Loading...
HomeMy WebLinkAboutPW14-089 - Original - Eastside Tree Works, LLC - Tree Removals - 4/16/14 i t, .,.. Records Managem­entmN ZKENT Document WASHINOTON 4, CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Eastside Tree Works LLC Vendor Number: JD Edwards Number p�Q Contract Number: TW 1�`QO � 1 This is assigned by City Clerk's Office Project Name: Tree Removal Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 4/16/14 Termination Date: 30 days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Scott Schroeder Department: PW Operations Detail: (i.e. address, location, parcel number, tax id, etc.): Removetrees at the following three locations: 1) 12017 SE 218th PI 2) 26440 127ih Ave. SE and 3) 24611 116t" Ave. SE. S:Publlc\Records Man agement\Fornns\ContractCover\adcc7832 1 11/08 L { i KENT WASHINGTON PUBLIC WORKS AGREEMENT between City of Kent and Eastside Tree Works LLC THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Eastside Tree Works LLC organized under the laws of the State of Washington, located and doing business at 838 286th Ave., Fall City, WA 98024- 7402, Phone: (206) 396-9998/Fax: (425) 222-0887, Contact: Matt Rengo (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall remove trees at the following locations: 1. 12017 SE 2181h Place 2. 26440 127th Ave. SE 3. 24611 116th Ave. SE For a description, see the Contractor's quote which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within thirty (30) days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Five Thousand, Two Hundred Fifty Six Dollars ($5,256.00), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. PUBLIC WORKS AGREEMENT - 1 (Under$10K and No Performance Bond) r , st A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. PUBLIC WORKS AGREEMENT - 2 (Under$10K and No Performance Bond) K D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change PUBLIC WORKS AGREEMENT - 3 (Under$IOK and No Performance Bond) increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. TEN NOTIFICATION OF CLAIM FAILURE TO PROVIDE A COMPLETE, WRITTEN WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. PUBLIC WORKS AGREEMENT - 4 (Under$10K and No Performance Bond) •4 The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in PUBLIC WORKS AGREEMENT - 5 (Under$1OK and No Performance Bond) connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. PUBLIC WORKS AGREEMENT - 6 (Under$1OK and No Performance Bond) C. Resolution of Disputes and Governing Law, This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Under$10K and No Performance Bond) ,s J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: 44 C/L By:-L (signature) (signature) Print Name: MAMd� Upjho Print Name: David A. Brock, P.E. Its Its: Interim Operations Manager DATE: 21z9/tY (title) DATE:T11y NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Matt Rengo Timothy J. LaPorte, P.E. Eastside Tree Works LLC City of Kent 838 2861h Ave. 220 Fourth Avenue South Fall City, WA 98024-7402 Kent, WA 98032 (206) 396-9998 (telephone) (253) 856-5500 (telephone) (425) 222-0887 (facsimile) (253) 856-6500 (facsimile) Eastsioe Tree Works-Tree RemovaVSchroeoer PUBLIC WORKS AGREEMENT - 8 (Under$10K and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. " By signing below, I agree to fulfill the five requirements referenced above. By: Miv �'�-- For: i;s1-pa- reri J'A" Title: ©ww o , Date: 20 1 EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. 1 EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I. the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 EXHIBIT A Eastside Tree Works LLC 838 286th Ave Fall City,WA 98024-7402 Wl Phone: 2o6-396-9998 W Fax:425-222-o887 customer: Date: 1/20/2014 Job Name: City of Kent 131119-1 City of Kent Work Site: 12436 SE 248th ST Joe Codiga Kent,WA 12436 SE 248th ST Kent,WA 98030 Proposed By: Matt Rengo 253-275-7717 425-999-5856 mattrengo@gmaii.com Item Plant Description Cost 1 Alder Tree Removal (2"-8"above grade level) $500.00 121 pi se and se 218th pl Ak 12017 SE 218th pi on the left side of the house side yard. `r Alder removal, Tree has wounds all the way up it.Ok to climb fir tree next to spurless for safety. Cut tree down to a 4'stick just above the neighbors fence. Figure for wood haul but neighbors may want the wood. Tree DBH 16" Height 60' Full tree removal (to 2-"-8"above ground level, depending on grade) including chip and haul all branches and trunk to be cut into firewood lengths. Does not include grinding the stump or roots. 2 Cottonwood Tree Removal(2"-8" above grade level) $2,300.00 26440 127th ave se kent. Tree is on the vacant lot to the south. E ' Remove large lightning struck cottonwood using 76' bucket truck Ok u to bring down in 20' lengths and haul with self loader. N ` Tree DBH 40" Height 120' Full tree removal(to 2-"-8"above ground level, depending on grade) including chip and haul all branches. Does not include grinding the .{ stump or roots. m M m vs = ,�, 3 3 Cottonwood Tree Removal (2"-8"above grade level) $2,000.00 24611 116Th Ave SE Kent Next lot south from the fire station. Remove Extra Large Cottonwood by falling in the helicopter landing pad next to the Kent fire station.Wood will be hauled as well by a self loading log truck. Fence will be taken down by ETW and put back in place after the work is done by ETW. Tree DBH 40" Height 135' Full tree removal (to 2-"-8"above ground level, depending on grade) Including chip and haul all branches. Does not Include grinding the stump or roots, Notes: Subtotal: $4,800.00 Tax: $456.00 Total: $5,256.00 TERMS For the duration of legal documentation, Eastside Tree Works shall be referred to as"ETWLLC" Cancellation of this contract requires written notice by US Mail within 72 hours of acceptance to address listed below A 10%non-refundable deposit is due upon acceptance,unless waived by ETWLLC 10%non- refundable fee is due upon cancellation outside of the required window Balance due to ETWLLC upon substantial completion,unless otherwise noted Permit cost,acquisition,and municipal code compliance is customer responsibility unless noted above Should project not be complete by month end,the percentage complete is due by the 10th of the following month If payment is not received as outlined above,the balance due may be subject to interest penalties of 12%per year,with a$25 00 per week service fee for delinquent accounts In the event it becomes necessary to enforce payment,the client agrees to pay all collection costs incurred by ETWLLC,including attorneys fees and costs,regardless of whether legal action is filed with the courts or not ETWLLC reserves the right to modify contract or void entirely if it deems any task within unsafe or for any other logistical reason All additional work requested by customer,in addition to what is written in this contract,will constitute additional charges Customer is responsible to define all property lines,and in the event of a dispute with neighboring property owners over trespass,customer agrees to defend ETWLLC In the event there is a dispute other than non-payment, both parties agree the first step is non-binding arbitration with the Better Business Bureau Should landscape or property become damaged,both parties agree that ETWLLC will reseed any damaged turf areas and prune or replace any plants and trees with similar species in common size,as well as rights to providing repairs to any other damages Our liability is limited to our on-site work,and only when ETWLLC crewmen are on customers property ETWLLC will not be liable for any damage occurrence outside of when workers are on property Unless other arrangements are made,full payment due upon completion of work This contract serves as notification of Lien rights as required by Washington State law Signature below indicates you agree to the terms set forth and have received a copy of this contract E o Customer Signature Date u w 4 L 'p a+ N AO uJ c i w4+ EXHIBIT B INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Worker's Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $1,000,000 general aggregate and a $1,000,000 products-completed operation aggregate limit. EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability, Commercial General Liability and Builders Risk insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. D. Contractor's Insurance For Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. Before any exposure to loss may occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy that includes all applicable conditions, exclusions, definitions, terms and endorsements related to this project. EXHIBIT B (Continued) H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. ACC)RD® /3/2 4 CERTIFICATE OF LIABILITY INSURANCE DADOM(YY) /3/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pollcy(les) must be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s) PRODUCER CONTACT CHOICE Insurance, LLC 7 NAME FAX PHONE (425) 739-6565 AIC No 1715 Market Street E-MAIL servicecl®choiceinsurance.net Kirkland WA 98033 ADDRESS INSURERS)AFFORDING COVERAGE NAIC N INSURERA Colony Insurance Company 39993 INSURED (206) 396-9998 INSURERS Ohio security Insurance Cm pan 24082 Eastside Tree Works LLC INSURER C 838 286th Ave BE INSURERD Fall City WA 980247402 INSURER INSURER F COVERAGES CERTIFICATE NUMBER:Cert ID 7031 REVISION NUMBER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS IN RI ADDL SUER POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE POLICY NUMBER MMIDD/YVVY MM/DD/YYYY A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR Y 103GL000118600 10/21/2013 10/21/2014 PREMISES Ea occurrence $ 100,000 MED EXP(Any one person) $ 5,000 PERSONAL B ADV INJURY $ 11000,000 GEN'L AGGREGATE LIMIT APPLIES PER GENERAL AGGREGATE $ 2,000,000 POLICY� PRO- POLICY ❑ LOC PRODUCTS-COMPIOP AGG $ 2,000,000 OTHER $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 11000,000 Ea accident B ANY AUTO BASS5639027 6/25/2013 16/25/2014 BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS X AUTOS X X NON-OWNED PROPERTY DAMAGE $ Peraccdent HIRED AUTOS AUTOS UMBRELLA LAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION PER 'ET' AND EMPLOYERS'LIABILITY Y/N 103GL000118800 10/21/2013 10/21/2014 STATUTE X ER ANY PROPRIETORIPARTNER/EXECUTIVE ❑ WorkComp/WA Stop Gap E L EACH ACCIDENT $ 11000,000 Ib OFFICEMEMBER EXCLUDED' N/A (Mandatory in NH) EL DISEASE-EA EMPLOYEE $ 11000,000 If DES IPTIONunder E L DISEASE.POLICY LIMIT $ 1,000,000 DESCRIPTION under OPERATIONS below S S DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Certificate Holder and Owner of Project are included as Additional Insureds with respect to work performed by and/or on behalf of the Named Insured per foxom U156P-0310 attached. Coverage is Primary and Non-Contributory. Waiver of Subrogation is included per form U047-0310 attached. Additional Insured applies per written contract and/or agreement CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Kent ACCORDANCE WITH THE POLICY PROVISIONS 400 West Gowe AUTHORIZED REPRESENTATIVE Kent WA 98032 I ©1988-2013 ACORD CORPORATION All rights reserved. ACORD 25(2013/04) The ACORD name and logo are registered marks of ACORD Page 1 of 1 i 103 GL 0001188-00 I I i THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Additional Insured Person(s)or Organization(s) (Additional Insured). Location(s) of Covered Operations: All persons or organizations as required by written As designated in written contract with the Named contract with the Named Insured Insured i A. SECTION II—WHO IS AN INSURED is amended to Include as an additional insured the person(s)or organization(s)shown in the Schedule for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional Insured on your policy Such person or organization is an additional insured only with respect to liability for"bodily injury", "property damage" or"personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; In the performance of your ongoing operations for the additional Insured(s) at the location(s) designated above. A person's or organization's status as an additional insured under this endorsement ends when your operations for that additional insured are completed B. With respect to the Insurance afforded to these additional Insureds, the following additional exclusions apply: This insurance does not apply to: Additional Insured Contractual Liability "Bodily injury"or"property damage"for which the additional insured(s)are obligated to pay damages by reason of the assumption of liability in a contract or agreement. Finished Operations at Work "Bodily Injury" or"properly damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project(other than service, maintenance or repairs)to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or U156P-0310 Includes copyrighted material of ISO Properties, Inc., Page 1 of 2 with its permission. ' 103 GL 0001188-00 I i 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization Negligence of Additional Insured "Bodily injury" or"property damage" arising directly or indirectly out of the negligence of the additional insured(s). C SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, 4. Other Insurance is amended and the following added: The insurance afforded by this Coverage Part for the additional insured shown in the Schedule is primary insurance and we will not seek contribution from any other insurance available to that additional insured. ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED. f i U156P-0310 Includes copyrighted material of ISO Properties, Inc, Page 2 of 2 with its permission 103 GL 0001188-00 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to Paragraph S.Transfer Of Rights Of Recovery Against Others To Us of Section IV— Conditions We waive any rights of recovery we may have against any person or organization because of payments we make for injury or damage resulting from your ongoing operations or"your work"done under a contract with that person or organization and included in the "products-completed operations hazard" if a. you agreed to such waiver, b. the waiver is included as part of a written contract or lease, and c. such written contract or lease was executed prior to any loss to which this insurance applies. ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED. U047-0310 Includes copyrighted material of ISO Properties, Inc., Page 1 of 1 with its permission Page 1of17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 3/25/2014 'County Trade Job Classification Wage lHoliday Overtime Note King Asbestos Abatement Workers Journey Level $41.691 5D 1 H King Boilermakers Journey Level $64.441 5N 1C King Brick Mason Brick And Block Finisher $43.261 5A 1M King Brick Mason Journey Level $50.121 5A 1M King Brick Mason Pointer-Caulker-Cleaner $50 121 5A 1M King Building Service Employees Janitor $20.59 5S r2F King Building Service Employees Traveling Waxer/Shampooer $21.00 5SKing Building Service Ernployees Window Cleaner (Non-Scaffold) $24 29 5SKing Building Service Employees Window Cleaner (Scaffold) $25.15 5SKing Cabinet Makers (In Shop) Journey Level $22 74 King Carpenters Acoustical Worker $50.82 5D 1M x King Carpenters Bridge, Dock And Wharf $50.82 5D 1M Carpenters King Carpenters Carpenter $50 82 5D 1M King Carpenters Carpenters on Stationary Tools $50.95 5D iM King Carpenters Creosoted Material $50.92 5D 1M King Carpenters Floor Finisher $50 82 5D 1M King Carpenters Floor Layer $50.82 5D 1M King Carpenters Scaffold Erector $50.82 5D 1M King Cement Masons Journey Level $51.18 7A 1M King Divers £t Tenders Diver $105.37 5D 1M 8A King Divers 8 Tenders Diver On Standby $59.50 5D 1M King Divers 8 Tenders Diver Tender $54 82 5D 1M King Divers & Tenders Surface Rcv 8 Rov Operator $54.82 5D 1M King Divers £t Tenders Surface Rcv & Rov Operator $51.07 5A 1B Tender King Dredge Workers Assistant Engineer $53.001 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52 58 5D 3F https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 2 of 17 King Dredge Workers Boatmen $52.30 5D 3F King Dredge Workers Engineer Welder $54.04 5D 3F King Dredge Workers Leverman, Hydraulic $55 17 5D 3F King Dredge Workers Mates $52.30 5D 3F King Dredge Workers Oiler $52 58 5D 3F King Drywall Applicator Journey Level $50 82 5D 1H King Drywall Tapers Journey Level $50 871 5P 1 E King Electrical Fixture Maintenance Journey Level $25 84 5L 1E Workers King Electricians - Inside Cable Splicer $65.69 7C 2W King Electricians - Inside Cable Splicer (tunnel) $70.52 7C 2W King Electricians - Inside Certified Welder $63.49 7C 2W l King Electricians - Inside Certified Welder (tunnel) $68.101 7C 2W King Electricians - Inside Construction Stock Person $35.691 7C 2W King Electricians - Inside Journey Level $61.301 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W King Electricians - Motor Shop Craftsman $15 37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $68.33 5A 4A Construction King Electricians - Powerline Certified Line Welder $62 50 5A 4A Construction King Electricians - Powerline Groundperson $42 56 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $62.50 5A 4A Construction Operator 'King Electricians - Powerhne Journey Level Lineperson $62.50 5A 4A Construction King Electricians - Powerline Line Equipment Operator $52.47 5A 4A Construction King Electricians - Powerline Pole Sprayer $62.50 5A 4A Construction King Electricians - Powerline Powderperson $46.55 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 3King Elevator Constructors Mechanic $80.14 7D 4A ,King Elevator Constructors Mechanic In Charge $86.77 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.25 5B 1R Products Work Only King Fence Erectors Fence Erector $15.18 1 'King Flaggers Journey Level $35 34 7A 31 King Glaziers Journey Level $53.76 7L 1Y King Heat & Frost Insulators And Journeyman $58.93 5J 15 Asbestos Workers 'King Heatinp Equipment Mechanics Journey Level $69.37 7F 1 E King Hod Carriers & Mason Tenders Journey Level $42 99 7A 31 King Industrial Power Vacuum Journey Level $9.32 1 a https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 3 of 17 Cleaner King Inland Boatmen Boat Operator $54.57 5B 1K King Inland Boatmen Cook $50.95 5B 1K King Inland Boatmen Deckhand $51 19 5B 1 K King Inland Boatmen Deckhand Engineer $52.18 5B 1 K King Inland Boatmen Launch Operator $53 40 5B 1 K King Inland Boatmen Mate $53 401 5B 1K King Inspection/Cleaning,/Seating, Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing, Of Grout Truck Operator $11.48 1 Sewer Ex Water Systems By Remote Control King Inspection/Cleaning,/Seating Of Head Operator $24.91 1 Sewer & Water Systems By Remote Control King Inspection/Cteaning,/Sealing Of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection/Cleamna/Sealing, Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $50.82 5D 1M King Ironworkers Journeyman $59.77 7N 10 King Laborers Air, Gas Or Electric Vibrating $41.69 7A 31 Screed " r King Laborers Airtrac Drill Operator $42.99 7A 31 King Laborers Ballast Regular Machine $41 691 7A 31 King Laborers Batch Weighman $35.341 7A 31 King Laborers Brick Pavers $41.69 7A 31 King Laborers Brush Cutter $41.69 7A 31 King Laborers Brush Hog Feeder $41.69 7A 31 King Laborers Burner $41.69 7A 31 King Laborers Caisson Worker $42 99 7A 31 King Laborers Carpenter Tender $41.69 7A 31 King Laborers Caulker $41.69 7A 31 King Laborers Cement Dumper-paving $42.46 7A 31 "King Laborers Cement Finisher Tender $41.69 7A 31 King Laborers Change House Or Dry Shack $41.69 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $41.69 7A 31 King Laborers Chipping Gun(30 Lbs. And $42.46 7A 31 Over) # King Laborers Choker Setter $41.69 7A 31 King Laborers Chuck Tender $41.69 7A 31 King Laborers Clary Power Spreader $42.461 7A 31 King Laborers Clean-up Laborer $41.69 7A 31 King Laborers Concrete Dumper/chute $42.46 7A 31 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 4of17 r Operator King Laborers Concrete Form Stripper $41.69 7A 31 King Laborers Concrete Placement Crew $42.46 7A 31 King Laborers Concrete Saw Operator/core $42 46 7A 31 Driller King Laborers Crusher Feeder $35.34 7A 31 King Laborers Curing Laborer $41 69 7A 31 King Laborers Demolition: Wrecking & Moving $41 69 7A 31 (incl Charred Material) King Laborers Ditch Digger $41.69 7A 31 King Laborers Diver $42.99 7A 31 King Laborers Drill Operator $42.46 7A 31 (hydraulic,diamond) `King Laborers Dry Stack Walls $41.69 7A 31 King Laborers Dump Person $41.69 7A 31 King Laborers Epoxy Technician $41.69 7A 31 King Laborers Erosion Control Worker $41.691 7A 31 King Laborers Faller 8 Bucker Chain Saw $42.46 7A 31 King Laborers Fine Graders $41.69 7A 31 King Laborers Firewatch $35 34 7A 31 King Laborers Form Setter $41.69 7A 31 King Laborers Gabian Basket Builders $41.69 7A 31 King Laborers General Laborer $41.69 7A 31 King Laborers Grade Checker 8 Transit $42.99 7A 31 Person King Laborers Grinders $41.69 7A 31 King Laborers Grout Machine Tender $41.69 7A 31 King Laborers Groutmen (pressure)including $42.46 7A 31 Post Tension Beams King Laborers Guardrail Erector $41 69 7A 31 King Laborers Hazardous Waste Worker (level $42.99 7A 31 A) I King Laborers Hazardous Waste Worker (level $42.46 7A 31 B) King Laborers Hazardous Waste Worker (level $41.69 7A 31 C) King Laborers High Scaler $42.99 7A 31 King Laborers Jackhammer $42.46 7A 31 King Laborers Laserbeam Operator $42.46 7A 31 King Laborers Maintenance Person $41 69 7A 31 King Laborers Manhole Builder-mudman $42.46 7A 31 King Laborers Material Yard Person $41.69 7A 31 King Laborers Motorman-dinky Locomotive $42.46 7A 31 King Laborers Nozzleman (concrete Pump, $42.46 7A 31 Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete 8 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/25/2014 Page 5 of 17 Rock, Sandblast, Gunite, i Shotcrete, Water Bla King Laborers Pavement Breaker $42.46 7A 31 King Laborers Pilot Car $35 34 7A 31 King Laborers Pipe Layer Lead $42 99 7A 31 King Laborers Pipe Layer/tailor $42.46 7A 31 King Laborers Pipe Pot Tender $42 46 7A 31 King Laborers Pipe Reliner $42461 7A 31 King Laborers Pipe Wrapper $42.46 7A 31 King Laborers Pot Tender $41.69 7A 31 King Laborers Powderman $42.99 7A 31 King Laborers Powderman's Helper $41.69 7A 31 King Laborers Power Jacks $42 46 7A 31 King Laborers Railroad Spike Puller - Power $42.461 7A 31 King Laborers Raker - Asphalt $42.991 7A 31 King Laborers Re-timberman $42.991 7A 31 King Laborers Remote Equipment Operator $42.46 7A 31 King Laborers Rigger/signal Person $42.46 7A 31 King Laborers Rip Rap Person $41.69 7A 31 King Laborers Rivet Buster $42.46 7A 31 King Laborers Rodder $42 46 7A 31 King Laborers Scaffold Erector $41 69 7A 31 King Laborers Scale Person $41.69 7A 31 King Laborers Sloper (over 20") $42.46 7A 31 King Laborers Sloper Sprayer $41.69 7A 31 King Laborers Spreader (concrete) $42.46 7A 31 King Laborers Stake Hopper $41.69 7A 31 King Laborers Stock Piler $41 69 7A 31 King Laborers Tamper Et Similar Electric, Air $42 46 7A 31 Et Gas Operated Tools King Laborers Tamper (multiple Et Self- $42.46 7A 31 propelled) King Laborers Timber Person - Sewer (Lagger, $42 46 7A 31 Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $41 69 7A 31 King Laborers Topper $41.69 7A 31 King Laborers Track Laborer $41 69 7A 31 l King Laborers Track Liner (power) $42.461 7A 31 King Laborers Traffic Control Laborer $37.791 7A 31 8R King Laborers Traffic Control Supervisor $37.79 7A 31 8R King Laborers Truck Spotter $41.69 7A 31 King Laborers Tugger Operator $42.46 7A 31 King Laborers Tunnel Work-Compressed Air $60.06 7A 31 Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $65.09 7A 31 i https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 6 of 17 Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $68.77 7A 31 8�( Worker 44 01-54.00 psi King Laborers Tunnel Work-Compressed Air $74.47 7A 31 Worker 54 01-60 00 psi King Laborers Tunnel Work-Compressed Au $76.59 7A 31 8�( Worker 60.01-64 00 psi King Laborers Tunnel Work-Compressed Air $81.69 7A 31 8�C Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Au $83 59 7A 31 88 Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $85.59 7A 31 8g Worker 70 01-72.00 psi King Laborers Tunnel Work-Compressed Air $87.59 7A 31 8� Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $43.09 7A 31 8�( Tender King Laborers Tunnel Work-Miner $43 09 7A 31 King Laborers Vibrator $42 461 7A 31 King Laborers Vinyl Seamer $41 69 7A 31 `King Laborers Watchman $32.12 7A 31 King Laborers Welder $42.46 7A 31 King Laborers Well Point Laborer $42.46 7A 31 King Laborers Window Washer/cleaner $32.12 7A 31 King Laborers - Underground Sewer General Laborer Et Topman $41.69 7A 31 f Et Water I King Laborers - Underground Sewer Pipe Layer $42.46 7A 31 Et Water King Landscape Construction Irrigation Or Lawn Sprinkler $13 56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $50.82 5D 1 H King Marble Setters Journey Level $50.12 5A 1M King Metal Fabrrica�hop1 Fitter $15 861 1 King Metal Fabrication (In Shop) Laborer $9 78 1 King Metal Fabrication In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 ;King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $51.92 5D 1M .King Modular Buildm s Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 https://fortress.wa.gov/In1/wagelookup/prvWagelookup.aspx 3/25/2014 Page 7of17 King Modular Buitdinigs Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buitdinys Welder $11.56 1 King Painters Journey Level $37 80 6Z 2B King Pile Driver Journey Level $51.07 5D 1M King Plasterers Journey Level $49 29 1R King Playoround It Park Equipment Journey Level $9.32 1 Installers King Plumbers E Pipefitters Journey Level $73.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $53.49 7A 3C SP King Power Equipment Operators Assistant Engineer $50.22 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $53 00 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $53 00 7A 3C 8P Concrete King Power Equipment Operators Bobcat $50.22 7A 3C 8P ' King Power Equipment Operators Brokk - Remote Demolition $50.22 7A 3C 8P Equipment King Power Equipment Operators Brooms $50.22 7A 3C 8P King Power Equipment Operators Bump Cutter $53 00 7A 3C 8P King Power Equipment Operators Cableways $53 49 7A 3C 8P King Power Equipment Operators Chipper $53 00 7A 3C 8P King Power Equipment Operators Compressor $50.22 7A 3C 8P King Power Equipment Operators Concrete Pump- Truck Mount $53.49 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $50.22 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $52.58 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump Truck Mount $53.00 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $52 581 7A 3C 8P King Power Equipment Operators Cranes 20 Tons Through 44 $53 00 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $54.04 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $53 49 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Under https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 8 of 17 King Power Equipment Operators Cranes: Friction 100 Tons $54.61 7A 3C 2P Through199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $55 17 7A 3C 8P King Power Equipment Operators Cranes Over 300 Tons Or 300' $55.17 7A 3C 8P Of Boom (including Jib With i € Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $52.58 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $53.00 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $53.00 7A 3C 8P a (power) King Power Equipment Operators Derricks, On Building Work $53 49 7A 3C 8P King Power EquipMtnL Operators Dozers D-9 tt Under $52 58 7A 3C I 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $52.58 7A 3C 8P I Or Crane Mount King Power Equipment Operators Drilling Machine $53.00 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $50.22 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $53 00 7A 3C 8P Gamaco 8 Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $52.58 7A 3C 8P I With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $50.22 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $53.00 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $50 22 7A 3C 8P King Power Equipment Operators Guardrail Punch $53 00 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $53 49 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $53.00 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $52.58 7A 3C 8P ' Locator King Power Equipment Operators Horizontal/directionat Drill $53.00 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $52.58 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $50.22 7A 3C 8P t Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $54.04 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $53.49 7A 3C 8P Not Including 8 Yards I ;King Power Equipment Operators Loaders, Overhead Under 6 $53.00 7A 3C 8P Yards x r s https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 9 of 17 {King Power Equipment Operators Loaders, Plant Feed $53.001 7A 3C 8P ;King Power Equipment Operators Loaders: Elevating Type Belt $52.58 7A 1C 8P King Power Equipment Operators Locomotives, All $53 00 7A 3C 8P King Power Equipment Operators Material Transfer Device $53 00 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $54.04 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Grader - Non- $52 58 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $53.49 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $50.22 7A 3C 8P Distribution Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $52.58 7A 3C 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $53 00 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $54.04 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $53 49 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $50.22 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $53 00 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $52.581 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $50.221 7A 3C 8P King Power Equipment Operators Power Plant $50 22 7A 3C 8P King Power Equipment Operators Pumps - Water $50 22 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $53 49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $50.22 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $53.49 7A 3C 8P Rubber Tired Earth Moving I Equipment King Power Equipment Operators Rigger And Bellman $50.22 7A 3C 8P King Power Equipment Operators Rollagon $53.49 7A 3C 8P King Power E ui meat Operators Roller, Other Than Plant Mix $50.221 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $52 58 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $53.00 7A 3C 8P King Power Equipment Operators Saws - Concrete $52.58 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $53 00 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $52.581 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled 45 $53.49 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 10 of 17 Yards And Over King Power Equipment Operators Service Engineers - Equipment $52.58 7A 3C 8P King Power Equipment Operators Shotcrete/gunite Equipment $50.22 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $52 58 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $53.49 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Tractors: 15 To 30 Metric Tons s King Power Equipment Operators Shovel, Excavator, Backhoes: $54 04 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons 'King Power Equipment Operators Shovel, Excavator, Backhoes: $54.61 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $53.49 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et $53 49 7A 3C 813 Screedman King Power Equipment Operators Subgrader Trimmer $53.00 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $52 58 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $54.61 7A 3C 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $54 04 7A 3C 8P ; Height Base To Boom King Power Equipment Operators Transporters, All Track Or $53 49 7A 3C 2P i Truck Type King Power Equipment Operators Trenching Machines $52.58 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $53.00 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $52.58 7A 3C 8P ` 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $53 00 7A 3C 8P King Power Equipment Operators Welder $53.49 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $50.22 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $53.001 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $53 00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $53.00 7A 3C 8P Underground Sewer Et Water Concrete r King Power Equipment Operators- Bobcat $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $50.22 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $50.22 7A 3C 8P Underground Sewer Et Water https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 11of17 King Power Equipment Operators- Bump Cutter $53.00 7A 3C 8P 3 Underground Sewer It Water King Power Equipment Operators- Cableways $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $53.00 7A 3C 8P j Underground Sewer a Water l King Power Equipment Operators- Compressor $50 22 7A 3C SP Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $53.49 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $50 22 7A 3C 8P Underground Sewer :t Water Screed ; King Power Equipment Operators- Concrete Pump - Mounted Or $52.58 7A 3C 8P Underground Sewer & Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $53.00 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $52 58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $53.00 7A 3C 8P Underground Sewer Et Water Tons With Attachments King Power EquiDment Operators- Cranes 100 Tons Through 199 $54.04 7A 3C 8P ; Underground Sewer Et Water Tons, Or 150' Of Boom " (Including Jib With Attachments) King Power Equipment Operators- Cranes 200 Tons To 300 Tons, $54.61 7A 3C 8P Underground Sewer i* Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $53.49 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Underground Sewer & Water Under King Power Eguipment Operators- Cranes: Friction 100 Tons $54 61 7A 3C 8P Underground Sewer Et Water Through 199 Tons ' i King Power Equipment Operators- Cranes: Friction Over 200 Tons $55.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $52 58 7A 3C 8P Underground Sewer & Water Attachments A-frame Over 10 _ Tons King Power Equipment Operators- Crusher $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $53.00 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $53 49 7A 3C 8P 14, https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 12 of 17 Underground Sewer Et Water King Power EQUIpment Operators- Dozers D-9 Et Under $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers Auger Type, Truck $52.58 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $50.22 7A 3C 8P I Underground Sewer Et Water Permanent And Shaft Type King Power EqUlDment Operators- Finishing Machine, Bidwell And $53.00 7A 3C 8P Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $52.58 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts. Under 3000 Lbs. With $50.22 7A 3C 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $53.00 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $50.22 7A 3C 8P ; Underground Sewer Et Water ` King Power Equipment Operators- Guardrail Punch $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $53.49 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. ft Over King Power Equipment Operators- Hard Tail End Dump $53.00 7A 3C 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $52.58 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $53.00 7A 3C 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $52.58 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $50.22 7A 3C 8P F Underground Sewer $ Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $54.04 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $53.49 7A 3C 8P Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $53 00 7A 3C 8P Underground Sewer a Water Yards King Power Equipment Operators- Loaders, Plant Feed $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $53 00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $54 04 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 13 of 17 Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $52.58 7A 3C 8P ' Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $50.22 7A 3C 8P s Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $52.58 7A 3C 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $53.00 7A 3C 8P , Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $54.04 7A 3C 81) Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $53.49 7A 3C 8P f Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $50 22 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Pile Driver (other Than Crane $53.00 7A 3C 8P , Underground Sewer Et Water Mount) i King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $52 58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $50.22 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To E Boom King Power Equipment Operators- Remote Control Operator On $53.49 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $52.58 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 14 of 17 Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $53.00 7A 3C 2P P Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $52 58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $53.49 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $52.58 7A 3C 8P R Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $50.22 7A 3C 8P ' Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $52.58 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $53.49 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Underground Sewer Et Water Tractors- 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $54 04 7A 3C 8P Underground Seaver Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $54.61 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $53.49 7A 3C 8P Underground Sewer a Water Screedman King Power Equipment Operators- Subgrader Trimmer $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $54.61 7A 3C 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $54.04 7A 3C 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $53.49 7A 3C 8P Underground Sewer Et Water Truck Type `King Power Equipment Operators- Trenching Machines $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $53.00 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $52.58 7A 3C 8P Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $53.00 7A 3C 8P E Underground Sewer Et Water King Power Equipment Operators- Welder $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmall Type $50.22 7A 3C 8P r Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $53 00 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 15 of 17 Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge r$44.86 5A 4A Trimmers King Power Line Clearance Tree Spray Person 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $30 20 5A 4A Trimmers King Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Back Mason Journey Level $50.12 5A 1M King Residential Carpenters Journey Level $28.201 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $39 62 5D 1M King Residential Drywall Tapers Journey Level $50.87 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $36 20 7L 1H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24 09 1 King Residential Painters Journey Level $24 46 1 King Residential Plumbers 8t Journey Level $34 69 1 Pipefitters .King Residential Refrigeration 8t Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41.84 7F 111 Workers King Residential Soft Floor Lavers Journey Level $42.15 5A 3D King Residential Sprinkler Fitters Journey Level $42 48 5C 211 (Fire ProtectLon) King Residential Stone Masons Journey Level $50 121 5A 1M King Residential Terrazzo Workers Journey Level $46.96 5A 1M King Residential Terrazzo/file Journey Level $21 46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $44.71 5A 3H King Roofers Using Irritable Bituminous $47.71 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $69.37 7F 1 E King Shipbuilding ft Ship Repair Boilermaker $40.12 7M 1H King Shipbuilding Et Ship Repair Carpenter $38.24 70 36 King Shipbuilding & Shjp Repair Electrician $37.80 70 313 King Shipbuilding Et Ship Repair Heat Et Frost Insulator $58.93 5J 1S https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 16 of 17 King Shipbuilding Et Ship Repair Laborer $36.781 70 3B King Shipbuilding 8 Ship Repair Machinist $37 811 70 3B King Shipbuilding Et Ship Repair Operator $40.15 70 3B King Shipbuilding Et Ship Repair Painter $37.79 70 3B King Shipbuilding Et SMp Repair Pipefitter $37.77 70 3B King Shipbuilding Et Ship Repair Rigger $37.74 70 13 King Shipbuilding Et Ship Repair Sandblaster $36 78 70 3B King Shipbuilding Et Ship Repair Sheet Metal $37.74 70 3B King Shipbuilding Et Ship Repair Shipfitter $37.74 70 3B King Shipbuilding Et Ship Repair Trucker $37.59 70 3B King Shipbuilding Et Ship Repair Warehouse $37.64 70 3B King Shipbuilding Et Ship Repair Welder/Burner $37.74 70 3B King Sign Makers a Installers Sign Installer $22.92 1 (Electncatl King Sign Makers Et Installers Sign Maker $21.36 1 jElectncaU King Sian Makers a Installers (Non- Sign Installer $27.28 1 Electncatl King Sign Makers Et Installers (Non- Sign Maker $33.25 1 r El-ctncalj King Soft Floor Lavers Journey Level $42.15 5A 3D ; King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69 59 5C 1x Protection) 3 King Stage Rigging Mechanics (Non Journey Level $13 23 1 Structurall King Stone Masons Journey Level $50.12 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $52.58 7A 3C 8P Surveyor King Surveyors Chainman $52.061 7A 3C I 8P King Surveyors Construction Site Surveyor $53.49 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $36 01 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20.05 5A 2B i Outside King Telephone Line Construction - Installer (Repairer) $34.50 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.01 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $35.27 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $36.01 5A 2B Outside (Heavy) King Telephone Line Construction Telephone Equipment Operator $33 47 5A 2B https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Page 17 of 17 Outside (Light) King Telephone Line Construction - Telephone Lineperson $33.47 5A 2B Outside King Telephone Line Construction - Television Groundperson $19 04 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $25.27 5A 2B Outside King Telephone Line Construction - Television System Technician $30.20 5A 2B Outside King Telephone Line Construction Television Technician $27.09 5A 2B Outside King Telephone Line Construction - Tree Trimmer $33.47 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A 1M King Tite Setters Journey Level $21.65 1 King Tile, Marble Et Terrazzo Finisher $37.79 5A 1B r Finishers I King Traffic Control Stripers Journey Level $42.331 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. E$48.87 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck Et Trailer 5D 3A 8L King Truck Drivers Dump Truck (W WA-Joint $48.03 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers Et Irrigation Pump Oiler $12.97 1 Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/25/2014 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker 1. ALL HOURS WORKED IN EXCESS OF EIGHT (8)HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either woi kweek shall be paid at one and one-half times the hourly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Satin day, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage F The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten(10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage G The first ten(10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four-ten hour schedule,shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage. M All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 1 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 1 N All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage O The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage P All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage Q. The first two (2) hours after eight (8) regular hows Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked to excess of ten (10) hours pet day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly Late of wage All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage. X The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve(12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly Late of wage When holiday falls on Saturday or Sunday,the day before Saturday,Friday, and the day after Sunday,Monday,shall be considered the holiday and all wot k performed shall be paid at double the hourly rate of wage Y. All hours worked outside the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any employe and the employee)and all hours worked in excess of eight(8)hours pet day(10 hours pet day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly Late of wage (except for employees who are absent fiom work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 hours during that workweek)All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at two times the hourly rate of wage F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage G. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays shall be paid at two and one-half times the hourly i ate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage 0 All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thiu Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)how s of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours(12)in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay Any shift staiting between the hours of 6 00 pm and midnight shall receive an additional one dollar(S1 00)per hour for all hours worked that shift The employer shall have the sole discretion to assign overtime work to employees Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. B The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly i ate of wage All hours worked over twelve(12)hours Monday through Satuiday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 3 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 3. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty (40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6 00 pm Saturday to 5 00 am Monday and Holidays shall be paid at double the hourly rate of wage After an employee has worked eight(8)hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more D. All hours worked between the hours of 6-00 pm and 6 00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage All other hours worked after 6 00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage late F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate of wage All hour s worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay Work performed on Sundays between Octobei 15th and Mai ch 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay I All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate However,Satuiday shall not be utilized as a make-up day when a holiday falls on Friday.All hours worked Monday through Saturday over twelve(12)hours and all hour s worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. Holiday Codes 5. A. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7) B. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8) C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) 4 ♦ C Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 5. H. Holidays-New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). I. Holidays:New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, and Christmas Day (6) J Holidays New Year's Day, Memorial Day, Independence Day,Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7) K. Holidays. New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). L. Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8) N Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9) P. Holidays-New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9) If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday Q. Paid Holidays New Year's Day, Memorial Day,Independence Day,Labor Day,Thanksgiving Day,and Christmas Day(6) R. Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day (7 1/2) S. Paid Holidays- New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7) T. Paid Holidays- New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day,And The Day Before Or After Christmas (9) Z. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) Holiday Codes Continued 6 A. Paid Holidays. New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8). E Paid Holidays New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day (9 1/2). G. Paid Holidays New Year's Day,Martin Luther King Jr Day,Presidents'Day,Memorial Day,Independence Day, Laboi Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And Christmas Eve Day(11) H. Paid Holidays. New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day Aftei Christmas, And A Floating Holiday(10) 5 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 6. I. Paid Holidays-New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7) T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9) Z. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Frday shall be considered as the holiday If a holiday falls on Sunday, the following Monday shall be considered as the holiday Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day B. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday C. Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day. And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday D. Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8) Unpaid Holidays President's Day Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday E. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays. New Year's Day Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last woiking day before Christmas day and Christmas day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday G. Holidays- New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day, and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday H Holidays New Year's Day, Martin Luther King Jr Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday 6 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 7. I. Holidays New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday K. Holidays- New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L Holidays:New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day,the Last Work Day before Christmas Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday M. Paid Holidays New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday When Christmas falls on a Saturday,the peceding Friday shall be observed as a holiday. O Paid Holidays: New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day After Or Before Christmas Day, And The Employees Buthday. 11) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. P Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10) If any of the listed holidays fall on Saturday,the piecedmg Friday shall be observed as the holiday If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly S. Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9) If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly 7 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Note Codes 8 A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50'To 100'-$2 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$3 00 pet Foot for Each Foot Over 100 Feet Over 150'To 220'-$4 00 pet Foot for Each Foot Over 150 Feet Over 220'-$5 00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Civet 50' To 100'-$1 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1 50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2 00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional$1 00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A.$0 75,Level B $0 50,And Level C $0 25 5 M. Workers on hazmat projects receive additional hourly premiums as follows'Levels A&B• $1 00,Levels C&D $0 50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1 00,Level B $0 75,Level C $0 50,And Level D $0 25 P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit. $1 50,Class C Suit $1 00,And Class D Suit$0 50 } Q The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes dui ing the shift shall be used in determining the scale paid. R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehtculat,bicycle, and pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggeis and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho These classifications are only effective on or after August 31,2012 S Effective August 3 L 2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging cat issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on appioved Traffic Control Plans or where directed by the Engineer All flaggers and spotteis shall possess a current flagging card issued by the State of Washington,Oiegon,Montana,or Idaho This classification is only effective on of after August 31,2012 8