Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW13-127 - Original - Nature's Way Tree Service, LLC - Contract - 04/11/2013
ecords Mai 0 eme� KENO Document W A9HIH GTOM CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Nature's Way Tree Service Vendor Number: JD Edwards Number Contract Number: YqJ 13-1�7 This Is assigned by City Clerk's Office Project Name: Tree Removal @ 21915 39th PI S Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 4/11/13 Termination Date: 5/11/13 Contract Renewal Notice (Days): N/A Number of days required notice for termination or renewal or amendment Contract Manager: Scott Schroeder Department: PWO - Streets Detail: (i.e. address, location, parcel number, tax id, etc.): Removal of dangerous tree at 21915 39th PI S S Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 KENT WASHINGTON PUBLIC WORKS AGREEMENT between City of Kent and Nature's Way Tree Service, LLC THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Nature's Way Tree Service, LLC organized under the laws of the State of Washington, located and doing business at 1019 184`h Ave Ct E Lake Tapps, WA 98391, Mike Harrell (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Contractor will remove one alder tree deemed potentially dangerous in the greenbelt at 21915 39th PI S. All debris will be left on site for wildlife habitat. For a copy of the contractor bid see attached exhibit A, incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 30 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed $657.00, including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and PUBLIC WORKS AGREEMENT - 1 (Under$1OK and No Performance Bond) performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be PUBLIC WORKS AGREEMENT - 2 (Under$1OK and No Performance Bond) required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming ad3udged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to PUBLIC WORKS AGREEMENT - 3 (Under$10K and No Performance Bond) require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. PUBLIC WORKS AGREEMENT - 4 (Under$10K and No Performance Bond) C. Contractor's Dui to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. PUBLIC WORKS AGREEMENT - 5 (Under$10K and No Performance Bond) Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this PUBLIC WORKS AGREEMENT - 6 (Under$10K and No Performance Bond) Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. PUBLIC WORKS AGREEMENT - 7 (Under$10K and No Performance Bond) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By /1 By: &��Q (signature) (signature) Print Name: .0 V Print Name: Brad Lake Its Its: Public Works Operations Manager (title) DATE Z4-44-Z01 DATE: 4I ll NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Mike Harrell Scott Schroeder Nature's Way Tree Service, LLC City of Kent 1019 184th Ave Ct E 220 Fourth Avenue South Lake Tapps, WA 98391 Kent, WA 98032 (253) 856-5600 (telephone) 253-740-4669 (telephone) (253) 856-6600 (facsimile) N/A (facsimile) PUBLIC WORKS AGREEMENT - 8 (Under$10K and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this �4 day of �'� , 20 . By: For: C j w o, 5 eN sc%--LLL Title: U\-�Jw,*-� Date: q- q ' (—F00 EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of , 20 By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 X i � iT -A Estimate sheet Nature's Way Tree Service, LLC Customer Information Irate 10191841hAveCtE CAA oQ I- zq -ZolS Lake Tapps W,4 98391 Z 19 Z5 253-740-4669 QL S I� � •tea Services (fours To Complete Oice (Pruning Tree evaluation Tree removal Other comments c-evv,wV4.\, a St. 1 A\C) kc-u_ 0 1na\1 s;dL � Cast- a`\ W 00 w.. �- (3 c�s�• o,i. 5� C, C .AV Sn �r ti�� \Qy5 a IT- Su6 total 600.oa Tax I S3 .. Total GS 7.00 EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. ACC) CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD013 `,�,/ 04/10/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s) PRODUCER CONTACT Don Young g Young Insurance Agency, LLC PHONE AICNo FXfi (253) 893-0011 FAX No (253) 893-0012 E-MAILADDRESS don@youngins.net PO Box 5340 INSURERS AFFORDING COVERAGE NAIC# Kent WA 98064- INSURERA St Paul Fire & Marine Ins Co. INSURED INSURER B Liberty Northwest Nature's Way Tree Service, LLC INSURER C 1019 184th Ave Ct E INSURER D INSURER E Lake Tapps WA 98391— INSURER COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR ADDLSUBR POLICY ERE TYPE OFINSURANCE INSR V= POLICY NUMBER MM DD VYYY POLICY LTR YYYV LIMITS A GENERAL LIABILITY ZGL10N07719 04/07/2013 4/07/2014 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $ 100,000 CLAIMS MADE Fx—�OCCUR / / / / MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER / / / / PRODUCTS-COMPrOP AGO $ 2,000,000 POLICY F-IRRCO LOD / / / / $ B AUTOMOBILE LIABILITY S54192707 03/14/201303/14/2014 COMBINED SINGLE LIMIT 1,000,000 X ANY AUTO / / / / BODILY INJURY(Per person) $ ALLOWNED SCHEDULED / / / / BODILY I NJURY(Per accident) $ AUTOS AUTOS NON OWNED / / / / PROPERTY DAMAGE $ HIRED AUTOS AUTOS Per accident UMBRELLA LIAB OCCUR / / / / EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE / / / / AGGREGATE $ DIED I I RETENTION$ / / / / $ WORKERS COMPENSATION / / / / WC TORY LIMIT BE AND EMPLOYERS'LIABILITY YIN ANY PROPRIETORIPARTNERrEXECUTIVE E L EACH ACCIDENT $ OFFICERIMEMBER EXCLUDED9 NIA (Mandatory In NH) / / / / E L DISEASE-EA EMPLOYE $ If yes,describe under DESCRIPTION OF OPERATIONS below / / / / E L DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,it more space is required) City of Kent is listed as an Additional Insured CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS City of Kent AUTHORIZED REPRESENTATIVE 499 West Gowe Kent WA 98032— ACORD 25(2010105) ©1988-2010 ACORD CORPORATION. All rights reserved. INS025 polooE)o1 The ACORD name and logo are registered marks of ACORD POLICY CHANGE ENDORSEMENT This endorsement summarizes the changes to your policy. All other terms of your policy not affected by these changes remain the same. How Your Policy Is Changed General Liability The following form has been added: ' Form#G0323 (12/1997) ADDITIONAL PROTECTED PERSONS ENDORSEMENT - CONTRACTORS GENERAL LIABILITY - NOT INCLUDING COMPLETED WORK Premium Change Which Is Due Now Additional premium --- Returned premium If Issued after the date your policy -----------_________ begins, these spaces must be completedSERVICE, and our representative must sign below. Authorized Representative ---------- Endorsement takes effect: -_04/07/13-- ; Policy number: cZGL-10N07719-13-47 ',------------------------- = Processing date: �04/10J13 14:08 0021 40704 Ed. 6-84 Endorsement 0 1984 The Travelers Indemnity Company. All rights reserved. Page ADDITIONAL PROTECTED PERSONS ENDORSEMENT - CONTRACTORS GENERAL LIABILITY - NOT INCLUDING COMPLETED WORK This endorsement changes your Contractors Commercial General Liability Protection, How Coverage Is Changed Architect, engineer, or surveyor professional services includes: There are two changes which are described • the preparation or approval of maps, below. drawings, opinions, reports, surveys, change orders, designs, or 1. The following Is added to the Who Is specification; and Protected Under This Agreement section. • supervisory, Inspection, or engineering This change adds certain protected services. persons and limits their protection. 2. The following Is added to the Other Additional protected person. The person or primary Insurance section. This change organization named below is an broadens coverage. additional protected person as required by a contract or agreement entered Into We'll consider this Insurance to be by you. But only for covered injury or primary to and non-contributory with the damage arising out of: insurance issued directly to the additional • your work for that person or protected persons listed below if: organization; • your contract specifically requires that • premises you own, rent, or lease from we consider this insurance to be that person or organization; or primary or primary and non- • your maintenance, operation, or use equipment teased from that person orr contributory insurance; or• you request before a loss that we organization. consider this insurance to be primary or primary and non-contributory We explain what we mean by your work Insurance. In the Products and completed work total limit section. Other Terms If the additional protected person is an All other terms of your policy remain the architect, engineer, or surveyor, we won't same. cover Injury or damage arising out of the performance or failure to perform architect, engineer, or surveyor professional services. Person Or Organization: City of Kent; 499 Gowe St. Kent, WA 98032 ------------------ Name of Insured ______ (__Effective Date -04/07/13 ;______ Palicy_ Number_L2GL----ft -- _-- - ! , NATURE'S WAY TREE SERVICE, LLC ' Processing Date `04/10/13 - 14:05 002; G0323 Rev. 12-97 Endorsement ® 1997 The Travelers Indemnity Company. All rights reserved. Page 1 of 1 Page 1 of 18 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 3/28/2013 County Trade Job Classification Wage Holiday Overtime Note King Asbestos Abatement Workers Journey Level $40.83 5D 1 H King Boilermakers Journey Level $62 34 5N 1C King Brick Mason Brick And Block Finisher $42.21 5A 1M King Brick Mason Journey Level $49.07 5A 1M King Brick Mason Pointer Caulker Cleaner $49.07 5A 1M t 'King Building Service Employees Janitor $19.981 55 2F King Building Service Employees Traveling Waxer/shampooer $20.39 5S 2F King Building Service Employees Window Cleaner (Scaffold) $24.52 5S 2F King Building Service Employees Window Cleaner(non-scaffold) $23.66 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $49.57 5D 1M King Carpenters Bridge, Dock And Wharf $49.57 5D I I Carpenters King Carpenters Carpenter $49.57 5D 1M King Carpenters Carpenters on Stationary Tools $49.70 5D 1M King Carpenters Creosoted Material $49.67 5D 1M King Carpenters Floor Finisher $49.571 5D 1M King Carpenters Floor Layer $49.57 5D 1M King Carpenters Scaffold Erector $49.57 5D 1M King Cement Masons Journey Level $50.13 7A 1M 'King Divers Et Tenders Diver $100.28 5D 1M 8A King Divers Et Tenders Diver On Standby $56.68 5D 1M King Divers Et Tenders Diver Tender $52.23 5D 1 M King Divers 8 Tenders Surface Rcv Et Rov Operator $52.23 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $48.67 5A 1 B Tender King Dredge Workers Assistant Engineer $51.37 5D 3G King Dredge Workers Assistant Mate(deckhand) $50.861 5D 3G 3 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 2of18 King Dredge Workers Boatmen $51.371 5D 3G King Dredge Workers Engineer Welder $51.42 5D 3G King Dredge Workers Leverman, Hydraulic $52 99 5D 3G King Dredge Workers Maintenance $51.11 5D 3G ,King Dredge Workers Mates $51.37 5D 3G King Dredge Workers Oiler $50.99 5D 3G King Drywall Applicator Journey Level $49.74 5D 1H King Drywall Tapers Journey Level $49.79 5P 1 E King Electrical Fixture Maintenance Journey Level $25.34 5L 1E Workers '_King Electricians - Inside Cable Splicer $64.24 7C 2W King Electricians - Inside Cable Splicer (tunnel) $69.07 7C 2W King Electricians - Inside Certified Welder $62 04 7C 2W King Electricians - Inside Certified Welder (tunnel) $66.65 7C 2W King Electricians - Inside Construction Stock Person $34.19 7C 2W King Electricians - Inside Journey Level $59.85 7C 2W King Electricians - Inside Journey Level (tunnel) $64.24 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 i King Electricians - Powerline Cable Splicer $64.95 5A 4A Construction King Electricians - Powerline Certified Line Welder $59.37 5A 4A i Construction King Electricians - Powerline Groundperson $42.16 5A 4A Construction t King Electricians - Powerline Head Groundperson $44.50 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A Construction Operator King Electricians - Powerline Jackhammer Operator $44.50 5A 4A Construction B King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A Construction King Electricians - Powerline Line Equipment Operator $49.95 5A 4A Construction King Electricians - Powerline Pole Sprayer $59.37 5A 4A Construction iKing Electricians - Powerline Powderperson $44.50 5A 4A a Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $77.70 7D 4A King Elevator Constructors Mechanic In Charge $84.24 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $14.60 5B 2K Products Work Only !King Fence Erectors Fence Erector $15.18 1 King Flaegers Journey Level $34.61 7A E2YKing Glaziers Journey Level $52.76 7L https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 3of18 IKing Heat Et Frost Insulators And Journeyman $56.93 5J 1S Asbestos Workers King Heating Equipment Mechanics Journey Level $68.52 7F 1E King Hod Carriers Et Mason Tenders Journey Level $42.11 7A 2Y King Industrial Power Vacuum Journey Level $9.24 1 i Cleaner ; 'King Inland Boatmen Boat Operator $52.32 5B 1K King Inland Boatmen Cook $48.891 5B 1 K KKing Inland Boatmen Deckhand $48.96 5B 1K King Inland Boatmen Deckhand Engineer $49 95 5B 1K King Inland Boatmen Launch Operator $51.16 5B 1 K King Inland Boatmen Mate $51 16 5B 1K King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 ( Sewer Et Water Systems By 3 Remote Control ;King Insulation Applicators Journey Level $49 57 5D 1M King Ironworkers Journeyman $59.02 7N 10 ; IKing Laborers Air, Gas Or Etectric Vibrating $40.83 7A 2Y i Screed King Laborers Airtrac Drill Operator $42.11 7A 2Y King Laborers Ballast Regular Machine $40.83 7A 2Y King Laborers Batch Weighman $34.61 7A 2Y King Laborers Brick Pavers $40.83 7A 2Y King Laborers Brush Cutter $40.83 7A 2Y King Laborers Brush Hog Feeder $40.83 7A 2Y King Laborers Burner $40.83 7A 2Y 'King Laborers Caisson Worker $42.11 7A 2Y King Laborers Carpenter Tender $40.83 7A 2Y King Laborers Caulker $40.83 7A 2Y King Laborers Cement Dumper-paving $41.59 7A 2Y King Laborers Cement Finisher Tender $40.83 7A 2Y King Laborers Change House Or Dry Shack $40.83 7A 2Y King Laborers Chipping Gun (under 30 Lbs.) $40.83 7A 2Y King Laborers Chipping Gun(30 Lbs And $41.59 7A 2Y Over) https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/28/2013 Page 4 of 18 King Laborers Choker Setter $40.831 7A 2Y !King Laborers Chuck Tender $40.83 7A 2Y King Laborers Clary Power Spreader $41.59 7A 2Y King Laborers Clean-up Laborer $40 83 7A 2Y King Laborers Concrete Dumper/chute $41.59 7A 2Y Operator King Laborers Concrete Form Stripper $40.831 7A 2Y King Laborers Concrete Placement Crew $41.591 7A 2Y King Laborers Concrete Saw Operator/core $41.59 7A 2Y Driller King Laborers Crusher Feeder $34.61 7A 2Y King Laborers Curing Laborer $40.83 7A 2Y King Laborers Demolition: Wrecking 8 Moving $40.83 7A 2Y (incL. Charred Material) King Laborers Ditch Digger $40.83 7A 2Y King Laborers Diver $42.11 7A 2Y King Laborers Drill Operator $41.59 7A 2Y (hydraulic,diamond) King Laborers Dry Stack Walls $40.83 7A 2Y King Laborers Dump Person $40.831 7A 2Y King Laborers Epoxy Technician $40.831 7A 2Y King Laborers Erosion Control Worker $40.83 7A 2Y King Laborers Faller Ft Bucker Chain Saw $41.59 7A 2Y King Laborers Fine Graders $40.83 7A 2Y King Laborers Firewatch $34.61 7A 2Y King Laborers Form Setter $40.83 7A 2Y King Laborers Gabian Basket Builders $40.83 7A 2Y King Laborers General Laborer $40.83 7A 2Y ;King Laborers Grade Checker Et Transit $42.11 7A 2Y Person King Laborers Grinders $40.83 7A 2Y King Laborers Grout Machine Tender $40.831 7A 2Y King Laborers Groutmen (pressure)including $41.59 7A 2Y Post Tension Beams King Laborers Guardrail Erector $40.831 7A 2Y King Laborers Hazardous Waste Worker (level $42.11 7A 2Y A) King Laborers Hazardous Waste Worker (level $41.59 7A 2Y B) BKing Laborers Hazardous Waste Worker (level $40.83 7A 2Y C) King Laborers High Scaler $42.11 7A 2Y King Laborers Jackhammer $41.591 7A 2Y King Laborers Laserbeam Operator $41 59 7A 2Y King Laborers Maintenance Person $40.83 7A 2Y King Laborers Manhole Builder-mudman $41.59 7A 2Y https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 5 of 18 King Laborers Material Yard Person $40.831 7A 2Y ,King Laborers Motorman-dinky Locomotive $41.591 7A 2Y King Laborers Nozzleman (concrete Pump, $41.59 7A 2Y Green Cutter When Using Combination Of High Pressure Air & Water On Concrete Et Rock, Sandblast, Gumte, Shotcrete, Water Bla ;King Laborers Pavement Breaker $41.59 7A 2Y King Laborers Pilot Car $34.61 7A 2Y King Laborers Pipe Layer Lead $42.11 7A 2) King Laborers Pipe Layer/tailor $41.59 7A 2Y King Laborers Pipe Pot Tender $41.591 7A 2Y King Laborers Pipe Refiner $41.59 7A 2Y 'King Laborers Pipe Wrapper $41.59 7A 2Y `King Laborers Pot Tender $40.83 7A 2Y King Laborers Powderman $42.11 7A 2Y King Laborers Powderman's Helper $40.83 7A 2Y King Laborers Power Jacks $41.591 7A 2Y a King Laborers Railroad Spike Puller - Power $41.59 7A 2Y King Laborers Raker - Asphalt $42.11 7A 2Y King Laborers Re-timberman $42.11 7A 2Y King Laborers Remote Equipment Operator $41.59 7A 2Y 'King Laborers Rigger/signal Person $41.59 7A 2Y King Laborers Rip Rap Person $40.83 7A 2Y King Laborers Rivet Buster $41 59 7A 2Y King Laborers Rodder $41.59 7A 2Y King Laborers Scaffold Erector $40.83 7A 2Y King Laborers Scale Person $40.83 7A 2Y King Laborers Sloper (over 20") $41.59 7A 2Y King Laborers SLoper Sprayer $40.83 7A 2Y King Laborers Spreader (concrete) $41.59 7A 2Y King Laborers Stake Hopper $40.83 7A 2Y King Laborers Stock Piler $40.83 7A 2Y `King Laborers Tamper 8 Similar Electric, Air $41.59 7A 2Y Et Gas Operated Tools (King Laborers Tamper (multiple Et Self- $41.59 7A 2Y propelled) :King Laborers Timber Person - Sewer (lagger, $41.59 7A 2Y Shorer 8 Cribber) (King Laborers Toolroom Person (at Jobsite) $40.83 7A 2Y King Laborers Topper $40.831 7A 2Y King Laborers Track Laborer F$40.83 7A 2Y King Laborers Track Liner (power) 7A 2Y King Laborers Traffic Control Laborer 7A 2Y 8RKing Laborers Traffic Control Supervisor 7A 2Y 8R https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/28/2013 Page 6 of 18 lKing Laborers Truck Spotter $40.83 7A 2Y King Laborers Tugger Operator $41.59 7A 2Y King Laborers Tunnel Work-Compressed Au $55.89 7A 2Y 8D i Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $60.92 7A 2Y Worker 30.01-44.00 psi °King Laborers Tunnel Work-Compressed Air $64.60 7A 2Y Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $70.30 7A 2Y Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Au $72.42 7A 2Y S Worker 60.01-64 00 psi King Laborers Tunnel Work-Compressed Air $77.52 7A 2Y 8� Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Au $79.42 7A 2Y 8D Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $81.42 7A 1H 8D Worker 70.01-72 00 psi King Laborers Tunnel Work-Compressed Air $83.42 7A 1H 8D Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y 8D Tender 'King Laborers Tunnel Work-Miner $42.21 7A 2Y 8D King Laborers Vibrator $41.591 7A 2Y King Laborers Vinyl Seamer $40.83 7A 2Y King Laborers Watchman $31.46 7A 2Y King Laborers Welder $41.59 7A 2Y King Laborers Well Point Laborer $41.59 7A 2Y King Laborers Window Washer/cleaner $31.46 7A 2Y King Laborers - Underground Sewer General Laborer Et Topman $40.83 7A 2Y Et Water =King Laborers - Underground Sewer Pipe Layer $41.59 7A 2Y 8 Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers 'King Landscape Construction Landscape Equipment $28.17 1 i Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $49.74 5D 1 H King Marble Setters Journey Level $49 07 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 =King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $50.67 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 7of18 King Modular Buildings Electrician $11.56 1 :King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9 40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $36.53 6Z 2B :King Pile Driver Journey Level $49.82 5D 1M King Plasterers Journey Level $48 23 7G 1 R <King Playpround £t Park Equipment Journey Level $9.19 1 Installers ,King Plumbers at Pipefitters Journey Level $71.69 6Z 1G King Power EguipMg0j Operators Asphalt Plant Operators $52.19 7A 3C 8P King Power Equipment Operators Assistant Engineer $48.92 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $51.70 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $51.70 7A 3C 8P ; Concrete King Power Equipment Operators Bobcat $48.92 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $48.92 7A 3C 8P Equipment i King Power Equipment Operators Brooms $48.92 7A 3C 8P King Power Equipment Operators Bump Cutter $51.70 7A 3C 8P King Power Equipment Operators Cableways $52.19 7A 3C 8P King Power Equipment Operators Chipper $51.701 7A 3C 8P King Power Equipment Operators Compressor $48.92 7A 3C 8P , King Power Equipment Operators Concrete Pump: Truck Mount $52.19 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $48.92 7A 3C 8P Screed r King Power Equipment Operators Concrete Pump - Mounted Or $51.28 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $51.70 7A 3C 8P With Boom Attachment Up To 42m King Power Eauipment Operators Conveyors $51.28 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $51.70 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 20 Tons Through 44 $51.70 7A 3C 8P Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators Cranes: 100 Tons Through 199 $52.74 7A 3C 8P I Tons, Or 150' Of Boom i (including Jib With 1 King Power Equipment Operators Cranes: 100 Tons Through 199 $52.74 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWageIookup.aspx 3/28/2013 Page 8 of 18 Tons, or 150'of boom I (including jib with i attachments); Overhead, bridge type, 100 tons and over; Tower crane up to 175' in # height, base to boom. King Power Equipment Operators Cranes- 200 Tons To 300 Tons, $53.31 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $52.19 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $48.92 7A 3C 8P Under i King Power Equipment Operators Cranes: Friction 100 Tons $53.31 7A 3C 8P Through 199 Tons ,King Power Equipment Operators Cranes. Friction Over 200 Tons $53.87 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $53.87 7A 3C 8P Of Boom (including Jib With Attachments) 'King Power Equipment Operators Cranes: Through 19 Tons With $51.28 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $51 70 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $51.70 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $52.19 7A 3C 8P King Power Equipment Operators Dozer Quad 9, HD 41, D10 and $52.19 7A 3C 8P t Over King Power Equipment Operators Dozers D-9 Et Under $51.28 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $51.28 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $51.70 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $48.92 7A 3C 2P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $51.70 7A 3C 8P Gamaco £t Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $51.28 7A 3C 8P With Attachments King Power Eauipment Operators Forklifts- Under 3000 Lbs. With $48.92 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $51.70 7A 3C 8P l Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $48.92 7A 3C 8P King Power Equipment Operators Guardrail Punch $51.70 7A 3C 8P King Power Equipment Operators Guardrail Punch/Auger $51.70 7A 3C 8P -King Power Equipment Operators Hard Tail End Dump $52 19 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/28/2013 Page 9 of 18 lKing Power Equipment Operators Hard Tail End Dump $51.70 7A 3C 8P , Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $51.28 7A 3C 8P Locator !King Power Equipment Operators Horizontal/directional Drill $51.70 7A 3C 8P " Operator King Power Equipment Operators Hydralifts/boom Trucks Over $51.28 7A 3C 8P I 10 Tons ;King Power Equipment Operators Hydralifts/boom Trucks, 10 $48.92 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $52.74 7A 3C 8P ! Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $52.19 7A 3C 8P Not Including 8 Yards ,King Power Equipment Operators Loaders, Overhead Under 6 $51.70 7A 3C 8P Yards t King Power Equipment Operators Loaders, Plant Feed $51.70 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $51.28 7A 3C 8P ' King Power Equipment Operators Locomotives, All $51.70 7A 3C 8P King Power Equipment Operators Material Transfer Device $51.70 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $52.74 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Mixers: Asphalt Plant $51.70 7A 3C 8P " King Power Equipment Operators Motor Patrol Grader - Non- $51.28 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $52.19 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $52.19 7A 3C 2P Drill, Boring, Road Header l And/or Shield King Power Equipment Operators Oil Distributors, Blower $48.92 7A 3C 2P I Distribution 8 Mulch Seeding I Operator King Power Equipment Operators Outside Hoists (elevators And $51.28 7A 3C 8P Man lifts), Air Tuggers,strato ;King Power Equipment Operators Overhead, Bridge Type Crane: $51.70 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $52.74 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $52.19 7A 3C 8P £ Tons Through 99 Tons 'King Power Equipment Operators Pavement Breaker $48.92 7A 3C 8P ?King Power Equipment Operators Pile Driver (other Than Crane $51.70 7A 3C 8P p Mount) King Power Equipment Operators Plant Oder - Asphalt, Crusher $51.28 7A 3C 2 King Power Equipment Operators Posthole Digger, Mechanical $48.92 7A 3C 8P King Power Equipment Operators Power Plant $48.92 7A 3C 8P King jPower Equipment Operators Pumps - Water $48.92 7A 3C 8P t King Power Equipment operators Quad 9, Hd 41, DI And Over $52.19 7A 3C 8P ! https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 10 of 18 r King Power Equipment Operators Quick Tower- No Cab, Under $48.92 7A 3C 8P 100 Feet In Height Based To Boom 'King Power Equipment Operators Remote Control Operator On $52.19 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $48.92 7A 3C 8P King Power Equipment Operators Rollagon $52.19 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $48.92 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $51.28 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $51.70 7A 3C 8P King Power Equipment Operators Saws - Concrete $51.281 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $51.70 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $51.28 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $52.19 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $51.28 7A 3C 8P King Power Equipment Operators Shotcrete/gumte Equipment $48.92 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $51.28 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe. $52.19 7A 3C 813 r Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $51.70 7A 3C 8P Tractors. 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $52.74 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons p King Power Equipment Operators Shovel, Excavator, Backhoes $53.31 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Shpform Pavers $52.19 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et $52.19 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $51.70 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $51.28 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $53 31 7A 3C 8P Height, Base To Boom `King Power Equipment Operators Tower Crane Up To 175' In $52.74 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $52.19 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $51.28 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $51.70 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $51.28 7A 3C 8P 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $51.70 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 11 of 18 King Power Eauipment Operators Welder $52.191 7A 3C 8P King Power Eauipment Operators Wheel Tractors, Farman Type $48.92 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $51.70 7A 3C 8P iKing Power Equipment Operators- Asphalt Plant Operators $52.19 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Assistant Engineer $48.92 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Barrier Machine (zipper) $51.70 7A 3C 8P a Underground Sewer Et Water 1King Power Equipment Operators- Batch Plant Operator, $51.70 7A 3C 8P i I Underground Sewer Et Water Concrete King Power Eauipment Operators- Bobcat $48.92 7A 3C 8P t Underground Sewer Et Water ; $King Power Eauipment Operators- Brokk - Remote Demolition $48.92 7A 3C 8P ` Underground Sewer Et Water Equipment King Power Eauipment Operators- Brooms $48.92 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Bump Cutter $51.70 7A 3C 8P Underground Sewer Et Water ?King Power Eauipment Operators- Cableways $52.19 7A 3C 8P Underground Sewer Et Water 3King Power Equipment Operators- Chipper $51.70 7A 3C 8P ' Underground Sewer Et Water King Power Equipment Operators- Compressor $48.92 7A 3C 8P ' Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $52.19 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 a M King Power Eauipment Operators- Concrete Finish Machine -laser $48.92 7A 3C 8P Underground Sewer Et Water Screed %King Power Eauipment Operators- Concrete Pump - Mounted Or $51.28 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line i Pump, Pump High Pressure. ;King Power Equipment Operators- Concrete Pump: Truck Mount $51.70 7A 3C 8P s Underground Sewer Et Water With Boom Attachment Up To 42m ,King Power Equipment Operators- Conveyors $51.28 7A 3C 8P Underground Sewer Et Water i King Power Eauipment Operators- Cranes: 20 Tons Through 44 $51.70 7A 3C 8P << Underground Sewer Et Water Tons With Attachments =King Power Eauipment Operators- Cranes 20 Tons Through 44 $51 70 7A 3C 2P Underground Sewer Et Water Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Eauipment Operators- Cranes 100 Tons Through 199 $52.74 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom (including Jib With King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $53.31 7A 3C 8P Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) i https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 12 of 18 King Power Equipment Operators- Cranes: 45 Tons Through 99 $52.19 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) ;King Power Equipment Operators- Cranes: A-frame - 10 Tons And $48.92 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $53.31 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes- Friction Over 200 Tons $53.87 7A 3C 8P Underground Sewer Et Water tKing Power Equipment Operators- Cranes: Over 300 Tons Or 300' $53.87 7A 3C 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) !King Power Equipment Operators- Cranes: Through 19 Tons With $51.28 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $51.70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $51.70 7A 3C 8P Underground Sewer Et Water (power) 'King Power Equipment Operators- Derricks, On Building Work $52.19 7A 3C 8P Underground Sewer Et Water -King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $52.19 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Dozers D-9 Et Under $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $51.28 7A 3C 8P Underground Sewer Et Water Or Crane Mount Iz King Power Equipment Operators- Drilling Machine $51.70 7A 3C 8P Underground Sewer Et Water ro King Power Equipment Operators- Elevator And Man-lift: $48.92 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $51.70 7A 3C 2P l Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $51 28 7A 3C 8P Underground Sewer Et Water With Attachments !King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48.92 7A 3C 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $51 70 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc !King Power Equipment Operators- Gradechecker/stakeman $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $51.70 7A 3C 8P Underground Sewer Et Water .King Power Equipment Operators- Guardrail Punch/Auger $51.70 7A 3C 8P i Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $52.19 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards Et Over King Power Equipment Operators- Hard Tail End Dump $51.70 7A I 3C 8P Underground Sewer Et Water Articulating Off-road s � https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 13 of 18 1 Equipment Under 45 Yards i King Power Eauipment operators- Horizontal/directional Drill $51.28 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $51.70 7A 3- 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydrahfts/boom Trucks Over $51.28 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydrahfts/boom Trucks, 10 $48.92 7A 3C 8P Underground Sewer Et Water Tons And Under King Power Eauipment operators- Loader, Overhead 8 Yards. Et $52.74 7A 3C 8P Underground Sewer Et Water Over Y King Power Equipment Operators- Loader, Overhead, 6 Yards. But $52.19 7A 3C 8P Underground Sewer Et Water Not Including 8 Yards g 'King Power Equipment Operators- Loaders, Overhead Under 6 $51.70 7A 3C 8P Underground Sewer Et Water Yards 'King Power Equipment Operators- Loaders, Plant Feed $51.70 7A 3C 8P Underground Sewer Et Water k King Power Equipment Operators- Loaders: Elevating Type Belt $51.28 7A 3C 8P ; Underground Sewer Et Water w King Power Equipment Operators- Locomotives, All $51.70 7A 3C 8P Underground Sewer Et Water § King Power Equipment Operators- Material Transfer Device $51.70 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Mechanics, All (leadmen - $52.74 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) ; King Power Equipment Operators- Mixers: Asphalt Plant $51.70 7A 3C 8P t Underground Sewer Et Water lKing Power Equipment Operators- Motor Patrol Grader - Non- $51.28 7A 3C 8P Underground Sewer Et Water finishing 'King Power Equipment Operators- Motor Patrol Graders, Finishing $52.19 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $52.19 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $48.92 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator ;King Power Equipment Operators- Outside Hoists (elevators And $51 28 7A 3C 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $51.70 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $52.74 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $52.19 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $51.70 7A 3C 8P Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $51.28 7A 3C 8P i https://fortress.wa.gov/InI/wagelookup/prvWagelookup.aspx 3/28/2013 Page 14 of 18 Underground Sewer It Water 1 1 King Power Equipment Operators- Posthole Digger, Mechanical $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10And Over $52.19 7A 3C 8P Underground Sewer Et Water i King Power Equipment Operators- Quick Tower - No Cab, Under $48.92 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To a Boom i King Power Equipment Operators- Remote Control Operator On $52.19 7A 3C 8P l Underground Sewer Et Water Rubber Tired Earth Moving i Equipment King Power Equipment Operators- Rigger And Bellman $48.92 7A 3C 8P t Underground Sewer Et Water King Power Equipment Operators- Rotlagon $52.19 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $48.92 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $51.28 7A 3C 8P t Underground Sewer Et Water Materials King Power Equipment Operators- Rota-milt, Roto-grinder $51.70 7A 3C 8P Underground Sewer 8t Water King Power Equipment Operators- Saws - Concrete $51.28 7A 3C 8P Underground Sewer 8: Water King Power Equipment Operators- Scraper, Self Propelled Under $51.70 7A 3C 8P Underground Sewer It Water 45 Yards 'King Power Equipment Operators- Scrapers - Concrete Et Carry All $51.28 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Scrapers, Self-propelled: 45 $52.19 7A 3C 8P x Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $51.28 7A 3C 8P Underground Sewer Et Water I s King Power Equipment Operators- Shotcrete/gunite Equipment $48.92 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators. Shovel , Excavator, Backhoe, $51.28 7A 3C 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe• $52.19 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $51.70 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons IKing Power Equipment Operators. Shovel, Excavator, Backhoes: $52.74 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons hKing Power Equipment Operators- Shovel, Excavator, Backhoes: $53.31 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $52.19 7A 3C 2 ; https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 15 of 18 F Underground Sewer Et Water 'King Power Equipment Operators- Spreader, Topsider a $52.19 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $51 70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $51 28 7A 3C 8P Underground Sewer Et Water mKing Power Eauipment Operators- Tower Crane Over 175'in $53.31 7A 3C 8P E Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $52.74 7A 3C 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $52.19 7A 3C 8P Underground Sewer Et Water Truck Type King Power Eauipment Operators- Trenching Machines $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $51.70 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $51.28 7A 3C 8P Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $51.70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Welder $52.19 7A 3C 8P Underground Sewer Et Water i sKing Power Equipment Operators- Wheel Tractors, Farman Type $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $51.70 7A 3C 8P Underground Sewer Et Water i King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A Trimmers i King Power Line Clearance Tree Spray Person $40.73 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A Trimmers ¢King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A Trimmers i King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A Trimmers King Refrigeration Et Air Journey Level $70.46 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $49.07 5A 1M :King Residential Carpenters Journey Level $28.201 1 ;King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $38.60 5D 1M King Residential Drywall Tapers Journey Level $49.79 5P 1 E King Residential Electricians JOURNEY LEVEL $30.44 1 a King Residential Glaziers Journey Level $35.10 7L 1 H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers liourney Level $23.03 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/28/2013 Page 16 of 18 King Residential Marble Setters Journey Level $24.091 1 King Residential Painters Journey Level $24.46 1 `King Residential Plumbers Et Journey Level $34.69 1 I Pipefitters I !King Residential Refrigeration Et Air Journey Level $70.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41 30 7F 1 R Workers King Residential Soft Floor Lavers Journey Level $41.78 5A 3D King Residential Sprinkler Fitters Journey Level $40.81 5C 2R (Fire Protection) i King Residential Stone Masons Journey Level $49.07 5A 1M King Residential Terrazzo Workers Journey Level $45.43 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $43.90 5A 1R King Roofers Using Irritable Bituminous $46.90 5A I Materials King Sheet Metal Workers Journey Level (Field or Shop) $68.52 7F 1 E King Shipbuilding Et Ship Repair Boilermaker $39.66 7M 1H King Shipbuilding Et Ship Repair Carpenter $38.24 70 3B r King Shipbuilding Et Ship Repair Electrician $37.82 70 3B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $56.93 5J 1S King Shipbuilding Et Ship Repair Laborer $36.78 70 3B King Shipbuilding Et Ship Repair Machinist $37.81 70 3B King Shipbuilding Et Ship Repair Operator $40.15 70 3B King Shipbuilding Et Ship Repair Painter $37.81 70 36 King Shipbuilding Et Ship Repair Pipefitter $37.77 70 3B King Shipbuilding Et Ship Repair Rigger $37.76 70 3B King Shipbuilding Et Ship Repair Sandblaster $36.78 70 3B King Shipbuilding Et Ship Repair Sheet Metal $37.74 70 3B King Shipbuilding Et Ship Repair Shipfitter $37.76 70 3B King Shipbuilding Et Ship Repair Trucker $37.61 70 3B King Shipbuilding Et Ship Repair Warehouse $37.65 70 3B King Shipbuilding Et Ship Repair Welder/Burner $37.76 70 3B King Sign Makers Et Installers Sign Installer $22.92 1 (Electrical) King Sign Makers Et Installers Sign Maker $21.36 1 (Electrical) King Sign Makers Et Installers (Non- Sign Installer $27 28 1 Electrical) King Sign Makers Et Installers (Non- Sign Maker $33.25 1 t Electrical) King Soft Floor Lavers Journey Level $41.78 5A 3D King Solar Controls For Windows Journey Level $12.44 1 a https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 17 of 18 King Sprinkler Fitters (Fire Journey Level $69.59 5C 1x Protection) King Stage Rie¢in¢Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $49.07 5A 1M King Street And Parkin Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $51.28 7A 3C 8P Surveyor ;King Surveyors Chamman $50.76 7A 3C 8P King Surveyors Construction Site Surveyor $52.19 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction Cable Splicer $35.09 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $19.22 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $33.63 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $35.09 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer it $34.37 5A 2B Outside !King Telephone Line Construction - Telephone Equipment Operator $35.09 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $32.62 5A 2B Outside (Light) King Telephone Line Construction - Telephone Lineperson $32.62 5A 2B Outside King Telephone Line Construction - Television Groundperson $18.65 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B Outside (King Telephone Line Construction - Television System Technician $29.42 5A 2B Outside King Telephone Line Construction - Television Technician $26.43 5A 2B Outside IKing Telephone Line Construction - Tree Trimmer $32.95 5A 2B Outside King Terrazzo Workers Journey Level $45.43 5A 1M King Tile Setters Journey Level $21 651 1 ,King Tile, Marble Et Terrazzo Finisher $37 76 5A 1B Finishers :King Traffic Control Stripers Journey Level $41.53 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $47.91 5D 3A 8L 3 WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D 3A 8L WA-Joint Council 28) !King Truck Drivers Dump Truck Et Trailer $47.91 5D 3A 8L https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Page 18 of 18 !King Truck Drivers Dump Truck (W. WA-Joint $47.07 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $47 91 5D 3A 8L Council 28) 'King Truck Drivers Transit Mixer $43.23 1 King Well Drillers £t Irrigation Pump Irrigation Pump Installer $17.71 1 Installers `King Well Drillers £t Irrigation Pump Oiler $12.97 1 Installers King Well Drillers 8t Irngation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 3/28/2013 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 �*assaa��**a***s�«+�*«�e�**rsr:«»s.*�+«ss:r►��a�*+*ss�*r+rs�*�*�a*ass*+**s+***«***�*s+*ax*:«**�r*�.*sax*�+*s+ Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker.On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly late of the cost of fringe benefits actually provided for the worker 1 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-I IALF TIMES THE HOURLY RATE OF WAGE B All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. The first two(2)hours after eight(8) regulai hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage D The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the how ly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage E The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Satw day. and all hours worked on Sundays and holidays shall be paid at double the houly rate of wage F. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10) hours on Saturday shall he paid at one and one-half times the how ly i ate of wage All other overtime hours worked,except Laboi Day, shall be paid at double the hourly late of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage G. The first ten(10) hours worked on Saturdays and the first ten(10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the houly late o1 wage All hours-worked in excess of ten(10) hours per day Monday through Saturday and all hows worked on Sundays and holidays shall be paid at double the hour ly rate of wage H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment bieakdowm)shall be paid at one and one-half times the hourly late of wage All hours worked Monday through Sariuday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage J. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage K All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 1 Benefit Code Key— Effective 3-3-2013 thru 8-30-2013 1 N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage O. The first ten (10) hours worked on Saturday shall be paid at one and one-half tiles the hourly rate of wage All hours worked on Sundays,holidays and after twehe(12)hours,Monday through Fuday and after ten (10) hours on Saturday shall be paid at double the hourly rate of wage P All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage Q The first two (2) hours aver eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly late of wage All hours wvoiked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Chustmas day)shall be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times the how ly iate of wage R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage S The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays and all other overtime hours worked except Labor Day, shall be paid at double the hourly late of wage All hours worked on Labor Day shall be paid at thi ec times the hourly late of wage U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly late of wage V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hoary rate of wage All horns worked on Thanksgiving Day and Chustmas day shall be paid at double the hoi ly i ate of wage W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-halt times the hourly rate of wage All hold s worked on holiday, shall be paid at double the hourly rate of wage X The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly late of wage All hours worked over twelve (12) hours Monday through Saturday. Sundays and holidays shall be paid at double the hourly late of wage When holiday falls on Saturday or Sunday,the day before Saturday,Friday and the day after Sunday Monday, shall be considered the holiday and all work perfoimed shall be paid at double the hourly Late of wage Y All hours worked outside the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage (except for employees who are absent from work without prior approval on a scheduled workday doling the workweek shall be paid at the straight-time late until they have worked 8 hours in a day (10 in a 4 x 10 wotkwcek)or 40 hours during that workweek) All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage Z All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pap 2 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID A'[ ONE'AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at wo and one-half times the hourly rate ofwagc including holiday pay H All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. K All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay O All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage R All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked over 12 hours in a day of on Sundays and holidays shall be paid at double the hourly rate of wage W. The first two(2)hours after eight(8)regular hours Monday thiough Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly late of wage Alt other hours worked Monday through Saturday. and all houis woi kcd on Sundays and holidays shall he paid at double the hourly rate of wage On a loui-day, ten-hout weekly schedule,either Monday thin Thursday of I uesday thru Friday schedule,all hours woiked after ten shall be paid at double the hourly rate of wage '1 he first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage All other houis woiked on the fifth,sixth,and seventh days and on holiday s shall be paid at double the hourly Late of wage Y. All hours worked on Saturdays(except for make-up days)shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Satuiday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hour ly late of wage 3 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hout shifts are established,of foity(40)houis of straight time per week,Monday through Fuday,of outside the normal shift,and all work on Saturdays shall be paid at time and one-half the stiaight time rate Hours worked over twelve houis(12)in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time late of pay Any shift starting betty een the hours of 6 00 pm and midnight shall receive an additional one dollai ($1 00)per horn foi all houis woiked that shift The employer shall have the sole discretion to assign overtime work to employees Pi unary considetation for overtime work shall be given to employees regularly assigned to the woik to be performed on overtime situations After an employee has woiked eight(8)hours at an applicable overtime iate,all additional houis shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more 3 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 3. B The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid atone and one-half times the hourly late of wage All hours worked over twelve(12)hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established of forty(40)hours of straight time per week,Monday through Friday,of outside the noimal shift.and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6 00 pm Saturday to 5 00 am Monday and Holidays shall be paid at double the hourly rate of wage After an employee has worked eight(8)hours at an applicable oveitimc late,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)houi s of more D. All hours wwked between 6 00 pm Monday through 6 00 am Saturday,shall be paid at an overtime rate of 15% over the hourly rate of wage All other hours woi ked aftci 6 00 am on Sahu day s,shall be paid at one and one-half times the hourly iate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage E All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the how ly wage i ate G Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts arc established,or forty(40)hours of sti aight time per w eek,Monday through Fi iday.,and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked oN cr twelve hows(12) in a single shift and all work peifor coed after 8 00 am Sunday to 8 00 am Monday and Holidays shall be paid at double the straight time late of pay After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall beat the applicable ovcitime rate until such time as the employee has had a bi eak of tight(8) hours or more 4 AT L HOURS WORKED IN EXCESS OF EiGHT (8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONL-HALF TIMES I HE IIOURLY RAI L OF WAGE A All hows worked in excess of eight(8)hours per day of for ty(40)hours per week shall be paid at double the hourly i ate of wage All hours worked on Saturdays Sundays and holiday s shall be paid at double the hourly rate of wage Holiday Codes 5 A Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7) B Holidays. New Year's Day, Memorial Day, independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day.the day before Christmas,and Christmas Day(8). C Holidays New Year's Day Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) D Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day. the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) H Holidays New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6) 4 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 5. 1 Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6) J Holidays New Year's Day, Memorial Day, Independence Day,Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9) L Holidays New Year's Day, Martin Luther King Ji Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day.And Christmas Day (8) N. Holidays New Year's Day, Presidents' Day, Memorial Day. Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The F'i iday After Thanksgiving Day,And Chi istnias Day (9) P Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Chustmas, And Christmas Day (9) If A Holiday Falls On Sunday, The Followmg Monday Shall Be Considered As A Holiday Q Paid holidays New Year's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day, and Christmas Day(6) R. Paid Holidays New Year's Day, Memorial Day Independence Day, Labor Day Thanksgiving Day, Day After Thanksgiving Day One-1 lalf Day Before Chustmas Day,And Chi stmas Day (7 112) S Paid Holidays- New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,And Christmas Day (7) T. Paid Holidays. New Year's Day, Washington's Buthday, Memorial Day, Independence Day, Laboi Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9) Z. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day (8) Holidav Codes Continued 6 A Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8) E Paid Holidays New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Day After Thanksgiving Day,Christmas Day,And A Half-Day On Christmas Eve Day (9 1/2) G, Paid Holidays-New Year's Day,Martin Luther King Jr Day,Presidents'Day,Memorial Day,Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day.Christmas Day And Christmas Eve Day(11) H. Paid Holidays New Year's Day, New Year's Eve Day, Memorial Day Independence Day, Labor Day, Thanksgiving Day, Friday After 'thanksgiving Day, Christmas Day The Day After Christmas, And A bloating Holiday(10) I Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7) 5 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 6 T. Paid Holidays New Year's Day, Presidents' Day, Memoual Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After "Ihanksgiving Day, The Last Working Day Before Christmas Day And Christmas Day (9) Z. Holidays New Year's Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday If a holiday falls on Sunday, the following Monday shall be considered as the holiday Holiday Codes Continued 7. A Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day. And Chustmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday It any of the listed holidays lalls on a Saturday,the preceding Friday shall be a regular work day B Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday C. Holidays- New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a Sunda} shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday D Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day Thanksgiving Day. the Friday after Thanksgiving Day, And Christmas Day (8) Unpaid Holidays President's Day Any paid holiday which trills on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday E. Hohdays New Year's Day Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the tollowing Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday F Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day. the Friday after Thanksgiving Day the last wroiking day before Christmas day and Chustmas day (8) Any holiday which falls on a Sunday shall be observed as a holiday, on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday G. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day.Thanksgiving Day, and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday H Holidays New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday I. Holidays New Year's Day,President s Day,Independence Day, Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday winch falls on a Saturday shall be observed as a holiday on the preceding Fi iday 6 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 7. J Holidays New Year's Day, Independence Day, Memorial Day, Labor Day,Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday K Holidays New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) An} holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the pieceding Friday L. Holidays New Year's Day,Memorial Day,Labor Day, Independence Day, Thanksgiving Day, the Last Work Day betore Christmas Day, And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday M Paid Holidays New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day Labor Day Thanksgiving Day,the Fi iday after Thanksgiving Day,Christmas Day, And the Day after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Satuiday shall be observed as a holiday on the preceding Friday N. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday When Christmas falls on a Saturday,the pi eeeding Friday shall be observed as a holiday O. Paid Holidays New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day Labor Day Thanksgiving Day, The Friday Ater"Ihanksgiving Day, Christmas Day, The Day After Or Before Christmas Day, And The Employees Birthday 11) Any holiday which falls on a Sunday shall be obscived as a holiday on the following Monday Any holiday which tails on a Saturday shall be observed as a holiday on the preceding Friday P Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the tollowing Monday Q Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on a Sunday shall be obseived as a holiday on the following Monday It any of the listed holidays falls on a Saturday, the preceding F r iday shall be a regular woi k day R. Paid Holidays New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day and the day aftei or before Cln istmas Day(10) If any of the listed holidays fall on Satui da),the preceding Friday shall be observed as the holiday If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly S. Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Chi istmas Day,The Day Aftet Christmas,And A Floating Holiday(9) If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be comidei ed a holiday and compensated accordingly Note Codes 8 A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or mole Over 50 To 100'-$2 00 per Foot for Each Foot Over 50 Feet Ovet 100'To 150'-S3 00 per Foot for Each Foot Ovet 100 Feet Ovei 150'To 220'-$4 00 per Foot for Each Foot Over 150 Feet Over 220'-$5 00 per Foot for Each Foot Over 220 Feet 7 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 C In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50'To ]00'-$] 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1 50 per Hoot foi Each Foot Ovei 100 Feet Ovet 150'1 o 200'-$2 00 per Fool for Each Foot Over 150 Feet Over 200'-Drvets May Name Their Own Pi ice D Workers working with supplied air on hazmat projects receive an additional $1 00 per hour L. Workers on hazmat projects receive additional hourb, premiums as follows-Level A- $0 75,Level B $0 50,And Level C $0 25 M. Workers on hazmat projects receive additional hourly premiums as follows Levels A&B $1 00,Levels C&D $0 50 N. Workers on hazmat projects receive additional hourly premiums as follows-Level A $1 00,Level B $0 75,Level C $0 50,And Level D $0 25. P Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit $2 00,Class B Suit $1 50,Class C Suit $1 00,And Class D Suit$0 50 Q The highest piessute registered on the gauge for an accumulated time of more than fifteen(15)minutes dw ing the shift shall be used in deteimmmg the scale paid R Effective August 31,2012—A Traffic Control Supervisor shall be present on the pi oject whenever flagging or spotting of other traffic control labor rs being utilized A fi affic Conti of Laborer perfoi ins the setup,maintenance and removal of all tempoiaiy traffic control devices and construction signs necessaiy to control vehiuilai,bicycle, and pedesU ran traffic dwmg construction operations Flaggers and Spotters shall be posted where shov�n on approved Traffic Control Plans or whet e directed by the Engineer All flaggers and spettei s shall possess a can ent flagging card issued by the State of Washington,Oregon,Montana,or Idaho These classifications are only effective on or after August 31 2012 S Effective August 31,2012—A Traffic Control Supervisor shall be present on the pioject whenever flagging or spotting of other traffic conti of labor is being utilized Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans of where duected by the Engmeei All flaggers and spotter s shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho Fhrs classification is only effective on of after August 31,2012 T Effective August 31,2012—A Traffic Control Laborer performs the setup maintenance and removal of all temporary uaffic control devices and construction signs necessar; to control vchiculat,bicycle,and pedestrian uaftic during construction operations Flaggers and Spotters shall be posted where shown on approved riatfic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31 2012 8