HomeMy WebLinkAboutPW13-103 - Change Order - #13 - Goodfellow Bros., Inc. - SE 256th St Improvements - 04/01/2014 KENT
WASHINGTON
CHANGE ORDER NO, #13
NAME OF CONTRACTOR: Goodfellow Brothers, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: SE 256th Street Improvements
ORIGINAL CONTRACT DATE: June 6, 2013
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Comcast field initiated changes to add conduit for 2 power sources,
missing conduit segment and conflicts placing 5' vault. Incomplete
Comcast plans at time of bidding and design. Change order will be
reimbursed by Comcast.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $5,208,988.60
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $33,934.35
(incl, applicable WSST)
Current Contract Amount $5,242,922.95
(incl. Previous Change Orders)
Current Change Order $10,000.00
Applicable WSST Tax on this Change $950.00
Order
Revised Contract Sum $5,253,872.95
CHANGE ORDER - 1 OF 3
`)W l3- IDS
Original Time for Completion 300 working days
9 P
(insert date)
Revised Time for Completion under 303 working days
prior Change Orders
(insert date)
Days Required (t) for this Change 1 calendar days
Order
Revised Time for Completion 304 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below,
CONTRACTOR: CNITY OF KENT:
ti
By: <d By: 47
signature) srgna re
Print Name: Print Name: imothv J LaPorte, P.E.
Its_ Its Public Works Director
(title (title)
DATE: `+�1� DATE: /� /�L
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
CHANGE ORDER - 3 OF 3
��• FILE NO: 200.2
`r KENT
CHANGE ORDER WORKSHEET NO, JL�Y3
Construction Management Division - Public Works W
Project: SE 2561h Street Improvements Project No.: 09-3012C
Project Engineer: Mark Madfai Fed-Aid No.: N/A
Owners Rep: Phil McConnell Contractor: Goodfellow Brothers
Date: 2/4/2014
I. PROPOSED CHANGE
Comcast field initiated changes to add conduit for 2 power sources and missing conduit segment
and conflicts placing 5' vault
II. REASON AND BACKGROUND FOR CHANGE
Incomplete Comcast plans at time of bidding and design bust at vault location
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ® Not Applicable
Change Order No. I _ 1 1FOR ACCOUNTING USE ONLY
Sch No. I Item Description Total Est. 1 Qty this Unit Unit Price Total Estimated Cost of
Qty PE Item
(
------- - - - - - --- - ---- ----- --- --
6 Comcast force account 1 1 FA — 10,000_00
EITIndependent Estimate Attached i CREATE PAY ITEM ONLY- Payment to be made ® PAY THIS PAY ESTIMATE
-REQUIRED i at a later date upon completionof work _
- - - --- _W4- ----- - - ---- ---
Material Submittals Required - CC Construction Coordinator ' New Sub Reqrd? I No—
DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable
Change Order No. I _ I FOR ACCOUNTING USE ONLY
Sch No. B i No Item Description Qty Unit Unit Price Cost of Item
------ ------- -------------------
Independent Estimate Attached -REQUIRED
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
Change Order No. I _ ( I FOR ACCOUNTING USE ONLY
Sch No B 1 No Item Description Qty Unit Unit Price Cost of Item
i I I
Independent Estimate Attached - REQUIRED
1 REV. DATE:4/01/10
KtNT FILE NO: 200.2
W�SNivG1Ov
TOTAL ESTIMATED COST OF CHANGE ORDER * $10 000300
*Total of the Cost of Item Columns
THIS PAY ESTIMATE $1,OS2.39
IV. WORKING DAYS
Original Contract Due This Change Order*-� ! Previous Total
DATE:_
* Ex lanation justification Re uired: 0,
TOTAL WORKING DAYS* 3
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
C
Prepared By: - Date: 3- 3-
Phil(Ff lcCon 11
Construction Supervisor: r Date:
Pau 4uehnp 3
Construction Manager: Date:
2 REV. DATE.4/01/10
FA Sheet No
DAILY REPORT OF
FORCE ACCOUNT WORKED N- T
Project Name SE 256th Street Improvements Project No 09-3012
Item No 6000 Date 214/2014
Description of Work BIII Out to comcast force account to find pace to place splice vault in alley
Unable to place per plan
Work by Subcontractor? no
Prime Contractor Goodfellow Brothers Sub-Contractor
LABOR .-
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Jay No Match foreman 1 6301 $ 5301
Mike operator 55 60 16 $ 33088
Phil No Match pipelayer 55 4896 $ 26928
$
SUBTOTAL-LABOR $ 66317
LABOR OVERHEAD&PROFIT @ 29% $ 19232
LABOR TOTAL $ 85549
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
JD 50D mini excavator 55 2610 $ 143 55
F 150 pickup 1 1918 $ 1918
Is
SUBTOTAL-EQUIPMENT $ 16273
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 34 17
EQUIPMENT TOTAL $ 19690
MATERIALSISERV ICESIRENTALS
MATERIALS 1 SERVICES Quantity Units I Umt Pnce DOLLAR AMOUNT
5
Is
SUBTOTAL $
OVERHEAD&PROFIT @ 21% $
TOTAL $
Verification of Hours Worked TOTAL $ 1,05239
12%MARKUP (for
prime when subcontract work) $
Contractor's Representative Dale SHEET TOTAL $ 1,052.39
Owners Representative Date
Comments
a
EQUIPMENT
r WATCH.
www equipmentwatch com
Rental Rate Blue Book@ September 27,2013
Q
Deere 50D
Crawler Mounted Compact Excavators I t
Size Class
Operating Weight 4.1 -5.0 MTons :7
Weight
10,811 Ibs
Configuration for 50D
Power Mode Diesel Operating Weight 5 3998 MT
Operator Protection EROPS Bucket Capacity-Heaped 5 2 cft
Net Horsepower 38.1
Equipment Notes Bucket included in rate,unless otherwise noted
Blue Book Rates
"FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost
Ownership Costs Estimated FHWA Rate"
Operating Costs
Monthly Weekly Daily Hourly Hourly Hourly
Published Rates $2,325 00 $650 00 $165 00 $25 00 $13 15 $26 36
Adjustments
Region ($46 50) ($13 00) ($3 30) ($0 50)
(Washington 98%)
Model Year(2013
100%)
Ownership(100%) - - -
Operating(100%)
Total: $2,278.50 $637 00 $161.70 $24 50 $13.15 $26 10
Rate Element Allocation
Element Percentage Value
Depreciation(ownership) 45% $1,046 25/mo
Overhaul(ownership) 36% $837 001 mo
CFC(ownership) 6% $139 501 mo
Indirect(ownership) 13% $302 251 mo
Fuel(operating) @$3 98 47% $6 221 hr
Revised Date 2nd Half 2013
Standby 2610
-13.15
12 95/2=6.48
All material herein @ 2003-2013 Penton,Inc All rights reserved. Page 1 of 1
EQUIPMENT
' WATGH e
www equipmentnatch com
Rental Rate Blue Book® September 20,2013
On-Highway Light Duty Trucks
Miscellaneous Models
Size Class
Net Hp 100-199 HP
Configuration for On-Highway Light Duty Trucks
Power Mode Gasoline Cab Type Conventional
Axle Configuration 4X4 Ton Rating 112
Horsepower 191,0
Blue Book Rates
FH%NA Ra`e is eq al to the monthly ownership cost divided by 176 plus the hourly estimated operating cost
Ownership Costs ; Estimated) FHWA Rate"
Operating Costs
Monthly Weekly Daily Hourly Hourly! Hourly
Published Rates S685 00 $19D 00 S48 00 57.00 $15 65' S19 54
Adjustments I
Region ($11 65) (S3 23) ($0,82) (SO 12) j
(Washington
98 3%)
Model wear(2005 (S51 65) (S14 38) (S3 63) (SO 53)
92 3 io)
Cwnership(100%) - - -
Operating(100%)
Total. $62150 $172.39 $43.55 $6.35 $15.65 S19,18
Rate Element Allocation
Element Percentage Value
Depreciation(ownership) 58% $397 30/mo
Overhaul(ownership) 28% S191 BeImo
CFC(ownership) 4% $27 401 mo
Indirect to vnershlp) 10% $68 501 mo
Fuel(coeratinq)n S3 45 80% S12 52l hr
Revised Dale 2nd Half 2013
All material herein 02003-2013 Penton, Inc All rights reserved Page 1 of 1
r
Job Name: #2659- SE 256th-Kent WA BILLING RATES
FACTORS
FRINGE-OPERATORS 1665 6/1/13
FRINGE-LABORERS 9 93 6/1/13 AUG _t 2013
L&I 2 445 1/1/13
WA STATE UNEMP(SUTA) 5.84% 1/1/13
FED UNEMP(FUTA) 0 60% p_
FICA 7.65% � `•���i2`,�(�(t xrr �
OVERTIME FACTOR 1500
**Wage Rates are locked @ 611112 rates
REG 0 T
JOB REG PAY O.T.PAY BURDEN BURDEN
DESCRIPTION CLASS RATE RATE RATE RATE
OPERATORS GR1A BACKHOE-OVER 50 TONS T090TONS 5330E 36.54 $4.81 60,78 81.63
Eff 7/1/12 MECHANIC 538 OE
GR 1 LOADER 6-8 YDS 525 OE 35.99 5399 60 16 80,69
BACKHOE-OVER 30TO 50 METRICTONS 529 OE
MOTOR PATROL GRADER-FINISHER 5270E
GR 2 LOADER UNDER 6 YDS 524 OE 35.50 5325 59 60 79.85
BACKHOE-15 TO 30 METRIC TONS 529 OE
GRADE ENGINEER 530 OE
SCRAPER UNDER 45 YDS 532 OE
GR 3 DOZER D9 AND UNDER 521 OE 35,08 5262 59.12 79 13
SERVICE ENGINEER-EQUIP 531 OE
MOTOR PATROL GRADER-NON-FINISH 5340E
BACKHOE-UNDER 15 METRIC TONS 535 OE
GR 4 GRADE CHECKER/STAKEMAN 523 OE 32.72 49,08 5643 75 09
ROLLER OPERATOR 522 OE
OPERATOR APPRENTICE 65% 562 OE 2280 3420 45.11 58.12
OPERATOR APPRENTICE 70% 563 OE 2456 3683 4711 61 12
OPERATOR APPRENTICE 75Y. 564 OE 2631 3947 49 11 64.12
OPERATOR APPRENTICE 80% 567 OE 2806 4210 Sill 67,12
OPERATOR APPRENTICE 90% 568 OE 3157 4736 55 12 7313
OPERATOR APPRENTICE 95% 569 OE 33 33 4999 57 12 76 13
"Contract states fotentPn are now$2 00 ovet highest class under super vision
MASTER MECHANIC-$2 50 over Group 1 540 OE 31349 5774 63.01 84 96
OPERATOR FOREMAN-$2 50 over Group 1 520 OF 38.49 57,74 63 01 84 96
7_B0_R_ERS__7 GR 2a FLAGGER 503 L 25.09 37 64 4100 55 31
Eff 6/1/12 GR2b TRAFFIC CONTROL SUPERVISOR 508 L 27.49 4124 43.74 59.42
GR 3 GENERAL LABORER 502 L 3131 4697 48 10 65 96
GR 4 PIPELAYER 509 L 3207 4811 48 96 6726
LABORER APPRENTICE 60% 506 L 1879 28.18 33.81 44 52
LABORER APPRENTICE 70% 504 L 2192 3288 37,38 49.88
-LABORER APPRENTICE 80% 505 L 25,05 37.57 4095 55 24
LA-BORER APPRENTICE 85% 27.26 4089 4348 5903
",LABORER APPRENTICE 90% 507 L 2818 42 27 44 52 60 60
t� ,LABORER APPRENTICE 95% 508 L 3047 4570 4713 6451
LABOR FOREMAN-$2.00 above highest 501 LF 34 07 51.11 51 25 70 68
LABOR FOREMAN-(equal to 520 OF) 501 FS 38.49 57.74 5629 7824
Jj-
8/12/2013
Madfai, Mark
From: Walker, Bill W <Bill-Walker@cable comcast com>
Sent: Friday, February 21, 2014 2 26 PM
To: McConnell, Phillip, Madfai, Mark
Cc: adrianm@goodfellowbros com, Kuehne, Paul
Subject: RE Comcast Force Account Work
Ok by Comcast for the work at tie in near 116'h Ave SE and the work for the two power supplies needed for the
conversion
Bill Walker
Comcast Cable
From: McConnell, Phillip [madto PMcConnell@kentwa gov]
Sent: Tuesday, February 18, 2014 10:02 AM
To: Madfai, Mark; Walker, Bill W
Cc: adrianm a)goodfellowbros.com; Kuehne, Paul
Subject: Comcast Force Account Work
i
Mark and Bill,
Comcast is requesting Goodfellow Brothers perform three extra bodies of work Two power sources and an intercept
point All to be paid through the contract to Goodfellow's, then billed to and paid for by Comcast. I need confirmation
by Bill Walker and yourself,to direct the contractor to execute with this work. The work will be tracked and paid as a
force account
Phil McConnell, Owners Representative
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5542 1 Cell 253-261-5685
pmcconnellOKentWA.gov
CITY OF KENT, WASHINGTON
KentWA.gov Facebook + YouTube
PLEASE CONSIDER THE ENVIRONMENT DEFORE PRINTING THIS E-MAIL
1