Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW13-225 - Original - Coatings Unlimited, Inc. - Reith Road Reservoir Exterior Surface Cleaning - 12/11/2013
Records Management-, KENT Document WASHINGTON }t; CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Coatings Unlimited Inc Vendor Number: JD Edwards /Number Contract Number: F%V 'bopp`Ab This is assigned by City Clerk's Office Project Name: Reith Road Reservoir Cleaning Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 12/11/13 Termination Date: 5/1/14 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Sean Bauer Department: PW Operations Detail: (i.e. address, location, parcel number, tax id, etc.): Clen the exterior surface of the City's Reith Road Reservoir which is located at 25601� Reith Road, Kent. S Pub lic\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 F KENT GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE between the City of Kent and Coatings Unlimited Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Coatings Unlimited Inc. organized under the laws of the State of Washington, located and doing business at 18420 68th Ave. S. #110, Kent, WA 98032, Phone (425) 251-3268/Fax. (425) 251-3269, Contact. Greg Snider (hereinafter the "Vendor"). AGREEMENT I. DESCRIPTION OF WORK. Vendor shall provide the following goods and materials and/or perform the following services for the City: The Vendor shall clean the exterior surface of the City of Kent's Reith Road Reservoir which is located at 25601 Reith Road, Kent, WA 98032. For a description and Vendor's quote, see Exhibit A which is attached and incorporated by this reference. Vendor acknowledges and understands that it is not the City's exclusive provider of these goods, materials, or services and that the City maintains its unqualified right to obtain these goods, materials, and services through other sources. II. TIME OF COMPLETION. Upon the effective date of this Agreement, Vendor shall complete the work and provide all goods, materials, and services by May 1, 2014. III. COMPENSATION. The City shall pay the Vendor an amount not to exceed Five Thousand, Nine Hundred Eighty Four Dollars and six cents ($5,984.06), including applicable Washington State Sales Tax, for the goods, materials, and services contemplated in this Agreement. The City shall pay the Vendor the following amounts according to the following schedule: GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 1 (Under$10,000 00, including WSST) The Vendor shall be paid after execution of agreement and completion of cleaning the exterior surface of the Reith Road Reservoir. If the City objects to all or any portion of an invoice, it shall notify Vendor and reserves the option to only pay that portion of the invoice not in dispute. In that event, the parties will immediately make every effort to settle the disputed portion. A. Defective or Unauthorized Work. The City reserves its right to withhold payment from Vendor for any defective or unauthorized goods, materials or services. If Vendor is unable, for any reason, to complete any part of this Agreement, the City may obtain the goods, materials or services from other sources, and Vendor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Agreement price specified above. The City further reserves its right to deduct these additional costs incurred to complete this Agreement with other sources, from any and all amounts due or to become due the Vendor. B. Final Payment: Waiver of Claims. VENDOR'S ACCEPTANCE OF FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY VENDOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. IV. PREVAILING WAGES. Vendor shall file a 'Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Vendor shall pay prevailing wages in effect on the date the bid is accepted or executed by Vendor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. V. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 5108 RCW, the parties make the following representations: A. The Vendor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Vendor maintains and pays for its own place of business from which Vendor's services under this Agreement will be performed. C. The Vendor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Vendor's services, or the Vendor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 2 (Under$10,000.00, including WSST) D. The Vendor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Vendor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Vendor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Vendor maintains a set of books dedicated to the expenses and earnings of its business. VI. TERMINATION. Either party may terminate this Agreement, with or without cause, upon providing the other party thirty (30) days written notice at its address set forth on the signature block of this Agreement. VII. CHANGES. The City may issue a written change order for any change in the goods, materials or services to be provided during the performance of this Agreement. If the Vendor determines, for any reason, that a change order is necessary, Vendor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XIV(D), within fourteen (14) calendar days of the date Vendor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Vendor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Vendor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Vendor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Vendor fails to require a change order within the time allowed, the Vendor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Vendor disagrees with the equitable adjustment, the Vendor must complete the change order work; however, the Vendor may elect to protest the adjustment as provided in subsections A through E of Section VII, Claims, below. The Vendor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Vendor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Vendor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Vendor may file a claim as provided in this section. The Vendor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Vendor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Vendor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 3 (Under$10,000.00, including WSST) At a minimum, a Vendor's written claim shall include the information set forth in subsections A, items I through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information. 1. The date of the Vendor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Vendor is asserting a schedule change or disruption. B. Records. The Vendor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Vendor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Vendor's Duty to Complete Protested Work. In spite of any claim, the Vendor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Vendor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Vendor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. VENDOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR VENDOR'S ABILITY TO FILE THAT SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. This Agreement is subject to all warranty provisions established under the Uniform Commercial Code, Title 62A, Revised Code of Washington. Vendor warrants goods are merchantable, are fit for the particular purpose for which they were obtained, and will perform in accordance with their specifications and Vendor's representations to City. The Vendor GOODS &SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 4 (Under$10,000.00, including WSST) shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any part of the goods are repaired, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Vendor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Vendor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Vendor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Vendor, its sub-contractors, or any person acting on behalf of the Vendor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Vendor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Vendor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Vendor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Vendor's work when completed shall not be grounds to avoid any of these covenants of indemnification. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE VENDOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Vendor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Vendor's part, then Vendor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Vendor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Vendor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT VENDOR'S RISK. Vendor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 5 (Under$10,000.00, including WSST) 4 in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Vendor's own risk, and Vendor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and ]unsdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Vendor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 6 (Under$10,000.00, including WSST) c , H. Compliance with Laws. The Vendor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Vendor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. VENDOR: CITY OF KENT: 1A By. "" By: L�A- U- ignai signature) Print Name: reg Snider Print Name: David A. Brock, P.E. Its: President Its: Interim Operations Manager (title)) � DATE: 12-4-13 DATE: �2- 7� �-5 NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: VENDOR: CITY OF KENT: Greg Snider Timothy J. LaPorte, P.E. Coating Unlimited Inc. City of Kent 18420 68"' Ave. S. #110 220 Fourth Avenue South Kent, WA 98032 Kent, WA 98032 (425) 251-3268 (telephone) (253) 856-5500 (telephone) (425) 251-3269 (facsimile) (253) 856-6500 (facsimile) Coatings Unlimited-Beith Rd Tank/Bauer GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 7 (Under$10,000.00, including WSST) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree o fulfill the five requirements referenced above. By: Greg Snider For: Coatings Unlimited, Inc. Title: President Date: 12-4-13 EEO COMPLIANCE DOCUMENTS - 1 of 3 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 of 3 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 of 3 EXHIBIT A Scope of work: Coatings Unlimited Inc. will provide the labor, materials, and equipment to clean the exterior surface of the City of Kent Water Departments Reith Road Reservoir located at 25601 Reith Road, Kent, WA 98032, including roof, sides, and stairwell, in the amount not to exceed $5,984.06 including Washington State sales tax. i I If I I I I i 1 i I I I R i COATINGS UNLIMITED INC 18420 68'h AVE. S # 110 KENT WA 98032 PH-425-251-3268 FAX-425-251-3269 mstudley t@coatmgsunlmuted eom Please Deliver The Following Page(s)To: NAME: Jim Reed FIRM: City of Kent FAX#: (253)856-6600 FROM: Mike Studley DATE: 10-25-13 ' We are transmitting I pages including cover sheet. If you do not receive all pages,please contact us as soon as Possible at(425)251-3268.THANK YOU REGARDING: Price Quote for all Labor and Equipment to pressure wash only the exterior of the Reith Rd Res City of Kent to provide all water and 110 volt power. Price: $4,950.00 i i I Please call If more Information is needed. Please visit www coatingsunhmlted com ] EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. • ' DATE(MM/DO/WW) AC Kra CERTIFICATE OF LIABILITY INSURANCE 12/10/2013 lill THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT If the certificate holder Is an ADDITIONAL INSURED, the poilcy(les) must be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsements) PRODUCER WA#712152 1-206-343-2323 CONTACT NAME MCM Insurance Services, LLC dba MCM PHONE I FAX Bacic Pacific Insurance Services, LLC #OF82099 AIC No,Exit 1325 Fourth Avenue, Suite 2100 EMAIL ADDRESS Seattle, WA 99101 _ _ _INSURER(S)AFFORDING COVERAGE NAIC9 INSURERA STARR SURPLUS LINES INS CO 13604 INSURED INSURERS ALASKA NATL INS CO 38733 Coatings Umlimited Inc. NATIONAL UNION FIRE INS CO OF PITTS 19445 INSURER C 18420 68th Ave S Ste 110 INSURER RE INSUR E Kent, WA 98032 -- - - INSURER F COVERAGES CERTIFICATE NUMBER- 37258754 REVISION NUMBER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICA-E MAY BE ISSUED OR MAY PERTAIN THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS _ INSR ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE POLICY NUMBER MM/DDIYYYY MMIDDIYYYY A GENERAL LIABILITY SLPGGL0073902 04/11/12 04/11/14I EACH OCCURRENCE ' $ 1,000,000 DAMAGE TO RENTED 100,000 X COMMERCIAL GENERAL LIABILITY PREMISES(Ea occurrence) $ _ CLAIMS-MADE X ' OCCUR � MED EXP(Any one person) _ $ 5,000 ' I i X WA Stop Gap PERSONAL 8 ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER JFCT PRODUCTS COMP,OP AGG $ 2,000,000 POLICY I X PRO- __I LOC $ g 13DAS32121 11 4 1 COMBINED SINGLE LIMIT 1,000,000 AUTOMOBILE LIABILITY (Ea accruent) $ X ANY AUTO I BODILY INJURY iPer person) $ ALL OWNED I SCHEDULED BODI_Y INJURY,Per accident) $ AUTOS IAUTOS - NON-OWNED I PROPERTY DAMAGE $ X HIREDAUTOS X AUTOS I(Per accident) $ C I UMBRELLA LIAB X OCCUR BE019590762 04/11/13 04/11/14 EACH OCCURRENCE i $ 21000,000 _ X EXCESS LIAB CLAIMS MADE AGGREGATE _ $ 2,000,000 DED ' RETENTION$ $ WORKERS COMPENSATION ,AIC STATU- OTH- AND EMPLOYERS LIABILITY YIN I_ TgRY LIMIT$I EIt_ ANY PROPRIETCR,PARTNERIEXECUTIVE� NIAI �I E L EACH ACCIDENT $ IM OFFIGEREMBER EX(LUCED7 (Mandatory in NH) E L DISEASE-EA EMPLOYEE $ If yeti descrue Un 1er E L DISEASE-POLICY LIMIT $ DESCRIPTION Or O ERATIONS oeloo, I I DESCRIPTION OF OPERATIONS I LOCATIONS 1 VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) RE. Job #7-5605-6, Reith Road Reservoir. The General Liability and Automobile Liability policies include a blanket automatic Additional Insured endorsement that provides Additional Insured status to City of Kent, only when there is a written contract that requires such status, and only with regard to work performed on behalf of the named insured The General Liability and Automobile Liability policies contains a special endorsement with Primary and (Sea Attached Descriptions) Noncontributory wording Per project aggregate applies to the General Liability policy as per attached endorsement. Umbrella Liability policy follows form. CERTIFICATE HOLDER CANCELLATION 7-5605-6 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Kent Engineering THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS Nancy Yoshitake 400 West Gowe AUTHORIZED REPRESENTATIVE Kent, WA 98032 USA U ©1988.2010 ACORD CORPORATION All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD Leah 37258754 COMMERCIAL Policy Number. SLPGGL0073902 GENERAL LIABILITY CG 20 10 10 01 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED — OWNERS, LESSEES OR CONTRACTORS — SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Person or Organization. Blanket as required by written contract on a primary&non-contributory basis (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as appl,cable to this endorsement} A Section II—Who Is An Insured is amended to nclude as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of your ongoing operations performed for that insured B With respect to the insurance afforded to these additional insureds,the following exclusion is added 2 Exclusions This insurance does not apply to"bodily injury"or"property damage"occurring after- (1)All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs)to be performed by or on behalf of the additional insured(s)at the site of the covered operations has been completed, or (2)That portion of"your work"out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a par,of the same project CG20101001 COMMERCIAL Policy Number: SLPGGL0073902 GENERAL LIABILITY CG20371001 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED — OWNERS, LESSEES OR CONTRACTORS — COMPLETED OPERATIONS This endorsement modifies insurance provided under the following COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Person or Organization, Blanket as required by virtue of written contract. Location And Description of Completed Operations: dditional Premium: (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement) Section II—Who Is An Insured is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of"your work"at the location designated and described in the schedule of this endorsement performed for that insured and included in the"products-completed operations hazard" CG 20 37 10 01 AW Alaska National INSURANCE COMPANY BUSINESS AUTO COVERAGE ENHANCEMENT ENDORSEMENT THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies Insurance provided under the following: BUSINESS AUTO COVERAGE FORM Various provisions in this endorsement restrict SECTION IV — Business Auto Conditions, coverage Read the entire policy carefully to Paragraph A. 5. —Transfer of Rights of Recovery determine rights, duties, and what is and is not Against Others To Us is amended to include: covered. 5. Transfer of Rights of Recovery Against Throughout this policy, the words "you" and "your" Others to Us refer to the Named Insured shown in the Declarations. The words "we", "us", and 'our" refer to This condition does not apply to any the company providing this insurance. person(s) or organization(s)to the extent that subrogation against that person or Other words and phrases that appear in quotation organization is waived prior to the "accident" marks have special meaning Refer to SECTION V— or the "loss" under a contract with that person DEFINITIONS in the Business Auto Coverage Form or organization. The coverages provided by this endorsement apply SECTION II — LIABILITY COVERAGE, Paragraph per "accident" and, unless otherwise specified, are A 2 a (2)—Supplementary Payments is replaced by subject to all of the terms, conditions, exclusions and the following deductible provisions of the policy, to which it is attached. (2) Up to $10,000 for cost of bail bonds (including bonds for related traffic law SECTION II — LIABILITY COVERAGE, Paragraph violations) required because of an A 1 Who Is An Insured is amended to nclude' "accident"we cover We do not have to furnish these bonds d. Any "employee" of yours while operating an "auto" hired or rented under a SECTION 11 — LIABILITY COVERAGE, Paragraph contract or agreement in that A 2 a (4)—Supplementary Payments is replaced by "employee's" name, with your permission, the following, while performing duties related to the conduct of your business (4) All reasonable expenses incurred by the "insured"at our request, including e. Any person or organization for whom you actual loss of earnings up to $500 a have agreed in writing to provide day because of time off from work insurance such as is afforded by this Coverage Form, but only with respect to liability arising out of the ownership, maintenance or use of"autos"covered by this policy If such person or organization has other insurance then this insurance is primary to and we will not seek contribution from the other insurance. ANIC CA 1150 02 13 Insured Copy Page 1 of 4 AW Alaska National INSURANCE COMPANY c. "Loss" caused by falling objects or SECTION 11 — LIABILITY COVERAGE, Paragraph missiles A.2.c. — Voluntary Property Damage is added as follows. However, you have the option of having glass breakage caused by a covered "auto's" c. Voluntary Property Damage collision or overturn considered a"lass" under Collision Coverage At your written request, we may make a voluntary payment for Property Damage Glass Repair—Waiver of Deductible caused by an "insured", but without liability to a third party, up to $25,000 We No deductible applies to glass breakage, if well not make a Voluntary Property the glass is repaired rather than replaced Damage payment to anyone who is an "insured"under this policy. SECTION III — PHYSICAL DAMAGE COVERAGE, Paragraph A 4 a — Transportation Expenses is SECTION III — PHYSICAL DAMAGE COVERAGE, replaced by the following: Paragraph A 2 —Towing is replaced by the following a. Transportation Expenses Towing We will pay up to $200 per day to a We will pay up to $500 for towing and labor maximum of $1,500 for temporary costs incurred each time a covered "auto" transportation expense Incurred by you that is a- because of the total theft of a covered "auto"that is a a. Private passenger; (1) Private passenger; b. Truck, (2) Truck; c. Pick-up truck; (3) Pick-up truck; d. Panel ,or (4) Panel, or 6. Van type vehicle under 20,000 Ibs of Gross (5) Van Vehicle Weight is disabled. However, the type vehicle under 20,000 Ibs of Gross labor must be performed at place of Vehicle Weight We will pay only for disablement those covered "autos"for which you carry either Comprehensive or Specified SECTION III — PHYSICAL DAMAGE COVERAGE, Paragraph A 3 — Glass Breakage — Hitting a Bird Causes Loss Coverage We well pay or Animal —Falling Objects or Missiles is replaced for temporary rary transportation expenses incurred during the period beginning 48 by the following, hours after the theft and ending, regardless of the policy's expiration, Glass Breakage—Hitting a Bird or Animal when the covered "auto" rs returned to —Falling Objects or Missiles use or we pay for its"loss". If you carry Comprehensive Coverage for the damaged covered "auto", we will pay the following under Comprehensive Coverage a. Glass Breakage; b. "Loss" caused by hitting a bird or animal; and ANIC CA 1150 02 13 Insured Copy Page 2 of 4 AV Alaska National INSURANCE COMPANY (2) Specified Causes of Loss only if the SECTION III — PHYSICAL DAMAGE COVERAGE, Declarations indicate that Specified Paragraph AA.b. — Loss of Use Expenses is Causes of Loss Coverage is provided replaced by the following: for the "auto"withdrawn from service; or b. Loss of Use Expenses—Hired, Rented, (3) Collision only if the Declarations or Borrowed Automobiles indicate that Collision Coverage is provided for the "auto" withdrawn We will pay expenses for which an from service. "insured" becomes legally responsible to pay for loss of use of a vehicle hired, SECTION III — PHYSICAL DAMAGE COVERAGE, rented or borrowed without a driver under Paragraph AA d — Airbag Coverage is added as a written rental contract or agreement. follows* We will pay for loss of use expenses, if caused by d. Airbag Coverage (1) Other than Collision, only if the We will pay for the cost to repair, replace, Declarations indicate that or reset an airbag that inflates for any Comprehensive Coverage is provided reason other than as a result of a for the vehicle withdrawn from collision, if the Declarations indicate that service the covered "auto" has Comprehensive Coverage or Specified Causes of Loss (2) Specified Causes of Loss only if the Coverage. Declarations Indicate that Specified Causes of Loss Coverage is provided SECTION III — PHYSICAL DAMAGE COVERAGE, for the vehicle withdrawn from Paragraph A 4 e — Rental Reimbursement service. Coverage is added as follows (3) Collision only if the Declarations e. Rental Reimbursement Coverage indicate that Collision Coverage is provided for the vehicle withdrawn We will pay up to $75 per day for rental from service. reimbursement expenses incurred by you for the rental of an `auto" because of However, the most we will pay for any 'loss"to a covered"auto"that is a: expenses for loss of use is$200 per day,to a maximum of$1,500 (1) Private Passenger; SECTION III — PHYSICAL DAMAGE COVERAGE, (2) Truck, Paragraph A 4 c —Non-Transportation Loss of Use Expenses is added as follows (3) Pick-up truck, c. Non-Transportation Loss of Use (4) Panel, or Expenses (5) Van We will pay up to $2,000 for non- transportation expense incurred by you, type vehicle under 20,000 lbs. of Gross because of "loss" to a covered "auto", if Vehicle Weight. Payment applies in caused by: addition to the otherwise applicable amount of each coverage you have on a (1) Other than Collision, only if the covered "auto". No deductibles apply to Declarations indicate that this coverage Comprehensive Coverage is provided for the`auto"withdrawn from service, ANIC CA 1150 02 13 Insured Copy Page 3 of 4 AV ASEaska ift0onal URANCE COMPANY (1) We will pay only for those expenses SECTION IV — BUSINESS AUTO CONDITIONS — incurred during the policy period Paragraph B 5 b — Other Insurance is replaced by beginning 24 hours after the "loss" the following. and ending, regardless of the policy's expiration, with the lesser of the b. For Hired Auto Physical Damage following number of days Coverage, the following are deemed to be covered "autos"you own (a) The number of days reasonably required to repair or replace the (1) Any covered "auto" you lease, hire, covered "auto". rent, or borrow, and (b) 30 days (2) Any covered "auto" hired or rented by your "employee" under a contract (2) This coverage does not apply while in that individual "employee's" name, there are spare or reserve "autos" with your permission, while available to you for your operations performing duties related to the conduct of your business (3) The Rental Reimbursement Coverage described above does not However, any"auto" that is leased, hired, apply to a covered "auto" that is rented or borrowed with a driver is not a described or designated as a covered covered"auto" "auto" on Rental Reimbursement Coverage Form CA 99 23_ SECTION V — DEFINITIONS — Paragraph C — SECTION IV — BUSINESS AUTO CONDITIONS — "Bodily injury" is replaced by the following Paragraph B 2 —Concealment, Misrepresentation Or Fraud is amended by adding Unintentional Failure C. "Bodily injury" means bodily injury, sickness or to Disclose Hazards at the end of Paragraph B 2 as disease sustained by a person including death or follows mental anguish resulting from any of these. Mental anguish means any type of mental or Unintentional Failure to Disclose Hazards emotional illness or disease If you unintentionally fad to disclose any hazards existing at the inception date of your policy, we will not deny coverage under this Coverage Form because of such failure. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or non-renewal This endorsement changes the policy to which it is attached and, unless otherwise stated, is effective on the date issued at 12 01 A M standard time at your mailing address shown in the policy. The information below is required only when this endorsement is issued subsequent to commencement of the policy Endorsement Effective Poiicy No. 13DAS32121 Insured Endorsement No. 3 Countersigned By © Insurance Services Office, Inc., 2009 ANIC CA 1150 0213 Insured Copy Page 4 of 4 POLICY NUMBER SLPGGL0073902 COMMERCIAL GENERAL LIABILITY CG 25 03 03 97 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Projects (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement ) A. For all sums which the insured becomes legally 4. The limits shown in the Declarations for Each obligated to pay as damages caused by Occurrence, Fire Damage and Medical Ex- '.occurrences" under COVERAGE A (SECTION pense continue to apply However, instead of 1), and for all medical expenses caused by acci- being subject to the General Aggregate Limit dents under COVERAGE C (SECTION 1), which shown in the Declarations, such limits will be can be attributed only to ongoing operations at a subject to the applicable Designated Con- single designated construction protect shown in struction Project General Aggregate Limit the Schedule above B For all sums which the insured becomes legally 1. A separate Designated Construction Protect obligated to pay as damages caused by General Aggregate Limit applies to each "occurrences" under COVERAGE A (SECTION designated construction protect, and that limit 1), and for all medical expenses caused by acci- is equal to the amount of the General Aggre- dents under COVERAGE C (SECTION 1), which gate Limit shown in the Declarations cannot be attributed only to ongoing operations 2. The Designated Construction Protect General at a single designated construction protect shown Aggregate Limit is the most we will pay for in the Schedule above the sum of all damages under COVERAGE 1. Any payments made under COVERAGE A A, except damages because of"bodily injury" for damages or under COVERAGE C for or "property damage" included in the medical expenses shall reduce the amount "products-completed operations hazard", and available under the General Aggregate Limit for medical expenses under COVERAGE C or the Products-Completed Operations Ag- regardless of the number of gregate Limit, whichever is applicable, and a. Insureds, 2. Such payments shall not reduce any Desig- b. Claims made or"suits" brought, or nated Construction Project General Aggre- c. Persons or organizations making claims gate Limit or bringing "suds" C. When coverage for liability arising out of the "products-completed operations hazard" is pro- 3. Any payments made under COVERAGE A vided, any payments for damages because of for damages or under COVERAGE C for "bodily injury" or 'property damage" included in medical expenses shall reduce the Desig- the "products-completed operations hazard" will nated Construction Project General Aggre- reduce the Products-Completed Operations Ag- gate Limit for that designated construction gregate Limit, and not reduce the General Ag- project Such payments shall not reduce the gregate Limit nor the Designated Construction General Aggregate Limit shown in the Decla- Project General Aggregate Limit rations nor shall they reduce any other Des- ignated Construction Project General Aggre- gate Limit for any other designated construc- tion project shown in the Schedule above CG 25 03 03 97 Copyright, Insurance Services Office, Inc , 1996 Page 1 of 2 0 D. If the applicable designated construction project E. The provisions of Limits Of Insurance (SECTION has been abandoned, delayed, or abandoned III) not otherwise modified by this endorsement and then restarted, or if the authorized contract- shall continue to apply as stipulated ing parties deviate from plans, blueprints, de- signs, specifications or timetables, the project will still be deemed to be the same construction project Page 2 of 2 Copyright, Insurance Services Office, Inc , 1996 CG 25 03 03 97 13 Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 12/4/2013 :County Trade Job Classification Wage Holiday[Overtimel Note King Asbestos Abatement Workers Journey Level $41.69 5D 1 H King Boilermakers Journey Level $62 34 5N 1C King Brick Mason Brick And Block Finisher $43.26 5A 1M King Brick Mason Journey Level $50.12 5A 1M King Brick Mason Pointer-Caulker-Cleaner $50.121 5A 1M King Budding Service Employees Janitor $20.591 5S 2F King Building Service Emplovees Traveling Waxer/Shampooer $21.001 5S 2F King Building Service..Employees Window Cleaner (Non-Scaffold) $24.291 5S 2F King Building Service Employees Window Cleaner (Scaffold) $25.15 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $50.82 5D 1M King Carpenters Bridge, Dock And Wharf $50.82 5D 1M Carpenters King Carpenters Carpenter $50 821 5D 1M King Carpenters Carpenters on Stationary Tools $50.95 5D 1M King Carpenters Creosoted Material $50.92 5D 1M King Carpenters Floor Finisher $50 82 5D 1M King Carpenters Floor Layer $50.82 5D 1M King Carpenters Scaffold Erector $50.82 5D 1M King Cement Masons Journey Level $51.18 7A 1M King Divers Et Tenders Diver $100.28 5D 1M 8A King Divers Et Tenders Diver On Standby $56.68 5D 1 M King Divers Et Tenders Diver Tender $52.23 5D 1M l King Divers Et Tenders Surface Rcv Et Rov Operator $52.23 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $48.67 5A 1 B Tender King Dredge Workers Assistant Engineer $53.00 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F I i https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 2 of 17 )King Dredge Workers Boatmen $52.30 5D 3F King Dredge Workers Engineer Welder $54.04 5D 3F King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King dredge Workers Mates $52.30 5D 3F King Dredge Workers Oiler $52.58 5D 3F King Drywall Applicator Journey Level $50 82 5D 1H King Drvwalt Tapers Journey Level $49.79 5P 1E King Electrical Fixture Maintenance Journey Level $25.34 5L 1E Workers King Electricians - Inside Cable Splicer $64.24 7C 2W King Electricians - Inside Cable Splicer (tunnel) $69 07 7C 2W King Electricians - Inside Certified Welder $62 04 7C 2W King Electricians - Inside Certified Welder (tunnel) $66 65 7C 2W King Electricians - Inside Construction Stock Person $34.19 7C 2W King Electricians - Inside Journey Level $59.85 7C 2W King Electricians - Inside Journey Level (tunnel) $64.24 7C 2W King Electricians Motor Shop Craftsman $15 37 1 King Electricians - Motor Shop Journey Level $14.69 1 s King Electricians - Powerhne Cable Splicer $66 43 5A 4A Construction King Electricians Powerhne Certified Line Welder $60 75 5A 4A Construction King Electricians Powerhne Groundperson $42.36 5A 4A Construction 'King Electricians - Powerhne Heavy Line Equipment $60 75 5A 4A Construction Operator King Electricians - Powerhne Journey Level Lineperson $60.75 5A 4A Construction $ King Electricians - Powerline Line Equipment Operator $51.05 5A 4A Construction King Electricians - Powerhne Pole Sprayer $60.75 5A 4A r Construction i King Electricians - Powerline Powderperson $45.39 5A 4A Construction King Electronic Technicians Journey Level $31 00 1 -King Elevator Constructors Mechanic $77.70 7D 4A King Elevator Constructors Mechanic In Charge $84.24 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $14.60 5B 2K i Products Work Only King Fence Erectors Fence Erector $15.18 1 King Raggers Journey Level $35.34 7A 2Y King Glaziers Journey Level $53.76 7L 1Y King Heat 8 Frost insulators And Journeyman $58.93 5J 1s Asbestos Workers King Heating Equipment Mechanics Journey Level $69.37 7F 1E King Hod Carriers Ft Mason Tende-s Journey Level $42 99 7A 2Y King Industrial Power Vacuum Journey Level $9.24 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 3of17 3 Cleaner King Inland Boatmen Boat Operator $52.51 5B 1K King intand Boatmen Cook $48 89 5B 1K King Inland Boatmen Deckhand $49.13 5B 1K King Inland Boatmen Deckhand Engineer $50.12 56 1K King Inland Boatmen Launch Operator $51.34 5B 1K King Inland Boatmen Mate $51 34 5B 1K King Inspection/Cleanin�SeahnQ Of Cleaner Operator, Foamer $31 49 1 Sewer Et Water Systems By Operator Remote Control King Inspection/CleaninQ/Seah� Grout Truck Operator $11.48 i Sewer Ex Water Systems By Remote Control King Inspection/Cleanm� Of Head Operator $24.91 1 Sewer a Water Systems By Remote Control King Inspection/Cleamn2/Seahne Of Technician $19.33 1 Sewer & Water Systems By Remote Control 'King Tv Truck Operator $20.45 1 Sewer Et Water Stems By I Remote Control i King Insulation ,h hcators Journey Level $50.82 5D 1M King Ironworkers Journeyman $59 77 7N 10 King Laborers Air, Gas Or Electric Vibrating $41.69 7A 2Y i Screed King Laborers Airtrac Drill Operator $42.99 7A 2Y King Laborers Ballast Regular Machine $41 69 7A 2Y King Laborers Batch Weighman $35 34 7A 2Y ) King Laborers Brick Pavers $41.69 7A 2Y King Laborers Brush Cutter $41 69 7A 2Y King Laborers Brush Hog Feeder $41 69 7A 2Y t King Laborers Burner $41.69 7A 2Y King Laborers Caisson Worker $42.99 7A 2Y King Laborers Carpenter Tender $41.69 7A 2Y King Laborers Caulker $41 69 7A 2Y King Laborers Cement Dumper-paving $42.46 7A 2Y r King Laborers Cement Finisher Tender $41.69 7A 2Y King Laborers Change House Or Dry Shack $41.69 7A 2Y King Laborers Chipping Gun (under 30 Lbs.) $41.69 7A 2Y King Laborers Chipping Gun(30 Lbs. And $42.46 7A 2Y Over) King Laborers Choker Setter $41.69 7A 2Y King Laborers Chuck Tender $41.69 7A 2Y Y King Laborers Clary Power Spreader $42.46 7A 2Y King Laborers Clean-up Laborer $41.69 7A 2Y King Laborers Concrete Dumper/chute $42.46 7A 2Y https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2013 Page 4 of 17 Operator King Laborers Concrete Form Stripper $41.69 7A 2Y King Laborers Concrete Placement Crew $42.46 7A 2Y King Laborers Concrete Saw Operator/core $42.46 7A 2Y Driller King Laborers Crusher Feeder $35 34 7A 2Y King Laborers Curing Laborer $41 69 7A 2Y King Laborers Demolition. Wrecking 8 Moving $41.69 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $41.69 7A 2Y King Laborers Diver $42.99 7A 2Y King Laborers Drill Operator $42.46 7A 2Y (hydraulic,diamond) King Laborers Dry Stack Walls $41.69 7A 2Y King Laborers Dump Person $41.69 7A 2Y King Laborers Epoxy Technician $41.69 7A 2Y King Laborers Erosion Control Worker $41.69 7A 2Y King Laborers Faller 8 Bucker Chain Saw $42.46 7A 2Y King Laborers Fine Graders $41.69 7A 2Y King Laborers Firewatch $35 34 7A 2Y King Laborers Form Setter $41.69 7A 2Y King Laborers Gabian Basket Builders $41.69 7A 2Y King Laborers General Laborer $41.69 7A 2Y King Laborers Grade Checker 8 Transit $42 99 7A 2Y Person King Laborers Grinders $41 69 7A 2Y King Laborers Grout Machine Tender $41 69 7A 2Y King Laborers Groutmen (pressure)including $42.46 7A 2Y Post Tension Beams King Laborers Guardrail Erector $41.69 7A 2Y King Laborers Hazardous Waste Worker (level $42.99 7A 2Y A) King Laborers Hazardous Waste Worker (level $42 46 7A 2Y B) King Laborers Hazardous Waste Worker (level $41 69 7A 2Y C) King Laborers High Scaler $42.99 7A 2Y King Laborers Jackhammer $42.46 7A 2Y King Laborers Laserbea m Operator $42.46 7A 2Y King Laborers Maintenance Person $41.69 7A 2Y King Laborers Manhole Builder-mudman $42.46 7A 2Y King Laborers Material Yard Person $41 69 7A 2Y King Laborers Motorman-dinky Locomotive $42 46 7A 2Y King Laborers Nozzleman (concrete Pump, $42.46 7A 2Y Green Cutter When Using E Combination Of High Pressure w Air 8 Water On Concrete a https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 5 of 17 Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $42.46 7A 2Y King Laborers Pilot Car $35.34 7A 2Y King Laborers Pipe Layer Lead $42.99 7A 2Y King Laborers Pipe Layer/tailor $42.46 7A 2Y King Laborers Pipe Pot Tender $42.46 7A 2Y King Laborers Pipe Rehner $42.46 7A EV King Laborers Pipe Wrapper $42.46 7AKing Laborers Pot Tender $41.69 7AKing Laborers Powderman $42.99 7A King Laborers Powderman's Helper $41.69 7A 2Y King Laborers Power Jacks $42.46 7A 2Y King Laborers Railroad Spike Puller - Power $42.46 7A 2Y p King Laborers Raker - Asphalt $42 99 7A 2Y King Laborers Re-timberman $42.99 7A 2Y King Laborers Remote Equipment Operator $42.46 7A 2Y King Laborers Rigger/signal Person $42.46 7A 2Y King Laborers Rip Rap Person $41.69 7A 2Y King Laborers Rivet Buster $42 46 7A 2Y King Laborers Rodder $42.46 7A 2Y King Laborers Scaffold Erector $41.69 7A 2Y King Laborers Scale Person $41.69 7A 2Y King Laborers Sloper (over 20") $42.46 7A 2Y King Laborers Sloper Sprayer $41 691 7A 2Y King Laborers Spreader (concrete) $42.461 7A 2Y King Laborers Stake Hopper $41 691 7A 2Y King Laborers Stock Piler $41.69 7A 2Y King Laborers Tamper Et Similar Electric, Air $42.46 7A 2Y Et Gas Operated Tools King Laborers Tamper (multiple Et Self- $42 46 7A 2Y 3 y propelled) King Laborers Timber Person - Sewer (lagger, $42.46 7A 2Y Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $41.69 7A 2Y King Laborers Topper $41 69 7A 2Y King Laborers Track Laborer $41.69 7A 2Y i King Laborers Track Liner (power) $42.46 7A 2Y King Laborers Traffic Control Laborer $37.79 7A 2Y 8R King Laborers Traffic Control Supervisor $37.791 7A 2Y 8R King Laborers Truck Spotter $41.691 7A 2Y I King Laborers Tugger Operator $42 46 7A 2Y King Laborers Tunnel Work-Compressed Air $60.06 7A 2Y 8g i Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $65.09 7A 2Y 82 I https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 6 of 17 Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $68 77 7A 2Y Worker 44.01-54 00 psi ,King Laborers Tunnel Work-Compressed Air $74.47 7A 2Y Worker 54 01-60.00 psi King Laborers Tunnel Work-Compressed Air $76.59 7A 2Y >� Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $81 69 7A 2Y 8�( Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $83 59 7A 2Y M8 Worker 68 01-70 00 psi ;King Laborers Tunnel Work-Compressed Air $85.59 7A 1H M ' Worker 70.01-72.00 psi f King Laborers Tunnel Work-Compressed Air $87.59 7A 1H 88 Worker 72.01-74.00 psi j King Laborers Tunnel Work-Guage and Lock $43.09 7A 2Y Tender King Laborers Tunnel Work-Miner $43 09 7A 2Y 8�C King Laborers Vibrator $42.46 7A 2Y King Laborers Vinyl Seamer $41.69 7A 2Y King Laborers Watchman $32 121 7A 2Y ; King Laborers Weider $42 461 7A 2Y King Laborers Well Point Laborer $42.461 7A 2Y King Laborers Window Washer/cleaner $32.12 7A 2Y King Laborers - Underground Sewer General Laborer Ft Topman $41.69 7A 2Y Et Water King Laborers - Underground Sewer Pipe Layer $42.46 7A 2Y 1 $ Water ° King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers c King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers .King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $50.82 5D 1H King Marble Setters Journey Level $50.121 5A 1M King Metal Fabrication (In Shop) Fitter $15 86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shog) Painter $11.10 1 King Metal Fabrication (In Shopl Welder $15 48 1 King Millwright Journey Level $51.92 5D iM King Modular Buildings Cabinet Assembly $11.56 1 King Modular Bu,ldmgs Electrician $11 56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11 56 1 King Modular Buildings Production Worker $9.40 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 7 of 17 'King Modular Buildings Tool Maintenance $11.56 1 ; King Modular Buildings Utility Person $11.56 1 King Modular Budd Welder $11.56 1 King Painters Journey Level $36.64 6Z 2B King Pile Driver Journey Level $51.07 5D 1M King Plasterers Journey Level $49.29 7G 1 R King Plaveround 8 Park Equipment Journey Level $9.19 1 Instalters 7Kmg Plumbers Et Pipefitters Journey Level $72.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $53.49 7A 3C 8P King Power Equipment Operators Assistant Engineer $50.22 7A 3C 8P King Power E ui ment Operators Barrier Machine (zipper) $53.001 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $53.00 7A 3C 8P Concrete King Power Equipment Operators Bobcat $50.221 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $50.22 7A 3C 8P Equipment E King Power Equipment Operators Brooms $50.22 7A 3C 8P , King Power Equipment Operators Bump Cutter $53 00 7A 3C 8P King Power Equipment Operators Cableways $53.49 7A 3C 8P King Power Equipment Operators Chipper $53.00 7A 3C 813 King Power Egrnpment Operators Compressor $50 22 7A 3C 8P King Power E ui ment Operators Concrete Pump: Truck Mount $53.49 7A 3C 8P With Boom Attachment Over 42 l M King Power Equipment Operators Concrete Finish Machine -laser $50.22 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $52.58 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $53.00 7A 3C 8P With Boom Attachment Up To a 42m King Power Equipment Operators Conveyors $52.58 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $53 00 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes. 100 Tons Through 199 $54.04 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) s King Power Equipment Operators Cranes 200 Tons To 300 Tons, $54.61 7A 3C 8P Or 250' Of Boom (including Jib z With Attachments) ,King Power Equipment Operators Cranes- 45 Tons Through 99 $53.49 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment aerators Cranes A-frame - 10 Tons And $50 22 7A 3C 8P Under ' https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 8 of 17 King Power Equipment Operators Cranes: Friction 100 Tons $54.61 7A 3C 8P Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $55.17 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P Of Boom (including Jib With s Attachments) :King Power Equipment Operators Cranes. Through 19 Tons With $52.58 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $53 001 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $53.00 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $53.491 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $52.581 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $52.58 7A 3C 8P Or Crane Mount -King Power Equipment Operators Drilling Machine $53 001 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $50.22 7A 3C 8P i Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $53.00 7A 3C 8P Gamaco Et Similar Equipment King Power Equipment Operators Forklift. 3000 Lbs And Over $52.58 7A 3C 8P With Attachments King Power Equipment Operators Forklifts Under 3000 Lbs. With $50.22 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer- Using Blue $53.00 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $50.22 7A 3C 8P King Power Equipment Operators Guardrail Punch $53.00 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $53.49 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over Ting Power Equipment Operators Hard Tait End Dump $53.00 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $52.58 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $53.00 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $52.58 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $50.22 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. a $54 04 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $53.49 7A 3C 8P Not including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $53.00 7A 3C 8P Yards 3 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 9 of 17 tKing Power Equipment Operators Loaders, Plant Feed $53.001 7A 3C 8P King Power Equipment Operators Loaders. Elevating Type Belt $52.581 7A 3C 8P King Power Equipment Operators Locomotives, All $53.00 7A 3C 8P King Power Equipment Operators Material Transfer Device $53.00 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $54.04 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Grader - Non- $52.58 7A 3C 8P ; finishing King Power Equipment ODerators Motor Patrol Graders, Finishing $53.49 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $53 49 7A 3C 8P Dntl, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $50.22 7A 3C 81? Distribution 8 Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $52.58 7A 3C 8P x Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $53.00 7A 3C 8P 20 Tons Through 44 Tons lKing Power Egu pment Operators Overhead, Bridge Type: 100 $54.04 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $53.49 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $50.22 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $53.00 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $52.58 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $50 22 7A 3C 8P King Power Equipment Operators Power Plant $50.221 7A 3C 8P King Power Equipment Operators Pumps - Water $50.22 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $50.22 7A 3C 8P 100 Feet In Height Based To a Boom King Power Equipment Operators Remote Control Operator On $53.49 7A 3C 8P Rubber Tired Earth Moving Equipment ) King Power Equipment Operators Rigger And Bellman $50.22 7A 3C 8P King Pow�tnent Operators Rollagon $53.49 7A 3C 8P King Power Equipment Operators Rolter, Other Than Plant Mix $50 22 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P Materials •King Power Equipment Operators Roto-mill, Roto-grinder $53.00 7A 3C 8P King Power Equipment Operators Saws - Concrete $52.58 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $53.00 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers Concrete Et Carry All $52.58 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled 45 $53.49 7A 3C 8P i € https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2013 Page 10 of 17 Yards And Over King Power EQ ui omenL Operators Service Engineers - Equipment $52.58 7A 3C 8P 'King Power Equipment Operators Shotcrete/gunite Equipment $50.221 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $52 58 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $53.49 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Tractors, 15 To 30 Metric Tons kKing Power Equipment Operators Shovel, Excavator, Backhoes: $54 04 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes- $54 61 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $53.49 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et $53.49 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $53.00 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $52.58 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $54.61 7A 3C 8P Height, Base To Boom `King Power Equipment Operators Tower Crane Up To 175' In $54 04 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $53 49 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $52.58 7A 3C 2 King Power Equipment Operators Truck Crane Oiler/driver - 100 $53.00 7A 3C 8P Tons And Over ,King Power Equipment Operators Truck Crane Oiler/driver Under $52.58 7A 3C 8P s 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $53.00 7A 3C 8P King Power Equipment Operators Welder $53.491 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $50.22 7A 3C 8P King Power Equipment aerators Yo Yo Pay Dozer $53 00 7A 3C 813 i King Power Equipment Operators- Asphalt Plant Operators $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $53.00 7A 3C 8P Underground Sewer 8 Water Concrete King Power Equipment Operators- Bobcat $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $50.22 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $50.22 7A 3C Sp- Underground Sewer Et Water https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 11 of 17 :King Power Equipment Operators- Bump Cutter $53.00 7A 3C 8P Underground Sewer & Water King Power Equipment Operators Cableways $53.49 7A 3C 8P Uneerground Sewer & Water King Power Equipment Operators- Chipper $53.00 7A 3C 8P ` Underground Sewer & Water IKing Power Equipment Operators- Compressor $50.22 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Concrete Pump: Truck Mount $53.49 7A 3C 8P Underground Sewer & Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $50.22 7A 3C 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $52.58 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $53.00 7A 3C 8P Underground Sewer & Water With Boom Attachment Up To 42m a King Power Equipment Operators- Conveyors $52.58 7A 3C 8P Underground Sewer &Water ,King Power Equipment Operators- Cranes 20 Tons Through 44 $53.00 7A 3C 8P Underground Sewer & Water Tons With Attachments ;King Power Equipment Operators- Cranes- 100 Tons Through 199 $54.04 7A 3C 8P Underground Sewer &Water Tons, Or 150' Of Boom (Including Jib With Attachments) 'King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P Underground Sewer & Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $53.49 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) lKing Power Equipment Operators- Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Underground Sewer & Water Under King Power Equipment Operators- Cranes. Friction 100 Tons $54 61 7A 3C 8P Underground Sewer & Water Through 199 Tons 'King Power Equipment Operators- Cranes- Friction Over 200 Tons $55.17 7A 3C 8P Underground Sewer & Water FKing Power Equipment Operators- Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P , Underground Sewer & Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes- Through 19 Tons With $52.58 7A 3C 8P Underground Sewer & Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $53.00 7A 3C 8P Underground Sewer &Water King Power Equipment Operators Deck Engineer/deck Winches $53.00 7A 3C 8P Underground Sewer &Water (power) King Power Equipment Operators- Derricks, On Building Work $53.49 7A 3C 8P l https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2013 Page 12 of 17 Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 8 Under $52.58 7A 3C 8P Underground Sewer Et Water King Power Egui meat Operators- Drill Oilers: Auger Type, Truck $52 58 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $50.22 7A 3C 8P Underground Sewer a Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $53.00 7A 3C 8P Underground Sewer Et Water Gamaco 8 Similar Equipment King Power Equipment Operators- Forklift. 3000 Lbs And Over $52.58 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators Forklifts, Under 3000 Lbs With $50.22 7A 3C 8P Underground Sewer Et Water Attachments King Power Equipment Operators Grade Engineer: Using Blue $53.00 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $50.22 7A 3C 8P Underground Sewer Et Water IKing Power Equipment Operators- Guardrail Punch $53.00 7A 3C 8P 8 Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $53.49 7A 3C 8P Underground Sewer Et Water Articulating Off- Road I Equipment 45 Yards Et Over ' King Power Equipment Operators- Hard Tail End Dump $53.00 7A 3C 8P Underground Sewer & Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $52 58 7A 3C 8P F Underground Sewer Et Water Locator. King Power Equipment Operators- Horizontal/directional Drill $53 00 7A 3C 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $52.58 7A 3C 8P Underground Sewer Et Water 10 Tons King rower Equipment Operators- Hydralifts/boom Trucks, 10 $50 22 7A 3C 8P Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $54 04 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $53.49 7A 3C 8P Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $53.00 7A 3C 8P Underground Sewer Et Water Yards King Gower Equipment Operators Loaders, Plant Feed $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Locomotives, All $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $54.04 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 13 of 17 Underground Sewer Et Water $0.50 Per Hour Over Mechanic) ,King Power Equipment Operators- Motor Patrol Grader - Non- $52.58 7A 3C 8P Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $50.22 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $52.58 7A 3C 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato King Overhead, Bridge Type Crane $53 00 7A 3C 8P I Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $54.04 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $53.49 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons 'King Power Equipment Operators- Pavement Breaker $50.22 7A 3C 8P Underground Sewer Et Water )King Power Equipment Operators- Pile Driver (other Than Crane $53.00 7A 3C 8P ' Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $50.22 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Power Plant $50.22 7A X 8P Underground Sewer Et Water l King Power Equipment Operators- Pumps - Water $50 22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $50.22 7A 3C 8P Underground Sewer & Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $53.49 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $50.22 7A 3C 8P Underground Sewer Et Water a King Power Equipment Operators- Rollagon $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Roller, Other Than Plant Mix $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $52.58 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2013 Page 14 of 17 Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $53.00 7A 3C 8P Underground Sewer Et Water 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $52.58 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $53.49 7A 3C 8P Underground Sewer a Water Yards And Over King Power Equipment Operators Service Engineers - Equipment $52.58 7A 3C 813 Underground Sewer Et Water King Power EGUlpment Operators- Shotcrete/gunrte Equipment $50 22 7A 3C 8P Underground Sewer Et Water King Power Equipment Qperators Shovel , Excavator, Backhoe, $52.58 7A 3C 8P Underground Sewer Et Water. Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe. $53.49 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Ecuipment Operators- Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment aerators- Shovel, Excavator, Backhoes. $54 04 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $54.61 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $53 49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $53.49 7A 3C 8P Underground Sewer Et Water Screedman King Power Egu gment Operators- Subgrader Trimmer $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $54.61 7A 3C 8P Underground Sewer Et Water Height, Base To Boom lKing Power Equipment Operators- Tower Crane Up To 175' In $54.04 7A 3C 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $53.49 7A 3C 8P Underground Sewer Et Water Truck Type King Power Ecumnient Operators- Trenching Machines $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver• 100 $53.00 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane oiler/driver Under $52.58 7A 3C 8P Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $53.00 7A 3C 8P 4 Underground Sewer Et Water King Power Equipment Operators- Welder $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farman Type $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $53.00 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2013 Page 15 of 17 Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $43.76 5A 4A ( Trimmers King Power Line Clearance Tree Spray Person $41.51 5A 4A b Trimmers King Power Line Clearance Tree Tree Equipment Operator $43.76 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $39.10 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $29.44 5A 4A Trimmers King Refrigeration Et Air Journey Level $71.46 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $50.12 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $39.62 5D 1M King Residential Drywall Tapers Journey Level $49.79 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $35 10 7L 1H j King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters King Residential Refrigeration Et Air Journey Level $71.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41.84 7F 1 R Workers King Residential Soft Floor Lavers Journey Level $42.15 5A 3D King Residential Sprinkler Fitters Journey Level $40.81 5C 2R (Fire Protection) King Residential Stone Masons Journey Level $50.12 5A 1M King Residential Terrazzo Workers Journey Level $46.96 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 F mshers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $44 21 5A 1 R King Roofers Using Irritable Bituminous $47.21 5A 1R Materials King Sheet Metal. Workers Journey Level (Field or Shop) $69 37 7F 1E King Shipbuilding Et Ship Repair Boilermaker $39.66 7M 1H King Shipbuilding a Ship Repair Carpenter $38.24 70 3B King Shipbuilding Et Ship Repair Electrician $37.82 70 3B King Shipbuilding & Shp Repair Heat Et Frost Insulator $58.93 5J 1s https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2013 Page 16 of 17 King Shipbuilding tt Ship Repair Laborer $36.78 70 3B King Shipbuilding It Ship Repair Machinist $37 81 70 3B King Shipbuilding & Ship Repaii Operator $40.15 70 3B King Shipbuilding 8 Ship Repair Painter $37.79 70 3B King Shipbuildin & Shjp-R!pa Pipefitter $37.77 70 3B King Shipbuilding & Ship Repair Rigger $37.76 70 3B King Shipbuilding ff Ship Repair Sandblaster $36.78 70 3B King Shipbuilding & Ship Repair Sheet Metal $37.74 70 3B King Shipbuilding Et Ship Repair Shipfitter $37.76 70 3B King Shipbuilding Et Ship Repair Trucker $37.59 70 3B King Shipbuitdina Et Ship Repair Warehouse $37.65 70 3B King Shipbuilding Et Ship Repair Wetder/Burner $37.76 70 3B King Sign Makers Et Installers Sign Installer $22 92 1 (Electrical) King Sign Makers Et Installers Sign Maker $21.36 1 (Electrical) .King Sign Makers In Installers (Non- Sign Installer $27.28 1 Etectncall King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Etectncall King Solt Floor Lavers Journey Level $42.15 5A 3D King Solar Controls For Windows Journey Level $12 44 1 King Sprinkler Fitters (Fire Journey Level $69 59 5C 1x Protection) King Stage Ripping Mechanics (Non Journey Level $13.23 1 Structural) I King Stone Masons Journey Level $50.12 5A 1M King Street And�Lot Journey Level $19.09 1 Sweeper WorKers iKing Surveyors Assistant Construction Site $52.58 7A 3C 8P i Surveyor 'King Surveyors Chainman $52.06 7A 3C 8P King Surveyors Construction Site Surveyor $53.491 7A 3C 8P King Telecommunication Journey Level $22 76 1 Technicians King Telephone Line Construction - Cable Splicer $36.01 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20 05 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $34.50 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.01 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $35.27 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $36.01 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operatorl $33.47 5A I 2B https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2013 Page 17 of 17 E Outside (Light) i King Telephone Line Construction - Telephone Lineperson $33.47 5A 2B Outside King Telephone Line Construction - Television Groundperson $19.04 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $25.27 5A 2B Outside King Telephone Line Construction - Television System Technician $30 20 5A 2B Outside King Telephone Line Construction - Television Technician $27.09 5A 2B Outside King Telephone Line Construction - Tree Trimmer $33.47 5A 2B Outside i King Terrazzo Workers Journey Level $46.96 5A 1M King Tile Setters Journey Level $21 65 1 King Tile, Marble Et Terrazzo Finisher $37.79 5A 1 B Finishers King Traffic Control Stripers Journey Level $42.33 7A 1K a a King Truck Drivers Asphalt Mix Over 16 Yards (W. $47 91 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck Er Trailer $47 91 5D 3A 8L :King Truck Drivers Dump Truck (W WA-Joint $47 07 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $47.91 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers & Imp,atior Pump Irrigation Pump Installer $17 71 1 i irstalters King Welt Drillers Et Irrigation Pump Oiler $12 97 1 s Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 Irsta(ters https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2013 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 +#########R#######R####k RRRR#k#####RR#k###kR######RR#k####R###k###RRk####Rkkk###########kkk######k########## Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker I ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C The first two(2) hours after eight(8)regular hours Monday through Fi iday and the first ten(10)hours on Saturday shalt be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage D The first two(2)hours before or after a five-eight(8) hour workweek day or a four-ten(10)hour workweek day and the first eight(8)houi s worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage All additional hours worked and all worked on Sunday,and holidays shall be paid at double the hourly rate of wage E The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday and all hours woiked on Sundays and holidayN shall be paid at double the hourly rate of wage F The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half tines the hourly rate of wage All othet overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage G The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten (10)hours Pei day Monday through Saturday and all hours worked on Sundays and holidays shall he paid at double the hourly iate of wage H All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage J The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage M All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the houiN tate of wage 1 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 1. N All hours worked on Saturdays (except makeup days) shall be paid at one and one-half tunes the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage O The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly late of wage P All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage Q The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten(10) hours pet day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times the hourly late of wage R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage S The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays and all other overtime hours worked, except Laboi Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage V All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half tiles the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage X The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half tiles the hourly rate of wage All hours worked over twelve (12) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls on Satuiday of Sunday, the day before Saturday,Friday and the day alter Sunday,Monday,shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage Y All hours worked outside the hours of 5 00 am and 5 00 pin (or such other hours as may be agreed upon by any employer and the employee)and all hows worked in excess of eight(8)hours per day (10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day) shall be paid at one and one-half times the hourly rate of wage (except foi employees who are absent from work without piior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 houi s duung that workweek)All hours worked Monday through Saturday over twelve(12) hours and ell hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage Z All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hours woiked on holidays shall be paid the straight time iate of pay in addition to holiday pay 2 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 2 ALL HOURS WORKED iN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage C All hours worked on Sundays shall be paid at one and one-half times the boat ly rate of wage All hours worked on holidays shall be paid at two times the hourly rate of wage, F The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage G All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay H All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. K All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay O All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage R All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage U All hours worked on Saturdays shall be paid at one and one-halftmmes the hourly rate of wage All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage W The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times tho houry rate of wage All odmei hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day, ten-hour weekly schedule either Mouday thni Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage The fiist eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage All other hours worked on the fifth, sixth,and seventh days and on holidays shall be paid at double the hourly tate of wage Y All hours worked on Saturdays(except for make-up days)shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 3 ALL HOURS WORKED IN FXCESS OF EIGHT(8)HOURS PFR DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TiMES TI1E HOURLY RAI E OF WAGE A Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)houi shifts are established,or forty(40)houi s of sti night time pci week,Monday through Fnday or outside the normal shift and all woik on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours(12)in a single shill and all work performed aflei 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay Any shift starting between the hours of 6 00 pm and midnight shall receive an additional one dollar($1 00)per hour for all houis worked that shift The employer shall have the sole discretion to assign overtime work to employees Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations After an employee has worked eight (8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more 3 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 3. B. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve(12)hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)how shifts are established_or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-hall times the hourly rate of wage All work performed alter 6 00 pm Satmday to 5 00 am Monday and Holidays shall be paid at double the hourly rate of wage After an employee has woiked eight(8)houis at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such tune as the employee has had a break of eight(8)hours or more D. All hours worked between the hours of 6 00 pm and 6 00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage All othei hours worked after 6 00 am on Saturdays, shall be paid at one and one-half times the hourly rate of wage All hours woiked on Sundays and holidays shall be paid at double the hourly rate of wage E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of straight time work is achieved,then any bouts worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate F All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on Sunday shal I be paid at two tines the hourly rate of wage All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay G Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts aie established,or forty (40)hours of straight time per week,Monday through Friday,,and all work on Saturdays shall be paid at time and one-half the straight time rate hours worked over twelve hours(12) in a single shift and all work performed after 8 00 am Sunday to 8 00 am Monday and Holidays shall be paid at double the straight time iate of pay Aftei an employee has worked eight(8)hours at an applicable.overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8) hours or more 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAiD AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A All hours woiked in excess of eight(8)hours pet day or forty (40)hours per week shall be paid at double the hourly rate of wage All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage Holiday Codes 5 A Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day (7) B Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8) C Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) D Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) 4 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 H Holidays New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6) 5 I Holidays New Year's Day, Memorial Day, independence Day.Labor Day, Thanksgiving Day, and Christmas Day (6) J Holidays New Year's Day, Memorial Day, Independence Day, Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day And Christmas Day(7) K Holidays New Year's Day, Presidents' Day, Memorial Day Independence Day, Labor Day, Thanksgiving Day, Friday Altcr Thanksgiving Day,The Day Before Christmas And Christmas Day(9) L Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day Thanksgiving Day,Friday Alter Thanksgiving Day,And Christmas Day(8) N Holidays New Yeat's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After rhanksgivmg Day,And Christmas Day(9) P Holidays New Year's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9) If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday Q Paid Holidays New Year's Day,Memorial Day, independence Day, Labor Day, Thanksgiving Day, and Christmas Day(6) R Paid Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day..And Christmas Day (7 1i2) S Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7) T Paid Holidays New Year's Day, Washington's Birthday, Memorial Day. Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgn uig Day, Christmas Day, And The Day Before Or After Christmas (9) Z Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(8) Holiday Codes Continued 6 A Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday Aftei Thanksgiving Day And Chrsunas Day(8) E Paid Holidays New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day.Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day (9 1/2) G Paid Holidays New Year's Day.Martin Luther King Jr Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans' Day,Thanksgiving Day,I lie Friday After Thanksgiving Day,Christmas Day And Christmas Eve Day(I 1) H Paid Holidays New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, 5 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (10) I Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Chi istmas Day(7) 6 T. Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Befoie Christmas Day, And Christmas Day(9) Z Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday If a holiday falls on Sunday, the following Monday shall be considered as the holiday Holidav Codes Continued 7 A Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Obscived As A Holiday On The Following Monday If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day B Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which lalls on a Saturday shall be observed as a holiday on the preceding Fiiday C Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which fi% on a Saturday shall be obseived as a holiday on the piccedmg Friday D. Paid Holidays New Year's Day, Memorial Day, independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Fiiday after Thanksgiving Day, And (hristmas Day (8) Unpaid Holidays President's Day Any paid holiday which tails on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday E Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday F Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls oil a Saturday shall be observed as a holiday on the pieceding f i iday G. Holidays New Year's Day, Memorial Day,Independence Day, Labor Day,Thanksgiving Day, and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a hohday on the following Monday H. Holidays New Year's Day, Martin Luther King Jr Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9) Any holiday Much falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be obsei ved as a holiday on the preceding Friday 6 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 I Holidays New Year's Day,President's Day,independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday 7 1 Holidays New Year's Day, independence Day, Memonal Day, Labor Day, Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday K Holidays New Year's Day, Memorial Day Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Chitsunas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the pieceding I'riday L Holidays New Year's Day, Memorial Day, Labor Day. independence Day, Thanksgiving Day, the Last Work Day bcloic Chustmas Day, And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Satuiday shall be obscived as a holiday on the preceding Friday M Paid Holidays New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the pieceding Ftiday N Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Chi istmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday When Christmas lalls on a Saturday,the preceding Friday shall be observed as a holiday O Paid Holidays New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day Aftei Oi Before Christmas Day. And The Fniployees Birthday 11) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday P Holidays New Year's Day, Memorial Day, independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And C hristmas Day (7) Any holiday which falls on a Sunday shall be obsei ved as a holiday on the following Monday Q Holidays New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on a Sunday shall he observed as a holiday on the following Monday If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day R Paid Holidays New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiv ing Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10) If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday 11 any of the listed holidays falls on a Sunday the day observed by the Nation shall be considered a holiday and compensated accordingly S Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9) If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly Note Codes 8 A In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more 7 Benefit Code Key—Effective 8-31-2013 thru 3-4-2014 Over 50'To 100'-$2 00 per Foot for Each Foot Over 50 Feet Over 100' fo 150'-$3 00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4 00 per Foot for Each Foot Over 150 Feet Ovei 220'-$5 00 per Foot for Each Foot Over 220 Feet 8 C In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50'To 100'-$1 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$150 per Foot for Fach Foot Over 100 Feet Over 150'To 200'-$2 00 per Foot for Fach Foot Over 150 Feet Over 200'-Divers May Name 1 hctr Own Price D Workers working with supplied air on hazmat projects receive an additional$1 00 per hour L Workers on hazmat projects receive additional hourly premiums as follows-Level A $0 75,Level B $0 50,And Level C SO 25 M Workers on hazmat projects receive additional hourly premiums as follows Levels A&B $1 00,Levels C&D $0 50 N Woikers on hazmat projects receive additional hourly premiums as follows-Level A $1 00,Level B $0 75,Level C $0 50,And Level D $0 25 P Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit $2 00,Class B Suit. $1 50,Class C Suit $1 00,And Class D Suit$0 50 Q The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid R Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control Iaboi is being utilized A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic conuol devices and construction signs necessary to control vehicular,bicycle, and pedestrian traffic during construction opetations Flaggeis and Spotters shalt be posted where shown on appi oved'I raffic Control Plans m where directed by the Engineer All flaggers and spotters shall possess a current flagging caid issued by the State of WiOnigton,Oregon Montana,or Idaho These classifications are only effective on or after August 31,2012 S Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or othet traffic control labor is being utilized Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the fngmeer All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or aftei August 31,2012 T Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations Flaggers and Spottei s shall be posted where shown on approved Traffic Control Plans or where dnected by the Eiigincei All naggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 8