipated.
Item Amount Comments
Company
Labor $ -
Materials $ 61,781
Equipment $ -
Inspection $ 7,536
Service Provider Outside Services $ 63,446 Includes State Sales Tax
Operating Rights $ -
Overhead $ 20,765
Company Total $ 153,527
Government Entity
Labor $ 35,375
Operating Rights $ -
Government Entity Total $ 35,375
Total Revision to Estimate $ 188,902
Allocation of Revision Total
Company 60% $ 113,341
Government Entity 40% $ 75,561
Total Revision $ 188,902
Note: This Cost Estimate Revision will be effective only when signed by both parties:
Puget Sound Energy City of Kent
Signed: Signed:
.............---
Title: Title:
Date: Date:
(Please sign and return one copy)
i
PUGET SOUND ENERGY
159, 71N Puget Sound Energy PO Box 90868 Bellevue,WA 98009-0868 a subsidiary of PUGET ENERGY
i
e
KENT
R'ASIiIN.... Agenda Item: Consent Calendar - 70
TO: City Council
DATE: December 9, 2014
SUBJECT: Puget Sound Energy (PSE) Construction Agreement for James
Street/Russell Road Levee Improvements - Authorize
MOTION: Authorize the Mayor to sign two cost revision change orders with
Puget Sound Energy for the James Street/Russell Road Realignment
Project, upon terms acceptable to the Public Works Director and City
Attorney.
SUMMARY: The focus of the project is to construct a portion of the South Reach
Levee adjacent to the James Street and Russell Road intersection. The intersection will
be setback further away from the Green River and a concrete retaining wall will be
constructed along the Public Works Operations facility to reduce impacts to the site.
In order to perform the above-described work, existing overhead Puget Sound Energy
(PSE) lines will need to be relocated underground. A construction agreement with PSE
was executed on August 25, 2014. When preparing the agreement, it was assumed
that utility relocation would take place in two phases over 2014 and 2015, which
would require a separate PSE agreement for the work completed in 2015. The
contractor has proposed a schedule that will allow all utility work to be completed in
2014. There will be no additional cost to the City for this change.
PSE has provided two cost revision estimates for the change orders. The first removes
temporary work that is no longer required due to this change and the second includes
the work that would have been added in a new construction agreement in 2015.
Kent's cost share for PSE's work is estimated to be $101,135.
EXHIBITS: (1) Amendments No. 1 & 2 to Construction Agreement; (2) Construction
Agreement, dated August 14, 2014; (3) PSE Change Orders memorandum; (4) PSE
Cost Estimate Revision #1; and (5) PSE Cost Estimate Revision #2
i
RECOMMENDED BY: Public Works Committee j
YEA: Ralph - Fincher - Higgins NAY:
I
BUDGET IMPACTS: There is no impact to the budget as funding will be reimbursed
by the King County Flood Control District through an Interlocal Agreement on this
project.
REQUEST FOR MAYOR'S SIGNATU E
®
� � , Please Fill in All Applicable Sores---_.
g
Re" _,_,• Reviewed by Director '
Originator's Name: Cheryl Viseth Dept/Div. PW'En ineerin Extension: 5504
Date Sent: 12/11/2014 Date Required: 12/16/2014
Return to: Cheryl Viseth/Toby Hallock CONTRACT TERMINATION DATE: NA
VENDOR: Puget Sound Energy DATE OF COUNCIL APPROVAL: 12/9/2014
ATTACH THE COUNCIL. MOTION) SHEET FOR THE MAYOR - if applicable
Brief Explanation of Document:
The Puget Sound Energy';(PSE) Construction Revision Agreement is for the James
Street/Russell Road Levee Improvements.
In order to complete the project, existing overhead PSE lines will need to be relocated
underground. A construction agreement with PSE was signed on August 24, 2014. The
contractor has proposed a schedule that will allow all utility work to be completed in
2014 instead of 2015. The two amendments are attached.
Funding will be reimbursed by the King County Flood Control District through an
Interlocal Agreement.
All Contracts Must Be Routed Through The Law Department
(This area to be completed by the Law Department)
Received:
Approval of Law Dept..
Law Dept. Comments
Date Forwarded to Mayor;
Shaded Areas To Be Completed By Administration Staff
Received:
s,. kt AnN iaYs
S
Recommendations and Comments:
Disposition:
Date Returned: