Loading...
HomeMy WebLinkAboutPW13-089 - Original - All City Fence Company - Guardrail Repair Kent Des Moines Road - 4/22/13 Records M a emen KENT WL9„,„GTGM Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: All City Fence Co. Vendor Number: ID Edwards Number Contract Number: 6�J 13-089 This Is assigned by City Clerk's Office Project Name: Repair damaged guardrail @ Pacific Hwy & Kent Des Moines Rd Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 4/22/13 Termination Date: 5/1/2013 Contract Renewal Notice (Days): N/A Number of days required notice for termination or renewal or amendment Contract Manager: Tom Rusbuldt Department: PWO - Streets Detail: (i.e. address, location, parcel number, tax id, etc.): Guardrail repair. 4 t i I s:Public\RecordsManagement\Forms\ContractCover\adcc7832 11/08 KENT PUBLIC WORKS AGREEMENT between City of Kent and All City Fence Co. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and All City Fence Co. organized under the laws of the State of Washington, located and doing business at 36 S Hudson Street Seattle, WA 98134 (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall repair the damaged handrail and patch damaged concrete wall located at Pacific Highway South & Kent Des Moines Road, in the South Bound Lane, West side of the road. For a copy of the Contractor's bid and pictures of the area to be repaired see the attached Exhibit A which is incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by May 1, 2013. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed $2,552.45, including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City's payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. A. Payment and Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a payment and performance bond for the full contract amount. PUBLIC WORKS AGREEMENT - 1 (Under$1OK and Performance Bond) B. Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of Contractor's signature on the Agreement. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Under$1OK and Performance Bond) E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events. A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City PUBLIC WORKS AGREEMENT - 3 (Under$1OK and Performance Bond) will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information. 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment PUBLIC WORKS AGREEMENT - 4 (Under$1OK and Performance Bond) for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. PUBLIC WORKS AGREEMENT - 5 (Under$10K and Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by PUBLIC WORKS AGREEMENT - 6 (Under$1OK and Performance Bond) filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. PUBLIC WORKS AGREEMENT - 7 (Under$10K and Performance Bond) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: By: &qnL-� �l' (signature)./-`, ', (signature) Prin ame: ►�Q� t- OX.4- Print Name: Bradley Lake Its "1Qavl( Its: Operations Manager (title) DATE: DATE: 3e2.(2.m t :3 NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Gene Claiborne Tom Rusbuldt All City Fence Co. City of Kent 36 S Hudson Street 220 Fourth Avenue South Seattle, WA 98134 Kent, WA 98032 206-324-3747 (telephone) (253) 856-5673 (telephone) 206-324-1508 (facsimile) (253) 856-6600 (facsimile) PUBLIC WORKS AGREEMENT - 8 (Under$1OK and Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this �� da of 6'L� !'i , 20 . By: /I ram, For: uc_ M Title: (96,s t XN 7- Date: VLI" 62—_ le)L5 EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of , 20 By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 FS cc ALL Pv-1 I %P& 36 South Hudson Street- Seattle, WA gal 34 • Phone (206) 324-3747. Fax(206) 324-1608 Bonded and Insured " Contractor Registration No.ALLClOF927KW Proposal a-nd Customer Phone Numbers City Of Kent Home Business 253- W5673 ^Attu Tam Rusbatdt Fax CeII/Pager 253-508-2050 5821 S 240th St Purchase Order# Pscifse tltwy S&Ymnt-Des-Moins Rd West Side of Rd South Bound Kent Ws 98032 Job Address - trusbuldy�q kentwa.gov We propose to install on your property the fencing materials listed below subject to the TERMS AND CONDITIONS ON THE REVERSE SIDE OF THIS PROPOSAL AND CONTRACT Chain Link Specifications Wood Fence Specifications FENCE HEIGHT 42` FENCE HEIGHT FABRIC SELVAGE HANDRAIL FENCE STYLE _ SIZE 1 GAUGE OF WIRE MATERIAL GRADE _ 1 LINEAL FOOTAGE 13' LINEAL FOOTAGE LINE POST SIZE J TYPE 2 3181' DO 40 POST SIZE LINE POST DEPTH 1 ADAPTION Core Drilled POST TYPE _ TOP RAIL SIZE I TYPE 2 31$*M__ 4p POST SPACING ,_ POST DEPTH ENDICORNER POST SIZEIiYPE 2 318" DQ 40 RAIL SIZE � ENDICORNER POST DEPTH Core Drilled RAIL TYPE _. - GATE POST SIZE I TYPE BOARD SIZE, GATE SIZE I DESIGN BOARDS SPACED GATE FRAME SIZE I MATERIAL BOARDS FACED GATE POST SIZE I TYPE FENCE CONTOUR GATE SIZE I DESIGN GATE SIZE I TYPE GATE FRAME SIZE I MATERIAL GATE SIZE i TYPE BARBED WIRE OTHER TENSION WIRE I BRACES 3-1 7/9"Mid rails TAX RATE 9.50°l0 ' SLATS PRICE $2,331.00 OTHER Paint all field welds with zinc STATE SALES TAX 4 _$221.44 rich primer and paintmm TOTAL 52,552.45 TERMS Net 30 Days ry Cash or Check Specials- Labor and Material to Install Fence per Attached: Customer to Clear and/or Show Fence Line Labor and Material to Install Hand rail per Attached: Patch damaged concrete wall aprox 4' +- THIS PROJECT COMES WITH A THREE YEAR WARRANTY ON MATERIALS AND LABOR Please visit us on the web at wsfrw.allcltvfence corn All City Fence Co., Inc. PURCHASER ACCEPTS THIS PROPOSAL BY Cene Claiborne 2876 3/25/2013 AGREEING TO THE I ERMS ON i HV - AND Reoresentative — DATE SIGNING IN THE SPACE PROVIDED. EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. ALLCITY-01 AMYLUDWIG CERTIFICATE OF LIABILITY INSURANCE F DATD/(YYY) 2/15/215/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder to lieu of such endorsement(s) PRODUCER CONTACT NAME _ _ ICaledonian Insurance Group,Inc. PHONE 1 (206)232-9870 FAX 1 206 232-9515 PO Box 60 A c No Ext _ _ (AIX,No) ( ) Mercer Island,WA 98040-0060 E MAIL ADDRESS INSURER(S)AFFORDING COVERAGE NAIC# INSURERA Security National Ins Co INSURED INSURER B Koch Holdings Inc dba All City Fence Co INSURER C 36 South Hudson Street INSURER D Seattle,WA 98134 INSURER E INSURER F COVERAGES CERTIFICATE NUMBER REVISION NUMBER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR IAD L BR POLICY EFF POLICYEXP LTR TYPE OF INSURANCE I INSR WVD POLICY NUMBER MM/DD/YYYY MMIDD LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00 A X COMMERCIAL GENERAL LIABILITY X SPP1004850-03 5/19/2012 5/19/2013 PREMISES Ea occurrence $ 100,00 CLAIMS-MADE 1XI OCCUR MED EXP(Any one person) $ 10,000, PERSONAL&ADV INJURY $ 1,000,00 _ GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY X PECTRO LOC $ _ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,U0U Ea accident) $ A JX ANY AUTO SPP1004850-03 5/19/2012 5/19/2013 BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS HIRED AUTOS NON-OWNED PROPERTYDAMAGE $ AUTOS Per axident X UMBRELLA LIAB X OCCUR EACH OCCURRENCE S 4,000,000 A EXCESSLIAB CLAIMS-MADE SMB1004861-03 5/19/2012 5/19/2013 AGGREGATE S LIED X RETENTION$ _ _ Aggregate $ 4,000,000 WORKERS COMPENSATION WC STATU- X OTH- AND EMPLOYERS'LIABILITY TORY LIMITS ER A ANY PROPRIETOR/PARTNER/EXECUTIVE YIN SPP1004850-03 5/19/2012 5/19/2013 E L EACH ACCIDENT S 1,000,000 OFFICER/MEMBER EXCLUDED? C NIA -- (Mandatory in NH) E L DISEASE-EA EMPLOYLq $ 1,000,000 f yes describe under DESCRIPTION OF OPERATIONS below EL DISEASE-POLICY LIMIT 1 5 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,U more space is required) RE Hoise Replacement City of Kent is additional insured as required by written contract per attached endorsement CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City Of Kent THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Public Works Operations ACCORDANCE WITH THE POLICY PROVISIONS 2220 4th Avenue South Kent,WA 98032-5895 AUTHORIZED REPRESENTATIVE , t ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD I Policy: SPP1004850 03 COMMERCIAL GENERAL LIABILITY CG 20 33 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU This endorsement modifies insurance provided under the following COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured any person or or- additional insureds, the following additional exclu- ganization for whom you are performing operations sions apply when you and such person or organization have This insurance does not apply to- agreed in writing in a contract or agreement that such person or organization be added as an addi- 1. "Bodily injury", "property damage" or "personal tional insured on your policy Such person or or- and advertising injury" arising out of the render- ganization is an additional insured only with re- ing of, or the failure to render, any professional spect to liability for "bodily injury", "property architectural, engineering or surveying servic- damage" or "personal and advertising injury" es, including caused, in whole or in part, by a. The preparing, approving, or failing to pre- 1. Your acts or omissions, or pare or approve, maps, shop drawings, opi- nions, reports, surveys, field orders, change 2. The acts or omissions of those acting on your orders or drawings and specifications, or behalf, b. Supervisory, inspection, architectural or in the performance of your ongoing operations for engineering activities the additional insured 2. "Bodily injury" or "property damage" occurring A person's or organization's status as an additional after insured under this endorsement ends when your operations for that additional insured are com- a. All work, including materials, parts or pleted equipment furnished in connection with such work, on the project (other than ser- vice, maintenance or repairs) to be per- formed by or on behalf of the additional in- sured(s) at the location of the covered operations has been completed, or b. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontrac- tor engaged in performing operations for a principal as a part of the same project CG 20 33 07 04 ©ISO Properties, Inc , 2004 Page 1 of 1 RLI• PRLIO Box CompanyIPOWER OF ATTORNEY P O Rox 3967 Peoria IL 61612-3967 Phone.(309)692-1000 Fax,(309)683-1610 RLI Insurance Company Bond No. LSM0416909 Know All Men by These Presents: That the RLI Insurance Company a corporation organized and existing under the laws of the State of Illinois and authorized and licensed to do business in all states and the Distuct of Columbia does hereby make, constitute and appoint: Elizabeth Erickson in the City of Mercer Island ,State of Washington as Attorney in Fact with full power and authority heteby conferred upon him/her to sign, execute,acknowledge and deliver for and on its behalf as Surety,in general,any and all bonds,undeitakrngs,and recognizances in an amount not to exceed Five Hundred Thousand and00/100 Dollats ( $ 500,000.00 ) for any single obligation,and specifically for the following desci ibed bond " Principal: Koch Holdings Inc DBA All City Fence Co Obligee: City of Kent Type Bond: Performance and Payment Bond Bond Amount: S 2,388.20 The RLI Insurance Company further certifies that the following is a true and exact copy of a Resolution adopted by the Board of Directors of RLI Insurance Company and now in force to-wit: "All bonds, policies, undertakings, Powers of Attorney of other obligations of the corporation shall be executed in the corporate name of the Company by the President,Secretary,any Assistant Secretary,Treasurer,or any Vice President,or by such other officers as the Board of Directors may authorize. The President,any Vice President,Secretary,any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds,policies or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." IN WITNESS WHEREOF,the RLI Insurance Company has caused these presents to be executed by its Vice President with its coipoiate seal affixed this 21 st day of March 2013 "1011111111, ATTEST: 00\26`? Cc ,%,, RLI Insurance Company eQJ,• rpavoai .." - 0jj&' %M SEAL* Cynthia S.thm Assistant Secretary ..••. pF Roy C.Di Vice President u"JN On this 21st day of March 2013 before me,a Notary Public,persona red Roy C.Die and Qmthia S.Dohm who being by me duly sworn,acknowledged that they signed the above Power of Attorney as Vice President and Assistant Secielary ,respectively,of the said RLI Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation, "OFFICIAL SEAL" rwuc JACOUEIINE M BOCKLER Ja uelme M Bocl er Notary Public sum coanr,.a'. xaiassoxiau A0011011 RUsRLI P0Box396cCompaI PERFORMANCE BOND P O Box 3967 Peoria IL 61612-3967 Phone (309)692-1000 Fax (309)683-1610 Bond No. LSM0416909 KNOW ALL MEN BY THESE PRESENTS: That Koch oldi gs Inc DBA All City Fence Co (Here maert the name or legal pile of the cantrae.tor) 36 South Hudson St. Seattle.WA 99134 (Here invert the address of the contractor) as Principal,hereinafter called Contractor,and RLI Insurance Company ,an Illinois Corporation,as Surety,hereinafter called Surety,are held and firmly bound unto Cti riK e owner)ms 220 4th Ave S Kent,Washimaton 98032 as Obligee,hereinafter (Here insert the address of the owner) called Owner,in the amount of Two Thousand Three Hundred Eiphty Eight and 20/100 Dollars( $ 2,388.20 ),for the payment whereof Contractor and Surety bind themselves,then heirs,executors,administrators, successors and assigns,jointly and severally,firmly by these presents. WHEREAS,Contractor has by written agreement dated March 21,2013 entered into a Contract with Owner for Handrail in accordance with drawings and specifications prepared by (Full name of architect or engineer) which contract is by reference made a part hereof,and is hereafter referred to as the Contract NOW,THEREFORE,THE CONDITION OF THIS OBLIGATION is such that,if Contractor shall promptly and faithfully perform said Contract,then this obligation shall be null and void;otherwise it shall remain in full force and effect. Whenever Contractor shall be,and declared by Owner to be in default under the Contract,the Owner having performed Owner's obligation thereunder,the Surety may promptly remedy the default,or shall promptly 1. Complete the Contract in accordance with its terms and conditions,of 2. Obtain a bid or bids for submission to Owner for completing the Contract in accordance with its terms and conditions,and upon determination by Owner and Suiety of the lowest responsible bidder,art ange for a contract between such bidder and Owner and make available as work piogresses(even though there should be a default or a s uccession of defaults under the conhact of contracts of completion arranged tinder this paragraph)sufficient funds to pay the cost of completion less the balance of the contract price,but not exceeding,including others costs and damages for which the Surety may be liable hereundei,the amount set forth in the fiist paragraph hereof The term"balance of the contract puce,"as used in this paragraph,shall mean the total amount payable by Ownet to Contractor undet the Contract and any amendments thereto,less the amount pioperly paid by Owner to Contractor. Any suit under this bond must be instituted before the expilation of two(2)years from the date on which Contractor ceases work on the Contract. No right of action shall accrue on this bond to or for the use of any person or corpoiation other than the Owner named herein or the hens,executors,admimstiatots or successors of Owner Signed this 21st day of March A.D. 2013 Koch Holdings Inc D6A All City Fence Cc RLI Insurance Company (Puncipal) (Seal) U By Elizabeth Erickson Attomey In Fact C0031004.50,0 R`I® RLI Insurance Peoria Company LABOR AND MATERIAL PAYMENT P O Box 3967 Peoria IL 61612-3967 Phone (309)692-1000 Fax,(309)683-1610 BOND Bond No, LSM0416909 NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH ANOTHER BOND IN FAVOR OF THE OWNER CONDITIONED FOR THE FULL AND FAITHFUL PERFORMANCE OF THE CONTRACT KNOW ALL MEN BY THESE PRESENTS: That Koch Holdings Inc DBA All City Fence Co (Here Insert the name or legal Ulie of the contractor) 36 South Hudson St Seattle WA 98134 as (Here Insert the address of the contractor) Principal,hereinafter called Principal,and RLI Insurance Company an Illinois Corporation,as Surety,hereinafter called Surety,are held and firmly bound unto City of Kent (Here insert the name or legal title of the owner) 220 4th Ave S Kent Washington 98032 (Here Insert the address of the owner) as Obligee, hereinafter called Owner,for the use and benefit of claimants as hereinbelow defined,in the amount of Two Thousand Three Hundred Eighty Eight and 20/100 Dollars( $ 2,38820 ), for the payment whereof Principal and Surety bind themselves,their heirs,executors,administrators,successors and assigns,jointly and severally,firmly by these presents WHEREAS,Principal has by written agreement dated March 21,2013 entered Into a Contract with Owner for Handrail In accordance with drawings and specifications prepared by (Full name of architect or engineer) which contract is by reference made a part hereof,and is hereafter referred to as the Contract NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION Is that if the Principal shall prom tly make payment to all claimants as hereinafter defined, for all labor and material used or reasonably required for use in the performance ofpthe Contract, then this obligation shall be void,otherwise it shall remain in full force and effect,subject,however,to the following conditions 1 A claimant is defined as one having a direct contract with the Principal or with a sub-contractor of the Principal for labor, material, or both, used or reasonably required for use in the performance of the Contract,labor and material being construed to include that part of water,gas,power,light, heat,oil,gasoline,telephone service or rental of equipment directly applicable to the Contract 2. The above named Principal, and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined,who has not been paid in full before the expiration of a period of ninety(90)days after the dale on which the last of such claimant's work or labor was done or performed, or matenals were furnished by such claimant, may sue on this bond for the use of such claimant in the name of the Owner, prosecute the suit to final 1'udgment for such sum or sums as may be justly due claimant, and have execution thereon,provided,however,that the Owner shall not be liable for the payment of any costs or expenses of any such suit. 3 No suit or action shall be commenced hereunder by any claimant, (a) Unless claimant shall have given written notice to any two of the following The Principal,the Owner,or the Surety above named, within ninety(90)days after such claimant did or performed the last of the work or labor,or furnished the last of the materials for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed Such notice shall be served by mailing the same by registered mail, postage prepaid, in an envelope addressed to the Principal, Owner or Surety, at any place where an office Is regularly maintained for the transaction of business,or served in any manner in which legal process may be served in the state in which the aforesaid project is located,save that such service need not be made by a public officer (b) After the expiration of one(1)year following the date on which Claimant ceased work on said Contract. (c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state In which the Ps ro ect,or any part thereof is situated,or in the United States Distncl Court for the district In which the project or any part thereof, is tuated,and not elsewhere. 4. The amount of this bond shall be reduced by and to the extent of any payment of payments made in good faith hereunder,Inclusive of the payment by Surety of mechanics liens which may be filed or record against said improvements, whether or not claim for the amount of such lien be presented under and against this bond Signed this 21 st day of March A D, 2013 Koch Holdin s Inc DBA All Cit Fence Co RLI Insurance Company r nc pa ea BY Elizabeth Erickson Attorney In Fact C0027004-50,0 Page Iof18 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 4/2/13 160t Trade Job Classification Wage Holiday Overtime Notel ',King Asbestos Abatement Workers Journey Level $40.83 5D 1 H 'King Boilermakers Journey Level $62.34 5N 1C King Brick Mason Brick And Block Finisher $42.21 5A 1M King Brick Mason Journey Level $49.07 5A 1M King Brick Mason Pointer-Caulker-Cleaner $49.07 5A 1M King Building Service Emplovees Janitor $19.98 5S 2F `King Building Service Employees Traveling Waxer/shampooer $20.39 5S 2F =King Building Service Employees Window Cleaner (Scaffold) $24.52 5S 2F ;King Building Service Employees Window Cleaner(non-scaffold) $23.66 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $49.571 5D 1M i King Carpenters Bridge, Dock And Wharf $49.57 5D 1M Carpenters King Carpenters Carpenter $49.57 5D 1M King Carpenters Carpenters on Stationary Tools $49.70 5D 1M King Carpenters Creosoted Material $49.67 5D 1M l King Carpenters Floor Finisher $49.571 5D 1M rKing Carpenters Floor Layer $49.57 5D 1M =King Carpenters Scaffold Erector $49.57 5D 1M King Cement Masons Journey Level $50.13 7A 1M King Divers £t Tenders Diver $100.28 5D 1M 8A King Divers 8 Tenders Diver On Standby $56.68 5D 1M King Divers 1* Tenders Diver Tender $52.23 5D 1M King Divers It Tenders Surface Rcv £t Rov Operator $52.23 5D 1M King Divers It Tenders Surface Rcv Et Rov Operator $48.67 5A 1 B Tender King Dredge Workers Assistant Engineer $51.37 5D 3G King Dredge Workers Assistant Mate(deckhand) $50.86 5D 3G https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/8/2013 Page 2 of 18 King Dredge Workers Boatmen $51.371 5D 3G King Dredge Workers Engineer Welder $51.42 5D 315 King Dredge Workers Leverman, Hydraulic $52.99 5D 3G King Dredge Workers Maintenance $51.11 5D 3G King Dredge Workers Mates $51.37 5D 315 King Dredge Workers Oiler $50.99 5D 315 King Drywall Applicator Journey Level $49.74 5D 1 H King Drywall Tapers Journey Level $49.79 5P 1 E King Electrical Fixture Maintenance Journey Level $25.34 5L 1 E i Workers King Electricians - Inside Cable Splicer $64.24 7C 2W King Electricians - Inside Cable Splicer (tunnel) $69.07 7C 2W King Electricians - Inside Certified Welder $62.04 7C 2W -King Electricians - Inside Certified Welder (tunnel) $66.65 7C 2W King Electricians - Inside Construction Stock Person $34.19 7C 2W King Electricians - Inside Journey Level $59.85 7C 2W King Electricians - Inside Journey Level (tunnel) $64.24 7C 2W i King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $64.95 5A 4A i Construction King Electricians - Powerline Certified Line Welder $59.37 5A 4A Construction King Electricians - Powerline Groundperson $42.16 5A 4A Construction ; King Electricians - Powerline Head Groundperson $44.50 5A 4A Construction ,King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A Construction Operator King Electricians - Powerline Jackhammer Operator $44.50 5A 4A Construction King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A Construction King Electricians - Powerline Line Equipment Operator $49.95 5A 4A Construction i King Electricians - Powerline Pole Sprayer $59.37 5A 4A Construction King Electricians - Powerline Powderperson $44.50 5A 11 I a Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $77.70 7D 4A King Elevator Constructors Mechanic In Charge $84.24 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $14.60 5B 2K Products Work Only King Fence Erectors Fence Erector $15.18 1 King Flagpers Journey Level $34.61 7A 2Y King jGlaziers Journey Level $52.76 7L 1Y https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/8/2013 Page 3 of 18 )King Heat Et Frost Insulators And Journeyman $56.93 51 15 Asbestos Workers King Heating Equipment Mechanics Journey Level $68.52 7F 1 E King Hod Carriers Et Mason Tenders Journey Level $42.11 7A 2Y King Industrial Power Vacuum Journey Level $9.24 1 Cleaner ;King Inland Boatmen Boat Operator $52.32 5B 1K ? King Inland Boatmen Cook $48.89 5B 1 K King Inland Boatmen Deckhand $48.96 5B 1K King Inland Boatmen Deckhand Engineer $49.95 5B 1K King Inland Boatmen Launch Operator $51.16 5B 1K King Inland Boatmen Mate $51.16 5B 1K ' King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer £t Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer £t Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 Sewer £t Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer It Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By ' Remote Control King Insulation Applicators Journey Level $49 57 5D 1M King Ironworkers Journeyman $59.02 7N 10 King Laborers Air, Gas Or Electric Vibrating $40.83 7A 2Y l Screed King Laborers Airtrac Drill Operator $42.11 7A 2Y King Laborers Ballast Regular Machine $40.83 7A 2Y E King Laborers Batch Weighman $34.61 7A 2Y P King Laborers Brick Pavers $40.83 7A 2Y King Laborers Brush Cutter $40.83 7A 2Y l King Laborers Brush Hog Feeder $40.83 7A 2Y King Laborers Burner $40.83 7A 2Y King Laborers Caisson Worker $42.11 7A 2Y King Laborers Carpenter Tender $40.83 7A 2Y King Laborers Caulker $40.83 7A 2Y King Laborers Cement Dumper-paving $41.59 7A 2Y King Laborers Cement Finisher Tender $40.83 7A 2Y King Laborers Change House Or Dry Shack $40.83 7A 2Y King Laborers Chipping Gun (under 30 Lbs.) $40.83 7A 2Y King Laborers Chipping Gun(30 Lbs. And $41.59 7A 2Y ° Over) d https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 4 of 18 King Laborers Choker Setter $40.831 7A I 2Y King Laborers Chuck Tender $40.83 7A 2Y King Laborers Clary Power Spreader $41.59 7A 2Y King Laborers Clean-up Laborer $40.83 7A 2Y King Laborers Concrete Dumper/chute $41.59 7A 2Y Operator King Laborers Concrete Form Stripper $40.83 7A 2Y King Laborers Concrete Placement Crew $41.59 7A 2Y King Laborers Concrete Saw Operator/core $41.59 7A 2Y Driller King Laborers Crusher Feeder $34.61 7A 2Y King Laborers Curing Laborer $40.83 7A 2Y King Laborers Demolition: Wrecking 8 Moving $40.83 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $40.83 7A 2Y King Laborers Diver $42.11 7A 2Y King Laborers Drill Operator $41.59 7A 2Y (hydraulic,diamond) King Laborers Dry Stack Walls $40.83 7A 2Y King Laborers Dump Person $40.83 7A 2Y King Laborers Epoxy Technician $40.83 7A 2Y ! King Laborers Erosion Control Worker $40.831 7A 2Y King Laborers Faller Et Bucker Chain Saw $41.591 7A 2Y King Laborers Fine Graders $40.831 7A 2Y King Laborers Firewatch $34.61 7A 2Y King Laborers Form Setter $40.83 7A 2Y King Laborers Gabian Basket Builders $40.83 7A 2Y `King Laborers General Laborer $40.83 7A 2Y EKing Laborers Grade Checker Et Transit $42.11 7A 2Y Person King Laborers Grinders $40.83 7A 2Y King Laborers Grout Machine Tender $40.831 7A 2Y King Laborers Groutmen (pressure)including $41.59 7A 2Y i Post Tension Beams :King Laborers Guardrail Erector $40.83 7A 2Y :King Laborers Hazardous Waste Worker (level $42.11 7A 2Y A) ;King Laborers Hazardous Waste Worker (level $41.59 7A 2Y B) King Laborers Hazardous Waste Worker (level $40.83 7A 2Y C) King Laborers High Scaler $42.11 7A 2Y King Laborers Jackhammer $41.59 7A 2Y King Laborers Laserbea m Operator $41.59 7A 2Y King Laborers Maintenance Person $40 831 7A 2Y King Laborers Manhole Builder-mudman $41.591 7A 2Y https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 5 of 18 King Laborers Material Yard Person $40.831 7A 2Y King Laborers Motorman-dinky Locomotive $41.59 7A 2Y King Laborers Nozzleman (concrete Pump, $41.59 7A 2Y ) Green Cutter When Using Combination Of High Pressure Air It Water On Concrete Et Rock, Sandblast, Gumte, Shotcrete, Water Bla King Laborers Pavement Breaker $41.59 7A 2Y ) King Laborers Pilot Car $34.61 7A 2Y King Laborers Pipe Layer Lead $42.11 7A 2Y 'King Laborers Pipe Layer/tailor $41.59 7A 2Y King Laborers Pipe Pot Tender $41.59 7A 2Y King Laborers Pipe Reliner $41.59 7A 2Y King Laborers Pipe Wrapper $41.59 7A 2Y King Laborers Pot Tender $40.83 7A 2Y King Laborers Powderman $4211 7A 2Y King Laborers Powderman's Helper $40.83 7A 2Y S King Laborers Power Jacks $41.59 7A 2Y King Laborers Railroad Spike Puller - Power $41.59 7A 2Y King Laborers Raker - Asphalt $42.11 7A 2Y ;King Laborers Re-timberman $4211 7A 2Y King Laborers Remote Equipment Operator $41.59 7A 2Y King Laborers Rigger/signal Person $41.59 7A 2Y King Laborers Rip Rap Person $40.83 7A 2Y King Laborers Rivet Buster $41.59 7A 2Y King Laborers Rodder $41.59 7A 2Y King Laborers Scaffold Erector $40.83 7A 2Y King Laborers Scale Person $40.83 7A 2Y s King Laborers Sloper (over 20") $41.59 7A 2Y King Laborers Sloper Sprayer $40.83 7A 2Y King Laborers Spreader (concrete) $41.59 7A 2Y King Laborers Stake Hopper $40.83 7A 2Y King Laborers Stock Piler $40.83 7A 2Y King Laborers Tamper Et Similar Electric, Air $41.59 7A 2Y 8: Gas Operated Tools King Laborers Tamper (multiple Et Self- $41.59 7A 2Y propelled) King Laborers Timber Person - Sewer (lagger, $41.59 7A 2Y Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $40.83 7A 2Y 'King Laborers Topper $40.83 7A 2Y King Laborers Track Laborer $40.83 7A 2Y King Laborers Track Liner (power) $41.59 7A 2Y King Laborers Traffic Control Laborer $37.01 7A 2Y 8R King Laborers Traffic Control Supervisor $37.01 7A 2Y 8R https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 6of18 King Laborers Truck Spotter $40.83 7A 2Y King Laborers Tugger Operator $41.59 7A 2Y King Laborers Tunnel Work-Compressed Air $55.89 7A 2Y 8D l Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $60.92 7A 2Y 8� f Worker 30.01-44.00 psi :King Laborers Tunnel Work-Compressed Air $64.60 7A 2Y Q Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $70.30 7A 2Y 8g Worker 54.01-60.00 psi r King Laborers Tunnel Work-Compressed Air $72.42 7A 2Y 8D Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $77.52 7A 2Y 8D Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $79.42 7A 2Y 8Q Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $81.42 7A 1H 8D T Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $83 42 7A 1H 8D Worker 72.01-74.00 psi l F King Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y 88 Tender t ,King Laborers Tunnel Work-Miner $42.21 7A 2Y King Laborers Vibrator $41.59 7A 2Y King Laborers Vinyl Seamer $40.83 7A 2Y King Laborers Watchman $31.46 7A 2Y King Laborers Welder $41.59 7A 2Y King Laborers Well Point Laborer $41.59 7A 2Y King Laborers Window Washer/cleaner $31.46 7A 2Y King Laborers - Underground Sewer General Laborer Et Topman $40.83 7A 2Y Et Water King Laborers - Underground Sewer Pipe Layer $41.59 7A 2Y Et Water ,King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers ;King Landscape Construction Landscape Equipment $28.17 1 g Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers l ng Lathers Journey Level $49.74 5D 1H King Marble Setters Journey Level $49.07 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shoo) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 `King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $50.67 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 7 of 18 King Modular Buildings Electrician $11.56 1 ' King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $36.53 6Z 2B King Pile Driver Journey Level $49.82 5D 1M King Plasterers Journey Level $48.23 7Q 1 R King Playground £t Park Equipment Journey Level $9.19 1 Installers ;King Plumbers 8 Pipefitters Journey Level $71.69 6Z 115 !King Power Equipment Operators Asphalt Plant Operators $52.19 7A 3C 8P ' King Power Equipment Operators Assistant Engineer $48.92 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $51.70 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $51.70 7A 3C 8P Concrete .King Power Equipment Operators Bobcat $48.92 7A 3C 8P iKing Power Equipment Operators Brokk - Remote Demolition $48.92 7A 3C 8P s Equipment King Power Equipment Operators Brooms $48.92 7A 3C BP King Power Equipment Operators Bump Cutter $51.70 7A 3C 8P King Power Equipment Operators Cableways $52.19 7A 3C 8P i King Power Equipment Operators Chipper $51.70 7A 3C 8P King Power Equipment Operators Compressor $48.92 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $52.19 7A 3C 8P With Boom Attachment Over 42 M King Power Eauipment Operators Concrete Finish Machine -laser $48.92 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $51.28 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $51.70 7A 3C 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $51.28 7A 3C 8P ;King Power Equipment Operators Cranes- 20 Tons Through 44 $51.70 7A 3C 8P Tons With Attachments 'King Power Equipment Operators Cranes: 20 Tons Through 44 $51.70 7A 3C 8P 1 Tons With Attachments i Overhead, Bridge Type Crane. 20 Tons Through 44 Tons `King Power Equipment Operators Cranes: 100 Tons Through 199 $52.74 7A 3C 8P 3 Tons, Or 150' Of Boom (including Jib With King Power Equipment Operators Cranes: 100 Tons Through 199 $52.74 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 8of18 Tons, or 150' of boom (including pb with attachments); Overhead, bridge type, 100 tons and over; Tower crane up to 175' in height, base to boom. King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $53.31 7A 3C 8P i Or 250' Of Boom (including Jib With Attachments) f King Power Equipment Operators Cranes: 45 Tons Through 99 $52.19 7A 3C 8P t Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $48.92 7A 3C 8P Under King Power Equipment Operators Cranes: Friction 100 Tons $53.31 7A 3C 8P € Through199 Tons 'King Power Equipment Operators Cranes: Friction Over 200 Tons $53.87 7A I 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $53.87 7A 3C 8P ` Of Boom (including Jib With s Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $51.28 7A 3C 8P Attachments A-frame Over 10 s Tons !King Power Equipment Operators Crusher $51.70 7A 3C 8P - King Power Equipment Operators Deck Engineer/deck Winches $51.70 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $52.19 7A 3C 8P King Power Equipment Operators Dozer Quad 9, HD 41, D10 and $52.19 7A 3C 8P Over 9 King Power Equipment Operators Dozers D-9 Et Under $51.28 7A 3C 8P King Power Equipment Operators Drill Oilers- Auger Type, Truck $51.28 7A 3C 8P Or Crane Mount € King Power Equipment Operators Drilling Machine $51.70 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $48.92 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $51.70 7A 3C 8P Gamaco ft Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $51.28 7A 3C 8P With Attachments P $King Power Equipment Operators Forklifts: Under 3000 Lbs With $48.92 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $51.70 7A 3C 8P Prints, Cut Sheets, Etc f King Power Equipment Operators Gradechecker/stakeman $48.92 7A 3C 8P King Power Equipment Operators Guardrail Punch $51.70 7A 3C 8P King Power Equipment Operators Guardrail Punch/Auger $51.70 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $52.19 7A 3C 8P ! Articulating Off- Road Equipment 45 Yards. Et Over https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 9of18 !King Power Equipment Operators Hard Tail End Dump $51.70 7A 3C 8P Articulating Off-road Equipment Under 45 Yards lKing Power Equipment Operators Horizontal/directional Drill $51.28 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $51 70 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $51.28 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $48.92 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $52.74 7A 3C 8P Over !King Power Equipment Operators Loader, Overhead, 6 Yards. But $52.19 7A 3C 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $51.70 7A 3C 8P Yards King Power Equipment Operators Loaders, Plant Feed $51.70 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $51.28 7A 3C 8P King Power Equipment Operators Locomotives, All $51.70 7A 3C 8P King Power Equipment Operators Material Transfer Device $51.701 7A 3C 8P ` King Power Equipment Operators Mechanics, ALI (leadmen - $52.74 7A 3C 8P ; $0.50 Per Hour Over Mechanic) King Power Equipment Operators Mixers: Asphalt Plant $51.70 7A 3C 8P King Power Equipment Operators Motor Patrol Grader - Non- $51.28 7A 3C 8P j finishing ,King Power Equipment Operators Motor Patrol Graders, Finishing $52.19 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $52.19 7A 3C 8P Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $48.92 7A 3C 8P ` Distribution 8 Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $51.28 7A 3C 8P Manhfts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $51.70 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $52.74 7A 3 - 8P Tons And Over ;King Power Equipment Operators Overhead, Bridge Type: 45 $52.19 7A 3C 8P ; Tons Through 99 Tons `King Power Equipment Operators Pavement Breaker $48.92 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $51.70 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $51.28 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $48.92 7A 3C 8P King Power Equipment Operators Power Plant $48.92 7A 3C 8P King Power Equipment Operators Pumps - Water $48.92 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $52.19 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 10 of 18 King Power Equipment Operators Quick Tower- No Cab, Under $48.92 7A 3C 8P ; 100 Feet In Height Based To i Boom King Power Equipment Operators Remote Control Operator On $52.19 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $48.92 7A 3C 8P King Power Equipment Operators RoRagon $52.19 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $48.92 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $51.28 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $51.70 7A 3C 8P King Power Equipment Operators Saws - Concrete $51.28 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $51.70 7A 3C 8P 45 Yards 'King Power Equipment Operators Scrapers - Concrete Et Carry All $51.28 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $52.19 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $51.28 7A 3C 8P d King Power Equipment Operators Shotcrete/gumte Equipment $48.92 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $51.28 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $52.19 7A 3C 8P } Over 30 Metric Tons To 50 Metric Tons .King Power Equipment Operators Shovel, Excavator, Backhoes, $51.70 7A 3C 8P , Tractors: 15 To 30 Metric Tons i King Power Equipment Operators Shovel, Excavator, Backhoes: $52.74 7A 3C 8P ' Over 50 Metric Tons To 90 Metric Tons =King Power Equipment Operators Shovel, Excavator, Backhoes: $53.31 7A 3C 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $52.19 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et $52.19 7A 3C 8P I Screedman `King Power Equipment Operators Subgrader Trimmer $51.701 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $51.28 7A 3C 8P ;King Power Equipment Operators Tower Crane Over 175'in $53.31 7A 3C 8P Height, Base To Boom =King Power Equipment Operators Tower Crane Up To 175' In $52.74 7A 3C 8P ` Height Base To Boom 'King Power Equipment Operators Transporters, All Track Or $52.19 7A 3C 8P i Truck Type i King Power Equipment Operators Trenching Machines $51.28 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $51.70 7A 3C 8P Tons And Over =King Power Equipment Operators Truck Crane Oiler/driver Under $51.28 7A 3C 8P 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $51.70 7A 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 11of18 `King Power Equipment Operators Welder $52.191 7A 3C I 8P I King Power Equipment Operators Wheel Tractors, Farmall Type $48.92 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $51 70 7A 3C 8P 'King Power Equipment Operators- Asphalt Plant Operators $52.19 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $51.70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $51.70 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $48.92 7A 3—C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $48.92 7A 3C 8P Underground Sewer Et Water Equipment ; E King Power Equipment Operators- Brooms $48.92 7A 3C 8P j Underground Sewer Et Water I King Power Equipment Operators- Bump Cutter $51.70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $52.19 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $51.70 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Compressor $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $52.19 7A 3C 8P , Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $48.92 7A 3C 8P ; Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $51.28 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $51.70 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.70 7A 3C 8P ( Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.70 7A 3C 8P Underground Sewer Et Water Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Cranes: 100 Tons Through 199 $52.74 7A 3C 8P i Underground Sewer Et Water Tons, Or 150' Of Boom l (including Jib With King Power Equipment Operators- Cranes- 200 Tons To 300 Tons, $53.31 7A 3C 8P Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 12 of 18 King Power Equipment Operators- Cranes: 45 Tons Through 99 $52.19 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $48.92 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $53.31 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $53.87 7A 3C 8P Underground Sewer Es Water z i King Power Equipment Operators- Cranes- Over 300 Tons Or 300' $53.87 7A 3C 8P Underground Sewer a Water Of Boom (including Jib With Attachments) lKing Power Equipment Operators- Cranes: Through 19 Tons With $51.28 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 I Tons King Power Equipment Operators- Crusher $51.70 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Deck Engineer/deck Winches $51.70 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $52.19 7A 3C 8P Underground Sewer Et Water s King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $52.19 7A 3C 8P Underground Sewer Et Water Over ;King Power Equipment Operators- Dozers D-9 Et Under $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $51.28 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $51.70 7A 3C 8P Underground Sewer Et Water -King Power Equipment Operators- Elevator And Man-lift: $48.92 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type ; King Power Equipment Operators- Finishing Machine, Bidwell And $51.70 7A 3C 8P t Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $51.28 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48.92 7A 3C 8P Underground Sewer Et Water Attachments 'King Power Equipment Operators- Grade Engineer: Using Blue $51.70 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc ;King Power Equipment Operators- Gradechecker/stakeman $48.92 7A 3C 8P ; Underground Sewer 8 Water King Power Equipment Operators- Guardrail Punch $51.70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch/Auger $51.70 7A 3C 8P ` Underground Sewer Et Water King Power Equipment Operators. Hard Tail End Dump $52.19 7A 3C 8P ` Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $51.70 7A 3C 8P t Underground Sewer Et Water Articulating Off-road ; https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/8/2013 Page 13 of 18 Equipment Under 45 Yards ;King Power Eauipment Operators- Horizontal/directional Drill $51.28 7A 3C 8P Underground Sewer Et Water Locator g 'King Power Equipment Operators- Horizontal/directional Drill $51.70 7A 3C 8P Underground Sewer 8t Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $51.28 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydratifts/boom Trucks, 10 $48.92 7A 3C 8P ? ' Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $52.74 7A 3C 8P Underground Sewer Et Water Over =King Power Equipment Operators- Loader, Overhead, 6 Yards. But $52.19 7A 3C 8P Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $51.70 7A 3C 8P " Underground Sewer Et Water Yards ;King Power Equipment Operators- Loaders, Plant Feed $51.70 7A 3C 8P Underground Sewer Et Water s King Power Equipment Operators- Loaders: Elevating Type Belt $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $51.70 7A 3C 8P n Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $51.70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, ALl (leadmen - $52.74 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Mixers: Asphalt Plant $51.70 7A 3C 8P ' Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Grader - Non- $51.28 7A 3C 8P Underground Sewer Et Water finishing King Power Equipment operators- Motor Patrol Graders, Finishing $52.19 7A 3C 8P Underground Sewer 8 Water iKing Power Equipment Operators- Mucking Machine, Mote, Tunnel $52.19 7A 3C 8P , Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $48.92 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $51.28 7A 3C 8P , Underground Sewer Et Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $51.70 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons s King Power Eauipment Operators- Overhead, Bridge Type: 100 $52.74 7A 3C 8P ' Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $52.19 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $48 92 7A 3C 8P Underground Sewer Et Water King Power Equipment operators- Pile Driver (other Than Crane $51.70 7A 3C 8P , Underground Sewer 8:Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $51.28 7A 3C 8P t i https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 14 of 18 9 Underground Sewer Et Water R King Power Equipment Operators- Posthole Digger, Mechanical $48.92 7A 3C 8P Underground Sewer Et Water i King Power Equipment Operators- Power Plant $48.92 7A 3C 8P ; Underground Sewer Et Water King Power Equipment Operators. Pumps - Water $48.92 7A 3C 8P Underground Sewer 8: Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $52.19 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $48.92 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To Boom `King Power Equipment Operators- Remote Control Operator On $52.19 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving i Equipment King Power Equipment Operators- Rigger And Bellman $48.92 7A 3C 8P Underground Sewer Et Water ,King Power Equipment Operators- RoUagon $52.19 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $51.28 7A 3C 8P Underground Sewer Et Water Materials King Power Eouipment Operators- Roto-mill, Roto-grinder $51.70 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $51.28 7A 3C 8P Underground Sewer Et Water =Kmg Power Equipment Operators- Scraper, Self Propelled Under $51.70 7A 3C 8P Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $52.19 7A 3C 8P : Underground Sewer 8: Water Yards And Over :King Power Equipment Operators- Service Engineers - Equipment $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $51.28 7A 3C 8P Underground Sewer 8:Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $52.19 7A 3C 8P ` Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $51.70 7A 3C 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes. $52.74 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons £King Power Equipment Operators- Shovel, Excavator, Backhoes: $53.31 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Shpform Pavers $52.19 7A 3C 8P 3 a ' a https://fortress.wa.gov/Ini/wagel00kup/prvWagelookUp.aspx 4/8/2013 Page 15 of 18 Undereround Sewer ft Water King Power Equipment Operators- Spreader, Topsider ft $52.19 7A 3C 8P ; Undereround Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $51.70 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Tower Bucket Elevators $51.28 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $53.31 7A 3C 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $52.74 7A 3C 8P Underground Sewer 8 Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $52.19 7A 3C 8P Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $51.28 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $51.70 7A 3C 8P Underground Sewer ft Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $51.28 7A 3C 8P ` Undereround Sewer It Water 100 Tons 'King Power Equipment Operators- Truck Mount Portable Conveyor $51.70 7A 3C 8P Undereround Sewer Et Water King Power Equipment Operators- Welder $52.19 7A 3C 8P Underground Sewer 8:Water King Power Equipment Operators- Wheel Tractors, Farman Type $48.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $51.70 7A 3C 8P Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A Trimmers King Power Line Clearance Tree Spray Person $40.73 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A i Trimmers i King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A Trimmers lKing Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A Trimmers !King Refrigeration ft Air Journey Level $70.46 6Z 1G Conditioning Mechanics 'King Residential Brick Mason Journey Level $49.07 5A 1M King Residential Carpenters Journey Level $28.20 1 °King Residential Cement Masons Journey Level $22.64 1 ;King Residential Drywall Applicators Journey Level $38.60 5D 1M King Residential Drywall Tapers Journey Level $49.79 5P 1 E King Residential Electricians JOURNEY LEVEL $30.44 1 King Residential Glaziers Journey Level $35.10 7L 1H ;King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/8/2013 Page 16 of 18 King Residential Marble Setters Journey Level $24.091 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers 8t Journey Level $34.69 1 Pip efitters ;King Residential Refrigeration Et Air Journey Level $70.46 6Z 113 Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41.30 7F 1 R Workers King Residential Soft Floor Lavers Journey Level $41.78 5A 3D King Residential Sprinkler Fitters Journey Level $40.81 5C 2R i (Fire Protection) King Residential Stone Masons Journey Level $49.07 5A 1M King Residential Terrazzo Workers Journey Level $45.43 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers IKing Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $43.90 5A 1R King Roofers Using Irritable Bituminous $46.90 5A 1R Materials King Sheet Metal Workers Journey Level (Field or Shop) $68.52 7F 1E King Shipbuilding l3 Ship Repair Boilermaker $39.661 7M 1 H King Shipbuilding Et Ship Repair Carpenter $38.24 70 3B King Shipbuilding Et Ship Repair Electrician $37.82 70 3B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $56.93 5J 1S King Shipbuilding Et Ship Repair Laborer $36.78 70 3B i ;King Shipbuilding Et Ship Repair Machinist $37.81 70 313 King Shipbuilding Et Ship Repair Operator $40.15 70 313 King Shipbuilding Et Ship Repair Painter $37.81 70 1 3B I King Shipbuilding Et Ship Repair Pipefitter $37 77 70 313 i King Shipbuilding Et Ship Repair Rigger $37.76 70 3B King Shipbuilding Et Ship Repair Sandblaster $36.78 70 313 ,King Shipbuilding Et Ship Repair Sheet Metal $37.74 70 3B 'King Shipbuilding Et Ship Repair Shipfrtter $37.76 70 3B King Shipbuilding Et Ship Repair Trucker $37.61 70 3B King Shipbuilding Et Ship Repair Warehouse $37.65 70 3B King Shipbuilding Et Ship Repair Welder/Burner $37.76 70 3B King Sign Makers Et Installers Sign Installer $22.92 1 ? (Electncall King Sign Makers Et Installers Sign Maker $21.36 1 (Electrical) King Sign Makers Et Installers (Non- Sign Installer $27.28 1 l Electrical )King Sign Makers li Installers (Non- Sign Maker $33.25 1 Electrical 'King Soft Floor Lavers Journey Level $41.78 5A 3D King Solar Controls For Windows Journey Level $12.44 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 17 of 18 IKing Sprinkler Fitters (Fire Journey Level $69.59 5C 1X Protection) King Stage Rining,Mechanics (Non Journey Level $13.23 1 Structurall i King Stone Masons Journey Level $49.07 5A 1M King Street And Parking, Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $51.28 7A 3C 8P ' Surveyor King Surveyors Chainman $50.76 7A 3C 8P King Surveyors Construction Site Surveyor $52.19 7A 3C 8P :King Telecommunication Journey Level $22.76 1 r Technicians `King Telephone Line Construction - Cable Splicer $35 09 5A 2B Outside =King Telephone Line Construction - Hole Digger/Ground Person $19.22 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $33.63 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $35.09 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $34.37 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $35.09 5A 2B Outside (Heavy) cKing Telephone Line Construction - Telephone Equipment Operator $32.62 5A 2B Outside (Light) King Telephone Line Construction - Telephone Lineperson $32.62 5A 2B Outside King Telephone Line Construction - Television Groundperson $18.65 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B Outside %King Telephone Line Construction - Television System Technician $29.42 5A 2B Outside F )King Telephone Line Construction - Television Technician $26.43 5A 2B Outside King Telephone Line Construction - Tree Trimmer $32.95 5A 2B Outside King Terrazzo Workers Journey Level $45.43 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble Et Terrazzo Finisher $37.76 5A 1 B Finishers King Traffic Control Stripers Journey Level $41.53 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $47.91 5D 3A 8L WA-Joint Council 28) <King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck a Trailer $47.91 5D 3A 8L https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 4/8/2013 Page 18 of 18 King Truck Drivers Dump Truck (W. WA-Joint $47.07 5D 3A 8L s Council 28) King Truck Drivers Other Trucks (W. WA-Joint $47.91 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers Et Irrigation Pump Oiler $12.97 1 Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 Installers y y https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/8/2013 Benefit Code Key-Effective 3-3-2013 thru 8-30-2013 *******************rt***********rt**rt******rt*rtrt********rtrtrtrt*rtrt*rt*rtrt***rt**rtrt*rtrtrtrt************rt*rtrt************** Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker 1 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hour ly rate of wage D The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All othei overtime hours worked,except Laboi Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage G. The first ten(10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten(10) houis per day Monday through Saturday and all houis worked on Sundays and holidays shall be paid at double the hourly rate of wage H All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Satuiday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All houis worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage K All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage M All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 1 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 1 N All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays,holiday~and after twelve(12)hours,Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage P All hours worked on Satmdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage Q The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten(10) houis pci day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day) shall be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times the hourly Late of wage R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage S The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays and all other overtime hours woiked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at thiee times the hourly rate of wage U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on Labor Day shall be paid at thiee times the hourly rate of wage V All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall he paid at one and one-half times the hourly rate of wage All houis worked on holidays shall be paid at double the hourly late of wage X The first four (4) hours after eight (8) regulai hours Monday thiough Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All houis worked over twelve (12)hours Monday thiough Saturday, Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls on Saturday or Sunday,the day before Saturday,Friday, and the day after Sunday,Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage Y All hours worked outside the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day (10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage (except for employees who are absent from work without piior appioval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have woikcd 8 hours in a day (10 in a 4 x 10 )Norkweek)or 40 hours during that workweek)All hours worked Monday through Saturday over twelve(12)hours and all houis worked on Sundays and Labor Day shall be paid at double the hourly rate of wage Z All hours wolked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay 2 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at two times the hourly rate of wage. F The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage G. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay H. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage K. All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day, ten-hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule all hours worked after ten shall be paid at double the hourly rate of wage The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage All other hours worked on the fifth,sixth,and seventh days and on hohdays shall be paid at double the hourly rate of wage Y All hours worked on Saturdays(except for make-up days)shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty (40)hour s of straight time per week.Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours(12)in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay Any shift starting betwcen the hours of 6 00 pm and midnight shall receive an additional one dollar($1 00)per how for all hours worked that shift The employer shall have the sole discretion to assign overtime work to employees Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more 3 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 3 B The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid atone and one-half times the hourly rate of wage All hours worked over twelve(12)hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty(40)hours of straight time per week,Monday through Friday,or outside the normal shift,and all work on Saturdays shall be paid at one and one-half times the hourly Late of wage All work poifoimed after 6 00 pm Saturday to 5 00 am Monday and Holidays shall be paid at double the hourly rate of wage After an employee has worked eight(8)hours at an applicable overtime rate all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more D All hours worked between 6 00 pm Monday through 6 00 am Saturday,shall be paid at an overtime rate of 15% over the hourly rate of wage All other hours worked after 6 00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage All hours woiked on Sundays and holidays shall be paid at double the houily late of wage E All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate G Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established,or forty (40)hours of straight time per week,Monday through Friday,,and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours(12) in a single shill and all work performed aftei 8 00 am Sunday to 8 00 am Monday and Holidays shall be paid at double the straight time rate of pay After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate unlit such time as the employee has had a break of eight(8) hours or more. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A. All houis worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage Holiday Codes 5 A. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7) B Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Chi istmas Day(8) C. Holidays: New Year's Day, Presidents Day, Memorial Day. Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8) D Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day (8) H Holidays New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6) 4 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 5. I. Holidays.New Year's Day,Memorial Day, Independence Day, Labor Day,Thanksgiving Day,and Christmas Day (6) J. Holidays New Year's Day, Memorial Day, Independence Day,Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7) K. Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9) L Holidays New Year's Day Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day (8) N Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After'I hanksgiving Day,And Chi istmas Day(9) P. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9) If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday Q Paid Holidays-New Year's Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day, and Christmas Day(6) R. Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day (7 1,12) S. Paid Holidays- New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day. Thanksgiving Day,And Christmas Day(7) T Paid Holidays. New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9) Z. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiv ing Day,And Christmas Day(8) Holiday Codes Continued 6 A Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day (8) E. Paid Holidays New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day,Labor Day, Thanksgiving Day,Day After Thanksgiving Day, Christmas Day,And A Half-Day On Christmas Eve Day (9 1/2) G. Paid Holidays New Year's Day,Martin Luther King Jr Day,Presidents'Day,Memorial Day,Independence Day. Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day Christmas Day,And Christmas Eve Day(11) H Paid Holidays- New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday(10). I Paid Holidays-New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). 5 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 6. T. Paid Holidays- New Year's Day Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day(9) Z. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday if a holiday falls on Sunday, the following Monday shall be considered as the holiday Holiday Codes Continued 7 A Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday Aftet Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday C Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday D Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8) Unpaid Holidays Presidents Day Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any paid hohday which falls on a Saturday shall be observed as a holiday on the preceding Friday E Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday F Holidays, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day (8) Any holiday which falls on a Sunday shall be obseived as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the pi ecedmg Friday G Holidays New Year's Day,Memorial Day, Independence Day, Labor Day,Thanksgiving Day, and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday H Holidays New Year's Day, Martin Luther King Jr Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the tollowing Monday Any holiday which falls on a Saturday shall be obseived as a holiday on the preceding Friday. I Holidays New Year's Day,President's Day, Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Fi iday 6 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 7 J. Holidays:New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday K. Holidays- New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which laps on a Saturday shall be observed as a holiday on the preceding Friday L Holidays- New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day,the Last Work Day before Christmas Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday M Paid Holidays New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day Labor Day,Thanksgiving Day,the Fi iday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the pieceding Friday. N Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday O. Paid Holidays New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday Aftei Thanksgiving Day, Christmas Day, The Day After Or Before Christmas Day, And the Employees Birthday 11) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. P. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Q Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday if any of the listed holidays falls on a Saturday, the preceding Ft iday shall be a regulai work day R. Paid Holidays New Year's Day,the day after or before New Year's Day,President's Day,Memorial Day, Independence Day,Labor Day Thanksgiving Day the Friday after Thanksgiving Day,Christmas Day.and the day after or before Christmas Day(10) If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday if any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly S Paid Holidays New Year's Day,Memorial Day Independence Day,Laboi Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(9) if any of the listed holidays falls on a Sunday the day observed by the Nation shall be considered a holiday and compensated accordingly Note Codes 8. A In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50'To 100'-$2 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$3 00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4 00 per Foot for Each Foot Over 150 Feet Over 220'-$5 00 per Foot for Each Foot Over 220 Feet 7 Benefit Code Key—Effective 3-3-2013 thru 8-30-2013 C In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more Over 50'To 100'41 00 per Foot for Each Foot Over 50 Feet Ovei 100'To 150'41 50 per Foot for Each Foot Ovel 100 Feet Over 150'To 200'-$2 00 per Foot for Each Foot Ovel 150 Feet Over 200'-Divers May Name Their Own Pi ice D Workers working with supplied air on hazmat projects receive an additional $1 00 per hour L Workers on hazmat projects receive additional hourly premiums as follows-Level A.$0 75,Level B $0 50,And Level C $0 25 M Workers on hazmat projects receive additional hourly premiums as follows Levels A&B $1 00,Levels C&D $0 50 N Workers on hazmat projects receive additional hourly premiums as follows -Level A:$1 00,Level B $0 75,Level C $0 50,And Level D $0 25 P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit. $2 00,Class B Suit- $1 50,Class C Suit $1 00,And Class D Suit$0 50 Q The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in deteimming the scale paid R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle, and pedeshian traffic dining construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans of where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington Oregon,Montana or Idaho fhese classifications are only effective on or after August 31 2012 S Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicutai,bicycle,and pedestuan traffic during construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggers and spotter s shall possess a current flagging card issued by the State of Washington Oregon,Montana.or Idaho This classification is only effective on or after August 31,2012 8