Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW14-208 - Original - Dunkin & Bush, Inc. - 3.5 Million Gallon Reservoir - 08/21/2014
w3�v yj �+y, Records Mana en { KEN Document Wp9HINGT.N 5.§v..}T x sd V. �3 r' .. CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. j I i Vendor Name: Dunkin & Bush, Inc. Vendor Number: JD Edwards Number Contract Number: 1 This is assigned by City Clerk's Office Project Name: 3.5 Million Gallon Reservoir Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: Date of the Mayor's signature Termination Date: 10/31/14 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Kevin Swinford Department: PW Operations Detail: (i.e. address, location, parcel number, tax id, etc.): Clean the exterior of the reservoir which is located at 12533 SE 2861h Place, Auburn, WA. i S:Public\RecordsManagement\Forms\ContractCover\adcc7832 ( 11/08 • [PENT Agenda Item: Consent Calendar - 7F `Nn51iiNOicN it TO: City Council DATE: August 19, 2014 SUBJECT: Public Works Agreement with Dunkin & Bush, Inc. for Cleaning Water Tank Exterior - Authorize I MOTION: Authorize the Mayor to sign a Public Works Agreement with Dunkin and Bush Inc., in an amount not to exceed $28,470.00 for exterior tank cleaning at the 3.5 million gallon reservoir, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. SUMMARY: The City of Kent Water Division operates and maintains 9 reservoirs within the City's water service area. The paint coating of each tank is thoroughly inspected and cleaned every five years. The 3.5 million gallon reservoir is located on the east hill and is one of our largest tanks at 126 feet tall. This tank's exterior coating is in need of cleaning. Interior inspection and cleaning was completed in February by City staff. The contractor will use high lift equipment to reach the entire exterior surface of the tank. Cleaning will be performed in a manner that will prevent damage to the exterior coating. EXHIBITS: Dunkin and Bush Inc., Public Works Agreement RECOMMENDED BY: Public Works Committee YEA: Fincher - Ralph NAY: BUDGET IMPACTS: Funding for this work is included in the water utility operating budget. i PUBLIC WORKS ENGINEERING Timothy J. LaPorte P.E., Public Works Director /■1�` Phone: 253-856-5500 Fax; 253-856-6500 ' KENT wa S H I N G T O N Address: 400 West Gowe Kent, WA. 98032-5895 i Date: June god 2014 To: Sean Bauer, Water Superintendent From: Kevin R Swinford, Source and Supply Supervisor Subject: 3.5 Exterior Tank Cleaning Our 3.5 million gallon reservoir located at 12533 Se 286th Place, Auburn WA is due for exterior cleaning. As you are aware this tank is not feasible for Water Department staff to clean due to its overall height and associated fall restraint requirements. I have contacted local area companies that specialize in this type of work to provide us with quotes for service based on a provided scope of work. The following three companies were contacted in which two provided pricing. The third company expressed interest but failed to submit a quote. Quotes include Washington State Prevailing Wage less WSST. Dunkin and Bush, Inc. - $26,000.00 Coatings Unlimited, Inc. - $26,500.00 Washington Marine Cleaning, LLC No Response Attached for your review and approval are the quotes from the vendors, the scope of work and a request for contract (Goods and Services Agreement) Let me know if you have any questions or need additional information. y•�� II K�IV W1.Nix�ron i PUBLIC WORKS AGREEMENT between City of Kent and Dunkin & Bush, Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Dunkin & Bush, Inc. organized under the laws of the State of Washington, located and doing business at PO Box 97080, Kirkland, WA 98083, Phone: (425) 885-7064/Fax: (425) 885-3790, Contact: Nik Carlstorm (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall perform exterior tank cleaning services at the 3.5 million gallon reservoir which is located at 12533 SE 286th Place, Auburn, WA. For a description, see the Scope of Work and Contractor's quote which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. I II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, the Contractor shall complete the work described in Section I by October 31, 2014. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Twenty Eight Thousand, Four Hundred Seventy Dollars ($28,470.00), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $35,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and PUBLIC WORKS AGREEMENT - 1 (Over$1OK, under$35K, and No Performance Bond) performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be PUBLIC WORKS AGREEMENT - 2 (over$1 OK, under$35K, and No Performance Bond) required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor, D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D}, I within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City j will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to PUBLIC WORKS AGREEMENT - 3 (Over$1OK, under$35K, and No Performance Bond) require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. i VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. i B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are I followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. PUBLIC WORKS AGREEMENT - 4 (Over$IOK, under$35K, and No Performance Bond) C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy j Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. I PUBLIC WORKS AGREEMENT - 5 (Over$1OK, under$35K, and No Performance Bond) i I Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF j THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. i In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by j and construed in accordance with the laws of the State of Washington. If the parties are unable j to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this PUBLIC WORKS AGREEMENT - 6 (Over$1OK, under$35K, and No Performance Band) i Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment, Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Over$10K, under$35K, and No Performance Bond) J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. I IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: ,f By:. By: (sr` n'atu (signature) Print Name: Deidre Dunkin Print Namer` Suzette Cooke Its President I•ts / Mayor ,� 1� DATE: July 17 , 2014 DATE:jV zz- NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: I CONTRACTOR: CITY OF KENT: Shawn Harju Timothy J. LaPorte, P.E. Dunkin & Bush, Inc. City of Kent PO Box 97080 220 Fourth Avenue South Kirkland, WA 98083 Kent, WA 98032 (425) 885-7064 (telephone) (253) 856-5500 (telephone) (425) 885-3790 (facsimile) (253) 856-6500 (facsimile) APPR VED AS; TCY FOR : t Kent Law Department Dunkin&Bush-3.5 Reservoir C1en1,g/Svinf.,d i PUBLIC WORKS AGREEMENT 8 (Over$1OK, under$35K, and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signi below, gr o fu 'Il the five requirements referenced above. By: f� I For: Dunkin & Bush, Inc. Title: president Date: July 17 2014 i i i EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor i POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. i Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments, 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. I EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. i I I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: i i EEO COMPLIANCE DOCUMENTS - 3 EXHIBIT A Scope of Work: Dunkin &Bush, Inc. will provide the labor, materials and equipment to clean the exterior surface of the City of Kent Water Departments 3.5 million gallon water tank. Cleaning will be done with high pressure water jetting in such a manner as to not damage exterior coating. If coating damage occurs contractor Is prepared to repair up to 5 square feet of coating matching color to the City's satisfaction. The City of Kent will provide the following: • Note: Access to site is restricted(City will provide a key) for duration of project • Unlimited potable water will be provided • Backfiow protection(R.P) will be provided • 15amp electrical service will be provided Special notes: • The site offers good general access to the tank. There Is good compacted gravel access 360 degrees around the tank although width narrows slightly on the south side to approx. 12 feet • Tank will remain online during cleaning so provisions shall be made by contractor to prevent over spray into vent/screen assembly • The site is gated, fenced and locked but is not monitored. It will be the contractors responsibility to remove, secure and/or lock all equipment (this Includes any City provided equipment) prior to leaving the site. The City will not be responsible for any missing equipment. Restrictions: • Days of operation will be confined to those day(s) in which Public Works operates. Current schedule is a 9/80 Monday thru Friday with every other Friday off. • Hours of operation will be 7am-4pm. I I I I ' I I I DUNKIN & BUSH, INC. Industrial Contractors Since 1943 May 29,2014 C erri�,-,�ie7Yd Mr,Kevin Swinford Cei%' t�nvu nvrtrons&nmpmn Source and Supply Supervisor Public Works Department A wnsNC-Cerdrled 220 Fourth Avenue South Women'.,Bn imn Enterprise Kent,WA 98032 RE: Pressure Wash Water Tower D&B Quote#114158 Dear Mr. Swinford, We propose to furnish all labor,D&B equipment and supervision necessary to accomplish the work as set forth in our scope of work below and the following clarifications. Scope of work: • Access and wash 74'Dx110'H water tank in Vent,WA. • Access to tank will be from a 135'mardift. I Specification: • Pressure wash all areas of exterior to SSPC SP12 (high pressure water jetting). Price: $26,000,00 Clarifications and representations: 1, Our price is valid for 30 days and excludes sales/use tax. 2, Our price is based on the local prevailing wage rate. 3. Customer to provide wash water and power. 4. Should others need to utilize the area,our price does not include contingencies for down time. 5. We would like a 2 week lead time to secure labor and materials. 6. Price includes up to 5 SF of touchup painting with specified system. `thank you for this opportunity to quote on your work. If you have any questions please call me at 425.885.7064 or email at ncarlstroin@a dunkinandbush corn. Regards, 1Z4 �- Nik Carlstrom Associate Estimator COJ2PORATE 0rFICP I RO,Box 97080 1 Kirkland,WA 98083 1 Phone 425,885.7064 1 Fax 425.885,3790 j Kirkland, WA I Bellingham,WA. I Portion([,OR I Kenai, AK Bakersfield,CA I Honolulu,111 1 Salt Lake City,UT j EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's j insurance and shall not contribute with it. I I j I EXHIBIT B (Continued) 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. DUNKI-1 OP ID: GI III ACOR® DATE(MMlDD YYY CERTIFICATE OF LIABILITY INSURANCE 06118114 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les) most be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsements). PRODUCER CONTACT Hub International Northwest 426-489.4501 NAME; P.O.Box 3018 425-489-4501 PHONE No,Ext)� aC No Bothell,WA 98041-3018 E-MAIL Andy Prill ADDRESS: _ INSURER(S)AFFORDING COVERAGE NAIC9 INSURER A:Zurich American Insurance Co. 16536 INSURED Dunkin&Bush,Inc. INSURERB:Steadfast Ins Co P.O.Box 97080 Starr Indemnity&Liability Cc INSURERC N Y 38318 Kirkland,WA 98083 ---- -- -- -- INSURER D INSURER E _.. _ INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR AODBR POLICYEFF POLICYEXP TYPE OF INSURANCE LTR .. IN$R Me POLICYNUMBER __. MMIDDeCTIT MWOD/YYYY LIMITS, GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY X GLA3999932-06 10/04/13 10101/14 PREMISES NI,NI tU rrence) $ 300,000 CLAIMS-MADE X_1 OCCUR �I MED EXP(Any one Peron) i..$ 10,000 X Oemer/Coot Prot. PERSONAL&ADV INJURY I..S 1,000,000 X Stop Gap Llab GENERAL AGGREGATE S 2,000,000 fGENT AGGREGATE LIMIT APPLIES PER: PRODUCTS CCMPlOP AGO S 2,000,000 POLICY X PE° LOU Emp Ben. $ 1,000,000 AUTOMOBILE LIABILITY (Ea aceden COMBINED SINGLE LIMIT 1,000,000 A X ANY AUTO X GLA3999932-05 10/01/13 10/01/14 BODILY INJURY(Per person) S ALLOWNED SCHEDULED AUTOS AUTOS li BODILY INJURY(Par acGdenq $ NON-OWNED I PROPERTY DAMAGE $ HIREDAUTOS AUTOS (Peraecitlent) )( UMBRELLA LIAR X OCCUR j i EACH OCCURRENCE $ 1,000,000 C EXCESS LIAR I CLAIMS MADE! X 1000020397 10/01/13 1 10/01/14 (AGGREGATE.. S 1,000,000 DED X RETENTIONS _ S WORKERS COMPENSATION WCSTATU- OTH AND EMPLOYERS'LIASILITY _ TOR Y LIMITS X ER A ANY PROPRIETOR/PARTNER/EXECUTIVE YIN GLA3999932A6 10/01/13 10101/14 EL EACH ACCIDENT L.$ 1,000,000 !OFFICERIMEMBER EXCLUDED? .NIA I ;(Mandatory in Mu WA STOP GAP E.L.DISEASE-EA EMPLOYEES 1,000,000 If DESCRIPTION OF OPERATIONS below _ _ _ E.L.DISEASE-POLICY LIMIT I $ 1,000,000 ! _ B PROF/POLL E0059333604 10/01N3 10/01/14 OCCIAGG: 1,000,00 ''.. ',. ',. ,LIABILITY DESCRIPTION OF OPERATIONS I LOCATIONS l VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) ADDITIONAL INSURED REQUIRED BY WRITTEN CONTRACT: THE CITY OF KENT. COVERAGE IS PRIMARY & NON—CONTRIBUTORY. SEE ATTACHED AT (GL/AUTO) & ONGOING/COMPLETED OPS ENDORSEMENTS. UMBRELLA LIABILITY POLICY IS FOLLOW FORM. RE: ANY & ALL OPERATIONS OF THE NAMED INSURED ON — EXTERIOR TANK CLEANING, 3.5 MILLION GALLON RESEVOIR LOCATED AT 12533 BE 286TH PLACE, AUBURN, WA. CERTIFICATE HOLDER CANCELLATION CITY OF SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE CITY OF KENT THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. A WASHINGTON MUNICIPAL CORP. PUBLIC WORKS DEPARTMENT AUTHORIZED REPRESENTATIVE 220 FOURTH AVENUE SOUTH .KENT,WA 98032 ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010106) The ACORD name and logo are registered marks of ACORD i Am tl ° Sc �tl Ij mm�+ Ra 88 121 � " o d ui v: ci 3 a C 'i666 a oE ' Tg. h', s3h t N �FL rg OT`� V A vA NV1 cai R UUZ. CU� �` W oNC° o b 13 EF 5 m .°cd o 0 0 'v� o a 5 � w o-y FL q E 'a o = mao �'" aai = �.� 9"' ''75 JE E 3 8 12 9 .. xo.i-`o�� � N me x1 ry t� COMMERCIAL GENERAL LIABILITY CG 25 03 05 09 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART I SCHEDULE Designated Construction Project(s): VARIOUS PROJECTS. Information required to complete this Schedule, if not shown above,will be shown in the Declarations. A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for obligated to pay as damages caused by "occur- damages or under Coverage C for medical rences"under Section I—Coverage A,and for all expenses shall reduce the Designated Con- medical expenses caused by accidents under struction Project General Aggregate Limit for Section I — Coverage C, which can be attributed that designated construction project. Such only to ongoing operations at a single designated payments shall not reduce the General Ag- construction project shown in the Schedule gregate Limit shown in the Declarations nor above: shall they reduce any other Designated Con- 1. A separate Designated Construction Project struction Project General Aggregate Limit for General Aggregate Limit applies to each des- any other designated construction project ignated construction project, and that limit is shown in the Schedule above, equal to the amount of the General Aggregate 4. The limits shown In the Declarations for Each Limit shown in the Declarations. Occurrence, Damage To Premises Rented To 2. The Designated Construction Project General You and Medical Expense continue to apply. Aggregate Limit is the most we will pay for the However, instead of being subject to the sum of all damages under Coverage A, ex- General Aggregate Limit shown in the Decla- rations, such limits will be subject to the appli- "property ages damage" included of in the "injury or cable Designated Construction Project Gen- completed operations hazard", and for medi- cal expenses under Coverage C regardless of the number of: a. Insureds; b. Claims made or"suits" brought; or c. Persons or organizations making claims or bringing "suits CG 25 03 05 09 O Insurance Services Office, Inc., 2008 Page 1 of 2 ❑ B. For all sums which the insured becomes legally C. When coverage for liability arising out of the obligated to pay as damages caused by "OGCur- "products-completed operations hazard" is pro- rences" under Section I— Coverage A, and for all vided, any payments for damages because of medical expenses caused by accidents under "bodily injury" or "property damage" included in Section I — Coverage C, which cannot be attrib- the "products-completed operations hazard" will uted only to ongoing operations at a single des- reduce the Products-completed Operations Ag- ignated construction project shown in the Sched- gregate Limit, and not reduce the General Ag- ule above: gregate Limit nor the Designated Construction 1. Any payments made under Coverage A for Project General Aggregate Limit. damages or under Coverage C for medical D. If the applicable designated construction project expenses shall reduce the amount available has been abandoned, delayed, or abandoned under the General Aggregate Limit or the and then restarted, or if the authorized contract- Products-completed Operations Aggregate ing parties deviate from plans, blueprints, de- Limit, whichever is applicable; and signs, specifications or timetables, the project will 2. Such payments shall not reduce any Desig- still be deemed to be the same construction pro- nated Construction Project General Aggre- ject. gate Limit. E. The provisions of Section III — Limits Of Insur- ance not otherwise modified by this endorsement shall continue to apply as stipulated. i I I I I i I' I I I I Page 2 of 2 ©Insurance Services Office, Inc., 2008 CG 25 03 05 09 ❑ i t i POLICY NUMBER: GLA399932-05 COMMERCIAL AUTO CA 20 48 02 99 j THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are"insureds"under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective: Countersigned By: Named Insured: Authorized Re resentative SCHEDULE Name of Person(s) or Organization(s): ANY PERSON OR ORGANIZATION TO WHOM OR WHICH YOU ARE REQUIRED TO PROVIDE ADDITIONAL INSURED STATUS OR ADDITIONAL INSURED STATUS ON A PRIMARY, NON—CONTRIBUTORY BASIS, IN A WRITTEN CONTRACT OR WRITTEN AGREEMENT EXECUTED PRIOR TO LOSS, EXCEPT WHERE SUCH CONTRACT OR AGREEMENT IS PROHIBITED BY LAW. li (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to the endorsement.) Each person or organization shown in the Schedule is an "insured"for Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. CA 20 48 02 99 Copyright, Insurance Services Office, Inc., 1998 Page 1 of 1 ❑ Insured copy i Page 1 of 17 III State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 6/11/2014 Count Trade Job Classification Wage Holiday Overtime Note King Asbestos Abatement Workers Journey Level $41.69 5D 1H King Boilermakers Journey Level $64.44 5N I King Brid<Mason Brick And Block Finisher $43.26 5A I King Brick Mason Journey Level $50.12 5A 1M King Brick Mason Pointer-Caulker-Cteaner $50.12 5A 1M King Building Service Employees Janitor $20.59 5S 2F King Building Service Employees Traveling Waxer/Shampooer $21.00 5S 2F King BuMinQ Service Employees Window Cleaner (Non-Scaffold) $24.29 5S 2F King Buildine Service Employees Window Cleaner (Scaffold) $25.15 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $50.82 5D 1M King Carpenters Bridge, Dock And Wharf $50.82 5D 1M Carpenters King Carpenters Carpenter $50.82 5D 1M King Carpenters Carpenters on Stationary Tools $50.95 5D 1M King Carpenters Creosoted Material $50.92 5D 1M King Carpenters Floor Finisher $50.82 5D 1M King Carpenters Floor Layer $50.82 5D 1M King Carpenters Scaffold Erector $50.82 5D 1M King Cement Masons Journey Level $51.18 7A 1M King Divers a Tenders Diver $105.37 5D 1M 8A King Divers $ Tenders Diver On Standby $59.50 5D 1M King Divers Et Tenders Diver Tender $54.82 5D 1M King Divers E# Tenders Surface Rcv & Roy Operator $54.82 5D 1M King Divers 8 Tenders Surface Rcv 8 Rov Operator $51.07 5A 1B Tender King Dredge Workers Assistant Engineer $53.00 5D 3F King aredge Workers Assistant Mate (Deckhand) $52.58 5D 3F Page 2 of 17 King Dredge Workers Boatmen $52.301 51D L I King PLed e Workers Engineer Welder $54.04 SID 3F --g— King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King Dredge Workers Mates $52.30 BID 3F King Dredo(LkYorkers Oiler $52.58 So 3F King 2MLrat Applicator Journey Level $50.82 5D I H King DryVatt Takers Journey Level $50.87 5P I E King Electrical Fixture Maintenance Journey Level $25.84$5L JE Workers King Electricians - Inside Cable Splicer __$65.69 7C 2W King Electricians - Inside Cable Splicer (tunnel) _$70.52 7C 2W King Electricians -_Inside Certified Welder $63.491 7C 2W King Electricians - Inside Certified Welder (tunnel) $68.101 ZC 2W King Electricians - Inside Construction Stock Person $35.691 7C 2W King Electricians - Inside Journey Level $61.301 ZC 2W Electric ians ricians - Inside Journey Level (tunnel) $65.69 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $68.33 5A 4A !Construction King Electricians - Powerline Certified Line Welder $62.50 5A 4A �Construction King Electricians - Powerline Groundperson $42.56 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $62.50 5A 4A Construction Operator King Electricians - Powerline Journey Level Lineperson $62.50 5A 4A Construction I King Electricians - Powerline Line Equipment Operator $52.47 5A 4A Construction King Electricians - Powerline Pole Sprayer $62.50 5A 4A Construction King Electricians - Powerline Powderperson __$46 55 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $80.14 7D 4A King Elevator Constructors Mechanic In Charge $86.77 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.25 5B IR Products Work Only King Fence�Erectors Fence Erector $15.18 1 King fja�gai s Journey Level $35.341 ZA 31 King Glaziers Journey Level $53.76 7L Ey heat—Et journeyman $58.93 5J is King Frost insulators And Asbestos Workers King Hearing Equipment Mechanics Journey Level $69.37 7F 1E King Hod Carriers ft Mason Tenders Journey Level $42.99 7A —31 King Industrial Power Vacuum lJourney Level $9.32 1 https://fortress.wa.gov/lni/wagelookup/prvWagelo*okup.aspx 6/11/2014 Page 3 of 17 Cleaner I King Inland Boatmen Boat Operator $54.57 5B 1K King Inland Boatmen Cook $50.95 5B 1K King Inland Boatmen Dockhand $51.19 5B 1K - t King Inland Boatmen Dockhand Engineer $52.18 5B 11K King Inland Boatmen Launch Operator $53.40 5B 1K King Inland Boatmen Mate $53.40 5B 1K King Inspection/Cteanin /Seating Of Cleaner Operator, Foamer $31.49 1 Sewer d: Water Systems By Operator Remote Control King nspectionlCleaninq/Sealing Of Grout Truck Operator $11.48 1 Sewer Ec Water Systems B Remote Control King Inspection/Cleaning/Sealirro Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleanin /Sealing Of Technician $19.33 1 Sewer E* Water Svstems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Sy. tems By Remote Control King Insulation Applicators Journey Level $50.82 5D 1M King Ironworkers Journeyman $59.77 7N 10 King Laborers Air, Gas Or Electric Vibrating $41.69 7A 31 Screed King Laborers Airtrac Drill Operator $42.99 7A 31 King Laborers Ballast Regular Machine $41.69 7A 31 King Laborers Batch Weighman $35.34 - 31 King Laborers Brick Pavers $41.69 7A 31 King Laborers Brush Cutter $41.69 7A 31 King Laborers Brush Hog Feeder $41.69 7A 31 King Laborers Burner $41.69 7A 31 King Laborers Caisson Worker $42.99 7A 31 King Laborers Carpenter Tender $41.69 7A 31 King Laborers Caulker $41.69 7A 31 King Laborers Cement Dumper-paving $42.46 7A 31 King Laborers Cement Finisher Tender $41.69 7A 31 King Laborers Change House Or Dry Shack $41.69 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $41.69 7A 31 King Laborers Chipping Gun(30 Lbs. And $42.46 7A 31 Over) King Laborers Choker Setter $41.69 7A 31 King Laborers Chuck Tender $41.69 #7AE31King Laborers Clary Power Spreader $42.46 31King Laborers Clean-up Laborer $41.64 31 King Laborers Concrete Dumper/chute $42.46 7A 31 Page 4 of 17 I Operator King Laborers Concrete Form Stripper $41.69 7A 31 King Laborers Concrete Placement Crew $42.46 7A 31 King Laborers Concrete Saw Operator/core $42.46 7A 3t Driller King Laborers Crusher Feeder $35.34 7A 31 King Laborers Curing Laborer $41.69 7A 31 King Laborers Demolition: Wrecking 8 Moving $41.69 7A 31 (incl. Charred Material) King Laborers Ditch Digger $41.69 7A 31 j King Laborers Diver $42.99 7A 31 I King Laborers Drill Operator $42.46 7A 31 (hydraulic,diamond) King Laborers Dry Stack Watts $41.69 7A 31 King Laborers Dump Person $41.69 7A 31 King Laborers Epoxy Technician $41.69 7A 31 King Laborers Erosion Control Worker $41.69 7A 31 King Laborers Fatter & Bucker Chain Saw $42.46 7A 31 King Laborers Fine Graders $41.69 7A 31 King Laborers Firewatch $35.34 7A 31 King Laborers Fotm Setter $41.69 7A 31 King Laborers Gabian Basket Builders $41.69 7A 31 King Laborers General Laborer $41.69 7A 31 King Laborers Grade Checker 8 Transit $42.99 7A 31 Person King Laborers Grinders $41.69 7A 31 King Laborers Grout Machine Tender $41.69 7A 31 King Laborers Groutmen (pressure)including $42.46 7A 31 Post Tension Beams King Leba_ers Guardrail Erector $41.69 7A 31 King Laborers Hazardous Waste Worker (level $42.99 7A 31 A) i King Laborers Hazardous Waste Worker (level $42.46 7A 31 B) King Laborers Hazardous Waste Worker (level $41.69 7A 31 C) King Laborers High Scaler $42.99 7A 31 King Laborers Jackhammer $42.46 7A 31 King Laborers Laserbeam Operator $42.46 7A 31 King Laborers Maintenance Person $41.69 7A 31 King Laborers Manhole Builder-mudman $42.46 7A 31 King Laborers Material Yard Person $41.69 7A 31 King Laborers Motorman-dinky Locomotive $42.46 7A 31 King Laborers Nozzleman (concrete Pump, $42.46 7A 31 Green Cutter When Using Combination Of High Pressure Air t Water On Concrete a httr)s://fortress.wa.govJlni/wagelookup/prvWagelookup.aspx 6/11/2014 i Page 5 of 17 I Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $42.46 7A 31 King Laborers Pilot Car $35.34 7A 31 King Laborers Pipe Layer Lead $42.99 7A 31 King Laborers Pipe Layer/tailor $42.46 7A 31 King Laborers Pipe Pot Tender $42.46 7A 31 King Laborers Pipe Refiner $42.46 7A 31 King Laborers Pipe Wrapper $42,46 7A 31 King Laborers Pot Tender $41.69 7A 31 King Laborers Powderman $42.99 7A 31 King Laborers Powderman's Helper $41,69 7A 31 King Laborers Power Jacks $42.46 7A 31 King Laborers Railroad Spike Putter - Power $42.46 7A 31 King Laborers Raker - Asphalt $42.99 7A 31 King Laborers Re-timberman $42.99 7A 31 King Laborers Remote Equipment Operator $42.46 7A 31 King Laborers Riggerlsignal Person $42.46 7A 31 King Laborers Rip Rap Person $41.69 7A 31 King Laborers Rivet Buster $42.46 7A 31 King Laborers Redder $42.46 7A 31 King Laborers Scaffold Erector $41.69 7A 31 King Laborers Scale Person $41.69 7A 31 King Laborers Sloper (over 20") $42.46 7A 31 King Laborers Stoper Sprayer $41.69 7A 31 King Laborers Spreader (concrete) $42.46 7A 31 King Laborers Stake Hopper $41.69 7A 31 King Laborers Stock Piler $41.69 7A 31 King Laborers Tamper Et Similar Electric, Air $42.46 7A 31 &Gas Operated Tools King Lahorers Tamper (multiple 8 Self- $42.46 7A 31 propelled) King Laborers Timber Person - Sewer (lagger, $42.46 7A 31 Shorer 8 Cribber) King Laborers Toolroom Person (at Jobsite) $41.69 7A 31 King Laborers Topper $41.69 7A 31 King Laborers Track Laborer $41.69 7A 31 King Laborers Track Liner (power) $42.46 7A 31 King Laborers Traffic Control Laborer $37.79 7A 31 8R King Laborers Traffic Control Supervisor $37.79 7A 31 8R King Laborers Truck Spotter $41.69 7A 31 King Laborers Tugger Operator $42.46 7A 31- King Laborers Tunnel Work-Compressed Air $60.06 7A 31 8C Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $65.09 7A�31AQ . n ti111 I')l11A i Page 6 of 17 Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $68.77 7A 31 Worker 44.01.54.00 psi King Laborers Tunnel Work-Compressed Air $74.47 7A 31 88 Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $76.59 7A 31 8�C Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $81.69 7A 31 i Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $83.59 7A 31 88 Worker 68,01-70.00 psi j King Laborers Tunnel Work-Compressed Air $85.59 7A 31 8g- Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $87.59 7A 31 Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $43.09 7A 31 Tender King Laborers Tunnel Work-Miner $43.09 7A 31 M King Laborers Vibrator $42.46 7A 31 King Laborers Vinyl Seamer $41.69 7A 31 King Laborers Watchman $32.12 7A 31 King Laborers Welder $42.46 7A 31 King Laborers Well Point Laborer $42.46 7A 31 King Laborers Window Washer/cleaner $32.12 7A 31 King Laborers - Underground Sewer General Laborer Ft Topman $41.69 7A 31 & Water King Laborers - Uilderoround Sewer Pipe Layer $42.46 7A 31 Ft Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape C.nnstructi0n Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers I King Lathers Journey Level $50.82 5D 1H King Marble Setters Journey Level $50.12 5A 1M King Metal Fabrication (In Shopt Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In ShoppJ Painter $11.10 1 King Metal Fabrication (in Shop) Welder $15.48 1 King Millwroht Journey Level $51.92 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 a. ov Ini wa elooku rvWa elooku .as x 6 11 2014 httNs://f�rtress,w g / 1 � NIN � N N 1 / i Page 7 of 17 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Weider $11.56 1 King Painters Journey Level $37.80 6Z 2B King Pile Driver Journey Level $51.07 5D 1M King Plasterers Journey Level $49.29 7M 1R King Playground & Park Equipment Journey Level $9.32 1 Installers King Plumbers Et Pipefitters Journey Level $73.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $53.49 7A 3C 8P King Power Equipment Operators Assistant Engineer $50.22 7A 3C 2P King Power Equipment Operators Barrier Machine (zipper) $53.00 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $53.00 7A 3C 8P Concrete King Power Equipment Operators Bobcat $50.22 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $50.22 7A 3C 8P Equipment King Power Equipment Operators Brooms $50.22 7A 3C 8P King Power Equipment Operators Bump Cutter $53.00 7A 3C 8P King Power Equipment Operators Cableways $53.49 7A 3C 8P King Power Equipment Operators Chipper $53.00 7A 3C 8P King Power Equipment Operators Compressor $50.22 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $53.49 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $50.22 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $52.58 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $53.00 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment 0 er�ators Conveyors $52.58 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $53.00 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $54.04 7A 3C 8P Tons, Or 150'Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P Or 250'Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $53.49 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) i King Power Equipment O erp ators Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Under I K/11 nn14 Page 8 of 17 King pcvLer L Cranes: Friction 100 Tons $54.61 7A 3C 8P Through 199 Tons King Power Equipment operators Cranes: Friction Over 200 Tons $55.17 ZAA 3C 8P King Power E ui meat 0 erators Cranes: Over 300 Tons Or 300' $55.17 ZA_ 3C 8P Of Boom (including Jib With Attachments) King LQwqr Fgui ment Operators Cranes: Through 19 Tons With $52.58 _7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators lip rs Crusher $53.00 ZA_ 3C 8P e::r:_E:q Deck Engineer/deck Winches $53.00 7A 8P King Power —ui grpe n�s 3C(power) II King Power Equipment Operators Derricks, On Building Work $53.49 7A 3C SP King Power Equipment OjL rjatqLs Dozers D-9 It Under $52.58 7A 3C 8P q--_ King Lower Eguiptnent Operators Drill Oilers: Auger Type, Truck $52.58 7A 3C 8P Or Crane Mount I I King Power Equipment Drilling Machine $53.001 ZA I 3C 8P King Power Equipment Operators Elevator And Man-lift: $50.22 7A 3C BP Permanent And Shaft Type King Power Equipment. Operators Finishing Machine, Bidwell And $53.00 7A 3C 8P Gamaco a Similar Equipment King Power ui Equipment........q_ Operators Forklift: 3000 Lbs And Over $52.58 7A 3C 813 With Attachments King Power Equipment op — —Operators Forklifts: Under 3000 Lbs. With $50.22 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue __$53.001 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $50.221 7A i—C 8P King Power Eg jp rent Operators Guardrail Punch $53.001 ZA 3C 8P King Power Equinment Operators Hard Tail End Dump $53.49 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over King Lowe�rE ujQjjlgpt Operators Hard Tait End Dump __$53.00 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $52.58 7A 3C 813 Locator King Horizontal/directional Drill $53.00 7A 3C 8P Operator King Pow er Equinment operators Hydralifts/boom Trucks Over $52.58 7A 3C 8P 10 Tons King Lower Equipment Operators Hydralifts/boom Trucks, 10 $50.22 7A 3C 8P Tons And Under King Lower Eqqjament Operators Loader, Overhead 8 Yards. tt $54.04 7A 3C 8P Over King Lower_E_guipment Operators Loader, Overhead, 6 Yards. But $53.49 ZA 3C 8P Not Including 8 Yards I King LqApr Equipment 0qerators Loaders, Overhead Under 6 $53.00 ZA 3C 8P Yards https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/11/2014 Page 9 of 17 King Eq!Aer Equipment Operators Loaders, Plant Feed $53.00 7A ac- Ap —E King Power Equipment Loaders: Elevating Type Belt $52.58 7A 2c- EP 00 7A King Power Equipment Operators Locomotives, AtI. $53E.00 E 3C 8PKing Power Equipment 0 erators Material Transfer Device $53.00 7A 3C 8P Kingpower Equ pment Operators Mechanics, All (teadmen - $54.04 ZA 2-C 8P $0,50 Per Hour Over Mechanic) King Power EQUiDoleliLOp erators Motor Patrol Grader - Non- $52.58 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $53.49 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $50.22 7A 2c- 2 Distribution Ft Mulch Seeding Operator King Power Equipment ODera Outside Hoists (elevators And $52,58 ZA- 3C 8P Mantifts), Air Tuggers,strato King PowerEguiprnent Operators Overhead, Bridge Type Crane: $53.00 7A X 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $54.04 7A 3C 8P Tons And Over King Power Equipment p Operators Overhead, Bridge Type: 45 $53.49 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $50.22 ZA 3C 8P King Power EquipmentEgujpD2jent Operators Pile Driver (other Than Crane --$53-00 ZA 2-C 8P Mount) --�5— 7A 3C 8PKing Power Equipment o ptL 2.58 Operators Plant Oiler- Asphalt, Crusher King Power Equipment_Ope rators Posthote Digger, Mechanical $50.22 7A 3C 8P King Power Equipment Operators Power Plant $50.22 7A 3C 8P King Power Equipment Operators Pumps - Water $50.22 7A 3C 8P $53.49 7A ZA King Power Equipment Operators Quad 9, Hd 41, DI 0 And Over 53.49 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $50.22 7A 2-C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $53.49 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Beltman -----�5022 ZA 3C 8P King Power Equipment Operators Rottagon $-53.49—7A 3C 8P King Reiter, Other Than Plant Mix $50.22 7A 3C SP King Power Equipment Operators Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P Materials King Power Equ pment Operators Roto-milt, Roto-grinder $53.00 7A ic- 2P King — Power Equipment Operators Saws - Concrete $52.58 7A 3C 8P King Emer Egu�ment Operators Scraper, Self Propelled Under $53.00 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete It Carry All $52.58 7A 3C 8P King pow(ILEgujqgjent Operators �Scrapers, Self-propelled: 45 $53.49 7A 2C 8P ncnv All 1 /1)()l 4 Page 10 of 17 Yards And Over King EquipmentPower f2p Operators Service Engineers - Equipment $52.58 7A ic King pqy,/��rators Shotcrete/gunite Equipment $50.22 7A E EP King power Equipment Operators Shovel , Excavator, Backhoe, $52.58 7A 3C 8P Tractors Under 15 Metric Tons. King Power Ef.11ji 2 R[qgLt operators Shovel, Excavator, Backhom $53.49 7A 3C Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power_Equj9ment 0 erato�rs Shovel, Excavator, Backhoes: $54.04 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $54.61 7A 3C 8P Over 90 Metric Tons King Power EquipmentStipform Pavers $53.49 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et $53.49 7A 3C 8P Screedman King Power EgqjQnjmt Operators Subgrader Trimmer '$53.00 ZA 3C 8P King Power Equipment Operators Tower Bucket Elevators $52.58 7A 3C 8P King Power Eljqjanent Operators Tower Crane Over 175'in $54.61 7A 3C 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $54.04 7A 3C 8P Height Base To Boom King Power Equipment ORe�tors Transporters, All Track Or $53.49 7A 3C 8p Truck Type King E21Aer Equipment Operators, Trenching Machines $52.58 7A ic King Power Eguiprneiit Operatars Truck Crane Oiler/driver- 100 $53.00 7A 3C 8P Tons And Over King Lower Equ pment Operators Truck Crane Oiler/driver Under $52.58 7A 3C 8P 100 Tons King Power Equipment Truck Mount Portable Conveyor $53.00 7A 3C 813 King Power Equipment Operators Welder $53.49 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmalt Type $50.22 7A 3C 813 King Power Yo Yo Pay Dozer $53.00 7A 3C 8p King Eq —Ver Iquji-iment Operators- Asphalt Plant Operators $53.49 7A 3C 81? Underground Sewer & Water King PowerAssistant Engineer $50.22 ZA i—C 8P Underground Sewer& Water � King Power E Barrier Machine (zipper) —$53.00 ZA 3C 8P Underground Sewer ft Water T7A _3 C 7A 3C 7A 2C 7A 3C 7A 3C King Power Batch Plant Operator, $53.00 7A 3C 8P Underground Sewer Et Water Concrete King �P�owerF ujp�ment Operators- Bobcat $50.22 7A 3C 8P Undei!g�wer F Water King Power�Equi me Brokk - Remote Demolition 5422 T=3 8P UndergroundEquipment 1 King Power Equipment Operators- Brooms $50.22 7A 3C 8P Underground $50.22 Z— Sewer a Water htti)s://fortress.wa.gov/1ni/wagelookup/prvWagelookup.aspx 6/11/2014 Page 11 of 17 King Power Equipment Operators_ Bump Cutter $53.00 7A 3C SP Under around Sewer a Water King Power Equipment Operators- Cableways $53.49 7A 3C 8P Underaround Sewer a Water King Power Equipment Operators- Chipper $53.00 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Compressor $50.22 7A 3C SP Underground Sewer a Water King Power Equipment Operators- Concrete Pump: Truck Mount $53.49 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $50.22 7A 3C 8P Underground Sewer a Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $52.58 7A 3C 8P Underground Sewer a Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $53.00 7A 3C 8P Underground Sewer a Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $52.58 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators_ Cranes: 20 Tons Through 44 $53.00 7A 3C 8P Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $54.04 7A 3C 8P Underaround Sewer a Water Tons, Or 150'Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $54.61 7A 3C SP Underaround Sewer a_Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Oneratars Cranes: 45 Tons Through 99 $53.49 7A 3C 8P Underaround Sewer a Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P .Underground Sewer Ft Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $54.61 7A 3C 8P Underaround Sewer a Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $55.17 7A 3G 8P Underaround Sewer a Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $55.17 7A 3C BP Underground Sewer a Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $52.58 7A 3C 8P Underaround Sewer a Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $53.00 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Deck Engineer/deck Winches $53.00 7A 3C 8P Underaround Sewer a Water (power) King Power Equipment Operators- Derricks, On Building Work $53.49 7A 3C 8P i 6/11 /?f114 Page 12 of 17 Underground Sewer &Water King Rower Equipment Operators- Dozers D-9 Et Under $52.58 7A 3C 8P !!rLd.ergroundSewer Et Water King Lowe Drill Oilers: Auger Type, Truck $52.58 7A Ec ALP Underground Sewer 8t Water Or Crane Mount King Power Equipment OQe mtors- Drilling Machine _$53.00 7A 3C 8P Under round Sewer a Water g, — King Power Equipment Operators- Elevator And Man-lift: $50.22 7A Ec A-P Underground Sewer Ft Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $53.00 7A 3C 8P Underground Sewer Et Water Gamaco R Similar Equipment King Power dp_ment Operators- Forklift: 3000 Lbs And Over $52.58 7A 3C 8P Underground Sewer Q Water With Attachments King Power fciuip meat Operators_ Forklifts: Under 3000 Lbs. With $50.22 7A 3C 8P Underground Sewer Es Water Attachments King Power Equipment Operators- Grace Engineer: Using Blue $53.00 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power, Equipment Operators- Gradechecker/stakeman $50.22 7A X Ep Underground Sewer !t Water King Power Equipment Guardrail, Punch $53.00 7A 3_c 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $53.49 ZA_ ic EP Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Ft Over King Power Equipment Operators- Hard Tail End Dump _$53.00 7A 3C 8P men Underground Sewer &Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators: Horizontal/directional Drill $52.58 ZA_ 3C 8P Underground Sewer Et Water Locator EC_ 8P King Eg�y��ratgts- Horizontal/directional Drill $53.00 7A Under round Sewer E Water Operator King Power Equipme nt Operators- Hydralifts/boom Trucks Over $52.58 7A 3C 8P Underground 10 Tons King PowerHydratifts/boom Trucks, 10 _$50.22 7A X SP Lindergnound Sewer Et Water Tons And Under King Po wer Loader, Overhead 8 Yards. Et $54.04 7A 3C 8P Underground Sewer Ft Water Over King PowerLoader, Overhead, 6 Yards. But $53.49 7A ic Ep Under round Sewer Ct Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $53.00 7A 3C 8P Under round Sewer Q_Water Yards King fLqVqr Equipment Loaders, Plant Feed $53.00 7A 3C 8P _ — I Underground Sewer a Water King Ewer Equipment Loaders: Elevating Type Belt $52.58 7A 3C 8P Underground. on King Power Equipment Operators- Locomotives, All $53.00 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Material Transfer Device $53.00 7A 3C 8P Underground_Sewer ft Water King Power EQ02Menjofierators- Mechanics, All (leadmen - $54.04 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/11/2014 Page 13 of 17 Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $52.58 7A EX8P und Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $53.49 7A 8P Underground Sewer a Water King Power�ufpment Operators- Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Underground Sewer EL Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $50.22 7A 3C 8P Underground Sewer& Water Distribution Ec Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $52.58 7A 3C 8P Underground Sewer £s Water Mantifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $53.00 7A 3C 8P UnderPround Sewer &Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $54.04 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $53.49 7A 3C 8P Underground Sewer a Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $50.22 7A 3C 8P Underground Sewer Et Water King Power Equ pment Operators- Pile Driver (other Than Crane $53.00 7A 3C 8P Underground Sewer Ft Water Mount) King Power Equipment Operators- Plant Oiler- Asphalt, Crusher $52.58 7A 3C 8P Underground Sewer Et Water' King Power Equipment Operators- Pesthole Digger, Mechanical $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pumps -Water $50.22 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $53.44 7A 3C 8P Underground Sewer EL Water King Power Equipment Operators- Quick Tower- No Cab, Under $50.22 7A 3C 8P Underground Sewer Ft Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $53.49 7A 3C 2P Underground Sewer &Water Rubber Tired Earth Moving Equipment � King Power Equipment Operators- Rigger And Bellman $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon . $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Ope ators- Roller, Other Than Plant Mix $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $52.58 7A 3C BP Underground Sewer & Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $52.58 7A 3C 8P L s.x«... //F...-4.-...... .u-. r....•nr;hn,-�r�r�Innli,mtnrAAl�nolnn Lim a�nv h/11 /2f114 Page 14 of 17 yLLde�rrotjad Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $53.00 7A 3C 8P Underground Sewer Et Water 45 Yards King Power Egtment Operators- Scrapers - Concrete B Carry All $52.58 7A 3C 8P Underground Sewer Ft_water King Power Equipment Operators- Scrapers, Self-propelled: 45 $53.49 ZA 3C 8P Underground Sewer Et Water Yards And Over , King EgV2-_r Equipment Operators- Service Engineers - Equipment $52.58 7A 3C 8P Underground Sewer EL Water King power E Shotcrete/gunite Equipment $50,22 7A 3C 8P Underground-Sewer Et Water ---- King Eqjyer Equipment Operators- Shovel. , Excavator, Backhoe, $52.58 7A 3C 8P gn Jerr round Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shove(, Excavator, Backhoe: $53.49 7A 3C 8P Underground Sewer Ec Water Over 30 Metric Tons To 50 Metric Tons I King Power Equipment Operators- Shove[, Excavator, Backhoes, $53.00 7A 3C SP Underground Sewer a: Water Tractors: 15 To 30 Metric Tons King Power Equipment 0 gerators- Shove[, Excavator, Backhoes: $54.04 7A 3C 8P Underground Sewer C1 Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shove[, Excavator, Backhoes: $54.61 7A 3C 8P Underground Sewer a Water Over 90 Metric Tons King Power Equipment Operators- Stipform Pavers $53.49 7A 3C 8P Underground Sewer F1 Water King Power Equipment Operators- Spreader, Topsider Et $53.49 7A 3C 8P Underground Sewer E Water Screedman King EgIA -�53.00 LA i-C Power jipD3qnt Operators- Subgrader Trimmer 8P Underground Sewer Ft Water King power Equipment Operators- Tower Bucket Elevators -$52.58 7A 3C 8P Underground King Power Equipment Operators- Tower Crane Over 175'm $54.61 7A 3C 8P Under round Sewer 8: Water Height, Base To Boom King power E Tower Crane Up To 175' In $54.04 7A 3C 8P Underground Sewer Ct Water Height Base To Boom King power E Transporters, Ali Track Or $53.49 7A 3C 8P jIncitng round Sewer ft Water Truck Type King Power Eau -qqrjLp Operators- Trenching Machines $52.58 7A 3C 8P Underground Sewer 0 Water qgjp.L - King Power Equipment Operators- Truck Crane Oiter/driver- 100 $53.00 7A 3C 8P Under qEound Sewer Q: Water Tons And Over King PO4veLfgjjipment Operators- Truck Crane Oiler driver Under $52.58 7A 3C 8P tUnderground Sewer & Water 100 Tons King Power E uipment Operators- Truck Mount Portable Conveyor $53.00 7A 3C 8P LJnderqLcLund Sewer UWater King Power Equipment oggLELtois- Welder $53.49 7A 3C 8P Undergro und Sewer F± Water King Wheat Tractors, Farmatt Type $50.22 7A 3C 8P Underground-Sewer R Water King Power Equipment Operators- Yo Yo Pay Dozer $53.00 7A 3C SP https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/11/2014 i Page 15 of 17 Underground Sewer & Water King Power Line Clearance Tree Journey Level In Charge $44.86 5A 4A Trimmers King Power Line Clearance Tree Spray Person $42.58 SA 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A Trimmers King Refrigeration a Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $50.12 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $34.62 5D 1M King Residential Drywatl Tapers Journey Level $50.87 5P 1E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $36.20 7L 1H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers £c Journey Level $34.69 1 Pipefitters King Residential Refrigeration & Air' Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41.84 7F 1R Workers King Residential Soft Ftoor Lavers Journey Level $42.15 5A 3D King Residentiat5prinkler Fitters Journey Level $42.48 5C 211 Fire Protection) King Residential Stone Masons Journey Level $50.12 5A 1M King Residential Terrazzo Workers Journey Level $46.96 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $44.71 5A 3H King Roofers Using Irritable Bituminous $47.71 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $69.37 7F 1 E King Shipbuilding &Ship Repair Boilermaker $40.12 7M 1H King Shipbuilding &Ship Repair Carpenter $38.24 70 313 King Shipbuilding Et Ship Repair Electrician $37.80 70 3B King Shipbuilding & Ship Repair Heat 8 Frost Insulator $58.93 SJ 15 G.4a-V /lr -+.- %A, nnit/In L i in/nr%AA/ann Inn Li in Acnv tin l r?nl4 Page 16 of 17 King Shipbuilding & Ship Re air Laborer $36.781 ZO I 3B King 5uj Repair Machinist $37.81 70 3B King Ship Win Et Whip-Repair Operator $40.15 70 3B King Shipbuilding & Shi�Repair Painter $37.79 70 3B King Shipbuilding Ft Ship Re air Pipefitter $37.77 70 3B King Shipbuilding-8: Ship Repair Rigger $37.74 70 - King Shipbuilding ft Ship Repair Sandbtaster $36.78 EQ 36 King Shipbuilding Et Ship Repair Sheet Metal $37.74 70 3B King Shipbuilding -Shipfitter $37.74 70 3B King Shipbuij LRpl?-ai r Trucker $37.59 70 3B $37 64 ---Metal King Shipbuilding & Ship_Repair Warehouse $37.64 70 3B Bu r W King Lhipbuitchng, Ship Repair Welder/Burner $37.74 ZQQ 3B 92 King Sign Makers Q�Installers Sign Installer $22.92 1 (Electrical King _Sign Makers Ftelnstatters Sign Maker $21.36 1 (Electrical) King Sion MakersLA Installers on- Sign Installer $27.28 1 Electricalj King Sion Makers f Installers_i]Non: Sign Maker $33.25 ElectricalA King Soft Floor Lam Journey Level $42.15 5A 3D King Solar Controls For Windows Journey Level -$1 2.44 1 King Spirink-ter Fitters jr-ire Journey Level $69.59 5C Protection) King Stage Rigging-Mtch,Mechanics�Non Journey Level $13.23 a- St-ructurall 0 King Stone Masons Journey Level $501.12 5-A 1M King Street And Parkins Lot Journey Level $19.09 1 Sweeper Workers King 5ii� Assistant Construction Site $52.58 7A 3C SP Surveyor King Surveyors Chainman $52.06 7A 3C 8P King Surveyors Construction Site Surveyor $53.49--EA71 3C 8P King _Ffj1AqPYjQ1Ljnication Journey Level $22.76 Technicians King Telephone Line Construction - Cable Splicer $36.01 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person --$20.05 5A 2B Outside I King Telephone Line Construction - Installer (Repairer) $34.50 5A 2B Outside King LE Ltej2hone Lint Construction - Special Aparatus Installer 1 $36.01 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer 11 $35.27 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $36.01 5A Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $33.471 5A https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/11/2014 i Page 17 of 17 Outside (Light) King Telephone Line Construction - Telephone Lineperson $33.47 5A 2B Outside King Telephone Line Construction _- Television Groundperson $19.04 SA 2B Outside King Telephone Line Construction - Television Lineperson/Installer $25.27 5A 2B Outside King Telephone Line Construction - Television System Technician $30.20 5A 2B Outside King Telephone Line Construction - Television Technician $27.09 5A 2B Outside King 1"etephone Line Construction - Tree Trimmer $33.47 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A I King Tile Setters Journey Level $21.65 1 King Tile. Marble It Terrazzo Finisher $37.79 5A 1B Finishers King Traffic Control5tripers Journey Level $42.33 7A I King Truck Drivers Asphalt Mix Over 16 Yards (W. $48.87 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck Et Trailer $48.87 51) 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $48.03 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers £t irriq_ation Pum_ Irrigation Pump Installer $17.71 1 Installers King Well Drillers it In_i atian Pump Oiler $12.97 1 Installers King Welt Drillers Et irrigation Pump Wetl Driller $18.00 1 Installers I I I I I H++r t+ r+ �� ,.,� tlnit,nranclnnl`i, Jnni\�lanatnnlciin acny 6/11 /2014 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All bouts worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. Ap hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. 'the first two(2) hours after eight(8)regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(9)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next(lay after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten(10)hours worked on Saturdays and the first ten (10)hours worked on a fifth calendar weekday in a four-ten hour schedule,shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10) hours Pat,day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown)shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all bouts worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly ram of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked an Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage, All hom s worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 I I 1. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. j O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monclay through Friday and after ten(10) hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas clay)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All homy worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on"thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday,the day before Saturday,Friday, and the day after Sunday,Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee)and adl hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek) and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 hours during that workweek.)All hours worked Monday through Saturday over twelve(12)horns and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall Ire paid the straight time rate of pay in addition to holiday pay. I i 2 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly Late of wage.All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of i wage, , G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked ors Saturdays shall be paid at one and one-half times the hourly rate of wage,All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday than Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shalt be paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF FIGITf(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 ant Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift.The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to die work to be performed on overtime situations.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. B. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked over twelve(12)hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 3 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 j 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall he at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more- D. All hours worked between the hours of 6:00 pro and 6:00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays,shall be paid at one and one-half tines the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Bach week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be pair(at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at tvvo and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between Marchl6th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay,Work performed on Sundays between October l5th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate, However,Saturday shall not be utilized as a make-up day when a holiday falls on Friday.All homy worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF FIGHT(8)HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-IIALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8), C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, die Friday and Saturday after Thanksgiving Day,And Christmas Day(8). 4 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 5. H. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after'thanksgiving Day, And Christmas(6). L Holidays:New Year's Day, Memorial Day, Independence Day,Labor Day, 'Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving I7ay,The Day Before Christmas,And Christmas Day(9). L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,Tire Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day,'The Day Before Christmas,And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday, Q. Paid Holidays:New Year's Day,Memorial Day,Independence Day, Labor Day,Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Imdependence Day, Labor Day, Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). Holidav Codes Continued 6. A. raid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, Day After Thanksgiving Day, Christmas Day, And A Half-Day On Christmas Eve Day.(9 112). C. Paid Holidays:New Year's Day,Martin Luther King Jr. Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday Alter Thanksgiving Day,Christmas Day,And Christmas Eve Day(I1). I H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Label- Day, Thanksgiving Day, Friday Alter 'Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating holiday(10). 5 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 6. I. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9). i i Z. holidays:New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Flolidav Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday, If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day, B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday, Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays[ New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls an a Sunday shall be observed as a holiday on the following Monday.Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day, Thanksgiving Day,and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday, it. Holidays: Now Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday,Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 6 i Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 7. I. Holidays:New Years Day,President's Day,Independence Day,Memorial Day,Labor Day,'Fhanksgiving Day,The Friday After Thanksgiving Day,The Day Before Christmas Day And Christmas Day (9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. j I J. Holidays:New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. i K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays:New Year's Day,Memorial Day,Labor Day, Independence Day,Thanksgiving Day, the Last Work Day before Christmas Day,And Christmas Day (7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: Ncw Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor]Jay,Thanksgiving Day,the Friday after'Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas frills on a Saturday,the preceding Friday shall be observed as a holiday. O. Paid Holidays: New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day After Or Before Christmas Day, And Tlie Employees Birthday. 11). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. I S. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. 7 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Y I i Note Codes i 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$2.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-.$3.00 per Foot for Each Foot Over 100 feet Over 150'To 220'-$4.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$1.00 per Foot for Each Foot Over 50 Feet Over 100"10 150'-111.50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Feet Over 200'-I)ivcrs May Name Their Own Price D. Workers working with supplied air on hazinat projects receive an additional$1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$0.75,Level B:$050,And Level C:$0.25. M. Workers on hazmat projects receive additional hourly premiums as follows:Levels A&B:$1.00,Levels C&D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00,Level B:$0,75,Level C:$0.50,And Level D:$0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1.50,Class C Suit:S L00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the. shift shall be used in determining the scale paid. R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor Is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle, and pedestrian traffic during construction operations,Flaggers and Spotters shalt be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,orldaho.'I'hese classifications are only effective on or after August 31,2012, S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012, T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. 8