Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW14-145 - Original - Transportation Systems, Inc. - 101st Ave SE & 256th St Signal Pole Installation - 06/06/2014
ANT Records Mna emery w s„ „ Document t CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Transportation Systems Inc. Vendor Number: JD Edwards Number Contract Number: ir 0LI ®1 This is assigned by City Clerk's Office Project Name: 101" Ave. SE and S. 256th St. Intersection Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: Date tlae-1Wa or's signature Termination Date: 9/30/14 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Merrill Vesper Department: Engineering Detail: (i.e. address, location, parcel number, tax id, etc.): Furnish and install a new signalole and pedestrian push buttons at the northeast corner of the 101-s've. SE and S. 256t St. intersection, including constructing the foundations and installing wiring_ Also included is approximately 20 square yards of cement concrete sidewalk. _ _ I S:Public\RecordsManagement\forms\contractcover\adcc7832 1 11/08 Corporations: Registration Detail Page 1 of 2 Corporations(/corps/1 s Secretary of State �FY�- t *HHe /car s/) Information Ce t (/ p/ II- 1 Nonnrojr5(/ p ft' formation asoxl G ar'fes (charities/1 I Awards f/ / tprcommOOW-92/1 Pubic Notia s f/ / bl' Y ) Contact Us(/corps/Contactinfo as x FAO(/ p/FAO 1 fL! Corporations Division - Registration Data Search TRANSPORTATION SYSTEMS,INC purchase Documkei,,E r th's Comoratl (O d D p 7 b'=602726209) UBI Number 602726209 Category REG Prof t/Nonprofit Proflt Active/Inactive Active - State Of Incorporation WA WA Filing Date 05/15/2007 Expiration Date '., 05/31/2015 Inactive Date Duration Perpetual Registered Agent Information Agent Name BRYSON HUIE Address 5349 W TAPES DR E City LAKE TAPES State WA ZIP 983918942 Special Address Information Address City State Zip Governing Persons f Title Name Address a' A ALL Officers HUIE,BRYSON D 5349 W TAPES DR E LAKE TAPES,WA 983918942 P,richase D.aiments for Ubi Corporati JOrdgrDocs.asp0ubi=602726209I _ , , ., - - -. _-,._I__ L /C/nni n Corporations: Registration Detail Page 2 of 2 Washington Secretary of State Corporations Division 801 Capitol Way South SO Box 40234 Olympia,WA 98504-0234 (360)725-0377 i ICET1 T" PUBLIC WORKS AGREEMENT between City of Kent and Transportation Systems, Inca THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Transportation Systems, Inc. organized under the laws of the State of Washington, located and doing business at 6917 166th Ave. E., Sumner, WA 98390-2980, Phone: (206) 510-6533/Fax: (253) 863-9626, Contact: Bryson Huie (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall furnish and install a new signal pole and pedestrian push buttons at the northeast corner of the 101st Ave. SE and S. 256th St. intersection, including constructing the foundations and installing wiring. Also included is approximately 20 square yards of cement concrete sidewalk. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by September 30, 2014. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Thirty Nine Thousand, Nine Hundred Forty Six Dollars ($39,946.00). Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20-171 and its related rules for the work contemplated in this Agreement. The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City's payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. PUBLIC WORKS AGREEMENT - 1 (Roadway/Pedestrian Path - Over$I OK, under$50K, and Performance Bond) A. Payment and Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a payment and performance bond for the full contract amount. B. Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of Contractor's signature on the Agreement. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. PUBLIC WORKS AGREEMENT - 2 (Roadway/Pedestrian Path - Over$10K, under$50K, and Performance Bond) D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the PUBLIC WORKS AGREEMENT - 3 (Roadway/Pedestrian Path - Over$1OK, under$50K, and Performance Bond) facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL 13E AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. PUBLIC WORKS AGREEMENT - 4 (Roadway/Pedestrian Path - Over$1OK, under$50K, and Performance Bond) B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. PUBLIC WORKS AGREEMENT - 5 (Roadway/Pedestrian Path - Over$10K, under$50K, and Performance Bond) XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or PUBLIC WORKS AGREEMENT - 6 (Roadway/Pedestrian Path - Over$1OK, under$SOK, and Performance Bond) relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Cit rV Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Roadway/Pedestrian Path - Over$1OK, under$50K, and Performance Bond) J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONT OR: CITY OF KENT: By. A'4 By. (signature) s (signature) Print Name:�Sr4 Print Nape; S 4zette Cooke Its It1s ayor (title) DATE: DATE: "-/ -Z ,z NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Bryson Huie Timothy J. LaPorte, P.E. Transportation Systems, Inc. City of Kent 6917 166" Ave. E. 220 Fourth Avenue South Sumner, WA 98390-2980 Kent, WA 98032 (206) 510-6533 (telephone) (253) 856-5500 (telephone) (253) 863-9626 (facsimile) (253) 856-6500 (facsimile) APPRO ED AS TO ORM. P V 1 Kent Law Department rransportanon syst-mi°a zseh sienai Pole Reps/Vesper PUBLIC WORKS AGREEMENT - 8 (Roadway/Pedestrian Path - Over$1OK, under$50K, and Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By sigECE fulfill the five requirements referenced above. By: For: Sti Sew. S �v.c Title: �CffeS�de Date: EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 i I I PROPOSAL I To the City Clerk City Hall Kent, Washington 98032 The undersigned hereby certifies that Tranwortation Systems, The has examined the job site and construction details of the work as outlined on the plans and described in the specifications for the project named 101" Ave. SE at SE 25W" St. Signal Pole Replacement for the City of Kent, Washington, and has read and thoroughly understands the plans and specifications and contract governing the work embraced in this improvement and the method by which payment will be made for that work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with the bid and contract, and at the following schedule of rates and prices: NOTE TO BIDDERS: 1) All bid items are described in the Kent Special Provisions (KSP) or the Standard Specifications (WSDOT). Reference the Section No. listed in this proposal, where the bid item is described. 2) Proposal items are numbered in sequence but are non-continuous. 3) Unit prices for all items, all extensions, and total amount of bid must be shown. 4) Should bid items with identically worded bid item descriptions appear in more than one schedule of the proposal, the bidder must bid the same unit price. The City shall use the lowest unit price submitted by the bidder for the items in question in each schedule where identical bid item description appears. Bid Items with identically worded descriptions which appear in more than one schedule are denoted with an asterisk (*). EXAMPLE SCHEDULE I - STREET ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1006 2-03.5 100 Roadway Excavation, $14.00 $1,400.00 WSDOT CU YIDS Including Haul Per CY Any bids not filled out properly may be considered non-responsive. 101s"at 256'h Signal Pole Replacement/Vesper 2 April 9, 2014 SCHEDULEI - STREET ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1000 1-09.7 1 Mobilization $2,500.00 $2,500.00 WSDOT LUMP SUM Per LS 1010 2-02.5 20 Remove Existing Asphalt $ 105.00 $2,100.00 KSP SQ YDS Concrete Pavement Per SY i 1050 2-02.5 35 Saw Cut Existing Asphalt $6.00 $210.00 I<SP LN FT Concrete Pavement Per LF 1060 2-03.5 4 Roadway Excavation Incl. $185.00 $740.00 KSP CU YDS Haul Per CY 1080 4-04.5 5 Crushed Surfacing Top $ 38.00 $ 190.00 KSP TONS Course, 5/8 Inch Minus Per TON ($6.00 Min) 1145 8-14.5 20 Cement Concrete Sidewalk $ 125.00 $2,500.00 KSP SQ YDS Per SY 1315 8-28.5 2 Pothole Utilities $400.00 $ 800.00 KSP EACH Per EA Schedule I Total $ 9,040 00 10is`at 256th signal Pole Replacement/Vesper 3 April 9, 2014 it SCHEDULE V — TRAFFIC CONTROL ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 5005 1-10.5 16 Traffic Control Labor $48.00 $768.00 KSP HOURS Per HR 5015 1-10.5 4 Traffic Control Supervisor $52.00 $ 208.00 KSP HOURS Per HR 5020 1-10.5 1 Temporary Traffic Control $600.00 $600.00 KSP LUMP SUM Devices Per LS 5035 1-10.5 2 Sequential Arrow Sign (SAS) $45.00 $90.00 KSP DAYS Per DAY 5065 8-12.5 100 Temporary 6' High Chain Link $5.25 $525.00 KSP LN FT Fence PerLF I Schedule V Total $2,191.00 1015'at 256`h Signal Pole Replacernent/Vesper 4 April 9, 2014 i SCHEDULE VT — ELECTRICAL ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 6000 8-20.5 1 New Traffic Signal Pole, $22,952.00 $22,952,00 KSP EACH Including Foundation and Per EA Wiring 6005 8-20.5 1 New Pedestrian Push Button, $4,063.00 $4,063.00 KSP EACH Including Foundation and Per EA Wiring 6010 8-20.5 1 Remove Existing Foundation $750.00 $750.00 KSP EACH Per EA Schedule VI Total $77,765 00 I 101ab at 256"Signal Pole Replacement/Vesper 5 April 9, 2014 SCHEDULE VII - TEMPORARY EROSION AND SEDIMENTATION CONTROL ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 7015 8-01.5 2 Inlet Protection $ 150.00 $300.00 KSP EACH Per EA 7025 8-01.5 100 Clear Plastic Covering $ 1.50 $ 150.00 KSP SQ FT Per SF 7055 8-01.5 1 Erosion/Water Pollution $500.00* $500,00 WSDOT FORCE Control Per FA ACCOUNT *Common price to all bidders I Schedule VII Total $ 950.00 I' i l l I I 101'at 256°h Signal Pole Replacement/Vesper 6 Aprll 9, 2014 i i BID SUMMARY Schedule I $9,040.00 Schedule V $2,191.00 Schedule VI $27,765.00 Schedule VII $950.00 TOTAL BID AMOUNT $39,946.00 101s'at 256"Signal Pole Replacement/Vesper 7 April 9, 2014 EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. EXHIBIT B (Continued) 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. 5/12/2014 19:25 Remote ID Remote ID 6 2/18 DAM o%iz/2014Y1 A ® CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS li CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the j certificate holder in lieu of such endomement(s). PRODUCER WA#712152 1-206-343-2323 CONTACT NAME: MCM Insurance Services, LLC dba MCM PHONE FAX Bacie Pacific Insurance Services, LLC #0FB2099 AALC N EIY Ac No: 1325 Fourth Avenue, Suite 2100 E-MAIL ADDRESS: Seattle, WA 98101 INSURERS$AFFORDING COVERAGE HAIG INSURERA: CONTINENTAL WESTERN INS CO 10804 INSURED INSURER B: Transportation Systems Inc. INSURER C 3218 142nd Ave E INSURER D: NSURER E Sumner, WA 98390 INSURER F COVERAGES CERTIFICATE NUMBER: 39672325 REVISION NUMBER: THIS IS TO CERTIFY THAT TI-IE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSft BR POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE POLICY NUMBE MMIDDIYYYY MNDDIYYYV A GENERAL LIABILITY X X CWP293586124 09/19/1 09/19/14 EACH OCCURRENCE $ 1,000,000 X DAMAGE TG RENTED 10010 - COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ CLAIMS-MADE O OCCUR MED EXP(Any Dna pw806 $ 51000 PERSONAL B ADV INJURY $ 1,000,aoc X WA Stop Gap GENERALAGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOPAGG $ 2r000000 POLICY X PRO- LOC $ A AUTOMOBILE LIABILITY X CWP293586124 19 1 09/19/14 COMBINEDSINGLE LIMIT 1,000,000 Es accident X ANYAUTO BODILY INJURY(Per Person) $ ALL OWNED SCHEDULED BODILY INJURY(Peramidsn0 $ ,. AUTOS AUTOS NON-OWNED PROPERTY DAMAGE $ HIRED AUTOS AUTOS Per accident I X Comp: $1,0 Coll: $1100 $ A rUMBRELLA LIAB N OCCUR X X CU293586222 09/19/1 09/19/14 EACH OCCURRENCE $ 51000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE_ $ 5,000,000 DF_❑ RETENTION $ WORKERS COMPENSATION WOC STAN• OTIgH- AND EMPLOYERS'LIABILnY YIN ANY PROPRIETORPARTNEIUEXECUTIVE F.L.EACH ACCIDENT RA $ OFFICEREMBER EXCLUDED? C] NIA (Manda(ory in NH) E.L_DISEASE-EA EMPLOYE $ , byes,descdh0 under DESCRIPI ION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTIONOF OPERATIONSI LOCATIONS?VEHICLES (Attach ACORD 701,AddI00nal Remarks Schedule,i(m0re space is required) RE: 101st Ave BE & S. 256th St. Par the attached the following are additional insured - products completed operations, primary & noncontributory, waiver of subrogation applies: City of Kent CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Kent THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 400 West Gowe AUTHORIZED REPRESENTATIVE Kent, WA 98032 /f�l/����^ USA ���GGUt ©1988.2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD t n'--'I ... J T:_.. AA_.. 10 AAiA A . NCD6d RI„ A79A 5/12/2014 19:25 Remote ID Remote ID 9/18 POLICY NUMBER: Cwa2e35e6124 COMMERCIAL GENERAL LIABILITY CG2D100704 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies Insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organ ization s : Location(s) Of Covered Operations City o2 Kent Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these Include as an additional insured the person(s) or additional insureds, the following additional exclu- organization(s) shown in the Schedule, but only sions apply: with respect to liability for "bodily injury", "property This insurance does not apply to "bodily injury' or damage" or "personal and advertising injury" "property damage" occurring after: caused, In whole or in part, by: 1. Your acts or omissions; or 1. All work, including materials, parts or work, ment furnished in connection with such work, 2. The acts or omissions of those acting on your on the project (other than service, maintenance behalf; or repairs) to be performed by or on behalf of in the performance of your ongoing operations for the additional insured(s) at the location of the the additional insured(s) at the location(s) desig- covered operations has been completed; or nated above. 2. That portion of "your work" out of which the injury or damage arises has been put to its in- tended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a princi- pal as a part of the same project. I I I CG 20 10 07 04 © ISO Properties, Inc., 2004 Page 1 of 1 ❑ PArAiii PrI Tima MAv. 19. M 14 4- )5PM No. 0790 5/12/2014 19:25 Remote ID Remote ID 9/18 ........... ...... ............. ......................... ........ ................ ......- . ..... . ................ . COMMERCIAL:MNERAL LIABILIT� - ..... ................ ..... ........ ...... CL CG 0013 08 13 . .. ... ....... ......I......... .THIS END6RSEM'15N-r OHANCE8;THE P5LIV..-#LtAS8 MAD IT:6AREFULLY END S OR EMMT::. Ill,s nc ibr§c I-,md t dffj provided I - the following: n ma, des provi 0 undsr GEKERAI,.,LIA131LITY WVERAOIn:PART • A MED16 A*L 0AYMENTS: ': - q. I.....-If ct sE bWi :.doVERAdgC-Mtbi4bAL-OAYmP-NTSi6 lint othervriseexoludedftin this Coverage subject to the ferias of SECTION Ili LIM1Td T KdMedical FxPen peke 0 ..... Limit provide d, by *r q -13: -fhe,M4di c*aj Expenre Limit 8hown in the Dedaratl6fig of this CoVef Eigei Pact..: i q. FIRE, LIGHTNING, AN6 SPRJ ER L FAKAGF-PAM AGE30PIREMISES YIDUIRENT� ...... If daffioge4o pre r ises rented to you under CoVor0ge:A--,i§ .not-o'he*i6 bInluded fr6in tllis.POIMY, t is following applies: The.I.ast panagra'Phof 311&16N i a'06VEkA*Clt A. xcluslans isidplotbd and replaced by Ill 0. " q ....... ..... . sprinkler exp a%or),:Smo k,4:,,cir byjre,.Itg trung, 1 leakage-gMage to pfoft)lsea While "rented to by:you V lth 0466 sIon of the es to this:. tiq.a as iliescri bed in SECTON III - cWhiar, A separate 11mit of ln�vranco:aippll* coverage I L 1 MfTS*OF lN6U1ZANGE .......... ce P ii ra"gro,p`h '6 3 T[dN ill -� .LIMITS OF INSURINSURANCEis,cldlbted end irep)b d by the ............. Sub t a 00(1� or mage, f6d:To'You Uffit gh6Wrf In the'Doolar4mris; - -nagesbecaused propeftydani��b' to is the most W6 will Piiy under GOVERAGM A for dai Ony 0 ,Pr6JWSbs; while rented to you ter�rily occupied by you With the V6rPnissfoh Of 00 -. 11l'a. owner.,.riB1 f -1 . .. .11. .. ..:---.—.......... . ....... . .3 :16sdrartce JV � :.CDEIRCIAL PERAL LIABILITY t- DISIDITIONS.is dolh inTf�vd and replocpd by the followl a:t: is F re Ug h t 1 9 p Orion; me e..pr-SprihWer-Leakage insuranGe-Jor prom 56s rented to You ar tel n0drefrIlY Occup ed b 'l n'th th permls fine Y.You W1 a so of owner', : A .- 8fragraph 9.A.of SECT[ON EF d lay tlYd foll6wi n*'g.; .a..`..A-cdhfrdc t for:a lease Of promlses. However thatiportion of ft,c6fitmttf&-a ea se.-b promiseg ary Obrki 6r 0199*htion f6r darnagd by fft lightli109 exposen, ,sno P or .sprn ler as�Agb to-Prenlise -wlj6 r6n6d toYoU of temp00fily. b t-a vinsurb d contract' occupidd yypu witli pormls:slon'df holowrneris 0 n P'. q P606 of C ��o p A 1.h tol �na t(�Flol&iirsvmn,c�e w.ik�.e s CL a G 3.0.8,13': jnciva�G Dffi4arinc..4AfB'Ut �armfgsiorl worl TlmA MAu 19 A. 07)6 q 5/12/2014 19:25 Remote ID Remote ID D 10/18 ........................ 1........_..... . ................. .................... 1.11111... .... .. ........ . .... ..... ................. . .. .. .................... ...........1. 1 . . .... .. ............ ...... ........ -OWNEDWA, tkbR T ,: TE AF ... ...... ................. .........._................ E F AZ 001LOO-01015 I$11014toO 9nd.rPPW.'0.JbY tlla.. iollOWHO long;and '. .... .. lie...Nbf�d��ed tb:b,�Ilry.perjwns orprop�arty f6r.a 0 harq�L AY D SUP PI Emil��ARYO p SECTION ILL.SUPPLOAENTAkV MYM'ENTS:-COVERAGES A-AND BhiMon InsUr ance in paragraph, Jb,is in r 0 asfe ft '2' :Thejlft_ilt of Ihs;0ra,ilw... irf,paragraph idsis ificfelasedl from $2506 SDD15�-.-AU TO,M.ATI-C ............ SPECIFIED:':. � . , .. RE . IJ S' PROW.," q ::ADDITIONAL : INSUREO �AT ONSHIP : 0 ...... ...... AGNRCONTRIBUT RY� ..."1 ...... ...... ...... 11061lowng.isadded to P....a... ..graph Zof 50TEdh It aWHO SAN INSURER ' rly.pers.bn or orgai4idi[Wde66ribdd 15616W, when,you are obligated by Artuaiof 6 Whitten boWwct or ntqmo6loilt tW'suoh Person:be pollqy, WN�-n....T 1.e.q ui.red bY virtue. vvfItte,n contr6O 1pr:.agreement . . P Toy 10� to any ad 1066ft insure W([fbpn:a Primary bass And:*11 11&: K,cortributonfebm thqa ditional - Insured's policy, ' 'Maln agieri:'Orc teasers Of,Premises; -The manager or lssrot.of a prorniso lea5rid to� o the o m worship main' of I teriance:or:use.t at.par.t of -or h folloWing h I;lx 0 1 Lisi(DrfG h jhjji ddi lon.al q es:,,not -p pjY io, ...... Any Which you cease to 4�al6fl3A 0 :1tha ;Pr.Mll18L&8. on.16lit1dri 6 rf d by or riow coI;5tnjr j6h ist,o po!�Itioht�pe o"6 I ... . on.... If eha of the niprag esoror UMesdr bt:Uas6d, Egtflpfflahk....Arly pefgw45r*orqanjzaiiori f(bM:-Whdn1 You o" -equiprij6hi,,but bOly'vAt (989 ci liability far' bodily:injury', flot 9 orect t 0 Id Wvekflsifff 6, in wilb!" Of iti. pirf �bq,�yo tdn H 0 persona :al urY Ga se opa01 Ll i6: r use-of:equipiffient logsodiciryw by.such . ....... ... Howeval',this-Inswatica.ddbs rfmoOlylO: ibd r -11M. W 111t �ny qUr 10.1 9, persofi .rorgahinflori but only wi i :respect b 6dily 4nj ry r daffiage onsing Pitt of; YOUr Pro- cWi shown [r #ho Schedule which are I b jotti if f, lowing distributed or sold [rfthv��OQu a course thci vord6ftIlLigii rYbqgi su aT. 'd 01. . oeano apply.10', q :A'; - -orpro)L for,*WNch the- V66d6ri§ bb[grted to th assump ion b Or 94 116C er M; dt'Mag(45; Y T-ason . f liaullity1b 21:boilcratt III t This 6901(iglort tides':ffotapply to figbility f6r'j5i thAtibi-vbhddr:WWld havb . 2 'An' lthonzad by You, y:expydsg.warrany,una1 " ubc K�dd tfTe",Orbd,: .i..�AV,iphysiba cherl ca ciange n , tiitent[onaily':6y the or;:, lloriln�ti�6rv[oC5 edge 2 46 d. A T; Iti,, 10 WA d Oum :MA AW., 5/12/2014 19:25 Remote ID Remote ID D 11/18 .... ...... .....-..................... .................... ...... ..........-.......... ............ ...... .............. .......... ...... . ......... ......... ...... ...... .. .... . .......- ... ............. ... . ......... ..... A kepackaging',' _.UnIeSS ljhPa6k6d toleiv 'lfof :We purpse. o 0...... .. ........... 6afflonw6tioni testing, or the substitution 6f PA�rts .urfderinstir 6t16ftl from the maffActun�riard then:Mpao'kaged in ihenh.,Ijlrio bolltganeir;, ........... iy . -...... ifei to,make .such inspections, adqus(Menits,109ti. of%sdrviring. As the � vendor has ggr46�-d ld.mak.e or normally.urld6ftkkie"q Make 161)i�Us uAl OU f8 0 8L r opera ions - excep a r, D6ftion�i ratbnr riwa. t I Pi Wu6v�s�,0 op4lh5tIoIf9 perfdr-Mod atthd r Is�win'edrihection Wlt�thu.-516,bf tN�:�'*�. -roduct, b ti: 'I hiNe been Inb6W or r6labded T. ."Pr6dkitsi which after'distri u ton or$a 8� Y You, -:r,6rig or su)stanc p - r. offusied�a:s-a contal.- 6 t�90iqredieni of apy.,6ML Y.pi. n r, part or t e vrld P111'. or,:_ b This i%rfeaffna,dbbs� ot applV*t6"an y insured 04s6h'or organize#inr frorc Mbll yo u 6a-v'6 acqwwn3-ah pft6dsidniny ingredient; Part:a aaritairor;enta"ring rota :saadrripahylng or contairilqU.,sUch Pr6duc 4 State.. Or-.Political S.U dh.606,n Refating TP,?1`41111s6.W.- b 'Aiiy$tat.0 or pofifical.subd(vislon'WbjedUb the 16110W. lrig addiltlorfal provIslam.. h6 RN or: I hig Irigurallc6 applies o&r] 61 I only rbgpObt to own.9hazardsA6rWI*1YJ s 'di libo with: Oamitas�..yo u wdn- 'r ent,-or' - P611fEal ub. vision ha�, sisuel a permit In conned oitiro h thlsl lbind to.Whic The exisNMcd; coal hblosi. FlViaVii8ys,� man holes,signs'; awnings; panciOiegl cellar,L m zjnnerg orarquees in ll)o[st away opa � gs,,sidewilk vaults,;&? b siniflarwiposuros, or ... ... The donstrtrctlon efekff r or.raiflavaI of eva t to Limits of-Ihsoraino E for such 8 fional insured-ad&014 limits . coverage 9 L.I M I Cfd' s __1ri this w_ a e 4o trr'or the,lim'i€s you p and such additfeiial lhs&M agreed to by V1V W4 of 8 contraef 'or agr6*a,m en .. ..i-....i b* �pr 1s-',k1s ,Those; Mtt5 are bU§lve�ofAnd are r6t Inadditlon Elie tod . :mtho, eal2ratons . Wlidn'r6quifed B)t viftud. of a vsntteti col track or agreement, cov* arty add Ronal ;.insured AUTOMATIC AbdifloNAC INSURED � SPIE-dr! NOW RIBUTORYWil. e;'on a:prV arY ba is and 011 10 $06 Ion OUIREb 186 D'08' d 4" WS' URe &d I f I I *, -ragtdph; V SECTION ll�WRO[SAN Dis. tM*60d rbplboed by tie W a o ing: I�r.l...organization _ 'I ... ..l.. I . ", niza ib on ' I .1 . .... ajoint,.vai%jre, Mld overw c youmdintain ownersh.I.p or majorityInteresCof moreAhan Z06/d.wll be.aAarriedlosured if here Is.no othof.$Iiiiilar: 1. "Insuran ce.availab!6.to iftf.organintlom.-Hbvvevor a ..C6ve:r8gd un er'lliI.s,prov. is on' I's affd'r0d o'hiy;u-nIll the 180K�day.a fter yo..u acquire.. ..o.r to.rin ;� l W lhe oegfthlzatlon or thdond.oflhe t 1 ma g o*. titer&Jdoss hoVapplY to�"b6dflYInJu?Yff Or i:irpj�W Y f *lon, 11 - acciul rad:pr.oned the orpnIzAti _d OVEMG a does riot apply a op0sural an4.a. d I 1�lfi .:I:n.jury arising out df,an uenso -cdrnmtttetl. , ......�Irw qul,- e a erg et ion b6lore you c or orm b*ni ... ..... G. .. The Gen IAJ 'fO�L' It Qiid0r`-SEGTION fff -LIM ITS OF.IN$ORA E AppiW.*separa. e vle, era 9.9rep rp. f pl : :CLCG 00 43%13 with ifs:Offils;Wtl Al T; KA 0 A KI, 079n* 5/12/2014 19:25 Remote ID Remote ID D 12/18 ........... ............. ...... ........... .......... ...... ................. ........ ......................... I �...... ................ 11.. .. .. ............... .......... ......... ......... ....... ........_11-111111111_................ ....... .....n ........ ..................... .......... bm ites:owne y:orree o.yO ....... .. ........__................ ......... . ...... .............. ........... ......... ................... ............ to 6n �6w'Od iy Dr,ren€ed to ................. o aklon V I t rnonm� pi-wrimos Jftv Vng the or nnec Ing 0 S, Or.,'preen ises :W Os .abnnodiw SdMteM`uPr&d brily b falleond. When paragrap ia- G4nstructton Prajor, t oft� of GL,C;G is.a. t General Aggre§AWLF 1 m part.of this po.iay,,%theii:paragrapK�,0.,A -not klppl .. The fallowing is i2..Dute& ffanis:ec ,"C n -LaIrn siufflo*f*:t� lbwlv;aC OiI dIAL dll0t� LIJAMLl' -ONDMONS., 'A report of ah .(i) You, if j61_1 are'an lridiql List, ... n 2)') y41_1 * . .i, ,i`sfir a.corpoi-a onor is if ypU:are4 f:jilli na. I I.Y iqO.rnpanY'*, z _Is;jconsldn�r6d-kn6W-Iedge and roWres You 116,116fify Us*bf*:% ,.o..boufreride,;_offense,*e* din :;or sul soon 89.0radiciblo: , .. W-o aacon gider do n noA nI cm-or 51AMt is repoi a d to YNjrworkeTW bjmpensaficjni i6wrer for Awevent WhiWlater develops mto. n occur* ence , offers se, cinini .or �I;Qi"I . , h*6 a �s GO a 0 �y f6r.w-hic r \�dr g under this p6lic, Vva WI I only, as,t66n as:Y.6U*kM*QW.:the:.c:Ia!'m:sh:oul,d ba:oddr�assod I y thispaiicy.ratherih riyo0r.. .6fke&,..Ppt�,npen.sa.don.poli.o.y., Th Icllowinq' .Is� added to 'Raragraph..6.- Pepras6ntafloris cf $Edf IOU IV':= t�01VIMPER.C.11AL:: GEMERALLFAIRL TZNS if you u h mtnnt!6tWly.fiAil ta-6961&4 any on latabf your er is - o brage a Use-O disclose� owa*v qrj t hi:s� 0 rbjbrf 60s; r, if. .Vis d dt:� # tbut l-� ' biv:rldhi of Wiffe at on or Piori-ronewti This Or6viMbn d*005 r16(Bppjy .tb.nrIy.kjrjuvvn j0jury or"damage wF ictt Pis excluded un or:ariy _,.nifhor.prWisinirl of this policV,..- j ; :,Ni NTAL ANG61SK krag.raph 3.;bfS 'C4i1ON V�DErlN6TlQN509 d liy,a persoirr incluoliig'n.'-iental h cr dea. it . :rp%u ing firorn at 6f t h 666 at any time, - ' K. WA!Vt 60 TRANSVER OF Pnbi4it 6F RECGVERTAGAINST OTHi;R6 q A661rfat CXM �i ta Us of EG ION .lV G€91GI[v1ERGIPL-GENEk AL L!4131LITY� d6h=Waimnaod ivVe,;),WalVb.tny right.of-roobvery.We.may_ crits':`v 6 nbakd.lfor. bodilyh Ury .gar ":property *da;Tw1ge, ;A._ _..t ' .rising , .. , Obt'of yetis 6ngd6q;.dp6r1t!bn* r Uirib :suiah Waiver wit4:Ah9t: oirsdn::oi'br nrfint!M aM :4jUUddd:'M the,`Pf6dUdNmodMPlbtbd Opern Mw ia ard", -' Jnj.urypr,darragL - wever,our ng)ttniayofilyb6,4id[vedpfic rise fo'thc� lns6red must do nothing.4tiar a loss. bring qs:af�- :-h6!p* i rn PE Ifr,bur,rights; •At:our.rb.que�3t*,j..9 insured 'US eA 'those;rlghta..... 8 ilob affi IL"i 6j.. . ..... ..... �.. .; . i, With ft P rm$3 ... ......... pprpivArl Time Mav 1) 9014 4, 9Ii PR: 6. 0 1*� q 5/12/2014 19:25 Remote ID Remote [D D 13/i8 .......................... .... __ __ _ ......__ ____ _ ......_ _ _ __ __........._ __ ___ __ ............ .............. ___�_� '---- ............ —...... - -' -- ---' -- -' ----------. ----------' —' -- .� ----� ------. --� ---------' � ',~----~--'--~~.,'—~.---~~~'--,--'~~~~---.—~—^^ ............ ~......—~ ...... —~—~. Mina a xel tons �,' � � � 5/12/M14 19:25 Remote ID Remote ID D 14/18 ......... ..... ...... ...... ..........-.............. a Provtdnig engineering :arahiteGfural drsurueying servicestdoffiers:iii yotrc'apactty ....... as:Wnehginoer, arChU:bt or:surveyoi,and ..... 4 0i;6 ii ing :or Hiring Indopendent.professtanale to provlda; ehgIn90 h9,. arotiitebtural or-sury-, 6g;seryioestoconnocuan.iriit} ti�irisb`uet€onwsF4gp�.drM $a157ecttaPgagraph3 �e 6r'atlong tSi onprepare cirnapprovr maps, shop drawings a Pt aria approvin opinions reports, suPVEysr field orders change :orders -dr: .drawungs." and I! apecifiicaz ans'and fr Supervisory.or'inspecfion:ractivitles psrforfr ed a� part of ahyrelatetl ePchtfecteral or origin eering:activities: :.._...: ..,.. .... ..._..,.. . . : Professional serv'iot da'nof Incltida services ns wifhii7 e¢ truction tateans, mefhneJs technques,:.sequencos:ang;proc.-ures:orriplayed' by you'or .performed oy or. frsr :the : :' ct1nSTYlJG i©oi i'n2nac I its: 0: (C�y�S�* Its. subconfractnrs; tn :canriectit�n vJitil•dour - opera or 8.. f5odrly irfluiy"'�r prespertp dAmgA'`occtirnng after 1:: WE wnrk;:nclnd,ngii Ater ais;party or equipment:furnished in icpnheriion with uc €:work an tl e,.rdjebt tother than s rvtce ;ntalnfenanco.;crr repaus} to kts performed lay ar on . behalf of thp.,additfonaI insureds) at the.locaddn of ha caved tipermlons..ias been ` ,. . corr 'Istria or ,,:,,.. ... p - . �; That parf on of yogi woW put bf Whirh`thQ,inlury yr darnag arnses has hEm put to its tntendeEl, use by ;any person or organization :otheY than another contractor or . subcantrartor ohgaged an' fierforrn(ng`.operations far a oflnClpal as a.part of the:same p oledt' 4 ritCeaiy:IN Contribut'ary. When required ggvirtua of �vr[tten ontrad or;sgreelnent caverage;.,proVidedI any additional tnsure8 by ADDITIt3NElL tNSU#aED -4VdN€R5, LESSEES, 06NTt2ACTC3R8 QR rsTt Et2S c3tdGCriN UPEI A7tUN9=AUTOMATiG, tN t lot IN .#'RIIMARY.NON CONTPI8UTdkY.WiI 4s 9n;a+�nmary basis and Wll not s ok contrl�ruHon from fha additional Insured's}5altcy I CL fZ ild 13 U.$:t3 fnctudes c4I yrlgfitpd mefprizrof insuranCc'Se vices Cage 6 cif 6 .. - ONice,:lna,With itspem7iasionps Received Time Mav, 12, 2414. 4 25PM' No 0720' 5/12/2014 19:25 Remote ID Remote ID 15/18 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTOR GENERAL LIABILITY PLATINUM ENDORSEMENT This endorsement modlfles Insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. PROPERTY DAMAGE TO BORROWED EQUIPMENT 1. Paragraph 2.1. of SECTION I - COVERAGES, COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY is amended as follows: Paragraphs (3) and (4) of this exclusion do not apply to tools or equipment loaned to you, provided they are not being used to perform operations at the time of loss. 2. SECTION III—LIMITS OF INSURANCE is deleted and replaced by the following: The most we will pay in any one "occurrence" for "property damage" to borrowed equipment is $15,000, This limit of insurance is the most we will pay regardless of the number of: a. Insureds; b. Claims made or"suits" brought; or c. Persons or organizations making claims or bringing "suits". 3. Deductible a. Our obligation to pay damages on behalf of the insured applies only to the amount of damages in excess of $250 as applicable to "property damage" as the result of any one "occurrence", regardless of the number of persons or organizations who sustain damages because of that"occurrence". b. The terms of this insurance, including those with respect to our right and duty to defend the insured against any "suits" seeking those damages; and your duties In the event of an "occurrence", claim, or"suit" apply irrespective of the application of the deductible amount. c. We may pay any part or all of the deductible amount to effect settlement of any claim or suit and, upon notification of the action taken; you shall promptly reimburse us for such part of the deductible amount as we have paid. B. CONSTRUCTION PROJECT GENERAL AGGREGATE LIMIT 1. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under COVERAGE A (SECTION 1), and for all medical expenses caused by accidents under COVERAGE C (SECTION I), which can be attributed only to ongoing operations at a single construction project away from premises owned by or rented to the insured: a. A Single Construction Project General Aggregate Limit applies to each construction project away from premises awned by or rented to the insured, and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. b. The Single Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under COVERAGE A, except damages because of"bodily injury" or"property damage" included in the "products-completed operations hazard", and for medical expenses under COVERAGE C regardless of the number of: (1) Insureds; (2) Claims made or"suits" brought; or (3) Persons or organizations making claims or bringing"suits". c. Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the Single Construction Project General Aggregate Limit for that construction project away from premises owned by or rented to the insured. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Single Construction Project General Aggregate Limit for any other separate construction project away from premises owned by or rented to the insured. CL CG 00 20 01 12 Includes copyrighted material of Insurance Services Page 1 of 4 Office, Inc with its permission Received Time May, 12, 2014 4: 25PM No, 0720 5/12/2014 19:25 Remote ID Remote ID 16/18 d. The limits shown in the Declarations for Each Occurrence, Fire Damage and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Single Construction Project General Aggregate Limit. 2. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under COVERAGE A (SECTION 1), and for all medical expenses caused by accidents under COVERAGE C (SECTION I), which cannot be attributed only to ongoing operations at a single designated construction project away from premises owned by or rented to the insured: a. Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products-Completed Operations Aggregate Limit,whichever is applicable; and b. Such payments shall not reduce any Single Construction Project General Aggregate Limit. 3. When coverage for liability arising out of the"products-completed operations hazard" is provided, any payments for damages because of "bodily injury" or "property damage" included in the "products-completed operations hazard" will reduce the Products-Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit or the Single Construction Project General Aggregate Limit. 4. If the applicable construction project away from premises owned by or rented to the Insured has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. 5. The provisions of Limits Of Insurance (SECTION 111) not otherwise modified by this endorsement shall continue to apply as stipulated. C. LIMITED JOB SITE POLLUTION 1. Exclusion f. under Section I—Coverage A Is replaced by the following: 2. Exclusions This insurance does not apply to: f. Pollution (1) "Bodily injury" or "property, damage" arising out of the actual, alleged or threatened discharge, dispersal, seepage, migration, release or escape of"pollutants": (a) At or from any premises, site or location on which any Insured or any contractors or subcontractors working directly or indirectly on any insured's behalf are performing operations if the operations are to test for, monitor, clean up, remove, contain, treat, detoxify or neutralize, or in any way respond to, or assess the effects of, "pollutants"; or (b) At or from a storage tank or other container, ducts or piping which Is below or partially below the surface of the ground or water or which, at any time, has been buried under the surface of the ground or water and then subsequently exposed by erosion, excavation or any other means if the actual, alleged or threatened discharge, dispersal, seepage, migration, release or escape of"pollutants" arises at or from any premises, site or location which any insured or any contractors or subcontractors working directly or indirectly on any insured's behalf are performing operations If the "pollutants" are brought on or to the premises, site or location in connection with such operations by such insured, contractor or subcontractor. Subparagraph (b) does not apply to "bodily injury" or "property damage" arising out of heat, smoke or fumes from a "hostile fire". (2) Any loss, cost or expense arising out of any: (a) Request, demand, order or statutory or regulatory requirement issued or made pursuant to any environmental protection or environmental liability statutes or regulations that any insured test for, monitor, clean up, remove, contain, treat, detoxify or neutralize, or in any way respond to, or assess the effects of, "pollutants"; or CL CG 00 20 01 12 Includes copyrighted material of Insurance Services Page 2 of 4 Office, Inc with its permission Received Time May. 12. 2014 4: 25PM No, 0720 i 5/12/2014 19:25 Remote ID Remote ID ❑ 17/18 (b) Claim or suit by or on behalf of a governmental authority for damages because of testing for, monitoring, cleaning up, removing, containing, treating, detoxifying, or neutralizing or in any way responding to or assessing the effects of, "pollutants". However, this paragraph does not apply to liability for those sums the insured becomes legally obligated to pay as damages because of"property damage"that the insured would have in the absence of such request, demand, order or statutory or regulatory requirement, or such claim or "suit" by or on behalf of a governmental authority. 2. With respect to "bodily injury" or "property damage" arising out of the actual, alleged or threatened discharge, dispersal, seepage, migration, release or escape of"pollutants": a. The"Each Occurrence Limit" shown in the Declarations does not apply. b. Paragraph 7. of Limits Of Insurance(Section III) does not apply. c. Paragraph 1. of Section III—Limits Of Insurance is replaced by the following: The Limits Of Insurance shown in this endorsement, or in the Declarations and the rules below fix the most we will pay regardless of the number of: (1) Insureds; (2) Claims made or"suits" brought; or (3) Persons or organizations making claims or bringing "suits". d. The following are added to Section III—Limits Of Insurance: S. Subject to 2. or 3.above,whichever applies, the most we will pay for the sum of: a. Damages under Coverage A; and b. Medical expenses under Coverage C because of "bodily injury" or "property damage' arising out of the actual, alleged or threatened discharge, dispersal, seepage, migration, release or escape of "pollutants" is $100,000 aggregate. 9. Subject to S. above, the Medical Expense Limit Is the most we will pay under Coverage C for all medical expenses because of"bodily injury" sustained by any one person arising out of the actual, alleged or threatened discharge, dispersal, seepage, migration, release or escape of"pollutants". D. VOLUNTARY PROPERTY DAMAGE 1. The following is added to Section 1 —COVERAGES: We will pay, at your request for"property damage"to that part of any property: a. Which you or any subcontractors working directly or indirectly on your behalf are performing operations; or b. That must be restored, repaired or replaced because "your work" was incorrectly performed on it. This insurance applies only to "property damage" to property of others while in your care, custody, or control, and arising out of operations away from your insured premises and incidental to your business. Exclusions j.(3),(4),(5)and (6)do not apply to this coverage. This insurance does not apply to "property damage" Included within the "explosion hazard", the"collapse hazard" or the"underground property damage hazard". 2. For the purposes of the coverage provided by D. VOLUNTARY PROPERTY DAMAGE, SECTION III—LIMITS OF INSURANCE Is replaced by the following: A. Limits of Insurance 1. Unless a higher limit is shown in the Declarations, the most we will pay in any one "occurrence'for"property damage" under this endorsement is $15,000. 2. Unless a higher limit is shown in the Declarations, the most we will pay for all covered "occurrences" during any one policy period is $15,000 Aggregate Limit of Insurance. CL CG 00 20 01 12 Includes copyrighted material of Insurance Services Page 3 of 4 Office, Inc with its permission Received Time May. 12, 2014 4: 25PM No. 0720 5/12/2014 19:25 Remote ID Remote ID ❑ 18/18 The Limits of Insurance of this endorsement apply separately to each consecutive annual period and to any remaining period of less than 12 months, starting with the beginning of the policy period shown in the Declarations, unless the policy period is extended after issuance for an additional period of less than 12 months. In that case, the additional period will be deemed part of the last preceding period for purposes of determining the Limits of Insurance. 3. Deductible a. Our obligation to pay damages on behalf of the insured applies only to the amount of damages in excess of $250 as the result of any one "occurrence", regardless of the number of persons or organizations who sustain damages because of that"occurrence'. b. The terms of this Insurance, including those with respect to our right and duty to defend the insured against any"suits"seeking those damages; and your duties in the event of an "occurrence', claim, or "suit" apply irrespective of the application of the deductible amount. c. We may pay any part or all of the deductible amount to effect settlement of any claim or suit and, upon notification of the action taken; you shall promptly reimburse us for such part of the deductible amount as we have paid. 4. For the purposes of the coverage provided by D. VOLUNTARY PROPERTY DAMAGE, SECTION IV—COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: a. The following is added to paragraph 2. Duties In The Event Of Occurrence, Offense, Claim or Suit: In the event of loss covered by this endorsement, the insured shall, if requested by us, replace the property or furnish the labor and materials necessary for repairs at actual cost to the insured, excluding prospective profit or overhead charges of any nature. Any property so paid for or replaced shall, at our option, become our property. Any payment made by us shall not constitute an admission of liability by an insured, or by us. h. Paragraph 4.Other Insurance is amended as follows: (1) Paragraph 4.a. Primary Insurance is deleted. (2) Subparagraphs (1) and (2) of paragraph 4.b. Excess Insurance are deleted and replaced with the following: This insurance is excess over any of the other insurance, whether primary, excess, contingent or on any other basis. All other provisions that apply to paragraph 4. Other Insurance contained in the Commercial General Liability Coverage Form are applicable. 5. For the purposes of the coverage provided by D. VOLUNTARY PROPERTY DAMAGE, the following definitions are added to SECTION V—DEFINITIONS: a. "Collapse hazard" includes "structural property damage' and any resulting "property damage"to any other property at any time. b. "Explosion hazard" includes "property damage" arising out of blasting or explosion. The "explosion hazard" does not include "property damage' arising out of the explosion of air or steam vessels, piping under pressure, prime movers, machinery or power transmitting equipment. c. "Structural property damage' means the collapse of or structural injury to any building or structure due to: (1) Grading of land, excavating, borrowing, filling, back-filling, tunneling, pile driving, cofferdam work or caisson work; or (2) Moving, shoring, underpinning, raising or demolition of any building or structure or removal or rebuilding of any structural support of that building or structure. d. "Underground property damage hazard" includes "underground property damage" and any resulting "property damage'to any other property at any time. e. "Underground property damage" means "property damage" to wires, conduits, pipes, mains, sewers, tanks, tunnels, any similar property, and any apparatus used with them beneath the surface of the ground or water, caused by and occurring during the use of mechanical equipment for the purpose of grading land, paving, excavating, drilling, borrowing,filling, back-filling or pile driving. CL CG 00 20 01 12 Includes copyrighted material of Insurance Services Page 4 of 4 Offico, Inc with its permission Received Time May. 12, 2014 4: 25PM No. 0720 5/12/2014 19:25 Remote ID Remote ID 3/18 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY COMMERCIAL AUTOMOBILE EXPANSION ENDORSEMENT - PLATINUM This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM The following provides a broad range of coverage in addition to that provided by the basic policy. In some instances, a higher limit or broader coverage is available. Should the policy indicate broader coverage or higher limits than provided by this endorsement,the higher limits or broader coverage shall apply- A. BROADENED NAMED INSURED (2) A person's or organization's status as an additional insured exists only The Named I nsured shown in the Declarations Is amended to Include: while you are performing operations for that additional Insured. Any organization,other than a joint venture, over (3) Section II, Paragraph C. Limits of which you maintain ownership or majority inter- Insurance for person or organization as[ of more than 50%, unless that organization added as additional insured are is an "insured" under any other automobito pol- those specified In the written can- icy or would be an "Insured" under such a policy tract or agreement, or in this cover- but for the exhaustion of Its Limit of insurance, age form,whichever is less. These however; limits of insurance are Inclusive of 1. Coverage under this provision is afforded and are not in addition to the Limits only until the 180th day after you acquire or of Insurance shown In the Declare- form the organization or the end of the policy tions. period,whichever is earlier. (4) This insurance applies on a primary 2. Coverage does not apply to"bodily injury"or and non-contributory basis if that is "property damage" that occurred before you required by the written contract or acquired orformed theorganizatlDn. agreement, B. ADDITIONAL INSURED BY CONTRACT OR (5) This insurance does not apply AGREEMENT unless the written contract or The following is added Io Section II - Liability agreement has been executed prior Coverage, Paragraph A.1.: d the "bodily injury" of "property damage". d. Any person or organization for whom you C. ADDITIONAL INSURED -EMPLOYEES are performing operations if you and such person or organization have agreed in writ- The following is added to the Section il—Liability ing in e rontmrt or agreement that such Coverage, Paragraph A.I. Who Is An Insured person or organization be added as an addi- Provision: tional insured on your policy. Any"employee" of yours Is an "insured" while us- (1) Such person or organizatlon Is an ing a covered "auto"you don't own, hire or borrow additional insured only with respect in your business or your personal affairs. to liability for"bodily injury'or"prop- D. EXTENDED COVERAGE-BAIL BONDS erty damage': Section II — Liability Coverage, Paragraph (a) Caused by an"accident", and A.2.a.(2). is deleted and replaced by the follow- (b) Resulting from the ownership, Ing: maintenance or use of a Gov- (2) Up to $5,000 for cost of bail bonds Bred "auto". (Including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish these bonds. CW 34 6110112 Includes Copyrighted material of Insurance Services Page 1 of 5 Office,Inc.,with its permission Received Time May. 12. 2014 4: 25PM No, 0720 5/12/2014 19:25 Remote ID Remote ID D 4/18 E. EXTENDED COVERAGE - LOSS OF EARN- J, LEASED OR FINANCED "AUTOS" - PHYSI- ING CAL DAMAGE COVERAGE Section II - Liability Coverage, Paragraph The following is added to Section III - Physical A.2.a.(4) is deleted and replaced by the follow- Damage Coverage, Paragraph C. ing: 4. In the event of a total "loss" to a covered (4) All reasonable expenses incurred by auto", we will pay any unpaid amount due the "insured" at our request, includ- on the lease or loan for a covered "auto", ing actual loss of earning up to$500 less: a day because of time off from work. a. The amount under the Physical Damage F. FELLOW EMPLOYEE COVERAGE Coverage section of the policy; and The Fellow Employee Exclusion contained in J. Any: Section II -Liability Coverage does not apply. (1) Overdue leasefloan payments at the This coverage is excess over any other collect- time of the"loss"; able Insurance. G. AUTO MEDICAL PAYMENTS COVERAGE - (2) Financial penalties Imposed under a INCREASED LIMIT lease for excessive use, abnormal wear and tear or high mileage; If the"insured"Is Wearing a seat belt at the time (3) Security deposits not returned by an "accident" occurs, the LIMIT OF INSUR- the lessor; Al for AUTOMOBILE MEDICAL PAYMENTS COVERAGE shown in the Declarations will be (4) Costs for extended warranties, double the limit shown. All other terms and con- Credit Life Insurance, Health, Acci- ditions applicable to MEDICAL PAYMENTS re- dent or Disability Insurance pur- main unchanged, chased with the loan or lease; and H. COVERAGE EXTENSION AS A CONSE- (5) Carry-over balances from previous QUENCE OF THEFT OF AN "AUTO" - loans or leases. 1. Transportation Expense K. GLASS DEDUCTIBLE Section III - Physical Damage Coverage, Section III - Physical Damage Coverage, Para- Paragraph A.4.a. is deleted and replaced by graph D. is deleted and replaced by the follow- the following: ing: a. We will also pay up to $75 per day to a D. DEDUCTIBLE maximum of $2,500 for temporary For each covered "auto" our obligation to transportation expense Incurred by you pay for, repair, return or replace damaged or because of the total theft of a covered stolen property will be reduced by the appli- "auto' of the "private passenger type°. cable deductible shown in the Declarations. We will pay only for (hose covered Any Comprehensive Coverage deductible "autos' for which you carry either Com- shown in the Declarations does not apply to: prehensive or Specified Causes of Loss Coverage. We will pay for temporary 1. "Lass"caused by fire or lightning;or transportation expenses Incurred during 2, "Loss"when you elect to patch or repair the period beginning 48 hours after the glass rather than replace. theft and ending, regardless of the pol- icy's expiration,when the covered"auto' L. EXTENDED COVERAGE - ELECTRONIC Is returned to use or we pay for its EQUIPMENT "loss". Paragraph C.2.a. Limits of insurance of Section We will also pay reasonable and neces- III-Physical Damage Coverage Is deleted.: sary expenses to facilitate the return of We will pay with respects to a covered "auto"for the stolen "auto"to you. 'loss" to antennas and other accessories neces- I. EXTENDED COVERAGE-AIRBAGS sary for use of the electronic equipment. How- Section III - Physical Damage Coverage, Para- ever, this does not include tapes, records or graph 0.3.a. does not apply to the unintended discs. discharge of an airbag. Coverage is excess over any other collectible insurance or warranty specifically designed to provide coverage. CW 34 68 0112 Includes Copyrighted material of Insurance Services Page 2 of 5 Office,Inc„with its permission I Received Time May, 12. 2014 4:25PM No, 0720 5/12/2014 19:25 Remote ID Remote ID 0 5/18 M. EXTENDED COVERAGE - PERSONAL EF- P. PHYSICAL DAMAGE COVERAGE - HIRED FECTS "AUTOS The following is added to Section III — Physical You may extend the Comprehensive, Specified Damage Coverage, Paragraph AA.: Causes of Loss and Collision coverages pro- vided on your owned "autos" to any "auto" you "auto" maybe extended "loss"to lease, rent, hire or borrow from someone other eyed your "auto" personal property if you are an than your employees or partners or members of their households subject to the following: Individual, the personal property of a family member, that is In the covered 1. The most we will pay in any one"loss" Is the "auto"at the time of"loss". least of $100,000, the actual cash value of e"loss" the"auto"or the cost to repair or replace the The most we will pay for any on under this coverage extension is a "loss" "auto", except that such amount will be re- duced by a deductible to be determined as N. TOWING AND LABOR COVERAGE follows: Section III — Physical Damage Coverage, Para- a. The deductible shall be equal to the graph A.2.is deleted and replaced by the follow- amount of the highest deductible shown Ing: for any owned"auto" of the same classi- fication for that coverage. In the event If a private passenger type "auto" or light truck there Is no owned "auto" of the same "auto" (0-10,000 Lbs. GVW) is provided both classification, the highest deductible for Comprehensive and Collision Coverage, we will any owned "auto"will apply for that cov- pay up to $150 for towing and labor costs In- erage. curred each time such "auto" is disabled. If a medium, heavy or extra-heavy truck or extra- - b, No deductible will apply to "loss" caused heavy Truck-tractor "auto" (greater than 10,000 by fire or lightning. Lbs. GVW)Is provided both Comprehensive and 2. Coverage provided under this extension will; Collision Coverage, we will pay up to $250 for towing and labor costs incurred each time such a. Be excess over any other collectible "auto" Is disabled. However, the labor must be insurance; performed at the place of disablement. b. Pay, in addition to the limit set forth in O. EXTENDED COVERAGE - CUSTOMIZED P.I. above, up to $500 per day, not to FURNISHINGS exceed $3.500 per"loss*for: The following is added to Section III — Physical (1) Any costs or fees associated with Damage Coverage, Paragraph A.4.: the"loss"to a hired"auto"; and e. Physical Damage Coverage on a cov- (2) Loss of use, provided It is the con- ered "auto" may be extended to "loss"to sequence of art "accldenV for which custom furnishings including, but not you are legally liable, and as a result limited to special carpeting and insula- of which a monetary loss is sus- lion, helght-extending roofs, and custom tamed by the leasing or rental con- murals, paintings, or other decals or tern. graphics, custom signage and custom O, RENTAL REIMBURSEMENT COVERAGE non-factory paint. Our limit of liability for loss to custom We will pay for rental reimbursement expenses furnishings shall be the least of: incurred by you for the rental of an "auto" be- cause of"loss"to a covered"auto". (1) Actual cash value of the stolen or 1, Payment applies in addition to the otherwise damaged property; applicable amount of each coverage you (2) Amount necessary to repair or re- have on the covered"auto", place the property;or 2. No deductible applies to this coverage. (3) $1,000 3. We will pay only for those expenses incurred This coverage extension does not apply during the policy period beginning 24 hours to electronic equipment. after the"loss"and ending, regardless of the expiration date of the policy, with the lesser of the following: C W 34 66 0112 Includes Copyrighted material of Insurance Services Page 3 of 5 Office,inc.,with its permission Received Time May. 12. 2014 4: 25PM No. 0120 5/12/2014 19:25 Remote ID Remote ID ❑ 6/19 a. When the covered "auto" has been re- (b) Any"auto"used by that individual paired or replaced,or or his or her spouse while working aid under this in a business of selling, servicing, b. When the total amount P repairing or parking"autos". coverage extension reaches$2,500. 2. Changes in Auto Medical Payments And 4. Our payment is limited to the lesser of the Uninsured And Underinsured Motorists following amounts: Coverages a. Necessary and actual expenses in- The following is added to Who Is An Insured: curred. Any individual named in R.1.a and his or her b. Not more than$75 per day. "family members"are"Insured" while"occupy- 5. We will ay up to an additional $300 for the ing" or while a pedestrian when being struck pa y reasonable and necessary expenses you in- by any"auto"you don't own except: cur to remove your materials and equipment Any "auto" owned by that individual or by any from the covered "auto' and replace such "family member". materials and equipment on the rental 3. Changes In Physical Damage Coverage "auto Any private passenger type "auto" you don't 6. This coverage does not apply while there own,hire or borrow Is a covered"auto"while In are spare or reserve "autos" available to you the care, custody or control of any individual for your operations. named in R.1.a or his or her spouse while a 7. If`loss" results from the total theft of a cov- resident of the same household except: ered "auto" of the "private passenger type", a. Any "auto" owned by that individual or by we will pay under this coverage only that any member of his or her household. amount of your rental reimbursement ex- b. Any"auto" used by that individual or his or penses which is not already provided far tin- her spouse while working in a business of der the Physical Damage Coverage Exten- selling, servicing, repairing or parking sion• "autos". R. DRIVE OTHER CAR COVERAGE 4. The most we will pay for the total of all dam- 1. Changes In Liability Coverage ages under LIABILITY COVERAGE, AUTO MEDICAL PAYMENTS, UNINSURED MO- a. Any"auto" you don't own,hire or borrow Is TORISTS COVERAGE and UNDERIN- a covered "auto" for Liability Coverage SURED MOTORISTS COVERAGE is the while being used by: LIMITOF INSURANCE shown in the Decla- (1) You, if you are designated in the rations as applicable to owned"autos". Declarations as an Individual; 5. Our obligation to pay for, repair, return or (2) Your partners or members, if you replace damaged or stolen property under are designated in the Declarations PHYSICAL DAMAGE COVERAGE, will be as a partnership orjolnl venture; reduced by a deductible equal to the amount of the largest deductible shown for any (3) Your members or managers, if you owned private passenger type "auto" appll- are designated in the Declarations cable to that coverage. If there are no as a limited liability company; owned private passenger type "autos", the (4) Your "executive officers", If you are deductible shall be $60 for Comprehensive designed in the Declarations as an Coverage and $100 for Collision Coverage. organization other than an individ- No deductible will apply to "loss" caused by ual, partnership,joint venture or lim- fire or lightning. ited liability company; and E. Additional Definition (5) The spouse of any person named in As used In this section; R. DRIVE OTHER R.1.a.1. through R.1.a.(4) while a CAR COVERAGE: resident of the same household. 'Family member" means a person related to except: the individual named in R.1.a by blood, Inar- (a) Any "auto" owned by that individ- rage or adoptlon who is a resident of the Indl- ual or by any member of his or vidual's household, including a ward or foster her household. child. CW 34 68 01 12 Includes Copyrighted material of Insurance Services Page 4 of 5 Office,Inc.,with Its permission Received Time May. 12, 2014 4: 25PM No. 0720 5/12/2014 19:25 Remote ID Remote ID ❑ 7/1e S. KNOWLEDGE OF OCCURRENCE T. WAIVER OF SUBROGATION BY CONTRACT The following is added to Section IV— Business OR AGREEMENT Auto Conditions, Paragraph A.2.: The following Is added to Section IV - Business d. Notice of an "accident" or "loss" will be Auto Conditions, Paragraph A,5,: considered knowledge of yours only if We waive any right of recovery we may have reported to you, if you are an individual, against any "insured" provided coverage under a partner, an executive officer or an em- this endorsement under B., ADDITIONAL IN- ployee designated by you to give us SURED BY CONTRACT OR AGREEMENT, but such notice. only as respects "loss' arising out of the opera- lion, maintenance or use of a covered "auto" e. Notice of an "accident" or "less" to your pursuant to the provisions or conditions of the Workers Compensation insurer, for an event which later develops into a claimwritten contractor agreement. for which there Is coverage under this U. UNINTENTIONAL OMISSIONS policy, shall be considered notice to us, The following is added Section IV - Business but only if we are notified as soon as Auto Conditions, Paragraph B.2.: you know that the claim should be ad- dressed by this policy, rather than your We will not deny coverage under this policy if Workers Compensation policy. you fail to disclose all hazards existing as of the f. Your rights under this policy shall not be inception date of the policy, provided such fall- prejudiced if you fail to give us notice of ure is not intentional. an "accident" or "loss", solely due to V LIBERALIZATION your reasonable and documented belief If we revise this endorsement to provide greater that the event is not covered by this pol- coverage without additional premium charge,we Icy will automatically pmvidn the. addlllonal rover- The following is added to Section IV—Busl- age to all endorsement holders as of the day the ness Auto Conditions, Paragraph 2.b.: revtsion N effective in your stale, (6) Knowledge of the receipt of docu- ments concerning a claim or "suit" will be considered knowledge of yours only if receipt of such docu- ments is known to you, if you are an individual, a partner, an executive officer or an employee designated by you to forward such documents to us. i CW 34 68 0112 Includes Copyrighted material of Insurance Services Page 5 of 5I, Office,Inc„with its permission Received Time May. 12, 2014 4: 25PM No, 0720 Bond #58708078 PAYMENT AND PERFORMANCE BOND ICtNT TO CITY OF KENT Wne '.a.nx KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, Transportation Systems, Inc. as Principal, and western surety company a Corporation organized and existing under the laws of the State of Washington, as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of 39, 946.00 , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of 101" Ave. SE at SE 2561h St. Signal Pole Replacement (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority of its governing body. 101"at 256"' Signal Pole Replacement/Vesper 9 April 9, 2014 Bond #58708078 Transportation Systems, Inc. TWO WITNESSES: Y&A4PRINCIPAL r principal's name above) Z- BY: //:) S{ltl�ic �urn� TITLE: �rCS�U DATE: S-2J Y DATE: S•2!•/ f CORPORATE SEAL: lVelS Rust l7cuAA� PRINT NAME Western Surety Company DATE: o G SURETY CORPORATE SEAL: BY: Brian D s, attorney-in-fact DATE: 05/12/2014 TITLE: Attorney-in-fact ADDRESS: MCM 1325 Fourth Ave Suite 2100 Seattle, WA 98101 CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within Bond; that Who signed the said bond on behalf of the Principal of the said Corporation; that I know his signature thereto is genuine, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. SECRETARY OR ASSISTANT SECRETARY 1015'at 256' Signal Pole Replacement/Vesper 10 April 9, 2014 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents,That WESTERN SURETY COMPANY,a South Dakota corporation,is a duly organized and existing corporation having its principal office in the City of Sioux Falls,and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make,constitute and appoint Don Bacic, Maria Moss, Marilyn Larson, Brian Daniels, Brian O'Neil, Regan Hupf, Individually of Seattle,WA,its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - �I and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney,pursuant to the authority hereby given,are hereby ratified and confirmed. I;I This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof,duly adopted,as indicated,by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 27th day of July,2012. s�pErrw WESTERN SURETY COMPANY �„'QTpPPOg4j`t ai cy�4TN Ufi��a' and T.RnrBa[,Vice President State of South Dakota ss County of Minnchaha On this 27th day of July,2012,before me personally came Paul T.Bruflat,to me known,who,being by me duly swom,did depose and say: that he resides in the City of Sioux Falls,Stale of South Dakota;that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deer]of said cotporation. My commission expires 444FSNNh%""%444N4444445 III, { J.MORTE NOTARY PUBLIC _ Jane 23,2015 I6eAL SOUTH DAKOTA 1444444444444444444444444! �/v(/v J.Mohr,Notary Public CERTIFICATE I,L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in farce,and further certify that the By-Law of the corporation printed on the reverse hereof is still in force, in testimony whereof f have hereunto subscribed my name and affixed the seal of the said corporation this (Zty day of_/PI , 67 WESTERN SURETY COMPANY r ....pON�e01s AV Vrr \�TT\ �� zI l L.Nelson,Assistant Secretary Foot F4280-7-2012 Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360.902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 4/9/2014 'Count Trade Job Classification Wa a Holiday Overtime Note! :King Asbestos Abatement Workers Journey Level $41.69 5D 1H S ,King Boilermakers Journey Level $64.44 5N 1C "King Brick Mason Brick And Block Finisher $43.26 5A 1M EKing Brick Mason Journey Level $50.12 5A 1M ?King Brick Mason Pointer -Cleaner $50.12 5A 1M ;King Building Service Employees Janitor $20.59 5S 2F }King Building Service Employees Traveling Waxer/Shampooer $21.00 5S 2F tKing Building Service Employees Window Cleaner (Non-Scaffold) $24.29 5S 2F `King Building Service Employees Window Cleaner (Scaffold) $25.15 SS 2F iKing Cabinet Makers (In Shop) Journey Level $22.74 1 'King Carpenters Acoustical Worker $50.82 5D 1M 'King Carpenters Bridge, Dock And Wharf $50.82 5D 1M Carpenters jKing Carpenters Carpenter $50.82 5D 1M !King Carpenters Carpenters on Stationary Tools $50.95 5D 1M Mng Carpenters Creosoted Material $50.92 5D 1M ;King Carpenters Floor Finisher $50.82 5D 1M King Carpenters Floor Layer $50.82 5D 1M King Carpenters Scaffold Erector $50.82 5D 1M King Cement Masons Journey Level $51.18 7A 1M King Divers Et Tenders Diver $105.37 5D 1M SA SKing Divers Et Tenders Diver On Standby $59.50 5D 1M King Divers Et Tenders Diver Tender $54.82 5D 1M SKing Divers 8 Tenders Surface Rcv Et Rov Operator $54.82 5D 1M King Divers B Tenders Surface Rcv Et Rov Operator $51.07 5A 1 B Tender King Dredge Workers Assistant Engineer $53.00 5D 3F !King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F I https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 2 of 17 King Dredge Workers Boatmen $52.301 5D 3F King Dredee Workers Engineer Welder $54.04 5D 3F :King Dredee Workers Leverman, Hydraulic $55.17 5D 3F SKing Dredee Workers Mates $52.30 5D 3F kng _Dredge Workers Oiler $52.58 5D 3F i 'King Drywall Aoolicator Journey Level $50.82 5D 1H 'King Drywall Taoers Journey Level $50.87 5P 1E { 'King Electrical Fixture Maintenance Journey Level $25.84 SL 1E Workers !King Electricians - Inside Cable Splicer $65.69 7C 2W 'King Electricians - Inside Cable Splicer (tunnel) $70.52 7C 2W ;King Electricians Inside Certified Welder $63.49 7C 2W !King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W ;King Electricians - Inside Construction Stock Person $35.69 7C 2W King Electricians - Inside Journey Level $61.30 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W ;King Electricians - Motor Shop Craftsman $15.37 1 iKing Electricians - Motor Shoo Journey Level $14.69 1 iKing Electricians - Powerline Cable Splicer $68.33 5A 4A Construction 'King Electricians - Powerline Certified Line Welder $62,50 5A 4A i Construction King Electricians - Powerline Groundperson $42.56 5A 4A Construction iKing Electricians - Powerline Heavy Line Equipment $62.50 5A 4A Construction Operator { King Electricians - Powerline Journey Level Lineperson $62.50 5A 4A Construction iKing Electricians - Powerline Line Equipment Operator $52.47 5A 4A f Construction King Electricians - Powerline Pole Sprayer $62.50 5A 4A Construction King Electricians - Powerline Powderperson $46.55 5A 4A I Construction iKing Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $80.14 7D 4A IKing Elevator Constructors Mechanicln Charge $86.77 70 4A g 11K Fabricated Precast Concrete All Classifications - In-Factory $15.25 5B 1 R Products Work Only King Fence Erectors Fence Erector $15.18 1 King Flaegers Journey Level $35.34 7A 31 King Glaziers Journey level $53.76 7L 1y King Heat it Frost Insulators And Journeyman $58,93 5J 15 Asbestos Workers King Heating Equipment Mechanics Journey Level $69.37 7F 1 E King Hod carriers 8 Mason Tenders IJourney Level $42.99 7A 31 iKing Industrial Power Vacuum Journey Level $9.32 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 3 of 17 Cleaner ;King Inland Boatmen Boat Operator $54.57 5B 1K (King Inland Boatmen Cook $50.95 5B 1K ,King Inland Boatmen Deckhand $51.19 5B 1K (King Inland Boatmen Deckhand Engineer $52.18 5B jKing Inland Boatmen Launch Operator $53.40 5B #Z�% 1K ;King Inland Boatmen Mate $53.40 5B 1K ,King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water Systems By Operator Remote Control !King Inspection/Cleaning/ Laing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control iKing Inspection/Cleaning/Sealing Of Head Operator $24.91 1 j Sewer Et Water Systems By Remote Control 'King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer Et Water Systems By Remote Control IKing Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 s Sewer Et Water Systems By Remote Control ;King Insulation Applicators Journey Level $50.82 5D 1M King Ironworkers Journeyman $59.77 7N 10 King Laborers Air, Gas Or Electric Vibrating $41.69 7A 31 Screed King Laborers Airtrac Drill Operator $42.99 7A 31 King Laborers Ballast Regular Machine $41.69 7A 31 King Laborers Batch Weighman $35.34 7A 31 King Laborers Brick Pavers $41.69 7A 31 3King Laborers Brush Cutter $41.69 7A 31 King Laborers Brush Hog Feeder $41.69 7A 31 j King laborers Burner $41.69 7A 31 King Laborers Caisson Worker $42.991 7A 31 King Laborers Carpenter Tender $41.691 7A 31 ;King Laborers Caulker $41.69 7A 31 [King Laborers Cement Dumper-paving $42.46 7A 31 jKing Laborers Cement Finisher Tender $41.69 7A 31 I King Laborers Change House Or Dry Shack $41.69 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $41.69 7A 31 ;King Laborers Chipping Gun(30 Lbs. And $42.46 7A 31 Over) King Laborers Choker Setter $41.69 7A 31 King Laborers Chuck Tender $41.69 7A 31 ;King Laborers Clary Power Spreader $42.46 7A 31 J King Laborers Clean-up Laborer $41.69 7A 31 King Laborers Concrete Dumper/chute $42.46 7A 31 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 4 of 17 Operator King Laborers Concrete Form Stripper $41.69 7A 31 King Laborers Concrete Placement Crew $42.46 7A 31 King Laborers Concrete Saw Operator/core $42.46 7A 31 Driller jKing Laborers Crusher Feeder $35.34 7A 31 King Laborers Curing Laborer $41.69 7A 31 King Laborers Demolition: Wrecking & Moving $41.69 7A 31 (incl. Charred Material) 'King Laborers Ditch Digger $41.69 7A 31 ;King Laborers Diver $42.99 7A 31 ;King Laborers Drill Operator $42.46 7A 31 (hydraulic,diamond) j King Laborers Dry Stack Walls $41.69 7A 31 jKing Laborers Dump Person $41.69 7A 3 ;King Laborers Epoxy Technician $41.691 7A 31 ;King Laborers Erosion Control Worker $41.69 7A 31 IKing Laborers Falter Et Bucker Chain Saw $42.46 7A 31 jKing Laborers Fine Graders $41.69 7A 31 King Laborers Firewatch $35.34 7A 31 King Laborers Form Setter $41.69 7A 31 King Laborers Gabian Basket Builders $41.69 7A 31 ;King Laborers General Laborer $41.691 7A 31 rKing Laborers Grade Checker Et Transit $42.99 7A 31 I Person in Laborers Grinders $41.69 7A 31 IKing Laborers Grout Machine Tender $41.69 7A 31 King Laborers Groutmen (pressure)including $42.46 7A 31 l Post Tension Beams King Laborers Guardrail Erector $41.69 7A 31 King Laborers Hazardous Waste Worker (level $42.99 7A 31 A) King Laborers Hazardous Waste Worker (level $42.46 7A 31 B) King Laborers Hazardous Waste Worker (level $41.69 7A 31 C) King Laborers High Scaler $42.99 7A 31 'King Laborers Jackhammer $42.46 7A 31 'King Laborers Laserbeam Operator $42.46 7A 31 jKing Laborers Maintenance Person $41.69 7A 31 yKing Laborers Manhole Builder-mudman $42.461 7A 31 jKing Laborers Material Yard Person $41.69 7A 31 jKing Laborers Motorman-dinky Locomotive $42.46 7A 31 King Laborers Nozzleman (concrete Pump, $42.46 7A 31 Green Cutter When Using Combination Of High Pressure Air a Water On Concrete & https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 5 of 17 Rock, Sandblast, Gunite, Shotcrete, Water Bla iKing Laborers Pavement Breaker $42.46 7A 31 King Laborers Pilot Car $35.34 7A 31 jKing Laborers Pipe Layer Lead $42.99 7A 31 :King Laborers Pipe Layer/tailor $42.46 7A 31 ,King Laborers Pipe Pot Tender $42.46 7A 31 King Laborers Pipe Reliner $42.46 7A 31 IKing Laborers Pipe Wrapper $42.46 7A 31 EKing Laborers Pot Tender $41.691 7A 31 iKing Laborers Powderman $42.99 7A 31 jKing Laborers Powderman's Helper $41.69 7A 31 iKing Laborers Power Jacks $42.46 7A 31 jKing Laborers Railroad Spike Puller - Power $42.46 7A 31 King Laborers Raker - Asphalt $42.99 7A 31 King Laborers Re-timberman $42.99 7A 31 ;King Laborers Remote Equipment Operator $42.46 7A 31 King Laborers Rigger/signal Person $42.46 7A 31 !King Laborers Rip Rap Person $41.69 7A 31 ;King Laborers Rivet Buster $42.461 7A 31 IKing Laborers Rodder $42.46 7A 31 jKing Laborers Scaffold Erector $41.69 7A 31 King Laborers Scale Person $41.69 7A 31 jKing Laborers Sloper (over 20") $42.46 7A 31 King Laborers SloperSprayer $41.69 7A 31 IKing Laborers Spreader (concrete) $42.46 7A 31 jKing Laborers Stake Hopper $41.691 7A 31 King Laborers Stock Piler $41.69 7A 31 King Laborers Tamper 8 Similar Electric, Air $42.46 7A 31 1 8 Gas Operated Tools Vng Laborers Tamper (multiple B Self- $42.46 7A 31 } propelled) d King Laborers Timber Person - Sewer (lagger, $42.46 7A 31 a 1 Shorer Et Cribber) IKing Laborers Toolroom Person (at Jobsite) $41.69 7A 31 , [Mq Laborers Topper $41.69 7A 31 iKing Laborers Track Laborer $41.69 7A 31 King Laborers Track Liner(power) $42.46 7A 31 King Laborers Traffic Control Laborer $37.79 7A 31 811 1 I j King Laborers Traffic Control Supervisor $37.791 7A 3l 811 !King Laborers Truck Spotter $41.69 7A 31 i ;King Laborers Tugger Operator $42.46 7A 31 iKing Laborers Tunnel Work-Compressed Air $60.06 7A 31 Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $65.09 7A 31 8� https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 6 of 17 Worker 30.01.44.00 psi King Laborers Tunnel Work-Compressed Air $68.77 7A 31 Worker 44.01.54.00 psi jKing Laborers Tunnel Work-Compressed Air $74.47 7A 31 S Worker 54.01.60.00 psi ;King Laborers Tunnel Work-Compressed Air $76.59 7A 31 Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $81.69 7A 31 ! Worker 64.01-68.00 psi `King Laborers Tunnel Work-Compressed Air $83.59 7A 31 8D Worker 68.01-70.00 psi {King Laborers Tunnel Work-Compressed Air $85.59 7A 31 8D Worker 70.01-72.00 psi =King Laborers Tunnel Work-Compressed Air $87.59 7A 31 8D Worker 72.01.74.00 psi King Laborers Tunnel Work-Guage and Lock $43.09 7A 31 8D Tender 'King Laborers Tunnel Work-Miner $43.09 7A 31 80 IKing Laborers Vibrator $42.46 7A 31 King Laborers Vinyl Seamer $41.69 7A 31 jKing Laborers Watchman $32.12 7A 31 IKing Laborers Welder $42.46 7A 31 jKing Laborers Well Point Laborer $42.46 7A 31 IKing Laborers Window Washer/cleaner $32.12 7A 31 ,King Laborers - Underground Sewer General Laborer 8 Topman $41.69 7A 31 &Water King Laborers - Underground Sewer Pipe Layer $42.46 7A 31 t3 Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 i Installers IKing Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers ;King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $50.82 5D 1H IKing Marble Setters Journey Level $50.12 5A 1M !King Metal Fabrication (In Shop) Fitter $15.86 1 ;King Metal Fabrication (In Shop) Laborer $9.78 1 jKing Metal Fabrication (In Shop) Machine Operator $13.04 1 ;King Metal Fabrication (In Shop) Painter $11.10 1 j jKing Metal Fabrication (In Shop) Welder $15.48 1 King Mittwright Journey Level $51.92 5D 1M jKing Modular Buildings Cabinet Assembly $11.56 1 jKing Modular Buildings Electrician $11.56 1 jKing Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 3 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 7 of 17 I King Modular Buildines Tool Maintenance $11.56 1 IKing Modular Buildines Utility Person $11.56 1 (King Modular Buildings Welder $11.56 1 ;King Painters Journey Level $37.80 6Z 2B ;King Pile Driver Journey Level $51.07 5D IM i ;King Plasterers Journey Level $49.29 70 1R !King Playground 8 Park Equipment Journey Level $9.32 1 ( Installers ;King Plumbers Ft Pipefitters Journey Level $73.69 6Z 1G IKing Power Equipment Operators Asphalt Plant Operators $53.49 7A 3C 8P ;King Power Equipment Operators Assistant Engineer $50.22 7A 3C 8P `King Power Equipment Operators Barrier Machine (zipper) $53.00 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $53.00 7A 3C 8P Concrete ;King Power Equipment Operators Bobcat $50.22 7A 3C 8P IKing Power Equipment Operators Brokk - Remote Demolition $50.22 7A 3c 8P Equipment King Power Equipment Operators Brooms $50.22 7A 3C 8P King Power Equipment Operators Bump Cutter $53.00 7A 3C 8P King Power Equipment Operators Cableways $53.49 7A 3C 8P King Power Equipment Operators Chipper $53.00 7A 3C 813 !King Power Equipment Operators Compressor $50.22 7A 3C 8P IKing Power Equipment Operators Concrete Pump: Truck Mount $53.49 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $50.22 7A 3C 8P Screed {King Power Equipment Operators Concrete Pump - Mounted Or $52.58 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. ;King Power Eauipment Operators Concrete Pump: Truck Mount $53.00 7A 3C 8P With Boom Attachment Up To 42m f ;King Power Equipment Operators Conveyors $52.58 7A 3C SP King Power Equipment Operators Cranes: 20 Tons Through 44 $53.00 7A 3C 8P Tons With Attachments i King Power Equipment Operators Cranes: 100 Tons Through 199 $54.04 7A 3C AP Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P Or 250'Of Boom (including Jib With Attachments) ;King Power Equipment Operators Cranes! 45 Tons Through 99 $53.49 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Under I https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 8 of 17 I'King Power Equipment Operators Cranes: Friction 100 Tons $54.61 7A 3C 8P Through 199 Tons !King Power Equipment Operators Cranes: Friction Over 200 Tons $55.17 7A 3C 8P ;King Power Equipment Operators Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P Of Boom (including Jib With Attachments) i King Power Equipment Operators Cranes: Through 19 Tons With $52.58 7A 3C 8P Attachments A-frame Over 10 Tons .King Power Equipment Operators Crusher $53.00 7A King Power Equipment Operators Deck Engineer/deck Winches $53.00 7A 3C 8P ) (power � jKing Power Equipment Operators Derricks, On Building Work $53.49 7A 3C 8Ps IKing Power Equipment Operators Dozers D-9 8 Under $52.58 7A 3C 8P i IKing Power Equipment Operators Drill Oilers: Auger Type, Truck $52.58 7A 3C 8P Or Crane Mount jKing Power Equipment Operators Drilling Machine $53.00 7A 3C 8P i ;King Power Equipment Operators Elevator And Man-lift: $50.22 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $53.00 7A 3C 8P 9 Gamaco Iz Similar Equipment ! ;King Power Equipment Operators Forklift: 3000 Lbs And Over $52.58 7A 3C 8P With Attachments j !King Power Equipment Operators Forklifts: Under 3000 Lbs. With $50.22 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $53.00 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $50.22 7A 3C 8P King Power Equipment Operators Guardrail Punch $53.00 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $53.49 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Ft Over I King Power Equipment Operators Hard Tail End Dump $53.00 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $52.58 7A 3C 8P 3 Locator King Power Equipment Operators Horizontal/directional Drill $53.00 7A 3C 8P Operator 'King Power Equipment Operators Hydralifts/boom Trucks Over $52.58 7A 3C 8P f 10 Tons !King Power Equipment operators Hydralifts/boom Trucks, 10 $50.22 7A 3C 8P Tons And Under j IKing Power Equipment Operators Loader, Overhead 8 Yards. & $54.04 7A 3C 8P i Over King Power Equipment operators Loader, Overhead, 6 Yards. But $53.49 7A 3C 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $53.00 7A 3C 8P Yards ! https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 9 of 17 I i King Power Equipment Operators Loaders, Plant Feed $53.001 7A 3C 8P jKing Power Equipment Operators Loaders: Elevating Type Belt $52.58 7A 3C 8P ;King Power Equipment Operators Locomotives, All $53.001 7A 3C 8P King Power Equipment Operators Material Transfer Device $53.00 7A 3C 8p King Power Equipment Operators Mechanics, All (leadmen - $54.04 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Grader - Non- $52.58 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $53.49 7A 3C 8P [King Power Equipment Operators Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Drill, Boring, Road Header And/or Shield :King Power Egyuipment Operators Oil Distributors, Blower $50.22 7A 3C 8P j Distribution ft Mulch Seeding Operator I King Power Equipment Operators Outside Hoists (elevators And $52.58 7A 3C 8P Manlifts), Air Tuggers,strato f King Power Equipment Operators Overhead, Bridge Type Crane: $53.00 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $54.04 7A 3C 8P Tons And Over i (King Power Equipment Operators Overhead, Bridge Type: 45 $53.49 7A 3C 8P Tons Through 99 Tons {King Power Equipment Operators Pavement Breaker $50.22 7A 3C 8P j i King Power Equipment Operators Pile Driver (other Than Crane $53.00 7A 3C 8P Mount) 1 King Power Equipment Operators Plant Oiler -Asphalt, Crusher $52.58 7A 3C 8P i King Power Equipment Operators Posthote Digger, Mechanical $50.22 7A 3C 8P King Power Equipment Operators Power Plant $50.22 7A 3C 8P )King Power Equipment Operators Pumps - Water $50.22 7A 3C 8P j King Power Equipment Operators Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $50.22 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $53.49 7A 3C 8P Rubber Tired Earth Moving Equipment ,King Power Equipment Operators Rigger And Bellman $50.22 7A 3C BP j ,King Power Equipment Operators Rollagon $53.49 7A 3C 8P a King Power Equipment Operators Roller, Other Than Plant Mix $50.22 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P Materials ;King Power Equipment Operators Roto-mill, Roto-grinder $53.00 7A 3C 8P j King Power Equipment Operators Saws - Concrete $52.58 7A 3C 8P +I ,King Power Equipment Operators Scraper, Self Propelled Under $53.00 7A 3C LP 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $52.58 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $53.49 7A 3C 8P I i i I https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 10 of 17 Yards And Over IKing Power Equipment Operators Service Engineers - Equipment $52.58 7A 3C 8P jKing Power Equipment Operators Shotcrete/gunite Equipment $50.22 7A 3C 8P 'King Power Equipment Operators Shovel , Excavator, Backhoe, $52.58 7A 3C 8P Tractors Under 15 Metric Tons. i King Power Equipment Operators Shovel, Excavator, Backhoe: $53.49 7A 3C 8P I Over 30 Metric Tons To 50 Metric Tons 'King Power Equipment Operators Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Tractors: 15 To 30 Metric Tons 'King Power Equipment Operators Shovel, Excavator, Backhoes: $54.04 7A 3C 8P ® Over 50 Metric Tons To 90 Metric Tons Fl 'King Power Equipment Operators Shovel, Excavator, Backhoes: $54.61 7A 3C 8P Over 90 Metric Tons ' :King Power Equipment Operators Stipform Pavers $53.49 7A 3C 8P 'King Power Equipment Operators Spreader, Topsider 8 $53.49 7A 3C 8P j Screedman King Power Eauipment Operators Subgrader Trimmer $53.00 7A 3C 8P jKing Power Equipment Operators Tower Bucket Elevators $52.58 7A 3C 8P jKing Power Equipment Operators Tower Crane Over 175'in $54.61 7A 3C 8P 1 Height, Base To Boom IKing Power Equipment Operators Tower Crane Up To 175' In $54.04 7A 3C 8P Height Base To Boom j King Power Equipment Operators Transporters, All Track Or $53.49 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $52.58 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver- 100 $53.00 7A 3C 8P I Tons And Over in Power Equipment Operators Truck Crane Oiler/driver Under $52.58 7A 3C 8P 100 Tons I King Power Equipment Operators Truck Mount Portable Conveyor $53.00 7A 3C 8P IKing Power Equipment Operators Welder $53.49 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmatt Type $50.22 7A 3C 8P lKing Power Equipment Operators Yo Yo Pay Dozer $53.00 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $53.49 7A 3C 8P i Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $50.22 7A 3C 8P Underground Sewer 8 Water 1 King Power Equipment Operators- Barrier Machine (zipper) $53.00 7A 3C 8P j Underground Sewer 8 Water King Power Equipment Operators- Batch Plant Operator, $53.00 7A 3C 8P Underground sewer @ Water Concrete bKing Power Equipment Operators- Bobcat $50.22 7A 3C 8P j I Underground Sewer @ Water IKing Power Equipment Operators- Brokk - Remote Demolition $50.22 7A 3C 8P f Underground Sewer Ft Water Equipment King Power Equipment Operators- Brooms $50.22 7A 3C 8P i Underground Sewer& Water j https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 11 of 17 ;King Power Equipment Operators- Bump Cutter $53.00 7A 3C 8P Underground Sewer Et Water IKing Power Equipment Operators- Cableways $53.49 7A 3C 8P 3 Underground Sewer Et Water EKing Power Equipment Operators- Chipper $53.00 7A 3C 813 j Underground Sewer Et Water 1 IKing Power Equipment Operators- Compressor $50.22 7A 3C 8P , Underground Sewer Et Water ;King Power Equipment Operators- Concrete Pump: Truck Mount $53.49 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M !King Power Equipment Operators- Concrete Finish Machine -laser $50.22 7A 3C 8P Underground Sewer Et Water Screed t ' ,King Power Equipment Operators- Concrete Pump - Mounted Or $52.58 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. (King Power Equipment Operators- Concrete Pump: Truck Mount $53.00 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42 m King Power Equipment Operators- Conveyors $52.58 7A 3C SP Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $53.00 7A 3C SP Underground Sewer $ Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $54.04 7A 3C 8P Underground Sewer a Water Tons, Or 150' Of Boom (Including Jib With Attachments) }King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P Underground Sewer Et Water Or 259 Of Boom (including Jib With Attachments) { King Power Equipment Operators- Cranes: 45 Tons Through 99 $53.49 7A 3C 8P j Underground Sewer Et Water Tons, Under 150' Of Boom I I (including Jib With Attachments) !King Power Equipment Operators- Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Underground Sewer Et Water Under FKing Power Equipment Operators- Cranes: Friction 100 Tons $54.61 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $55.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P 1 Underground Sewer Et Water Of Boom (including Jib With Attachments) iKing Power Equipment Operators- Cranes: Through 19 Tons With $52.58 7A 3C 8P Underground Sewer a Water Attachments A-frame Over 10 Tons j I iKing Power Equipment Operators- Crusher $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $53.00 7A 3C 8P i Underground Sewer Ft Water (power) iKing Power Equipment Operators- Derricks, On Building Work $53.49 7A 3C 8P i https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/9/2014 Page 12 of 17 �I Underground Sewer @ Water •,King Power Equipment Operators- Dozers D-9 Et Under $52.58 7A 3C 8P Underground Sewer Ft Water (King Power Equipment Operators- Drill Oiters: Auger Type, Truck $52.58 7A 3C 8P Underground Sewer&Water Or Crane Mount 'King Power Equipment Operators- Drilling Machine $53.00 7A 3C 8P S Underground Sewer @ Water King Power Equipment Operators- Elevator And Man-lift: $50.22 7A 3C 8P t Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $53.00 7A 3C 8P Underground Sewer It Water Gamaco a Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $52.58 7A 3C 8P Underground Sewer & Water With Attachments ;King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $50.22 7A 3C 8P Underground Sewer 8 Water Attachments j 'King Power Equipment Operators- Grade Engineer: Using Blue $53.00 7A 3C 8P Underground Sewer 6 Water Prints, Cut Sheets, Etc `King Power Equipment Operators- Gradechecker/stakeman $50.22 7A 3C 8P i Underground Sewer Ft Water I 'King Power Equipment Operators- Guardrail Punch $53.00 7A 3C 8P Underground Sewer @ Water I !King Power Equipment Operators- Hard Tait End Dump $53.49 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over {King Power Equipment Operators- Hard Tail End Dump $53.00 7A 3C 8P I Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards j 'King Power Equipment Operators- Horizontal/directional Drill $52.58 7A 3C 8P Underground Sewer 8 Water Locator Ong Power Equipment Operators- Horizontal/directional Drill $53.00 7A 3C 8P Underground Sewer 8 Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $52.58 7A 3C 8P Underground Sewer Et Water 10 Tons ,King Power Equipment Operators- Hydralifts/boom Trucks, 10 $50.22 7A 3C 8P Underground Sewer 3 Water Tons And Under s King Power Equipment Operators- Loader, Overhead 8 Yards. & $54.04 7A 3C 8P Underground Sewer Ft Water Over 'King Power Equipment Operators- Loader, Overhead, 6 Yards. But $53.49 7A 3C 8P Underground Sewer Et Water Not Including 8 Yards 'King Power Equipment Operators- Loaders, Overhead Under 6 $53.00 7A 3C 8P j Underground Sewer Et Water Yards 'King Power Equipment Operators- Loaders, Plant Feed $53.00 7A 3C 8P I Underground Sewer Ft Water !King Power Equipment Operators- Loaders: Elevating Type Belt $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $53.00 7A 3C 8P I Underground Sewer @ Water King Power Equipment Operators- Material Transfer Device $53.00 7A 3C 8P Underground Sewer @ Water King Power Egui ment Operators- Mechanics, All (leadmen - $54.04 7A 3C 8P 1 i https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 13 of 17 Underground Sewer & Water $0.50 Per Hour Over Mechanic) IKing Power Equipment Operators- Motor Patrol Grader - Non- $52.58 7A 3C 8P j Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $53.49 7A 3C HP Underground Sewer Et Water 1 !King Power Equipment Operators- Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield !King Power Eauipment Operators- Oil Distributors, Blower $50.22 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $52.58 7A 3C 8P j Underground Sewer Et Water Manlifts), Air Tuggers,strato 'King Power Equipment Operators- Overhead, Bridge Type Crane: $53.00 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $54.04 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $53.49 7A 3C 8P I Underground Sewer Et Water Tons Through 99 Tons IKing Power Equipment Operators- Pavement Breaker $50.22 7A 3C 8P j Underground Sewer Et Water i King Power Equipment Operators- Pile Driver (other Than Crane $53.00 7A 3C 8P i Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $52.58 7A 3C 8P Underground Sewer a Water 1 King Power Equipment Operators- Posthole Digger, Mechanical $50.22 J7A3C LPUnderground Sewer a Waterer EquipIKing Powment Operators- Power Plant $50.223C 8PUnderground Sewer a Water (King Power Equipment Operators- Pumps - Water $50.223C 8P Underground Sewer Et Water jKing Power Equipment Operators- Quad 9, Hd 41, DI And Over $53.49 7A 3C 8P j Underground Sewer a Water King Power Equipment Operators- Quick Tower- No Cab, Under $50.22 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $53.49 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $50.22 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Rollagon $53.49 7A 3C 8P Underground Sewer 8: Water King Power Equipment Operators- Roller, Other Than Plant Mix $50.22 7A 3C 8P Underground Sewer Et Water I King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P j Underground Sewer Et Water Materials Wng Power Equipment Operators- Roto-mill, Roto-grinder $53.00 7A 3C 8P 9 Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $52.58 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/9/2014 Page 14 of 17 Underground Sewer Ft Water ;King Power Equipment Operators- Scraper, Self Propelled Under $53.00 7A 3C 8P Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete a Carry All $52.58 7A 3C 8P Underground Sewer Et Water i King Power Equipment Operators- Scrapers, Self-propelled: 45 $53.49 7A 3C 8P Underground Sewer Et Water Yards And Over %King Power Equipment Operators- Service Engineers - Equipment $52.58 7A 3C 8P Underground Sewer Et Water ,King Power Equipment Operators- Shotcrete/gunite Equipment $50.22 7A 3C 8P Underground Sewer @ Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $52.58 7A 3C 8P I Underground Sewer Et Water Tractors Under 15 Metric Tons. t King Power Equipment Operators- Shovel, Excavator, Backhoe: $53.49 7A 3C 8P ? Underground Sewer Et Water Over 30 Metric Tons To 50 j Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Underground Sewer It Water Tractors: 15 To 30 Metric Tons 'King Power Equipment Operators- Shovel, Excavator, Backhoes: $54.04 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons iKing Power Equipment Operators- Shovel, Excavator, Backhoes: $54.61 7A 3C 8P � Underground Sewer Q Water Over 90 Metric Tons j King Power Equipment Operators- Slipform Pavers $53.49 7A 3C 8P Underground Sewer Et Water iKing Power Equipment Operators- Spreader, Topsider £t $53.49 7A 3C 8P I Underground Sewer Et Water Screedman iKing Power Equipment Operators- Subgrader Trimmer $53.00 7A 3C 8P Underground Sewer Et Water (King Power Equipment Operators- Tower Bucket Elevators $52.58 7A 3C 8P i Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $54.61 7A 3C 8P Underground Sewer Et Water Height, Base To Boom y iKing Power Equipment Operators- Tower Crane Up To 175' In $54.04 7A 3C 8P s Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $53.49 7A 3C 8P ? Underground Sewer If Water Truck Type King Power Equipment Operators- Trenching Machines $52.58 7A 3C 8P j y Underground Sewer Et Water RKing Power Equipment Operators- Truck Crane Oiler/driver- 100 $53.00 7A 3C 8P ; Underground Sewer Et Water Tons And Over ':King Power Equipment Operators- Truck Crane Oiler/driver Under $52.58 7A 3C 8P j i Underground Sewer Et Water 100 Tons ,King Power Equipment Operators- Truck Mount Portable Conveyor $53.00 7A 3C 8P j Underground Sewer Et Water King Power Equipment Operators- Welder $53.49 7A 3C 8P 'y Underground Sewer Et Water IKing Power Equipment Operators- Wheel Tractors, Farman Type $50.22 7A 3C 8P Underground Sewer 8 Water iKing Power Equipment Operators- Yo Yo Pay Dozer $53.00 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 15 of 17 ( Underground Sewer 8 Water King Power Line Clearance Tree Journey Level In Charge $44.86 5A 4A i Trimmers 'King Power Line Clearance Tree Spray Person $42.58 5A 4A Trimmers f 'King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A Trimmers ,King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers {King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A � Trimmers I jKing Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics jKing Residential Brick Mason Journey Level $50.12 5A 1M jKing Residential Carpenters Journey Level $28.20 1 ;King Residential Cement Masons Journey Level $22.64 1 ;King Residential Drywall Applicators Journey Level $39.62 5D 1M j (King Residential Drywall Tapers Journey Level $50.87 5P 1 E ,King Residential Electricians Journey Level $30.44 1 'King Residential Glaziers Journey Level $36.20 7L 1H ;King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 'King Residential Marble Setters Journey Level $24.09 1 jKing Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 j Pipefitters !King Residential Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41.84 7F 1 R Workers j jKing Residential Soft Floor Lavers Journey Level $42.15 5A 3D jKing Residential Sprinkler Fitters Journey Level $42.48 5C 2R (Fire Protection) jKing Residential Stone Masons Journey Level $50.12 5A 1M King Residential Terrazzo Workers Journey Level $46.96 5A 1M iKing Residential Terrazzo/Tile Journey Level $21.46 1 Finishers iKing Residential Tile Setters Journey Level $25.17 1 iKing Roofers Journey Level $44.71 5A 3H (King Roofers Using Irritable Bituminous $47.71 5A 3H p Materials 'King Sheet Metal Workers Journey Level (Field or Shop) $69.37 7F 1 E !King Shipbuitding i3 Ship Repair Boilermaker $40.12 7M 1H ;King Shipbuilding Et Ship Repair Carpenter $38.24 70 - 3B ;King Shipbuitdine Et Ship Repair Electrician $37.80 70 3B j 'King Shipbuilding Et Ship Repair Heat Et Frost Insulator $58.93 5.1 15 j https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 16 of 17 ;King Shipbuilding, is Ship Repair Laborer $36.78 70 3B jKing Shipbuilding a Ship Repair Machinist $37.81 70 3B ;King Shipbuilding, @ Ship Repair Operator $40.15 70 3B (King Shipbuilding rt Ship Repair Painter $37.79 70 3B King Shipbuilding & Ship Repair Pipefitter $37.77 70 3B King Shipbuilding Et Ship Repair Rigger $37.74 70 3B jKing Shipbuilding Et Ship Repair Sandblaster $36.78 70 36 iKing Shipbuilding a Ship Repair Sheet Metal $37.74 70 3B jKing Shipbuilding Et Ship Repair Shipfitter $37.74 70 3B gKing Shipbuilding a Ship Repair Trucker $37.59 70 3B IKing Shipbuilding Ft Ship Repair Warehouse $37.64 70 . 3B jKing Shipbuilding 8 Ship Repair Welder/Burner $37.74 70 3B jKing Sign Makers @ Installers Sign Installer $22.92 1 fElectricall ;King Sign Makers 8 Installers Sign Maker $21.36 1 fElectricall King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical ;King Sign Makers 8 Installers (Non- Sign Maker $33.25 1 f Electrical (King Soft Floor Lavers Journey Level $42.15 5A 3D ;King Solar Controls For Windows Journey Level $12.44 1 I :King Sprinkler Fitters Fire Journey Level $69.59 SC 1x ! I j Protectionl )�) King Stage Rigging Mechanics (Non Journey Level $13.23 1 5,ructurall jKing Stone Masons Journey Level $50.12 5A 1M j ;King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers jKing Surveyors Assistant Construction Site $52.58 7A 3C 8P 1 Surveyor jKing Surveyors Chainman $52.06 7A 3C 8P 0.King Surveyors Construction Site Surveyor $53.49 7A 3C 8P in Telecommunication Journey Level $22.76 1 1 Technicians !King Telephone Line Construction - Cable Splicer $36.01 5A 2B i Outside "King Telephone Line Construction - Hole Digger/Ground Person $20.05 5A 2B Outside jKing Telephone Line Construction - Installer (Repairer) $34.50 5A 2B { Outside I King Telephone Line Construction - Special Aparatus Installer 1 $36.01 5A 2B Outside °King Telephone Line Construction - Special Apparatus Installer II $35.27 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $36.01 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operatorl $33.47 5A 2B i https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Page 17 of 17 Outside (Light) King Telephone Line Construction - Telephone Lineperson $33.47 5A 2B j Outside King Telephone Line Construction - Television Groundperson $19.04 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $25.27 5A 26 Outside jKing Telephone Line Construction - Television System Technician $30.20 5A 2B { Outside j ;King Telephone Line Construction - Television Technician $27.09 5A 2B Outside ;King Telephone Line Construction - Tree Trimmer $33.47 5A 2B i Outside j King Terrazzo Workers Journey Level $46.96 5A 1M IFKing Tile Setters Journey Level $21.65 1 `;King Tile, Marble Ft Terrazzo Finisher $37.79 5A 1B Finishers i King Traffic Control Stripers Journey Level $42.33 7A 1K King Truck Drivers Asphalt Mix Over16 Yards (W. $48.87 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck Ft Trailer $48.87 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $48.03 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L Council 28) l King Truck Drivers Transit Mixer r$43.23King Well Drillers Ft IrrigationPump Irrigation Pump InstallerSInstallers `King Well Drillers Ft Irrigation Pump Oiler Installers ,King Well Drillers 8 Irrigation Pump Well Driller 1 j Installers https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/9/2014 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED 1N EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half tunes the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be aid at double the hourly rate of wage. Y Y P D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly !, rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. L.. F. The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten(10)horns on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten(10) hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten(10)hours per day Monday through Saturday and all horns worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown)shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. L All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 - -2 1 III Benefit Code Key Effective 3 5 0 4 thru 8-30-2014 1. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate ofI wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight(8)regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. Ali S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other ',... overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid al three thnes the hourly rate of wages ,. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage, All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day)shall be paid at one and one-half times the hourly rate of wage, All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. '.. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve(12) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage.When holiday falls on Saturday or Sunday,the day before Saturday,Friday,and the day after Sunday,Monday, shall be considered the '.. holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pill(or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 hours during that workweek.)All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL li BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two tithes the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All bou s worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. i O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours alley eight(8)regular hours Monday through Friday and the fast eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hots weekly schedule,either Monday thin Thursday or Tuesday thin Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF LIGHT(8)IIOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift.The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. B. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked over twelve(12)hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 3 it i i it I Benefit Code Key—Effective 3-5-2014thru 8-30-2014 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday,shall be paid at a premium 's rate of 15%over the hourly rate of wage.All other hours worked after 6:00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All horns worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two tines the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half titres the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay.Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate. However,Saturday shall not be utilized as a make-up day when a holiday falls on Friday.All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Ycar's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). 4 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 5. H. Holidays:New Years Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). I. Holidays:New Year's Day,Memorial Day,Independence Day, Labor Day,Thanksgiving Day, and Christmas Day (6) J. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, 'thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). L. holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8). N. Holidays: New Years Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Years Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day(9), If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, ThanksgivingII, Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day,Christmas Day, And The Day Before Or After Christmas (9) Z. Holidays: New Year's Day,Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the !, Friday after Thanksgiving Day,And Christmas Day(8), Holiday Codes Continued 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, hrdependence Day,Labor Day,Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day.(9 1/2). G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And Christmas Eve Day(11). H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). 5 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 6, I. Paid Holidays: New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9). L. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday, If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on trc preceding Friday. C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. O. Holidays:New Year's Day, Memorial Day,Independence Day, Labor Day,Thanksgiving Day, and Christmas Day (6),Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. II. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 6 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 7. 1. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays:New Year's Day, Independence Day,Memorial Day,Labor Day, Thanksgiving Day and Christmas Day li (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday alter Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays:New Year's Day,Memorial Day,Labor Day,Independence Day, Thanksgiving Day,the Last Work Day before Christmas Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday, Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day, Christmas Day,And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. O. Paid Holidays: New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day After Or Before Christmas Day,And The Employees Birthday. 11). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. P. Holidays: New Year's Day, Memorial Day, independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays:New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9),If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly, 7 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Note Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$2.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$3.00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4.00 per Foot for Each Foot Over 150 Feet Over 220'-$5.00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or �I more: Over 50'To 100'-$1.00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1.50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2.00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$0.75,Level B: $0.50,And Level C:$0.25. M. Workers on hazmat projects receive additional hourly premiums as follows:Levels A&B:$1.00,Levels C&D: , $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00,Level B:$0.75,Level C:$0.50,And Level D: $0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1.50,Class C Suit:$1.00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle, and pedestrian traffic during construction operations.Flaggers and Spotters shall be pasted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. 8 REQUEST FOR MAYOR'S SIGNATURE r Please Fill in All Applicable Boxes � ge4tewed by Director. i Ori( inator's Name: Merrill Ves er Dept/Div. Engineering ,'Extension: 5517 I bate Sent. ./4 t4 Date Required: ' '`a ,,) y � Return to: Nancy Yoshitake CONTRACT TERMINATION DATE: 9/30/14 VENDOR: Transportation Systems, Inc. DATE OF COUNCIL APPROVAL: n/a ATTACH THE COUNCIL MOTION SHEET FOR THE MAYOR if applicable Brief Explanation of Document: Bids were solicited and two bids were received for the 1015t Ave. SE and S. 256th St. intersection project. Transportation Systems was selected to furnish and install a new signal pole and pedestrian push buttons at the northeast corner of the intersection, including constructing the foundations and installing wiring. Also included is approximately 20 square yards of cement concrete sidewalk. All Contracts Must Be Routed Through The Law Department (tTfiis area to be completed by the Law Departmen$fF}{1 9 A � Received: 1 . j Approval of Law Pe_pt, Law Dept. Comments: Date Forwarded to Mpy FI0�EIVEb Shaded reas To Be Completed B Administration Staff S Y �16 r• n,F+ � p -- Received ' CITY OF gar f � � C111`Y CLERK Recommendations and Comments: -z r � �` Y Disposition ?, ;. r 't ;/ PINc t °y� 0, ° Date Returned: