HomeMy WebLinkAboutPW13-195 - Change Order - #1 - Titan Earthwork, LLC - 112th Ave SE Watermain Improvement Project - 01/06/2014 Records Man'Agemetit, KEN T Was„,„Gro„ Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Titan Earthwork, LLC Vendor Number: JD Edwards Number n Contract Number: -�w I zL This is assigned by City Clerk's Office Project Name: 112th Ave SE Watermain Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 7/29/2013 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Jason Bryant Department: PW - Engineering Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #1 S Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 -.000"'. KENT WASHINGTON CHANGE ORDER NO. #1 NAME OF CONTRACTOR: TITAN Earthwork, LLC ("Contractor") CONTRACT NAME & PROJECT NUMBER: 112t" Ave Se Watermain ORIGINAL CONTRACT DATE: 7/29/2013 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Furnish and install saddle manhole, manhole necessary to complete storm system. The existing manhole was in poor condition and could not be used. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $1,811,541.01 (including applicable alternates and WSST) Net Change by Previous Change Orders $0 (inc/. applicable WSST) Current Contract Amount $1,811,541.01 (incl. Previous Change Orders) Current Change Order $6,600.00 Applicable WSST Tax on this Change $627.00 Order Revised Contract Sum $1,818,768.01 CHANGE ORDER - 1 OF 3 Original Time for Completion 120 working days (insert date) Revised Time for Completion under 0 prior Change Orders (insert date) Days Required (t) for this Change 0 calendar days Order Revised Time for Completion 120 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. .IN WITNESS, the parties below have executed this Agreement, which will csoine effective on the last date written below. Oft.-"Cle 7p�-- o V'- /t-e 47` By: -G By: (si ure (signature) Print N e• / Print Name: go 3 f �S Its C� Its �£c°�,CCE i ►1(,4w p�dcr� -- trtllee) 20 �� (title) DATE: DATE: (Tll CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department CHANGE ORDER - 3 OF 3 FILE 200 2 w. UT CHANCE ORDER WORKSHEET Date of change order: Datq worked erformed- _ / IZ//� C011CLllTenCe/AppYOVal(Intls&Date): Construction Supervisor Con truchon Manager Project Name: /mi Project Number: s Contractor: ` // %l'ic/ 155�zr��l�E/Jir lcs C.O. Type/Bid Item#: Force Account(est. total) $ Lump Sum $ Schedule M Change Order#: - Ordered By: Engineer ev L Contractor Description of Work: <<�rdG s'// ct✓ s�s�` �r Ile Reason: c7VG' k `S 071-elyt //sTL'��/� ,✓%s l�ycti �?/�d�Le/� /c it S' /st- !�l/Gr✓.Q r COST ESTIMATE X $_�(e Cod, / !�- s = $ y l QUANTITY 'PRICE UNIT(S) ESP ATED TOTAL ACTUAL COST X $ G/eJ o / C = $ QUANTITY PRICE UNIT(S) ACTUAL TOTAL TIME Extension Of Contract Time Due To This Change Order-------------------Calendar/Working Days COMMENTS Posted by Date Checked by. Date Pay Estimate# \\VT\P WPubbc\CheckOut\Constructimr\Fomis-Public Prolects\Pay Estimate Fomrs\Change Order Worksheet doe Rev 5/21/03