Loading...
HomeMy WebLinkAboutPW14-068 - Original - Skycorp Ltd. - Donnelly & French Properties Structures Demolition - 04/02/2014 Records Mamagement , KEN T Wp$H1ryGTON rw Document _1 CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Skycorp Ltd. Vendor Number: JD Edwards Number Contract Number: T"VV 14- 0(' T This Is assigned by City Clerk's Office Project Name: Donnelly and French Properties Structures Demolition Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: Date of the Mayor's signature Termination Date: 12/31/14 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Kelly Peterson Department: Engineering Detail: (i.e. address, location, parcel number, tax id, etc.): The Contractor shall remove structures at the Donnelly property_located at 26005 Kent Kangley Road and the French property located at 26025 Kent Kangley Road. S:Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 KENT WASHIN GTCN PUBLIC WORKS AGREEMENT between City of Kent and Skycorp Ltd. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Skycorp Ltd. organized under the laws of the State of Washington, located and doing business at 526 N. West Ave., Suite 11, Arlington, WA 98223, Phone: (360) 926-8989, Contact: Skyler Waldal (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall remove structures at the Donnelly property located at 26005 Kent Kangley Road and the French property located at 26025 Kent Kangley Road. For a description, see the Scope of Work and Contractor's bid which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, the Contractor shall complete the work described in Section I by December 31, 2014. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Twenty Six Thousand, Seven Hundred Dollars ($26,700.00), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $35,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and PUBLIC WORKS AGREEMENT - 1 (Over$1OK, under $35K, and No Performance Bond) \ F performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be PUBLIC WORKS AGREEMENT - 2 (Over$1OK, under $35K, and No Performance Bond) required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages, with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to PUBLIC WORKS AGREEMENT - 3 (Over$IOK, under$35K, and No Performance Bond) require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. PUBLIC WORKS AGREEMENT - 4 (Over$1OK, under $35K, and No Performance Bond) C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. PUBLIC WORKS AGREEMENT - 5 (Over$10K, under$35K, and No Performance Bond) Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this PUBLIC WORKS AGREEMENT - 6 (Over$1OK, under$35K, and No Performance Bond) Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 7 (Over$10K, under$35K, and No Performance Bond) J. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: "406d By: (signature) (signature) Print Name: Sif��k�'G�R/da./ Pr' t e. uzette Cooke Its P�srt�+�d- It Mayor (title) DATE: 3/zS/f� DATE: NOTICES TO BE SENT TO: NOTICE TO BE SENT TO: CONTRACTOR: CITY OF KENT: Skyler Waldal Timothy J. LaPorte, P.E. Skycorp Ltd. City of Kent 526 N. West Ave., Suite 11 220 Fourth Avenue South Arlington, WA 98223 Kent, WA 98032 (360) 926-8989 (telephone) (253) 856-5500 (telephone) (253) 856-6500 (facsimile) APPROV D AS TO ORM: t/Gl/� Kent Law Department Skycorp-Donnelly-Fmncn Demo/Peterson PUBLIC WORKS AGREEMENT - 8 (Over$1OK, under$35K, and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. S. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: ezzK For: Z12 ,,,f Title: Date: 2y�/9 EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: i EEO COMPLIANCE DOCUMENTS - 3 EXHIBIT A January 24, 2014 PARCEL NUMBER 252206-9067 I French Property-West @ 26025 — Kent Kangley Rd. BUILDING DEMOLITION SCOPE OF WORK 1. Install sufficient temporary erosion control measures to prevent silted runoff from leaving site or entering adjacent waterways during demolition. Avoid stripping existing organic material around structures to help filter possible runoff. 2. If the attached hazardous materials survey performed for the site, shows that asbestos or other hazardous material is present in any of the structures being demolished, the contractor shall include in his/her bid the removal and disposal of all such material by a licensed/certified abatement contractor, who will remove and dispose of the material in compliance with all applicable local, state and federal codes, prior to beginning actual demolition. 3. Decommission and remove existing septic tank located northwest of main house as identified on the attached French/Donnelly Bid Map, in compliance with local and state codes. Tank is to be pumped and removed with the void filled with soil material from the surrounding area. Notify King County Health Department in writing, on forms obtained from a Health Officer, within 30 days that the decommissioning has been completed. Provide copies of all documents filed with the County, to the City. 4. Pump and remove underground fuel storage tank located at the northwest corner of house in accordance with all federal, state and local codes. S. Existing power pole located on north side of existing structure, within the asphalt area, is to remain. 6. Haul and dispose of any appliances found inside or outside of the structures — (ie. refrigerator, dishwasher, range, washer, or dryer).* j 7. Demolish and remove existing house (2,190 SF), and metal pole structure (1040 SF).* All work shall be in compliance with demolition permit issued by King County. The well, located inside the covered patio area on the south end of house structure, is to remain and shall be protected during building and concrete slab removal. 8. Excavate, haul and dispose of concrete house foundation, garage footings and footing drains, pads, slabs, and concrete floors (240 TONS).* 9. Excavate, haul and dispose of existing asphalt pad (approx. 120 square yards).* 10.1-laul and dispose of other miscellaneous yard debris, wooden landscape timbers and concrete blocks (used to delineate planter beds), irrigation sprinkler system, all interior site wood and metal fencing, posts and gates, wood deck, satellite dish, metal pipe arch, and assorted trash to complete site cleanup, as directed by the Engineer. 11.Remove and dispose of landscape shrubbery as needed to facilitate the removal of the structures, including any shrubs as directed by Engineer. Shrubs identified with flagging marked "save" shall be protected during construction, but any vegetation that is inadvertently damaged during the structure demolition work, shall be removed. i 12.When concrete foundation and flooring have been removed, grade soil from the foundation, in toward center of excavation using available material from surrounding ground, as directed by Engineer. 13.Remove temporary erosion control measures, (le. straw wattles, erosion control fencing, etc.) as directed by Engineer. Seed all disturbed areas with grass mixture that includes 40% Perennial Ryegrass, 40% Creeping Red Fescue, 10% Colonial Bentgrass and 10% White Dutch Clover, and cover with minimum 3 inches of loose straw. 14.Contractor shall not operate any heavy equipment within 50 feet of the stream which is located along the south property line. 15.Notify Project Engineer upon project completion, to schedule a site walk-thru. *Recycle as much material as possible and provide disposal receipts. Notes: • City has obtained Demolition Permit from King County. All permit conditions shall be met by Contractor including the submittal of a Solid Waste Management Plan (SWMP) identifying where demolition materials are January 24, 2014 PARCEL NUMBER 252206-9078 Donnelly Property (cb 26005 Kent Kanaley Rd. BUILDING DEMOLITION SCOPE OF WORK 1. Install sufficient temporary erosion control measures to prevent silted runoff p Y from leaving site or entering Rock Creek. Avoid stripping existing organic material around structures to help filter possible runoff. 2. If the attached hazardous materials survey performed for the site, shows that asbestos or other hazardous material is present in any of the structures being demolished, the contractor shall include in his/her bid the removal of all such material by a licensed/certified abatement contractor, who will remove and dispose of the material in compliance with all applicable local, state and federal codes, prior to beginning actual demolition. 3. Decommission and remove existing septic tank as located on attached French/Donnelly Bid Map, in compliance with all state and local codes. Tank is believed to be at the southwest corner of the house approximately 9 feet from an existing chain link fence. Pump tank, remove and fill the void with soil surrounding the tank area. Notify King County Health Department in writing, on forms obtained from a Health Officer, within 30 days that the decommissioning has been completed. Provide copies of all documents submitted to King County, to the City as well. 4. Haul and dispose of any remaining appliances either inside or outside the existing structures - (ie. refrigerator, dishwasher, range/oven, washer, or dryer).* 5. Demolish and remove from site the existing concrete block house (1,056 SF), and attached wooden structure (400 SF).* All work shall be in compliance with demolition permit issued by King County. 6. Excavate, haul and dispose of concrete block house floor, footings, pads and j sidewalks (350 TONS).* 7. Haul and dispose of all miscellaneous yard debris, wooden landscape timbers, metal posts, boat(s), fencing (along eastern property line and that portion attached to northwest corner of garage), footing drains, interior furnishings, and trash piles located on property or as directed by the Engineer. I 8. Remove and dispose of existing landscape shrubbery adjacent to the house as needed to facilitate the structure removal, as well as any shrubs as directed by Engineer. Shrubs identified with flagging marked "save" shall be protected during site work. Vegetation that is inadvertently damaged during the structure demolition work shall be removed as well. 9. Existing well and well house, located on south end of property, are to remain. Contractor shall take measures to protect well house during other work in the area. IO.When concrete foundation has been removed, grade soil from side slopes of foundation, in toward center of excavation using available material from surrounding ground, as directed by Engineer. 11.Remove temporary erosion control measures, (le. straw wattles, erosion control fencing, etc.) as directed by Engineer. Seed all disturbed areas with grass mixture that includes 40% Perennial Ryegrass, 40% Creeping Red Fescue, 10% Colonial Bentgrass and 10% White Dutch Clover, and cover with minimum 3 inches of loose straw. 12.Contractor shall not operate any equipment within 50 feet of the stream located within the southern end of the property. 13.Notify Project Engineer upon project completion, to schedule a site walk-thru. *Recycle as much material as possible and provide disposal receipts. Notes: • City has obtained a King County Demolition Permit. All permit conditions shall be met by Contractor including the submittal of a Solid Waste Management Plan (SWMP) identifying where demolition materials are disposed of, and the temporary erosion control for the area, including street cleaning. Recycling of materials (wood, wire, concrete, metal, insulation, appliances, cabinets, etc.) is strongly recommended. • A copy of the Asbestos Survey of buildings done in compliance with AHERA requirements is attached. Contractor shall obtain Puget Sound Air Pollution Control Authority permit. Existing trees and shrubs marked with flagging shall remain undisturbed. Contractor shall complete scope of work for this site, the French East and French West sites within 30 working days from Notice to Proceed. Contact Nick Horn at 253-856-5529 for onsite inspection and access. The City of Kent reserves the right to reject any and all bids or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. 1 L7D Demolition -Environmental -General Contractors February 10.2014 i Attn: Gianville.Horn Agency: City of Kent Address: 220 Fourth Ave South,Kent,WA 98032 Re. Donnelly Property 26005 Kent Kangley Rd. French Property—26025 Kent Kangley Rd. SKYCORP, LTD. Is pleased to provide the proposal according to the e-mailed scope from City of Kent on January 24"2014 fot your consideration: SKYCORP, LTD.will provide removal'of structures at 26005 Kent Kangley Rd and 26025 Kent Kangley Rd Provided survey by City of Kent, includes abatement and demolition in the amount of$26,700.00 Should there be anything that is not listed in this scope of work or encountered in perform ing the said work a change order proposal will be submitted to you. Should you have any questions concerning this proposal please feel free to contact us at anytime. Thank you, SKYCORP,LTD Skyler Waldal, President EXHIBIT B INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 or its equivalent, with minimum limits of $2,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $2,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an Additional Insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. All endorsements adding Additional Insureds shall be issued on form CG 20 10 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4. Contractor's Pollution Liability insurance covering losses caused by pollution conditions that arise from the operations of the Contractor. EXHIBIT B (Continued) B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with minimum limits of $2,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $2,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 3. Contractor's Pollution Liability insurance shall be written in an amount of at least $1,000,000 per loss, with an annual aggregate of at least $1,000,000. Coverage may be written on a claims-made basis. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. EXHIBIT B (Continued) D. Contractor's Insurance for Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. DATE(MM/DDNYYY) CERTIFICATE OF LI BILIW INSURANCE 03/202014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policiii must be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). RODUCER CONTACT NAME larker Smith&Feek,Inc PHONE 425-709-3600 FAX 425-709-7460 A/C No�Ezt) IA/C No) 1233 112th Avenue NE E-MAIL tellevue,WA 98004 ADDRESS INSURERS)AFFORDING COVERAGE NAIC# INSURER A Colony Insurance Company lSURED SkyCorp, LTD INSURER B Continental Western Insurance Company -- 526 NW Avenue Suite 11 INSURER C Arlington,WA 98223 INSURER D INSURER E INSURER F :OVERAGES CERTIFICATE NUMBER: REVISION NUMBER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS SR A L UBR POLICY EFF POLICY EXP LIMITS rR TYPE OF INSURANCE POLICY NUMBER MM/DD/YYYV MM/DO/YYYY GENERAL LIABILITY EPK301320 4/4/2013 4/4/2014 EACH OCCURRENCE s 1,000,000 D AGE TO REN D 50,000 X' COMMERCIAL GENERAL LIABILITY X PREMISES fEa occurrence $ CLAIMS-MADE I OCCUR MED EXP(Any one person) $ 5,000 PERSONAL B ADV INJURY $ 1,000,000 GENERAL AGGREGATE I $ 2,000,000 I-- GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGO $ 2,000,000 POLICYX PRO- Loc Deductible $ 2,500 AUTOMOBILE LIABILITY CA292898525 COMBINED SINGLE LIMIT 1,000,000 4/4/2013 4/42014 Ea accident $ X ANY AUTO X BODILY INJURY(Per person) $ —�ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE $HIRED AUTOS AUTOS Per am dent) $ UMBRELLA LIAR' X OCCUR EXC301464 6/7/2013 414/2014 EACH OCCURRENCE $ 1,000,000 X EXCESS LIAR CLAIMS-MADE X AGGREGATE $ 1,000,000 DIED X RETENTION$ -0- $ WORKERS COMPENSATION EPK301320 TWO STATU- X OTH- AND EMPLOYERS'LIABILITY YIN 4/4/2013 4/4/2014 RY-LIMIIS R ANY PROPRIETOR/PARTNER/EXECUTIVE �x Washington State Stop Gap E L EACH ACCIDENT 1$ 1,000,000 OFFICER/MEMBER EXCLUDED N f A _Employers Liability only i (Mandatory in NH) E L DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E L DISEASE-POLICY LIMIT $ Professional Llab-Claims Made, EPK301320 $1,000,000 Each Claim $2,500 Deductible 4/4/2013 4/4/2014 $2,000,000 Aggregate T I I ESCRIPTION OF OPERATIONS!LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,If more apace Is required) ISR Colony Insurance Company I INS TYPE Pollution Liability I ADDL INSR, I POLICY NUMBER EPK301320, Pollution Liab-Occurrence with$2,500 eductible 1 4/41201 3-41412014 1 LIMITS $1,000,000 each condition 2,000,000 Aggregate dy of Kent is included as lee Attached Description) ERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS City of Kent 220 Fourth Avenue South AUTHORIZED REPRESENTATIVE Kent,WA 98032 ©1�988--2010 ACORD CORPORATION All rights reserved CORD 26(2010/05) The ACORD name and logo are registered marks of ACORD DESCRIPTIONS (Continued from Page 1 ) Mclitional Insured and coverage is Primary and Non-Contributory per attached Endorsement EV 242 03 12(GL&Pollution)and EV 239 02 12(GL&Pollution) nd EV200 10 12(GL&Pollution)and CW3468 01 10(Auto)and following form per policy form(Excess) Per project aggregate applies per attached ndorsement EV107-0609(GL) Notice of Cancellation is provided per attached form EV0001-08 12(GL) i "THIS CERTIFICATE RESCINDS AND REPLACES PREVIOUSLY ISSUED CERTIFICATE ON 03/18/2014"' I I r THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY COMMERCIAL AUTOMOBILE EXPANSION ENDORSEMENT - PLATINUM This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM The following provides a broad range of coverage in addition to that provided by the basic policy. In some Instances, a higher limit or broader coverage is available. Should the policy Indicate broader coverage or higher limits than provided by this endorsement,the higher ilmlts or broader coverage shall apply. A. BROADENED NAMED INSURED those specified in the written con- The Named Insured shown in the Declarations Is tract or agreement, or in this cover- amended to Include: age form, whichever is less. These limits of insurance are Inclusive of Any organization, other than a joint venture,over and are not in addition to the Limits which you maintain ownership or majority Inter- of Insurance shown in the Declara- est of more than 50%, unless that organization tions. is an "insured" under any other automobile pol- (4) This insurance applies on a primary icy or would be an"insured'under such a policy and non-contributory basis if that is but for the exhaustion of its Limit of Insurance, required by the written contract or l however; agreement. 1. Coverage under this provision is afforded (5) This insurance does not apply only until the 180th day after you acquire or unless the written contract or form the organization or the end of the policy agreement has been executed prior period,whichever is earlier. to the "bodily injury" or "Property 2. Coverage does not apply to"bodily injury"or damage". "property damage"that occurred before you C. ADDITIONAL INSURED-EMPLOYEES acquired or formed the organization. B. ADDITIONAL. INSURED BY CONTRACT OR The following r added to the Section g n Liability Insured AGREEMENT Coverage, Paragraph A.1. VYha is An Insured Pmvislon: The following Is added to Section It - Liability Any"employee" of yours is an "insured" while us- Coverage, Paragraph A.1.: ing a covered"auto"you don't own,hire or borrow d. Any person or organization for whom you in your business or your personal affairs. are performing operations if you and such D. EXTENDED COVERAGE-SAiL BONDS person or organization have agreed In writ- ing in a contract or agreement that such Section 11 — Liability Coverage, Paragraph person or organization be added as an adds- A.2.a.(2). is deleted and replaced by the follow- tional insured on your policy. ing: (1) Such person or organization Is an (2) Up to $3,000 for cost of bail bonds additional insured only with respect (including bonds for related traffic to liability for-bodily injury" or"prop- law violations) required because of erty damage": an "accident" we cover. We do not (a) Caused by an"accident", and have to furnish these bonds. (b) Resulting from the ownership, E. EXTENDED COVERAGE - LOSS OF EARN. maintenance or use of a cov- ING ered"auto". Section 11 — Liability Coverage, Paragraph (2) A person's or organizailon's status A.2.a.(4) is deleted and replaced by the follow- as an additional insured exists only i"g' while you are performing operations (4) All reasonable expenses Incurred by for that additional insured. the "insured" at our request, Includ- ing actual loss of eaming up to$500 (3) Section 11, Paragraph C. Limits of a day because of time off from work. Insurance for person or organization added as additional insured are CW 34 68 11110 Includes Copyrighted material of insurance SerAces Page 1 of S Office.inc..with fts permission F., FELLOW EMPLOYEE COVERAGE (3) Security deposits not returned by The Fellow Employee Exclusion contained in the lessor; Section II —Liability Coverage does not appply. (4) Costs for extended warranties, This coverage is excess over any other t�ilact- Credit Life Insurance, Health, Acci- able insurance. dent or Disability insurance pur- G. AUTO MEDICAL PAYMENTS COVERAGE - eased with the lean or tease;and INCREASED LIMIT (3) Carry-over balances from previous If the"Insured"is wearing a seat belt at the time loans or leases. an 'accident" occurs, the LIMIT OF INSUR- K. GLASS DEDUCTIBLE ANCE for AUTOMOBILE MEDICAL PAYMENTS Section III — Physical Damage Coverage, Para- COVERAGE shown in the Declarations will be graph D. Is deleted and replaced by the follow- double the limit shown. All other terms and con- Ing: ditions applicable to MEDICAL PAYMENTS re- main unchanged. D. DEDUCTIBLE H. COVERAGE EXTENSION AS A COHSE- For each covered 'auto' our obligation to QUENCE OF THEFT OF AN"AUTO" pay for,repair, return or replace damaged or 1. Transportation Expense stolen property wlli be reduced by the appit- cable deductible shown in the Declarations. Section III — Physical Damage Coverage, Any Comprehensive Coverage deductible Paragraph AA a. is deleted and replaced by shown in the Declarations does not apply to: the following: " I 1. Loss caused by fire or lightning;or a. We will also pay up to$75 per day to a 2. 'Lose Wien you elect to patch or repair maximum of $2,500 for temporary glass rather than replace. transportation expense incurred by you because of the total theft of a covered L. EXTENDED COVERAGE - ELECTRONIC 'auto" of the "private passenger type". EQUIPMENT We will pay only for those covered The following Is added to Section III - Physical 'autos"for which you carry either Com- Damage Coverage,Paragraph AA.: prehensive or Specified Causes of Loss Coverage. We will pay for temporary c. Physical Damage Coverage on a cov- transportation expenses incurred during ered "auto"also applies to 'loss' to any the period be 48 hours after the electronic equipment that receives or theft and ending, regardless of the poll- transmits audio, visual or data signals lays expiration,when the covered`auto" and that is not designed solely for the is returned to use or we pay for its reproduction of sound. This coverage 'loss". applies only H the equipment is perma- nently Installed in the covered "auto" at We will also pay reasonable and neces- the time of "loss" or the equipment is sary expenses to facilitate the return of removable from a housing unit which is the stolen"auto"to you. permanently installed in the covered I. EXTENDED COVERAGE-AIRBAGS "auto'at the time of the°toss", and such op- Section III — Physical Damage Coverage, Para- equipment is designed to be solely the graph B.3.a. does not appl to the unintended mauteeerated el use of the power from the discharge of an airbag. G�overage is excess covered electrical system, in or upon the over any other collectible insurance or warranty covered'auto". specifically designed to provide coverage. We will pay with respects to a covered J. `auto" for 'loss" to antennas and other , LEASED OR FINANCED "AUTOS" - PHYS CAL DAMAGE COVERAGE accessories necessary for use the electronic equipment. However, this � The following is added to Section Iii — Physical does not include tapes, records or discs. Damage Coverage,Paragraph C. M. EXTENDED COVERAGE - PERSONAL EF- 4. In the event of a total "loss' to a covered FECTS `auto", we will pay any unpaid amount due The following is added to Section ill— Physical on the lease or loan for a covered "auto", Damage Coverage, Paragraph A.4.: less: a. The amount under ttte Physical Damage d. Physical Damage Coverage on a cov- e section the yscacy;and erty ered"auto"may be extended to-loss"to your personal prop or, if you are an b. Any: individual, the personal property of a (1) Overdue lease/loan payments at the family member, that Is in the covered -auto"at the time of Ross". time of the"foss"; The most we will pay for any one"loss" (2) Financial penalties imposed under a under this coverage extension is$500. lease for excessive use, abnormal wear and tear or high mileage; CW 34 68 0110 Includes Copoghted material of Insurance services Page 2 of 5 Office.Inc,with its permission `N. TOWING AND LABOR COVERAGE b. Pay, in addition to the limit set forth in Section tll — Physical Damage Coverage, Para- P,1. above, up to $500 per day, not to exceed$3,500 per"loss"for: graph A.2. is deleted and replaced by the follow- ing. (1) Any costs or fees associated with If a private passenger tyyppe 'auto" or light tru& the"loss"to a hired"auto"; and "auto" (0-10,000 Lbs. GVW) Is provided both (2) Loss of use, provided it is the corn Comprehensive Wd Collision Coverage,we will sequence of an'accident"for which pay up to $100 for towing and labor costs in- you are legally liable,and as a result curred each time such"auto` is disabled. How- of which a monetary loss is sus- ever, the labor must be performed at the place tained by the leasing or rental can- of disablement. cem. O. EXTENDED COVERAGE - CUSTOMIZED 0. RENTAL REIMBURSEMENT COVERAGE FURNISHINGS We will pay for rental reimbursement expenses The following is added to Section ill — Physical incurred by you for the rental of an `auto" be- Damage Coverage,Paragraph A.4.; cause of"loss'to a covered"auto". 9. Physical Damage Coverage on a cov- 1. Payment applies In addition to the otherwise Bred `auto'may be extended to"loss"to applicable amount of each coverage you custom furnishings including, but not have on the covered'auto*. limited to special carpeting and insula- 2. No deductible applies to this coverage. tion, height-extending roofs,and custom murals, paintings or other decals or 3. We will pay only for those expenses incurred graphics, during the policy period beginning 24 hours for loss to custom after the gloss'and endin.9,regardless of the Our limit of Nabifi furnishings shad betyttfo least of, expiration date of the policy, with the Lesser of the following: (1) Actual cash value of the stolen or a. When the covered "auto" has been re- damaged property, paired or replaced,or (2) Amount necessary to repair or re- b. When the total amount paid under this place the property;or coverage extension reaches$2,500. (3) $500. 4. Our payment is limited to the lesser of the This coverage extension does not apply following amounts: to electronic equipment a. Necessary and actual expenses in- P. PHYSICAL DAMAGE COVERAGE - HIRED cum. "AUTOS" b. Not more than S75 per day. You may extend the Comprehensive, Specified 5. We will pay up to an additional $300 for the Causes of Loss and Collision coverages pro- you vided on your owned 'autos"to any 'auto' you reasonable and necessary expenses ipm in- lease, rent, hire or borrow from someone other fur to remove red tau materials aril equipment than your employees or partners or members of from the covered auto and replace such their households subject to the following: materials and equipment on the rental " 'auto . 1. The most we will pay in any one"loss" is the g. This coverage does not apply white there least of $50,000, the actual cash value of the"auto"or the cast to repair or replace theare spare or reserve autos"available to you for your operations. "auto", except that such amount will be re- duced by a deductible to be determined as T. if'loss' results from the total theft of a cov- follows: Bred "auto" of the 'private passenger type", a. The deductible shall be equal to the we will pay under this coverage only that amount of the highest deductible show amount of your rental reimbursement ex- for any owned `auto"of the same olassi- penses which is not already provided for un- fication for that coverage_ In the event der the Physical Damage Coverage Exton- there is no owned "auto" of the same slon. classification, the highest deductible for R. DRIVE OTHER CAR COVERAGE any owned 'auto"will apply for that cov- 1. Changes In Liability Coverage erage. a. Any"auto"you don't own,hire or borrow is b. No deductible will apply to"loss"caused covered by fire or lightning. wh1 ebeing *auto" dob for Liability Coverage 2. Coverage provided under this extension will (1) You, if you are designated in the a. Be excess over any other collectible Declarations as an individual; insurance; i CW 34 68 111110 Indodes Copyrighted material of Insurance Services Page 3 of 5 a Office.Inc.,with Its permission (2) Your partners or members, if you owned private passenger type "autos', the are designated in the Declarations deductible shall be $50 for Comprehensive as a partnership or joint venture; Coverage and $100 for Collision Coverage. (3) Your members or managers, if you No deductible will apply to 'loss" caused by are designated in the Declarations fire or lightning. as a limited liability company, E. Additional Definition (4) Your 'executive officers", if you are As used in this section: R. DRIVE OTHER designed in the Declarations as an CAR COVERAGE: organization other than an Indlvid- "Family member" means a person related to ual, partnership,joint venture or fim- the individual named in fLI.a by blood, mar- ited liability company;and riage or adoption who is a resident of the indi- (5) The spouse of any person named in viduars household, including n warn or foster R.1.a.1. through R.i.a.(4) white a child. resident of the same household. S. KNOWLEDGE OF OCCURRENCE except: The following Is added to Section IV— Business (a) Any 'auto" owned by that individ- Auto Conditions, Paragraph A.2.: uai or by any member of his or d. Notice of an "accident or loss" will be her household. considered knowledge of yours only if (b) Any"auto"used by that individual reported to you, N you are an individual, or his or her spouse while working a partner,an executive officer or an em- in a business of selling,servicing, ployee designated by you to give us repairing or parking"autos". such notice. 2. Changes In Auto Medical Payinents And a. Notice of an"accident" or "loss" to your Uninsured And Undednsured Motorists Workers Compensation insurer, for an Coverages event which later develops into a claim The following is added to Who IsAn insured: for which there is coverage under this policy, shall be considered notice to us, Any individual named in R.1.a and his or her but only if we are notified as soon as 'family members"are insured"while"occupy- you know that the claim should be ad- ing" or while a pedestrian when being struck dressed by this policy, rather than your by any'auto*you don't own except Workers Compensation policy. Any "auto" owned by that individual or by any f. Your rights under this policy shall not be "family member". prejudiced If you fall to give us notice of 3. Changes to Physical Damage Covers" an "aocidenr or "loss . solely due to your reasonable and documented belief Any private passenger type "auto" you don't that the event is not covered by this pol- own,hire or borrow is a covered"auto"while in icy. the care, custody or control of any Individual The following is added to Section IV—Busi- named in R.1.a or his or her spouse while a ness Auto Conditions,Paragraph 2.b.: resident of the same household except a. Any "auto" owned by that individual or by (6) Knowledge of the receipt of docu- any member of his or her household. will b concerning a claim "suit" ill be considered knowledge of b. Any "auto" used by that Individual or his or yours only if receipt of such docu- her spouse while working in a business of ments is known to yott, If you are an selling, servicing, repairing or parking individual, a partner, an executive "autos". officer or an employee designated 4. The most we will pay for the total of all dam- by you to forward such documents ages under LIABILITY COVERAGE, AUTO taus. MEDICAL PAYMENTS, UNINSURED MO- T. WAIVER OF SUBROGATION BY CONTRACT TORISTS COVERAGE and UNDERIN- OR AGREEMENT SURER MOTORISTS COVERAGE is the The following is added to Section IV- Business LIMIT OF INSURANCE shown In the Decla- Auto Conditions, Paragraph A.5.: rations as applicable to owned"autos". We waive any right of recovery we may have S. Our obligation to pay for, repair, return or against any 'insured" provided coverage under replace damaged or stolen property under this endorsement under B., ADDITIONAL IN- PHYSICAL DAMAGE COVERAGE, will be SURED BY CONTRACT OR AGREEMENT, but reduced by a deductible equal to the amount only as respects "loss" arising out of the opera- of the largest deductible shown for any lion, maintenance or use of a covered "auto" owned private passenger type "auto" appli- pursuant to the provisions or conditions of the cable to that coverage. if there are no written contract or agreement. CW 34 68 0110 Includes Copyrighted material of insurance Services Page 4 of 5 Office,Inc.,with its permission U. UNINTENTIONAL OMISSIONS V LIBERALIZATION The following is added Section IV - Business If we revise this endorsement to provide greater Auto Conditions, Paragraph 13.2: coverage without additional premium charge,we We will not deny coverage under this poky if will automatic ally provide the additional cover- fail to disclose all hazards existing as of the age to all endorsement holders as of the day the incu eption date of the policy, provided such fail- ure is not intentional. CW 34 68 01 10 includes Copyrighted material of Insurance Services Page 5 of 5 Mice,Inc.,with its pennisston -THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. AMENDATORY - POLICY AGGREGATE LIMITS OF INSURANCE PER PROJECT This endorsement modifies insurance provided under the following COMMERCIAL GENERAL LIABILITY COVERAGE PART SECTION IV — LIMITS OF INSURANCE AND DEDUCTIBLE, Paragraph 3. within the Common Policy Provisions is amended by the addition of the following The Policy Aggregate Limit applies separately to each of your projects away from premises owned by or rented to you ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED. EV107-0609 Includes copyrighted material of ISO Properties, Inc , Page 1 of 1 with its permission THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION - ONGOING OPERATIONS This endorsement modifies insurance provided under the following. COMMERCIAL GENERAL LIABILITY COVERAGE PART CONTRACTORS POLLUTION LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Or anization s : Locations Of Covered Operations: Where Required By Written Contract Where Required By Written Contract I Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A Section III — Who Is An Insured within the Common Policy Provisions is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to li- ability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by 1. Your acts or omissions, or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) desig- nated above B. With respect to the insurance afforded to these additional insureds, the following additional exclu- sions apply. This insurance does not apply to "bodily injury" or"property damage" occurring after- 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the addi- tional insured(s) at the location of the covered operations has been completed, or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in per- forming operations for a principal as a part of the same project ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED. I i �I I i EV242-0312 Includes copyrighted material of 150 Properties, Inc., Page 1 of 1 with its permission. I THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NON-CONTRIBUTORY ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS This endorsement modifies insurance provided under the following, COMMERCIAL GENERAL LIABILITY COVERAGE PART CONTRACTORS POLLUTION LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) or Organization(s): Where Required By Written Contract SECTION III —WHO IS AN INSURED within the Common Policy Provisions is amended to include as an additional insured the person(s) or organization(s) indicated in the Schedule shown above, but solely as respects "claims" caused in whole or in part, by "your work" for that insured by you, or by those acting on your behalf This insurance shall be primary and non-contributory, but only in the event of a named msured's sole negligence ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED I I i I I EV200-1012 Page 1 of 1 1 Page 1of17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 3/13/2014 'County Trade Job Classification Wage Holiday Overtimel Note King Asbestos Abatement Workers Journey Level $41.69 5D 1 H King Boilermakers Journey Level $64.44 5N 1C King Brick Mason Brick And Block Finisher $43.26 5A 1M King Brick Mason Journey Level $50.12 5A 1M King Brick Mason Pointer-Caulker-Cleaner $50.12 5A 1M King Building Serv�Employees Janitor $20.59 5S 2F King Building Service Employees Traveling Waxer/Shampooer $21.00 5S 2F King Building Service Employees Window Cleaner (Non-Scaffold) $24.29 5S 2F King Building Service Employees Window Cleaner (Scaffold) $25.15 5S 2F ,King Cabinet Makers (in Shop) Journey Level $22.741 1 ,King Carpenters Acoustical Worker $50.821 5D 1M i King Carpenters Bridge, Dock And Wharf $50.82 5D 1M Carpenters iKing Carpenters Carpenter $50.82 5D 1M King Carpenters Carpenters on Stationary Tools $50.95 5D iM King Carpenters Creosoted Material $50.92 5D iM King Carpenters Floor Finisher $50.82 5D 1M King Carpenters Floor Layer $50.82 5D 1M .King Carpenters Scaffold Erector $50.82 5D 1M King Cement Masons Journey Level $51.18 7A 1M King Divers Et Tenders Diver $105.37 5D 1M 8A ' King Divers Et Tenders Diver On Standby $59.50 5D 1M 1 King Divers Et Tenders Diver Tender $54.82 5D 1 M I ;King Divers Et Tenders Surface Rcv Et Rov Operator $54.82 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $51.07 5A 1 B 9 Tender King Dredge Workers Assistant Engineer $53.00 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 2of17 King Dredge Workers Boatmen $52.30 5D 3F King Dredge Workers Engineer Welder $54.04 5D 3F King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King Dredge Workers Mates $52.30 5D 3F King Dredge Workers Oiler $52.58 5D 3F King Drywall Applicator Journey Level $50.82 5D 1 H King Drywalt Tapers Journey Level $50.87 5P 1E King Electrical Fixture Maintenance Journey Level $25.84 5L 1 E j Workers King Electricians - Inside Cable Splicer $65.69 7C 2W i King Electricians- Inside Cable Splicer (tunnel) $70.52 7C 2W King Electricians - Inside Certified Welder $63.49 7C 2W King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W King Electricians - Inside Construction Stock Person $35.69 7C 2W King Electricians - Inside Journey Level $61.30 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W `King Electricians Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $68.33 5A 4A Construction King Electricians - Powerline Certified Line Welder $62.50 5A 4A Construction r King Electricians - Powerline Groundperson $42.56 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $62.50 5A 4A Construction Operator King Electricians - Powerline Journey Level Lineperson $62.50 5A 4A Construction King Electricians - Powerline Line Equipment Operator $52.47 5A 4A Construction King Electricians - Powerline Pole Sprayer $62.50 5A 4A Construction ;King Electricians - Powerline Powderperson $46.55 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $80.141 7D 4A King Elevator Constructors Mechanic In Charge $86.77 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $15.25 5B 1R Products Work Only King Fence Erectors Fence Erector $15 18 1 King Flaggers Journey Level $35 34 7A 31 King Glaziers Journey Level $53.76 7L 1y King Heat Et Frost Insulators And Journeyman $58.93 5J 15 Asbestos Workers King Heating Equipment Mechanics Journey Level $69.37 7F 1E King Hod Carriers Et Mason Tenders Journey Level $42.99 7A 31 King Industrial Power Vacuum Journey Level $9.321 11 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 3 of 17 Cleaner King Inland Boatmen Boat Operator $54.57 5B 1K King Inland Boatmen Cook $50.95 5B 1K King Inland Boatmen Deckhand $51.19 5B 1K King Inland Boatmen Deckhand Engineer $52.18 5B 1 K King Inland Boatmen Launch Operator $53.40 56 1K King Inland Boatmen Mate $53.40 5B 1K King Inspection/Cleaning/Seating Of Cleaner Operator, Foamer $31.49 1 Sewer & Water Systems By Operator Remote Control King Inspection/Cleaning/Seating 0f Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control King Inspection/Cleamng/Seating Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer Et Water Systems By i Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer & Water Systems By Remote Control King Insulation Applicators Journey Level $50.82 5D 1M King Ironworkers Journeyman $59.77 7N 10 King Laborers Air, Gas Or Electric Vibrating $41.69 7A 3t Screed King Laborers Airtrac Drill Operator $42.99 7A 31 King Laborers Ballast Regular Machine $41.69 7A 31 King Laborers Batch Weighman $35.34 7A 31 King Laborers Brick Pavers $41.69 7A 31 King Laborers Brush Cutter $41.69 7A 31 King Laborers Brush Hog Feeder $41.69 7A 31 King Laborers Burner $41.69 7A 31 King Laborers Caisson Worker $42.99 7A 31 King Laborers Carpenter Tender $41.69 7A 31 King Laborers Caulker $41.69 7A 31 King Laborers Cement Dumper-paving $42.46 7A 31 King Laborers Cement Finisher Tender $41.69 7A 31 King Laborers Change House Or Dry Shack $41.69 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $41.69 7A 31 King Laborers Chipping Gun(30 Lbs. And $42.46 7A 31 Over) King Laborers Choker Setter $41.69 7A 31 j King Laborers Chuck Tender $41.69 7A 31 King Laborers Clary Power Spreader $42.46 7A 31 King Laborers Clean-up Laborer $41.69 7A 31 King Laborers Concrete Dumper/chute $42.46 7A 31 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/13/2014 Page 4 of 17 Operator King Laborers Concrete Form Stripper $41.69 7A 31 King Laborers Concrete Placement Crew $42.46 7A 31 King Laborers Concrete Saw Operator/core $42.46 7A 31 Driller King Laborers Crusher Feeder $35.34 7A 31 King Laborers Curing Laborer $41 69 7A 31 King Laborers Demolition: Wrecking I} Moving $41.69 7A 31 (mcl. Charred Material) King Laborers Ditch Digger $41.69 7A 31 King Laborers Diver $42.99 7A 31 King Laborers Drill Operator $42.46 7A 31 (hydraulic,diamond) King Laborers Dry Stack Walls $41.69 7A 31 King Laborers Dump Person $41.69 7A 31 King Laborers Epoxy Technician $41 69 7A 31 King Laborers Erosion Control Worker PS41. 7A 31 King Laborers Faller 8 Bucker Chain Saw 7A 31 King Laborers Fine Graders 7A 31 King Laborers Firewatch 7A 31 King Laborers Form Setter 7A 31 `King Laborers Gabian Basket Builders $41.69 7A 31 King Laborers General Laborer $41.69 7A 31 King Laborers Grade Checker ft Transit $42.99 7A 31 Person King Laborers Grinders $41.69 7A 31 King Laborers Grout Machine Tender $41.69 7A 31 King Laborers Groutmen (pressure)including $42.46 7A 31 Post Tension Beams King Laborers Guardrail Erector $41.69 7A 31 King Laborers Hazardous Waste Worker (level $42.99 7A 31 A) King Laborers Hazardous Waste Worker (level $42.46 7A 31 B) 1 'King Laborers Hazardous Waste Worker (level $41.69 7A 31 C) King Laborers High Scaler $42.99 7A 31 King Laborers Jackhammer $42.46 7A 31 King Laborers Laserbeam Operator $42.46 7A 31 King Laborers Maintenance Person $41.69 7A 31 King Laborers Manhole Builder-mudman $42.46 7A 31 King Laborers Material Yard Person $41.69 7A 31 King Laborers Motorman-dinky Locomotive $42.46 7A 31 King Laborers Nozzleman (concrete Pump, $42.46 7A 31 Green Cutter When Using Combination Of High Pressure Air 8 Water On Concrete £t https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/13/2014 Page 5 of 17 Rock, Sandblast, Gunite, Shotcrete, Water BLa King Laborers Pavement Breaker $42.46 7A 31 King Laborers Pilot Car $35.34 7A 31 King Laborers Pipe Layer Lead $42.99 7A 31 King Laborers Pipe Layer/tailor $42.46 7A 31 King Laborers Pipe Pot Tender $42.46 7A 31 King Laborers Pipe Reliner $42.46 7A 31 King Laborers Pipe Wrapper $42.46 7A 31 King Laborers Pot Tender $41.69 7A 31 King Laborers Powderman $42.99 7A 31 King Laborers Powderman's Helper $41.69 7A 31 King Laborers Power Jacks $42.46 7A 31 'King Laborers Railroad Spike Puller - Power $42.46 7A 31 King Laborers Raker - Asphalt $42.99 7A 31 King Laborers Re-timberman $42.99 7A 31 King Laborers Remote Equipment Operator $42.46 7A 31 King Laborers Rigger/signal Person $42.46 7A 31 King Laborers Rip Rap Person $41.69 7A 31 King Laborers Rivet Buster $42.46 7A 31 i King Laborers Rodder $42.46 7A 31 King Laborers Scaffold Erector $41.69 7A 31 { King Laborers Scale Person $41.69 7A 31 King Laborers Sloper (over 20") $42.46 7A 31 King Laborers Sloper Sprayer $41 69 7A 31 King Laborers Spreader (concrete) $42.46 7A 31 King Laborers Stake Hopper $41 69 7A 31 King Laborers Stock Piler $41.69 7A 31 King Laborers Tamper Et Similar Electric, Air $42.46 7A 31 8 Gas Operated Tools King Laborers Tamper (multiple Er Self- $42.46 7A 31 propelled) King Laborers Timber Person - Sewer (lagger, $42.46 7A 31 Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $41.69 7A 31 King Laborers Topper $41 69 7A 31 King Laborers Track Laborer $41.69 7A 31 King Laborers Track Liner (power) $42.46 7A 31 King Laborers Traffic Control Laborer $37.79 7A 31 8R a King Laborers Traffic Control Supervisor $37.79 7A 31 8R King Laborers Truck Spotter $41.69 7A 31 , King Laborers Tugger Operator $42.46 7A 31 King Laborers Tunnel Work-Compressed Air $60.06 7A 31 8�C Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $65 09 7A 31 8�( I https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/13/2014 Page 6 of 17 Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $68.77 7A Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $74.47 7A 31 Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $76.59 7A 31 8� Worker 60.01-64 00 psi King Laborers Tunnel Work-Compressed Air $81.69 7A 31 8S Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $83.59 7A 31 84 Worker 68.01.70 00 psi King Laborers Tunnel Work-Compressed Air $85.59 7A 31 8� Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $87.59 7A 31 8� Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $43.09 7A 31 8� Tender King Laborers Tunnel Work-Miner $43.09 7A 31 8g King Laborers Vibrator $42.46 7A 31 King Laborers Vinyl Seamer $41.69 7A 31 King Laborers Watchman $32.12 7A 31 King Laborers Welder $42.46 7A 31 King Laborers Well Point Laborer $42.46 7A 31 King Laborers Window Washer/cleaner $32.12 7A 31 King Laborers - Underground Sewer General Laborer 8: Topman $41.69 7A 31 & Water King Laborers Underground Sewer Pipe Layer $42.46 7A 31 & Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $50.82 5D 1H King Marble Setters Journey Level $50.12 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabruatilon In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Mlllwnght Journey Level $51.92 5D 1M King Modular Buildings Cabinet Assembly $11 56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King IModutar Buildings Production Worker $9.40 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 7 of 17 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular BuRdings Welder $11.56 1 King Painters Journey Level $37.80 6Z 26 King Pile Driver Journey Level $51 07 5D 1M King Plasterers Journey Level $49.29 7MC 1R King Playground_Et Park Equipment Journey Level $9.32 1 Installers King Plumbers a Pipefitters Journey Level $73 69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $53.49 7A 3C 8P King Power Equipment Operators Assistant Engineer $50.22 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $53.00 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $53.00 7A 3C 8P Concrete King Power Equipment Operators Bobcat $50.22 7A 3C 8P King Power Equipment Operators Brokk- Remote Demolition $50.22 7A 3C 8P Equipment King Power Equipment Operators Brooms $50.22 7A 3C 8P King Power Equipment Operators Bump Cutter $53.00 7A 3C 8P ;King Power Equipment Operators Cableways $53.49 7A 3C 8P 'King Power Eq uipMtRL Operators Chipper $53.00 7A 3C 8P King Power Equipment Operators Compressor $50.22 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $53.49 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $50.22 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $52.58 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $53.00 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment 0perators Conveyors $52.58 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $53.00 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $54.04 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $53.49 7A 3C 813 Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $50 22 7A I 3C 8P Under https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 8of17 King Power Equipment Operators Cranes: Friction 100 Tons $54.61 7A 3C 8P Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $55.17 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $52.58 7A 3C 8P Attachments A-frame Over 10 Tons lKing Power Equipment Operators Crusher $53.00 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $53.00 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $53.49 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $52.581 7A 3C 8P King Poser Equipment Operators Drill Oilers: Auger Type, Truck $52.58 7A 3C 8P 1 Or Crane Mount King Power Equipment Operators Drilling Machine $53.00 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $50.22 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $53.00 7A 3C 8P j Gamaco It Similar Equipment 1 King Power Equipment Operators Forklift: 3000 Lbs And Over $52.58 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $50.22 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $53.00 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $50.22 7A 3C 8P King Power Equipment Operators Guardrail Punch $53.00 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $53.49 7A 3C 8P Articulating Off- Road i Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $53.00 7A 3C 8P ' Articulating Off-road ! Equipment Under 45 Yards 'King Power Equipment Operators Horizontal/directional Drill $52.58 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $53.00 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $52.58 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $50 22 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $54.04 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $53.49 7A 3C 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $53.00 7A 3C 8P i Yards https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 9 of 17 King Power Equipment Operators Loaders, Plant Feed $53.001 7A 3C 8P j King Power Equipment Operators Loaders: Elevating Type Belt $52.581 7A 3C 8P King Power Equipment Operators Locomotives, All $53.001 7A 3C 8P King Power Equipment Operators Material Transfer Device $53.00 7A 3C 8P King Power Equipment Operators Mechanics, All (Leadmen - $54.04 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Grader - Non- $52.58 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $53.49 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $53.49 7A 3C 8P Drill, Boring, Road Header And/or Shield F King Power Equipment Operators Oil Distributors, Blower $50.22 7A 3C 8P ' i Distribution It Mulch Seeding i Operator King Power Equipment Operators Outside Hoists (elevators And $52.58 7A 3C 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane, $53.00 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $54.04 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type, 45 $53.49 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $50.22 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $53.00 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $52.58 7A 3C 8P 'King Power Equipment Operators Posthole Digger, Mechanical $50.22 7A 3C 8P King Power Equipment Operators Power Plant $50.22 7A 3C 8P King Power Equipment Operators Pumps - Water $50.22 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $50.22 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $53.49 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Beliman $50.22 7A 3C 8P King Power Equipment Operators Rotlagon $53.49 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $50.22 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $53.00 7A 3C 8P King Power Equipment Operators Saws - Concrete $52.58 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $53.00 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete & Carry All $52.58 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $53.49 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/13/2014 Page 10 of 17 Yards And Over King Power Equipment Operators Service Engineers - Equipment $52.58 7A 3C 8P King Power Equipment Operators Shotcrete/gumte Equipment $50.22 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $52.58 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $53.49 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $54.04 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $54.61 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Shpform Pavers $53.49 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et $53.49 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $53.00 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $52.58 7A 3C 8P 'King Power Equipment Operators Tower Crane Over 175'in $54.61 7A 3C 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $54.04 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $53.49 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $52.58 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver- 100 $53.00 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $52.58 7A 3C 8P 100 Tons ;King Power Equipment Operators Truck Mount Portable Conveyor $53.00 7A 3C 8P 'King Power Equipment Operators Welder $53.49 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $50.22 7A 3C 8P { King Power Equipment Operators Yo Yo Pay Dozer $53 00 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $53 00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $53.00 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $50.22 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $50.22 7A 3C 8P Underground Sewer fz Water a https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 11 of 17 King Power Equipment Operators- Bump Cutter $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $53.00 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Compressor $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $53.49 7A 3C 8P Underground Sewer& Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $50.22 7A 3C 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $52.58 7A 3C 8P Underground Sewer £t Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump. Truck Mount $53.00 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $53.00 7A 3C 8P Underground Sewer & Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $54.04 7A 3C 8P Underground Sewer & Water Tons, Or 150' Of Boom I (Including Jib With Attachments) King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P t Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $53.49 7A 3C 8P Underground Sewer & Water Tons, Under 159 Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Underground Sewer & Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $54.61 7A 3C 8P Underground Sewer & Water Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $55.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P Underground Sewer & Water Of Boom (including Jib With Attachments) I King Power Equipment Operators- Cranes: Through 19 Tons With $52.58 7A 3C 8P Underground Sewer & Water Attachments A-frame Over 10 d Tons King Power Equipment Operators-. Crusher $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $53.00 7A 3C 8P Underground Sewer & Water (power) King Power Equipment Operators Derricks, On Building Work $53.49 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 11 of 17 King Power Equipment Operators- Bump Cutter $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $53.00 7A 3C 8P Underground Sewer Et Water :King Power Equipment Operators- Compressor $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $53.49 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $50.22 7A 3C 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $52.58 7A 3C 8P ) Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $53.00 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To g 42m King Power Equipment Operators- Conveyors $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $53.00 7A 3C 8P Underground Sewer Et Water Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $54.04 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom f (Including Jib With Attachments) ;King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $54.61 7A 3C 8P i Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $53.49 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $50.22 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $54.61 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $55.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $55.17 7A 3C 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $52.58 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons 'King Power Equipment Operators- Crusher $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Deck Engineer/deck Winches $53.00 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $53.49 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/13/2014 Page 13 of 17 Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- $52.58 7A 3C 8P Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $53.49 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $53.49 7A 3C 813 Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $50.22 7A 3C 813 Underground Sewer & Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $52.58 7A 3C 8P Underground Sewer & Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $53.00 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $54.04 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $53.49 7A 3C 8P Underground Sewer & Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $53.00 7A 3C 8P Underground Sewer & Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $52.58 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Posthole Digger, Mechanical $50.22 7A 3C 8P + Underground Sewer & Water King Power Equipment Operators- Power Plant $50.22 7A 3C 813 Underground Sewer & Water King Power Equipment Operators- Pumps - Water $50.22 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Quad 9, Hd 41, DI And Over $53.49 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Quick Tower - No Cab, Under $50.22 7A 3C SP i Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $53.49 7A 3C 8P ! Underground Sewer Et Water Rubber Tired Earth Moving i Equipment King Power Equipment Operators- Rigger And Bellman $50.22 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Rollagon $53.49 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Roller, Other Than Plant Mix $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $52.58 7A 3C 8P Underground Sewer & Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $53.00 7A 3C 8P 1 Underground Sewer & Water King Power Equipment Operators- Saws - Concrete $52.58 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 14 of 17 Underground Sewer a Water King Power Equipment Operators- Scraper, Self Propelled Under $53.00 7A 3C 8P Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $53 49 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $52.58 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Shotcrete/gunite Equipment $50.22 7A 3C 8P Underground Sewer Et Water ,King Power Equipment Operators- Shovel , Excavator, Backhoe, $52.58 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $53.49 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $53.00 7A 3C 8P Underground Sewer a Water Tractors, 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $54.04 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $54.61 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons 'King Power Equipment Operators- Slipform Pavers $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider 8: $53.49 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $52.58 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Tower Crane Over 1751n $54 61 7A 3C 8P # Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $54.04 7A 3C 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $53.49 7A 3C 8P Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $53.00 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $52.58 7A 3C 813 1 Underground Sewer Et Water 100 Tons # King Pourer Equipment Operators- Truck Mount Portable Conveyor $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Welder $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmall Type $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Yo Yo Pay Dozer $53.00 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/13/2014 Page 15 of 17 Underground Sewer 8: Water King Power Line Clearance Tree Journey Level In Charge $44.86 5A AA - Trimmers King Power Line Clearance Tree Spray Person $42.58 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A Trimmers King Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $50.12 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $39.62 5D 1M King Residential Drywall Tapers Journey Level $50.87 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $36.20 7L 1H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 .King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters King Residential Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41.84 7F 1R Workers King Residential Soft Floor Lavers Journey Level $42.15 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 2R (Fire Protection) King Residential Stone Masons Journey Level $50.121 5A 1M King Residential Terrazzo Workers Journey Level $46.961 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residentiat Tile Setters Journey Level $25.171 1 King Roofers Journey Level $44.71 5A 3H King Roofers Using Irritable Bituminous $47.71 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $69.37 7F 1 E King Shipbuilding It Ship Repair Boilermaker $40.12 7M 1 H King Shipbuilding Et Ship Repair Carpenter $38.24 70 3B King Shipbuilding Et Ship Repair Electrician $37.80 70 3B ; King IShipbuilding Et Ship Repair Heat Et Frost Insulator $58.93 5J 1S l i https://fortress.wa.gov/Inl/wagelookup/prvWageIookup.aspx 3/13/2014 Page 16 of 17 ti King Shipbuilding Et Ship Repair Laborer $36.78 70 3B King Shipbuilding Et Ship Repair Machinist $37.81 70 3B King Shipbuilding Et Ship Repair Operator $40.15 70 3B King Shipbuilding E: Ship Repair Painter $37.79 70 3B King Shipbuilding E: Ship Repair Pipefitter $37.77 70 3B King Shipbuilding Et Ship Repair Rigger $37.74 70 3B King Shipbuilding Et Ship Repair Sandblaster $36.78 70 3B King Shipbuilding E: Ship Repair Sheet Metal $37.74 70 3B King Shipbuilding Et Ship Repair Shipfitter VS22.92 70 3B King Shipbuilding Et Ship Repair Trucker 70 3B King Shipbuilding Et Ship Repair Warehouse 70 3B — j King Shipbuilding Et Ship Repair Welder/Burner 70 3B King Sign Makers Et Installers Sign Installer 1 (Electrical) King Sign Makers Et Installers Sign Maker $21.36 1 (Electncall King Sign Makers 8 Installers (Non-, Sign Installer $27.28 1 Electrical King Sign Makers 8 Installers (Non- Sign Maker $33 25 1 Electrical} King Soft Floor Lavers Journey Level $42.15 5A 3D King Sotar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69.59 5C 1x Protection) King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $50.12 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $52.58 7A 3C 8P Surveyor King Surveyors Chainman $52.061 7A 3C 8P King Surveyors Construction Site Surveyor $53.49 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $36.01 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20.05 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $34.50 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.01 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $35.27 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $36.01 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $33 471 5A I 26 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Page 17 of 17 Outside (Light) King Telephone Line Construction - Telephone Lineperson $33.47 5A 2B Outside King Telephone Line Construction - Television Groundperson $19.04 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $25.27 5A 213 Outside King Telephone Line Construction - Television System Technician $30.20 5A 2B Outside King Telephone Line Construction - Television Technician $27.09 5A 2B Outside King Telephone Line Construction - Tree Trimmer $33 47 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble tt Terrazzo Finisher $37.79 5A 1B Finishers King Traffic Controt Stripers Journey Level $42.33 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. $48.87 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $48.03 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck ft Trailer $48 87 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $48.03 5D 3A 8L , Council 28) King Truck Drivers Other Trucks (W. WA-Joint $48.87 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Weil Drillers I* Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers Ft Irrigation Pump Oiler $12.97 1 Installers King Well Drillers 8 Irrigation Pump Well Driller $18.00 1 Installers _ _- -j https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/13/2014 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8) HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four-ten hour schedule,shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown)shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Satuday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly l ate of wage K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 1. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage Q. The first two (2) hours after eight(8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly late of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All houis worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day)shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve(12) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls on Saturday or Sunday,the day before Saturday,Friday,and the day after Sunday,Monday,shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage Y. All hours worked outside the hours of 5 00 am and 5.00 pm (or such other hours as may be agreed upon by any employer and the employee)and all houis weiked in excess of eight(8)hours per day (10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage (except for employees who are absent from work without piior appioval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 hours during that workweek)All hours worked Monday thiough Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 3-5-2014 thru B-30-2014 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at two times the hourly rate of wage F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage G All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hour ly rate of wage U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage W, The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage 3 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours(12)in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay Any shift starting between the hours of 6 00 pm and midnight shall receive an additional one dollar($1 00)per hour for all hours worked that shift The employer shall have the sole discretion to assign overtime work to employees Primaiy consideration for overtime work shall be given to employees regularly assigned to the wink to be performed on overtime situations After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or moi e, B The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve(12)hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 3 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 3. C Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage All work performed after 6 00 pm Saturday to 5 00 am Monday and Holidays shall be paid at double the hourly rate of wage After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. D. All hours worked between the hours of 6 00 pm and 6 00 am,Monday through Saturday,shall be paid at a premium rate of 15%over the hourly rate of wage All other hours worked after 6 00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate However,Saturday shall not be utilized as a make-up day when a holiday falls on Friday All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8) HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage Holiday Codes 5. A. Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7) B. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8) C. Holidays- New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (8) D Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). 4 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 5. H. Holidays-New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6) I. Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day, and Christmas Day (6) J. Holidays.New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7) K Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9) L Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8) N Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9) P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Chi istmas, And Christmas Day (9) If A Holiday Falls On Sunday, The + Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays New Year's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,and Christmas Day(6) R. Paid Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day (7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7) T Paid Holidays- New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day, Christmas Day,And The Day Before Or After Christmas (9) i Z. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) Holiday Codes Continued 6. A. Paid Holidays- New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8) E Paid Holidays- New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Day After Thanksgiving Day,Christmas Day,And A Half-Day On Christmas Eve Day (9 1/2) G Paid Holidays:New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day,Ch>>stmas Day,And Christmas Eve Day(11) H. Paid Holidays- New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). 5 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 6. I. Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9) Z. Holidays-New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday If any of the listed holidays falls on a Satui day,the preceding Friday shall be a regular work day B. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday C. Holidays New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the pi eceding Friday. D. Paid Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8) Unpaid Holidays President's Day Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday E. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday F. Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday G. Holidays. New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H Holidays New Year's Day, Martin Luther King Jr Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday 6 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 7. I Holidays New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday i J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day,Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday K. Holidays- New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday L Holidays New Year's Day, Memorial Day, Labor Day, Independence Day,Thanksgiving Day, the Last Work Day before Christmas Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding ; Friday I M. Paid Holidays- New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Laboi Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day 1 after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday O Paid Holidays: New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day. Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day + After Or Before Christmas Day, And The Employees Birthday 11) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. j P Holidays New Year's Day. Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after j1 Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Q. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day R. Paid Holidays New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10) If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly S Paid Holidays.New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9) If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly 7 Benefit Code Key—Effective 3-5-2014 thru 8-30-2014 Note Codes 8. A In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more. Over 50'To 100'-$2 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$3 00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4 00 per Foot for Each Foot Over 150 Feet Over 220' -S5 00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Ovei 50'To 100'-$1 00 per Foot for Each Foot Over 50 Feet Over 100'To 150' -S 150 per Foot for Each Foot Over 100 Feet Over 150'To 200'-S2 00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional$1 00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$0.75,Level B:$0.50,And Level C $0 25 M. Workers on hazmat projects receive additional hourly premiums as follows-Levels A&B $1 00,Levels C&D: $0 50 N. Workers on hazmat projects receive additional hourly premiums as follows-Level A. $1 00,Level B•$0 75,Level C. $0 50,And Level D $0 25 P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1 50,Class C Suit:$1.00,And Class D Suit$0 50 Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle, and pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where duetted by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana or Idaho These classifications are only effective on or after August 31,2012 S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting of other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 8 REQUEST FOR MAYOR'S SIGNATURE KENT Please Fill in All Applicable Boxes �w A irect rr Originator's Name: Kelly Peterson Dept/Div. Engineering Extension: 5547 Date Sent: .-/, j,,4 Date Required: -d 41 / Return to: Nancy Yoshitake CONTRACT TERMINATION DATE: 12/31/14 VENDOR: Skycorp Ltd. DATE OF COUNCIL APPROVAL: n/a ATTACH THE COUNCIL MOTION SHEET FOR THE MAYOR - if applicable Brief Explanation of Document: The attached agreement is for Skycorp to remove structures at the Donnelly property located at 26005 Kent Kangley Road and the French property located at 26025 Kent Kangley Road. All Contracts Must Be Routed Through The Law Department lot= _a a q o�gleted by the Law Department) Received: EC V{4+..IV1 � I �� Approval of Law Dept.: 11 02 1614 Law Dept. Comments: KENT LAN DEPT. cNV� 0 Date Forwarded to Mayor: q( 2, I Shaded Areas To Be Completed By Administration Staff Received: RECEIVE Recommendations and Comments: Disposition: City of Kent Office of the Mayor Date Returned: