Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW13-193 - Original - Secoma Fence, Inc. - Blue Boy Water Reservoir Fence Extension - 07/09/2013
KENT W.shiN�TDN PUBLIC WORKS AGREEMENT between City of Kent and Secoma Fence, Inc THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Secoma Fence, Inc organized under the laws of the State of Washington, located and doing business at 7720 Pacific Hwy E Milton, WA 98354 (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Contractor will provide labor and materials to extend the fencing at the City of Kent Blue Boy Water Reservoir as described and illustrated in the scope of work and contractor quote dated 6/18/2013 and incorporated by the reference as "Exhibit A". Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by December 31, 2013. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed $1756.23, including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and PUBLIC WORKS AGREEMENT - 1 (Under$10K and No Performance Bond) performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be PUBLIC WORKS AGREEMENT - 2 (Under$1OK and No Performance Bond) required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to PUBLIC WORKS AGREEMENT - 3 (Under$10K and No Performance Bond) require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. PUBLIC WORKS AGREEMENT - 4 (Under$10K and No Performance Bond) C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. PUBLIC WORKS AGREEMENT - 5 (Under$10K and No Performance Bond) Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this PUBLIC WORKS AGREEMENT - 6 (Under$10K and No Performance Bond) Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. PUBLIC WORKS AGREEMENT - 7 (Under$10K and No Performance Bond) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: klk v• By: bi 0. (signature) (signature) Print Name: G V1 Print Name: Bradley Lake Its Its: Operations Manager (title) DATE: U-7/0Z 1f13 DATE: 9 Za/3 NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Nathan Hagberg Sean Bauer Secoma Fence, Inc City of Kent 7720 Pacific Hwy E 220 Fourth Avenue South Milton, WA 98354 Kent, WA 98032 253-926-8600 (telephone) (253) 856-5600 (telephone) 253-926-3007 (facsimile) (253) 856-6600 (facsimile) PUBLIC WORKS AGREEMENT - 8 (Under$10K and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this OZ day of ]`U , 20�. By: For: SccCV\.(X 1F6X(C V-AL Title: ftS1rlWA- Date:_U-1 /0-Z / 13 EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of 120 By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 EXHIBIT A Scope of work: Secoma Fence, Inc. will provide the labor and materials to extend the Blue Boy Reservoir fence enclosure 7-linear feet and returning to the tank additional 5-11near feet for a total of 12-linear feet. The new fence to match the existing fence to the extent possible with 7-foot high 1-inch mesh, green vinyl coated chain link fabric, galvanized framework, with 3-strands of barbwire above and razor ribbon. Includes (2) new 2 7/8 inch OD posts set in concrete with one being 9-foot tall at corner to support additional barbwire and one being 12-foot tall at tank outside concrete collar. One additional 2 7/8 inch by 12 foot long post will be banded to the post at the tank collar to fill gap without attaching to the tank. Six strands of barbwire will be run from the 12-foot high tank post tapered down to the 9-foot corner post and wrapped with a band of razor ribbon. Ultra Barrier will be added to the top of existing and new fence for a total of 34-feet. The two new fence posts shall be set in concrete and allowed to cure prior to the removal of any existing fence so that the fence enclosure remains secure at all times. Project includes removal of existing 7-foot swing gate. EXHIBIT A Se - Pt CHAIN LINK• WOOD *ORNAMENTAL IRON colona " ow Residential A Commercial FENCE, INC. e4al*4 I` Superior Workmanship 7720 Pacific llwy E. Quality Materials Milton, WA 98354 MEMBER IFIA Insurance Work (253)926-8600 FAX(253)928-3007 Contractor Lic#SECOMFI 176BJ 1-800-422-6828 secomasatea@hotmall.com t y� www.secomafenca com DATE ) 1 t�-j SUBMITTED TO 1'�, sp(,e�N PH FAX_,,,_, ADDRESS i bf rt�^<t` C`ti _ lic-q ")(7 A JOB ADDRESS 1j �00 s `�){p P� FOOTAGE 4Z A}C' C: 1L l,� t . . . . HEIGHT_ -�__ POSTSPACING _ Sin ' ' WIRE GAUGE 1 f -1 7C a ) c . BARB t-i P 1- 44-L (.o TOP f , I . . BOTTOM ?- ca . . . LINE POST L END POST 2-W5' . . . . . CORNER POST_ As . . . . WALK GATE POST Q2 L kyq--10 rb v�J.0 tL DRIVE GATE POST . ' GATE FRAME A I--1 ,�►R 2 Z-4 - STEPPED GROUND CONTOUR ' AIRLINE CEDAR FENCING STYLES Solid❑ Shadow p • f . err . . . To Grade❑ Stairstep❑ iz3$O . . Facng In ❑ Out ❑ Metal Base ❑ . . . UNDERGROUND OEISTRUCAONS LOCATED? Yes❑No❑ RESPONSIBILITY: Locating,clearing and staking of fence and/or property lines is the sole responsibility of the purchaser Purchaser further agrees that Secoma Fence,Inc., shall not be held responsible for any damage to underground pipes,wires or hidden obstructions,and herewith waives any claims relating thereto ADDITIONAL WORK, Any work or materials delivered or installed in addition to that proposed herein,shall be subject to an additional charge and will be billed at the current rate gg p pe THIS WARRANTY IS EXPRESSLY Y: Secorna IN LIEU OF ALL OTH.warrants ER link fencing EXPRESS OR IMPLIED,INCLUDINGTHE W�RRANTIES OF MERCHANTABILITYANhod TNESSof (1)year No person,firm or corporation is authorized to assume for Secoma Fence, Inc.,any other liability in connection with the sale of these goods MODIFICATION: This wain g constitutes the full and complete agreement between the parties,and there are no representations,warranties,promises and/or conditions, oral or in writing,other than as stated herein Any amendment or modification of the within agreement,to be effective and binding,must be in writing,dated and signed by the parties hereto COMPANY APPROVAL:This agreement shall not become effective unless signed by the buyer and delivered to the seller at its office in Tacoma,Washington,and there accepted by it within ten(1(l)days from the date above written If order is not placed within 10 days from date of proposal contact us regarding increased costs. Above Specified Work to be Completed CASH PRICE TERMS 35 PERCENT DOWN for the Sum Total of SALES TAX I TOTAL 1;51a r ^ The above Prices,Specifications and DOWN PAYMENT Salesmen Date conditions are satisfactory and are hereby accepted BALANCE DUE Add $80 tot is bid for priifvailinb-wage projects If applicable PURCHASER DATE Accepted for Co Date iCOMPLETION The word'completion,as used herein shall mean payment in fug received by Secoma Fence,Inc,at Its office address,within ten TIC)calendar days of the date of completion of work designated herein EXHIBIT A Secoma tFence Inc 7720 ftcrfk hu y TE --Mftor4 'WA 98354 Nwne. 253-926-8600 —Tad 253-926-3007 umw secomafence.com City of Kent Attn. Sean Bauer Itemized list of work: 1. 12' of new 7' ta1111/a chain link to be installed. 2. 34' of ultra barrier to be installed at top of new fence. 3. Install new posts. 4. Install barb wire and razor ribbon on new fence. 5. Removal of old gate. a EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. SECOM-1 OP ID: KI ,a►coRv CERTIFICATE OF LIABILITY INSURANCE DATE(MMI12013V) 07/04/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the pollcy(Ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Phone.425-885-2283 CONTACT Kim Breen NAME Redmond General Insurance Agcy Fax 425-885-6631 PHONE 425-952-2662 a A c,No PO BOX 847 /C Nc, Ezt Redmond,WA 98073-0847 E-MAIL Kevin E.Bear ADDRESS kbreen@rgla.com INSURER(S)AFFORDING COVERAGE NAIL 0 INSURER A Mutual of Enumclaw 11232 INSURED Secoma Fence, Inc. INSURER B 7720 Pacific Hwy E Milton,WA 98354 INSURER C INSURER D INSURER E INSURER F COVERAGES CERTIFICATE NUMBER- REVISION NUMBER' THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR TYPE OF INSURANCE DDL SUER POLICY NUMBER MM/DDPOLICY EFF TR /YYYY) (MM0fLDCDWYXYPYI LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00 A X COMMERCIAL GENERAL UABILITY X CPP001286400 01/29/2013 01/29/2014 PREMISES Ea occurrence $ 300,00 CLAIMS-MADE 7XI OCCUR MED EXP(Any one person) $ 10,000 PERSONAL B ADV INJURY $ 1,000,000 _ GENERAL AGGREGATE $ 2,000,000 GENT AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OPAGG $ 2,000,000 POLICY X PRI- LOC $ ECT AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,00 Ea accident E A X ANY AUTO CPPOO1286400 01/29/2013 01/29/2014 BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS X HIREDAUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per accident) $ X UMBRELLA LIA13 X OCCUR EACH OCCURRENCE 3 2,000,000 A Excess ua6 CLAIMS-MADE UMC000266700 01/2912013 01/29/2014 AGGREGATE s 2,000,000 DEO X RETENTION$ 10,000 I 5 WORKERS COMPENSATION `NC ETATU- X OTH- AND EMPLOYERS'LIABILITY CRY LIMITS ER A ANY PROPRIETOR/PARTNER/EXECUTIVEY/N CPP001236400 01/29/2013 01/29/2014 EL EACHACCIDENT $ 1,000,00 OFFICER/MEMBER EXCLUDED NIA (Mandatory in NH) EMPL LIAB/WA STOP GAP EL DISEASE-EA EMPLOYEE $ 1,000,00 If yes describe under DESCRIPTION OF OPERATIONS below E L DISEASE-POLICY LIMIT $ 1,000,00 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) City of Kent is an Additional Insured if required by written contract per forms CG2033 0704, CG2037 0704 & EA9910 1012 Waiver of Subrogation applies per form CG2404 0509 & EA9910 1012 Primary/Non Contributory coverage applies per form NE8B02 1201 Per Pro3ect Aggregate applies per form CG2503 0509. All forms attached. CERTIFICATE HOLDER CANCELLATION KENT-01 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Kent 4th Ave S ACCORDANCE WITH THE POLICY PROVISIONS Kent,WA 98032 AUTHORIZED \�J)REPRESENTATIVE ` 1989888V20010 ACORD CORPORATION. All rights reserved ACORD 25(2010105) The ACORD name and logo are registered marks Of ACORD COMMERCIAL GENERAL LIABILITY CG 20 33 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II - Who Is An Insured is amended to the rendering of, or the failure to render, include as an additional insured any person or any professional architectural, engineering organization for whom you are performing op- or surveying services, including: ertions when you and such person or organi- a. The preparing, approving, or failing to zation have agreed in writing in a contract or prepare or approve, maps, shop draw- agreement that such person or organization be ings, opinions, reports, surveys, field added as an additional insured on your policy. orders, change orders or drawings and Such person or organization is an additional in- specifications; or sured only with respect to liability for bodily injury", "property damage" or "personal and b. Supervisory, inspection, architectural or advertising injury" caused, in whole or in part, engineering activities. by. 2. "Bodily injury"or"property damage"occur- 1. Your acts or omissions;or ring after: 2. The acts or omissions of those acting on a. All work, including materials, parts or your behalf; equipment furnished in connection with In the performance of your ongoing operations such work, on the project (other than for the additional insured. service, maintenance or repairs) to be performed by or on behalf of the addi- A person's or organization's status as an addi- tional insured(s) at the location of the tional insured under this endorsement ends covered operations has been com- when your operations for that additional in- pleted, or sured are completed. b. That portion of "your work" out of B. With respect to the insurance afforded to these which the injury or damage arises has additional insureds, the following additional ex- been put to its intended use by any per- clusions apply: son or organization other than another This insurance does not apply to: contractor or subcontractor engaged in 1. "Bodily injury", "property damage"or"per- performing operations for a principal as sonal and advertising injury" arising out of apart of the same project. CO 20 33 07 04 Copyright, ISO Properties, Inc., 2004 Page 1 of 1 UNIFORM POLICY NUMBER: COMMERCIAL GENERAL LIA1fIL Y CO 20 37 0104 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endomewwA modNba htsurim provided Under to Nawll COMMERCIAL GENERAL LIABILITY COVERAGE PART ONEDUL19 Name Of Addkional Insured Penon(a) Or Ofonbxftnft. L.oatton And Description Of Cora O rations As requlnd by written contract As required by wtltten contract Information uired b lete tis h Schedule M not dwn abom willbe dawn In the Declarations. Secdon N - Who Is An )round Is amended to Include as an addiftmi Irmind this pwacn(s) or orgentcallon(s)shown In the Schedule,but only with respect to Nabft for'lrod ly k4urf or-properly dam- age"caused, In whole or In part, by Nc ur work,at the location designated and desaibed in the sched- ule d this ardonament pertamed for that addidoW Insured and kxk4ed in the 'products-oompleted operations hazard. This insurance is Primary,but only with respect to IlabNilyr arising out of"your work"performed for the Additional insured by the Named Insured at the location designated above. Any other lnsunnco available to the Additional Wound Is excess and noncontributory, CO 20 37 07 04 0 180 Pcoperbes,Inc.,2004 Page 1 of 1 13 COMMERCIAL AUTO EA 99 10 10 12 THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. BUSINESS AUTO ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement,the provisions of the Coverage Form apply unless modified by this endorsement. The following changes revise SECTION I— COVERED Physical Damage Coverage is extended to the AUTOS temporary substitute auto for the lesser of the Paragraph C.I. Is deleted and replaced with the following number of days: following: 1. The number of days reasonably required to 1. Trailers repair or replace the covered "auto" that is out a. "Trailers" with a load capacity of 2,000 of service; or pounds or less designed primarily for travel 2. 30 days. on public roads; or The following changes revise SECTION II -LIABILITY b. "Trailers" with a load capacity of 5,000 COVERAGE pounds or less designed primarily for travel The following is added to Paragraph A.1.: on public roads when: d. Blanket Additional Insured a. Pulled by an owned "auto" specifically Any person or organization that you are described in Item Three of the required to include as an additional insured Declarations as a covered "auto" for on this Coverage Form in a written contract Liability Coverage under this Coverage or agreement that is signed and executed Form;and by you before the"bodily injury"1 ►Y"or"property b. Not used for business, farming or damage"occurs and that is in effect during ranching purposes the policy period is an"insured"for Liability The following is added: Coverage, but only for damages to which D. Temporary Substitute Autos—Physical Damage this insurance applies A person's or organization's status as an If Physical Damage Coverage is provided by this additional insured under this endorsement Coverage Form, the following types of vehicles are ends when your contract or agreement with also covered "autos" for Physical Damage such person or organization ends Coverage- The Limits of Insurance applicable to the Any "auto" you do not own while used with the Additional Insured are those spedified in the permission of its owner as a temporary substitute written contract or agreement but not more for a covered "auto" you own that is out of service than the Limits of Insurance specified in the because of its. Declarations of this policy. The Limits of 1. Breakdown; Insurance applicable to the Additional 2. Repair; Insured are inclusive of and not in addition to the Limits of Insurance shown in the 3. Servicing; declarations for the Named Insured 4. °Loss";or This Coverage does not apply to lessors of S. Destruction. leased"autos". The coverage that applies is the same as the coverage provided for the vehicle being replaced. EA 99 10 10 12 Includes copyrighted material of Insurance Services Office,Inc.with Its permission. Page 1 of 4 e. Broadened Named Insured under this policy. No deductible applies to Any business entity newly acquired or this coverage. formed by you during the policy period (1) We will pay only for those expenses provided you own 51% or more of the incurred as a result of a covered "loss" business entity and the business is not occurring during the policy period separately insured for Business Auto beginning 24 hours after the"loss" and Coverage. Coverage is extended up to a ending, regardless of the policy's maximum of 90 days following acquisition expiration, with the lesser of the or formation of the business entity or until following number of days. the end of the policy period, whichever (a) The number of days reasonably comes first required to repair or replace the covered"auto". If"loss"is caused C Employee Hired Auto by theft, this number of days is An"employee"of yours Is an"insured"while added to the number of days it operating an "auto" hired or rented under a takes to locate the covered "auto" contract or agreement in that "employee's" and return it to you;or name, with your permission, while (b) 10 days. performing duties related to the conduct of your business. (2) Our payment under this Coverage Paragraphs A.2.a. 2 and A.2.a.4 are deleted and Extension esa.) is limited to the lesser ( ) ( ) of the necessary and actual expenses replaced with the following: incurred or the maximum amount 2. Coverage Extensions shown, $250. a. Supplementary Payments (3) Coverage under this Coverage (2) Up to $2,500 for cost of bail bonds Extension (4.a.) does not apply while there are spare or reserve autos (including bonds for related traffic law violations) required because of an available to you for your operations. "accident"we cover. We do not have to The following is added to Paragraph AA.: furnish these bonds c. Transportation Expenses - Theft of a (4) All reasonable expenses incurred by Private Passenger Auto the "insured" at our request, including In the event of "loss" to a covered private actual loss of earnings up to$300 a day passenger type "auto" caused by a total because of time off from work. theft which is covered by Comprehensive or The following changes revise SECTION III—PHYSICAL Specified Causes of Loss Coverage on this DAMAGE COVERAGE policy, we will pay up to $25 per day to a This coverage applies only for a covered °auto" for maximum of $500 for transportation which Physical Damage Coverage is provided for on expenses incurred by you as a result of that this policy loss m. The following is added to Paragraph A.3: (1) We will pay for transportation expenses incurred during the period beginning Glass Repair—Waiver of Deductible 264 hours(11 days)after the"loss". No deductible will apply to glass breakage if such (2) Regardless of the policy's expiration, glass is repaired in a manner acceptable to us our reimbursement of your rather than replaced transportation expenses under this Paragraph AA.a. is deleted and replaced with the Coverage Extension will end when the following: covered "auto" is returned to your use 4. Coverage Extensions or we pay for Its"loss". a (3) No deductible applies to this Coverage . Limited Rental Reimbursement or Travel Expense Extension. We will pay up to $25 per day to a d. Tapes,Records and Discs maximum of$250 for rental reimbursement We will pay for "loss" to tapes, records, expenses for the rental of an"auto"or other compact discs, or other similar devices transportation expense incurred by you used with audio, visual or data electronic because of"loss"to a covered "auto"which devices. Is covered by Comprehensive, Specified (1) We will pay only if the tapes, records, Causes of Loss,or Collision coverage compact discs,or other similar devices: EA 9910 1012 Includes copyrighted material of Insurance Services Office,Inc.with its permission. Page 2 of 4 (a) Are your property or that of a family (d) Animals, private passenger"autos,' member, or motorcycles, aircrafts, boats or any (b) Are the property of an "employee" other motorized vehicles or their using a covered "auto" in your equipment, furnishings or business affairs at the time of the appurtenances. "loss";and (e) Equipment or accessories while (c) Are in a covered "auto" which your Travel Trailer, "Camper" or sustains other covered "loss"under Motor Home is leased or rented to Comprehensive or Collision any organization or any person coverage at the time of the"loss"to other than you or a family member. tapes, records, compact discs, or (2) The maximum we will pay for"loss" is other similar devices. the lesser of: (2) The most we will pay for "loss" under (a) The actual cash value of the this Coverage Extension(4.d.)is$200. personal property at the time of (3) Physical Damage Coverage provisions "loss"; apply to this coverage, except that any (b) The cost of repairing the damage; deductible applicable to Comprehensive or or Collision coverage does not apply to (c) The cost of replacing the damaged this Coverage Extension(4.d.). personal property with other The exclusion referring to tapes, records, personal property of like kind, discs or other similar audio, visual or data condition,quality and value. electronic devices designed for use with g. Vacation Expense Allowance audio, visual or data electronic equipment does not apply. We will pay you $50 per day to a maximum Tfor extra e. Camper Bodies Trailer, CCamper"expenses or N Travel Motor Home is a In the event of a "loss" to a detached scheduled auto for physical damage "camper," physical damage coverage will coverage, and the Travel Trailer, "Camper" apply as if it were part of the covered "auto" or Motor Home: on which it is rated. (1) Is damaged or destroyed and is f. Contents of a Travel Trailer, Camper or uninhabitable;and Motor Home (2) While being used for vacation purposes When a Travel Trailer, "Camper" or Motor within the policy period. Home is a scheduled auto for physical Extra expenses must be supported by damage coverage,we will pay up to$1,000 receipts or other valid evidence. for"loss'to personal property belonging to you or a family member that is within the The following is added to Paragraph A. Travel Trailer, "Camper" or Motor Home. 5. Extra Expense—Broadened Coverage We will pay up to$250 for"loss"to personal We will pay for the direct expense of the property belonging to you or a family returning of a stolen covered"auto"to you. We member that is outside the Travel Trailer, will pay only for those covered "autos"for which "Camper"or Motor Home. you carry Comprehensive or Specified Causes (1) We will not pay for"loss"to: of Loss Coverage. This coverage will only (a) Articles carried or held for sale, apply to vehicles recovered inside the 48 storage or repairs, or for later contiguous United States. This coverage does delivery;goods kept to show or sell; not apply to an"auto"we deem a total"loss". or theatrical wardrobes. The following is added to Paragraph B,3.a.- (b) Business,store of office furniture or Airbag Coverage—Accidental Deployment equipment. However, this exclusion does not apply to the (c) Records or accounts, money, unintended inflation of an airbag if the inflation bullion,deeds,contracts,evidences is caused by mechanical or electrical of debt, securities, tokens or breakdown. tickets, stamps in current use or manuscripts. EA 99 10 10 12 Includes copyrighted material of Insurance Services Office,Inc.with its permission. Page 3 of 4 The following changes revise SECTION IV — The following changes revise SECTION V - BUSINESS AUTO CONDITIONS DEFINITIONS The following is added to Paragraph A.2.a.: The following is added: Amended Duties in the Event of an Accident, 0. "Camper" means a portable dwelling unit without Claim,Lawsuit or Loss axles or wheels that has been manufactured for However, this duty is only required when the attachment on the bed of a pickup truck to be used "accident"is known to: for casual travel or camping. (1) You, if you are an individual; (2) A partner,if you are a partnership; (3) A member, if you are a limited tlabMty company;or (4) An executive officer or insurance manager, if you are a corporation. The following is added to Paragraph A.: 6. Blanket Waiver of Subrogation We waive any right of recovery we may have against any person or organization to the extent required of you by a written contract executed prior to any"accident"because of payments we make for damages under this coverage form. The following is added to Paragraph B.2.: Unintentional Failure to Disclose Hazards Any unintentional failure to disclose all exposures or hazards existing as of the effective date of the Business Auto Coverage Form or at any time during the policy period will not invalidate or adversely affect the coverage for such exposure or hazard. However,you must report the undisclosed exposure or hazard to us as soon as reasonably possible after Its discovery. Paragraph B.5.b. is deleted and replaced with the following b. For Hired Auto Physical Damage Coverage,the following are deemed to be covered"autos"you own* (1) Any covered "auto" you lease, hire, rent or borrow,and (2) Any covered "auto" hired or rented by your "employee" under a contract in that individual "employee's" name, with your permission, while performing duties related to the conduct of your business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered"auto" The following is added to Paragraph B.S. d. To the extent required by an"insured contracN, this insurance is primary on behalf of the additional insured, and any other insurance maintained by the additional insured is excess and not contributory with this insurance. If the "insured contract" does not require this provision,then Paragraph a.above will apply. EA 99 10 10 12 Includes copyrighted material of Insurance Services Office,Inc.with Its permission. Page 4 of 4 POLICY NUMBER: CPP 0012864 00 COMMERCIAL GEWRAL LIABtLITY CG 24 04 05 09 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: AS REQUIRED BY WRITTEN CONTRACT 7720 PACIFIC HWY E MILTON WA 98354 Information required to complete this Schedule,If not shown above,will be shown In the Declarations. The following Is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Sec- tion IV—Conditions: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payrnents we make for injury or damage arising out of your ongoing operations or "your work' done under a contract with that person or organization and included in the "products-completed operations hazard". This waiver applies only to the person or organization shown to the Schedule above. r CG 24 04 05 09 0 Insurance Services Office, Inc.,2008 Page 1 of 1 Wolters Kluwer Financial Services I Uniform Forms TM Mutual of Enumclaw Insurance Company POLICY NUMBER:CPP 0012864 00 ME 88 02 12 01 EFFECTIVE DATE:01/29/2013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CG 20 33 07 04 ADDITIONAL INSURED-OWNERS,LESSEES OR CONTRACTORS-AUTOMATIC STATUS This endorsement modifies insurance provided under the following Coverage Part(s): COMMERCIAL GENERAL LIABILITY CG 20 33 07 04 ADDITIONAL INSURED-OWNERS,LESSEES OR CONTRACTORS-AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU. PRIMARY WORDING: THIS INSURANCE IS PRIMARY, BUT ONLY WITH RESPECT TO LIABILITY ARISING OUT OF THE ONGOING OPERATIONS PERFORMED FOR THE ADDITIONAL INSURED BY THE NAMED INSURED. ANY OTHER INSURANCE AVAILABLE TO THE ADDITIONAL INSURED IS EXCESS AND NON-CONTRIBUTORY. ME 88 02 12 01 Includes copyrighted material of Insurance Services Oft ce,Inc.with Is permission. Page 1 Of 1 POLICY NUMBER:CPP 0012864 00 COMMERCIAL GENERAL LIABILITY CG 25 03 05 09 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): Information required to complete this Schedule,if not shown above,will be shown in the Declarations. A. For all sums which the Insured becomes le- gate Limit for that designated construction gally obligated to pay as damages caused by project Such payments shall not reduce "occurrences" under Section 1 — Coverage A, the General Aggregate Limit shown in the and for all medical expenses caused by acci- Declarations nor shall they reduce any dents under Section 1 — Coverage C, which other Designated Construction Project can be attributed only to ongoing operations General Aggregate Limit for any other at a single designated construction project designated construction project shown in shown in the Schedule above: the Schedule above. 1. A separate Designated Construction Proj- 4. The limits shown in the Declarations for ect General Aggregate Limit applies to Each Occurrence, Damage To Premises each designated construction project, and Rented To You and Medical Expense that limit is equal to the amount of the continue to apply. However, instead of General Aggregate Limit shown in the being subject to the General Aggregate Declarations. Limit shown in the Declarations, such 2. The Designated Construction Project Gen- limits will be subject to the applicable eral Aggregate Limit is the most we will Designated Construction Project General pay for the sum of all damages under Aggregate Limit Coverage A, except damages because of B. For all sums which the insured becomes "bodily injury" or "property damage" legally obligated to pay as damages caused by included in the "products-completed apes "occurrences" under Section 1 — Coverage A, ations hazard", and for rnedical expenses and for all medical expenses caused by under Coverage C regardless of the accidents under Section I — Coverage C, number of: which cannot be attributed only to ongoing a. Insureds; operations at a single designated construction b. Claims made or"suits" brought; or project shown in the Schedule above: 1. Any payments made under Coverage A c. Persons or organizations making for damages or under Coverage C for claims or bringing "suits". medical expenses shall reduce the amount 3. Any payments made under Coverage A available under the General Aggregate for damages or under Coverage C for Limit or the Products-completed Opera- medical expenses shall reduce the Desig- tions Aggregate Limit, whichever is ap- nated Construction Project General Aggre- plicable-,and CG 25 03 05 09 ©Insurance Services Office, Inc.,2008 Page 1 of 2 Wolters Kluwer Financial Services I Uniform FormaTm 2. Such payments shall not reduce any Des- D. If the applicable designated construction proj- ignated Construction Project General e t has been abandoned, delayed, or aban- Aggregate Limit. doned and then restarted, or if the authorized C. When coverage for liability arising out of the contracting parties deviate from plans, blue- "products-completed operations hazard" is prints, designs, specifications or timetables, provided,any payments for damages because the project will stiff be deemed to be the same of "bodily injury" or "property darnage" in- constniction protect cluded in the "products-completed operations E. The provisions of Section III — Limits Of In- hazard' will reduce the Produds-completed surance not otherwise modified by this Operations Aggregate Limit, and not reduce endorsement shall continue to apply as the General Aggregate Limit nor the Desig- stipulated. nated Construction Project General Aggregate Limit. Page 2 of 2 0 Insurance Services Office, Inc.,2008 CG 25 03 05 09 Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 6/28/2013 'County Trade Job Classification Wage Holiday0vertime Note' King Asbestos Abatement Workers Journey Level $40.83 5D 1 H King Boilermakers Journey Level $62.34 5N 1C King Brick Mason Brick And Block Finisher $42.21 5A 1M ;King Brick Mason Journey Level $49.07 5A 1M King Brick Mason Pointer-Caulker-Cleaner $49.07 5A 1M King Building Service Emplovees Janitor $19.98 5S 2F ,King Building Service Employees Traveling Waxer/shampooer $20.39 5S 2F King Building Service Emplovees Window Cleaner (Scaffold) $24.52 5S 2F King Building Service Employees Window Cleaner(non-scaffold) $23.66 5S 2F King Cabinet Makers In Shop) Journey Level $22.74 1 i King Carpenters Acoustical Worker $49.57 5D 1M 'King Carpenters Bridge, Dock And Wharf $49.57 5D 1 M Carpenters King Carpenters Carpenter $49.57 5D 1M King Carpenters Carpenters on Stationary Tools $49.701 5D 1M King Carpenters Creosoted Material $49.67 5D 1M King Carpenters Floor Finisher $49 57 5D 1M King Carpenters Floor Layer $49 57 5D 1M King Carpenters Scaffold Erector $49.57 5D 1M t King Cement Masons Journey Level $50.13 7A 1M King Divers 8: Tenders Diver $100.28 5D 1M 8A King Divers Et Tenders Diver On Standby $56.68 5D 1M King Divers 8 Tenders Diver Tender $52.23 5D 1M King Divers t*Tenders Surface Rcv £t Rov Operator $52.23 5D 1M King Divers £t Tenders Surface Rcv It Rov Operator $48.67 5A 1B Tender I King Dredge Workers Assistant Engineer $51.07 5D 3G King Dredge Workers Assistant Mate(deckhand) $50.56 5D 3G t https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 2 of 17 King Dredge Workers Boatmen $51.071 5D 3G King Dredge Workers Engineer Welder $51.12 5D 3G King Dredge Workers Leverman, Hydraulic $52.69 5D 3G t King Dredge Workers Maintenance $50.81 5D 3G King Dredge Workers Mates $51.07 5D 3G i King Dredge Workers Oiler $50.69 5D 3G King Drywall Applicator Journey Level $49.74 5D 1H King Drywall Tapers Journey Level $49.79 5P 1 E King Electrical Fixture Maintenance Journey Level $25.34 5L 1E Workers King Electricians - Inside Cable Splicer $64.24 7C 2W yKing Electricians - Inside Cable Splicer (tunnel) $69.07 7C 2W E King Electricians - Inside Certified Welder $62.04 7C 2W King Electricians Inside Certified Welder (tunnel) $66.65 7C 2W King Electricians - Inside Construction Stock Person $34.19 7C 2W :King Electricians - Inside Journey Level $59.85 7C 2W King ElectriciansInside Journey Level (tunnel) $64.24 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 iKing Electricians - Powerline Cable Splicer $64.95 5A 4A Construction King Electricians - Powerline Certified Line Welder $59.37 5A 4A Construction King Electricians - Powerline Groundperson $42.16 5A 4A Construction King Electricians - Powerline Head Groundperson $44.50 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A Construction Operator 'King Electricians - Powerline Jackhammer Operator $44.50 5A 4A Construction King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A Construction ' King Electricians - Powerline Line Equipment Operator $49.95 5A 4A Construction King Electricians - Powerline Pole Sprayer $59.37 5A 4A Construction ?King Electricians - Powerline Powderperson $44.50 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 i King Elevator Constructors Mechanic $77.70 7D 4A IKing Elevator Constructors Mechanic In Charge $84.24 7D 4A lKmg Fabricated Precast Concrete All Classifications - In-Factory $14.60 5B 2K Products Work Only ;King Fence Erectors Fence Erector $15.181 1 1 King FlaQQers Journey Level $34.61 7A 2y =King Glaziers Journey Level $52.76 7L a https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/28/2013 Page 3 of 17 King Heat Et Frost Insulators And Journeyman $56.93 5J 1s I Asbestos Workers King Heating Equipment Mechanics Journey Level $68.52 7F 1 E King Hod Carriers Et Mason Tenders Journey Level $42 11 7A 2Y King Industrial Power Vacuum Journey Level $9.24 1 Cleaner King Inland Boatmen Boat Operator $52.32 5B 1K King Inland Boatmen Cook $48.891 5B 1K King Inland Boatmen Deckhand $48.96 5B 1K King Inland Boatmen Deckhand Engineer $49.95 5B 1 K King Inland Boatmen Launch Operator $51 16 5B 1 K King Inland Boatmen Mate $51.16 5B 1 K King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31 49 1 Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seahng Of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $49.57 5D 1M IKing Ironworkers Journeyman $59.02 7N 10 King Laborers Air, Gas Or Electric Vibrating $40.83 7A 2Y Screed (King Laborers Airtrac Drill Operator $42.11 7A 2Y ,King Laborers Ballast Regular Machine $40.83 7A 2Y King Laborers Batch Weighman $34.61 7A 2Y King Laborers Brick Pavers $40.83 7A 2Y p King Laborers Brush Cutter $40 83 7A 2Y s 'King Laborers Brush Hog Feeder $40.83 7A 2Y King Laborers Burner $40.83 7A 2Y King Laborers Caisson Worker $42.11 7A 2Y sKing Laborers Carpenter Tender $40.83 7A 2Y King Laborers Caulker $40.83 7A 2Y °King Laborers Cement Dumper-paving $41.59 7A 2Y King Laborers Cement Finisher Tender $40.83 7A 2Y King Laborers Change House Or Dry Shack $40.83 7A 2Y ,King Laborers Chipping Gun (under 30 Lbs.) $40.83 7A 2Y 1King Laborers Chipping Gun(30 Lbs. And $41.59 7A 2Y Over) https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 4 of 17 King Laborers Choker Setter $40.831 7A 2Y King Laborers Chuck Tender $40.831 7A 2Y King Laborers Clary Power Spreader $41 591 7A 2Y King Laborers Clean-up Laborer $40.83 7A 2Y King Laborers Concrete Dumper/chute $41.59 7A 2Y ; Operator King Laborers Concrete Form Stripper $40.83 7A 2Y King Laborers Concrete Placement Crew $41.59 7A 2Y lKing Laborers Concrete Saw Operator/core $41.59 7A 2Y Driller King Laborers Crusher Feeder $34.61 7A 2Y King Laborers Curing Laborer $40.83 7A 2Y lKing Laborers Demolition: Wrecking Et Moving $40 83 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $40.83 7A 2Y IKing Laborers Diver $42.11 7A 2Y King Laborers Drill Operator $41.59 7A 2Y (hydraulic,diamond) King Laborers Dry Stack Walls $40.83 7A 2Y 'King Laborers Dump Person $40.83 7A 2Y I King Laborers Epoxy Technician $40.831 7A 2Y King Laborers Erosion Control Worker $40.83 7A 2Y lKing Laborers Faller Et Bucker Chain Saw $41.59 7A 2Y King Laborers Fine Graders $40.83 7A 2Y ;King Laborers Firewatch $34.61 7A 2Y =King Laborers Form Setter $40.83 7A 2Y r 'King Laborers Gabian Basket Builders $40.83 7A 2Y King Laborers General Laborer $40.83 7A 2Y King Laborers Grade Checker Et Transit $42.11 7A 2Y Person King Laborers Grinders $40.83 7A 2Y King Laborers Grout Machine Tender $40.83 7A 2Y x King Laborers Groutmen (pressure)including $41.59 7A 2Y Post Tension Beams King Laborers Guardrail Erector $40.83 7A 2Y King Laborers Hazardous Waste Worker (level $42.11 7A 2Y A) 'King Laborers Hazardous Waste Worker (level $41.59 7A 2Y B) King Laborers Hazardous Waste Worker (level $40.83 7A 2Y C) ;King Laborers High Scaler $42.11 7A 2Y j King Laborers Jackhammer $41.59 7A 2Y =King Laborers Laserbea m Operator $41.59 7A 2Y ;King Laborers Imaintenance Person $40.83 7A 2Y ?King Laborers Manhole Builder-mudman $41.59 7A 2Y https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 5of17 King Laborers Material Yard Person $40.831 7A 2Y King Laborers Motorman-dinky Locomotive $41.591 7A 2Y King Laborers Nozzleman (concrete Pump, $41.59 7A 2Y Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gumte, Shotcrete, Water Bla King Laborers Pavement Breaker $41.59 7A 2Y King Laborers Pilot Car $34 61 7A 2Y King Laborers Pipe Layer Lead $42.11 7A 2Y King Laborers Pipe Layer/tailor $41.59 7A 2Y King Laborers Pipe Pot Tender $41.59 7A 2Y King Laborers Pipe Reliner $41.591 7A 2Y King Laborers Pipe Wrapper $41.591 7A 2Y King Laborers Pot Tender $40.83 7A 2Y King Laborers Powderman $42.11 7A 2Y Kmg Laborers Powderman's Helper $40.83 7A 2Y King Laborers Power Jacks $41.59 7A 2Y King Laborers Railroad Spike Puller - Power $41.591 7A 2Y King Laborers Raker - Asphalt $42.111 7A 2Y King Laborers Re-timberman $42.11 7A 2Y King Laborers Remote Equipment Operator $41.59 7A 2Y (King Laborers Rigger/signal Person $41.59 7A 2Y King Laborers Rip Rap Person $40.83 7A 2Y King Laborers Rivet Buster $41.59 7A 2Y ,King Laborers Rodder $41.59 7A 2Y King Laborers Scaffold Erector $40.83 7A 2Y King Laborers Scale Person $40.83 7A 2Y ;King Laborers Sloper (over 29) $41.59 7A 2Y iKing Laborers Sloper Sprayer $40.83 7A 2Y King Laborers Spreader (concrete) $41.591 7A 2Y King Laborers Stake Hopper $40.83 7A 2Y 'King Laborers Stock Piler $40.83 7A 2Y King Laborers Tamper Et Similar Electric, Air $41.59 7A 2Y Et Gas Operated Tools King Laborers Tamper (multiple & Self- $41.59 7A 2Y propelled) King Laborers Timber Person - Sewer (lagger, $41.59 7A 2Y Shorer & Cribber) King Laborers Tootroom Person (at Jobsite) $40.83 7A 2Y 'King Laborers Topper $40.83 7A 2Y i `King Laborers Track Laborer $40.83 7A 2Y ;King Laborers Track Liner (power) $41.59 7A 2Y ;King Laborers Traffic Control Laborer $37.01 7A 2Y 8R King Laborers Traffic Control Supervisor $37.01 7A 2Y 8R 4 https://fortress.wa.gov/Inl/wagelookup/prvWagelookup.aspx 6/28/2013 Page 6of17 3 IKing Laborers Truck Spotter $40.83 7A 2Y King Laborers Tugger Operator $41.59 7A 2Y King Laborers Tunnel Work-Compressed Air $55.89 7A 2Y 8� Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $60.92 7A 2Y Worker 30.01-44 00 psi King Laborers Tunnel Work-Compressed Air $64.60 7A 2Y Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $70.30 7A 2Y 8Q Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $72.42 7A 2Y Worker 60 01-64.00 psi King Laborers Tunnel Work-Compressed Air $77.52 7A 2Y Worker 64.01-68.00 psi i King Laborers Tunnel Work-Compressed Air $79.42 7A 2Y ` Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $81.42 7A 1H 8Q Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $83.42 7A 1H 8Q Worker 72 01-74.00 psi King Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y 8� Tender King Laborers Tunnel Work-Miner $42.21 7A 2Y 8M King Laborers Vibrator $41.59 7A 2Y King Laborers Vinyl Seamer $40.83 7A 2Y King Laborers Watchman $31.46 7A 2Y King Laborers Welder $41.59 7A 2Y King Laborers Well Point Laborer r$41.59 7A 2Y King Laborers Window Washer/cleaner 7A 2Y i King Laborers - Undereround Sewer General Laborer 8 Topman 7A 2Y 8 Water King Laborers - Undereround Sewer Pipe Layer 7A 2Y 8 Water IKing Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers IKing Lathers Journey Level $49.74 5D 1H 'King Marble Setters Journey Level $49.07 5A 1M ;King Metal Fabrication (In Shop) Fitter $15.86 1 ,King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 IKing Metal Fabrication (In Shop) Painter $11.10 1 IKing Metal Fabrication Iln Shop) Welder $15.48 1 =King Millwright Journey Level $50.67 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/28/2013 Page 7 of 17 )King Modular Buildings Electrician $11.56 1 .King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 ,King Modular Buildings Tool Maintenance $11.56 1 ;King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $36.53 6Z 2B King Pile Driver Journey Level $49.82 5D 1M King Plasterers Journey Level $48.23 7Q 1 R King Playground 8 Park Equipment Journey Level $9.19 1 Installers King Plumbers £t Plpefitters Journey Level $71.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $51.89 7A 3C 8P King Power Equipment Operators Assistant Engineer $48.62 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $51.40 7A 3C 8P x King Power Equipment Operators Batch Plant Operator, $51.40 7A 3C 8P ! Concrete ,King Power Equipment Operators Bobcat $48.62 7A 3C 8P !King Power Equipment Operators Brokk - Remote Demolition $48.62 7A 3C 8P Equipment )King Power Equipment Operators Brooms $48.62 7A 3C 8P King Power Equipment Operators Bump Cutter $51.40 7A 3C SP gKing Power Equipment Operators Cableways $51.89 7A 3C 8P 'King Power Equipment Operators Chipper $51.40 7A 3C 8P ' King Power Equipment Operators Compressor $48.62 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $51.89 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $48.62 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $50.98 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $51.40 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $50.98 7A 3C 8P E King Power Equipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $51.89 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 8 of 17 Tons, Under 159 Of Boom (including Jib With Attachments) King Power Eauipment Operators Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P ' r Under King Power Equipment Operators Cranes. Friction 100 Tons $53.01 7A 3C 8P Through 199 Tons King Power Eauipment Ocerators Cranes: Friction Over 200 Tons $53.57 7A 3C 8P King Power Equipment Operators Cranes- Over 300 Tons Or 300' $53.57 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $50.98 7A 3C 8P Attachments A-frame Over 10 Tons King Power Eauipment Operators Crusher $51.40 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $51.40 7A 3C 8P (power) Ia King Power Eauipment Operators Derricks, On Building Work $51.89 7A 3C 8P a King Power Equipment Operators Dozers D-9 Et Under $50.98 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $51.40 7A 3C 8P a King Power Equipment Operators Elevator And Man-lift: $48.62 7A 3C 8P Permanent And Shaft Type i King Power Equipment Operators Finishing Machine, Bidwell And $51.40 7A 3C 8P ti Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $50.98 7A 3C 8P j With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $51.40 7A 3C 8P Prints, Cut Sheets, Etc King Power Eauipment Operators Gradechecker/stakeman $48.62 7A 3C 8P E 4King Power Equipment Operators Guardrail Punch $51.40 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $51.89 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $51.40 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $50.98 7A 3C 8P Locator (King Power Equipment Operators Horizontal/directional Drill $51.40 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $50.98 7A 3C 8P 10 Tons 'King Power Equipment Operators Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P ; Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. £t $52.44 7A 3C 8P Over https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 9of17 King Power Equipment Operators Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P Not Including 8 Yards 'King Power Equipment Operators Loaders, Overhead Under 6 $51.40 7A 3C 8P Yards g !King Power Equipment Operators Loaders, Plant Feed $51.40 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $50.98 7A 3C 8P King Power Equipment Operators Locomotives, All $51.40 7A 3C 8P King Power Equipment Operators Material Transfer Device $51 40 7A 3C 8P , King Power Equipment Operators Mechanics, All (leadmen - $52 44 7A 3C 8P , $0.50 Per Hour Over Mechanic) King Power Equipment Operators Mixers: Asphalt Plant $51.40 7A 3C 8P King Power Equipment Operators Motor Patrol Grader - Non- $50.98 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $51.89 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P Drill, Boring, Road Header And/or Shield ` King Power Equipment Operators Oil Distributors, Blower $48.62 7A 3C 8P Distribution Et Mulch Seeding j Operator ! King Power Equipment Operators Outside Hoists (elevators And $50.98 7A 3C 8P Manlifts), Air Tuggers,strato i ,King Power Equipment Operators Overhead, Bridge Type Crane: $51.40 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $52.44 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $51.89 7A 3C 8P Tons Through 99 Tons 'King Power Equipment Operators Pavement Breaker $48.62 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $51.40 7A 3C 8P l Mount) i King Power Equipment Operators Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P ; King Power Equipment Operators Posthole Digger, Mechanical $48.62 7A 3C 8P i =King Power Equipment Operators Power Plant $48.62 7A 3C 8P King Power Equipment Operators Pumps - Water $48.62 7A 3C 8P =King Power Equipment Operators Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $48.62 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $51.89 7A 3C 8P Rubber Tired Earth Moving Equipment ,lKing Power Equipment Operators Rigger And Bellman $48 62 7A 3C 8P King Power Equipment Operators Rollagon $51.89 7A 3C 8P ; King Power Equipment Operators Roller, Other Than Plant Mix $48.62 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-Lift $50.98 7A 3C 8P Materials King I Power Equipment Operators Roto-mill, Roto-grinder 1 $51.40 7A 3C 8P l https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/28/2013 Page 10 of 17 King Power Equipment Operators Saws - Concrete $50.98 7A 3C 8P King Power Equipment operators Scraper, Self Propelled Under $51.40 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $50.98 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $51.89 7A 3C 8P 1 Yards And Over ,King Power Equipment Operators Service Engineers - Equipment $50.98 7A 3C 8P King Power Equipment Operators Shotcrete/gumte Equipment $48.62 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $50.98 7A 3C 8P ; Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe. $51.89 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $51.40 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Eauipment Operators Shovel, Excavator, Backhoes: $52.44 7A 3C 8P Over 50 Metric Tons To 90 1 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $53.01 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $51.89 7A 3C 8P 'King Power Equipment Operators Spreader, Topsider Et $51.89 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $51.40 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $50.98 7A 3C 8P ; King Power Equipment Operators Tower Crane Over 175'in $53.01 7A 3C 8P " Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $52.44 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $51.89 7A 3C 8P ' Truck Type King Power Equipment Operators Trenching Machines $50.98 7A 3C 8P } King Power Equipment Operators Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $50.98 7A 3C 8P 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $51.40 7A 3C 8P King Power Equipment Operators Welder $51.89 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmall Type $48.62 7A 3C 8P IKing Power Equipment Operators Yo Yo Pay Dozer $51.401 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $51.89 7A 3C 8P Undereround Sewer Et Water King Power Equipment Operators- Assistant Engineer $48.62 7A 3C 8P Undereround Sewer Et Water i 'King Power Equipment Operators- Barrier Machine (zipper) $51.40 7A 3C 8P i Undereround Sewer Et Water .King Power Equipment Operators- Batch Plant Operator, $51.40 7A 3C 8P Underground Sewer Et Water Concrete https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 11 of 17 King Power Equipment Operators- Bobcat $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $48.62 7A 3C 8P Underground Sewer Ft Water Equipment :King Power Equipment Operators- Brooms $48.62 7A 3C 8P Underground Sewer Et Water ; King Power Equipment Operators- Bump Cutter $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $48.62 7A 3C 8P ; Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $51.89 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M `King Power Equipment operators- Concrete Finish Machine -laser $48.62 7A 3C 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $50.98 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $51.40 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $52.44 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) ,King Power Equipment Operators- Cranes: 45 Tons Through 99 $51.89 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom i (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $53.01 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $53.57 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P Underground Sewer Et Water Of Boom (including Jib With I Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $50.98 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 htt s: fortress.wa. v p // goIn'/ i/wagelookup/prvWagelookup.aspx 6/28/2013 Page 12 of 17 Tons =King Power Equipment Operators- Crusher $51.40 7A 3C 8P } Underground Sewer Et Water 'King Power Equipment Operators- Deck Engineer/deck Winches $51.40 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $51.89 7A 3C 8P Underground Sewer Et Water IKing Power Equipment Operators- Dozers D-9 Et Under $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers- Auger Type, Truck $50.98 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $51.40 7A 3C 8P k Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $48.62 7A 3C 8P 1 Underground Sewer Et Water Permanent And Shaft Type King Power Eauipment Operators- Finishing Machine, Bidwell And $51.40 7A 3C 8P < Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $50.98 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P Underground Sewer Et Water Attachments !King Power Equipment Operators- Grade Engineer: Using Blue $51.40 7A 3C 8P i Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $51.40 7A 3C 8P Underground Sewer Et Water !King Power Equipment Operators- Hard Tail End Dump $51.89 7A 3C 8P ' Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Eauipment Operators- Hard Tail End Dump $51 40 7A 3C 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $50.98 7A 3C 8P Underground Sewer 8t Water Locator ;King Power Equipment Operators- Horizontal/directional Drill $51.40 7A 3C 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $50.98 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P Underground Sewer Et Water Tons And Under i King Power Equipment Operators- Loader, Overhead 8 Yards. Et $52.44 7A 3C 8P } Underground Sewer bt Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P ? r Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $51.40 7A 3C 8P Underground Sewer Et Water Yards ,King Power Equipment Operators- Loaders, Plant Feed $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $50.98 7A 3C 8P I I t https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 13 of 17 I Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $51.40 7A 3C 8P Underground Sewer Et Water g ,King Power Equipment Operators- Material Transfer Device $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $52.44 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Mixers: Asphalt Plant $51.40 7A 3C 8P ! Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Grader - Non- $50.98 7A 3C 8P Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $51.89 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $48.62 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $50 98 7A 3C 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $51.40 7A 3C 8P ' Underground Sewer Et Water 20 Tons Through 44 Tons r King Power Equipment Operators- Overhead, Bridge Type: 100 $52.44 7A 3C 8P Underground Sewer Et Water Tons And Over `King Power Equipment Operators- Overhead, Bridge Type: 45 $51.89 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons 'King Power Equipment Operators- Pavement Breaker $48.62 7A 3C 8P Underground Sewer Et Water } King Power Equipment Operators- Pile Driver (other Than Crane $51.40 7A 3C 8P , Underground Sewer Et Water Mount) =King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Posthole Digger, Mechanical $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment operators- Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P Underground Sewer Et Water i King Power Equipment Operators- Quick Tower - No Cab, Under $48.62 7A 3C 8P I Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $51.89 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment 'King Power Equipment Operators- Rigger And Bellman $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $51.89 7A 3C 8P t 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 14of17 Underground Sewer Et Water i King Power Equipment Operators- Roller, Other Than Plant Mix $48.62 7A 3C 813 Underground Sewer Et Water l King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $51.40 7A 3C 8P Underground Sewer Et Water s King Power Equipment Operators- Saws - Concrete $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $51.40 7A 3C 8P ; Underground Sewer Et Water 45 Yards I King Power Equipment Operators- Scrapers - Concrete 8: Carry All $50.98 7A 3C 8P Underground Sewer Et Water iKmg Power Equipment Operators- Scrapers, Self-propelled: 45 $51.89 7A 3C 8P Underground Sewer Et Water Yards And Over ;King Power Equipment Operators- Service Engineers - Equipment $50.98 7A 3C 8P l Underground Sewer ft Water i lKing Power Equipment Operators- Shotcrete/gunrte Equipment $48.62 7A 3C 8P I Undereround Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $50.98 7A 3C 8P Undereround Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $51.89 7A 3C 2P € Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons !King Power Equipment Operators- Shovel, Excavator, Backhoes, $51.40 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons I King Power Equipment Operators- Shovel, Excavator, Backhoes: $52.44 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $53.01 7A 3C 8P l Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider It $51 89 7A 3C 8P Underground Sewer Et Water Screedman 'King Power Equipment Operators Subgrader Trimmer $51.40 7A 3C 81) t Underground Sewer Et Water ,King Power Equipment Operators- Tower Bucket Elevators $50.98 7A 3C 8P # Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175in $53.01 7A 3C 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $52.44 7A 3C 8P Underground Sewer Et Water Height Base To Boom ;King Power Equipment Operators- Transporters, All Track Or $51.89 7A 3C 8P ; Underground Sewer Et Water Truck Type 'King Power Equipment Operators- Trenching Machines $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P Underground Sewer It Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $50.98 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 15 of 17 k Underground Sewer£t Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $51.40 7A 3C 8P Underground Sewer Et Water `King Power Equipment Operators- Welder $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farman Type $48.62 7A 3C 8P Underground Sewer Ex Water King Power Equipment Operators- Yo Yo Pay Dozer $51.40 7A 3C 8P Underground Sewer Et Water g King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A Trimmers King Power Line Clearance Tree Spray Person $40.73 5A 4A Trimmers 'King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A Trimmers King Refrigeration Et Air Journey Level $70.46 6Z 1G Conditionine Mechanics King Residential Brick Mason Journey Level r$49.07 5A 1M King Residential Carpenters Journey Level 1 King Residential Cement Masons Journey Level 1 King Residential Drywall Applicators Journey Level 5D 1M 'Kmg Residential Drywall Tapers Journey Level 5P 1 E ; King Residential Electricians JOURNEY LEVEL $30.44 1 King Residential Glaziers Journey Level $35.10 7L 1H King Residential Insulation Journey Level $26 28 1 Applicators I King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.091 1 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters King Residential Refrigeration Et Air Journey Level $70.46 6Z 1G Conditioning Mechamcs King Residential Sheet Metal Journey Level (Field or Shop) $41.30 7F 1 R Workers King Residential Soft Floor Lavers Journey Level $41.78 5A 3D King Residential Sprinkler Fitters Journey Level $40.81 5C 211 (Fire Protection) King Residential Stone Masons Journey Level $49.07 5A 1M King Residential Terrazzo Workers Journey Level $45.43 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 lKing Roofers Journey Level $43.90 5A 1R https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Page 16 of 17 )King Roofers Using Irritable Bituminous $46.90 5A 1R Materials King Sheet Metal Workers Journey Level (Field or Shop) $68.52 7F 1 E King Shipbuilding Et Ship Repair Boilermaker $39.66 7M 1H King Shipbuilding Et Ship Repair Carpenter $38.24 70 3B King Shipbuilding Et Shia Repair Electrician $37.82 70 3B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $56.93 5J 15 King Shipbuilding Et Ship Repair Laborer $36.781 70 3B King Shipbuilding Et Ship Repair Machinist $37.811 70 3B King Shipbuilding Et Ship Repair Operator $40 151 70 3B King Shipbuilding Et Ship Repair Painter $37.81 70 3B King Shipbuilding Et Ship Repair Pipefitter $37.77 70 3B King Shipbuilding Et Ship Repair Rigger $37.76 70 3B King Shipbuilding Et Ship Repair Sandblaster $36.78 70 3B King Shipbuilding Et Ship Repair Sheet Metal $37.74 70 3B King Shipbuilding Et Ship Repair Shipfitter $37.76 70 3B King Shipbuilding Et Ship Repair Trucker $37.61 70 3B King Shipbuilding Et Ship Repair Warehouse $37.65 70 3B King Shipbuilding Et Ship Repair Welder/Burner $37 76 70 3B King Sign Makers Et Installers Sign Installer $22.92 1 (Electrical) )King Sign Makers Et Installers Sign Maker $21.36 1 (ElectricaU King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electricall King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical) King Soft Floor Lavers Journey Level $41.78 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69.59 5C 1x Protection) King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $49.07 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $50.98 7A 3C 8P Surveyor King Surveyors Chainman $50.461 7A 3C 8P , King Surveyors Construction Site Surveyor $51.89 7A 3C 8P "s King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $35.09 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $19.22 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $33.63 5A 2B https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 6/28/2013 Page 17 of 17 Outside :King Telephone Line Construction - Special Aparatus Installer 1 $35.09 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $34 37 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $35.09 5A 2B Outside (Heavy) -King Telephone Line Construction - Telephone Equipment Operator $32.62 5A 2B Outside (Light) King Telephone Line Construction - Telephone Lineperson $32.62 5A 2B Outside 'King Telephone Line Construction - Television Groundperson $18.65 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B Outside King Telephone Line Construction - Television System Technician $29.42 5A 2B Outside King Telephone Line Construction - Television Technician $26 43 5A 2B Outside King Telephone Line Construction - Tree Trimmer $32.95 5A 2B Outside !King Terrazzo Workers Journey Level $45.43 5A 1M King Tile Setters Journey Level $21.65 1 King Tile. Marble ft Terrazzo Finisher $37 76 5A 1 B Finishers King Traffic Control Stripers Journey Level $41.53 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. $47.91 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D 3A 8L WA-Joint Council 28) Wrig Truck Drivers Dump Truck Et Trailer $47.91 5D 3A 8L King Truck Drivers Dump Truck (W WA-Joint $47.07 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $47.91 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 3 £King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers IKing Well Drillers Et Irrigation Pump Oiler $12.97 1 Installers King Well Drillers 8t Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 6/28/2013 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 Overtime Codes Overtime calculations ate based on the hourly rate actually paid to the worker On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker 1 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. The first two (2)hours after eight(8) regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage E The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage F. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime houis worked,except Laboi Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at thiee tunes the hourly rate of wage G. The first ten(10) hours worked on Saturdays and the first ten(10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten (10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage J The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage K All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage M. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 1 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 1 N. All hours worked on Saturdays (except makeup days) shall he paid at one and one-half times the hourly rate of wage All houis worked on Sundays and holidays shall be paid at double the hourly rate of"age O The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Fiiday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage Q The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours woiked in excess of ten(10) hours pei day Monday thiough Saturday and all hours worked on Sunday s and holidays(except Chi istmas day)shall be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times the hourly late of wage R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays and all other oveitimc hours worked, except Labor Day, shall be paid at double the hourly iate of wage All hours woikcd on Labor Day shall be paid at three times the hourly late of wage U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays(except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be paid at double the houi ly iate of wage W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly late of wage X. The first foul (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve(12)hours Monday through Saturday, Sundays and holidays shall be paid at double the hour ly i ate of wage When holiday falls on Saturday or Sunday,the day before Saturday,Friday and the day after Sunday, Monday. shall be considered the holiday and all work perfoi med shall be paid at double the hourly rate of wage Y. All hours worked outside the hours of 5.00 am and 5 00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage (except for employees who are absent from work without prior appioval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek)or 40 hours during that workweek) All hours worked Monday thiough Saturday over twelve(12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hour s worked on holidays shall be paid the straight time rate of pay in addition to holiday pay 2 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RA'I E OF WAGE B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at two times the hourly rate of wage F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of vv age G. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage K All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay. O All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage R. All hours worked on Sundays and holidays and all hours worked over sixty (60)in one week shall be paid at double the hourly rate of wage U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of"age All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day, ten-hour weekly schedule either Monda} thin 7 hursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage The first eight(8)hours worked on the fifth day shall be paid at one and one-half tunes the hourly rate of v,age All other how s worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly late of"age Y. All hours worked on Saturdays(except for make-up days)shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly i ate of w age 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hoot shifts are established,or forty(40)hours of straight time per week,Monday through Friday,of outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours(12) in a single shilft and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay Any shift starting between the hours of 6 00 pm and midnight shall recene an additional one dollar(SI 00)per hour f0i all hours worked that shift The employer shall have the sole discretion to assign overtime work to employees Prtmaiy consideration for overtime work shall be given to employees regularly assigned to the vvoik to be performed on overtime situations After an employee has xNorked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more 3 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 3. B. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the houi IN rate of,age All hours worked over twelve(12)hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,of forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly late of wage. All work performed after 6 00 pm Saturday to 5 00 am Monday and Holidays shall be paid at double the hourly rate of,wage After an employee has worked eight(8)hours at an applicable ovei time iate,all additional hours shall beat the applicable overtime iate until such time as the employee has had a break of eight(8)hours or more D. All hours worked between 6 00 pm Monday through 6 00 am Satuiday,shall be paid at an overtime rate of 15% over the hourly rate of wage All other hours woi ked after 6 00 am on Saturdays,shall be paid at one and one-half times the houi ly rate of w age All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the houi ly wage rate G. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hOUIS of straight time per week,Monday thi ough Friday and all woik on Saturdays shall be paid at time and one-half the straight time rate Hours worked ovei twelve hours(12) in a single shift and all work performed after 8 00 am Sunday to 8 00 am Monday and Holidays shall be paid at double the straight time rate of pay After an employee has worked eight(8)hour sat an applicable oNeitime rate all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8) hours or more 4 ALL HOURS WORKED IN EXCESS OF EIGHT (8)HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A All how s worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage All hours worked on Saturday s, Sundays and holidays shall be paid it double the hourly i ate of wage Holiday Codes 5. A. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7) B. Holidays New Year's Day, Memoral Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Chi istmas,and Christmas Day(8). C. Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) D. Holidays New Year's Day. Memorial Day. Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) H. Holidays New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6) 4 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 5. 1. Holidays New Year's Day, Memorial Day,Independence Day, Labor Day,Thanksgiving Day,and Christmas Day (6) J Holidays New Year's Day, Memorial Day, Independence Day,Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day (7) K. Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day (9). L. Holidays New Year's Day, Martin Luther King Ji Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day (8) N Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Fnday After Thanksgiving Day,And Chistmas Day (9) P Holidays-New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday Aftei Thanksgiving Day The Day Before Chrstmas, And Chi stmas Day (9) If A Holiday Falls On Sunday, The 1-ollov%ing Monday Shall Be Considered As A Holiday Q. Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6) R Paid Holidays New Year's Day, Memorial Day, independence Day. Labor Day. Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day (7 1/2) S Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7) T. Paid Holidays. New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9) Z Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) Holidav Codes Continued 6 A Paid Holidays. New Year's Day, Presidents' Day, Memoual Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8) E Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day,Labor Day, Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day (9 1/2) G. Paid Holidays:New Year's Day,Martin Luther King Jr Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day.Christmas Day,And Christmas Eve Day(11) H. Paid Holidays New Year's Day, New Year's Eve Day, Memorial Day Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Chrstmas Day, The Day After Christmas, And A Floating Holiday(10) I Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7) 5 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 6 T. Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Chi istmas Day(9) Z Holidays.New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7) If a holiday falls on Satuiday, the preceding Fnday shall be considered as the holiday If a holiday falls on Sunday. the following Monday shall be considered as the holiday Holidav Codes Continued 7. A. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Obseived As A Holiday On The Following Monday If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day B. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Satuday shall be observed as a holiday on the preceding Friday C Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the tollowing Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays Nev, Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday aftei Thanksgiving Day, And Christmas Day (8) Unpaid Holidays President's Day Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a Saturday shall be observed as a holiday on the pi ecedmg f riday E. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day.And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday F. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last woiking day befoie Christmas day and Christmas day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be obsci ved as a holiday on the preceding Friday G. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, and Christmas Day (6) Any holiday which falls on a Sunday shall be obseived as a holiday on the tollowing Monday H Holidays New Year's Day, Martin Luther King Jr Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9) Any holiday whwh falls on a Sunday shall be obseived as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday 1. Holidays New Year's Day,President's Day.Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day.The Day Before Christmas Day And Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday 6 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 7 J. Holidays New Year's Day, Independence Day. Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday K. Holidays New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgivmg Day,And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday L. Holidays New Year's Day, Memorial Day, Labor Day, Independence Day,Thanksgiving Day, the Last Work Day before Christmas Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgn ing Day,the Friday after Thanksgiving Day,Chi rstmas Day.And the Day after or belore Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday N Holidays New Year's Day, Memorial Day Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday When C'hrrstmas falls on a Saturday,the preceding Friday shall be observed as a holiday O. Paid Holidays New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day The Friday After I hanksgrvmg Day, Chi stmas Day, The Day After Or Before Christmas Day, And The Employees Buthday 11) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday P. Holidays New Year's Day. Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monda} Q. Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a hohday on the following Monday If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day R. Paid Holidays New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day the Friday after Thanksgiving Day Christmas Dav,and the day after or before Chi rstmas Day (10) If any of the listed holidays fall on Saturday,the preceding Friday shall be obser v ed as the holiday If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly S. Paid Holidays-New Year's Day,Memorial Day Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,"I he Day After Christmas,And A Floating Holiday(9) If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly Note Codes 8. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50'To 100'-$2 00 per Foot for Each Foot Over 50 Feet Ovei 100'To 150'-S3 00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-S4 00 per Foot for Each Foot Over 150 Feet Over 220'-$5 00 per Foot for Each Foot Over 220 Feet 7 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50' To 100'-$1 00 per Foot for Each Foot Over 50 Feet Ovei 100'To 150'-$1 50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-$2 00 per Foot for Each Foot Over 150 Feet Over 200'-Divers May Name"I hen Own Price D. Workers working with supplied air on hazmat projects receive an additional $1 00 per hour L Workers on hazmat projects receive additional hourly premiums as follows-Level A $0 75,Level B•$0 50,And Level C $0 25 M Workers on hazmat projects receive additional hourly premiums as follows Levels A&B $1 00,Levels C&D. $0.50 N. Workers on hazmat projects receive additional hourly premiums as follows-Level A $1 00,Level B $0 75,Level C $0 50,And Level D. $0 25 P Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit $2 00.Class B Suit $1 50_Class C Suit $1 00.And Class D Suit$0 50 Q The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid R Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular bicycle, and pedestrian traffic during construction operations I laggers and Spottcts shall be posted where shown on approved Traffic Conuol Plans or where directed by the Engineer All (laggers and spotter s shall possess a current flagging car d issued b� the State of Washington,Oregon,Montana,or Idaho These classifications are only effective on or after August 31.2012 S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all tempor aiy traffic control devices and construction signs necessary to control vehicular bicycle,and pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved 7 raffic Control Plans or where directed by the Engineer All flaggei s and spotters shall possess a current flagging card issued by the State of Washington.Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 8 KEN• T WASHINOTON CITY OF KENT PUBLIC WORKS OPERATIONS LETTER OF TRANSMITTAL TO: Nathan Hagberg DATE: July 11, 2013 Secoma Fence, Inc 7720 Pacific Hwy E PROJECT: Fence Modification Milton, WA 98354 [ ] Drawings/Plans [ ] Specifications [] Vendor Set Up Form [X] Contract [ ] Contract Modification [ ] Copies Description One Public Works Agreements These are transmitted for the following reason(s): [ ] For approval [x] For your use [ ] As requested [ ] For review and comment [] For signature & return [ ] Other REMARKS: Attached is your copy of the signed contract. Please consider this your notice to proceed with scheduling the work. If you have any questions, please call me at (253) 856-5650. Thank you, Kristin Lykken Public Works Operations 220 4th Avenue South Kent, WA 98032-5895 (253) 856-5650, FAX (253) 856-6600 klykken@kentwa.gov